You can copy from here when filling out the rest of the page.
Omaha District is evaluating a permit application from the Souris River Joint Board to construct a part of the Mouse River Enhanced Flood Risk Reduction Project (MREFPP) in Minot, North Dakota. The application includes all phases included in Construction Stage 1.5, as identified in the Corps Final Programmatic Environmental Impact Statement published in July 2017. Construction Stage 1.5 consists of a series of levees, structural road closures, riprap, raising bridges, floodwalls, tie-back levees and a high water bypass channel. Construction Stage 1.5 extends along the Mouse River from upstream of the ND Highway 83 Bypass to downstream of 3rd Street NE in Minot, North Dakota. The project site is located on and near the River in Sections 13, 18, 21, 22, 23 and 24, Township 155 North, Range 83 West, Latitude 48.228060 degrees North, Longitude -101.315584 degrees West, Ward County, North Dakota.
Omaha District is evaluating a permit application from the Souris River Joint Board to construct a part of the Mouse River Enhanced Flood Risk Reduction Project (MREFPP) in Minot, North Dakota. The application includes all phases included in Construction Stage 1.5, as identified in the Corps Final Programmatic Environmental Impact Statement published in July 2017. Construction Stage 1.5 consists of a series of levees, structural road closures, riprap, raising bridges, floodwalls, tie-back levees and a high water bypass channel. Construction Stage 1.5 extends along the Mouse River from upstream of the ND Highway 83 Bypass to downstream of 3rd Street NE in Minot, North Dakota. The project site is located on and near the River in Sections 13, 18, 21, 22, 23 and 24, Township 155 North, Range 83 West, Latitude 48.228060 degrees North, Longitude -101.315584 degrees West, Ward County, North Dakota.
Final Programmatic Environmental Impact Statement
Mouse River Enhanced Flood Protection Project
Ward County, North Dakota
July 2017
US Army Corps
of Engineers ®
Prepared by:
U.S. Army Corps of Engineers
St. Paul District
180 Fifth Street East, Suite 700
St. Paul, MN 55101-1678
Cover Sheet
Final Programmatic Environmental Impact Statement
Mouse River Enhanced Flood Protection Plan
LEAD AGENCY: U.S. Army Corps of Engineers, Mississippi Valley Division, St. Paul
District (CEMVP)
ABSTRACT: This programmatic Environmental Impact Statement (EIS) documents the analysis of
requested actions to alter existing U.S. Army Corps of Engineers flood risk reduction projects in Ward
County, North Dakota. The EIS identifies effects associated with the initial phases of a project aimed to
reduce flood risk up to the 2011 flood-of-record for the Souris (Mouse) River Basin from Burlington
through Minot, North Dakota. The EIS also generally evaluates the effects that are anticipated for
remaining features following initial project implementation.
i
Executive Summary
Proposed Project
There has been a history of flooding along the Souris River (also referred to as the Mouse River) in northcentral North Dakota. In 2011 the flood of record occurred in the Souris River Basin, causing hundreds-ofmillions of dollars in damages to homes, businesses, public facilities, and infrastructure along the entire
length of the Souris River.
The Souris River Joint Water Resource Board (SRJB; the "requester") is pursuing a plan to reduce future
flood risks throughout the U.S. portions of the Souris River Basin by constructing a series of new levees,
floodwalls, and other flood risk reduction features. This plan has become known locally as the Mouse
River Enhanced Flood Protection Project (Project). The Project would be constructed and permitted in a
number of stages over a period of more than 25 years, depending on available funding. Each permitted
stage would be able to provide interim flood risk reduction for flows of at least 10,000 cubic feet per
second (cfs). Ultimately, at completion of construction, the Project would provide flood risk reduction to
27,400 cfs (flows equivalent to those experienced during the 2011 flood).
USACE Involvement
The construction of the Project would require alterations to a number of U.S. Army Corps of Engineers
(USACE) flood risk reduction projects, collectively referred to as the Souris River Basin Project. Alterations
to these projects require permission from USACE by way of Section 14 of the Rivers and Harbors Act of
1899 (33 United States Code (USC) 408, hereinafter referred to as Section 408). Permission to alter
projects is subject to USACE review of detailed designs and may be granted to the requester if the
proposed alteration does not impair the usefulness of the USACE project, which includes retaining the
project's authorized purpose, and is not injurious to the public interest. Detailed design has been
completed for three segments: Fourth Avenue NE (Phase 1), Napa Valley (Phase 2), and Forest Road
(Phase 3). Together, these three phases are Construction Stage 1 of the Project. Permission to make
alterations to the Souris River Basin Project is being sought from the USACE for actions associated with
the construction of Stage 1.
In addition, the Project would require fill to be placed in aquatic areas that are Waters of the United
States, which requires a Section 404 permit from the USACE as regulated by Section 404 of the Clean
Water Act (33 Code of Federal Regulations (CFR) 323). A Section 404 permit would only be issued for a
combination of features which can provide independent utility (i.e., can be constructed and can function
independently without substantial emergency actions). Construction of the next three phases (the Maple
Avenue High-Flow Diversion, Tierrecita Vallejo, and the tieback levee) would be capable of providing
independent utility for flood risk reduction to flows of 10,000 cfs (the 100-year flood event). These three
phases, along with Stage 1, make up Construction Stage 1.5. A Section 404 permit for placing fill in Waters
of the United States is being pursued for Construction Stage 1.5.
ii
Flood risk reduction features, alignments, and phasing of the Project after Stage 1.5 are more conceptual
in nature, but are also described in this document. These plans are preliminary, and may change based on
future evaluations, funding, and prioritization of critical needs for flood risk reduction.
NEPA Compliance
This document is an environmental compliance document, required by the National Environmental Policy
Act (NEPA) for Federal actions, such as USACE Section 408 permissions and Section 404 permitting. The
document evaluates the potential impacts of alternative actions that meet the requester's purpose and
need and also ensures that this information is available to public officials and citizens prior to making
decisions and taking action. General impacts associated with construction and operation of the Project
from Burlington through Minot as well as site-specific impacts associated with features purposed for
construction through Stage 1.5 are described in this document.
The proposed actions have the potential to result in significant effects to the human environment,
resulting in the preparation of an Environmental Impact Statement (EIS). Due to the size and complexity of
the project, the EIS was prepared as a programmatic document, meaning its scope is large enough to
account for phases being proposed for construction in the near-term as well as the more distant future.
This approach allows for a more holistic evaluation of impacts and may reduce the number and breadth of
subsequent NEPA documents needed to address impacts in the future. Site-specific and resource-specific
issues for subsequent phases of the Project will be reviewed and evaluated as detailed plans and official
proposals are submitted for approval. If impacts associated with the subsequent phases have changed
appreciably from what is described in this programmatic EIS, additional NEPA documents may be
required. It is anticipated that NEPA documentation for future design phases will consist of tiered NEPA
documents that address specific impacts unique to each phase.
Federal Coordination
In compliance with the Fish and Wildlife Coordination Act (16 USC 661-667e), continued correspondence
has occurred with the U.S. Fish and Wildlife Service (USFWS) and other federal and state agencies with
natural resource interests to evaluate impacts to fish and wildlife.
The Dakota skipper and the northern long-eared bat are two federally-listed (threatened) species with
potential habitat in the project area. Informal Section 7 consultation was initiated with the USFWS to
discuss potential impacts to the species, in accordance with the Endangered Species Act of 1973. After
slight modification to the Project plans, a "no effect" determination for federal-listed species was made;
therefore, no further consultation was required.
Section 106 of the National Historic Preservation Act, requires federal agencies to take into account the
effects of their undertakings on historic properties. Because of the size of this project, a Programmatic
Agreement (PA) (per 36 CFR 800.14(b)) was executed between the USACE, the North Dakota State Historic
Preservation Office (ND SHPO), and the SRJB to cover effects that cannot be fully determined in advance
iii
of the EIS. All effects will be considered and the process outlined in the PA will be completed prior to
issuance of a Section 404 permit for any Stage.
The Federal Emergency Management Agency (FEMA) is responsible for reviewing potential impacts in the
regulatory floodplain. The proposed Project is intended to remove areas from the regulatory floodplain
and thereby eliminate flood insurance requirements for properties in those areas. Preliminary results of
studies currently underway suggest that the 100-year floodplain may be updated from the current
effective flow rate of 5,000 cfs to 10,000 cfs. If accepted by FEMA, this modification would considerably
expand the existing 100-year floodplain. FEMA must comment on projects that create changes to the
regulatory floodplain by issuing a Conditional Letter of Map Revision (CLOMR). After the completion of
construction, a Letter of Map Revision (LOMR) would be issued to officially revise the Flood Insurance
Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM), and sometimes the Flood Insurance
Study (FIS) report.
These and other required federal, state, and local permits and approvals are discussed in detail in
Section 1.5.
Requester's Preferred Alternative and Other Alternatives
Several alternatives were considered by the requester when developing plans for the Project, including
upstream flood storage, major upstream diversion channels, local site diversion channels, high-flow
bypasses, channel modifications, floodproofing, relocations/buyouts, and additional floodplain
regulations.
The plan being proposed by the requester includes approximately 18.1 miles of new levees, 2.6 miles of
new floodwalls, 2 channel realignments totaling 1.6 miles, 2 high-flow bypass diversions, 20 transportation
closure structures, the reconstruction or modification of 6 bridges, 111.6 acres of overbank excavation,
and the acquisition of over 900 properties. This plan is referred to as the "Requester's Preferred
Alternative" in this EIS.
Alternatives other than the Requester's Preferred Alternative were eliminated for one or more of the
following reasons: ineffectiveness at flows up to 27,400 cfs, political infeasibility, engineering infeasibility,
significant social or environmental impacts, and cost. The Requester's Preferred Alternative was selected
after several years of studies and consultations with stakeholders.
For purposes of USACE's Section 404 permit and Section 408 permission decisions, the Requester's
Preferred Alternative was evaluated with respect to the No-Action Alternative. The No-Action Alternative
includes the existing federal levee system with additional flood fighting to flows of 10,000 cfs. Flood
fighting to this level has been successful in the past and is the most likely scenario to take place under the
current management of the system. However, flood fighting can be an intensive endeavor, carries a high
level of risk and uncertainty, and is not a favorable course of action for the community.
iv
In the occurrence of an unexpected, extreme weather event causing flood waters to rise rapidly, it is
possible that there would not be enough time for emergency flood fighting. Flood waters would
circumvent many of the discontinuous levees throughout the project area with flows in excess of 5,000 cfs.
The effects of flooding under this no-action scenario (No-Action Alternative 2) and the interim effects of
flooding during the construction of various stages of the Requesters Preferred Alternative were also
evaluated. The probability of this scenario is low and the impacts of this analysis are confined to
Appendix B1.
Summary of Effects
Geology, Soils, and Groundwater
The Requester's Preferred Alternative would not affect geologic or groundwater resources. Construction
could temporarily affect soils in the impact area, including approximately 291 acres of prime farmland, by
increasing the potential for erosion, compaction, loss of productivity, and contamination from leaking
equipment. Best management practices would be used to mitigate these effects and reduce the likelihood
of impacts to be minor and temporary in nature.
The No-Action Alternative would not directly affect geologic, soil, or groundwater resources.
Surface Waters
The Requester's Preferred Alternative would temporarily affect the Souris River through localized physical
disturbances attributed to construction activities such as vegetation clearing, grading, excavation, and soil
stockpiling. These impacts would be minimized by using appropriate erosion control measures. Project
features including 111.6 acres of overbank excavation and approximately 6,200 linear feet of riprap
placement which would require that work be done below the Souris River's ordinary high water mark,
resulting in permanent impacts to the river. Other permanent effects include the realignment of the river
channel in select areas, which would alter the course of the river or create cutoff channels.
The Requester's Preferred Alternative is expected to temporarily affect approximately 36 acres of wetlands
by causing sedimentation and ground disturbances, and to permanently affect approximately 21 acres of
wetlands where project features are constructed directly in wetland areas. Unavoidable wetland impacts
1
Appendix B was developed for the Requester's Preferred Alternative as presented in the original draft of
the EIS. After the release of the DEIS, the requester proposed design changes to their preferred alternative
which resulted in the release of an Addendum to the DEIS. For this Final EIS the Requester's Preferred
Alternative was updated to reflect the requester's new design, as described in the Addendum. The analysis
of impacts in Appendix B was written for the DEIS, using the original design. However, it was determined
that the difference in impacts between the original design and the new design would not be appreciably
different. As such, Appendix B remains unchanged from the DEIS and was not updated with the new
design.
v
would seek permitting and be mitigated as appropriate. In addition, the proposed setback levees and
overbank excavation would result in a larger floodplain with increase connectivity to floodwaters. Some of
these areas may eventually develop wetland characteristics.
The No-Action Alternative would not directly affect surface waters. The Souris River Channel would remain
unchanged, occasionally overtopping the existing levee system.
The No-Action Alternative could temporarily affect wetlands if flood fighting measures include placement
of fill in wetland areas. Any fill associated with flood fighting measures would be removed after the high
water receded.
Biological Resources
There are six federally endangered, threatened, or candidate species known to occur in Ward County. Of
these, there may be potential habitat in the project area for two threatened species; the Dakota skipper
and northern long-eared bat. There is no designated critical habitat present within the project area for
either federally-listed species. Trees within the project area may provide habitat for northern long-eared
bat; however, avoidance measures during construction would prevent any adverse effects to this species.
Dakota skipper habitat was identified in a potential borrow area during investigations; a new borrow area
has been located and will be used to avoid any impacts to the species.
The Requester's Preferred Alternative would both temporarily and permanently affect vegetation
communities in the project area by removing existing vegetation, including up to 61 acres of land with
forests or moderate tree cover. Indirect impacts from changes to vegetation would include the alteration
of hydrology, changes to nutrient and sediment deposition within existing vegetation communities, and
changes in the spread and abundance of non-native plant species. The type and magnitude of indirect
impacts on vegetation communities would vary widely with location, and may result in both positive and
negative changes depending on the current composition of the vegetation community and its existing
ecological function. Overall, however, the construction activities would likely result in a negative impact
due to an increase in non-native plants and/or noxious weeds.
Features of the Requester's Preferred Alternative constructed within the Souris River channel, floodplain,
or floodway could alter existing aquatic habitats of fish and other organisms through placement of riprap.
These changes would not preclude fish and other aquatic organisms from using the river, but may
adversely change the habitat for some species.
Small amounts of general wildlife habitat along the Souris River could be lost, but would not include any
unique or specialized wildlife habitats. Some benefits would be realized to wildlife resources from the
green spaces that would be created between levee setbacks in areas formerly occupied by homes,
creating enhanced opportunities for wildlife movement along the corridor. The Requester's Preferred
Alternative would not be expected to affect any state-listed species, state Species of Conservation Priority,
or federal Birds of Conservation Concern.
vi
Under the No-Action Alternative, biological resources would continue to function as they do currently and
have little to no effect on fish and wildlife. Fish and wildlife would be periodically displaced during flood
events while plant communities would change to various extents following prolonged inundation.
Land Use
The Requester's Preferred Alternative, by converting land for flood risk reduction, could have temporary
negative effects and permanent benefits to existing agricultural, commercial, industrial, residential, and
recreational land use. The Requester's Preferred Alternative would also create substantial permanent
benefits by allowing for the sustained use of land in the project area, and by creating a greenway along
the river with ecological benefits and recreational opportunities.
The No-Action Alternative would not change zoning, land use, and development within the project area.
The reoccurrence of high intensity flooding would make current land use in various locations of the
project area unsustainable. Residents and businesses would eventually move out of flood prone areas and
agricultural lands would experience adverse effects to productivity.
Infrastructure
The Requester's Preferred Alternative would significantly improve the flood risk-reduction infrastructure in
the project area and would permanently and significantly benefit the roadway network, allowing
transportation of essential goods, services, and facilitating emergency response during flood events.
Temporary transportation disruptions would occur during construction, but could be mitigated with
proper signage, detours, and rerouting. The Requester's Preferred Alternative would also substantially
benefit both public and private utilities by providing greater flood resilience, upgraded stormwater
management, and improved infrastructure.
Under the No-Action Alternative, infrastructure in areas that have experienced flooding in the past would
continue to be at risk. A flood event over 10,000 cfs would substantially and adversely affect infrastructure
in the project area. Long-term disruptions and destruction of infrastructure from higher-intensity floods
would result in adverse effects that could be felt regionally.
Contaminated Sites
A limited Phase II investigation in the Fourth Avenue NE segment revealed diesel range organic
concentrations that exceeded state guidelines. The Requester's Preferred Alternative would require that
groundwater pumped out for temporary dewatering during construction be discharged to the Souris
River; however, based on surface water quality standards, the discharged water would not affect the river's
water quality. The results were discussed with staff at the North Dakota Department of Health Surface
Water Division, who did not have any concerns with the discharge of this water to the Souris River. No
additional hazardous waste issues were identified for Phases 1, 2, or 3 of the Requester's Preferred
Alternative. A general HTRW assessment was conducted based on a desktop study and review of available
environmental regulatory reports for subsequent phases of the Project. Several potential HTRW sites that
could contain hazardous materials and petroleum products or have environmental concerns were
vii
identified. Potential impacts associated with these existing sites include construction impacts resulting
from disturbance of contaminated soil or groundwater, impacts associated with demolition of buildings
containing hazardous building materials, and excavation of debris in fill soil. Further investigation would
be required during detailed design to avoid these areas or dispose of the hazardous materials properly.
The No-Action Alternative would not directly affect potentially contaminated sites. Some sites would be
temporarily affected during flooding. The inundation of storage tanks and septic systems could potentially
cause them to overflow, which could contaminate soil, groundwater, and surface waters. Flooding of
contaminated sites is not expected to result in permanent adverse effects to any resources in the project
area.
Socioeconomics
The acquisition of more than 900 properties would be required to construct all phases of the Project.
However, the Requester's Preferred Alternative would ultimately decrease the flood risk for nearly 4,700
parcels currently located within the flood inundation area, and would reduce the potential need to
relocate businesses and homes. It would directly, permanently, and substantially increase the value of
properties in the newly protected areas. This would stimulate local business activity and would support
long-term business expansion. The Requester's Preferred Alternative would also support recovery
strategies for rebuilding flood-affected areas and would ultimately benefit community cohesion within the
project area. Construction of the Requester's Preferred Alternative would create jobs for each phase of
construction, which would in turn create additional indirect and induced jobs.
The No-Action Alternative would not be expected to generate additional jobs or business activities in
areas affected by the 2011 flood. Continued flooding could cause damage to properties, lead to loss of
communities, and cause permanent relocation of residents and businesses.
Demographic analysis indicates that the communities impacted by the project are not composed of
disproportionately minority or low-income communities, so no environmental justice impacts are
expected. While there are some pockets of low-income areas, these areas would not be affected
disproportionate to other demographic classes.
Recreation
The Requester's Preferred Alternative would permanently enhance existing recreational features, create
new recreational opportunities, and significantly contribute to the development of a planned greenway
corridor. Constructing and maintaining the Requester's Preferred Alternative would temporarily disrupt
access to some recreational resources, but these negative effects could be mitigated through
coordination with the community.
The No-Action Alternative would not directly result in adverse effects to recreational facilities. Recreational
use of levees, the river corridor, parks, fishing locations, and other recreational features would continue as
established, with usage periodically disrupted by flooding.
viii
Aesthetics and Visual Resources
The Requester's Preferred Alternative would enhance the aesthetic value in some areas while decreasing it
in others. Developing a greenway that would connect with parks, picnic sites, and fishing sites would
permanently improve visual aesthetics by enhancing the viewing experience of adjoining neighborhoods,
hikers, and general recreational users. Constructing the Requester's Preferred Alternative would
permanently decrease the aesthetic value for a limited number of properties that currently have pleasing
views of the river or greenspaces that would be replaced with flood risk reduction features such as a levee
or floodwall.
The No-Action Alternative would not directly affect aesthetics and visual resources. During flood events,
temporary adverse visual and aesthetic effects would occur, as they do now, with standing water, debris,
and sedimentation deposits.
Historic and Cultural Resources
A Class I Cultural Resources Survey was conducted to identify all known archaeological sites and historical
structures that could be affected by the Requester's Preferred Alternative. In addition, Class III
Archaeological Surveys were conducted to provide further detail on Stage 1 of the Requester's Preferred
Alternative. Detailed investigations could not be completed for the entire project in advance of the EIS
and a PA was executed between the USACE and the North Dakota State Historic Preservation Office (ND
SHPO) to cover potential impacts to cultural resources and historic structures that have not yet been
identified.
Stage 1 of the Requester's Preferred Alternative would have a direct effect on two historic structures
recommended eligible for the National Register of Historic Places (NRHP); Home Sweet Home (32WD507)
and the Minot Mill (32WD652). Stage 1.5 would require the replacement of the Soo Line-Canadian Pacific
railroad bridge. The Soo Line-Canadian Pacific Railroad is potentially eligible for inclusion in the NRHP and
proposed bridge replacement would need to follow the stipulations outlined within the Programmatic
Agreement. The stipulations outlined would have to be completed prior to issuance of a Section 404
permit for Stage 1.5.
The No-Action Alternative would not have a direct affect to historic and cultural resources. Six historic
structures and two archaeological sites are located within one mile of the Requester's Preferred
Alternative and would remain vulnerable to flooding with no action.
Air Quality and Noise
The Requester's Preferred Alternative could temporarily affect air quality and noise in the project area by
temporarily increasing daytime noise levels or air emissions from construction equipment and vehicles.
Overall, the Requester's Preferred Alternative would have only minor adverse effects on air quality and
noise in the project area.
ix
The No-Action Alternative would not directly affect air quality or noise levels. Flooding could result in
temporarily elevated noise levels and air emissions in localized areas where flood fighting and cleanup
efforts occur.
Human Health and Safety
The Requester's Preferred Alternative would benefit human health in the long term. Many health hazards
occur after floods and during clean-up activities, including compromising the structural integrity of roads,
bridges, houses, and other structures in the damaged areas; dispersing sewage and pathogens into
residential areas; and creating unhealthy conditions (like mold) in inundated structures. Reducing flood
risk to the communities along the Souris River would reduce the potential for loss of life or injuries during
flood events and would minimize the many health hazards that result from the flooding of developed
areas.
With the No-Action Alternative the health and safety hazards associated with flood events would continue
to occur during large flood events.
Cumulative Impacts
Impacts of the Requester's Preferred Alternative would contribute incrementally to the cumulative effects
on various resources when added to the impacts of other past, present, and reasonably foreseeable future
actions.
The primary cumulative effects resulting from the Requester's Preferred Alternative would include
residence displacement and traffic modifications. The Requester's Preferred Alternative and other future
flood risk reduction projects would add to the number of properties bought out or removed. Benefits
would be provided by long-term protection to properties within flood-prone areas. Cumulatively, the
Requester's Preferred Alternative and the other identified flood risk reduction projects provide the longterm beneficial effect of stabilizing property values and protecting against future flood damage.
The Requester's Preferred Alternative and others not related to flood control, such as infrastructure
projects, would contribute to cumulative effects on traffic in the vicinity of the project. The long-term
cumulative effect of these projects would, however, be beneficial, because these projects would improve
traffic flow along those specific routes once construction is completed.
The Requester's Preferred Alternative and a wide variety of projects, primarily related to development and
land conversion, contribute additional cumulative effects on the Souris River, wetlands, and other natural
resources. The contribution of the Requester's Preferred Alternative to cumulative effects on natural
resources includes stabilization and realignment of the Souris River and the permanent loss of up to 21
acres of wetland. Unavoidable impacts to these aquatic resource impacts would be mitigated as required.
The Requester's Preferred Alternative also contributes to cumulative effects to a lesser extent for air
quality, health and safety, recreation, cultural resources, and contaminated sites.
x
Interim Impacts
The construction sequencing for the Requester's Preferred Alternative was chosen to remove large
numbers of properties from the regulatory floodplain as soon as possible, while minimizing increases in
flood risk to other properties in the floodplain. Interim increases in flood risk and intensity could occur,
however, while the Requester's Preferred Alternative is partially constructed. Interim impacts for the
Requester's Preferred Alternative were evaluated at four interim stages of project construction. Interim
impacts were assessed using flows of 5,000 cfs, 10,000 cfs, and 27,400 cfs.
Interim impacts include increases in flood depth and changes in the locations of inundated properties.
Interim changes in flood depth tend to occur in areas that are adjacent to newly constructed project
segments as available storage in the floodplain is removed, floodwaters are pushed into other areas.
Inundation area reductions would generally occur where project features prevent inundation. Inundation
area increases would generally occur upstream of or adjacent to constrictions created by the Requester's
Preferred Alternative. The area of reduced inundation tends to be larger than that of increased inundation,
especially for larger floods.
The Requester's Preferred Alternative would have little impact on the 5,000 cfs flood profile as waters
would be contained within existing federal levees. Increases in inundation area and depth at 5,000 cfs
would generally be at overbank excavation areas that make the channel slightly wider.
For the 10,000 cfs flood event, there would be a net increase in the total area inundated in Minot, as
compared to the No-Action Alternative. This is because much of the Requester's Preferred Alternative
alignment is set further back from the banks of the river than the existing federal project. There is the
potential for inundation depths to increase by greater than 0.1 feet for up to 100 structures during
construction of the Requester's Preferred Alternative.
For the 27,400 cfs flood event, the total area flooded would tend to decrease with the implementation of
each construction stage. The largest reduction in inundation area would come after Construction Stage 2
when the area north of the river would have a complete levee system. The most significant interim
impacts would also come after Construction Stage 2, when higher flood elevations could be expected for
areas south of the river and east of downtown Minot. After the completion of Stage 2, roughly 600
structures would be expected to see an increase of greater than 0.5 feet. The majority of these increases in
flood depths would be eliminated after completion of Construction Stage 3. At the completion of all
construction stages, the Requester's Preferred Alternative would prevent approximately 5,000 structures
from being inundated at flows of 27,400 cfs.
Interim impacts to historic properties were also evaluated through Construction Stage 1.5. Flows of
10,000 cfs would increase flood depths by more than 0.5 feet after Construction Stage 1.5 for portions of
two historic districts; the northeast sector of the Minot Commercial Historic District and most of the
Eastwood Park Historic District. Flows of 27,400 cfs would also increase the depth of inundation by more
than 0.5 feet in the entire Minot Industrial Historic District and a small area in the northwest corner of the
Minot Commercial Historic District after Construction Stage 1.5.
xi
Findings and Conclusions
The Requester's Preferred Alternative would result in permanent adverse impacts to 21 acres of wetlands,
61 acres of forest or land with moderate tree cover, at least 2 historic structures, and 111.6 acres (along
approximately 6,200 linear feet) of impact to riparian areas below the OHWM through the placement of
riprap and overbank excavation. Temporary adverse impacts to wetlands (36 acres), soils, surface waters,
aesthetics, as well as air and noise would also be expected during construction of the Project.
The acquisition of more than 900 properties would be required to construct the Project. Some adverse
socioeconomic effects may result from property owners who do not wish to sell. However, there have
been relatively few reluctant sellers in the footprint of the Project. Ultimately, completion of the
Requester's Preferred Alternative would result in nearly 4,700 properties with decreased flood risk. Other
benefits of the Project include increases in recreational opportunities, floodplain connectivity, human
health and safety, the level of protection to infrastructure, and property values for those with increased
flood risk reduction provided by the Project.
Upon review of the design, the USACE, St. Paul District, may determine that alterations to the existing
USACE projects associated with the initial three phases (Construction Stage 1) of the Requester's Preferred
Alternative are not injurious to the public interest and will not impair the usefulness of the existing USACE
projects. Under these conditions, permission to perform alterations to the USACE projects may be granted
to the requester under Section 408. In addition, the USACE, Omaha District will review impacts of the
Requester's Preferred Alternative through Construction Stage 1.5 for permitting under Section 404. The
requested actions will be required to be the least environmentally damaging practicable alternative
(LEDPA) to meet the Project's purpose and need.
xii
Final Programmatic Environmental Impact Statement
Mouse River Enhanced Flood Protection Project
July 2017
Contents
Executive Summary .............................................................................................................................................................................. ii
Proposed Project ............................................................................................................................................................................. ii
USACE Involvement ........................................................................................................................................................................ ii
NEPA Compliance .......................................................................................................................................................................... iii
Federal Coordination .................................................................................................................................................................... iii
Requester's Preferred Alternative and Other Alternatives ............................................................................................. iv
Summary of Effects ......................................................................................................................................................................... v
Findings and Conclusions .......................................................................................................................................................... xii
1.0
Introduction ........................................................................................................................................................................... 1
1.1
Purpose and Need for the Project ........................................................................................................................... 2
1.2
Project Location ............................................................................................................................................................... 3
1.3
History of Flooding ........................................................................................................................................................ 6
1.4
Existing Flood Control Projects ................................................................................................................................. 6
1.5
Permits, Approvals, and Regulatory Requirements ........................................................................................... 8
1.6
Agency and Public Scoping ......................................................................................................................................12
2.0
Alternatives...........................................................................................................................................................................13
2.1
Requester's Preferred Alternative ...........................................................................................................................13
2.2
Other Alternatives Considered ................................................................................................................................48
3.0
Affected Environment ......................................................................................................................................................85
3.1
Geology, Soils, and Groundwater ...........................................................................................................................85
3.2
Surface Waters ...............................................................................................................................................................90
3.3
Biological Resources ................................................................................................................................................. 101
3.4
Land Use and Infrastructure .................................................................................................................................. 108
3.5
Potential Contaminated Sites ............................................................................................................................... 125
3.6
Socioeconomics.......................................................................................................................................................... 138
3.7
Recreation ..................................................................................................................................................................... 159
3.8
Aesthetics and Visual Resources.......................................................................................................................... 164
3.9
Historic and Cultural Resources ........................................................................................................................... 165
3.10
Air and Noise Quality ............................................................................................................................................... 175
xiii
4.0
Environmental Consequences ................................................................................................................................... 178
4.1
Geology, Soils, and Groundwater ........................................................................................................................ 178
4.2
Surface Waters ............................................................................................................................................................ 181
4.3
Biological Resources ................................................................................................................................................. 196
4.4
Land Use and Infrastructure .................................................................................................................................. 201
4.5
Contaminated Sites ................................................................................................................................................... 216
4.6
Socioeconomics.......................................................................................................................................................... 220
4.7
Recreation ..................................................................................................................................................................... 230
4.8
Aesthetics and Visual Resources.......................................................................................................................... 234
4.9
Historic and Cultural Resources ........................................................................................................................... 239
4.10
Air Quality and Noise ............................................................................................................................................... 243
4.11
Human Health and Safety ...................................................................................................................................... 249
4.12
Cumulative Effects ..................................................................................................................................................... 250
4.13
Interim Impacts ........................................................................................................................................................... 257
5.0
Agency and Public Involvement ............................................................................................................................... 276
5.1
Agency Coordination ............................................................................................................................................... 276
5.2
Public Involvement .................................................................................................................................................... 278
5.3
Document Review and Comment ....................................................................................................................... 280
6.0
Major Findings and Conclusions .............................................................................................................................. 282
6.1
Requester's Preferred Alternative and Other Alternatives ........................................................................ 282
6.2
Geology, Soils, and Groundwater ........................................................................................................................ 282
6.3
Surface Waters ............................................................................................................................................................ 282
6.4
Biological Resources ................................................................................................................................................. 283
6.5
Land Use and Infrastructure .................................................................................................................................. 284
6.6
Contaminated Sites ................................................................................................................................................... 284
6.7
Socioeconomics.......................................................................................................................................................... 285
6.8
Recreation ..................................................................................................................................................................... 286
6.9
Aesthetics and Visual Resources.......................................................................................................................... 286
6.10
Historic and Cultural Resources ........................................................................................................................... 286
6.11
Air Quality and Noise ............................................................................................................................................... 287
6.12
Human Health and Safety ...................................................................................................................................... 287
6.13
Cumulative Impacts .................................................................................................................................................. 287
6.14
Interim Impacts ........................................................................................................................................................... 288
6.15
Environmental Laws and Regulations ................................................................................................................ 289
xiv
7.0
List of Reviewers and Preparers ................................................................................................................................ 294
8.0
References ......................................................................................................................................................................... 297
xv
List of Tables
Table 1-1
Floods Greater than 5,000 cubic feet per second (cfs), Souris River upstream of Minot ....... 6
Table 1-2
Local, State, and Federal Permits, Approvals and Reviews Needed for the Project .............. 10
Table 2-1
Bridges to be Reconstructed or Modified .............................................................................................. 14
Table 2-2
Alternatives Evaluated for Operational Modifications of Existing Dams ................................... 51
Table 2-3
Alternatives Evaluated for Structural Modifications of Existing Dams ........................................ 53
Table 2-4
Alternatives Evaluated for Construction of New Storage ................................................................ 55
Table 2-5
Major Upstream Diversion Alternatives .................................................................................................. 57
Table 2-6
Local Site Diversion Alternatives ................................................................................................................ 60
Table 2-7
Ramstad Lincoln Neighborhood Alternatives ....................................................................................... 64
Table 2-8
Twenty-Seventh Street High-Flow Diversion Alternatives ............................................................... 67
Table 2-9
Kings Court Channel Realignment Alternatives ................................................................................... 71
Table 2-10
Burdick Channel Realignment Alternatives............................................................................................ 75
Table 3-1
Soil Units in the Impact Area ....................................................................................................................... 87
Table 3-2
Overview of Souris River Dams in North Dakota................................................................................. 92
Table 3-3
Existing Wetlands in Construction Stage 1.5 ........................................................................................ 98
Table 3-4
Fish Species Known to Occur in the Burlington-Sawyer Reach from 1960 to 2009 ............ 103
Table 3-5
Major Roadways in the Project Area ...................................................................................................... 114
Table 3-6
Roadway Bridges in the Project Area ..................................................................................................... 117
Table 3-7
Non-Municipal Utility Providers ............................................................................................................... 120
Table 3-8
Population ......................................................................................................................................................... 138
Table 3-9
Age and Gender Distribution, 2013 ........................................................................................................ 139
Table 3-10
Employment by Industry, 2013 ................................................................................................................. 141
Table 3-11
Housing Characteristics, 2013 ................................................................................................................... 142
Table 3-12
Minority Population Composition Comparison with the Region of Interest (ROI) .............. 148
Table 3-13
Minority Population Composition Comparison with Census Block Groups in the ROI ..... 149
Table 3-14
Racial Composition of the Population in Minot: Change from 2000 to 2010........................ 151
Table 3-15
Poverty and Income Characteristics (2009-2013).............................................................................. 152
Table 3-16
Poverty Threshold and Median Household Income Comparison............................................... 154
Table 3-17
Topics to Address Long-Term Recovery in Project Area ................................................................ 156
Table 3-18
Minot Parks and Open Space in the Project Area ............................................................................. 161
Table 3-19
Recreational Facilities Funded by the Federal Land and Water Conservation Fund
in the Vicinity of the Project ...................................................................................................................... 163
Table 3-20
Class I Cultural Resource Survey Prehistoric Archaeological Sites .......................................... 167
Table 3-21
Class I Cultural Resource Survey Historic Archaeological Sites ................................................ 167
Table 3-22
Class I Cultural Resource Survey Standing Structures/Historic Architectural Sites
within Class I Study Area ............................................................................................................................. 168
Table 3-23
Class III Standing Structures Survey Historic Structures within Phases 1-3 APE ............... 172
Table 3-24
Limiting Noise Levels for Zoning Districts............................................................................................ 177
Table 4-1
Inundation of Prime Farmland under the No-Action and Preferred Alternatives ................ 180
xvi
Table 4-2
Summary of Construction Stage 1.5 Wetland and OHWM Impacts.......................................... 186
Table 4-3
Accessible/Non-Accessible Primary Routes at 10,000 and 27,400 CFS .................................... 216
Table 4-4
Potentially Contaminated Sites That Could Be Flooded ................................................................. 219
Table 4-5
Protected and Inundated Parcels in 27,400 cfs Flood Event ......................................................... 222
Table 4-6
Property Buyouts for Phases 1, 2, and 3 ............................................................................................... 226
Table 4-7
Property Buyouts for Other Phases of Construction Stage 1.5 .................................................... 227
Table 4-8
Number of Inundated Parcels: No-Action Alternative .................................................................... 229
Table 4-9
Inundation of Recreational Facilities ...................................................................................................... 234
Table 4-10
Typical Noise Levels of Construction Equipment .............................................................................. 246
Table 4-11
Typical Noise Levels ...................................................................................................................................... 247
Table 4-12
Sensitive Receptors within about 1,000 feet of Phases 1, 2, and 3 ............................................ 248
Table 4-13
Construction Stage Definitions ................................................................................................................. 260
Table 4-14
No-Action Alternative: Interim Project Inundation Area and Depth Impacts Maps ........... 266
Table 4-15
No-Action Alternative: Summary of Inundation Changes for Structures ................................ 267
Table 4-16
Previously Listed, Recommended Eligible or Potentially Eligible Properties ......................... 273
Table 6-1
Status of compliance with federal environmental laws and regulations through
Construction Stage 1.5 ................................................................................................................................. 293
xvii
List of Figures
Figure 1-1
Project Location ................................................................................................................................................... 4
Figure 1-2
Mouse (Souris) River .......................................................................................................................................... 5
Figure 2-1
Project Phases of Construction Stage 1.5 ............................................................................................... 16
Figure 2-2
Conceptual Layout of Tierrecita Vallejo .................................................................................................. 19
Figure 2-3
Detailed Layout of Phases 2 and 3 ............................................................................................................ 22
Figure 2-4
Conceptual Layout of Maple Ave High-Flow Diversion .................................................................... 24
Figure 2-5
Detailed Layout of Phase 1........................................................................................................................... 27
Figure 2-6
Conceptual Layout of Tieback Levee ........................................................................................................ 28
Figure 2-7
Perkett Ditch Pump Station.......................................................................................................................... 33
Figure 2-8
Broadway Pump Station ................................................................................................................................ 34
Figure 2-9
Locations of Potential Borrow Areas ........................................................................................................ 37
Figure 2-10
Typical Levee Cross Section ......................................................................................................................... 39
Figure 2-11
Typical Floodwall Cross Section ................................................................................................................. 39
Figure 2-12
Typical High-Flow Diversion Cross Section ........................................................................................... 40
Figure 2-13
Typical Channel Realignment Cross Section ......................................................................................... 41
Figure 2-14
Typical Overbank Excavation Cross Section .......................................................................................... 41
Figure 2-15
Exploration Trench Type I and Type III .................................................................................................... 42
Figure 2-16
Typical Schematic of Seepage Collection System ............................................................................... 45
Figure 2-17
Upstream Flood Storage Alternatives ...................................................................................................... 50
Figure 2-18
Major Upstream Diversions.......................................................................................................................... 58
Figure 2-19
Local Site Diversions ....................................................................................................................................... 62
Figure 2-20
Ramstad Lincoln Neighborhood Alternatives ..................................................................................... 65
Figure 2-21
27th Street High-Flow Diversion Alternatives ........................................................................................ 68
Figure 2-22
Kings Court Channel Realignment Alternatives ................................................................................... 72
Figure 2-23
Burdick Channel Realignment Alternatives............................................................................................ 76
Figure 3-1
Schematic of Project Area for Environmental Analysis ..................................................................... 86
Figure 3-2
Wellhead Protection Areas ........................................................................................................................... 89
Figure 3-3
Overview of Souris River, Major Tributaries, and Dams .................................................................... 91
Figure 3-4
Souris River Impaired Waters ...................................................................................................................... 95
Figure 3-5
Delineated Wetlands .................................................................................................................................... 100
Figure 3-6
Zoning Jurisdiction ........................................................................................................................................ 110
Figure 3-7
Minot Growth Areas ...................................................................................................................................... 112
Figure 3-8
Aviation Facilities ............................................................................................................................................ 121
Figure 3-9
Minot Wastewater Treatment Plant ........................................................................................................ 123
Figure 3-10
HTRW Site Observation Summary: Phases 2 and 3 .......................................................................... 128
Figure 3-11
Historic Businesses: Phase 1 ...................................................................................................................... 131
Figure 3-12
Current Key Businesses: Phase 1 .............................................................................................................. 132
Figure 3-13
Known Environmental Sites: Phase 1 ..................................................................................................... 133
Figure 3-14
Phase II HTRW Assessment Area ............................................................................................................. 134
xviii
Figure 3-15
Known Environmental Sites in Construction Stage 1.5 Impact Area ......................................... 136
Figure 3-16
Known Environmental Sites within One Mile of Project ................................................................ 137
Figure 3-17
Environmental Justice Analysis Area....................................................................................................... 147
Figure 3-18
Low Income Populations in Project Area .............................................................................................. 153
Figure 3-19
Class III Archaeological and Standing Structures Surveys Phase 1 ............................................ 169
Figure 3-20
Class III Archaeological and Standing Structures Surveys Phases 2 and 3 ............................. 170
Figure 4-1
Phase 1 OHWM Impacts ............................................................................................................................. 188
Figure 4-2
Phases 2 and 3 OHWM Impacts ............................................................................................................... 189
Figure 4-3
Phases 2 and 3 Wetland Impacts ............................................................................................................. 190
Figure 4-4
Tierrecita Vallejo OHWM Impacts ........................................................................................................... 191
Figure 4-5
Tierrecita Vallejo Wetland Impacts ......................................................................................................... 192
Figure 4-6
Maple Avenue High-Flow Diversion OHWM Impacts ..................................................................... 193
Figure 4-7
Maple Avenue High-Flow Diversion Wetland Impacts ................................................................... 194
Figure 4-8
Phase 1 Roadway Modifications .............................................................................................................. 208
Figure 4-9
Phases 2 and 3 Roadway Modifications ................................................................................................ 210
Figure 4-10
Construction Stage 1 Project Segments ............................................................................................... 261
Figure 4-11
Construction Stage 1.5 Project Segments ............................................................................................ 262
Figure 4-12
Construction Stage 2 Project Segments ............................................................................................... 263
Figure 4-13
Construction Stage 3 Project Segments ............................................................................................... 264
Figure 4-14
Construction Stage 4 Project Segments ............................................................................................... 265
Figure 4-15
Net Inundation Area Changes Relative to No-Action Alternative .............................................. 269
Figure 4-16
Net Inundation Area Impacts .................................................................................................................... 270
Figure 4-17
Cultural Resources Interim Impacts Construction Stage 1.5 100-Year Flood Event ............ 274
Figure 4-18
Cultural Resources Interim Impacts Construction Stage 1.5 2011 Flood Event .................... 275
xix
List of Maps
Map 2-1
Proposed Project Features
Map 2-2
No-Action Alternative Inundation
Map 2-3
Existing Flood Risk-Reduction Features
Map 3-1
Soil Units
Map 3-2
Prime Farmland
Map 3-3
Floodplain and NWI Overview Map
Map 3-4
Land Cover
Map 3-5
Land Use Zones
Map 3-6
Transportation Overview
Map 3-7
Bridges in the Project Area
Map 3-8
Emergency Services Location
Map 3-9
Recreational Resources in Project Area
xx
List of Appendices
Appendix A
Scoping Document - Mouse River Enhanced Flood Protection Plan Environmental Impact
Statement
Appendix B
No-Action Alternative 2
Appendix C
Wetlands, Waters, and Biological Inventory Report
Appendix D
HTRW Assessment Report - Napa Valley and Forest Road Project Segments
Appendix E
HTRW Assessment Report Fourth Avenue
Appendix F
Hazardous, Toxic, and Radioactive Waste Field Investigation Phase 1- 4th Avenue
Floodwall, Minot North Dakota Memo
Appendix G
Class I Cultural Resources Survey, Mouse River Enhanced Flood Protection Project,
Burlington to Minot, Ward County, North Dakota
Appendix H
Class III Archaeological Survey, Mouse River Enhanced Flood Protection Project, Forest
Road Levee, 4th Avenue NE Floodwall, Napa Valley Levee, Minot Ward County, North
Dakota
Appendix I
Class III Standing Structures Survey, Mouse River Enhanced Flood Protection Project,
Forest Road Levee, 4th Avenue NE Floodwall, Napa Valley Levee, 2nd Avenue SW
Stormwater Pool, Minot, Ward County, North Dakota
Appendix J
Programmatic Agreement between the U.S. Army Corps of Engineers, St. Paul District, the
North Dakota State Historic Preservation Officer, and the Souris River Joint Water
Resource Board Regarding the Mouse River Enhanced Flood Protection Project, Renville,
Ward, McHenry, and Bottineau Counties, North Dakota
Appendix K
Interim Project Inundation Area and Depth Impacts Maps
Appendix L
Public and Agency Review - Comments and Responses
*Historic and Archaeological artifacts or sites and associated locational data are protected under North
Dakota Century Code 55-02-07. Access to, or release of, information from files that contain sensitive
information, such as information included in this report, may be provided upon request from the director of
the North Dakota state historical society.
xxi
Acronyms, Abbreviations and Units
ACM
asbestos-containing material
ADT
Average Daily Traffic
ANS
Aquatic Nuisance Species
APE
areas of potential effect
ARFF
Minot International Airport
BCC
Birds of Conservation Concern
BFE
Base Flood Elevations
BFEs
base flood elevations
Bgs
below ground surface
BMPs
best management practices
BNSF
Burlington Northern Santa Fe
CAA
Clean Air Act
CBDG-DR
Community Block Development Grant Disaster Recovery
CDBG-DR
Community Development Block Grant Disaster Recovery
CEMVP
U.S. Army Corps of Engineers, Mississippi Valley Division, St. Paul District
CEQ
Council on Environmental Quality
CEQ
Council on Environmental Quality
CERCLA
Comprehensive Environmental Response, Compensation, and Liability Act
CFR
Code of Federal Regulations
Cfs
cubic feet per second
CH4
methane
CLOMR
Conditional Letter of Map Revision
CO
carbon monoxide
CO2
carbon dioxide
CO2-e
CO2 equivalents
CWA
Clean Water Act
CWCS
Comprehensive Wildlife Conservation Strategy
dB
decibels
dBA
A-weighted decibel scale
DEIS
Draft Programmatic Environmental Impact Statement
DNPL
Delisted National Priorities List
DR
Departmental Regulation
DRO
diesel range organics
EIS
Environmental Impact Statement
EPA
Environmental Protection Agency
ESA
Endangered Species Act
FBFM
Flood Boundary and Floodway Map
FEMA
Federal Emergency Management Agency
FIRM
Flood Insurance Rate Map
xxii
FIRMs
Flood Insurance Rate Maps
FIS
Flood Insurance Study
FPPA
Farmland Protection Policy Act
GHGs
Greenhouse gases
Gpm
gallons per minute
GRO
gasoline range organics
Hazmat
Hazardous Materials
HIG
Historical Information Gatherers Inc.
Hp
horsepower
HTRW
Hazardous, Toxic, and Radioactive Waste
HUD
Department of Housing and Urban Development
IJC
International Joint Commission
IPaC
Information Planning and Conservation decision support system
ISRB
International Souris River Board
LEDPA
least environmentally damaging practicable alternative
LOI
Letters of Intent
LOMR
Letter of Map Revisions
LPP
Locally Preferred Plan
LTCR
Longterm Community Recovery
LUST
leaking storage tanks
LWCF
Land and Water Conservation Fund
MBTA
Migratory Bird Treaty Act
MDU
Montana-Dakota Utilities Company
MOA
Memorandum of Agreement
MOT
Minot International Airport
MREFPP
Mouse River Enhanced Flood Protection Project
N2O
nitrous oxide
NAAQS
National Ambient Air Quality Standards
NAWS
Northwest Area Water Supply
ND SHPO
North Dakota State Historic Preservation Office
NDAAQS
North Dakota ambient air quality standards
NDDA
North Dakota Department of Agriculture
NDDES
North Dakota Department of Emergency Services
NDDH
North Dakota Department of Health
NDDOT
North Dakota Department of Transportation
NDGF
North Dakota Game and Fish
NDNH
North Dakota Natural Heritage
NDPDES
North Dakota Pollutant Discharge Elimination System
NDRC
National Disaster Resilience Competition
NDSWC
North Dakota State Water Commission
NED
National Economic Development
xxiii
NEPA
National Environmental Policy Act
NFRAP
No Further Remedial Action Planned Sites
NHIS
Natural Heritage Inventory Species of Concern and Significant Ecological Communities
NHPA
National Historic Preservation Act
NLCD 2011
National Land Cover Database 2011
NLRRCRAG
No Longer Regulated Resource Conservation and Recovery Act (RCRA) Generator Facility
NO2
nitrogen dioxide
NOI
Notice of Intent
NPS
National Park Service
NRHP
National Register of Historic Places
NWI
National Wetland Inventory
NWR
National Wildlife Refuge
O&M
Operations and Maintenance
O3
ozone
OHWL
Ordinary High Water Level
OHWM
ordinary high water mark
OPC
opinion of probable cost
OSHA
Occupational Safety and Health Administration
PA
Programmatic Agreement
Pb
lead
PEMA
Palustrine emergent wetlands that are temporarily flooded
PEMC
seasonally flooded
PEMF
semi-permanently flooded
PER
Preliminary Engineering Report
PFO
Palustrine forested
PHASP
Project Health and Safety Plans
PL
Public Law
PM#
particulate matter
Project
Mouse River Enhanced Flood Protection Project
PSD
Prevention of Significant Deterioration
R2UBH
riverine with unconsolidated bottom
RCRA
Resource Conservation and Recovery Act
Requester
Souris River Joint Water Resource Board
ROC
Regions of Comparison
ROI
Region of Interest
RSA
regional service area
SFHA
Special Flood Hazard Areas
SFHAs
Special Flood Hazard Areas
SGCN
species of greatest conservation need
SHPO
State Historic Preservation Office
SO2
sulfur dioxide
xxiv
SoCP
100 Species of Conservation Priority
SPWLF
Special Waste Landfills
SRJB
Souris River Joint Water Resource Board
SRT
Souris River Telephone
StARR
Structure Acquisition, Relocation, or Ring Dike
STIP
Statewide Transportation Improvement Plan
SVOCs
semi-volatile organic compounds
SWG
State Wildlife Grants
SWIF
System Wide Improvement Framework
SWPPP
Stormwater Pollution Prevention Plan
TMDL
total maximum daily load
USACE
U.S. Army Corps of Engineers
USC
United States Code
USEPA
U.S. Environmental Protection Agency
USFWS
U.S. Fish and Wildlife Service
USGS
U.S. Geological Survey
VOC
Volatile Organic Compounds
VOCs
volatile organic compounds
WCWRD
Ward County Water Resource District
WTP
water treatment plant
xxv
1.0 Introduction
The U.S. Army Corps of Engineers (USACE) has prepared this programmatic Environmental Impact
Statement (EIS) to analyze the effects of a flood risk-reduction project along the Souris River (referred to
as the Mouse River in North Dakota) from Burlington, North Dakota through Minot, North Dakota. Locally
this project has been referred to as the Mouse River Enhanced Flood Protection Project (Project). The
Project requester is the Souris River Joint Water Resource Board (SRJB), which is comprised of
representatives from Minot and the four counties that lie within the Souris Basin: Bottineau, McHenry,
Renville, and Ward counties. The primary purpose of the SRJB is to address water management issues
within the Basin.
The SRJB submitted a letter to the USACE initiating the process for obtaining approval under Section 14
of the Rivers and Harbors Act of 1899 (33 United States Code (USC) 408, hereinafter referred to as
Section 408) to allow alterations to existing USACE projects in the Souris River Basin. USACE can issue
Section 408 permission to alter a USACE project if it is determined that modifications are not injurious to
the public interest and will not impair the usefulness of the project.
The proposed alterations and modifications would further reduce the risks of future flood events for
communities along the river, including Minot. The SRJB and the USACE entered into a Memorandum of
Agreement (MOA) for the Section 408 evaluation of the Project which established a framework for the
acceptance and expenditure of funds provided by the SRJB to expedite the evaluation of the SRJB's
request to make the proposed alterations to the USACE projects.
The requester's proposed Project would also involve placement of fill material in waters of the United
States which is regulated by Section 404 of the Clean Water Act (33 Code of Federal Regulations (CFR)
323). A permit would be required from the USACE for any activities involving placement of fill in wetlands
and waterbodies that are classified as waters of the U.S. The decision on a Department of Army permit
application pursuant to Section 404 cannot be rendered prior to the decision on the Section 408 request.
As part of the Section 408 and Section 404 processes, the USACE must comply with the National
Environmental Policy Act of 1969, as amended (NEPA). This EIS was prepared in accordance with NEPA
and the USACE regulations for implementing NEPA (Appendix B of 33 CFR 325 and Engineering Circular
1165-2-216). The St. Paul District of the USACE is the lead federal agency responsible for preparing the EIS
with the Omaha District of the USACE providing regulatory and technical assistance.
This EIS evaluates general impacts associated with constructing and operating a flood risk-reduction
project in the Souris River Basin that fulfill the requester's purpose and need (Section 1.1). A more
extensive impact assessment of the Requester's Preferred Alternative was conducted in areas where
detailed design information is available. The purpose of the EIS is to identify the range of potential
impacts that would result from the construction of the Project and ensure that this information is available
to public officials and citizens prior to making decisions and taking action. Site-specific and resourcespecific issues for subsequent phases of the Project will be reviewed and evaluated as detailed plans and
1
official proposals are submitted for approval. Supplemental NEPA documents may be required as project
plans evolve and appreciable changes to impacts are identified.
1.1
Purpose and Need for the Project
A record-breaking flood in 2011 caused extensive damage to homes, businesses, public facilities, and
infrastructure along the entire length of the Souris River in North Dakota. As a result of this flood, the
SRJB, in conjunction with the North Dakota State Water Commission (NDSWC), commissioned a study
(Preliminary Engineering Report (PER)) to develop and evaluate alternatives to reduce the risk of damages
from river flows comparable to those of the 2011 flood, including development of alignments for new
levees, floodwalls, and other flood risk-reduction measures. The PER focused on the developed areas of
the valley in an effort to provide homeowners with flood-damaged properties the information they
needed to make personal decisions about rebuilding their flooded homes. The PER included
recommendations for flood risk reduction features along a preliminary alignment that could help protect
against floods equivalent to the 2011 flood. The PER identified the recommended plan as the Mouse River
Enhanced Flood Protection Project (Project). The proposed actions represent the initial phases of a multiphase process to implement the Project in the more highly populated portions (i.e., from Burlington
through Minot) of the Souris River Valley.
The purpose of the proposed Project is to meet the following goals established by the project requester:
Reduce the risk of property damage and loss of life in the most densely populated reach of the
river due to floods that approach the size of the 2011 flood (i.e., 27,400 cubic feet per second
(cfs)), regardless of where the precipitation occurs in the Souris River Basin.
Remove as many structures as possible from the Federal Emergency Management Agency (FEMA)
preliminary regulatory floodplain (10,000 cfs flood) and provide a higher level of flood protection
along the most densely populated reaches of the river through implementation of interim flood
risk reduction measures (i.e., incremental project phases) that will be consistent and compatible
with the proposed Project.
Provide protection to FEMA's preliminary regulatory floodplain (10,000 cfs flood) or other
measurable protection levels with each incremental project phase.
Keep critical elements of the public transportation system operating during and after a flood
event that approaches the size of the 2011 flood.
Design and construct a flood risk-reduction system for a 27,400 cfs design flood event that is
consistent with current USACE standards and FEMA requirements for accreditation.
The need for action arises from reoccurring flooding in the project area, beyond the limits of what can be
contained by the existing Souris River Basin Project. Flooding has resulted in significant property damage,
the displacement of thousands of residents, interference with transportation systems and emergency
services, disruption to regional commerce, and resulted in total losses of more than $1 billion. Numerous
2
residents along the river have expressed their interest in additional flood risk-reduction measures to
protect them from floods of this magnitude and to avoid additional costs of flood insurance.
1.2
Project Location
The proposed Project is located along the Souris River in Ward County, North Dakota, from upstream of
Burlington to downstream of Minot, as shown on Figure 1-1. The Souris River is known by two names. In
Canada and by United States federal agencies such as the U.S. Geological Survey (USGS), USACE, U.S. Fish
and Wildlife Service (USFWS), and FEMA, it is referred to as the Souris River. The portion of the Souris
River located in North Dakota is referred to by state agencies, and in state maps and documents, as the
Mouse River. This document generally refers to the river as the Souris River.
The Souris River has its headwaters in Saskatchewan, Canada. It flows southeasterly into North Dakota
near Sherwood, continues southeast through the cities of Burlington, Minot, Sawyer, and Velva, then turns
back north and re-enters Canada in the province of Manitoba. Eventually it flows into the Assiniboine
River near Brandon--which joins the Red River of the North at Winnipeg. Within North Dakota, as shown
in Figure 1-2, the Souris River first flows through Renville County, with the Lake Darling Dam and the
Upper Souris National Wildlife Refuge (NWR) as key features, then through Ward County where a major
tributary, the Des Lacs River, joins it at Burlington. It continues on through the cities of Minot and Sawyer,
then passes into McHenry County and through Velva. Flowing generally northward, it passes through
Bottineau County and the J. Clark Salyer NWR and flows back into Canada near Westhope, North Dakota.
The project area for the initial phases of the Project has been narrowed from the areas included in the
initial study and planning (reference [1]). The project area includes a short reach of the Des Lacs River,
from Park Road to the confluence with the Souris River, and the Souris River from the confluence with the
Des Lacs River to just south of the Thirty-Seventh Avenue SE bridge (downstream of Minot). This reach is
mostly hydraulically independent from upstream and downstream river reaches and includes those Project
components (e.g., levees, floodwalls, road raises/realignments, channel bypasses) that are anticipated to
be constructed over the next 25 years or more.
3
Upper Souris
National Wildlife
Refuge
72ND ST NW
)
"
!
Renville County
Ward County
Foxholm
£
¤
52
De
128TH AVE NW
s
c
La
se
er
ou
M
v
Ri
r
2
£
¤
27TH ST NE
ve
Ri
46TH AVE NW
Des Lacs
Burlington
£
¤
B83
19TH AVE NW
55TH ST NE
Minot
Surrey
2
£
¤
£
¤
54TH AVE SW
Ward County
McHenry County
2
153RD ST SE
Barr Footer: ArcGIS 10.3.1, 2015-12-10 09:44 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 1-1 - Project Location.mxd User: kac2
s
83
£
¤
153RD ST NE
Lake Darling
Dam
79TH AVE SE
Logan
!
52
£
¤
83
£
¤
135TH AVE SE
Sawyer
177TH AVE SW
I
Project Area
National Wildlife Refuges
County Boundary
0
2
4
Municipalities
Miles
Figure 1-1
8
PROJECT LOCATION
Mouse River Enhanced Flood
Protection Project
!
Melita !
ris
CANADA
UNITED STATES
£
¤
Westhope !
Renville
County
North Dakota
Mohall
se
!
Bottineau
County
Ri
Mouse River
Park
u
Mo
r
ve
Barr Footer: ArcGIS 10.4, 2016-09-20 13:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 1-2 - Mouse (Souris) River.mxd User: jrv
!
Sherwood
52
Des Lacs
National
Wildlife
Refuge
2
£
¤
M
ou
R
iv
er
cs
o
Ri
McHenry
County
!
ve
r
!
Towner
Minot
!
Ward
County
Logan
Sawyer
£
¤
83
Project Area
Provincial/State Boundaries
0
6
12
Miles
Velva
52
£
¤
I
Mouse/Souris River Watershed
Flow Direction
se
Minot AFB
La
Burlington
County Boundary
J. Clark Salyer
National Wildlife
Refuge
Upper Souris
National Wildlife
Refuge
De
s
National Wildlife Refuges
r
Coulter !
ve
Ri
r
iver
Manitoba
Saskatchewan
u
So
e
Riv
ris
Sou
is R
Alameda
Figure 1-2
24
MOUSE (SOURIS) RIVER
Mouse River Enhanced Flood
Protection Project
1.3
History of Flooding
The Souris River has a history of flooding, including the record-breaking flood in June 2011. The current
100-year (1-percent annual chance) flood peak flow in Minot is 5,000 cfs, yet floods surpassing that flow
have occurred six times since 1904 (Table 1-1). During the June 2011 flood event, runoff from heavy rains
in the upstream portions of the watershed in Saskatchewan exceeded the storage capacity of upstream
reservoirs, already full from attenuating the April snowmelt runoff and several spring rains. The inflow was
essentially passed downstream, resulting in flood flows along the Souris River. A peak flow of 26,900 cfs
was recorded at the USGS gage upstream of Minot and flows in Minot were estimated at 27,400 cfs.
Table 1-1
Floods Greater than 5,000 cubic feet per second (cfs), Souris River upstream of
Minot
USGS Gage 05117500 (data from USGS - 1903 to 2011)(1) (2)
(1)
(2)
Year
Date
Peak Streamflow (cfs)
2011
June 25
26,900
1904
April 20
12,000
1976
April 17
9,350
1969
April 19
6,020
1979
May 09
5,960
1975
May 13
5,700
Based on historic newspaper accounts, and as summarized in USGS reports, a flood in 1882 occurred in Minot that
was about 3 feet higher than the 1904 flood and may have been comparable to the 2011 flood.
Prior to 1934 the USGS gage data was taken at Minot. After 1934 the USGS gage data has been taken at the present
gage location above Minot (USGS Gage 05117500).
The 2011 flood overwhelmed most levees and flood fighting efforts along the entire reach of the Souris
River through North Dakota, causing extensive damage to homes, businesses, public facilities,
infrastructure, and rural areas. The flood caused more than $690 million of damage to about 4,700
commercial, public, and residential structures in Ward and McHenry counties, and approximately 11,000
people were displaced from their homes.
1.4
Existing Flood Control Projects
To reduce the level of flood risk for developed areas along the Souris River, numerous federal flood
control projects have been constructed in the Souris River Valley over the last 40 years. These projects
generally consist of upstream flood storage reservoirs, levees, channel modifications, and pump stations.
The existing flood risk-reduction projects along the Souris River were developed by the USACE as the
Souris River Basin Project. The Souris River Basin Project was developed over several years in three
separate congressional actions and was implemented in three phases. The first phase was a channel
modification project in Minot. The second phase was a levee project in Velva. The third phase involved
multiple features, including flood storage in Alameda and Rafferty Dams in Saskatchewan; construction of
6
a gated spillway and flood storage at Lake Darling Dam; levees at Sawyer, Renville County Park (Mouse
River Park), and six housing subdivisions between Burlington and Minot; structural and nonstructural
measures for rural residents along the Souris River; modification of USFWS structures in the Upper Souris
and J. Clark Salyer NWR; and development of a flood warning system.
Existing flood risk-reduction features in the reach of the Souris River from Burlington to the upstream side
of Minot were federally designed and constructed by the USACE based on the project authorized by the
1986 Water Resources Development Act (Public Law [P.L.] 99-662) and Section 105 of the fiscal year 1988
Continuing Appropriations Act (P.L. 100-202). These existing features are located in Burlington (Johnson's
Addition) as well as in several downstream communities, including, Brooks' Addition, Talbott's, Country
Club Acres, Robinwood Estates, Kings Court, Rostad's Addition, and Tierrecita Vallejo. The project features
in Burlington are operated and maintained by Burlington; the remaining project features are operated and
maintained by the SRJB.
The existing flood risk-reduction features within Minot were federally designed and constructed by the
USACE based on the project authorized by Section 201 of the Flood Control Act of 1965 (P.L. 89-298) and
modified based on recommendations by the USACE Chief of Engineers in House Document 286, 87th
Congress, 2nd Session, and House Document 321, 91st Congress, 2nd Session. The project is operated
and maintained by Minot as the local sponsor. The project features consist primarily of channel
modifications, channel cutoffs, and levees and are part of an authorized federal project that extends from
Burlington to Logan, which includes flood control storage behind the Burlington Dam. Channel
modifications were designed to accommodate flows up to 5,000 cfs. In addition, several stretches of levee
were also constructed. These levees, along with emergency flood fighting, can typically provide flood risk
reduction to 10,000 cfs.
There are eight federal levee systems along the Souris River in the river reach extending from Burlington
through Minot (Map 2-3). These levee systems are listed below.
Johnson Addition (Burlington)
Brooks' Addition
Robinwood Estates/Country Club Acres
Talbott's Nursery
Kings Court
Rostad's Addition (Del Nor Drive)
Tierrecita Vallejo
Minot Left Bank
Minot Right Bank
7
For the Ward County levee systems upstream of Minot, the SRJB is the project sponsor. Operations and
maintenance responsibilities have been subrogated to the Ward County Water Resource District
(WCWRD). For the Minot levee systems, the WCWRD is the sponsor and operations and maintenance
responsibilities have been subrogated to Minot.
In November 2013, the USACE notified the project sponsors that, based on its periodic and routine
inspections, they would give the Minot and Ward County federal levee systems an "unacceptable" rating
because the condition of the levee systems did not meet current USACE levee safety standards.
Unacceptable deficiencies identified during the inspections included: unwanted vegetation growth;
encroachments (e.g., shed, fence, garage addition, irrigation system, etc.); sod cover loss; slope stability
problems; erosion/bank caving; cracking; obstruction of culvert inlets/outlets; erosion areas; and
revetments other than riprap (Reference [2]). Federal levee systems operated and maintained by a nonfederal sponsor, including the Ward County and Minot systems, are required to maintain "acceptable" or
"minimally acceptable" ratings to remain eligible for rehabilitation assistance under Public Law (PL) 84-99.
As part of PL 84-99, Flood Control and Coastal Emergencies, an "unacceptable" inspection rating is
grounds for the USACE to assign the levee systems an "inactive" status, making the levee sponsor
ineligible for federal rehabilitation assistance following a flood or natural disaster.
The USACE developed the System Wide Improvement Framework (SWIF) process to allow non-federal
sponsors to remain temporarily eligible for PL 84-99 while a plan for addressing deficiencies is developed.
A SWIF provides an opportunity to transition levee systems to USACE standards over time. By
implementing a SWIF, sponsors are allowed to prioritize deficiencies and reduce system-wide risk.
In order to prevent a lapse in rehabilitation assistance under PL 84-99, the sponsors submitted requests to
the USACE in March 2014 for a conditional extension to afford time to develop and implement a SWIF.
Two separate SWIF requests were submitted in the form of SWIF Letters of Intent (LOI), in which the
project sponsors outlined actions taken to date, along with planned future actions, to implement the
system-wide levee improvements. The requests were accepted by the USACE on July 31, 2014.
A combined SWIF was developed for the eight federal levee systems between Burlington and Minot. The
primary component of the SWIF is a plan for addressing the deficiencies identified in the USACE
inspections. The plan includes a risk-based prioritization list of deficiencies, schedule and funding
commitments, interim risk-reduction measures, and interim maintenance standards. These deficiencies will
be addressed during construction of the project. A letter of SWIF acceptance from USACE Headquarters
dated April 27, 2017 was received by the SRJB on May 4, 2017.
1.5
Permits, Approvals, and Regulatory Requirements
The proposed Project requires approvals and permits from the USACE. Section 408 authorizes the
Secretary of the Army to permit alterations and modifications to existing USACE projects in certain
circumstances. The Secretary of the Army has delegated this approval authority to the Chief of Engineers
of the USACE. The types of alterations and modifications under Section 408 that require approval by the
Chief of Engineers include degradations, raisings, and realignments of levee systems. The potential
impacts of these changes, including system impacts, must be evaluated in accordance with USACE
8
regulations and policy. Section 408 permission to alter a USACE project can only be granted if it is
determined that modifications are not injurious to the public interest and will not impair the usefulness of
the project.
Construction of the proposed Project would require the filling or excavating of wetlands and work within
the Souris River. The USACE has the authority to permit the placement of fill in waters of the United States
under Section 404 of the Clean Water Act (CWA; 33 USC 1344). As part of this permitting process, aquatic
resource impacts must be avoided or minimized to the extent practicable, and compensatory mitigation
must be provided for any unavoidable impacts. The Section 404 permit and the Section 408 permission
constitute federal actions and must therefore comply with the regulatory requirements of NEPA. This EIS is
meant to fulfill the NEPA requirements for both the Section 404 permitting and Section 408 permissions.
In accordance with the Endangered Species Act of 1973, Section 7 consultation with the U.S. Fish and
Wildlife Service (USFWS) is required for Federal actions that authorize, fund, or carry out activities that
may jeopardize the continued existence of a listed species or result in the destruction or adverse
modification of designated critical habitat. Potential habitat was identified in the project area for two
threatened species; the Dakota skipper and northern long-eared bat. Informal Section 7 consultation with
the USFWS occurred during the scoping of this document. Avoidance measures were developed to
prevent any adverse effects to the Dakota skipper and the northern long-eared bat. With the avoidance
measures, a "no effect" determination for listed species was made for the Project; therefore, no further
consultation was required.
In compliance with the Fish and Wildlife Coordination Act (16 USC 661-667e), there has been
correspondence with USFWS and other federal and state agencies with natural resource interests to
evaluate impacts to fish and wildlife.
Section 106 of the National Historic Preservation Act requires that federal agencies take into account the
effects of their undertakings or permitting on historic properties. Because of the size of this project, a
Programmatic Agreement (per 36 CFR 800.14(b)) has been developed between the USACE and the North
Dakota State Historic Preservation Office (ND SHPO) to cover effects that cannot be fully determined in
advance of the undertaking and non-Federal parties being delegated major responsibilities.
FEMA is responsible for reviewing potential Project impacts in the regulatory floodplain, which is defined
as the flood elevation corresponding to the one-percent annual chance flood. The proposed Project
features are intended to remove areas from the regulatory floodplain and thereby eliminate flood
insurance requirements for properties in those areas. The regulatory floodplain is defined on Flood
Insurance Rate Maps (FIRMs). Projects that make physical changes within the regulatory floodplain that
affect the hydraulic or hydrologic characteristics of a flooding source, including changes to the Base Flood
Elevations (BFE), Special Flood Hazard Areas (SFHA), or the regulatory floodway, require review and
approval by FEMA.
A Conditional Letter of Map Revision (CLOMR) is FEMA's comment on a proposed project that would,
upon construction, affect the hydrologic or hydraulic characteristics of a flooding source and thus result in
9
the modification of the existing regulatory floodway, the effective BFEs, or the SFHA. The CLOMR indicates
whether the project, if built as proposed, would be recognized by FEMA. The CLOMR process reviews the
technical engineering data to determine that approved engineering methods, required by 44 CFR
Section 65.10, were applied and that the project is in compliance with the local government ordinance
and FEMA standards. A CLOMR application was submitted to FEMA on February 16, 2017.
Once a project has been completed, the community must request a revision to the FIRM to reflect the
project. FEMA uses a Letter of Map Revision (LOMR) to modify published FIRMs. "As-built" certification
and other data must be submitted to support the revision request. The LOMR revises the FIRM, may revise
the Flood Insurance Study report, and when appropriate, includes a description of the modifications. The
LOMR process assures that the as-constructed project also meets the requirements of 44 CFR
Section 65.10 and that the project is in compliance with local government ordinances and FEMA's
standards. This includes FEMA levee system accreditation, which allows the levee system to be shown on a
FIRM as reducing risk from the one-percent annual chance flood, or one hundred year event. The LOMR
and CLOMR processes are initiated through an application to FEMA from the local sponsor for the Project.
In addition to the federal permits and approvals discussed above, SRJB would be required to obtain other
permits and approvals from state and local agencies. Table 1-2 lists the major federal, state, and local
permits, approvals, and consultations for the Project.
Table 1-2
Local, State, and Federal Permits, Approvals and Reviews Needed for the Project
Agency
Permit/Requirement
Rationale
Federal Permits/Approvals/Reviews(1)
U.S. Army Corps of
Engineers
National Environmental Policy
Act Compliance
For projects in which there is a federal action. Federal
actions for this project include Section 404 permits
and Section 408 permissions.
U.S. Army Corps of
Engineers
Section 404 Permit
For placement of dredged or fill material in
jurisdictional wetlands or other waters
U.S. Army Corps of
Engineers
Section 408 Permission
For modifications to existing USACE projects
U.S. Fish and Wildlife
Service
Section 7 Consultation
For compliance with the Endangered Species Act
where there are effects to federally listed species
U.S. Fish and Wildlife
Service
Fish and Wildlife
Coordination Act Compliance
For protection and conservation of fish and wildlife
resources
Federal Emergency
Management Agency
Conditional Letter of Map
Revision
For projects that affect the regulatory floodway
10
Agency
Permit/Requirement
Rationale
State Permits/Approvals/Reviews
State Historical Society of
North Dakota
Section 106 Concurrence
For compliance with the National Historic
Preservation Act
North Dakota State
Water Commission
Sovereign Lands Permit
For placement of fill below the ordinary high water
mark of traditionally navigable waters
North Dakota Game &
Fish Department
Fish and Wildlife
Coordination Act Compliance
For protection and conservation of fish and wildlife
resources
North Dakota State
Water Commission
Construction Permit
For construction of levees or other water resource
facilities with a diverting, obstructing, or retaining
capacity greater than 50 acre-feet of water
North Dakota State
Water Commission
Drainage Permit
North Dakota
Department of Health
Section 401 Water Quality
Certification
For compliance with state water quality standards
North Dakota
Department of Health
Construction General Permit
NDPDES
For projects that disturb more than one acre of land
North Dakota
Department of Health
Asbestos Notification of
Demolition and Renovation
For demolition or renovation of existing facilities
North Dakota
Department of
Transportation
Driveway Permit, project
review and approval
For new or modified driveway access to state
highways; for activities that affect state roads or
bridges
North Dakota
Office of the State
Engineer
For project components that drain a pond, slough,
lake, or sheetwater with a watershed of 80 acres or
more.
Regulatory Floodways Review
Century Code 61-16.2-14
For determining if the development in a regulatory
floodway is in compliance with state and federal law
Local Permits/Approvals
City of Minot
Engineering Department
Non-building Floodplain
Development Permit
For construction within the regulatory floodplain
City of Minot
Engineering Department
Project approval
For project activities that affect city streets, traffic
signals, and utilities
City of Minot Planning
and Zoning Department
Project approval
For project activities that require a zone change,
conditional use permit, interim use permit, plan
review, or variance
Minot Park District
Project approval
For project activities that affect city park and
recreational facilities
Canadian Pacific Railway
Permission to work in railroad
rights-of-way
For project activities that take place in railroad rightsof-way
(1)
A number of properties along the Project alignment have or will be acquired through funds administered by the U.S. Housing
and Urban Development Department (HUD). NEPA compliance on these acquisitions is being conducted through HUD and is
independent from the Project.
11
This EIS has been prepared as a programmatic document, meaning its scope is large enough to account
for phases being proposed for construction in the near-term as well as the more distant the future. Sitespecific and resource-specific issues for subsequent phases of the Project will be reviewed and evaluated
as detailed plans and official proposals are submitted for approval. If impacts associated with the
subsequent phases have changed appreciably from what is described in this programmatic EIS, additional
NEPA documents may be required. It is anticipated that NEPA documentation for future design phases
will consist of tiered NEPA documents that address impacts specific and unique to each phase.
1.6
Agency and Public Scoping
As part of the environmental review process, the USACE initiated scoping of the proposed Project to
obtain comments from regulatory agencies and the public. On October 1, 2014, January 29, 2015, and
May 27, 2015 USACE conducted consultation meetings with local, state, and federal agencies to provide
an overview of the proposed actions, gather feedback, and gage the severity of potential impacts. For a
similar purpose, public meetings were held in Burlington on April 8, 2015, and in Minot on April 9, 2015.
Based on the discussions and comments received at these meetings it was determined that significant
impacts to the human environment would result from the Project and that an EIS would be required to
fulfill the requirements of the NEPA. The USACE published a Notice of Intent (NOI) to prepare a
programmatic EIS for the proposed Project from Burlington through Minot in the Federal Register (Vol.
80, 137) on July 17, 2015.
After publishing the NOI, the USACE held an additional public scoping meeting in Minot on August 19,
2015. In addition, the SRJB has also hosted a number of neighborhood meetings. They included meetings
on November 9, 2015, and June 30, 2015 to update residents on the project status and the design of the
flood risk-reduction features in the vicinity of Fourth Avenue NE, and for the Napa Valley and Forest Road
portions of the Project, respectively. The City of Minot held meetings with residents of the Moose Lodge,
Leite-Brekke, and Kemper neighborhoods on November 9, 2016, November 10, 2016, and January 16,
2017, respectively, to discuss the implications that grant money (described further below) could have on
these neighborhoods. The SRJB has also held other public meetings and solicited comments and
questions dating back to 2011.
A Scoping Document was prepared to summarize information gathered during Project scoping so that it
could be used to inform the planning and evaluation of the proposed Project as it moves forward. A
secondary purpose of the document was to inform interested parties of the issues that were raised
through scoping and to identify how those issues could be addressed. A copy of the Scoping Document is
included in Appendix A.
Numerous written and verbal comments were submitted in response to the proposed Project. Comments
were categorized into seven areas along with generalized questions and responses in the Scoping
Document. Issues identified during scoping were taken into consideration and discussed as part of the
preparation of this EIS.
12
2.0 Alternatives
Actions and features that could be used to reduce the risk of flooding were identified in the planning of
the Project. Actions and features that could meet the requester's purpose and need were then combined
to form various alternatives. Ultimately the general concept of the Requester's Preferred Alternative was
determined to be the only alternative that could meet the purpose and need of the requester. Therefore,
the Requester's Preferred Alternative and the No-Action Alternative were explored more comprehensively
than other alternative actions in this document.
It should be noted that all phases of construction would be subject to a targeted alternatives analysis and
impact assessment under NEPA. Proposed actions would also need to be determined to be the least
environmentally damaging practicable alternative (LEDPA) to receive a Section 404 permit for the
placement of fill in any Waters of the United States. Due to the size and duration of the proposed
construction, detailed design has only been carried out for work through Stage 1.5. Further analysis on
work to be permitted after Stage 1.5 will likely require additional environmental review through
supplemental NEPA documents. The evaluation of alternatives in these supplemental documents will
identify the LEDPA, which will be the permitable actions under Section 404.
2.1
Requester's Preferred Alternative
The Requester's Preferred Alternative would consist of new levees, floodwalls, high-flow bypasses, channel
re-alignments, river closure structures, transportation closure structures, interior pump stations, overbank
excavation, new bridges, and bridge modifications (Map 2-1). In the project area, it is estimated that 18.1
miles of new levees and 2.6 miles of new floodwalls would be constructed along the river corridor. Twenty
transportation closure structures (13 roadway and 7 railroad) would be installed to allow traffic to
regularly pass through the line of protection during non-flood periods. The Requester's Preferred
Alternative would require an additional 24 stormwater pump stations (15 new and 9 replacement stations)
and associated ponding areas to manage the surface water runoff from the interior drainage systems.
Construction of the Requester's Preferred Alternative would include the acquisition and removal of more
than 500 homes and businesses in locations within the area flooded in 2011. As of November 2016,
approximately 110 of these homes and businesses have been purchased (and many removed) using
federal, state, and local funds. In addition, the City of Minot has indicated that it intends to aquire 67
properties in the Leite-Brekke, Moose Lodge, and Kemper neighborhoods with funding awarded through
the Department of Housing and Urban Development's (HUD) National Disaster Resilience Competition
(NDRC) program. The buyouts associated with the NDRC funding are being pursued independently of the
Requester's Preferred Alternative. However, they have become an intrical part of the Project and are
included in the description of the plan.
In addition, six bridges would be reconstructed or modified to meet the design flow criteria and keep
critical bridges open during flood events. A total of about 111.6 acres of overbank excavation would be
included under these bridges as well as in other select areas to increase hydraulic capacity within the
floodplain of the river. Other ancillary activities to facilitate implementation of the Requester's Preferred
13
Alternative would include re-aligning utilities (e.g., sanitary sewers, storm sewers, and watermains) and realigning and raising road segments. The bridge projects and associated road raises are being evaluated as
part of this EIS but would be designed and built by the jurisdictional authority identified in Table 2-1.
Table 2-1
Bridges to be Reconstructed or Modified
Jurisdictional Authority
Bridge Name
Colton Avenue Bridge (CR 10)
Ward County
U.S. Highway 83 Bypass Bridge
NDDOT
Canadian Pacific Railroad Bridge
Canadian Pacific Railroad
Burdick Expressway (U.S. 2 Bypass)
NDDOT
Twenty-Seventh Street Bridge
City of Minot
U.S. 2 Highway Bridge
NDDOT
Source: Reference [3]
The new flood risk-reduction features would accommodate flows up to 27,400 cfs (the estimated flow in
Minot during the 2011 flood). The average height of flood protection in the Requester's Preferred
Alternative would range from 9 to 14 feet along various stretches, with a maximum height of 27 feet at
the community of Tierrecita Vallejo (reference [1]).
The opinion of probable cost (OPC) range for the Requester's Preferred Alternative is $576 million to
$1,010 million based on feasibility-level design alternatives, alignments, quantities, and unit prices. The
OPC point estimate within the estimated accuracy range is $748 million, based on the current level of
project definition. This cost estimate does not consider the likelihood of cost escalation over the period of
implementation and will change with further design.
The Requester's Preferred Alternative would be constructed over a period of more than 25 years
depending on availability of SRJB's funding. Implementation of the Requester's Preferred Alternative
would involve constructing over 20 segments in various communities and neighborhoods from Burlington
through Minot. The initial construction of the Requester's Preferred Alternative would consist of designing
and constructing three segments within Minot: Fourth Avenue NE (Phase 1), Napa Valley (Phase 2), and
Forest Road (Phase 3). It is anticipated that these segments would be designed and permitted in late 2017
with construction beginning thereafter, at the end of 2017 or early 2018. The next phases of the Project
would include the construction of the Maple Avenue High-Flow Diversion, Tierrecita Vallejo, and a tieback
levee. The initial three phases along with these three later segments comprise Construction Stage 1.5.
Construction Stage 1.5 provides flood risk reduction to a portion of the project area, independent of any
other significant flood fighting actions, and is considered the first portion of the Project that can be
permitted under Section 404. Additional information on the various construction stages is provided in
Section 4.13.1. The locations of all phases included in Construction Stage 1.5 are shown on Figure 2-1.
Phasing for construction of the other segments of the Requester's Preferred Alternative would be
14
determined based on funding and a prioritization of critical needs for flood risk reduction in each reach of
the river.
There are also three other proposed projects related to Stage 1.5 that the USACE has determined to have
independent utility (i.e., can be constructed and can function independently absent of the Requester's
Preferred Alternative)(letter dated December 3, 2015 from Michael Bart of the USACE to Dave Ashley and
Chuck Barney of the SRJB). Since they were determined to function independently, each may be pursued
independently. These projects include:
1.
Constructing the Centennial Forest Stormwater Pond and maintaining the Perkett Ditch.
2.
Relocating the utilities extending from the Minot Water Treatment Plant to the other side of the
Souris River.
3.
Redirecting runoff from the Upper Tierrecita Vallejo Watershed directly to the Souris River.
The design of these projects would be compatible with future construction activities and would improve
surface water management in select areas. Environmental analyses of these projects are also included in
this EIS to evaluate cumulative effects.
The sections below describe the major components of the Requester's Preferred Alternative from
upstream end of the Project to downstream of Minot. The general layout of project features are displayed
in Map 2-1.
2.1.1
Burlington
Burlington is the most upstream community in the project area, located at the confluence of the Souris
and Des Lacs Rivers. The major flood risk-reduction components in this community for the Requester's
Preferred Alternative would consist of building about 1.7 miles of new levees and floodwalls, replacing the
Colton Avenue bridge, and moving Old Settler's Park Road.
The new levee would start on the northwestern end of the alignment at the existing Canadian Pacific
Railway embankment near Old Settler's Park Road. To minimize impacts to the community and avoid the
Del Lacs River, the levee would transition to a floodwall and extend along the current location of Old
Settler's Park Road. Old Settler's Park Road would be shifted south, away from the floodwall, to maintain
clear zone requirements. The floodwall alignment then shifts to the north to avoid impacts to the Peace
Lutheran Church cemetery. A closure structure is planned where the alignment crosses Old Settler's Park
Road. The levee would continue around Burlington and tie into the railroad embankment.
The Colton Avenue bridge in Burlington would be modified to meet the design flow hydraulic criteria and
keep the bridge open during flood events. The existing two-lane, 122-foot-long bridge would be removed
and replaced with a 225-foot-long bridge of similar width, located along the same alignment. The bridge
would be raised approximately 9 feet, which would require raising the roadway approaches. Overbank
excavation, under and immediately adjacent to the new bridge, would provide additional flow conveyance
under the bridge.
15
Phase 1 (4th Avenue)
Phase 2 (Napa Valley)
Phase 3 (Forest Road)
Other Phases
Project Footprint
Municipalities
CITY OF
BURLINGTON
£
¤
Barr Footer: ArcGIS 10.4, 2017-04-24 16:06 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 2-1 - Project Phases of Construction Stage 1.5.mxd User: KAC2
B83
£
¤
83
Phase 1
(4th Avenue)
Tieback Levee
Maple Avenue
High-Flow Diversion
Phase 2
(Napa Valley)
£
¤
2
Tierrecita
Vallejo
CITY OF MINOT
£
¤
B2
Phase 3
(Forest Road)
I
£
¤
B52
0
2,000
4,000
8,000
Feet
£
¤
83
£
¤
52
Imagery Source: USDA NAIP Imagery 2014
Figure 2-1
PROJECT PHASES OF
CONSTRUCTION STAGE 1.5
Mouse River Enhanced Flood
Protection Project
2.1.2
Vardon Golf Course and Surrounding Developments
New flood risk-reduction features at the Vardon Golf Course and the surrounding communities of Brooks
Addition, Country Club Acres, Robinwood, and Talbott's, would consist of approximately 2.6 miles of new
levees, two interior pump stations, pond storage, and rerouting of an existing ditch system east of the
Dakota Boys and Girls Ranch.
The levee on the northern side of the river would begin in Brooks Addition near the intersection of County
Highway 15 and Seventy-Fifth Street NW. The levee alignment extends downstream towards the Vardon
Golf Course between Seventy-Fifth Street NW and the Souris River. The levee alignment at the Country
Club was established to minimize possible impacts to the functionality of the golf course. It is anticipated
that the existing golf course clubhouse would be relocated by the owner. South of the Country Club, the
levee would follow the existing levee alignment through the community of Robinwood. At the
southernmost end of Robinwood, the levee alignment has been offset north of the existing levee to
achieve the required hydraulic capacity. The levee would then extend northeast and ultimately tie into
higher ground on the east side of Robinwood near the Dakota Boys and Girls Ranch.
The existing ditch, extending from County Road 15 along Nineteenth Avenue NW and behind homes
fronting Sixty-Fourth Street NW, would be realigned to the east of the Dakota Boys and Girls Ranch.
Realignment is required to avoid significant pumping requirements and internal drainage issues
associated with existing runoff from this ditch. A levee would be located along the Souris River to reduce
the flooding risk to the Talbott's community. Upgrades in this area would consist of raising the existing
levee system. Both ends of the alignment would tie into existing high ground on the western side of the
community, near U.S. Highway 2. An interior pump station and pond storage area would be constructed
within the community.
2.1.3
Kings Court
The Kings Court community is almost entirely surrounded by the Souris River. The Kings Court
neighborhood did not flood in 2011 as a result of successful flood fighting efforts. However, features that
would be constructed as part of the Requester's Preferred Alternative downstream of Kings Court would
result in a stage increase likely to overwhelm efforts in a similar flood. The Requester's Preferred
Alternative in this community would consist of about 0.9 mile of new levees, construction of gatewells at
existing channel crossings, and the realignment of 1.3 miles of existing river channel.
The new levee would begin on the western side of Kings Court. The alignment then proceeds easterly and
crosses the existing Souris River channel. The levee would wrap around Kings Court, again crossing the
existing river channel, before connecting to high ground east of U.S. Highway 2. Control structures, such
as gatewells, would be constructed to allow river flow and circulation through the original channel
alignment. Gatewells would be closed during significant flood events to direct flow through the channel
realignment.
The 1.3-mile-long channel realignment would be constructed outside of the Kings Court community and
would be similar in overall length to the existing river channel. The constructed channel would begin
17
approximately 1,500 feet upstream of the levee/river crossing. The alignment follows an existing oxbow
and meanders before reconnecting to the river downstream.
2.1.4
Tierrecita Vallejo
The Tierrecita Vallejo community is west of Minot on the northern side of the Souris River near U.S.
Highway 83. The new flood risk-reduction features in this community would consist of about 0.7 mile of
levee, a railroad closure structure with a small length of floodwall, , new ponding areas, and overbank
excavation. It is anticipated that this segment would be constructed as part of Construction Stage 1.5 of
the Requester's Preferred Alternative.
The levee would begin at the hillside north of the existing Canadian Pacific Railway, extending south
towards the western side of the community. A closure structure with floodwall transition sections would
be constructed at the railroad's intersection with the flood protection alignment. The closure structure
would allow for normal railroad operation and protection of the community during flood events. The
levee would extend southward from the railroad, on the western side of the community, before turning
and extending to the east and connecting to high ground near the U.S. Highway 83 Bypass. Figure 2-2
shows a conceptual layout of this segment.
2.1.5
Minot
The Minot reach of the Requester's Preferred Alternative is bounded by the U.S. Highway 83 Bypass to the
west and U.S. Highway 2 to the east. The Souris River bisects this community, meandering through the
heart of the city. Due to the complexity of the flood risk-reduction system within the city, the Requester's
Preferred Alternative has been divided into 12 segments in Minot, starting with the Napa Valley segment
near the U.S. Highway 83 Bypass and ending at the Keller segment near U.S. Highway 2. The flood riskreduction measures to be constructed in each segment of Minot are discussed in later sections.
The major components of the Requester's Preferred Alternative in Minot would include the following:
Approximately 8.4 miles of new levee
Approximately 2.0 miles of new floodwalls
Two high-flow diversion channels
Eleven road closures and four railroad closures
Five existing bridges would be reconstructed or modified
Thirteen new or replaced pump stations and associated ponding areas
Approximately 20 acres of overbank excavation
18
SW
Floodwall Alignment
28
TH
S
1S
T
T
SW
AV
E
SW
ST
3 0T H
Levee Footprint
Transportation Closure
Road Modifications
Overbank Excavation
2 ND AVE S W
Interior Ponding Areas (New)
Interior Ponding Areas
(Existing)
Railroad Closure
Floodwall
CAM
IN O
R
EAL
C A M IN O
D EL RIO
36
T SW
Interior Ponding Area (New)
37TH
S
Barr Footer: ArcGIS 10.4.1, 2017-05-05 10:30 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-2 - Conceptual Layout of Tierrecita Vallejo.mxd User: jrv
TH
ST
S
W
Interior Ponding Area (Existing)
£
¤
B83
Road
Realignment
I
Overbank Excavation
0
175
350
700
Feet
Overbank Excavation
ACCES
S RD
Figure 2-2
Imagery Source: USDA NAIP Imagery 2014
CONCEPTUAL LAYOUT OF
TIERRECITA VALLEJO
Mouse River Enhanced Flood
Protection Project
2.1.5.1
Napa Valley
In the Napa Valley segment, the primary flood risk-reduction measure would be a new levee, constructed
from U.S. Highway 83 Bypass, across the Souris Valley Golf Course and the Wee Links Golf Course to
Sixteenth Street SW. As mentioned in Section 2.1, a stormwater pond would be constructed in the
Centennial Forest to store and treat runoff before discharging to the Perkett Ditch and pump station.
The Napa Valley segment would be constructed during Phase 2 of the Requester's Preferred Alternative
and has therefore been advanced for design and permitting. The detailed layout of this segment is shown
on Figure 2-3. The Basis of Design Report (reference [4]) provides detailed information related to the
design of the flood risk-reduction features in this segment. The report provides supporting design
information and engineering analysis and methods for the major design features in this segment,
including:
New levee alignment--north of the Souris River extending (upstream to downstream) from U.S.
Highway 83 Bypass to Sixteenth Street SW.
Pump station and gatewell control structure near U.S. Highway 83 Bypass.
Levee ramps for access, maintenance, and inspections at locations identified in the construction
drawings.
Perkett Ditch Pump Station and gatewell control structure.
Stop log road closure, with floodwall sections on the upstream and downstream ends, at
Sixteenth Street SW.
Northwest Area Water Supply (NAWS) transmission line and watermain upgrades for crossings
within the USACE right-of-way near Sixteenth Street SW.
Bank erosion protection for the Souris River channel and flood risk-reduction features at various
locations.
Watermain, force main, and storm sewer upgrades for pipe crossings under the levee within the
USACE right-of-way at various locations.
Municipal infrastructure modifications and improvements including sanitary sewer, watermain,
storm sewer, and street reconstruction.
Wee Links and Souris Valley Golf Course modifications and improvements including tee, fairway,
and green reconstruction.
Wee Links Golf Course Pump Station
Gatewell control structure within the existing levee on the west side of the Wee Links Golf Course
to convey runoff to the Souris River from the golf course.
20
Tie-back levee to provide the Wee Links Golf Course with the existing level of flood risk reduction.
City greenway implementation including features such as bike/hike trail system and open space
(e.g., parks, natural areas).
2.1.5.2
Corrective measures for work items identified during the USACE's 2014 routine inspection.
Forest Road
With the Requester's Preferred Alternative, levees would be constructed on both sides of the river, and the
areas between the levees and the river channel would be excavated in the Forest Road segment. On the
northern side of the river the levee alignment extends from Sixteenth Street SW to the Canadian Pacific
Railroad tracks. On the southern side the levee alignment extends from a floodwall on the wastewater
treatment facility property to north of Fifth Avenue SW.
The Forest Road segment would be constructed during Phase 3 of the Requester's Preferred Alternative
and has therefore been advanced for design and permitting. The detailed layout of this segment is shown
on Figure 2-3 along with the Napa Valley segment. The Basis of Design Report (reference [4]) provides
detailed information related to the design of the flood risk-reduction features in this segment. The report
provides supporting design information and engineering analysis and methods for major design features
in this segment, including:
A new levee north of the Souris River extending (upstream to downstream) from approximately
Sixteenth Street SW to the Canadian Pacific Railroad.
Levee ramps for access, maintenance, and inspections at locations identified in the construction
drawings.
Northwest Area Water Supply (NAWS) transmission line and watermain upgrades for crossing
within the USACE right-of-way near Sixteenth Street SW.
Tie-back levee connecting the proposed levee to the existing railroad embankment to maintain
the level of risk management on the north side of the river.
Bank erosion protection for the Souris River channel and flood risk-reduction features at various
locations.
Watermain, force main, and storm sewer upgrades for pipe crossings under the levee within the
USACE right-of-way at various locations.
Municipal infrastructure modifications and improvements including sanitary sewer, watermain,
storm sewer, and street reconstruction.
City greenway implementation including features such as bike/hike trail system and open space
(e.g., parks, natural areas).
Corrective measures for work items identified during the USACE's 2014 routine inspection.
21
17TH ST NW
18TH ST NW
21ST ST NW
19TH ST NW
20TH ST NW
22ND ST NW
23RD ST NW
24TH ST NW
25TH ST NW
27TH ST NW
HS
T SW
2ND AVE NW
Construction Limits
Levee Footprint
Transportation Closure
Road Modifications and
Parking Areas
28
TH
2
TH
25
ST
1ST AVE SW
Overburden Waste
16TH ST SW
SW
SW
T
ST
Bank Stabilization Rip-Rap
Turf Reinforcement Mat
Storm Sewer 16th
Street to Oak Park
Dead Loop
AVE SW
ND
18
TH
24TH ST SW
T SW
HS
6T
SW
ST
SW
1ST AVE SW
22N
DS
30
T
CENTRAL AVE W
2
Perkett Ditch Modifications
2 ND
Overbank Excavation
Gatewell
Tie-Back
Levee DD
AVE
SW
!
.
Overbank
Excavation
Access Ramp #12
Existing Moose
Lodge Pump
Station
Access Ramp #16
4TH AVE SW
Existing Pump Station
(Replacement)
Tie-Back
Levee D
£
¤ Construction
21ST ST SW
Levee A
Phase 2 Napa
Valley Area
!
.
Access Ramp #2
Bark Park
Pump Station
Levee A
SW
ST
D
7th Ave SW Roadway
Modification
Levee B
6TH AVE SW
Access Ramp #11
Access Ramp #17
Access Ramp #6
Perkett Ditch
Pump Station
Access Ramp #4
Access Ramp #3
Access
Ramp
#15
22
N
Access
Ramp #1
SW
25TH ST
CENTENNIAL
PARK
Limits
!
.
Access Ramp #5
SOURIS VALLEY
GOLF COURSE
Perkett Ditch
Gatewell
Access Ramp #8
Access
Ramp
#7
Access Ramp #14
Access
Ramp #10
Roadway Closure
Structure and 16th Street
SW Road Raise
Access Ramp #9
WEE LINKS
GOLF COURSE
I
Access Ramp #13
Tie-Back Levee C
0
TH
16
Wee Links
Gatewell
ST
B2
300
600
1,200
Feet
SW
£
¤
11TH AVE SW
£
¤
18TH ST SW
29TH ST SW
D
12TH ST SW
SR
CES
£
¤
2 Source: USDA NAIP Imagery 2014
Imagery
28TH ST SW
B2
AC
Barr Footer: ArcGIS 10.4.1, 2017-05-05 10:37 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-3 - Detailed Layout of Phases 2 and 3.mxd User: jrv
B83
Figure 2-3
DETAILED LAYOUT OF
PHASES 2 AND 3
Mouse River Enhanced Flood
Protection Project
2.1.5.3
Maple Avenue High-Flow Diversion
A high-flow bypass, referred to as the Maple Avenue High-Flow Diversion, would be constructed between
Fifth Avenue SW and Broadway with the Requester's Preferred Alternative. The Maple Avenue High-Flow
Diversion would cross under the Canadian Pacific Railway and run parallel to the Burlington Northern
Santa Fe Railway. A levee would be located on the north side of the channel to protect against flooding,
while homes and businesses in the Moose Lodge neighborhood south of the river would be removed by
the City of Minot to allow for additional floodplain storage. An inlet weir would be installed at the
beginning of the Maple bypass. This weir structure would allow flows up to 3,000 cfs (an approximately
15-year flood) to continue down the existing river channel. Flows over 3,000 cfs would discharge into and
flow through the bypass channel. An outlet weir would be installed at the end of the bypass to restrict
backwater flow into the diversion channel. River control structures would be installed in the existing river
channel upstream of each of these weirs to prevent floodwaters from entering the bypassed segment of
the river during high-flow events. It is anticipated that this diversion would be constructed during
Construction Stage 1.5 of the Requester's Preferred Alternative.
The bypass channel alignment crosses several roads and the Canadian Pacific Railway. The railway would
cross over the diversion channel on a new bridge designed to accommodate design flows. Two roads,
Second Avenue SW and Sixth Street NW, would be reconstructed inside the bypass channel using no
bridges. Road closures would be installed at each of these road crossings. Other roads along the channel
alignment (e.g., Fifth Street SW, Seventh Street SW, Central Avenue W, and First Avenue W) would be
terminated at the bypass levee. Figure 2-4 shows a conceptual layout of the Maple Avenue High-Flow
Diversion.
23
7TH AVE NW
DR
1ST ST NW
Interior Ponding Areas (New)
TN
Interior Ponding Area (Existing)
4TH AVE NW
Approximate Pump Station
(Existing)
3RD ST NW
5TH ST NW
6TH ST NW
8TH ST NW
10TH ST NW
!
.
4TH AVE NE
10TH ST NW
SW
Interior Ponding Areas
(Existing)
1ST ST NW
W
11TH ST NW
Road Modifications
Road
Realignment
Floodwall
River Closure Structure
£
¤
£
¤
83
1ST AVE NW
16TH ST SW
83
CENTRAL AVE
CENTRAL AVE W
AK
Interior Ponding Area (New)
DR
1ST AVE SW
E
LAN
FIRE
Floodwall
!
.
Floodwall
RN
ES
W
TE
High-Flow Diversion
¤
£
¤£
MAPLE AVE
6TH AVE SW
B2
5TH ST SW
B2
5TH AVE SW
6TH AVE SW
2ND AVE SW
0
6th Street SW
Pump Station
E
AV
3RD AVE SW
FOREST RD
I
1ST ST SW
Railroad Closure
River Closure Structure
Imagery Source: USDA NAIP Imagery 2014
1ST AVE SE
RD
3RD ST SW
Interior Ponding Area (Existing)
Road Closure
4TH ST SW
2ND AVE SW
2ND AVE SW
1ST AVE SW
Road Realignment
6TH ST SW
O
16TH ST SW
River Closure Structure
NW
3RD AVE NW
Barr Footer: ArcGIS 10.4, 2017-04-25 16:03 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 2-4 - Conceptual Layout of Maple Avenue High-Flow Diversion.mxd User: KAC2
High Flow Diversion
S
6TH
N
DO
E
C
ST
Transportation Closure
6TH AVE NE
5TH AVE
Ramstad Park
Pump Station
4TH AVE NW
4TH ST NW
AV
E
!
.
Interior Ponding
Area (Existing)
TH
16
7TH S
T NW
11TH ST NW
12TH ST NW
5T
H
5TH AVE NW
Floodwall Alignment
W
N
16TH ST NW
8TH ST NW
17TH ST NW
Levee Footprint
250
500
1,000
Feet
3RD AVE SE
Figure 2-4
5TH AVE SW
CONCEPTUAL LAYOUT OF
MAPLE AVENUE HIGH-FLOW
DIVERSION
Mouse River Enhanced Flood
Protection Project
2.1.5.4
Fourth Avenue NE
A floodwall and levee would be constructed along Fourth Avenue NE on the northern side of the river
from Broadway to Third Street NE as part of the Requester's Preferred Alternative. Road closures would be
needed for the floodwall crossings of Fourth Avenue NE. A floodwall was selected in this area to minimize
impacts to Fourth Avenue NE and adjacent homes.
The Fourth Avenue NE segment would be the first segment (Phase 1) to be constructed and has therefore
been advanced for design and permitting. The detailed layout of this segment is shown on Figure 2-5. The
Basis of Design Report (reference [5]) provides detailed information related to the design of the flood riskreduction features in this segment. The report provides supporting design information and engineering
analysis and methods for major design features in this segment, including:
New flood protection alignment--north of the Souris River extending (upstream to downstream)
along the Souris River from the 3rd Avenue bridge west of Broadway to east of 3rd Street NE.
Broadway Pump Station and discharge chamber control structures.
Stop-log removable closure for walking path and maintenance access near Broadway.
Overbank excavation adjacent to the Souris River channel near Broadway.
Tie-back levee on the West end of the project west of the Broadway Pump Station and on the
East end of the project directly south of the proposed Railway Avenue.
Bank and slope stabilization for the Souris River channel and flood risk-reduction features at
various locations within the proposed project.
Watermain and storm sewer upgrades for pipe crossings through the line of protection within the
USACE right-of-way at various locations.
Municipal infrastructure modifications and improvements to accommodate the Project, including
sanitary sewer, watermain, storm sewer, and street reconstruction.
Franchise utility relocation.
City greenway implementation including features such as bike/hike trail system and open space
(e.g., parks, natural areas).
Two tie-back levees, one west of the Broadway Pump Station, and one on the East end of the
Project directly south of the proposed Railway Avenue.
2.1.5.5
Tieback Levee
An approximately 0.79-mile-long tieback levee would be constructed east of the Fourth Avenue NE
floodwall to provide interim flood protection up to flows of 10,000 cfs for northern portions of Minot. This
levee alignment starts at the eastern end of the 4th Avenue NE floodwall, runs easterly along the north
side of the railroad tracks, and ties into high ground just east of the intersection of Thirteenth Street NE
25
and Fifth Avenue NE. To accommodate the levee, portions of Fifth Avenue NE would be re-aligned. It is
anticipated that this tieback levee would be constructed as part of Construction Stage 1.5 of the
Requester's Preferred Alternative. Figure 2-6 shows the conceptual layout of the tieback levee.
2.1.5.6
Downtown Floodwalls
A floodwall would be constructed parallel to the Burlington Northern Santa Fe Railway on the southern
side of the river from Broadway to Third Street NE. A railroad closure would be needed for the crossing of
the railroad tracks. A floodwall was selected in this area to minimize impacts on the railroad and its
operation facilities.
2.1.5.7
Rodeo Road
A combination of levees and floodwalls would be used in the Rodeo Road segment from Third Street NE
to Fourth Avenue NE. A railroad closure would be needed for the crossing of the Burlington Northern
Santa Fe Railroad and a road closure for the crossing of Seventh Street NE. A portion of Fourth Avenue NE
would be re-aligned along the top of the levee.
2.1.5.8
Roosevelt Park
A combination of levees and floodwalls would be used in the vicinity of the Roosevelt Park and Zoo. On
the southern side of the river, a floodwall would be aligned to maintain Central Avenue as a through
street and allow access to the Roosevelt Park and Zoo. The floodwall would be constructed to protect the
existing pool and bathhouse facility buildings at the park, leaving the skate park on the river side of the
flood protection feature. The floodwall would transition to a levee, and the alignment would continue
through the park, located as close to the river channel as possible, to maintain continuity of the park's
open space. The levee would transition back to floodwall again as the alignment approaches the East
Burdick Expressway. On the northern side of the river, a levee would extend from Fourth Avenue NE to the
Burdick Expressway bridge.
2.1.5.9
Valker Road
Flood risk-reduction measures for the Valker Road segment would include new levees on both sides of
the river, overbank excavation, and an approximately 0.3 mile channel re-alignment located directly west
of Eighteenth Street to minimize impacts on this roadway. Road closures would be needed at the Eighth
Avenue SE bridge, which would remain in place and not be modified. The Burdick Expressway bridge
would be modified to keep the bridge open during flood events.
26
Construction Limits
AVE NE
7TH
SHIRLEY CT
2ND ST NE
6TH AVE NE
4TH ST NE
Road Modifications and
Parking Areas
3RD ST NE
Bank Stabilization Rip-Rap
Sanitary Lift
Station
4T H
AVE NW
3RD ST NE
MAIN ST N
83
5TH
£
¤
WALDERS ST
5TH AVE NE
Construction Limits
7TH ST NE
Overbank Excavation
5TH AVE NE
Road
Realignment
Turf Reinforcement Mat
6TH AVE NE
6TH ST NE
1ST ST NE
LAKE ST
NW
Levee Footprint
Floodwall Alignment
6TH AVE NE
1ST ST NW
5TH AVE
WALDERS ST
4TH ST NW
6TH AVE NW
3RD ST NW
7TH AVE NE
AVE
Gatewell
!
.
Approximate Proposed Pump
Station (New)
NE
4TH AVE NE
NW
Floodwall
Erosion and Scour
Protection
6TH ST NE
!
.
3RD ST SE
Broadway Pump
Station
3RD ST NW
VE
DA
3R
NW
4TH ST
2ND AVE NE
£
¤
83
NW
I
7 TH ST
2ND AVE
NE
Overbank Excavation
1ST AVE NE
1ST AVE NE
Imagery Source: USDA NAIP Imagery 2014
5TH ST NE
4TH ST NE
2ND ST SE
1ST AVE SE
FR
O
NT
ST
4TH ST NE
3RD ST SE
1ST ST SE
1ST ST SW
1ST AVE SW
6T
H
ST
300
600
AVE
SE
6T
H
Figure 2-5
ST
SE
6TH ST SE
SW
VE
TA
S
1
CENTRAL AVE
150
Feet
L
TR A
CEN
MAIN ST S
AV
W
EN
1ST ST SW
1ST
1ST ST SE
0
3RD ST SW
Barr Footer: ArcGIS 10.4, 2017-04-25 16:08 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 2-5 - Detailed Layout of Phase 1.mxd User: KAC2
NE
AVE
4TH
1ST AVE SE
DETAILED LAYOUT OF
PHASE 1
Mouse River Enhanced Flood
Protection Project
9TH AVE NE
Levee Footprint
Floodwall Alignment
Road Modifications
7TH AVE NE
7TH AVE NE
12TH ST NE
10TH ST NE
8TH ST NE
AVE NE
4TH ST NE
7 TH
11TH ST NE
8TH AVE NE
13TH ST NE
6TH AVE NE
Levee Footprint
5TH AVE NE
VE
4TH A
NE
RR AV
Floodwall
E NE
Levee Footprint
8TH ST NE
6TH ST NE
4TH AVE NE
E
AVE NE
10TH ST
N
4T H
D
3R
E
AV
Road Realignment
NE
I
0
NE
2ND AVE NE
175
350
700
14TH S
T
7TH ST
Feet
E
TS
S
8TH
CENTRAL AVE
1ST AVE SE
Imagery Source: USDA NAIP Imagery 2014
Figure 2-6
8TH ST SE
Barr Footer: ArcGIS 10.4, 2017-04-25 16:11 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 2-6 - Conceptual Layout of Tieback Levee.mxd User: KAC2
Road Realignment
CONCEPTUAL LAYOUT OF
TIEBACK LEVEE
Mouse River Enhanced Flood
Protection Project
2.1.5.10
Twenty-Seventh Street SE High-Flow Diversion
Another high-flow diversion would be constructed along the existing railroad and grain elevator property
for flood protection between Souris Court and downstream of Twenty-Seventh Street SE. Similar to the
Maple Avenue High-Flow Diversion discussed in Section 2.1.5.3, a levee would be located on both sides of
the channel and inlet and outlet weirs would be installed at the upstream and downstream ends of the
channel, respectively, to allow flows higher than 3,000 cfs to discharge into the bypass channel. River
control structures would also be needed upstream of the weirs to prevent floodwaters from entering the
bypassed segment of the river during high-flow events. A new bridge would be constructed across the
bypass channel at Twenty-Seventh Street SE to accommodate required channel flow capacity and keep
Twenty-Seventh Street SE open to traffic during flood events.
2.1.5.11
Keller
A new levee would be constructed south of the river in the Keller segment from the Twenty-Seventh
Street Diversion to U.S. Highway 2, where it would connect with the modified embankment of the
highway. A road ramp over the levee would be needed to provide access to properties between the levee
and the river. The U.S. Highway 2 bridge would be modified to keep the bridge open during flood events.
2.1.5.12
Bridge Modifications in the Minot Area
As part of the Requester's Preferred Alternative in the Minot area, three existing bridges would be
modified:
U.S. Highway 83 Bypass bridge--U.S. Highway 83 marks the upstream section of the Minot reach.
The bridge would be lengthened from a 220-foot span to approximately 350 feet. The bridge
would also be raised approximately 3.5 feet. The modifications are required to develop increased
flow area under the bridge and keep this critical transportation route open during the design
flood event. The roadway approach south of the bridge would be raised to 1 foot above the
design water surface elevation to maintain transportation access. Modifications would include
overbank excavation in the area under the bridge and immediately adjacent to it.
Coordination is ongoing with the North Dakota Department of Transportation (NDDOT)
regarding the U.S. Highway 83 Bypass bridge. Construction began in the spring of 2017.
Burdick Expressway bridge--U.S. Highway B2 and the Burdick Expressway bridge were identified
as critical transportation routes through Minot in the event of a flood. Based on required design
flows and hydraulic modeling requirements, modifications to this bridge structure are essential.
Bridge modifications would include realignment to the south to allow for traffic flow on the
existing bridge during construction, increased span length, bridge deck raise, and adjusted
roadway approaches. The bridge would be lengthened from a 200-foot span to approximately
395 feet. The bridge would also be raised approximately 10 feet. Channel excavation would be
performed around the new structure in conjunction with the bridge modifications. Levee
alignments would tie into the bridge abutments.
29
U.S. Highway 2 bridge--U.S. Highway 2 marks the downstream end of the Minot reach. As part of
the Requester's Preferred Alternative, a second set of bridges would be added to increase the
overall total span length to approximately 380 feet from the existing total of 180 feet. The
modifications are required to develop increased flow area under the bridge to keep this critical
transportation route open during the design flood event. The roadway approach south of the
bridge would be raised to 1 foot above the design water surface elevation to maintain
transportation access. Modifications would include overbank excavation in the area under the
bridge and immediately adjacent to it.
2.1.6
Apple Grove
Apple Grove is east of U.S. Highway 2, downstream of the Minot reach. The flood risk-reduction measures
for this community would consist of about 1.3 miles of new levee, a railroad closure structure, a roadway
up-and-over ramp, an interior pump station, and ponding storage. The levee alignment begins at the
modified embankment of the U.S. Highway 2 bridge located north of Apple Grove. It extends around the
community, generally following the Souris River, then turns south to avoid an existing section of remnant
oxbow. The alignment continues until it intersects the Canadian Pacific railroad grade and terminates into
high ground north of U.S. Highway 52. A railroad closure structure would be provided at the railroad
grade intersection. A ramp would be provided to maintain access to the road crossing located just north
of the railroad. About 28 acres of overbank excavation on the northern and southern river banks in the
vicinity of the modified U.S. Highway 2 bridge would increase hydraulic capacity through the bridge reach,
while reducing channel and overbank velocities during the design flood.
2.1.7
River Oaks
Flood risk-reduction measures for the River Oaks community would include a new 0.3-mile-long floodwall
and an internal pump station. Approximately 9 acres of overbank excavation would be conducted on the
northern river bank, just downstream of the end of the floodwall.
2.1.8
Eastside Estates
Eastside Estates is east of U.S. Highway 2 between U.S. Highway 52 and the Souris River. Flood riskreduction measures would include about 1.2 miles of new levee on three sides of the community, a
roadway up-and-over ramp, road and railroad closures, and an interior pump station. The levee alignment
starts at U.S. Highway 52 and proceeds north between Puppy Dog Coulee and the community. It
continues south and crosses U.S. Highway 52, connecting to high ground.
The levee alignment crosses the Canadian Pacific Railroad at two locations. A railroad closure structure
would be required at the eastern crossing. The western crossing does not require a closure structure but
would require a seepage cutoff. A road closure structure would be provided at the levee crossing of
Thirty-Seventh Avenue SE and a ramp would be provided at the intersection of Thirty-Third Avenue SE
and Fiftieth Street SE.
30
2.1.9
Chaparelle
Chaparelle is along U.S. Highway 52 and is the most downstream community in the project area. Flood
risk-reduction measures in this community include about 1,600 feet of new levee, a minor road realignment, and a new pump station to manage internal drainage.
2.1.10
Additional Features of the Requester's Preferred Alternative
In addition to the flood risk-reduction structures discussed in the previous sections, other structures and
features would be needed for constructing and operating the Requester's Preferred Alternative, including:
Ponding areas, interceptor ditches, and pump stations to manage internal drainage.
Gatewells to control stormwater.
Utility modifications and relocations to facilitate construction of the levees and floodwalls.
Roadway modifications to maintain access to properties and to accommodate the levees and
related closure structures.
Levee access ramps for service roads, golf course crossings, or trails.
Borrow sites to obtain soils needed for construction of the levees.
Disposal areas to manage excess soils and debris left over from construction activities.
Demolition of any remaining structures within the construction right-of-way.
Seepage control systems to intercept seepage during flooding and provide geotechnical stability.
Levee and river bank erosion protection.
Overbank excavation of the existing river channel to increase the cross-sectional area and
capacity of river flow during flood events while minimizing the increase in upstream water surface
levels.
Staging areas to store construction equipment and materials.
Details for most of these structures and features would be further refined during the design process of
each phase. Additional information on the pump stations and potential borrow sites is provided in the
following sections.
Pump Stations
Pump stations would be needed to pump stormwater runoff ponded on the landside side of the levees to
the river during periods of river flooding. Interceptor ditches and storm sewers would be used to route
stormwater from upstream ponding areas to the pump stations. The locations of existing and proposed
pump stations are shown on Map 2-1. A total of 24 pump stations (15 new and 9 replacement) would be
constructed for the Requester's Preferred Alternative.
31
The pump stations would be designed in accordance with EM 1110-2-1413 (Engineering and Design,
Hydrological Analysis of Interior Areas), EM 1110-2-3102 (General Principles of Pumping Station Design),
and EM 1110-2-3104 (Structural and Architectural Design of Pumping Stations). The design of each
station would be dependent on site-specific conditions and the volume of stormwater that would have to
be to be managed at each location. The pump stations would generally consist of a cast-in-place,
reinforced-concrete trench-well submersible station, and in some instances, include a heated building
above the pumps for maintenance and pump storage. The exterior finish of the building would be
designed to complement the surrounding neighborhood. The pump stations would have multiple pumps
(minimum of two pumps) with a total maximum pumping capacity ranging from 6,000 gallons per minute
(gpm) to 360,000 gpm. A permanent generator would be installed at each station to provide backup
power during power outages.
For Phases 1 through 3 three new pump stations would be installed: Perkett Ditch Pump Station, Bark Park
Pump Station, and Broadway Pump Station. The Perkett Ditch Pump Station would replace an existing
station located along a levee in Phase 2. The location of this pump station is shown on Figure 2-3 and the
detailed site plan is shown on Figure 2-7. A box culvert would route stormwater from an upstream pond
northwest of the pump station (i.e., Centennial Forest Pond) to a flow-splitter structure. An 84-inchdiameter reinforced-concrete pipe would then carry the water from the flow splitter to the pump station.
The pump station would pump interior stormwater to the Souris River via a discharge piping gatewell
structure. The station would have three 250 horsepower (hp) submersible pumps with an approximate
maximum pumping capacity of 45,000 gpm.
The Bark Park pump station would be a small station on the western edge of the Phase 2 project reach.
The station would consist of two 3,000 gpm pumps incorporated into the gatewell structure. The station
would replace the existing gatewell and will serve to evacuate water from the Tierrecita Vallejo system.
The Broadway Pump Station would be a new permanent pump station devoted to discharging interior
runoff from the Fourth Avenue NE watershed into the Souris River during times of intermediate tailwater,
when the Maple Avenue Diversion is not yet in operation. The Maple Avenue Diversion would be
completed as part of Construction Stage 1.5 of the Requester's Preferred Alternative. In the time between
completing the Broadway Pump Station and completing the Maple Avenue Diversion, the Broadway Pump
Station would operate as the sole means of conveyance from the Fourth Avenue NE watershed for both
intermediate and high tailwater conditions. The location of this pump station is shown on Figure 2-5 and
the detailed site plan is shown on Figure 2-8. A box culvert would route water via a 60-inch trunk sewer in
Third Street NE near the eastern extent of the Phase 1 limits and would convey storm runoff to a new
outfall at the Broadway Pump Station.
32
Perkett Ditch Pump Station
Barr Footer: ArcGIS 10.4, 2016-09-09 13:52 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-7 - Perkett Ditch Pump Station.mxd User: jrv
7th Avenue SW
Parking
Lot
Generator
Inlet Pipe
Transformer
Pump Station
Building
I
0
10
20
40
Feet
Outlet Pipe
Figure 2-7
PERKETT DITCH PUMP
STATION
Mouse River Enhanced Flood
Protection Project
Proposed STS
Storm Hanhole
Broadway Pump Station
Proposed Gatewell
Barr Footer: ArcGIS 10.4, 2017-05-03 13:00 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 2-8 - Broadway Pump Station.mxd User: KAC2
Proposed
Access Road
Proposed
Generator
Building
Proposed
Broadway
Pump
Station
I
0
22.5
45
90
Feet
Figure 2-8
Proposed Gatewell
BROADWAY PUMP
STATION
Mouse River Enhanced Flood
Protection Project
Borrow Areas
Borrow areas are locations that would be used to obtain fill to build features, such as levees. Potential
borrow sources generally consist of existing pits, but some new sources are likely to be considered. A
detailed subsurface investigation program consisting of test pits, soil borings, and lab testing would be
required to characterize and quantify available materials. In addition, environmental and cultural resource
studies would be conducted, as needed, along with research on any easements or land purchases
required to secure the use of the site(s).
The selection of borrow areas would be completed in compliance with Chapter 4 of EM 1110-2-1913. The
overlying objective for selecting a borrow source is to identify impermeable fill for levee construction and
aggregate materials for pipe bedding, road construction, and other potential needs. The primary selection
criteria that would be used to identify, screen, and select borrow source locations are provided below:
Suitable material - The borrow location must contain a sufficient quantity of impermeable soils
meeting the requirements for levee construction. If the material is at an offsite borrow source, the
source must be able to provide at least 100,000 cubic yards of suitable material. Additionally, the
material must be readily obtainable without requiring significant construction and excavation
activities. Suitable material must also be located above the water table or be obtainable at or near
the material's optimum moisture content. Drying the material prior to placing and compacting it
in the levee is not recommended.
Material proximity - The location of the borrow material must not create adverse impacts to the
levee or surrounding structures and Requester's Preferred Alternative features. Preference would
be given to borrow locations near the levee. If suitable, material from existing levees would be
used first. Alternate offsite locations would be identified in the construction documents.
Preference would be given to sites that fit the other suitability criteria, are in close proximity to
the levee sections, and have haul truck accessibility.
Property ownership - Stakeholders who own and manage borrow areas, including Minot and the
SRJB, would receive preference in selecting borrow material. Secondary preference would be
given to cooperative landowners who would provide access to the material with minimal
stipulations on its use. A property-access and material-use agreement would be completed with
the landowner prior to any borrow operations.
Environmental and cultural resource constraints - A desktop environmental and cultural analysis
would be completed prior to the selection of borrow locations. Additional field investigations
would be carried out as needed. Borrow source areas would be selected and laid out to minimize
environmental and cultural resource impacts to the extent practicable.
Restoration requirements - Another criteria for selection of a borrow source includes the amount
of restoration that would be needed. Sites requiring primarily replacement of topsoil and reestablishment of vegetation after material removal would be given more consideration, while sites
requiring construction or restoration of structures would be given less consideration.
35
As part of the PER (reference [1]), a desktop review of available topographic, soil, and geological maps,
aerial photographs, historical boring logs and well data, and information on existing engineering projects
was conducted to identify potential borrow sites. Seven potential sites have been identified in the project
area as shown on Figure 2-9. Additional studies (e.g., biological surveys, wetland surveys, cultural
resources investigations, geotechnical investigations) have been conducted at several of these sites to
evaluate site-specific impacts and suitability of the borrow material. The survey results were used to select
a borrow site that will provide suitable levee soils and will minimize impacts on environmental and cultural
resources. The Price Site has been identified as the borrow source for Phases 1, 2, and 3 of the Project.
36
Potential Borrow Site
Parcels
Project Footprint
Municipalities
Price Site
CITY OF
BURLINGTON
£
¤
B83
£
¤
83
MADC Site
Barr Footer: ArcGIS 10.4, 2017-04-30 13:46 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 2-9 - Potential Borrow Areas.mxd User: kac2
Highway 2
Site
CITY OF MINOT
£
¤
2
£
¤
B2
Magic City
Campus Site
I
£
¤
B52
0
Mini Golf
Course Site
2,000
4,000
8,000
Feet
£
¤
83
£
¤
52
Figure 2-9
Imagery Source: USDA NAIP Imagery 2014
LOCATIONS OF POTENTIAL
BORROW AREAS
Mouse River Enhanced Flood
Protection Project
2.1.11
Design, Construction, and Operations
The Requester's Preferred Alternative would be designed, constructed, and operated in accordance with
current USACE standards for federal flood risk-reduction projects and in accordance with the methods
and references cited in USACE engineering manuals, technical letters, regulations, and other documents.
The Requester's Preferred Alternative would be primarily constructed within the right-of-way of the
existing federal project. Additional right-of-way would be obtained where needed through purchase of
easements, Minot's voluntary buy-out program, or in some situations, condemnation. The proposed rightof-way would create a corridor which would have a minimum width of the levee, floodwall, and
embankment (including all appurtenant structures), plus 15 feet on each side measured from the outer
edges of the outermost critical structure. Temporary easements to facilitate construction activities, borrow
sites, and staging areas would also be obtained where needed.
For Phases 1 through 3, the staging areas would be located along the construction corridors and within
the construction limits shown on Figure 2-3 and Figure 2-6. For other segments in Construction Stage 1.5,
the staging areas would be located within the construction limits or within acquisition areas along the
construction corridor.
2.1.11.1
Requester's Preferred Alternative Feature Designs
The typical designs of the larger features (i.e., levees, floodwalls, high flow diversions, realigned channels,
and overbank excavations) of the Requester's Preferred Alternative are described in the following sections.
Additional design and specifications for Phases 1 through 3 are also provided in the Basis of Design
Reports (reference [4]; HEI 2015).
Levees
The typical levee for the Requester's Preferred Alternative would have side slopes of 3 horizontal to 1
vertical (3H:1V) with a minimum top width of 12 feet. The average levee height through the developed
portions of Minot would be about 14.4 feet, including a minimum 3 feet of freeboard for the design flood
event. The typical levee layout also includes a 15-foot-wide clear zone beyond the landside toe of the
levee for seepage control measures, inspection, and maintenance access. The typical levee cross section is
shown in Figure 2-10.
38
Figure 2-10
Typical Levee Cross Section
Floodwalls
Floodwalls consist of vertical wall sections to confine flood flows. The typical flood wall for the Requester's
Preferred Alternative would consist of a reinforced concrete inverted-T cantilever wall section as shown on
Figure 2-11. Similar to the levee, the typical floodwall layout would also include a clear zone beyond the
landslide toe of the floodwall for seepage control measures, inspection, and maintenance access. Because
of their more complex design, higher stresses on structural members, limitations on temporary raises
during emergency flood fighting, and higher construction costs, floodwalls have generally been sited only
where adequate space was not available to construct levees.
Figure 2-11
Typical Floodwall Cross Section
High-Flow Diversion Channels
High-flow diversions are new channels set above the existing river channel to convey flood flows and
bypass a portion of the existing channel. Two high-flow diversions are included in the Requester's
Preferred Alternative to reduce the number of residential properties affected by construction. The two
locations are in Minot and are referred to as the Maple Avenue Diversion and the Twenty-Seventh Street
39
SE Diversion. Water would only flow through these diversions during flows that exceed 3,000 cfs. As such,
the diversion channel bottom would be at a higher elevation than the existing river channel bank.
Control structures would be located at the upstream (inlet) and downstream (outlet) ends of each
diversion. Flows below 3,000 cfs would flow through the existing river channel. River closure structures
would be constructed in the existing river channel upstream and downstream of each of the high-flow
diversion channels. During normal flows the closure structure would be open, allowing water to continue
through the original river channel. When a flood event occurs the structures would be closed and all river
flows would be diverted into the high-flow diversion channel. The bottom width and elevation of the
high-flow diversion channel would vary based on required channel capacity and use of channel space in
non-flood conditions. A typical high-flow diversion cross section is provided in Figure 2-12.
Figure 2-12
Typical High-Flow Diversion Cross Section
Realigned Channels
Potential realignment channels have been proposed for the Kings Court and Valker Road segments. These
realignments have been designed to be about as long as the original channel. At each of these locations
the existing channel would be closed off with a levee, and flows would be managed through the dead
loop with a gatewell system. The gatewells would be open to allow river flows through the dead loops
during non-flood conditions, and the gatewells would be closed during flood events. A new channel
alignment would be excavated to convey all river flows up to the design flow event. The bottom elevation
of the channel would vary based on channel capacity during the design flood event and the acceptable
design water surface elevation. Geometry for channel realignments would closely mimic the existing
channel geometry in proximity to the realignment. The slope on the sides of the channel excavation
would range from 45H:1V.
Channel realignment corridors were designed be similar to levee corridors where flood protection
measures are located on each side of the realignment. In areas where flood protection is not immediately
adjacent, the channel realignment would be treated in a manner similar to other typical river corridors. A
typical channel realignment cross section is shown in Figure 2-13.
40
Figure 2-13
Typical Channel Realignment Cross Section
Overbank Excavation
Overbank excavations would be used to increase the cross section capacity for water flow during flood
events to minimize the increase in upstream water surface levels. Overbank excavations would be
primarily within Minot, in areas where space is restricted. To minimize impacts to the existing river and
wetlands the bottom elevation of the excavated section would typically be at the delineated Ordinary
High Water Level (OHWL) or above the 2-year flood event water surface elevation (approximately 1,150
cfs river flow). The slope on the side of the excavation would be 3H:1V and would typically extend from
the bank of the existing channel to a constructed feature as shown on Figure 2-14. Topsoil and erosion
protection materials could be placed in the excavation areas as part of the restoration procedures.
Figure 2-14
2.1.11.2
Typical Overbank Excavation Cross Section
Construction Activities
Construction activities would include demolishing and removing remaining structures, streets, and
utilities; excavating exploration trenches to search for unknown utility penetrations; removing vegetation
and unsuitable soils; constructing levees; and restoring the site. Temporary and permanent erosion
control measures would be implemented during the construction process to minimize surface runoff and
the deposit of sediment in the river and nearby wetlands. Each of these construction activities is generally
described in the following sections.
41
Structure Demolition
Houses, sheds, and garages within the new levee right-of-way and open floodplain storage areas would
be completely removed, along with basements, foundations, drain tiles, and bedding aggregate.
Appurtenant items would be removed in similar fashion, including sidewalks and private utilities
(including water, sanitary sewer, and all other underground utilities). The excavations would be backfilled
with impervious material and compacted in a series of lifts. The removed material would be transported
offsite for disposal at a licensed landfill.
Exploration Trench
Prior to constructing levees or closure structures, an exploration trench of 6-foot depth (Type I) or 10foot depth within demolished structure footprints (Type II) (Figure 2-15) would be excavated to verify that
the corridor is clear of unknown utility penetrations according to Section 7-2 of reference [6]. Backfill
would only be placed after careful inspection of the excavated trench to ensure that seepage channels or
undesirable materials are not present.
Figure 2-15
Exploration Trench Type I and Type III
Vegetation Removal
Clearing and grubbing would be conducted within the levee corridors, including removal of all vegetation,
roots, stumps, etc. A vegetation-free zone would be developed with a minimum width that encompasses
the levee, floodwall, or embankment dam, including all critical appurtenant structures, plus 15 feet on
each side from the outer edge of the outermost critical structure. Non-compliant vegetation would be
removed to reduce the risk of compromising the levee integrity in these areas. Areas where trees and
shrubs infringe upon this zone would be identified prior to construction. Unwanted vegetation within the
vegetation free zone would be removed during the flood protection system upgrades. This would include
removing both trees and shrubs above grade and removing roots greater than ½ inch in diameter in the
required root-free zone.
Street and Utility Demolition
Exiting streets and utilities would be removed within the new levee right-of-way. Roadway pavements and
base aggregates would be removed down to the subsoils of low permeability. Public and private utilities
existing under the street would be removed or abandoned. The removed material would be transported
offsite for disposal at a licensed landfill.
42
Levee Construction
Existing topsoil would be removed from the levee footprints and stockpiled for re-use during reclamation.
Wetland and other unsuitable soils would be removed entirely from the levee footprints and replaced with
acceptable compacted impervious fill. The levees would be constructed with impervious material, placed
in specified lifts, and compacted according to project specifications. The material for the levees would be
obtained primarily from designated borrow sites. Any excess material such as unsuitable soils and
construction debris would be disposed of at a licensed landfill or other approved disposal area.
Levee and River Bank Erosion Protection
Design for protection against levee and river bank slope erosion resulting from high velocities, shear
stresses, and scour during flood events would be completed in accordance with the Project Design
Guidelines, EM 1110-2-1601 (reference [7]), and FHW0A's HEC-11, Design of Riprap Revetment
(reference [8]). The main focus of erosion protection design is to protect the levee system. Designs would
include an evaluation of river geometry, soil conditions, scour potential, and consideration of multiple
flood events including the 2010 peak flow event (1,100 cfs), the preliminary flow being identified as the
100-year (1-percent annual chance) flood event (10,000 cfs), and the 2011 flood event (27,400 cfs).
Levee erosion protection would typically be designed considering total stream velocity, which is defined
as the average velocity of flow in the total cross-section. Bank erosion protection would be designed
considering modeled channel velocity.
Erosion protection at structures and outlets would be required to prevent erosion from concentrated
flows. Tie-back levees and existing levees to remain in place would be reviewed for protection against
potential overtopping.
Erosion protection design would explore alternative methods, when possible, that would meet both
erosion protection needs and levee design requirements. Potential alternatives include riprap, articulated
concrete block, turf-reinforced mats, and natural bioengineering methods. Selection of the appropriate
erosion protection method would be dependent on several factors, including river geometry, proximity of
levee to the river, depth, and velocity. The goal would be to balance erosion protection requirements with
aesthetic and environmental considerations.
Launchable riprap would be used in select areas for both bank and toe scour protection. Launchable
riprap is a technique for rock placement that provides protection against the undermining of bank
armoring. The riprap is designed to migrate downslope in the event of scouring. In some areas this may
result in a slight increase in riprap footprint.
Seepage Control
A seepage collection system is anticipated to be installed along the levee landside toe to intercept
seepage during flooding and provide geotechnical stability. Seepage collection would typically involve a
trench system with the following features:
43
Shallow Filter Trench--The upper portion of the seepage collection trench would be a trapezoidal
granular filter trench. The trench would be backfilled with fine aggregate and courser aggregate
material would be placed around a collection pipe.
Collection Pipe--A perforated, smooth-walled collection pipe would be centered horizontally in
the trapezoidal shallow filter trench to route seepage water to storm sewer facilities. This pipe
would typically be connected directly to a storm sewer manhole. Pipe size would be based on
slope, proposed pipe material (perforated, smooth walled) and anticipated seepage flow beneath
the levee.
Deep Relief Trench--The lower portion of the seepage collection trench would be a vertical
granular relief trench that extends down from the shallow relief trench and connects directly to
underlying high-permeability sand/gravel layer at a depth of approximately 15 to 20 feet.
The seepage collection system would be designed and constructed in accordance with EM 1110-2-1913
(reference [6]). Figure 2-16 shows a typical seepage collection trench at landside toe of the levee system.
Depending on soils and geotechnical analysis, seepage cut-off systems such as driven sheet pile or slurry
wall may be necessary in specific locations.
44
Figure 2-16
Typical Schematic of Seepage Collection System
Site Restoration
Areas disturbed by construction activities would be revegetated to prevent erosion and sedimentation,
stabilize the levee and associated appurtenances, and restore a natural and aesthetic appearance.
Revegetation of the restored areas would be conducted using a variety of methods based on site-specific
conditions. General methods and applicable locations for restoration measures include the following:
Topsoil and sod--Minot right-of-way, critical infrastructure green space.
Topsoil, hydraulic soil stabilizer, and seeding--open space areas, levee slopes, and all general
disturbed areas.
Topsoil with erosion control blanket and seeding--critical slope areas typically 3H:1V or steeper,
concentrated stormwater flow areas, slopes immediately adjacent to wetlands or other
environmentally sensitive areas.
Topsoil with TRF and seeding--slopes around critical infrastructure such as closures, headwalls, or
areas receiving concentrated stormwater flow.
Revegetation with native seed mixes and tree plantings open space areas.
45
Erosion Control Measures
Erosion control measures would be installed by the contractor prior to starting construction. As part of the
construction documents, a Stormwater Pollution Prevention Plan (SWPPP) would be developed to comply
with North Dakota Pollutant Discharge Elimination System (NDPDES) permit requirements. In accordance
with local, state, and federal requirements, and best management practices, the SWPPP would outline the
design, implementation, management, and maintenance of facilities, to reduce the amount of sediment
and other pollutants in stormwater discharges associated with land-disturbing activities.
Temporary measures used to control erosion and sedimentation during construction may include one or
more of the following:
Rock construction entrance
Sediment pond
Silt fence
Erosion-control blanket
Inlet siltation protection
Concrete washout
Floating silt curtain
Rock filter levee
Temporary and Permanent Vegetation
Dewatering controls
Temporary and permanent erosion-control measures would be specified on the construction drawings for
each phase of the project. During the construction process, the contractor would inspect and monitor the
installed erosion-control measures to verify they are functioning properly and providing adequate
functionality for construction phasing and scheduling. Any damaged or malfunctioning structures would
be fixed or replaced. It is anticipated that the contractor may also need to modify the erosion-control
measures as work proceeds, based on site-specific conditions and, if needed, install additional structures
to meet the requirements of the SWPPP. Any modifications to recommended erosion-control measures
would be documented by the contractor and included in any required contractor submittals or work
plans.
Utility River Crossings
Some municipal utilities would have to be modified as levees are constructed, interior drainage is
improved, and roadways are modified. Affected utilities would include sanitary sewers, watermains,
forcemains, and storm sewers. Utilities that cross under the Souris River channel would typically be
installed using open cut trench methods. These methods would include:
46
A steel sheet pile cofferdam system would be installed to facilitate open trench excavation. In
order to allow continued river flow during construction, the cofferdam would be limited in length
to approximately half of the river channel width at a time. The corridor width of the cofferdam
system would be reduced as much as possible to minimize temporary impacts on the river and
adjacent wetlands.
After the cofferdam system is completed, the area within the cofferdam would be dewatered by
pumping water to a sediment basin located in an adjacent upland area in accordance with
requirements specified in the SWPPP.
Once the area is dewatered, a trench would be excavated and the utilities would be installed
within the trench. Excavated material would be contained within the cofferdam system. Any
wetland soils excavated during construction would be stockpiled and replaced after construction
has been completed.
The river bed would be restored to pre-existing conditions and the cofferdam system would be
removed to allow normal flow in the river channel.
2.1.11.3
Operation and Maintenance
An addendum to the original Operations and Maintenance (O&M) Manual for the specific projects would
be completed as part of the Requester's Preferred Alternative. The manual would summarize the
procedures required for operating, maintaining, repairing, rehabilitating, and replacing Project features
and would include the latest approved flood risk-reduction regulations, maps, drawings, tables, and
references. The manual would likely include the following sections:
Section 1.0
General Information
Section 2.0
Ordinary Inspections, Maintenance, and Operations
Section 3.0
Inspections, Tests, and Operations during an Impending Flood
Section 4.0
Operations during Floods
Section 5.0
Post-Flood: Inspections, Tests, and Operations
Section 6.0
Post-Flood Report
Section 7.0
Repair, Replacement, and Rehabilitation
The addendum to the O&M manual would be part of the project's Construction Documentation Report,
which would be reviewed and approved by the USACE, FEMA, and the project sponsor upon completion
of the Requester's Preferred Alternative.
47
2.2
Other Alternatives Considered
In the evolution of this project, several sets of alternative plans have been developed and evaluated by the
requester with the goal of minimizing adverse impacts to the environment, local interests, and industry.
This section summarizes alternatives considered, including macro-scale alternatives that were more
conceptual in nature and micro-scale alternatives with more detailed analysis.
This analysis addresses alternatives for reducing flood risks from the Burlington through Minot stretch of
the Project. The alternatives were evaluated in terms of their effectiveness in meeting Project purpose and
need, as specified in Section 1.1.
Alternative plans that could meet these Project goals are described in this section. Social, environmental,
political, and economic constraints were used to evaluate larger conceptual Project alternatives and
screen out those that they felt were not viable from further analysis.
The generalized concept of the Requester's Preferred Alternative was determined to be a viable option for
meeting the Project's purpose and need. Different alternative alignments and features were also analyzed
in more detail for smaller segments of the Requester's Preferred Alternative in Section 2.2.3. These
smaller-scale design alternatives face fewer broad social, political, and economic limitations, but would
have substantial, prohibitive, local impacts.
2.2.1
Upstream Flood Storage Alternatives
The four upstream dams (Rafferty Dam, Boundary Dam, Alameda Dam, and Lake Darling Dam
[Figure 2-17]) are multiple purpose reservoir projects, operating for both flood storage and for water
supply and conservation purposes. The drawdown of the pool levels and the flood operation of these
dams are governed by an international agreement between the United States and Canada. The United
States and Canada have worked jointly to develop a water control plan that specifies procedures for
operating all four dams during flood and non-flood conditions, consistent with the objectives of providing
water supply and controlling flooding.
The Rafferty, Alameda, and Boundary dams are owned and operated by the Saskatchewan Water Security
Agency. The Rafferty and Alameda dams are part of the Rafferty-Alameda Project that was developed
between 1988 and 1995 to provide cooling water for the Shand Power Station near Estevan, reduce flood
risk for residents downstream in Saskatchewan and North Dakota, and provide a reliable water source for
municipal, domestic, irrigation and recreational use in the Saskatchewan portion of the Souris River Basin.
The Boundary Dam was built in 1957 on Long Creek, a tributary of the Souris River, to provide cooling
water for the Boundary Dam Generating Station. A channel links the Boundary Dam and the Rafferty Dam,
allowing water to flow between the two reservoirs.
The Lake Darling Dam is within the Upper Souris NWR and is owned and primarily operated by the
USFWS, in accord with the water control plan developed by international agreement (the USACE takes
over operation of the dam during a 10-percent annual chance flood or larger). The primary purpose of the
Lake Darling Dam and reservoir is to furnish a regulated supply of water to smaller wetlands downstream
48
and especially to the larger wetlands on the J. Clark Salyer Refuge, 110 miles downstream. The reservoir is
designed to hold a two-year supply of water to safeguard wetlands downstream against the threat of
drought.
The Lake Darling Dam, however, is operated in coordination with the upstream Rafferty-Alameda Project
and plays an integral role in flood control within the Souris River Basin. During flood conditions, USFWS
coordinates with USACE to manage releases to mitigate downstream flood risk, as specified in the
international water control plan. The Lake Darling Dam was modified as part of the USACE Souris River
flood risk-reduction project in the 1990s to provide additional storage and operational control of
flooding. At this time the dam has a maximum flood pool level of elevation 1601. Flood pool levels as
high as elevation 1620 were evaluated as part of the USACE Souris River Project, but the higher flood pool
levels were not selected due to the substantial adverse impacts associated with habitat loss relative to the
fairly modest degree of additional flood protection provided (reference [9]). The 1601 elevation in
combination with the flood storage in the Rafferty-Alameda Project was selected as the preferred
alternative for the USACE Souris River Project.
Although these existing dams are operated to reduce flooding in the downstream areas, they were only
partially able to reduce the peak flood flow for the June 2011 flood of record. Additional upstream flood
storage would be needed to meet the Project's need. This additional flood storage could be acquired by
implementing either a major structural approach or a non-structural approach at one or more of the
existing dams. Alternately, upstream flood storage capacity could be increased by constructing an entirely
new storage basin. Each of these approaches is discussed in the following sections.
49
Mo
os
e
Mo
un
ta
in
C
ree
k
Manitoba
Barr Footer: ArcGIS 10.4, 2016-09-09 13:57 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-17 - Upstream Flood Storage Alternatives.mxd User: jrv
Saskatchewan
Alameda Dam
)
"
Rafferty Dam
is
ur
Sou
r
Boundary Dam
)
"
So
)
"
Ri
is R
iv e r
r
ve
CANADA
UNITED STATES
Divide
County
£
¤
52
North Dakota
Bottineau
County
us
eR
Renville
County
Mo
Burke
County
ive
r
Lake Darling Dam
De
s
Williams
County
£
¤
2
Mountrail
County
Ward
County
)
"
La
cs
Ri
v
Burlington
McKenzie
County
I
Provincial/State Boundaries
0
7.5
15
Miles
McHenry
County
£
¤
83
Upstream Dam
County Boundary
Minot
£
¤
Project Area
)
"
er
52
Figure 2-17
30
UPSTREAM FLOOD STORAGE
ALTERNATIVES
Mouse River Enhanced Flood
Protection Project
2.2.1.1
Operational Modifications of Existing Dams
Non-structural alternatives for creating additional upstream flood storage to meet the Project needs,
including protection to 27,400 cfs, would involve modifying the operating plans of the Rafferty, Boundary,
Alameda, or Lake Darling Dam. This could be done in one of two ways:
1.
Drawing down the reservoir pool levels further in the spring prior to runoff - a significant part of
the flood storage capacity at these four dams comes from drawing down the pool level over the
winter in anticipation of storing the spring runoff from snowmelt and coincidental rainfall.
Additional storage could be gained by further drawing down the pool levels during the winter
months.
2.
Increasing the reservoir releases during flood events - strategically targeting higher levels of
discharge during non-major flood events could create extra storage capacity in these reservoirs
so that the flood storage could be more effectively used to reduce the peak flows from larger,
infrequent events such as the 2011 flood of record.
Operational modification alternatives and their advantages and disadvantages are summarized in
Table 2-2 and discussed further below.
Table 2-2
Location
Alternatives Evaluated for Operational Modifications of Existing Dams
Alternative
Further
drawdown prior
to spring
runoff
Rafferty Dam,
Boundary Dam,
Alameda Dam,
& Lake Darling
Increasing
reservoir
releases
during
flood
events
below
5,000 cfs
Effectiveness
Minimal
effectiveness for
the flood of
record, but may
reduce peak flows
downstream
during flood
events of lower
magnitude; only
effective for runoff
events upstream
of the dams
Cost
Less than
$100,000
Socio-Economic/Political Natural Resource
Considerations
Considerations
Requires extensive
international
negotiations; restricted
by existing reservoir
purposes
May impact
adequacy of water
levels to support
downstream
refuge habitat
objectives
Requires extensive
international
negotiations; restricted
by existing reservoir
purposes; may cause
increased downstream
flood impacts during
non-major flood events
or when runoff occurs
downstream of the
dams
May impact
adequacy of water
levels to support
downstream
refuge habitat
objectives
The potential benefits of additional spring drawdown or increased reservoir releases during non-major
flood events would include reduced peak flows and reduced frequency and risk of major flood events in
downstream areas. Operational modifications have the further benefit of being a relatively low cost
51
option. A significant drawback, however, is that if the flood runoff comes from a part of the drainage basin
that is not controlled by the dams, the additional storage might not effectively reduce peak flows and
could, in some situations, increase peak flows. The likely effectiveness of a spring drawdown is further
limited by the possibility that the extra flood storage could already be filled to capacity when additional
flooding occurs.
The effectiveness of a spring drawdown is also limited by the need to ensure that the reservoir pool will
refill to the designated levels so that other project purposes, particularly supplying water in Canada, can
be met. In addition, adequate water levels are critical in maintaining the natural resource conservation and
habitat creation objectives of these dams can be attained, especially the Lake Darling Dam.
Alternatives involving the release of larger flows from the dams during flood events face significant
challenges as they could result in additional undesired flood damages downstream. One of the current
key factors in determining dam releases during a flood is to keep the target flow of the Souris River at
Minot at or below 5,000 cfs, which is the design flow for the existing USACE flood risk-reduction projects
from Burlington through Sawyer. At flows higher than 5,000 cfs, potential damages could occur in the
developed areas downstream of Burlington. To achieve any higher levels of discharge during a flood so
that the flood storage could be more effectively used to reduce the peak flows from larger floods,
additional local measures from Burlington through Sawyer and on other reaches of the river in both the
U.S. and Canada would be required.
Most importantly, effectively addressing the Project objectives through operational modifications at the
existing dams would require challenging and time-consuming renegotiation of the existing international
agreement. Changes to the water supply and habitat/wildlife objectives of the Souris River Basin would
require significant compromises by many US and Canadian agencies.
Modifying dam operations would only be effective in reducing risks of floods from rainfall events
upstream of the dams; as such, these alternatives do not meet the current Project objectives. Because of
the political challenges and ineffectiveness to meet the Requester's desired objectives, these alternatives
have not been carried forward for further evaluation as part of this EIS.
The International Souris River Board is currently preparing a Plan of Study to review upstream dam
operations for flood conditions. In addition, the USACE is conducting a feasibility study to assess the
Souris River Basin's flood risk reduction features. These studies could potentially lead to recommended
modification of the basin's dam operations and to the reservoirs, levees, and channels. Any changes in
operations would be taken into consideration when planning and designing future Project phases that
have not yet been constructed.
2.2.1.2
Structural Modifications of Existing Dams
Additional upstream flood storage could be established by making structural modifications to the existing
Rafferty, Alameda, or Lake Darling dams to increase their storage capacity. Additional flood storage at the
Alameda and Rafferty dams would require major modifications to raise the dam embankments, as well as
52
modifications to the spillway and operating gates. Constructing additional storage at the Lake Darling
Dam would involve raising dam embankments.
Structural modification alternatives and their advantages and disadvantages are summarized in Table 2-3
and discussed further below.
Table 2-3
Alternatives Evaluated for Structural Modifications of Existing Dams
Location
Alternative
Rafferty
Dam
Raise dam
embankments,
modify spillway and
operating gates
Alameda
Dam
Raise dam
embankments,
modify spillway and
operating gates
Lake
Darling
Dam
Raise dam
embankments
Effectiveness
Cost
Minimal effectiveness
for the flood of record,
but may reduce peak
flows downstream
during flood events of
lower magnitude; only
effective for runoff
events upstream of the
dams; minor reduction
of impacts for 2011
flood levels
$200-700
million
(reference [10])
Socio-Economic /
Natural
Political
Resource
Considerations
Considerations
Land
acquisition/displace
ment concerns,
international
coordination
considerations
Habitat loss
Land
acquisition/displace
ment concerns,
recurring
agricultural losses
Habitat loss,
conflicts with
USFWS
refuge goals
In general, the ability of the alternatives identified in Table 2-3 to effectively meet the Project need
correlates with the magnitude of additional storage capacity constructed. In order to achieve the desired
levels of flood risk reduction, major modifications would be needed. These modifications would result in
large capital expenditures, would require significant amounts of land, and would present potentially
substantial social and political challenges.
The potential benefits of structural modifications to these existing dams would be to reduce both
localized peak flows as well as the frequency and risk of major flood events in the downstream areas. A
significant drawback in terms of overall effectiveness, however, is that if the flood runoff comes from a
part of the drainage basin that is not controlled by the dams, the additional storage might not be
effective in reducing system-wide peak flows.
Constructing additional flood storage at the Alameda and Rafferty dams presents a number of cost,
resource-impact, and political challenges. Because the structural modification alternatives would require
major construction to modify the existing dam infrastructure, these projects would most likely be very
expensive. Constructing additional flood storage would require acquisition of additional lands to be
periodically flooded by the larger reservoir pool, causing environmental and social impacts when current
land uses (habitat, housing, etc.) are displaced.
53
Most importantly, the Alameda and Rafferty structural modification alternatives would require
coordination, cooperation, and funding agreements between the U.S. and Canada. As a result, a
modification project would have to meet both Canadian and U.S. interests and meet both countries'
federal standards for economic justification. Because the majority of the benefits of the additional flood
storage would accrue to areas within the U.S., the project would not likely meet Canadian standards for
economic justification.
Constructing additional flood storage at the Lake Darling Dam would present a number of similar cost
and resource-impact challenges, as discussed in a 2012 design charrette conducted by the USACE. Like
the structural modification alternatives for the Alameda and Rafferty dams, major modification of the
existing Lake Darling Dam infrastructure would likely cost hundreds of millions of dollars. As noted in
Section 2.2.1, the existing Lake Darling Dam was modified as part of the USACE Souris River flood riskreduction project in the 1990s to provide additional storage and operational control of floods and was to
be operated in coordination with the upstream Rafferty and Alameda projects. The existing maximum
flood pool level was chosen after extensive planning efforts, and a number of alternatives were considered
in the environmental review process (USACE, 1985). Adverse environmental and social impacts, large landacquisition requirements, and compatibility issues with the existing USFWS refuge management plans
were deemed prohibitive at higher flood pool levels.
Due to the significant challenges identified above, none of the structural modification alternatives are
presently considered viable and these alternatives have not been evaluated further in this EIS. However,
these alternatives may be reconsidered in close collaboration with Canadian partners for viability in future
Project phases.
2.2.1.3
Construction of New Storage
Additional flood storage capacity could be provided by constructing new dams upstream in Canada or in
the U.S. In Canada, new storage could be constructed along the Souris River or Moose Mountain Creek.
New storage in the U.S. could be constructed along the Souris River or the Des Lacs River upstream of
Burlington.
New storage alternatives and their advantages and disadvantages are summarized in Table 2-4 and
discussed further below.
54
Table 2-4
Alternatives Evaluated for Construction of New Storage
Location
Canada: Souris
River or Moose
Mountain Creek
United States:
Souris River
United States:
Des Lacs River
Alternative
Construct new dams on
Souris River or Moose
Mountain Creek
Construct dam at
Burlington, Baker
Bridge, or Confluence
sites
Construct dam
upstream of Burlington
Effectiveness
Cost
Reduced peak
flows; reduced
frequency and
risk of major
flood events in
the
downstream
areas
$200-300
million
Control over
very small part
of the total
upstream
watershed
$30-40 million
(reference [10])
SocioNatural
Economic/Political
Resource
Considerations Considerations
Land acquisition/
displacement
concerns,
international
coordination
considerations
Habitat loss
Land acquisition/
displacement
concerns;
ongoing public
opposition
Habitat loss,
conflicts with
USFWS
refuge
management
plans
Land acquisition/
displacement
concerns
Habitat loss
In general, the alternatives identified in Table 2-4 could potentially meet the Project need, but similar to
the case with structural modifications at existing dams, would require large capital expenditures and the
acquisition of large tracts of land, and would present potentially insurmountable social and political
challenges.
Potential new dams in Canada on the Souris River or Moose Mountain Creek would present the same
challenges as structural modifications to Alameda or Rafferty dams, except that the new sites could be
more costly, have greater adverse environmental and social impacts, and require greater land acquisitions.
Furthermore, construction of new storage capacity in Canada would require coordination, cooperation,
and funding agreements between the U.S. and Canada.
As with operational or structural modifications at any of the existing Canadian dams, construction of a
new dam would be governed by an international treaty. As a result, any new dam project would have to
meet both Canadian and U.S. interests and comply with both countries' federal standards for economic
justification. Because the majority of benefits of the additional flood storage would accrue to areas within
the U.S., a new dam project would not likely meet Canadian standards for economic justification.
Similarly, flood storage at new dams in the United States could be quite costly, have greater adverse
environmental and social impacts, and require greater land acquisitions than structural modification of
existing dams. Furthermore, new dam alternatives in the U.S. were previously evaluated and were
determined to be unsuitable due to cost and political and social challenges (USACE, 1985). The Baker
55
Bridge and the Burlington and Confluence dams on the Souris River were all previously evaluated as part
of USACE's EISs for the Burlington Dam and the Lake Darling flood control project.
The Baker Bridge site was reviewed and dismissed due to the limitations on the total volume of water that
could be accommodated at this site and the unacceptable impacts to USFWS refuge lands. The
Confluence site was dismissed due to high costs and the significant highway and railroad relocations that
would have been required. The Burlington site was recommended by USACE and authorized by Congress
as a single-purpose flood storage site to be combined with other downstream project features that would
provide flood risk reduction for the Souris River Valley. Due to the extreme controversy surrounding the
Burlington Dam, however, Congress directed the USACE to stop design and de-authorized the project,
recommending in its place flood storage in the Lake Darling, Rafferty, and Alameda dams. This
recommendation was ultimately implemented.
New dam sites on the Des Lacs River could also be considered for flood storage, although challenges exist
similar to those at the sites on the Souris River. A major drawback is that the Des Lacs River is a tributary
to the Souris River and only controls a relatively small part of the total upstream watershed. The
contribution of the Des Lacs to the June 2011 flood peak was not significant, and additional storage on
the Des Lacs would not have reduced the 2011 flood peak. That being the case, it is not a viable option for
meeting the Project objectives.
Due to the significant challenges identified above, none of the new dam construction alternatives have
been evaluated further in this EIS.
2.2.2
Diversion Channel Alternatives
Diversions of flood flows upstream of flood-prone areas can be an effective way to reduce the risk of
flood damages. There are two basic concepts of diversions that would meet the project need for the
Souris River Valley:
Diversions from upstream of Lake Darling that would reduce flood flows along the entire U.S.
reach of the Souris River.
Local site diversions that would reduce flood flows and levels along specific reaches of the river.
Several potential diversion channel alternatives following these two basic concepts have been identified
and are discussed further below.
2.2.2.1
Major Upstream Diversions
Creating a major upstream diversion channel to meet the Project need would involve diverting high flows
from the Souris River starting from a location between the Lake Darling dam and the Canadian border.
Flows would then be diverted easterly to re-enter the Souris River downstream of Minot, likely somewhere
between Towner and the Canadian border. The two locations where such a diversion could be
accomplished are immediately south of the Canadian border (49 th Parallel alternative) and at the Lake
Darling Dam Reservoir (Lake Darling alternative), as shown in Figure 2-18.
56
Both major upstream diversion alternatives would provide flood-reduction benefits to the majority of
damage-prone locations along the Souris River in the U.S. but would be high cost projects with sizeable
adverse social and environmental impacts. These two alternatives and their advantages and disadvantages
are summarized in Table 2-5 and discussed further below.
Table 2-5
Major Upstream Diversion Alternatives
Location
Immediately
south of and
parallel to the
Canadian
border
Lake Darling
Reservoir,
Spring Coulee,
Deep Creek,
and Souris River
in Bottineau
County
Alternative
Effectiveness
49th Parallel
Diversion
Lake Darling
Diversion
Cost
$2-8 billion
Diversion designed to
pass up to 22,400 cfs,
which would help
Minot with keep peak
flows at or below
5,000 cfs for floods
originating on the
upper Souris River
$3-8 billion
(reference [10])
SocioNatural
Economic/Political
Resource
Considerations Considerations
Large land
requirements,
high cost for
excavation,
incompatable
with NWR
Habitat loss,
surface and
groundwater
impacts
along
alignment
Large land
requirements,
high cost for
excavation and
pump operation,
incompatable
with NWR
Habitat loss,
surface and
groundwater
impacts
along
alignment,
conflicts with
USFWS
refuge
management
plans
49th Parallel Diversion
The 49th Parallel Diversion alternative would divert Souris River high flows by way of a diversion channel
located just south of and parallel to the Canadian border. The diversion channel would begin near
Sherwood and terminate near Westhope, thereby diverting high flows upstream of Souris River Park and
downstream of J. Clark Salyer NWR.
Several diversion plans using the 49th Parallel alternative alignment have been studied in the past (also
referred to as Sherwood to Westhope Diversion and Boundary Diversion). The Burlington Dam EIS
considered this diversion, but found it economically infeasible due to the extent and cost of required
excavation. Because of its environmental, social, and economic disadvantages, the 49 th Parallel Diversion
alternative was not given further consideration in the Burlington Dam EIS.
Previous studies indicate that a 49th Parallel Diversion was designed to pass up to 22,400 cfs and would
help Minot with keeping peak flows at or below 5,000 cfs for floods originating on the upper Souris River.
In order to accommodate this, a diversion channel would require a top width of about 516 feet and an
average bottom width of 60 feet. The channel would parallel the Canadian border for a distance of about
45 miles. (USACE, 1985).
57
!
Melita !
Manitoba
Saskatchewan
u
So
ris
CANADA
UNITED STATES
49TH PARALLEL DIVERSION
!
Sherwood
£
¤
52
Westhope !
Renville
County
Mouse River
Park
North Dakota
Mohall
Des Lacs
National
Wildlife
Refuge
!
Bottineau
County
Upper Souris
National Wildlife
Refuge
Lake Darling
Dam
De
s
2
£
¤
LA K E D
AR
L IN
G
ON
D IV E RSI
se
R
iv
er
cs
o
Ri
McHenry
County
!
ve
r
!
Towner
Minot
!
Logan
Sawyer
£
¤
83
Major Upstream Diversions
Provincial/State Boundaries
0
6
12
Miles
Velva
52
£
¤
I
Mouse/Souris River Watershed
Flow Direction
M
ou
Minot AFB
La
Ward
County
County Boundary
J. Clark Salyer
National Wildlife
Refuge
)
"
Burlington
National Wildlife Refuges
r
Coulter !
ve
Ri
iver
Barr Footer: ArcGIS 10.4, 2016-09-09 14:04 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-18 - Major Upstream Diversions.mxd User: jrv
is R
Alameda
Figure 2-18
24
MAJOR UPSTREAM
DIVERSIONS
Mouse River Enhanced Flood
Protection Project
Although the diversion would protect Minot, the channel inlet would cause other undesirable flooding
impacts, including backwater effects and flooding in Saskatchewan, as well as increased peak flows in the
lower end of the J. Clark Salyer NWR and in Manitoba. Furthermore, the diversion channel would affect
normal surface and groundwater flow-patterns.
Constructing the 49th Parallel Diversion channel would also require about 2,800 acres of land. Disposing of
the excavated material would require a strip 1,200 feet wide along the entire channel length on one side,
resulting in an area of 6,500 acres of land. Disturbed lands would primarily include agricultural and prairie
areas, and numerous roadways and farm operations would be affected as well.
Due to the significant challenges identified above, the 49th Parallel Diversion alternative is not considered
viable and this alternative has not been evaluated further in this EIS.
Lake Darling Diversion
The Lake Darling Diversion alternative would involve constructing a pump station and diversion channel at
the Lake Darling Reservoir. Flows would be diverted east to discharge into Spring Coulee, which would in
turn discharge into Deep Creek before eventually returning to the Souris River in Bottineau County.
Conveying flow through both Spring Coulee and Deep Creek would require the construction of new,
larger channels as these waterways currently do not have the capacity required to convey 22,400 cfs. In
addition, pumping 22,400 cfs would require construction of a pump station larger than the presently
largest pump station in the world, which was constructed by the USACE in New Orleans at a cost of $500
million to convey 19,000 cfs of flow.
In order to accommodate 22,400 cfs, the Lake Darling Diversion channel requires the same cross section
as the 49th Parallel alternative; a top width of about 516 feet and an average bottom width of 60 feet. The
Lake Darling alternative would be approximately 44 miles long, requiring 2,750 acres of land. Disposing of
the excavated material would likewise require a strip 1,200 feet wide along the entire channel length on
one side, resulting in an area of 3,400 acres of disturbed land.
Significant land requirements, excavation and disposal of excavation material, groundwater impacts along
the alignment, and increased peak flows in the lower end of the J. Clark Salyer NWR and in Manitoba
would also accompany this diversion channel alternative.
The Lake Darling Diversion would face many of the same challenges raised by a diversion along the 49th
Parallel. A Lake Darling Diversion was determined to be economically infeasible due to the costs of
excavation and ongoing electricity requirements for pump operation. Due to these significant challenges
the Lake Darling Diversion alternative is not considered viable and this alternative has not been evaluated
further in this EIS.
2.2.2.2
Local Site Diversions
Four local site diversions have been considered in previous studies as options to reduce flood risks within
targeted areas of the Burlington through Minot reach of the Souris River (USACE, 1977; USACE 1985).
Local site diversion alternatives would involve constructing high-flow diversion channels located close to
59
certain flood-prone areas targeted for flood risk reduction. The four locations considered for local site
diversions include a diversion channel on the north side of Minot (Minot North alternative), a diversion
channel on the south side of Minot (Minot South alternative), a tunnel beneath Minot (Minot Tunnel), and
diversion of Des Lacs River high flows via a tunnel to the Burlington Dam (Des Lacs Tunnel), as shown in
Figure 2-19.
While local site diversion alternatives would provide effective flood protection to specific targeted areas,
these diversions would have to be combined with other alternatives to meet the Project's need to reduce
risks for the entire study reach. In general, these local site diversions raise challenges similar to those of
major upstream diversions (high costs, large land requirements, significant excavation/disposal
requirements, etc.), but on a smaller scale. The local site diversion alternatives and their advantages and
disadvantages are summarized in Table 2-6 and discussed further below.
Table 2-6
Local Site Diversion Alternatives
Alternative
Effectiveness
Minot
North
Reduced flood damage risks from
Burlington through most of Minot;
would not reduce risks along the
Souris River downstream of TwentySeventh Street SE
Minot
South
Minot
Tunnel
Reduced flood damage risks
through Minot; would not reduce
risks along the Souris River
upstream or downstream of Minot
Des Lacs
Tunnel
Cost
Socio-Economic /
Political
Considerations
Natural Resource
Considerations
$3-4 billion
Significant land
acquisition
requirement and
relocations
Habitat loss, surface and
groundwater impacts
along alignment
Greater than
$5 billion
Significant
infrastructure
requirement
Unfavorable geologic
conditions, groundwater
impacts along alignment
Not viable without additional dam storage near Burlington
Minot North
The USACE Burlington Dam study considered diverting high flows from just upstream of Burlington
through a diversion channel that extended to the east and discharged into Livingston Coulee on the north
side of Minot. Flows would then re-enter the Souris River just upstream of Twenty-Seventh Street SE in
Minot (Figure 2-19).
While the Minot North alternative could reduce flood damage risks from Burlington through most of
Minot, it would not reduce risks along the Souris River downstream of Twenty-Seventh Street SE. This
alternative would need to be combined with levee and floodwall projects in downstream communities to
meet the Project need.
60
Because the diversion channel route would extend across the upland areas, issues similar to those of other
diversion channel routes through the upland areas would exist, including extensive excavation and
disposal of excavation material, groundwater impacts along the alignment, environmental and social
impacts, large land requirements through highly developed and developable areas, and high cost. A
diversion channel large enough to accommodate flows similar to those of the 2011 flood would require
excavating a 14.4-mile-long channel more than 200 feet deep through upland, creating a large ravine that
would be between 0.3 mile and 0.7 mile wide, with excavation quantities in the range of 230-330 million
cubic yards of soil. Initial cost estimates are in the $3 to 4 billion range. Due to these challenges the Minot
North Diversion alternative is not considered viable and this alternative has not been evaluated further in
this EIS.
Minot South
The USACE Burlington Dam study considered diverting high flows from just upstream of Minot through a
diversion channel around the south side of the city and re-entering the Souris River downstream of the
city (Figure 2-19).
While this alternative could reduce flood damage risks through Minot, it would not reduce risks along the
Souris River upstream or downstream of Minot. This alternative would need to be combined with levee
and floodwall projects in communities outside of Minot to meet the Project need.
Similar to the case with the Minot North Diversion channel, the Minot South route would require
extensive excavation, the disposal of excavation material, groundwater impacts, environmental and social
impacts, large land requirements, and high cost. Minot South Diversion channel large enough to
accommodate flows similar to those of the 2011 flood would require cutting a 10.5-mile-long channel
more than 200 feet deep through high ground, creating a large ravine that would be between 0.3 mile
and 0.7 mile wide, with excavation quantities in the range of 230-330 million cubic yards of soil. Initial cost
estimates are in the $3 to 4 billion range. Due to these challenges the Minot South Diversion alternative is
not considered viable and this alternative has not been evaluated further in this EIS.
61
Local Site Diversions
CITY OF
GLENBURN
Municipalities
De
M
ou
se
S
r
ve
Ri
CITY OF
CARPIO
DE
cs
La
RENVILLE COUNTY
WARD COUNTY
LA
s
CS
R
iv
TU
N
NE
er
L
County Boundary
!
¯
28
£
¤
52
£
¤
CITY OF
BERTHOLD
£
¤
52
MINOT NO
£
¤
2
CITY OF
DES LACS
RTH ALIGNM
E NT
I
CITY OF
BURLINGTON
0
£
¤
B83
6,500 13,000
26,000
Feet
CITY OF
SURREY
CITY OF
MINOT
MIN
O
TT
UN
£
¤
B2
£
¤
B52
N EL
ALI
GN
ME
NT
T
Barr Footer: ArcGIS 10.4, 2016-09-09 14:05 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-19 - Local Site Diversions.mxd User: jrv
83
MI
Imagery Source: USDA NAIP Imagery 2014
NO
T S O U T H A LIG
NM
EN
£
¤
Figure 2-19
52
LOCAL SITE DIVERSIONS
Mouse River Enhanced Flood
Protection Project
Minot Tunnel
The USACE Burlington Dam EIS studied a Minot Tunnel on the south side of the Souris River. The Minot
Tunnel would include a 2.2-mile long, 31-foot or more diameter diversion tunnel beneath Minot with a
capacity of 9,000 cfs. Combined with the 5,000 cfs capacity channel enlargement project through Minot,
the Minot Tunnel could provide Minot protection to 14,000 cfs. The amount of land that would be lost
due to channel enlargement excavation was estimated to be about 212 acres. Additional lands would be
affected by disposal of the excavated channel and tunnel materials. The major adverse impacts attributed
to this alternative were associated with the disposal of excavated material, downstream channel
modifications, an impoundment area immediately upstream of Minot, and local cost sharing
requirements. This alternative was determined to be not economically feasible, to have notable adverse
impacts, and to not have local support. It was not pursued further in the USACE Burlington Dam EIS.
In order to accommodate flows similar to those of the 2011 flood of record, it is estimated that two 36foot diameter circular concrete tunnels would be required. Figure 2-19 shows an approximate alignment
for a Minot Tunnel capable of addressing the Project purpose. An initial assessment of the tunnel project's
feasibility indicates that the soft soil material in the project area would make tunnel construction
extremely challenging, if not infeasible. Project costs for somewhat shorter and less challenging tunnel
projects have been identified in the $3 to 5 billion range. The Minot Tunnel would be bigger and longer,
with more challenging construction conditions. Costs in excess of $5 billion would be anticipated.
Furthermore, the downstream Souris River channel would need to be enlarged to prevent backwater
effects in Minot. Downstream channel enlargement was estimated to require a channel bottom width of
105 feet.
Due to these challenges, the Minot Tunnel alternative is not considered viable, and this alternative has not
been evaluated further in this EIS.
Des Lacs Tunnel
As part of the USACE Burlington Dam Project, a diversion of high flows from the Des Lacs River via a
tunnel into the proposed flood pool of the Burlington Dam was evaluated. The Des Lacs River is a
tributary to the Souris River at Burlington. As such, diverting the flood flows from the Des Lacs River into
the Burlington dam flood pool could achieve greater control of the tributary's upstream drainage area.
This alternative, however, could only meet the Project need in conjunction with a major dam for flood
storage on the Souris River at the Burlington Dam site. Due to the challenges associated with the
upstream flood storage at Burlington that would be required to make the Des Lacs Tunnel alternative a
viable option for meeting the Project need, this alternative has not been evaluated further in this EIS.
2.2.3
Design Alternatives
Within the project area a number of design alternatives have been considered in select areas to meet the
Project need while minimizing costs and impacts. Two basic design alternative concepts were considered
in this alternatives analysis:
63
1.
High-flow bypasses
2.
Channel modifications/realignments
Several potential design alternatives following these two basic concepts have been identified and are
discussed further below.
2.2.3.1
High-Flow Bypasses
High-flow bypasses cut flow off from river loop sections during major flood events and could be used as a
component of a levee and floodwall system to divert flood flows, reducing flood risk to certain areas.
Because high-flow bypasses are designed to only be used during high flows, normal river flows stay in the
existing river channel. This approach can reduce the need for modification to the existing river corridor
and adjacent land, thereby reducing project impacts and costs. Preliminary engineering studies have
determined that these types of diversions would be applicable in only a few locations which are discussed
further below.
Ramstad/Lincoln Neighborhood Design Alternatives
Three alternatives were considered for the Ramstad/Lincoln neighborhood of Minot to provide enhanced
flood risk reduction for the design flow of 27,400 cfs. These alternatives include two high-flow bypasses
(Lincoln High-Flow Bypass alternative and Maple Avenue High-Flow Bypass alternative) and one
alignment alternative (Ramstad Alignment) as shown on Figure 2-20. More detailed information on these
alternatives is in Appendix I of the Preliminary Engineering Report (reference [1]).
While each alternative provides a comparable level of flood risk reduction, the two bypass alternatives
result in a smaller project footprint, less extensive levees, fewer pump stations, fewer closure structures,
and fewer residential properties affected, as compared to the Ramstad Alignment. These alternatives and
their advantages and disadvantages are summarized in Table 2-7 and discussed further below.
Table 2-7
Ramstad Lincoln Neighborhood Alternatives
Alternative
Effectiveness
$125
million
Lincoln Bypass
Maple Ave Bypass
(Requester's
Preferred Alt.)
Ramstad
Alignment
(1)
(2)
Cost
Engineering Properties Dwellings
Considerations Impacted Impacted(2)
Meets
Project
purpose(1)
$110
million
Moderate
$130
million
River
Channel
Impacted
(feet)
Wetlands
Impacted
(acres)
168
129
200
2.33
132
82
200
1.27
264
173
0
18.50
Indicates an alternatives ability to meet the Project purpose in conjunction with other flood risk reduction features
Impacted dwellings include single family residences and mobile homes.
64
8TH ST NW
Maple Avenue High-Flow
Diversion
5T
H
Lincoln High-Flow Diversion
AV
E
Ramstad Alignment
NW
TN
S
6TH
W
4TH AVE NW
4TH AVE NE
6TH ST NW
£
¤
£
¤
83
83
CENTRAL AVE
2ND AVE SW
RN
E
AV
TE
ES
W
¤
£
¤£
B2
Imagery Source: USDA NAIP Imagery 2014
ANE
RD
2ND AVE SW
1ST ST SW
L
FIRE
B2
I
1ST AVE SE
2ND AVE SE
1ST ST SE
1ST AVE SW
6TH ST SW
Barr Footer: ArcGIS 10.4, 2016-09-15 16:37 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-20 - Ramstad Lincoln Neighborhood Alternatives.mxd User: jrv
3RD AVE NW
0
225
450
900
Feet
3RD AVE SE
Figure 2-20
RAMSTAD LINCOLN
NEIGHBORHOOD
ALTERNATIVES
Mouse River Enhanced Flood
Protection Project
Lincoln High-Flow Bypass
The Lincoln High-Flow Bypass alternative would consist of a high-flow bypass and flanking levees along
the north side of the existing Canadian Pacific and Burlington Northern Santa Fe railroad embankments
from the area near Tenth Street SW and Second Avenue SW, extending east to the Broadway bridge. Two
river-closure structures would be located on the Souris River: one near the intersection of Tenth Street SW
and Second Avenue SW, and one just upstream of the Broadway bridge.
Maple Avenue High-Flow Bypass (Requester's Preferred Alternative)
The Maple Avenue High-Flow Bypass alternative is included as part of the Requester's Preferred
Alternative. This alternative would consist of a high-flow bypass and flanking levees starting along the
south side of the existing Canadian Pacific Railroad embankment near Second Avenue SW, extending
through Moose Park and the old Magic City Lumber property, crossing the Canadian Pacific tracks west of
the Sixth Street SW underpass, then following the same alignment as the Lincoln High-Flow Bypass,
extending east to the Broadway bridge. Two river-closure structures would be located on the Souris River:
one just upstream of the existing Canadian Pacific railroad bridge near Second Avenue SW, and one just
upstream of the Broadway bridge.
Ramstad Alignment (Existing River Alignment with No Diversion)
The Ramstad Alignment would consist of flood risk-reduction features along the existing river channel
between Second Avenue SW and the Broadway bridge. The Ramstad Alignment configuration consists
primarily of levees, floodwalls, and channel modifications set farther back from the river than the existing
flood control system to accommodate the design flow of 27,400 cfs with three feet of freeboard. This
alternative would require the most road closure structures, and there is insufficient space to construct the
levee without land acquisition and impacts to historic structures.
Comparison of Ramstad Lincoln Neighborhood Alternatives
Either the Lincoln or Maple Avenue bypass could be used for high-flow conditions only. During normal
flow conditions, Souris River flows would be conveyed through the river closure structures within the
existing main river channel, potentially allowing the bypass channels to be used for recreational purposes
in non-flood times. During periods of flooding, the existing river channel and levee system could remain
in place and provide protection up to 5,000 cfs. As water levels rise above a predetermined level (e.g.,
above 3,000 cfs), however, the river closure structures would be engaged and all flow would be diverted
through the high-flow bypass channel.
The Lincoln and the Maple Avenue bypass alignments both result in a smaller project footprint, less
extensive levees, fewer pump stations, fewer closure structures, and fewer residential properties to be
acquired within the Project footprint as compared to the Ramstad Alignment. The two diversions were
sized and designed to result in upstream water surface levels that are essentially the same as those
estimated for the Ramstad Alignment.
At a public meeting on January 31, 2012, the Minot City Council selected the Maple Avenue High-Flow
Bypass as the preferred alignment for the Project due to overall lower impacts to properties in the area as
66
well as lower wetland impacts. This feature is now incorporated as part of the Requester's Preferred
Alternative.
Twenty-Seventh Street High-Flow Diversion Alternatives
Three configuration alternatives were considered for a high-flow diversion at Twenty-Seventh Street SE to
provide enhanced flood risk reduction for the design river flow of 27,400 cfs. The Twenty-Seventh Street
SE High-Flow Bypass would divert flood flows near the west end of El Rio Drive and Twenty-Fifth Street SE
along a channel constructed north of the Canadian Pacific Rail line and CHS/Sun Prairie Grain property,
eventually extending east across Twenty-Seventh Street SE to reconnect with the existing Souris River
channel, as shown on Figure 2-21. River-closure structures would be located on the Souris River south of
Souris Court and south of Thirty-First Street SE.
During normal flow conditions, Souris River flows would be conveyed through the river closure structures
within the existing main river channel. The current river channel and levee system would remain intact and
continue to provide protection. As water levels continue to rise, both closure structures would shut off
flows to the existing river channel and divert all flows to the high-flow bypass channel.
Several configuration alternatives were considered for the Twenty-Seventh Street SE High-Flow Diversion.
Configuration A was chosen for inclusion in the design of the Requester's Preferred Alternative as it
results in the smallest increase in upstream flood levels and the lowest amount of impacts to wetlands.
These alternatives and their advantages and disadvantages are summarized in Error! Reference source
not found. and discussed further below. More detailed information on these alternatives is in Appendix I
of the Preliminary Engineering Report (reference [1]).
Table 2-8
Twenty-Seventh Street High-Flow Diversion Alternatives
Alternative
Effectiveness
Configuration A
(Requester's
Preferred Alt.)
Configuration B
Configuration C
Southward Shift
(1)
(2)
Meets
Project
purpose(2)
Cost
Engineering Properties Dwellings
Considerations Impacted Impacted(1)
River
Channel
Impacted
(feet)
Wetlands
Impacted
(acres)
$84 million
Moderate
33
99
200
0.06
$82 million
Moderate
28
96
200
0.10
$139
million
Complex
24
94
200
0.10
$134
million
Complex
22
94
200
0.10
Impacted dwellings include single family residences and mobile homes.
Indicates an alternatives ability to meet the Project purpose in conjunction with other flood risk reduction features
67
L
DE
L
Configuration A
Y
WA
WAY
U
SO
RIS
DR
T
RIS C
SOU
11TH AVE SE
IO
LR
11TH AVE SE
RD
IEW
LV
E
B
31ST ST SE
12TH AVE SE
27TH ST SE
E
13TH AVE SE
13TH AVE
DR
25
TH
ST
SE
I
0
150
300
600
Feet
£
¤
27TH ST SE
B52
Figure 2-21
Imagery Source: USDA NAIP Imagery 2014
27TH ST SE
Barr Footer: ArcGIS 10.4, 2016-09-09 14:08 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-21 - 27th Street High-Flow Diversion Alternatives.mxd User: jrv
Southward Shift
CT
BELVIEW DR
SO
IS
UR
Configuration C
SUNSET DR
Y
WA
DR
RIS
SOU
Configuration B
31ST ST SE
K
PAR
GREEN
27th STREET HIGH-FLOW
DIVERSION ALTERNATIVES
Mouse River Enhanced Flood
Protection Project
Configuration A (300-Foot-Wide Channel with Levees Requester's Preferred Alternative)
Configuration A for the Twenty-Seventh Street Diversion would consist of a 300-foot wide (top width)
channel with levees along both sides of the entire bypass channel. This configuration would provide the
smallest increase in upstream flood levels but would have the largest footprint and therefore have the
largest direct impact to residential property.
Configuration A was the selected alignment for the Requester's Preferred Alternative at the TwentySeventh Street High-Flow Diversion as it results in the least increase in upstream flood levels. Though
Configuration B results in a slightly higher increase in upstream flood levels compared to Configuration A,
it would require fewer property impacts. During the final design of the Twenty-Seventh Street High-Flow
Diversion, further evaluation of Configurations A and B should be conducted to identify opportunities that
minimize adverse impacts.
Configuration B (230-Foot-Wide Channel with Levees)
Configuration B is similar to Configuration A, but it is narrower. Configuration B would consist of a 230foot wide (top width) channel with levees along both sides of the entire bypass channel. The alignment
represents the narrowest levee alignment and would have fewer direct property impacts than
Configuration A.; however, due to the constricted channel, Configuration B would result in upstream flood
levels one to two feet higher than that of Configuration A.
Configuration C (230-Foot-Wide Channel with Floodwalls)
Configuration C represents the narrowest feasible configuration. The 230-foot wide channel is similar to
that in plan B while the narrow footprint occupied by the floodwall allows for reduced impacts to adjacent
residential and commercial properties. The narrow alignment, however, would result in a slight increase in
upstream flood levels and increased construction cost in comparison to Configuration A.
Configuration C's floodwall would run along both sides of the bypass channel, extend from the bypass
entrance to approximately Twenty-Seventh Street SE. Levees line both sides of the channel for the
remaining alignment. The floodwall configuration on the north side of the channel would consist of a
reinforced concrete T-wall. The floodwall configuration on the south side of the channel adjacent to the
railroad and railroad spur would consist of a cantilevered sheet pile wall to minimize the excavation and
construction footprint of the retaining wall, allowing the wall to be located closer to the rail spur than a Twall could be. The cantilever floodwall design would require a very stiff combination wall section to
minimize the wall deflection and impacts to the adjacent rail spur but would result in a more expensive
wall section.
Southward Shift
A shift of the entire diversion alignment to the south to avoid any residential impact was also considered.
This shift would, however, affect the CHS/Sun Prairie property and require relocation of a railroad
segment. Discussions with CHS/Sun Prairie indicate that this alternative would result in the business being
unable to operate at this site. Acquisition, relocation, and site preparation costs for CHS/Sun Prairie to
69
operate in a new location are expected to be $50 million or more. This configuration was not considered
further at this stage due to the substantially higher associated cost.
2.2.3.2
Channel Modifications/Realignments
Channel modifications are generally considered as a way to increase the flow conveyance of a river.
Modifications to achieve this can include either making the channel larger by increasing the width or
depth or by making the channel shorter through channel straightening or cutting off portions of the
channel. The existing USACE's flood risk-reduction project through Minot was primarily a channel
modification/enlargement project. Although this type of modification can be effective in lowering water
surface levels for the more frequent flood events, it typically has sizeable adverse environmental impacts.
A channel modification option that would enlarge the Souris River through the entire stretch of the
project area, to the degree that it could handle the 2011 flood flows, would not be considered a viable
option due to the extremely high cost and the significant adverse environmental impacts. Minor channel
modifications, however, where evaluated in two specific locations, Kings Court and the Burdick Segment.
These smaller scale realignments were evaluated in preliminary engineering studies to identify the impacts
and gage the practicality of their use
Kings Court
Several channel realignment alternatives considered in the vicinity of the Kings Court subdivision are
shown on Figure 2-22. During public meetings, Kings Court residents expressed a strong desire to not
lose any subdivision properties. The PER identified a preferred alternative for Kings Court that would
realign the existing Souris River channel and construct a new levee on the opposite side of the existing
river channel (Barr 2012).
These alternatives and their advantages and disadvantages are summarized in Table 2-9 and discussed
further below. Further detail is provided in a technical memorandum prepared by Barr Engineering Co
(reference [11]).
70
Table 2-9
Alternative
Kings Court Channel Realignment Alternatives
Effectiveness
Cost
Engineering Properties Dwellings
Considerations Impacted Impacted(1)
River Channel Wetlands
Impacted
Impacted
(feet)
(acres)
Alternative 1
(Requester's
Preferred Alt.)
$9.1 million
Complex
1
1
6,650
1.0
Alternative 2
$9.8 million
Easy
40
34
0
0
$20.8 million
Moderate
10
10
0
0
$11.5 million
Complex
11
11
4,000
5.8
Alternative 5
$8.9 million
Moderate
26
25
0
0
Alternative 6
$10.3 million
Moderate
26
25
0
0
Alternative 7
$16.4 million
Complex
2
2
100
0.6
Alternative 3
Alternative 4
(1)
(2)
Meets
Project
purpose (2)
Impacted dwellings include single family residences and mobile homes.
Indicates an alternatives ability to meet the Project purpose in conjunction with other flood risk reduction features
71
Alternative 1 - PER Plan
Alternative 2 - Aquire Property Below Design WSE
Alternative 3 - All Floodwalls
Alternative 4 - Offset Channel
Realigned Channel
Offset River Channel
Floodwall
Levee
.
!
.
!
.
!
.
!
Raise Existing
Levee, Fill on
River Side
£
¤
Barr Footer: ArcGIS 10.4, 2016-09-09 14:12 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-22 - Kings Court Channel Realignment Alternatives.mxd User: jrv
2
£
¤
2
£
¤
£
¤
2
2
Imagery Source: USDA NAIP Imagery 2014
Alternative 5 - Levee with Property Aquisitions
Alternative 6 - Raise Existing Levee in Place
Alternative 7 - Control Structures
Flood Control Features
Acquired Property
.
!
Approximate Pump Station (Existing)
Mouse River
I
High Flow Bypass
Channel
0
450
900
1,800
Gated Control Structure
.
!
Levee
.
!
Feet
.
!
Levee
Levee
Gated Control Structure
£
¤
2
£
¤
2
£
¤
2
Figure 2-22
KINGS COURT CHANNEL
REALIGNMENT ALTERNATIVES
Mouse River Enhanced Flood
Protection Project
Kings Court Alternative 1 PER Plan (Requester's Preferred Alternative)
Alternative 1 would include realigning approximately 6,650 feet of the Souris River channel northeast of
Kings Court. The new channel constructed in Alternative 1 was designed to be approximately 6,650 feet
long, maintaining the original channel length through this area. The new channel would also be
constructed to approximately the same cross-sectional dimensions as the existing river channel.
The existing levee would be left in place. A new, taller levee would, however, be constructed on the
opposite (i.e., northern and eastern) side of the Souris River channel to provide flood risk reduction up to
the 2011 event. The levee would be designed to have three feet of freeboard above the design water
surface elevation, reducing the risk of flooding for residents of the Kings Court neighborhood. The new
levee would cross the existing Souris River channel in two locations creating a dead loop between the
levee crossings. Flows through the dead loop would be managed using a gatewell system.
Gatewells on the upstream and downstream sides of the dead loop would provide minimal flow through
the dead loops during non-flood conditions, preventing stagnant water. The gatewells would be closed
during flood events. The area between the existing and new levees would function as an interior drainage
and ponding area. Deficiencies on the existing levee (i.e., garages/sheds built partially on the levee, trees,
etc.) would not be addressed as this levee would no longer be the line of protection. Alternative 1 is
anticipated to cost $9.1 million, including construction, land acquisition, and easements.
Alternative 1 was selected as the Requester's Preferred Alternative for Kings Court. It requires the fewest
residential relocations while also being one of the lower cost alternatives. Any alternative that does not
minimize property loss is not expected to gain support from Kings Court residents. Alternative 1 does,
however, have more aquatic impacts than other alternatives evaluated along Kings Court with
approximately 6,500 feet of impacted river channel and 1 acre of wetland impacts.
Kings Court Alternative 2 Acquire Property below the Design Water Surface Elevation
Alternative 2 would include acquiring and removing all Kings Court properties that are located below the
design water surface elevation. This alternative would require almost full acquisition of the Kings Court
neighborhood, removal of all associated structures, and relocation of residents. Alternative 2 is anticipated
to cost $9.8 million, including construction, land acquisition, and easements.
Kings Court Alternative 3 All Floodwalls
Alternative 3 would include construction of approximately 5,030 feet of floodwall within the existing levee
footprint. The top of the floodwall would be located four feet above the design water surface elevation to
provide freeboard and overtop protection. It is assumed that this alternative would require the
replacement of the gatewell adjacent to the existing pump station. Alternative 3 is anticipated to cost
$20.8 million, including construction, land acquisition, and easements.
Kings Court Alternative 4 Offset Channel
Alternative 4 would include raising approximately 850 linear feet of existing levee in place, fixing the
landside toe such that the majority of the center line of the levee is shifted riverside. This results in the
majority of the levee being constructed in the existing river channel. To mitigate filling of the river
73
channel, an offset channel would be constructed on the north and east sides of the new levee. The offset
channel would approximately follow the existing channel alignment, maintaining channel length but
shifted to a location further away from Kings Court homes. The new channel would be constructed to
approximately the same cross-sectional dimensions as the existing river channel. This alternative would
require that existing deficiencies be corrected. It is assumed that this alternative would require the
replacement of the gatewell adjacent to the existing pump station. Alternative 4 is anticipated to cost
$11.5 million, including construction, land acquisition, and easements.
Kings Court Alternative 5 Levee with Property Acquisitions
Alternative 5 would include construction of approximately 1,800 linear feet of new levee across the
southwest portion of Kings Court, raising approximately 850 linear feet of the existing Kings Court levee,
and acquiring all properties on the riverside of the levee. It is assumed that this alternative would require
the replacement of the gatewell adjacent to the existing pump station. Alternative 5 is anticipated to cost
$8.9 million, including construction, land acquisition, and easements.
Kings Court Alternative 6 Raise Existing Levee in Place
Alternative 6 would include raising approximately 5,000 linear feet of the existing Kings Court levee in
place to provide flood protection for the design water surface elevation plus freeboard. The existing levee
would be raised on the landside to prevent impacts to the existing river channel, and existing
infringements on the levee (i.e., garages/sheds, trees, etc.) would need to be removed. It is assumed that
this alternative would require the replacement of the gatewell adjacent to the existing pump station.
Alternative 6 is anticipated to cost $10.3 million, including construction, land acquisition, and easements.
Kings Court Alternative 7 Control Structures
Alternative 7 would include constructing control structures on the upstream and downstream ends of
Kings Court and a high-flow bypass channel, approximately 1,850 linear feet, northeast of Kings Court.
This alternative would connect with the river channel for flows less than a 2-year event. For flows less than
a 2-year event, all flow would pass through the control structures. Under larger events, flows could be
divided between the high-flow bypass channel and the control structures. As the flow increases, the gates
would be operated to restrict flow into the leveed side of the system.
The existing Kings Court levee would be left in place, Approximately 4,000 linear feet of new levee,
however, would be constructed on the opposite (i.e., north and east) side of the Souris River, and
approximately 850 linear feet of existing levee would be raised to provide flood protection to the design
water surface elevation plus freeboard based on the 2011 event. Deficiencies on the existing levee (i.e.
garages/sheds built partially on the levee, trees, etc.) would not be addressed as this levee would no
longer be the line of protection. The area between the existing and new levees could function as an
interior drainage and ponding area. Alternative 7 is anticipated to cost $16.4 million, including
construction, land acquisition, and easements.
74
Burdick Segment
Several channel realignment alternatives considered between the Burdick Expressway and 8th Avenue SE
(i.e., the Burdick Segment) are shown on Figure 2-23. A preferred alternative for the Burdick Segment was
identified in the PER (Barr 2012) that would realign the existing Souris River channel and construct a new
levee adjacent to the area.
These alternatives and their advantages and disadvantages are summarized in Table 2-10 and discussed
further below. Further detail is provided in a technical memorandum prepared by Barr Engineering Co
(reference [12]).
Table 2-10
Alternative
Burdick Channel Realignment Alternatives
Effectiveness
Cost
Engineering Properties Dwellings
Considerations Impacted Impacted(1)
River
Channel
Impacted
(feet)
Wetlands
Impacted
(acres)
Alternative 1
(Requester's
Preferred Alt.)
$18.3
million
Moderate
12
116
1,610
1.2
Alternative 2
$17.6
million
Moderate
13
116
1,370
1.3
$16.9
million
Easy
23
132
0
0
Alternative 4
$20.2
million
Easy
20
128
0
0
Alternative 5
$26.5
million
Complex
13
117
100
0
Alternative 3
(1)
(2)
Meets
Project
purpose(2)
Impacted dwellings include single family residences and mobile homes.
Indicates an alternatives ability to meet the Project purpose in conjunction with other flood risk reduction features
75
Alternative 1 - PER Plan
Alternative 2 - Shorter Channel Realignment
Alternative 3 - Levee Along Existing Channel Alignment
Flood Control Features
Acquired Property
Mouse River
Channel Realignment
Channel Realignment
Overbank Excavation
Overbank Excavation
Storm Sewer
Overbank
Excavation
Overbank
Excavation
Overbank
Excavation
Proposed Pump
Station
Proposed Pump Station
Proposed Pump
Station
Proposed Pump Station
Closure Structure
Closure Structure
Closure Structure
Barr Footer: ArcGIS 10.3.1, 2016-03-15 11:25 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 2-20 - Burdick Channel Realignment Alternatives.mxd User: KAC2
Proposed Pump Station
Closure Structure
Closure Structure
Closure Structure
Imagery Source: USDA NAIP Imagery 2014
Alternative 4 - Floodwall Along Existing Channel Alignment
Alternative 5 - Control Structures
I
Gated Control
Structure
Storm Sewer
0
Overbank
Excavation
Floodwall
Overbank
Excavation
Area Used as
High Flow
Bypass
225
450
900
Feet
Gated Control
Structure
Proposed Pump
Station
Proposed Pump Station
Proposed Pump Station
Closure Structure
Closure Structure
Closure Structure
Closure Structure
Figure 2-23
BURDICK CHANNEL
REALIGNMENT ALTERNATIVES
Mouse River Enhanced Flood
Protection Project
Burdick Alternative 1 PER Plan (Requester's Preferred Alternative)
Alternative 1 would include realigning approximately 1,610 feet of Souris River channel to the west. The
new channel would be approximately 860 feet long. To keep the same streambed slope along the shorter
realigned channel, a grade control structure (assumed for this alternatives analysis to be a boulder drop
structure) would need to be constructed within the realigned channel. The new channel would be
constructed to approximately the same cross sectional dimensions as the existing river channel. To
provide additional flow capacity for flood events through this reach, approximately 110,000 cubic yards of
overbank excavation would be included.
Approximately 1,670 feet of new levee would be constructed on the east side of the realigned Souris River
channel to provide flood risk reduction up to the 2011 event. The east levee would cross the existing
Souris River channel in two locations, creating a low-flow loop between the levee crossings. Flows through
the existing channel loop would be managed using a gatewell system. Gatewells on the upstream and
downstream sides of the existing channel loop would allow flow through the existing channel during nonflood conditions, minimizing ecological impacts and preventing water stagnation. The gatewells would be
closed during flood events. The existing channel area would be used as a ponding area for interior
drainage management with a new pump station. Alternative 1 is anticipated to cost $18.3 million,
including construction, land acquisition, and easements.
Alternative 1 was selected as the Requester's Preferred Alternative for the Burdick Segment as it requires
the fewest residential/commercial relocations.
Burdick Alternative 2 Shorter Channel Realignment
Alternative 2 is very similar to Alternative 1 but would involve a shortened channel realignment.
Alternative 2 would result in the realignment of 1,370 feet of existing channel into a 730 foot long
channel. Again, a grade control structure would be needed to keep the same streambed slope along the
shorter realigned channel. To provide additional flow capacity through this reach, approximately 133,000
cubic yards of overbank excavation would be included.
Approximately 1,750 feet of new levee would be constructed on the east side of the new Souris River
channel to provide flood risk reduction based on the 2011 event. The east levee would cross the existing
Souris River channel in two locations, creating a low-flow loop between the levee crossings. Flows through
the existing channel loop would be managed using a gatewell system. Gatewells on the upstream and
downstream sides of the existing channel loop would allow flow through the existing channel during nonflood conditions, minimizing ecological impacts and preventing water stagnation. The gatewells would be
closed during flood events. The existing channel area would be used as a ponding area for interior
drainage management with a new pump station. Alternative 2 is anticipated to cost $17.6 million,
including construction, land acquisition, and easements.
Burdick Alternative 3 Levee along Existing Channel Alignment
Alternative 3 would include construction of approximately 2,100 feet of new levee on the east side of the
existing Souris River channel. The levee alignment along the east bank would approximately follow the
77
edge of the existing river, minimizing impacts within the channel. Approximately 178,000 cubic yards of
overbank excavation would be included to increase flow capacity.
Rather than installing a new pump station at Eighteenth Street SE, for Alternative 3, approximately 970
feet of new storm sewer would be installed to convey interior drainage north to the Roosevelt Park dead
loop. Alternative 3 is anticipated to cost $16.9 million, including construction, land acquisition, and
easements.
Burdick Alternative 4 Floodwall along Existing Channel Alignment
Alternative 4 includes construction of approximately 1,000 feet of levee and approximately 1,030 feet of
floodwall on the east side of the river, adjacent to Eighteenth Street Southeast. Approximately 178,000
cubic yards of overbank excavation would be included to increase flow capacity through the reach. As
with Alternative 3, approximately 970 feet of new storm sewer would be installed to convey interior
drainage north to the Roosevelt Park dead loop. Alternative 4 is anticipated to cost $20.2 million,
including construction, land acquisition, and easements.
Burdick Alternative 5 Control Structures
Alternative 5 would include control structures on either side of the river bend and a high-flow bypass
channel west of the existing Souris River channel. This alternative would remain connected to the river
channel under most flow events. For flows less than a 2-year event, all flow would pass through the
control structures. Under larger events, flows could be divided between the high-flow bypass channel and
the control structures. As the flow increases, the gates would be operated to restrict flow into the leveed
side of the flood risk-reduction system.
Approximately 1,550 feet of levee would be constructed on the east side of the river. The east levee
alignment would cross the existing Souris River channel in two locations. The control structures would be
installed at these locations. The high-flow bypass channel would be created by removing 166,000 cubic
yards of material as overbank excavation between the levees. Alternative 5 would require that a new
pump station be installed. Alternative 5 is anticipated to cost $26.5 million, including construction, land
acquisition, and easements.
2.2.4
2.2.4.1
Other Alternatives
PER Alternative
The alternative presented in the PER (PER Alternative) is very similar to the Requester's Preferred
Alternative and was the basis for its design. The PER Alternative includes approximately 18.9 miles of new
levees, 2.7 miles of new floodwalls, 2 channel realignments totaling 1.6 miles, 2 high-flow bypass
diversions, 21 transportation closure structures, the reconstruction or modification of 6 bridges, and 121
acres of overbank excavation.
The overall concept of the plan represented in the PER Alternative is very similar to the Requester's
Preferred Alternative. However, the design of several segments have been altered. The most noticible
changes between the plans involve the City of Minot's buyouts and greenspace associated with each of
78
the alternatives. In January 2016 the City received grant funding through the NDRC program for
acquisition, relocation, and demolition of structures to reduce flood risk. The City intends to acquire
properties in the Leite-Brekke, Moose Lodge, and Kemper neighborhoods. With these buyouts, certain
flood risk reduction features associated with the PER Alternative were no longer warranted. As such, the
PER Alternative was modified to become what is currently presented as the Requester's Preferred
Alternative.
2.2.4.2
Floodproofing
Floodproofing can be used to modify structures that are in an area subject to flooding so that the
property does not receive significant damage when flooded. Floodproofing modifications could include
raising the first floor of homes above the design flood level; placing utilities such as the furnace, hot water
heaters, and electrical panels above the design flood level; locating garages or other low damage type
uses in the lower levels of buildings; and making structural modifications to prevent floodwaters from
entering the building. The USACE National Non-structural Floodproofing Committee identifies a range of
floodproofing measures that may be recommended for different flood depths, velocities, locations, and
structure types (i.e., residential or commercial) (reference [13]). Based on the Committee's
recommendations, the following floodproofing methods were considered in this evaluation:
Single family residences would be floodproofed through structural elevation with compensation
for basement loss.
Mobile homes would be relocated outside of the 2011 inundation area;
Commercial, industrial, and institutional structures would be floodproofed through floodwalls.
Floodproofing costs were assessed based on methodology in the USACE's 2011 Final Feasibility Report
and EIS for the Fargo-Moorhead Metropolitan Area Flood Risk Management Project (reference [14]). Costs
were adjusted to 2016 rates based on a general comparison of Engineering News Record's construction
cost indices from 2011 to 2016. Floodproofing measures were considered for primary dwelling and
commercial, industrial, and institutional structures within the footprint of the 2011 inundation area. The
heights of floodproofing measures were assumed to be such that flood risk reduction to the structure
would be at a level comparable to the levee associated with the Requester's Preferred Alternative.
Structural elevation of residences would require lifting the entire main floor of the primary dwelling to an
elevation greater than the 2011 flood event. Assuming most residential main floors are approximately 2
feet above existing ground, this would result in roughly a 12-foot structural raise. The basement would be
removed, though a storm shelter space would remain, and owners would be compensated for the loss of
living space. Mobile homes would be relocated outside of the 2011 inundation area. Auxiliary outbuildings
are assumed to remain at their existing elevation without any floodproofing measures.
Commercial, industrial, and institutional structures would be floodproofed through floodwalls
approximately 14 feet tall (above existing ground elevation). This floodproofing method would consist of
construction of a floodwall, extending to the footings of the building, to prevent floodwater from seeping
79
under the floodwall. Structural elevation was not considered viable for non-residential structures due to
the assumed size of the building footprints.
The estimated cost of the floodproofing methods described above is $738 million. It should be noted that
costs associated with any subsequent infrastructure modifications (e.g., sanitary lift station, gas, etc.) are
not included in the floodproofing cost estimate, but are expected to be required and would increase the
actual cost of this alternative.
According to the USACE National Nonstructural Floodproofing Committee, floodproofing by the methods
described above can pose several social concerns (reference [13]). Floodproofing would not protect public
infrastructure or emergency services, leaving these systems susceptible to flood damage and potentially
unavailable to the community during flood periods. With elevated structures, the risk remains that
residents would stay in their homes despite evacuation recommendations, though they would likely not
have access to infrastructure or services. Floodproofing would only protect primary dwellings or
commercial/industrial/institutional buildings and would not protect property or outbuildings. The height
of floodproofing methods needed to provide protection for this project would result in a severe
disruption of community cohesion, with dwellings elevated by 12-feet and 14-foot floodwalls surrounding
businesses. It is expected that the public would resist such measures and therefore was not chosen as the
Requester's Preferred Alternative. For these reasons, floodproofing has not been evaluated further in this
EIS.
2.2.4.3
Relocation/Buyouts
Removing structures from flood-prone areas is one of the most effective means of reducing future
structural flood damages and can be used effectively on a limited basis in conjunction with other options
such as levees and floodwalls. When considering relocations and buyout options, most state and federal
regulatory guidelines focus on the structures located within the 100-year floodplain. In the case of the
Souris River, however, almost all of structures damaged by the 2011 flood were located outside of the
100-year floodplain, especially in Minot where the principal feature of the existing flood risk-reduction
project was based on channel enlargements and not levees. A complete buyout and relocation of all
structures from the area flooded in 2011 would involve more than 5,500 structures2 and would cause an
extreme disruption to the existing communities within the Souris River Valley. The estimated cost of
buying out the structures and relocating mobile homes in the 2011 inundation area is $915 million, as
based on methodology in the USACE's 2011 Final Feasibility Report and EIS for the Fargo-Moorhead
Metropolitan Area Flood Risk Management Project (USACE, 2011). It should be noted that costs
associated with any subsequent utility modification and/or abandonment are not included in the
relocation/buyout cost estimate, but are expected to be required and would increase the actual cost of
this alternative. Though the cost of this alternative is comparable to that of the Requester's Preferred
2
The City of Minot has already undertaken a voluntary buyout program. As such, some of these 5,500
structures have already been bought out, while others have been abandoned.
80
Alterative, it is likely that this plan would be met with a high amount of public resistance, causing a
number of social impacts. Therefore, a complete buyout and relocation of all structures in the area
flooded in 2011 has not been further evaluated in this EIS.
2.2.4.4
Floodplain Regulations
As with other options such as floodproofing, relocations, and buyouts, floodplain regulations are generally
applied to structures within the 100-year floodplain. Such regulations have been in effect in the Souris
River Valley, governing the developments within the 100-year floodplain, but because the 2011 flood
greatly exceeded the defined 100-year floodplain limits, it is unlikely that using regulations alone would
reduce potential flood damages to the existing buildings that are currently in areas that were or could
have been flooded in 2011.
Adopting floodplain regulations that use the 2011 flood as the base flood for regulating future
development, however, could reduce potential damages to any new development from a potential future
flood comparable in size to the 2011 flood. This option could supplement other alternatives.
2.2.5
No-Action Alternative
The NEPA requires that alternative analysis include the evaluation of a no-action alternative. In instances
where management measures, such as flood fighting, are likely to take place, no action should be
evaluated as no change from the current management direction or level of management intensity.
Flooding in the project area has often been anticipated based on snowpack, precipitation forecasts, and
hydrological conditions, allowing for successful flood fighting to flows of approximately 10,000 cfs in
Minot. Therefore, the primary no-action alternative evaluated in this EIS shall be based on a successful
flood fight to 10,000 cfs and will be referred to as the No-Action Alternative.
Under the No-Action Alternative, any flows over 10,000 cfs will assume overtopping of the levees and
flooding behind those areas. The effectiveness of the existing infrastructure provides the basis for
assessing impacts resulting from the No-Action Alternative, which are presented in Section 4.0 of this EIS.
Impacts associated with the alternatives have been assessed under three flood flow conditions (5,000 cfs,
10,000 cfs, and 27,400 cfs). Map 2-2 illustrates the extent of inundation associated with the No-Action
Alternative. Regardless of the past success to flood fight flows of 10,000 cfs, it should be noted that flood
fighting can be an intensive endeavor, carries a high level of risk and uncertainty, and is not a favorable
course of action for the community.
In addition to the No-Action Alternative, a second no-action scenario was evaluated. This scenario will be
referred to as No-Action Alternative 2. No-Action Alternative 2 assumes that no emergency flood fighting
would take place, allowing water to circumvent many of the discontinuous levees throughout the project
area when flows exceed 5,000 cfs. This scenario could occur with an unexpected, extreme weather event,
where flood waters rise rapidly and do not allow enough time for emergency flood fighting. Although
flood fighting has been successful for the majority of properties during events under 10,000 cfs, a large
rainfall over particular locations in the basin could result in a lack of response time and ultimately lead to
flooding. Climate change predictions for the region include the increased likelihood of extreme weather,
81
namely high-intensity rainfall (reference [15]). However, conditions that would result in No-Action
Alternative 2 are still of low probability. Therefore the majority of results for No-Action Alternative 2 are
provided in Appendix B3 with only brief mention later in the EIS.
2.2.5.1
Existing Infrastructure
As part of the Souris River Basin Project, the USACE took measures to reduce the risk of flood damages
along the Souris River. This project included the construction of multiple flood risk-reduction features in
six subdivisions between Burlington and the upstream side of Minot. Flood risk-reduction features for this
project were federally designed and constructed by the USACE based on the project authorized by the
1986 Water Resources Development Act (Public Law [P.L.] 99-662) and Section 105 of the fiscal year 1988
Continuing Appropriations Act (P.L. 100-202). A separate phase of the Souris River Basin Project included
a channel-modification project within Minot. These flood risk-reduction features were federally designed
and constructed by the USACE based on the project authorized by the Flood Control Act of 1965 (P.L. 89298) and modified based on recommendations by the USACE Chief of Engineers in House Document 286,
87th Congress, 2d Session, and House Document 321, 91st Congress, 2d Session. Collectively, the flood
risk-reduction features constructed during the two phases of the Souris River Basin Project are referred to
as the existing federal project.
Many features built in these previously constructed projects were damaging to the Souris River channel,
adjacent wetlands, and other aquatic and terrestrial resources. Further understanding of the environment
and the beneficial services provided by natural processes since the construction of these projects have led
to numerous environmental laws and federal guidance aimed to avoid impacts to these resources. While
features constructed as part of the Souris River Basin Project are successful in providing the intended
flood risk reduction, a number of the features described in the following sections would not likely be
constructed if proposed today, due to environmental considerations.
Existing Flood Risk-Reduction: Burlington to Minot
Flood risk-reduction features were constructed in six subdivisions from Burlington to the upstream side of
Minot as part of the Souris River Basin Project. These existing features are described in the Operations and
Maintenance Manual for the Burlington to Minot Project prepared by the USACE (November, 1981). The
existing federal project features are located at Johnsons Addition (Burlington), Brooks Addition, Talbott's,
3
Appendix B was developed for the Requester's Preferred Alternative, as was presented in the original
draft of the EIS. After the release of the DEIS, the requester proposed design changes to their preferred
alternative which resulted in the release of an Addendum to the DEIS. For this Final EIS, the Requester's
Preferred Alternative was updated to reflect the requester's new design as described in the Addendum.
The analysis of impacts in Appendix B was written for the DEIS, using the original design. However, it was
determined that the difference in impacts between the original design and the new design would not be
appreciably different. As such, Appendix B remains unchanged from the DEIS as it was not necessary to
update the modeling and analysis for the negligible differences that would be expected.
82
Country Club Acres and Robinwood Estates, Kings Court and Rostads Addition, and Tierrecita Vallejo, as
shown in Map 2-3. The existing federal project features in Burlington are operated and maintained by
Burlington; the remaining project features are operated and maintained by the SRJB.
Existing flood risk-reduction features in Burlington, located at Johnsons Addition, include 4,800 feet of
levee, five sections of adjacent channel modifications across 2,800 feet of river channel (including an
approximately 400-foot long cut-off channel), an interior drainage system, a ponding area, a 2,000 gpm
pumping station, and a sandbag/earthen closure structure. The Johnsons Addition pump station is on the
south side of Colton Avenue, southwest of the intersection of Elm and Cheery Streets. The levee wraps
around the northeast portion of town, beginning just southeast of the city park/ball fields and ending
almost 600 feet from the CP Railway tracks near the border of wetland and agricultural lands. These flood
risk-reduction features, which were completed in 1991, were designed for a flood flow of 5,000 cfs with 3
to 3.8 feet of freeboard.
The Brooks Addition segment consists of about 4,600 feet of levee, five sections of adjacent channel
modifications across about 3,200 feet of river channel, one 2,000 gpm pumping station, and a ponding
area. The project, which was completed in 1991, was designed for a flood flow of 5,000 cfs with 3 to 3.8
feet of freeboard.
The Talbott's segment consists of 2,600 feet of levee, three sections of adjacent channel modifications
across 1,500 feet of river channel, one 2,000 gpm pumping station, and a ponding area. The Country Club
Acres and Robinwood Estates stretch consists of about 8,400 feet of levee, three sections of adjacent
channel modifications across 2,700 feet of river channel, one 2,000 gpm pumping station, and two
connected ponding areas. The Kings Court and Rostads Addition project consists of 4,100 feet of levee,
4,000 feet of channel modifications adjacent to the levee, one 4,000 gpm pumping station, and a ponding
area. All three of these projects, which were completed in 1993, were designed for a flood flow of 5,000
cfs with 3 to 3.8 feet of freeboard.
The Tierrecita Vallejo segment consists of 900 feet of levee, channel modifications on 600 feet of river
channel, a ponding area, and a portable Crisafulli pump. An existing 1,800-foot long emergency levee on
the west side of the development was also left in place without any upgrades. The project, which was
completed in 1990, was designed for a flood flow of 5,000 cfs with 3 to 3.8 feet of freeboard.
Existing Flood Risk-Reduction: Minot
During a separate phase of the Souris River Basin Project, operated and maintained by Minot, channel
modifications were developed within Minot. The project features consist primarily of channel
modifications and channel cutoffs which are part of an authorized federal project that extends from
Burlington to Logan, including flood-control storage in the Burlington Dam. The project features in Minot
were constructed separately from and prior to any of the other components of the authorized project. The
existing federal project in Minot extends from the U.S. Highway 83 Bypass on the west (upstream) to the
U.S. Highway 2 Bypass on the east (downstream). These existing features are detailed in the Operations
and Maintenance Manual for the existing federal project, prepared by the USACE (November, 1981).
83
The existing federal project was designed to accommodate flows up to 5,000 cfs with freeboard. This was
estimated at the time to be the 100-year (1-percent annual chance) flood peak discharge with the
implementation of upstream reservoir storage in the authorized plan. The existing Minot project features
are shown in Map 2-3 and include the following:
Channel excavation: Almost the entire Souris River reach through Minot was modified, Excavation
was done on one side of the channel, providing a channel bottom width from 35 to 40 feet, with
3:1 side slopes. The channel excavation extends from approximately Twenty-First Street SW on
the west (upstream) to the U.S. Highway 2 Bypass on the east (downstream).
Channel cutoffs: There are nine channel cutoffs in Minot with channel bottoms from 35- to 40-feet
wide. Several of the more prominent channel cutoffs are in the Roosevelt Park, Eastwood Park,
and Oak Park areas.
Channel control structures: Channel control structures are located within the cutoff channels to
maintain channel grade in the river or to divert normal stream flows around the original cutoff
channel loops. Four of the control structures are comprised of reinforced concrete and are located
in the cutoff channels at Roosevelt Park, Eighth Street SE, Ramstad Park, and Oak Park.
Levees: Levees were constructed adjacent to the channel wherever natural ground provided less
than two feet of freeboard above the 100-year (1-percent annual chance) flood elevation. Levees
were constructed to have a top elevation set three feet above the design water surface. The
longest reach of levee is on the west side of Minot from about Twenty-First Street SW to the U.S.
Highway 83 Bypass. Several other smaller and shorter sections of levee exist through the city.
Ponding areas: Seven areas have been acquired for use as temporary ponding areas.
Pumping stations: There are six pumping stations located in Minot to handle the interior drainage
due to storm sewer system modifications or channel cutoffs, as required by the channel
modifications or the levees.
2.2.5.2
Flood fighting
Emergency flood-fighting activities are currently executed in the Souris River Basin depending on
snowpack, hydrological conditions, and anticipated forecasts. While the extent and magnitude of these
actions are dependent on the timing and severity of the forecasted conditions, certain actions are most
likely to occur. For instance, in the Burlington through Minot area there are discontinuous levees that,
when connected during flood fighting efforts, provide flood risk reduction to flows of 10,000 cfs.
Emergency flood fighting actions to connect these levees can be considered likely management measures
expected to be implemented during high flow conditions.
84
3.0 Affected Environment
This section provides information on the existing resources and condition of the environment in the
project area as they relate to the existing social, economic, cultural and environmental settings
surrounding the project.
In this EIS, several specific terms are used to describe the affected area around the project. These terms
are defined below and shown on the schematic in Figure 3-1.
Project footprint is the specific area covered by Project features.
Impact area is the construction limits for phases that have undergone advanced design (Phases 1,
2, and 3), and is the Project footprint plus 50 feet for subsequent phases to account for
uncertainties in the final design and temporary workspaces.
Project area is the broad, nonspecific area in the vicinity of the Project. The Project footprint and
the impact area would both be within the project area.
3.1
3.1.1
Geology, Soils, and Groundwater
Geology
The project area is on the floodplains of the Souris River Valley and the Des Lacs River Valley, which were
carved into late Wisconsin age glacial drift during the draining of Glacial Lake Regina, in Saskatchewan.
Near the northern extent of the project area, the Souris River and Des Lacs River Valleys come together to
form the Souris River Valley. The side slopes of these river valleys slope steeply downward to the river
bottom and are deeply incised by perennial drainage streams (reference [16]).
Floodplain alluvial deposits, generally mapped across the extent of the Souris River Valley floodplain,
consist of fluvial channel and overbank sands, gravels, silts, and clays (reference [17], reference [18]). The
alluvial deposits are typically 50 to 100 feet thick (reference [19]). Beneath the alluvial deposits lies glacial
drift, including outwash deposits that are important local aquifers, as described in Section 3.1.3. At the
margins of the floodplain, colluvial fan deposits of sandy and silty clay originate from the mouths of
coulees and ravines (reference [17]). River terrace deposits, generally less than 20 feet thick, are used as
sources of construction aggregate material (reference [16]).
A total of approximately 250 feet of unconsolidated deposits overlie bedrock in the Souris River Valley
near central Minot (reference [18]). Bedrock underlying the Souris River Valley in the Minot area is the Fort
Union Group, a Paleocene sedimentary unit with alternating beds of silt, sand, clay, lignite, shale, and
sandstone (reference [19]). Thin lignite beds outcrop in the Souris River Valley and Des Lacs River Valley
northwest of Minot, but not in the project area. Minot is at the eastern edge of the Williston Basin,
although Ward County is only a minor producer of oil and gas. The core North Dakota petroleum
production areas are to the west of the Minot area.
85
P:\Mpls\34 ND\34511010\WorkFiles\Task 2 - EIS\Schematic of Project Areas for Environmental Analysis,CDR RLG 02-29-16
Project Feature
(e.g. levee)
Mo
us
Project Feature
(e.g. floodwall)
eR
ive
r
Not to Scale
Project Footprint
Impact Area
Project Area
Figure 3-1
SCHEMATIC OF PROJECT AREAS
FOR ENVIRONMENTAL ANALYSIS
Seismic risk is very low. The Project is in an area rated <1 on the 2014 USGS Seismic-Hazard Map
(reference [20]).
3.1.2
Soils
Soil units within the impact area are listed in Table 3-1. Over 60 percent of the soils are classified as Velva
series, which consist of deep, level, well-drained soils that formed in stratified loamy alluvium on river
bottoms. Velva series soils make fair topsoil, are not suitable to supply sand and gravel, give only fair
performance as road fill because they are subject to frost heaving, and can exhibit poor stability if used in
embankments (reference [21]). Approximately 28 percent of soils are classified as urban land, primarily
loamy udifluvents. Map 3-1 shows the distribution of these soil units. Soils in the impact area generally
have low to moderate susceptibility to sheet and rill erosion (Erosion Factors shown in Table 3-1).
Table 3-1
Soil Units in the Impact Area
Erosion
Prime
Factor
Farmland
Kf(1)
Soil Name
Percent
Slope
F576A
Velva loam, moist, occasionally flooded
0 to 2
0.32
F577A
Velva, moist-Fluvaquents, channeled
fine sandy loams, frequently flooded
0 to 2
F578A
Velva fine sandy loam, moist, wooded,
frequently flooded
F645B
Map Unit
Symbol
Acres
Percent(2)
Yes
274.5
34.6
0.17
No
174.3
21.9
0 to 2
-(3)
No
25.1
3.2
Urban land-Udifluvents loamy complex
0 to 6
-(3)
No
220.7
27.7
F639F
Orthents-Aquents-Urban Land,
highway complex
0 to 35
0.28
No
15.8
2.0
F643B
Urban land-Udorthents loamy complex
0 to 6
-(3)
No
3.2
0.4
F527A & F55A
Ludden silty clay, very poorly drained,
frequently flooded
0 to 1
0.24
No
23.4
2.9
F596A &
F596B
Darnen loam
0 to 6
0.24
Yes
15.5
2.0
F147F
Buse-Barnes-Darnen loams
9 to 35
0.20
No
3.1
0.4
F272E
Sioux-Arvilla-Renshaw complex
9 to 25
0.15
No
2.7
0.3
F562A
La Prairie-Fluvaquents, channeled
complex, frequently flooded
0 to 2
0.24
No
2.1
0.3
F680D
Barnes-Sioux complex
6 to 15
0.24
No
1.6
0.2
1
2
3
Erosion Factors indicate susceptibility of a soil to sheet and rill erosion by water. Kf indicates the erodibility of material less than
2 millimeters in size. Values of K range from 0.02 to 0.69. Higher values indicate greater susceptibility. Data from the U.S.
Department of Agriculture Web Soil Survey http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx.
Do not add to 100 percent because portions of the impact area are water.
No erosion factor listed by the U.S. Department of Agriculture Web Soil Survey
87
The Farmland Protection Policy Act (FPPA), USDA regulation implementing the FPPA (7 CFR Part 658), and
USDA Departmental Regulation (DR) No. 9500-3, Land Use Policy, provide protection for prime and
important farmland and prime rangeland and forestland. Map 3-2 shows prime farmland, unique
farmland, and farmland of statewide importance in the project area. The impact area contains
approximately 290 acres of prime farmland.
3.1.3
Groundwater
Groundwater resources in the project area consist of unconsolidated sand and gravel aquifers. Four
aquifers have been delineated in the area: Souris Valley aquifer system, Northwest Buried-Channel aquifer,
North Hill aquifer, and Sundre aquifer. The Souris Valley aquifer system, which occurs along the entire
length of the Souris River in Ward County, consists of multiple water bearing units with varying degrees of
hydrologic connection, including the Minot aquifer and the Burlington aquifer (reference [19]). Twelve
groundwater observation wells administered by the NDSWC monitor the aquifers within the project area.
The Souris Valley aquifer system underlies the project area and is the source of public water supplies for
several communities in the region. Burlington draws its public water supply from the Burlington aquifer.
Big Dipper Housing, approximately 2 miles downstream of Burlington, operates a community water
system with a well in the Souris Valley aquifer. Minot obtains its public water supplies from the Minot and
Sundre aquifers. Portions of the Project are located within wellhead protection areas established by the
North Dakota Department of Health (NDDH) to protect the Souris Valley aquifer, including the Burlington
and Minot aquifers (Figure 3-2).
The Minot aquifer is overlain by 50 to 100 feet of low permeability silts and clays. The aquifer varies in
thickness from 50 feet to more than 200 feet, and is present over an area approximately 0.5- to 1-mile
wide by 6- to 7-miles long. Recharge to the Minot aquifer comes from infiltration of precipitation, inflow
from adjacent aquifers (the Northwest buried-channel aquifer and the lower Souris aquifer), and seepage
from the Souris River (reference [19]). Before development, the Minot aquifer was under artesian pressure
(i.e., the aquifer water level elevation was higher than the Souris River water surface elevation). Pumping
from city wells drew the water level down approximately 70 feet by the 1960s. Water levels have since
recovered somewhat, but are still below their original levels (reference [19]).
The Burlington aquifer, located near the confluence of the Souris River and the Des Lacs River, extends
approximately 3 miles upriver to the north and 1.5 miles downriver toward Minot. It is poorly connected
to the Minot aquifer (reference [22]). Lithologic logs of the Burlington municipal wells show the aquifer is
30 to 45 feet thick, and overlain by approximately 70 feet of clay (reference [23]).
88
Wellhead/Source Water
Protection Area
Project Footprint
Municipalities
Burlington
City of
CITY OF
BURLINGTON
£
¤
B83
£
¤
83
Barr Footer: ArcGIS 10.4, 2017-04-30 15:20 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-2 - Wellhead Protection Areas.mxd User: kac2
Big
Dipper
Housing
Minot
£
¤
2
CITY OF MINOT
£
¤
B2
Colony Park
I
£
¤
B52
0
2,000
4,000
8,000
Feet
£
¤
83
£
¤
52
Figure 3-2
Data Source" North Dakota Department of Health, 2013
Imagery Source: USDA NAIP Imagery 2014
Country
Acres
MHP
WELLHEAD PROTECTION
AREAS
Mouse River Enhanced Flood
Protection Project
3.2
3.2.1
Surface Waters
Souris (Mouse) River
The primary water resource in the project area is the Souris (Mouse) River. The 435-mile long Souris River
originates in Saskatchewan, where it then flows to the southeast, across the Canadian border and into
North Dakota. Downstream (east) of Minot the Souris River turns to the northeast and flows back into
Canada in the Province of Manitoba. The Souris River has a large and complex watershed, with an
approximately 8,000 square-mile drainage area in North Dakota. The river is more than 300 miles long in
North Dakota and it passes through 11 dams and under more than 90 bridges. Major tributaries in North
Dakota include the Des Lacs River, Wintering River, Deep River, and Willow Creek (Figure 3-3). Major
tributaries in Canada include Long Creek, Moose Mountain Creek, Antler River, Gainsborough Creek,
Graham Creek, Jackson Creek, and Pipestone Creek.
In North Dakota, the upstream portion of the Souris River channel is narrow and steep and is confined
within a narrow floodplain. Channelization of the river increases as it approaches Burlington and Minot.
Through Minot, the Souris River is highly channelized and straightened as a result of the previous flood
control projects discussed in Section 2.2.5.1. From Sawyer to upstream of Towner, the Souris River channel
is relatively deep and exhibits more natural meandering. Downstream of Towner, the Souris River enters
the plain of Glacial Lake Souris where it becomes a wide, slower-moving channel with less steep banks.
Average annual normal flows in Minot are approximately 37 cubic feet per second, with upstream
impoundments creating slower flows. The USGS operates stream gages along the Souris River. Each
includes permanent infrastructure and is vulnerable to disruption from nearby construction. One active
USGS stream gage falls within the area of the Requester's Preferred Alternative, at site 05117500 Souris
(Mouse) River upstream of Minot.
90
Project Area
)
"
SASKATCHEWAN
Existing Dams
Mouse/Souris River
Watershed
MANITOBA
National Wildlife Refuge
County Boundaries
CANADA
Portal
Flaxton
Tolley
Burke
Burke
County
County
Renville
Renville
County
County
Mohall
cs
La
R
er
iv
Palermo
Des Burlington
Lacs
Minot
Mountrail
Mountrail
County
County
Surrey
Parshall
Pierce
Pierce
County
County
Butte
Kief
0
Data Sources:
USACE National Inventory of Dams 2012
U.S. Fish and Wildlife Service 2012
Canada National Hydro Network 2011
U.S. National Hydrologic Dataset 2012
Coleharbor
Turtle
Lake
Underwood
Washburn
40
Miles
Martin
Wells
Wells
County
County
Sheridan
Sheridan
County
County
Mercer
20
Anamoose
McLean
McLean
Riverdale
10
Maddock
Garrison County
County
Dunn
Dunn
County
County
I
York
Leeds
Benson
Benson
County
County
Drake
r
ive
Benedict Ruso
Knox
Esmond
gR
Balfour
Max
Rugby
Karlsruhe
Ryder
Douglas
Wolford
ee
k
ver
e Ri
Voltaire Bergen
Makoti
Mylo
)Eaton Dam
"
Granville
Velva
Cr
Towner
rin
nte
Wi
New
Town
Sawyer
Plaza
Sn
ak
e
McHenry
McHenry
County
County
s
Mou
Ward
Ward
County
County
Rolette
Willow
City
Dam 320
Dam 1
(Dam 309)
Berthold
Rolette
Rolette
County
County
Overly
Willow Creek
)"
Upham "
)
t Bank Creek
Cu
Ross Stanley
)
"
Deering
Dunseith
J. Clark
Dam 326 "
)
"
)
) Dam 87
"
) Dam 96
"
Rolla
Bottineau
Lake Darling
Dam (Dam 83)
Carpio
St John
Souris
Landa
)
Dam 341 "
(Dam 41)
Upper Souris
Grano
National
Wildlife Refuge
es
Donnybrook
UNITED STATES
Salyer National
De
ep Maxbass Newburg
Wildlife Refuge
Ri
ve
r Dam 332
) Carter Dam
"
Kenmare
Powers
Lake
White
Earth
Bottineau
Bottineau
County
County
r
ive
Bowbells
" Dam 357
)
Antler
Sherwood
eR
us
Mo
Columbus
Lignite
D
Barr Footer: ArcGIS 10.4, 2016-10-27 14:44 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 3-3 - Overview of Mouse River, Major Tributaries, and Dams.mxd User: jrv
Provincial/State Boundaries
Mcclusky
Goodrich
Figure 3-3
OVERVIEW OF MOUSE
RIVER, MAJOR
TRIBUTARIES, AND DAMS
Mouse River Enhanced Flood
Protection Project
Souris River flows are highly influenced by its 11 dams, which are critical elements in flood management
across the river's floodplain. As described in Table 3-2, many of these dams were constructed to create
habitat for waterfowl and other aquatic species and were not originally constructed to impound water for
flood management purposes; however, the reservoirs have incidentally been able to provide some
additional storage during periods of high flows. As shown by the comparison of low- and high-flow
conditions in Table 3-2, several of the dams have the capacity to double the volume of water in their
reservoirs during periods of high flow.
Table 3-2
Overview of Souris River Dams in North Dakota
Structure Name
Carter Dam
(Dam 41)
Lake Darling
Dam
(Dam 83)
Low-Flow Surface High-Flow Surface
Area (ac) & Volume Area (ac) & Volume
(ac-ft)
(ac-ft)
General Description
Carter Dam is upstream of the Lake Darling
reservoir and is part of the USFWS Upper Souris
NWR. It is operated by the USFWS.
Lake Darling Dam was constructed to create Lake
Darling. The dam's reservoir is used to maintain
pool elevations in the J. Clark Salyer Wildlife
Refuge (JCSNWR), located downstream. It also
provides flood storage to mitigate flood risk for
downstream properties. During low flows, the
Lake Darling Dam is operated by the USFWS. It is
operated by the USACE during flood conditions.
204 ac
641 ac
1,417 ac-ft
2,664 ac-ft
9,900 ac
12,900 ac
108,894 ac-ft
158,600 ac-ft
Dam 87
Dam 87 is operated by the USFWS to aid with
wetland management in the Upper Souris NWR
and is not intended for flood risk reduction.
Dam 96
Dam 96 is operated by the USFWS to aid with
wetland management in the Upper Souris NWR
and is not intended for flood risk reduction.
Eaton Dam
The Eaton Dam was constructed as part of an
irrigation project that diverts water into a series of
diked farm fields with flow-control structures.
Eaton Dam is operated seasonally for irrigation; as
such, it does not maintain a permanent pool and
is not intended for storage.
Dam does not provide storage
Dam 1
Dam 1 is a rock masonry dam that diverts water
into a managed storage area; it does not provide
storage itself. Gated culverts allow water to enter
and leave the storage area.
Dam does not provide storage
Dam 320
Dam 320 is the furthest upstream of the series of
JCSNWR dams. It was constructed to create a
conservation area for waterfowl and aquatic
species.
Dam 326
Dam 326 is a JCSNWR dam constructed to create
a conservation area for waterfowl and aquatic
species.
92
177ac
382 ac
670 ac-ft
1,371 ac-ft
837 ac
1,076 ac
2,560 ac-ft
3,420 ac-ft
365 ac
4,203 ac
513 ac-ft
10,167 ac-ft
2,104 ac
5,994 ac
2,186 ac-ft
26,382 ac-ft
Low-Flow Surface High-Flow Surface
Area (ac) & Volume Area (ac) & Volume
(ac-ft)
(ac-ft)
General Description
Structure Name
Dam 332
Dam 332 is a JCSNWR dam constructed to create
a conservation area for waterfowl and aquatic
species.
Dam 341
Dam 341 is a JCSNWR dam constructed to create
a conservation area for waterfowl and aquatic
species.
Dam 357
Dam 357 is the furthest downstream Souris River
dam in North Dakota, located a little over a mile
south of the Canadian border. It was constructed
to extend the JCSNWR north, with the intent of
providing habitat for waterfowl and aquatic
species.
3.2.1.1
225 ac
4,259 ac
460 ac-ft
10,378 ac-ft
1,003 ac
3,225 ac
1,847 ac-ft
12,238 ac-ft
348 ac
5,775 ac
467 ac-ft
35,744 ac-ft
Water Quality Classification
North Dakota Century Code (33-16-02.1) establishes a system for classifying waters of the state, specifies
existing and beneficial uses of these waters, and provides water quality standards to protect the beneficial
uses. Under this code, the Souris River is classified as a Class IA water. Class IA waters are intended to be
suitable for the propagation or protection of fish and other aquatic biota and for swimming, boating, and
other water recreation. Water quality in Class IA waters is intended to be suitable for irrigation, livestock
watering, and wildlife, without harmful effects. With treatment, including softening, Class IA waters are
intended to be suitable for municipal or domestic use.
3.2.1.2
Impairment Status
Under Section 303(d) of the Clean Water Act (CWA), states are required to monitor and assess their waters
to determine if they meet water quality standards and thereby support the beneficial uses they are
intended to provide (33 U.S.C. 1313(d)). Waters that do not meet their designated uses because of water
quality standard violations are listed as impaired. States are required to develop a list of impaired waters
that require total maximum daily load (TMDL) studies and are to submit an updated list of impaired
waters to the EPA every two years. In North Dakota, the NDDH monitors and assesses waters to determine
if they meet water quality standards for designated uses and lists waters as impaired that do not meet
their designated uses.
Based on the 2014 reporting year, the NDDH has listed portions of the Souris River as impaired or
threatened (Figure 3-4). Waters listed as impaired have water quality conditions that do not support at
least one designated use of the water. Waters listed as threatened have water quality conditions that
currently support all uses, but appear to be declining. The reach of the Souris River from the North
Dakota/Saskatchewan border downstream to Lake Darling is listed as threatened for impairment, with the
stressors being low dissolved oxygen and sedimentation/siltation and the affected designated uses being
for fish and other biota (reference [24]). A TMDL has been completed for dissolved oxygen, but a TMDL
has not yet been developed for sedimentation/siltation. The reach of the Souris River from Lake Darling
93
downstream to its confluence with the Des Lacs River is listed as impaired for benthic macroinvertebrate
bioassessments, with the affected designated uses being for fish and other aquatic biota (reference [24]).
A TMDL has not yet been completed for this impairment. Both of these reaches are located upstream of
the Project. The river reach that includes the proposed Project is not listed as impaired or threatened but
does lie downstream of the aforementioned areas.
94
Impaired River Segment
Threatened for Impairment
SASKATCHEWAN
Mouse/Souris River
Watershed
MANITOBA
National Wildlife Refuge
Provincial/State Boundaries
Flaxton
Renville
Renville
County
County
es
cs
La
R
er
iv
Glenburn
t Bank Creek
Cu
Ross Stanley
Palermo
Berthold
Des Burlington
Lacs
Minot
Mountrail
Mountrail
County
County
Surrey
Sawyer
Plaza
Parshall
Wolford
ee
k
Rugby
Velva
Pierce
Pierce
County
County
Karlsruhe
Knox
Butte
Kief
Benson
Benson
County
County
0
10
20
40
Miles
Maddock
Drake
r
ive
Benedict Ruso
I
York
Leeds
Esmond
gR
Balfour
Max
Mylo
ver
e Ri
Ryder
Douglas
Rolette
Granville
Voltaire Bergen
Makoti
Cr
Towner
rin
nte
Wi
New
Town
Sn
ak
e
McHenry
McHenry
County
County
s
Mou
Ward
Ward
County
County
Rolette
Rolette
County
County
Willow
City
Bantry
Deering
Dunseith
Overly
Willow Creek
Upham
Carpio
White
Earth
J. Clark
Salyer National
Wildlife Refuge
Upper Souris
Grano
National
Wildlife Refuge
D
Donnybrook
Rolla
Bottineau
De
ep Maxbass Newburg
Ri
ve
r
Kenmare
St John
Souris
Landa
Mohall
Tolley
Powers
Lake
UNITED STATES
Bottineau
Bottineau
County
County
r
ive
Bowbells
Burke
Burke
County
County
Antler
Sherwood
eR
us
Mo
Columbus
Lignite
Barr Footer: ArcGIS 10.4, 2016-10-27 14:46 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 3-4 - Mouse River Impaired Waters.mxd User: jrv
County Boundaries
CANADA
Portal
Anamoose
Martin
McLean
McLean
Garrison County
County
Dunn
Dunn
County
County
Data Sources:
U.S. Fish and Wildlife Service 2012
Canada National Hydro Network 2011
U.S. National Hydrologic Dataset 2012
Coleharbor
Turtle
Lake
Riverdale
Underwood
Washburn
Wells
Wells
County
County
Sheridan
Sheridan
County
County
Mercer
Mcclusky
Goodrich
Figure 3-4
MOUSE RIVER
IMPAIRED WATERS
Mouse River Enhanced Flood
Protection Project
3.2.2
Floodplain
Floodplains are flat or nearly flat land adjacent to a river or stream that experiences occasional or periodic
flooding. Floodplains include the floodway, which consists of the stream channel and adjacent areas that
carry flood flows, and the flood fringe, which includes areas covered by the flood, but which do not
experience a strong current. Floodplains function to prevent flood damage by detaining debris, sediment,
water, and ice.
FEMA delineates floodplains and determines flood risks in areas susceptible to flooding. The base flood
that FEMA uses, known as the 100-year (1-percent annual chance) flood, has a one-percent chance of
occurring during a given year. Executive Order 11988, Floodplain Management, requires federal agencies
to avoid, to the extent possible, the long- and short-term adverse impacts associated with occupying and
modifying floodplains and to avoid supporting direct or indirect floodplain development wherever there is
a practicable alternative. According to current FEMA floodplain designations, portions of the project area
fall within the regulatory floodway, as well as 100-year and 500-year floodplains of the Souris River
(Map 3-3).
Executive Order 13690 created new flood risk-reduction standards to apply to federal actions in light of
the potential impact of climate change on flooding. Federal agencies must expand floodplain
management from the current base flood level to a higher vertical elevation and corresponding floodplain
to address current and future flood risk. Under Executive Order 13690, federal agencies have the flexibility
to select one of three approaches to establish the flood elevation and hazard area under potential climate
change impacts:
Use data and methods informed by best-available, actionable climate science.
Build 2 feet above the 100-year (1-percent annual chance) flood elevation for standard projects
and 3 feet above for critical buildings, such as hospitals.
Build to the 500-year (0.2-percent annual chance) flood elevation or the elevation and flood
hazard area that result from using any other method identified in an update to the Federal Flood
Risk Management Standard.
Studies are underway to update the Souris River 100-year floodplain using the first option. As part of the
detailed Flood Insurance Study (FIS), updates to the floodplain and floodway boundaries are being
assessed along a portion of the Souris River (reference [25]). Preliminary study recommendations suggest
modifying the 100-year floodplain to be based on a discharge rate of 10,000 cfs, twice the discharge rate
of 5,000 cfs which is the basis for the current 100-year effective floodplain (reference [26]). If accepted by
FEMA, this modification would considerably expand the existing 100-year floodplain. The SRJB will
coordinate with FEMA to ensure permitting requirements are met for an expanded 100-year floodplain.
A flow of 10,000 cfs will be the assumed 100-year flood event in this EIS. Though results are only
preliminary, they appear to be the best available assessment of flood frequency at this time.
96
3.2.2.1
Hydrology and Hydraulics
A hydrologic and hydraulic study was conducted to evaluate existing conditions in support of floodplain
management alternatives for the Souris River Valley (reference [27]). Hydrologic models are used to
estimate the amount of water generated during a flood and where that floodwater comes from. Hydraulic
models are used to simulate the extent of flooding. Hydraulic model results provide water surface
elevations that can be used to map inundated areas for a particular flood event. For this project, hydraulic
models were used to predict how flooding occurs under existing conditions and to evaluate what could
be expected to occur under proposed conditions.
Flood condition models were developed for several different flood flow scenarios, including 5,000 cfs,
10,000 cfs, and 27,400 cfs (4). From preliminary floodplain study results, the 5,000 cfs scenario represents a
50-year flood event and the 10,000 cfs scenario represents a 100-year flood event, meaning a floods of
these magnitudes have a two-percent chance and a one-percent chance of occurring in a given year,
respectively. The 27,400 cfs scenario represents modeled conditions from the flood of 2011, also known as
the "flood of record" as it was the most substantial flood ever recorded. Inundation maps were developed
to show which areas of the Souris River Valley could be expected to flood under each of these three flood
scenarios. As shown in Map 2-2, the 27,400 cfs scenario results in a much larger inundation area than the
other two modeled flood events.
3.2.3
Wetlands
Wetlands are defined in the 1977 Executive Order 11990, Protection of Wetlands, and in Section 404 of
the CWA, as those areas that are inundated by surface or ground water frequently enough to support,
under normal circumstances, a prevalence of vegetative or aquatic life that requires saturated or
seasonally saturated soil conditions for growth and reproduction. Three parameters that define a wetland,
as outlined in the 1987 Corps of Engineers Wetlands Delineation Manual (reference [28]) and the 2010
Great Plains regional supplement, are hydric soils, hydrophytic vegetation, and hydrology.
Wetlands are an important natural resource serving many functions, such as providing habitat for wildlife,
storing floodwaters, recharging ground water, and improving water quality. Executive Order 11990
encourages federal agencies to minimize the destruction, loss, or degradation of wetlands and to preserve
and enhance their natural and beneficial values. To meet these objectives, the order encourages federal
agencies to consider alternatives to wetland impacts and to minimize potential wetland impacts if an
activity affecting a wetland cannot be avoided.
The Project is in a part of the upper Great Plains known as the Prairie Pothole Region. As glaciers from the
last ice age began to recede, millions of small depressional wetlands, known as potholes, were created. As
(4)
Models simulating flows of 14,000 and 20,000 cfs were created as part of project development;
however, the results were not appreciably different than the 10,000 cfs and 27,400 cfs events. Therefore,
these model results are not presented in the EIS.
97
humans settled and developed the area, it is estimated that more than half of the wetlands within the
Prairie Pothole Region were drained to accommodate agricultural practices (reference [29]).
Wetlands in the project area were first identified during a desktop review of U.S. Fish and Wildlife Service
(USFWS) National Wetland Inventory (NWI) maps (Map 3-3). Based on the desktop review, approximately
140 acres of NWI-identified wetlands are located in the general vicinity of Project features. The
construction of the Project is expected to permanently affect 21 acres and have temporary affects to 36
acres of these wetlands. Wetlands within the project area are primarily associated with the Souris River
channel itself and former oxbow areas, as well as small, isolated pothole wetlands (Map 3-3).
The NWI classifies wetlands into different types according to the USFWS's Cowardin Classification System
(reference [30]). The most prevalent Cowardin wetland types within the project area are riverine with
unconsolidated bottom (R2UBH), Palustrine emergent wetlands that are temporarily flooded (PEMA),
semi-permanently flooded (PEMF), or seasonally flooded (PEMC), and Palustrine forested (PFO). However,
the NWI tends to be outdated and does not always accurately reflect wetland presence, type, or size on
the landscape. As such, the desktop review incorporated topography and aerial imagery sources to modify
NWI polygons to more accurately depict current conditions.
Wetlands in Phases 1, 2, and 3 of the Project were field delineated in May through July 2015 (Appendix C).
No wetlands were identified in the Phase 1 or Phase 3 areas. In the Phase 2 area, six wetlands, totaling 2.6
acres were delineated within or intersecting the construction limits, as shown on Figure 3-5 and
summarized in Table 3-3 Delineated wetlands ranged in size from less than 0.1 to 1.5 acres and were
primarily classified as PEMA, PEMC, or PEMF with some areas also classified as PFO. For the remaining
portions of Construction Stage 1.5 (Tierrecita Vallejo, the Maple High-Flow Diversion, and the tieback
levee) NWI maps were used to evaluate the presence of wetlands, as noted in Table 3-3. Additional field
delineations will be required as part of design on these areas to confirm wetland acreages.
Table 3-3
Existing Wetlands in Construction Stage 1.5
Number of
Wetlands
Acres of Wetlands
Phase 1
-
-
Phase 2
6
2.6
Phase 3
-
-
Tierrecita Vallejo
2
7.5
Maple High-Flow Diversion
1
1.5
Tieback Levee
-
-
9
11.6
Phase
Total
98
Future construction activities are anticipated beyond the three currently planned phases described above,
including levees, floodwalls, and road improvements. Impacts to wetlands associated with future Project
phases would require additional field wetland delineations for design and permitting.
99
17TH ST NW
18TH ST NW
19TH ST NW
20TH ST NW
2ND AVE NW
21ST ST NW
22ND ST NW
- BLVD
23RD ST NW
24TH ST NW
27TH ST NW
25TH ST NW
- CR
3R
2
TH
25
ST
16TH ST SW
SW
* Wetland delineation by Houston
Engineering Inc May through July,
2015
- CT
CENTRAL AVE W
ST
T
1ST AVE SW
TH
22N
DS
O
18
SW
T SW
HS
6T
AK
DR
WES TFIELD AVE
VE S
2ND A
2ND AVE
- LN
28
TH
ST
30
SW
TH
ST
B83
24TH ST SW
SW
£
¤
Field Delineated Wetlands*
Project Footprint
CENTRAL AVE W
SW
AVE
NW
Wetlands (National Wetlands
Inventory)
-L
N
1ST AVE SW
D
W
SW
3RD AVE SW
T RD
12TH ST SW
FO R E S
17TH ST SW
18TH ST SW
21ST ST SW
25TH ST
5TH AVE SW
6TH AVE SW
TH
16
I
ST
SW
0
300
600
1,200
Feet
11TH AVE SW
ACCESS
RD
£
¤
SW
18TH ST SW
ST
W
TH
13
ST
28TH ST SW
TH
12
Data Source: Reference [31]
Imagery Source: USDA NAIP Imagery 2014
12TH AVE SW
TS
29TH ST SW
B2
S
TH
13
Barr Footer: ArcGIS 10.4, 2017-05-10 11:20 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-5 - Delineated Wetlands.mxd User: kac2
SW
24TH ST SW
4TH AVE SW
Figure 3-5
DELINEATED WETLANDS
Mouse River Enhanced Flood
Protection Project
3.3
3.3.1
Biological Resources
Vegetation
Prior to European settlement, native plant communities within the project area were dominated by drift
prairie, a mixed grass community transitional between tallgrass prairie to the east and shortgrass prairie
further west. The USEPA Level III Ecoregion mapping shows the project area is within the Northern
Glaciated Plains. It is further divided into the USEPA Level IV Ecoregions Northern Black Prairie, north of
Souris River, and Drift Plains, south of the river.
There are no undisturbed native plant communities remaining within the project area. Urbanized corridors
and developed riparian areas, along with the presence of existing flood risk-reduction features built from
1971 to 1993, including levees and flow control structures, have resulted in a disturbed non-continuous
river corridor throughout the project area. Much of the river corridor from Burlington through Minot is
dominated by non-native species. Other land in the project area has been committed to crop and pasture
land.
Within the urbanized, developed parts of the project area, the existing vegetation is dominated by
artificial cover types, specifically maintained lawns, and golf courses. Plant species typically found in
developed and disturbed urbanized environments are the primary inhabitants. These include non-native
grasses and non-native or naturalized herbaceous species and shrubs.
Non-native and invasive species are aggressive competitors with native plant species. When native species
cover is reduced, wildlife diversity typically decreases, because many wildlife species are adapted to
habitats comprised of native plant species. As a result, areas characterized by non-native and invasive
species vegetative cover are typically less diverse, both in plant and wildlife species. In addition,
infestations of some non-native invasive species can result in serious economic impacts, including
reduced crop yields and injury to livestock. Two such species, leafy spurge (Euphorbia esula) and Canada
thistle (Cirsium arvense) occur regularly in stretches along Souris River between Burlington and Minot
[reference [31]]. Both are on the North Dakota Noxious Weeds list [reference [32]].
Small-to-medium size stands of trees can be found scattered along the Souris River. These stands are
typically dominated by cottonwood (Populus deltoides), American elm (Ulmus americana), green ash
(Fraxinus pennsylvanica), and box elder (Acer negundo). A tree inventory conducted as part of the
biological studies for the proposed Project found that the vast majority (about 86 percent) of the trees in
the surveyed areas are green ash (reference [33]). Green ash and box elder are common tree species that
are generally not regarded as high-quality, desirable species. Nevertheless, these species and other trees
present along the Souris River provide habitat for nesting birds, insects and small mammals, and in some
places can cast shade on Souris River, which improves fish habitat.
Seasonal, temporary, and riparian wetlands are also present along the river. The vegetation that makes up
these wetland communities is described above in Section 3.2.3.
101
3.3.2
Fish and Wildlife
The Souris River is classified under the North Dakota Water Quality Standards as Class 1A (33-16-02.1-09),
by NDDH. This classification indicates water quality that supports propagation or protection of resident
fish species. North Dakota Natural Heritage (NDNH) database records, U.S. Fish and Wildlife Service
(USFWS) records, and North Dakota Game and Fish (NDGF) records show that no federally listed aquatic
resident species have been identified in the Souris River reach that passes through the project area. NDGF
capture records identify 24 fish species in the Souris River, two of which, the trout perch (Percopsis
omiscomaycus) and pearl dace (Margariscus margarita), are identified by NDGF as species of conservation
priority.
Fish surveys conducted on seven occasions dating back to 1960 revealed that the reach of the Souris River
between Burlington and Sawyer has historically been used by eighteen species of fish, including popular
game fish such as northern pike, walleye, and yellow perch. The most recent fish survey data (2008-2009)
for the Burlington-Sawyer reach, however, indicate only seven species were collected from this part of the
Souris River. These seven species include three species of cyprinids (minnows), three bottom-dwelling
species (bullheads and suckers), and yellow perch. The 2008-2009 surveys found no pike, walleye, or other
game fish. Recent anecdotal evidence, however, suggests that walleye are present in the Souris River in
Minot, as well as upstream. A complete list of the eighteen fish species known to have historically
occurred in the Souris River between Burlington and Sawyer, along with the last documented occurrence
during surveys for each species, is provided in Table 3-4.
102
Table 3-4
Fish Species Known to Occur in the Burlington-Sawyer Reach from 1960 to 2009
Species Common Name
Species Scientific Name
Last Documented
Black Bullhead
Ameiurus melas
2009
Blacknose dace
Rhinichthys atratulus
1975
Brassy minnow
Hybognathus hakinsoni
1975
Brook stickleback
Culaea inconstans
1997
Blackside darter
Percina maculata
1998
Common shiner
Luxilus comutus
2008
Creek chub
Semotilus atromaculatus
1998
Emerald shiner
Notropis atherinoides
1975
Fathead minnow
Pimephales promelas
2009
Johnny darter
Ethestoma nigrum
2009
Longnose dace
Rhinichthys cataractae
1998
Northern pike
Esox lucius
1997
Sand shiner
Notropis stramineus
2008
Tadpole madtom
Noturus gyrinus
2008
Trout perch
Percopsis omiscomaycus
1997
Walleye
Sander vitreus
1997
White sucker
Catostomus commersonii
2009
Yellow perch
Perca flavescens
1997
The Upper Souris NWR, located upstream of the study area; the J. Clark Salyer NWR, located downstream;
and the nearby Wintering River NWR and Cottonwood Lake NWR attract migratory waterfowl. The NWRs
are also important migratory stopover points for neotropical bird species, which are migratory species
where the majority of the individuals breed north of the Tropic of Cancer (23º North latitude) and winter
south of that latitude. There are approximately 200 bird species that meet this definition, primarily
songbirds, but also shorebirds, raptors and a few waterfowl. A USFWS Information Planning and
Conservation decision support system (IPaC) search conducted on September 2, 2016 for the project area
plus a one-mile buffer listed 22 USFWS Birds of Conservation Concern (BCC) that may migrate through
the area. BCCs are migratory nongame birds that, without additional conservation actions, are likely to
become candidates for listing under the Endangered Species Act (ESA) of 1973. The BCC species identified
in the IPaC search of the project area, as well as other neotropical migratory bird species, likely utilize the
nearby NWRs, and some may also nest in the project area.
Wildlife species inhabiting the project area are those species that are well-habituated to human presence
and are able to use the artificial or degraded vegetation communities that typify the area. These include
103
small to medium mammals (e.g., squirrels, fox, and deer), perching birds, common raptors, and common
insect species.
Bridges in the project area are typically used as nesting locations by several species of birds, primarily cliff
swallows, barn swallows, and rock pigeons. An inventory of bridges in the project area was conducted in
summer 2015 to determine the number of bridges used by birds for nesting, the species of birds that use
the bridges, and the estimated number of nests present (Appendix C). The inventory identified 29 bridges
within the project area. Of these, 12 bridges, or about 41 percent of the bridges in the project area, had
no birds or nests present. Nine bridges hosted only cliff swallow nests, and five bridges hosted only rock
pigeon nests. Three bridges hosted both cliff swallow and rock pigeon nests. No barn swallows were
observed, and no barn swallow nests were present at any bridge. The number of nests present ranged
from 60 to 500 for cliff swallows, with an average of 216 cliff swallow nests at bridges where the species
was present. The number of rock pigeon nests was more difficult to determine. There were no rock pigeon
nest counts at six of the eight locations where rock pigeons, or rock pigeons and swallows were observed.
Where rock pigeon nests were also counted; the number of nests ranged from 10 to 40.
3.3.3
National Wildlife Refuges
There are five NWRs within 50 miles of the project area. These are Upper Souris NWR, 14 miles northwest
of Minot and upstream of the project area; Des Lacs NWR, 36 miles northwest of Burlington and upstream
of the project area; J. Clark Salyer NWR, 39 miles northeast of Minot and downstream of the project area;
Wintering River NWR 31 miles southeast of Minot; and Cottonwood Lake NWR 43 miles south of Minot.
Upper Souris River NWR is a 39,092-acre refuge in the Souris River Valley, extending approximately 35
miles along the Souris River. It includes the 9,600-acre impoundment Lake Darling, which is managed as a
regulated supply of water to marshes within the Refuge and downstream, especially for the J. Clark Salyer
NWR 110 miles downstream.
The Des Lacs NWR is made up of more than 19,500 acres along 34 miles of the Des Lacs River. The Des
Lacs NWR extends from approximately 6.5 miles south of Kenmare, ND to the Canadian border. This
refuge is a mix of natural lakes and managed wetlands that provide ideal habitat for migrating and
nesting waterfowl and marsh birds.
At 58,700 acres, J. Clark Salyer NWR is the largest NWR in North Dakota, extending southward 45 miles
from the Canadian border along the Souris River. The Refuge is in the lakebed of glacial Lake Souris. The
rolling topography and diverse habitats on the Refuge are a result of glacial processes. Most of the
Refuge is river valley wetland. The southern part of the Refuge has wooded river bottoms, floodplain
meadows, and native prairie sandhills.
The Wintering River and Cottonwood Lake NWRs are both easement refuges where USFWS has acquired
the rights to regulate water levels and control hunting. The land on which these refuges are located
remains under private ownership and control.
104
All five of these NWRs provide important resting, forage and cover habitat for migratory birds and other
wildlife. They are also important components of the Central Flyway used by migrating waterfowl and other
birds.
3.3.4
Threatened and Endangered Species
Under Section 7 of the Endangered Species Act (ESA) of 1973, Federal agencies are required to ensure
that agency actions are not likely to jeopardize the continued existence of any listed species or result in
the destruction of adverse modification of critical habitat. 16 U.S.C. § 1536(a)(2). Listed species include
endangered and threatened species. According to the USFWS, an endangered species is one that is in
danger of extinction throughout all or a significant portion of its range, and a threatened species is one
that is likely to become endangered in the foreseeable future. A candidate species is a plant or animal on
which the USFWS has sufficient information to propose it as threatened or endangered under the ESA, but
which they have not yet proposed because other listing activities take precedence. While candidate
species are not legally protected under the ESA, it is consistent with the intent of the ESA to consider that
these species have significant value and merit protection.
A June 22, 2017 IPaC search identified six federally endangered, threatened, or candidate species known
or believed to occur in Ward County. These include:
Gray wolf (Canis lupus), an endangered mammal
Whooping crane (Grus americana), an endangered bird
Dakota skipper (Hesperia dacotae), a threatened insect
Northern long-eared bat (Myotis septentrionalis), a threatened mammal
Piping plover (Charadrius melodus), a threatened bird
Rufa red knot (Calidris canutus rufa), a threatened bird
The USFWS has designated critical habitat for gray wolf, whooping crane, Dakota skipper and piping
plover. However, there is no designated critical habitat for gray wolf or whooping crane in North Dakota.
There are designated critical habitat units for the piping plover and the Dakota skipper in North Dakota,
but they are outside of the project area. No critical habitat has been designated or proposed for Northern
long-eared bat or Rufa red knot.
3.3.4.1
Federally-listed Species Life History Summaries
Gray Wolf
The gray wolf is the largest wild canine species in North America. Gray wolves are most abundant
throughout northern Canada, Alaska, and the forested areas of Northern Michigan, Minnesota, and
Wisconsin and have been re-introduced to Yellowstone National Park in Wyoming. Historically, its
preferred habitat includes biomes such as boreal forest, temperate deciduous forest, and temperate
grasslands. Gray wolves live in packs of up to 21 members, although some individuals will roam alone.
105
While the gray wolf is not common in North Dakota, occasionally individual wolves pass through the state.
There are no documented occurrences of gray wolf, however, in the project area. USFWS has designated
critical habitat for gray wolf, but not in North Dakota.
Whooping Crane
The whooping crane is the tallest bird in North America. In the United States, this species is found
throughout the Midwest and Rocky Mountains regions from North Dakota south to Texas and west into
Colorado. Whooping cranes migrate through North Dakota along a band running from the south central
to the northwestern parts of the state. They use shallow, seasonally and semi-permanently flooded
Palustrine (marshy) wetlands for roosting and various cropland and emergent wetlands for feeding.
During migration, whooping cranes are often recorded in riverine habitats. Currently there are three wild
populations of whooping cranes in the United States, yielding a total population of about 383. Of these
three populations, only one is self-sustaining. None of these populations occur within the project area.
USFWS has designated critical habitat for whooping crane, but not in North Dakota.
Dakota Skipper
The Dakota skipper is a northern prairie butterfly species. Most of the native prairie habitat throughout
the species' historical range has been lost and converted to agriculture. As a result, the Dakota skipper is
now a rare and localized species, dependent upon high-quality native prairie remnants in Minnesota and
the Dakotas.
The USFWS has designated critical habitat for Dakota skipper but there are no designated critical habitat
units in Ward County. Throughout the project area there are potentially suitable habitats for Dakota
skipper. However, the North Dakota Natural Heritage Inventory Species of Concern and Significant
Ecological Communities database (NHIS database), has only one confirmed Dakota skipper sighting in the
vicinity of the Project. Based on the NHIS database, consulted September 2, 2016, a Dakota skipper
occurrence was documented in 1991 in an approximately 42-acre area west of Burlington.
Vegetative surveys and butterfly habitat evaluations of the potential borrow sites revealed potential
habitat for the Dakota skipper at the Highway 2 site (reference [34]). Survey results from other potential
borrow sites indicate that these sites do not contain suitable habitat for the Dakota skipper. A vegetation
survey was not conducted at the Price site, however, as this site has been cultivated and is not expected to
contain native prairie vegetation or suitable habitat.
Northern Long-eared Bat
The northern long-eared bat is a medium-sized bat that hibernates in caves and mines in the winter, and
in the summer roosts singly or in colonies under the bark or in cracks and crevices of trees. The northern
long-eared bat is relatively widespread. It is listed as a threatened species, however, because populations
of the species in the eastern and central United States are being sharply reduced by a fungal pathogen
that causes white-nose syndrome. The pathogen causes the bat to come out of hibernation prematurely.
In the eastern United States, northern long-eared bat populations have been reduced by more than
90 percent. The project area is within the range of the northern long-eared bat, although the project area
106
lies outside of the USFWS' current estimate of the spread of white-nose syndrome. In addition, there are
no known hibernacula or occupied roost trees within 0.25 mile of the project area, and there are no
documented occurrences of northern long-eared bats in the project area. USFWS determined in April
2016 that designation of critical habitat is not prudent at this time [reference [35]].
Piping Plover
The piping plover is a small migratory shorebird. Historically, piping plovers could be found throughout
the Atlantic Coast, Northern Great Plains, and the Great Lakes. Drastically reduced, sparse populations
presently occur throughout this historic range. However, piping plover is known to occur in Ward County,
and there are ten USFWS-designated piping plover critical habitat units in the county. They are located
approximately 19 to 26 miles southwest of the Project [reference [36]}. Additional designated critical
habitat units for piping plover are scattered throughout North Dakota, and along the Missouri River in
western North Dakota. Piping plover critical habitat includes reservoir reaches on the Missouri River
system composed of sparsely vegetated shoreline beaches, peninsulas, islands composed of sand, gravel,
or shale, and their interface with water bodies.
Rufa Red Knot
The rufa red knot is a small-medium shorebird that migrates long distances between summer and
wintering grounds. Rufa red knots travel more than 9,300 miles each way between Tierra del Fuego in the
winter and above the Arctic Circle for summer breeding. The long migration routes require regular
stopover points, referred to as staging areas, for feeding. Rufa red knots return regularly every year to
these staging areas, among which are the North Atlantic seaboard horseshoe crab breeding grounds,
specifically on the Delaware Bay and the Cape May Peninsula, where the birds feed on the crab eggs.
Commercial fisheries in these areas, however, have significantly reduced the production of horseshoe crab
eggs, which has been a major factor in the decline of the species and has prevented the red rufa from
being able to maintain viable population levels. There are no documented occurrences of rufa red knot in
the project area. Potential suitable staging areas for the species in and near the project area are relatively
small and do not provide food or shelter opportunities preferred by rufa red knots. USFWS has not
designated critical habitat for rufa red knot.
3.3.4.2
Species of Conservation Priority
In 2001, the USFWS began awarding State Wildlife Grants (SWG) for the development and
implementation of programs for the benefit of wildlife and their habitat, including species that are not
hunted or fished. States interested in qualifying for SWG funds were required to develop a
Comprehensive Wildlife Conservation Strategy (CWCS) that identified species of greatest conservation
need (SGCN) that occur in the state, and the habitats needed to conserve them. In 2005, the North Dakota
Game and Fish Department (NDGFD) published an updated version of the North Dakota CWCS that
identified 100 Species of Conservation Priority (SoCP, the NDGFD term for SGCN) (reference [37]). Federal
funding for the SWG program has since been eliminated; however, North Dakota and the other states
continue to maintain their CWCS and species lists.
107
The 100 SoCP in North Dakota include 45 birds, 2 amphibians, 9 reptiles, 15 mammals, 22 fish, and 7
freshwater mussels. The most current information on the distribution and relative abundance of SoCP
species is found in Appendix A of the 2005 CWCS (reference [37]). It is likely that many of the SoCP bird
species are occasionally present in the project area. However, it is unlikely that SoCP species in general are
regular inhabitants of the project area. This is because SoCP species typically do not use the developed
and artificial cover types and habitats in the project area. These species are also generally at a competitive
disadvantage with more common, introduced species that use the project area.
Many of the SoCP species are likely found in one or more of the four NWRs within 50 miles of the project
area, especially the SoCP waterfowl and shorebird species. Of the federally-species known to occur in
Ward County, the gray wolf, whooping crane, piping plover and Sprague's pipit are also SoCP species.
3.4
Land Use and Infrastructure
Land use and infrastructure in the project area are strongly influenced by the aggressive pace of growth
Minot has experienced in recent years. Between 2000 and 2014, Minot's population increased
approximately 30 percent (reference [38]), due largely to the expansion of the petroleum industry tapping
the Bakken shale formation during that period. Population growth has resulted in a growing demand for
housing and infrastructure (e.g., water, sewer, and transportation systems).
3.4.1
Land Use
Land use in the project area was assessed by reviewing local zoning ordinances and relevant
comprehensive land use and natural resource plans; federal, state, and local agency websites; aerial
photography; and a variety of GIS mapping sources including the Multi-Resolution Land Characteristics
Consortium, National Land Cover Database 2011 (NLCD 2011). Minot's Land Use Plan and 2012
Comprehensive Plan provide an overview of existing and planned land use in Minot.
3.4.1.1
Historical Context
Historically, North Dakota was covered with flat and rolling prairies. As people began to settle in the state
and as railroads were developed, much of the prairie land was converted to agricultural use and towns like
Minot and Burlington grew up along the railroads to facilitate transportation of goods and people. The
land use within the project area was influenced by Minot's historical development as a transportation and
shipping hub since the late 1800s. This region was developed during the time when the railroad was
expanding into the Midwest and natural resources were discovered in this area. Burlington, established in
1883, was the first county seat for Ward County, which was at the time the center for lignite mining.
Burlington is recognized as the site of the first framed building in the territory (reference [39]). An influx of
settlers came to the Burlington/Minot area during the 1880s, in part due to the expansion of railroad to
the area. The present day Great Northern Railroad is the successor to the Manitoba Railroad, which
reached Minot in 1886. Minot was established in 1887 and by 1888 had replaced Burlington as the county
seat. Minot experienced a significant population boom from the late 1880s through 1911 (reference [40]).
In the 1950's, the area experienced significant development, including the Minot Air Force base to the
north. Also around this time the Garrison Dam was built on the Missouri River south of Minot.
108
3.4.1.2
Current Land Use
Land cover reflects the general types of land use within the area. The NLCD2011 mapping results showing
the land cover in the project area are provided in Map 3-4. Zoning reflects land-use restrictions,
limitations, rights, and privileges assigned by municipalities. At present, Burlington and Minot each govern
zoning and land use within their corporate city limits and an extraterritorial zoning boundary (Figure 3-6).
Zoning maps for the cities are provided in Map 3-5. The project area between the corporate city limits of
Burlington and Minot, consisting of rural residential communities within Harrison Township, is covered
under the cities' extraterritorial zoning. The project area downstream of Minot is within Minot's
extraterritorial zoning boundary.
Burlington is a small residential community located in the Souris River Valley, south of the confluence of
the Mouse and Des Lacs Rivers. The Burlington segment of the project extends along the
eastern/northeastern outskirts of the city. Within and directly adjacent to the project boundary are
residential properties, a cemetery, Old Settlers Park, and the Canadian Pacific Railway. Land cover of the
project area near Burlington is predominately low-intensity developed area, with some open space,
pasture/hay, and cultivated crop areas. Other land cover includes developed areas, woody and emergent
herbaceous wetlands associated with areas directly adjacent to Souris River, and old oxbows associated
with the river channel. Burlington recently adopted city zoning. Previously Burlington zoning was
governed by Ward County under Ward County Zoning District 6 (reference [41], the Ward County Zoning
Districts map). Project features in the Burlington segment are in, or adjacent to, areas zoned residential
and agricultural, as shown on Map 3-5.
Between the city limits of Burlington and Minot, the project area is generally less developed. The Vardon
Golf Club is in this portion of the project area. North of this community, on the opposite side of the
railroad is an aggregate mine. Land cover in this area is predominantly open developed area, hay/pasture,
cultivated crops, and wetlands, with occasional areas of low- and medium-intensity development. Project
features within Burlington's and Minot's extraterritorial zoning boundaries are in areas that are zoned
agricultural and residential.
Within Minot, the project area is predominantly developed land, although in the western portions of
Minot, significant areas of undeveloped open space are present, along with low-intensity residential areas.
Jack Hoeven Park and the Wee Links Golf Course are also in this area. The project area in central Minot is
more densely developed and populated and includes commercial and industrial uses. The Roosevelt Park
and Zoo, in east-central Minot, is a public zone area used for outdoor recreation and leisure. Towards the
eastern limits of Minot, land use in the project area is low- to medium-density residential and
manufactured home neighborhoods along with light- to heavy-industrial, and commercial areas.
The project area downstream of the Minot city limits is largely less densely developed communities that
have a more rural character, with adjacent agricultural lands and wetland areas. Land use is generally
zoned single-family residential and agricultural, with minor areas zoned for general commercial uses.
109
City of Minot Extraterritorial
Zoning
City of Burlington
Extraterritorial Zoning
Project Footprint
Municipalities
CITY OF
BURLINGTON
£
¤
Barr Footer: ArcGIS 10.4, 2017-04-30 14:56 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-6 - Zoning Jurisdiction.mxd User: kac2
B83
£
¤
2
£
¤
83
CITY OF MINOT
£
¤
B2
I
£
¤
B52
0
2,000
4,000
8,000
Feet
£
¤
83
£
¤
52
Figure 3-6
Data Source: Bureau of Land Management 2011
Imagery Source: USDA NAIP Imagery 2014
ZONING JURISDICTION
Mouse River Enhanced Flood
Protection Project
3.4.1.3
Future Land Use and Flood Recovery Planning
Minot's Comprehensive Plan (reference [42]) recognizes that the city has experienced significant new
development due to the oil boom in western North Dakota, agriculture and railroad-related business,
flood recovery and reconstruction, the Minot Air Force Base, Minot State University, and Minot's
continued role as a regional center for western North Dakota and eastern Montana. These aspects are
discussed in more detail in Section 3.6. The Comprehensive Plan has identified "Growth Areas" with a
logical pattern of land uses to allow compact, orderly, rational growth to occur, creating desirable new
neighborhoods (Figure 3-7). The Growth Areas identified in Figure 3-7 show areas where growth is
expected to occur in the future. Note that the "phases" listed on the figure are from the Comprehensive
Plan and are not associated with the phases developed for the Requester's Preferred Alternative. These
Growth Areas have been planned to address future scenarios ranging from explosive growth (phase 5) to
slow growth (phase1) (reference [42]).
The proposed flood risk reduction Project is compatible with Minot's future planning efforts. Minot's land
use planning integrates greenway connections and compact development in the city. The 2012
Comprehensive Plan recognizes the need for rational and responsible growth and development that
offers a well-planned community and preservation of quality of life. Important considerations are made
for coordinated land use and transportation plans; encouragement of new and continued, balanced
growth of commercial/industrial development; and maintenance of downtown Minot as a focal point.
Minot's land use plan identifies the entire Souris River reach within the city, as conceptual greenway
connections. Designating greenway connections involves protecting and enhancing drainage corridors;
providing amenities; connecting major destinations with biking/walking routes; providing active living
choices; connecting wildlife habitat; and enhancing existing streets. Much of Construction Stage 1.5 is
located within the downtown area, which is considered a growth area with its own potential for
development and redevelopment.
Burlington has not developed a comprehensive city plan, but the Project plans have been closely
coordinated with city officials to ensure that they are compatible with any future plans they may have.
Much effort and support has been invested in recovering from the effects of the June 2011 flood. The
Federal government provided assistance to affected areas and communities (including housing,
infrastructure, and economic recovery), as well as recovery planning, which included developing flood risk
reduction measures. A long-term Mouse River Basin Recovery Strategy was developed by the North
Dakota Department of Commerce: the State of North Dakota Action Plan for Disaster Recovery, Utilizing
Supplemental CDBG Disaster Recovery Funding from the Department of Housing and Urban Development
Appropriations Act, 2013 (Public Law, 113-2), through the U.S. Department of Housing and Urban
Development (Federal Register Docket Nos, FR-5696-N-01, FR-5710-N-01 and FR-5696-N-03
(reference [43]).
111
Barr Footer: ArcGIS 10.4, 2016-09-20 14:01 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Figure 3-7 - Minot Growth Areas.mxd User: jrv
Note: The growth area phases represent the
progression of development based on the
location of available infrastructure; and the
location of planned infrastructure
expansions are anticipated to occur.
Source: reference [42]
2-Mile Jurisdictional
Boundary
Phase 5
City of Minot (2011)
Growth Area
Boundaries
Railroad
Phase 1
Airport
Phase 2
Streams
Phase 3
Open Water
Phase 4
Wetland
0
3,000
I
6,000
Feet
Figure 3-7
12,000
MINOT GROWTH AREAS
Mouse River Enhanced Flood
Protection Project
At the invitation of local and state partners, FEMA deployed a specialized team of planners to facilitate
long-term community planning in the Souris River Basin. Given the magnitude of the 2011 flooding,
FEMA's team included the Emergency Support Function #14, also known as Longterm Community
Recovery (LTCR), to assist with planning for the longterm recovery of the Souris River Basin. FEMA and
North Dakota Department of Emergency Services (NDDES) determined that state and federal disaster
recovery programs would adequately address the needs of all but one jurisdiction Ward County. Given
the effects of the flood on the cities of Burlington and Minot, their proximity, and their similar recovery
issues, the team indicated that Ward County communities would benefit from developing a long-term
recovery plan with coordinated efforts on recovery issues that would affect both jurisdictions, especially
those related to flood control and housing. The top long-term recovery priorities identified include:
Developing affordable housing.
Creating a Souris River Valley Greenway with recreational amenities.
Conducting a transportation study for the region.
As part of the long-term recovery planning, the Mouse River Basin Enhanced Flood Protection Plan,
Preliminary Engineering Report (reference [1]) was developed and released February 29, 2012. The
proposed Project is a continuation of these long-term planning efforts for a portion of the area affected
by the June 2011 flood.
Minot completed a disaster recovery plan, which supports the development of the Project. Related to the
state disaster recovery action plan, the Minot disaster recovery action plan (reference [44]) recommends
short-term recovery (e.g., acquiring and demolishing hazardous structures; removing debris; repairing
basic infrastructure; rehabilitating and reconstructing homes, businesses, and schools; and ensuring
adequate and operational emergency service), along with flood control planned and implemented on a
regional basis as one of the highest priorities for long-term recovery.
In addition to local city and disaster recovery planning in the project area, the Project has also been
incorporated into and is compatible with the North Dakota State Water Commission plans. The North
Dakota 2015 State Water Management Plan identifies Mouse River flood control as a high priority water
development project. This state plan identifies the Project, as designed, to provide flood relief to Souris
River Valley residents in both urban and rural settings. Flood control efforts by Project consist of the
features of the proposed Project, as well as other efforts outside of the project area, in Renville, McHenry,
and Bottineau Counties (reference [45]).
3.4.2
Infrastructure
Infrastructure provides the basic physical and organizational structures needed for the operation of a
functional society. It includes roadways, railways, transit systems, airports, utilities, water delivery and
internal drainage systems, along with emergency services. Types and density of infrastructure present vary
throughout the project area, ranging from extensive urban infrastructure within Minot to the more
minimal infrastructure in the rural residential areas outside the city limits of Burlington and Minot.
113
3.4.2.1
Existing Flood Risk-reduction Infrastructure
Flood risk-reduction infrastructure in the project area includes multiple flood risk-reduction features, in six
subdivisions between Burlington and the upstream side of Minot, constructed by USACE as part of the
Souris River Basin Project, as well as channel modification features constructed under a previous phase of
the Souris River Basin Project. Existing flood risk-reduction features in the project area are described in
Section 1.4.
3.4.2.2
Transportation
Roadways
As shown in Map 3-6, Minot is at the intersection of three major arterial roadways (U.S. Highway 83, U.S.
Highway 2, and U.S. Highway 52). These transportation routes are the primary roadway corridors for long
trips and are essential for commerce to and through the region and the state (reference [3]). Also shown
in Map 3-6 are minor arterial and collector (urban and rural) roadways. The minor arterial and collector
roadways serve the sub-region (i.e., Burlington and Minot), providing connections to principal arterial
roadways, activity centers, business/retail, schools, hospitals, and neighborhoods.
Table 3-5 provides a detailed summary of features and functions of the roadway networks identified on
Map 3-6.
Table 3-5
Major Roadways in the Project Area
Roadway Name
Functional Classification
No. of
Lanes
Average Daily Traffic
(ADT)(1)
U.S. Highway 2 (County 17 and 55th Street NE)
Principle Arterial
Expressway
4
10,600 19,710
U.S. Highway 2/ Burdick Expressway (U.S.
Highway 2 eastward to 13th Street SE)
Principal Arterial
4-5(2)
5,280 7,620
U.S. Highway 52
Principal Arterial
3
8,000 8,490
U.S. Highway 83 (S. and N. Broadway)
Principal Arterial
4-5(3)
11,700 29,440
U.S. Highway 83 Bypass
Principal Arterial
2
6,630 10,610
Railway Avenue
Minor Arterial
2
NA
University Avenue W
Minor Arterial
2/3
N/A
2nd Avenue SW
Minor Arterial/Collector
2
NA
3rd Street SE
Minor Arterial
3/4
4,470 8,455
3rd/4th Avenue NW
Minor Arterial
2/4
4,495
8th Street NW
Minor Arterial/Collector
2/3
NA
8th Avenue SE
Minor Arterial
2
NA
11th Avenue SW
Minor Arterial/Collector
2/3
NA
13th Street SE
Minor Arterial
2/3
NA
114
Roadway Name
Functional Classification
No. of
Lanes
Average Daily Traffic
(ADT)(1)
16th Street NW
Minor Arterial/Collector
2, 4, 5
11,130(4)
16th Street SW
Minor Arterial
4
14,365 15,780(5)
20th Avenue SW
Minor Arterial
3/4
NA
20th Avenue SE
Minor Arterial
4/5
NA
21st Avenue NW
Minor Arterial
2/4
3,090 3,400
27th Street SE
Minor Arterial
2/3
NA
31st Avenue SW
Minor Arterial
3
NA
31st Avenue SE
Minor Arterial
2
NA
37th Avenue SW
Minor Arterial
5
2,370 7,845
37th Avenue SE
Minor Arterial
3
NA
Central Avenue
Collector
2
NA
Hiawatha Street (SE)
Collector
2
NA
Northwest Avenue
Collector
2
NA
Sunset Blvd (NW)
Collector
2
NA
1st Avenue SE
Collector
2
NA
1st Street SW
Collector
2
NA
1st Street SE
Collector
2
NA
2nd/3rd Street SE
Collector
2
NA
3rd Avenue SE
Collector
2
NA
4th Avenue NE
Collector
2
NA
6th Street SW
Collector
2
NA
7th Street NE
Collector
2
NA
16th Avenue SE/SW
Collector
2/3
NA
11th Avenue NW
Collector
2
NA
11th Avenue SE
Collector
2
NA
20th Avenue SE
Collector
2
NA
20th Street NW
Collector
2
NA
27th Street SE
Collector
2
NA
31st Street SE
Collector
2
NA
55th Street NE/SE
Collector
2
1,610 3,115
County Road 10 (Colton Avenue-Burlington)
Collector
2
NA
County Road 12
Collector
2/3
3,115
115
Roadway Name
Functional Classification
No. of
Lanes
Average Daily Traffic
(ADT)(1)
County Road 14
Collector
2
NA
County Road 15
Collector
2
NA
County Road 17
Collector
2
NA
County Road 19 (S)
Collector
2
NA
Table sourced from reference [3]
(1) Range of current ADT (>5,000) was obtained from Minot, North Dakota 2035 Transportation Plan (Final January 2015).
(2) U.S. Highway 2 Bypass is five lanes running west to east, transitioning to four-lanes on the east side of U.S. Highway 83,
then becoming five lanes in east Minot prior to rejoining U.S. Highway 2.
(3) U.S. Highway 83 in north Minot is four-lane divided transitioning into five lanes through the heart of Minot, then south of
U.S. Highway 2 becoming four-lane divided.
(4) Segment located between Eleventh Avenue NW and Second Avenue SW
(5) Segment located between Second Avenue SW and Thirty-First Avenue SW
Roadway Bridges
Bridges over the Souris River are integral to transport in the region as they provide connections and
continuity for the overall transportation network regionally and locally. Numerous bridges are located
within the project area (Map 3-7). Table 3-6 provides an overview of roadway bridges in the project area.
Roadway bridges that would be directly affected by the Project include the following:
Colton Avenue bridge (Burlington)
U.S. Highway 83 Bypass bridge (Minot)
Burdick Expressway bridge (Minot)
Twenty-Seventh Street bridge (Minot)
U.S. Highway 2 bridge (Minot)
116
Table 3-6
Roadway Bridges in the Project Area
Bridge No.
(Map 3-7)
Bridge Location
No. of
Lanes
Approx. Length
(feet)
Colton Avenue Bridge(1)
1
Burlington
2
122
U.S. Highway 83 Bypass Bridge(1)
2
2
220
16th Street SW Bridge
3
Minot (west)
4
140
2nd Avenue SW
4
Minot
(west/central)
4
150
4th Avenue NW
5
Minot
(west/central)
4
165
5th Avenue NW
6
Minot
(west/central)
3
300
3rd Avenue NW/4th Avenue NW
7
Minot (central)
4
220
U.S. Highway 83/ Broadway Bridge
8
Minot (central)
4
>200
3rd Street NE
9
Minot (central)
2
>200
7th Street NE
10
Minot (central)
2
175
Burdick Expressway Bridge (U.S. Highway 2
Bypass Bridge)(1)
11
Minot (central)
4
200
8th Avenue SE
12
Minot
(east/central)
2
165
27th Street Bridge(1)
13
Minot
(east/central)
2
185
U.S. Highway 2 Bridge(1)
14
Minot (east)
4
180
Bridge Name
Minot
(far west)
Table sourced from reference [3]
(1) Roadway bridges that would be modified as part of the proposed Project
The U.S. Highway 83/Broadway Bridge is scheduled to be replaced. This effort is considered to have
independent utility from the proposed flood risk reduction project. It is being planned and evaluated as a
separate action by the North Dakota Department of Transportation (NDDOT) in cooperation with the
Federal Highway Administration and City of Minot. Detailed engineering design, construction
documentation, and environmental review and permitting are expected to be completed by fall 2016 with
construction anticipated during the 2017 and 2018 construction season. The bridge replacement is being
evaluated by NDDOT/FHWA separately for NEPA compliance.
Railways
The Burlington Northern Santa Fe (BNSF) Railway and the Canadian Pacific Railway are Class I commercial
rail lines carrying main line freight operations through the project area. The location of the railways in
relation to the Project are shown on Map 3-6. BNSF also has AMTRAK passenger service operating on its
tracks in the project area. The AMTRAK station, located in downtown Minot, is served by the "Empire
117
Builder," which had become increasingly popular, as reflected in its growing number of riders during the
2010 to 2014 oil boom (reference [3]).
BNSF has major yard operations in Minot, operating two mainline tracks through the city and the
switching yard is in eastern Minot, along U.S. Highway 2, in the industrial portion of the city. Trains are
routed on the multiple BNSF lines that come into Minot from the southeast, east, north, and west. BNSF
operates about 30 trains per day through Minot. BNSF freight traffic is primarily comprised of intermodal
and grain freight, drilling supplies for the western North Dakota oil fields, and oil shipments to refineries
in the southern United States. In addition to freight traffic, AMTRAK operates two trains per day on the
BNSF track--one east bound and one west bound. A portion of the mainline tracks and the yards are
susceptible to inundation during larger flood events. As a result of the 2011 flood event, BNSF temporarily
discontinued service on mainline tracks and at the AMTRAK depot, and they suffered damage to their
support facilities. BNSF has expressed a desire to raise their track and bridge to prevent mainline service
interruption during major flood events.
Canadian Pacific Railway operates a mainline through the Souris River Valley, running diagonally from
north central North Dakota, through Minot, to the extreme southeastern corner of the state. This is the
primary connection from their system in Saskatchewan and Alberta to the central United States. Canadian
Pacific has multiple siding locations and spur lines that service rail users. Canadian Pacific Railway
currently operates about 16 trains per day through the Souris River Valley. A single track of the Canadian
Pacific Railway passes through the project area near the intersection of First Avenue SW and Second
Avenue SW in Minot. As a result of the 2011 flood, Canadian Pacific also temporarily discontinued service
on tracks and suffered damage to support facilities. A Canadian Pacific Railway bridge located in the
Maple Avenue High-Flow Diversion segment would require reconstruction to be compatible with flows
from the diversion.
Public Transit
There are two local public transit systems (Minot City Transit and Souris Basin Transportation) in the
project area. Jefferson Lines also provides regional bus service.
Public transit plays an important role in Minot's overall transportation network. It serves Minot by
providing an alternate means of transportation, reducing traffic, and supporting community members
who do not have access to personal vehicles. Minot City Transit operates nine fixed bus routes, which
operate daily Monday through Saturday. The Minot City Transit public transportation system in the
project area is centralized in Minot.
Souris Basin Transportation is a non-profit corporation providing rural public transit service within Minot
and the surrounding seven county area. Souris Basin Transportation offers service for on-demand trips
and scheduled routes. This bus service operates along 14 routes, providing transit service to the general
public, with focus on the elderly and special-needs individuals.
Jefferson Lines provides commercial bus service to and from Minot. This intercity service provides
connections to cities along U.S. Highway 2 throughout North Dakota.
118
Airports and Airstrips
Two aviation facilities are located in the Minot region: the Minot International Airport and Minot Air Force
Base (Figure 3-8). The Minot International Airport is located at the northern edge of Minot it serves
Minot and the surrounding communities. The Minot Air Force Base is about 10 miles north and would not
be affected by the Project.
Minot International Airport (MOT) is a public airport located approximately two miles northeast of
downtown Minot. The airport includes a passenger terminal, a general aviation terminal building, three
aprons, two lighted runways, and a number of hangers, offices, and other support buildings and
equipment. Access to the Minot International Airport is primarily by Airport Road, a two-lane roadway
leading to the air carrier terminal area from North Broadway at the Twentieth Avenue NW intersection.
Nineteenth Avenue NW also serves as access between North Broadway and Airport Road.
3.4.2.3
Private Utilities
Private, non-municipal utility companies serving the communities in the project area are listed in
Table 3-7. Private utilities are commonly referred to as franchise utilities because these companies have
contractual permission to place their utilities in the public rights-of-way, with various local exceptions.
Generally, franchise agreements between local governments and utility companies require that the utility
company be responsible for relocating any utilities that conflict with the location of public improvements.
The Montana-Dakota Utilities Company (MDU) is the natural gas provider in the project area, providing
service to both Burlington and Minot. Within Minot, underground gas mains and service pipelines are
commonly run adjacent to and within the impact area. Natural gas service distribution stations are also
scattered throughout Minot near the project area.
Xcel Energy, the Verendrye Electric Cooperative, and Otter Tail Power are the primary electric providers in
the project area, providing service to both Burlington and Minot. Infrastructure within and adjacent to the
impact area includes overhead transmission and distribution lines, distribution switches, underground
transformers and distribution lines, and street lights.
119
Table 3-7
Non-Municipal Utility Providers
Utility Company
Service Type
Xcel Energy
Electric
Verendrye Electric Cooperative
Electric
Otter Tail Power
Electric
Montana Dakota Utilities
Natural Gas, Electric
Souris River Telecommunications
Telecommunications
Midcontinent Communications
Telecommunications
Reservation Telephone Cooperative
Telecommunications
North Prairie Rural Water District
Rural Water
Upper Souris Water Users District
Rural Water
Northwest Area Water Supply
Regional Water Supply
Enbridge
Crude Oil Transmission
Minot Air Force Base
Missile
Communications
120
Æ
Airport Location
Project Footprint
Æ
Minot Air Force
Base
Municipalities
£
¤
Barr Footer: ArcGIS 10.4, 2017-04-30 15:04 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-8 - Aviation Facilities.mxd User: kac2
83
I
0
3,500
7,000
14,000
Feet
£
¤
2
CITY OF
BURLINGTON
£
¤
B83
CITY OF
MINOT
Data Source: Federal Aviation Administration 2008
Imagery Source: USDA NAIP Imagery 2014
Æ
Minot International
Airport
Figure 3-8
CITY OF
SURREY
AVIATION FACILITIES
Mouse River Enhanced Flood
Protection Project
3.4.2.4
Public Water Distribution Systems
Burlington and Minot each operate public water distribution systems. Both municipal systems are
connected to the Northwest Area Water Supply (NAWS) system. The NAWS system is designed to supply
drinking water from Lake Sakakawea, on the Missouri River, to Burlington, Minot, and other North Dakota
communities. The system is only partially completed, however, and as of 2015 Minot was supplying water
to the NAWS system, rather than receiving water. Eventually, the NAWS system will serve Minot.
Burlington's municipal water supply is provided primarily by the NAWS system. The city also owns two
water supply wells (one of which is currently out of service) and a water treatment facility, which are used
as a redundant water supply and as a supplemental supply during periods of high demand.
Minot operates a municipal water system with wells that draw groundwater from the Minot Aquifer and
the Sundre Aquifer. Groundwater from the Minot and Sundre aquifers is being withdrawn at an
unsustainable rate. Minot is currently supplying water to the NAWS system and the North Prairie Rural
Water District system. Since 2008, Minot has been providing water from the city's groundwater wells to
Berthold, Deering, Kenmare, Mohall, Burlington, and the North Central Rural Water Consortium. This
interim water supply, as the NAWS project infrastructure is being completed, is provided by Minot
through temporary water service contracts that are scheduled to expire in 2018 (reference [42]).
The Minot Water Treatment Plant is in the western portion of Minot, adjacent to the Forest Road segment
of the Project and north of the BNSF Railway and U.S. Highway 2 business loop (Figure 3-9). Water is
treated and then distributed through high-service pumps to the water distribution system, which includes
trunk mains, booster stations, and water storage reservoirs that provide the water supply and pressure to
the system. Water distribution in Minot is currently divided between three pressure zones: North, South,
and Valley. A flood risk-reduction project, separate from the Requester's Preferred Alternative, is currently
underway to protect the Minot Water Treatment Plant from flooding.
The rural communities between Burlington and Minot receive potable water from the North Prairie Rural
Water District and the West River Water and Sewer District. Rural communities downstream of Minot are
supplied with potable water by the North Prairie Rural Water District.
122
Water Treatment Plant Levee
Footprint
4TH AVE SW
Water Treatment Plant
Floodwall Alignment
Project Footprint
5TH AVE SW
5TH AVE SW
12TH ST SW
FOREST RD
17TH ST SW
SW
18TH ST SW
20TH ST SW
19TH ST SW
H
5T
E
AV
8TH AVE SW
7TH AVE SW
16
TH
ST
FO
R
R
ST
SW
D
E
£
¤
£
¤
B2
MINOT WATER
TREATMENT PLANT
B2
I
0
150
300
600
Feet
11TH AVE SW
10TH ST SW
11TH ST SW
11TH AVE SW
16TH ST SW
ST
Imagery Source: USDA NAIP Imagery 2014
TH
18
SW
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:18 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-9 - Minot Wastewater Treatment Plant.mxd User: kac2
6TH AVE SW
Figure 3-9
MINOT WASTEWATER
TREATMENT PLANT
Mouse River Enhanced Flood
Protection Project
3.4.2.5
Sanitary Sewer Systems
Burlington operates a municipal sanitary sewer system, with the treatment facility located north of the city
between the Des Lacs and Souris Rivers. In the rural communities between Burlington and Minot, sewage
treatment systems consist of privately owned and managed septic systems and drain fields.
Minot also operates a municipal sanitary sewer system. Sanitary sewer system facilities that serve Minot
include the Treatment Facility, Valley Forcemains and Lift Stations, and the Puppy Dog Sewer System
which is currently undergoing expansion and enhancement with USACE funding (these actions are
independent of those being evaluated in this EIS). A critical component of Minot's sanitary sewer system is
the Puppy Dog Lift Station which is just east of the Eastside Estates phase of the proposed Project. This lift
station serves a majority of south Minot and is intended to serve substantial future development in the
city. The Minot Wastewater Treatment Plant, located southeast of Minot, consists of aeration ponds with
mechanical aerators for primary treatment, a series of facultative lagoon ponds for secondary treatment,
and an artificially constructed (discharging) wetland system for tertiary treatment.
Rural communities downstream of Minot are provided with sanitary sewer services through an agreement
with the Ward County Water Resources District and Minot. Although Minot's sanitary sewer infrastructure
exists in this area, sanitary sewer service in the far downstream extents of the project area consists of
privately owned septic systems and drain fields.
3.4.2.6
Storm Sewer System
Minot maintains and operates a storm sewer system within the city. Minot's storm sewer system consists
of underground pipes, manholes, lift stations, and other associated infrastructure. Portions of this
infrastructure are located in the Project impact area, particularly in central Minot. There is currently no
storm sewer infrastructure within the impact area downstream of the Minot city limits.
Burlington does not have a complete storm sewer system. Some shallow ditches located adjacent to the
city streets direct runoff into dead loops along the Souris River.
3.4.2.7
Emergency Services
Emergency services are provided throughout the project area and are critical in times of flooding and
other natural disasters. Locations of law enforcement departments, fire departments, medical emergency
response services, and hospitals within the project area are shown in Map 3-8.
Law Enforcement
Both cities in the project area have their own police departments. The Burlington Police Department,
which is headquartered in the western portion of town on Wallace Street East, has a chief and two
accompanying police officers. Minot, as County Seat of Ward County, has its city police department, as
well as the offices of the Ward County Sheriff's Department and other state and federal law enforcement
agencies, including the North Dakota Highway Patrol and U.S. Marshals Service, District of North Dakota.
The Minot Police Department, which is headquartered in City Hall off Second Avenue SW, less than
124
300 feet south of Phase 3 of the Requester's Preferred Alternative, is a full service law enforcement
agency, with 24/7 response and patrol.
Fire Services
Burlington has a volunteer fire department currently with 25 firefighters and 8 junior firefighters. The
department has nine pieces of apparatus: three wildland trucks, two tenders, two engines, one command
vehicle, and one rescue truck (reference [46]). The Burlington Fire Station is in central Burlington,
southwest of the confluence of the Des Lacs and Souris Rivers.
The Minot Fire Department has three fire stations with Headquarters Station in south-central Minot,
Station #2 near the downtown area, and Station #3 adjacent to the Minot International Airport. As Minot
has grown, the city has identified an immediate need for an additional fire station in northwestern Minot.
During the June 2011 flooding, northern portions of Minot were cut off from fire station access by flooded
roads.
The Minot Fire Department employs approximately 50 individuals in three Battalions. The fire department
provides services with full-time fire/rescue, medical, ARFF (Minot International Airport), and Hazardous
Materials (Hazmat) protection. According to the City of Minot 2012 Comprehensive Plan, the rescue squad
also protects a radius of 40 miles with Emergency Medical Services, auto extrication, high angle rescue,
water/ice rescue with PADI trained divers, and confined space rescue.
Emergency Medical Response
Both Burlington and Minot have medical emergency response services, though services in Minot are more
comprehensive, as the nearest hospitals and trauma center in the project area are located in Minot.
Burlington has a group of 15 state-certified First Responders that respond to medical emergencies
awaiting ambulance transport to a medical facility (reference [46]). In the project area there are two
hospitals (Trinity Hospital and Saint Joseph's) and the Trinity Medical Center, which is a+- Level II Trauma
Center, all located in downtown Minot (Map 3-8). The Trinity Medical Center operates the Trinity Medical
Center Heliport. Trinity Medical has discussed the possibility of moving its main facility to new buildings in
southwest Minot. If this move were to occur, the heliport would also relocate to the new location. Minot's
medical facilities serve not only local residents, but also the entire north-central North Dakota region.
3.5
Potential Contaminated Sites
A Hazardous, Toxic, and Radioactive Waste (HTRW) assessment was conducted for the project area in
general conformance with ER 1156-2-132 U.S. Army Corps of Engineers Water Resources Policies and
Authorities, Hazardous, Toxic and Radioactive Waste Guidance for Civil Works Projects (reference [47]). The
overall HTRW assessment area includes the sites of the planned flood risk-reduction features and a buffer
of approximately 50 feet around each feature. The purpose of this assessment was to identify potentially
contaminated sites that could be affected by construction or operation of the Project or that could affect
construction procedures.
125
The approach to the HTRW assessment was commensurate with the current level of project definition.
Two levels of assessment, with varying intensity, were carried out along the length of the Project. Phase I
HTRW assessments, which involves the real estate holdings and potential or existing environmental
contamination liabilities, were conducted for the three segments of the Project that have advanced into
the design phase, including the Fourth Avenue NE segment (Phase 1), Napa Valley segment (Phase 2), and
the Forest Road segment (Phase 3). Findings from the Phase I assessment identified an industrial area in
the Fourth Avenue NE segment so a more detailed Phase II investigation involving soil, air, and
groundwater samples was conducted. A general, desktop HTRW assessment was performed for the rest of
the Project segments. A full HTRW assessment will be for these segments prior to construction.
As flood risk-reduction features of the Project continue to be refined, more detailed assessments may be
conducted in the current HTRW assessment area, or if necessary, the HTRW assessment area may be
expanded during future environmental reviews of the Project. The following sections summarize the
detailed HTRW assessments that were completed for the initial three segments, and presents the general
HTRW assessment for the other segments of the Project.
3.5.1
Napa Valley and Forest Road Segments (Phases 2 and 3)
The HTRW assessments for the Napa Valley and Forest Road segments, due to their proximity, were
combined into a single report (Appendix D). A review of historic aerial photographs, topographic maps,
fire insurance maps, and reverse city directories for the HTRW assessment area indicates that historical
land use along the proposed levees and floodwalls was primarily agricultural until 1953, when homes
started being built. More recently, many of the homes and buildings have been vacated and demolished
as the result of the flood of 2011. The Wee Links Golf course was constructed in 2003 and the Jack
Hoeven Park and the Dakota Bark Park were opened in 2009. Current land use in the area of the Napa
Valley and Forest Road segments is shown on Map 3-5.
A search of regulatory database records covering the HTRW assessment area and adjoining areas was
conducted to identify known environmental sites that could be affected by the Project. Interviews were
also conducted with city staff knowledgeable about the area. The regulatory database search and the
interviews did not identify any sites of concern within the HTRW assessment area.
A geotechnical drilling investigation along the proposed alignments of the levees and floodwalls was
conducted from February through April 2015, which included several borehole locations within the HTRW
assessment area. Drilling observations indicate the presence of sand and clay fill, from depths of 2 to 16
feet below ground surface (bgs). No debris was encountered, with the exception of plastic in one boring.
No odors, discoloration, or free product were observed during the investigation (Barr 2015c).
A site inspection of the HTRW assessment area was completed in March 2015 from public rights-of-way.
No buildings or residences were entered and inspected. There are approximately 60 buildings located
within the assessment area. No evidence of contaminated materials was identified at any of these
buildings. Due to the age of the structures, however, it is possible that hazardous building materials (such
as asbestos-containing material (ACM) and lead-based paint) could have been used during construction.
Also, older buildings such as these could have had heating oil storage, wells, septic systems, or other
126
contaminant-related concerns. Buildings, equipment, and debris identified during the site inspection that
could contain potentially contaminated substances or be potential indicators of contamination are shown
on Figure 3-10.
127
17TH ST NW
18TH ST NW
19TH ST NW
20TH ST NW
2ND AVE NW
21ST ST NW
22ND ST NW
- BLVD
23RD ST NW
24TH ST NW
27TH ST NW
25TH ST NW
- CR
3R
2
2
H
5T
ST
!
16TH ST SW
SW
- CT
CENTRAL AVE W
TH
18
O
K
A
DR
WESTFIELD AVE
VE S
2ND A
- LN
2ND AVE
Storm Sewer / Manhole
HTRW - Hazardous, Toxic and Radioactive
Waste
ST
ST
1ST AVE SW
22N
D
24TH ST SW
T SW
HS
6T
28
TH
ST
30
SW
TH
B83
SW
ST
SW
£
¤
AVE
NW
Project Footprint
-L
N
SW
HTRW Phase 2 (Napa
Valley) Assessment Area
HTRW Phase 3 (Forest
Road) Assessment Area
CENTRAL AVE W
1ST AVE SW
D
Curt's Starter and
Alternator Service
and Propane Tank
W
SW
3RD AVE SW
Propane Tanks
Backup Generator
!
T RD
FORES
!
12TH ST SW
!
17TH ST SW
5TH AVE SW
18TH ST SW
24TH ST SW
25TH ST
SW
21ST ST SW
4TH AVE SW
!
!
6TH AVE SW
Empty Drums at
Moose Lodge Family
Center #822
!
!
I
Transformer
Electrical Box
TH
16
ST
Vent Pipe
0
300
600
1,200
SW
Wee Links
Maintenance
Shed
Feet
Minot Water
Treatment Plant
Concrete Structure
RD
11TH ST SW
11TH AVE SW
ACCESS
£
¤
18TH ST SW
ST
W
TH
13
SW
ST
28TH ST SW
TH
12
Data Source: D & E
Imagery Source: USDA NAIP Imagery 2014
12TH AVE SW
TS
29TH ST SW
B2
S
TH
13
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:17 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-10 - HTRW Site Observation Summary Phases 2 and 3.mxd User: kac2
Debris in
Wooded Area
Figure 3-10
HTRW SITE OBSERVATION
SUMMARY: PHASES 2 AND 3
Mouse River Enhanced Flood
Protection Project
3.5.2
3.5.2.1
Fourth Avenue NE Segment (Phase 1)
Phase I Assessment
A Phase I HTRW assessment was conducted for the Fourth Avenue NE segment (Appendix E). A review of
historic aerial photographs, topographic maps, fire insurance maps, and reverse city directories of the
Fourth Avenue NE HTRW assessment area indicates that land use along the floodwall and road
realignment was primarily residential by 1913. Past commercial/industrial properties included the Minot
Flour Mill, a feed and stable building/Cox Emerson Lumber/Bond Lumber Company, and Great Northern
Lumber Company. Other historic land uses are as follows:
Between 1913 and 1918, Standard Oil was operating on the east side of the assessment area and
had an oil warehouse, a lubricating tank house, a building for filling wagon tanks, a barrel filling
shed, and kerosene tanks. A dry cleaner, creamery, and the Minot Water Treatment Plant were
operating north of the assessment area in 1918 (Figure 3-11).
By 1926, additional residential development had occurred north of Fourth Avenue NE. Other land
uses were the same as in 1918; the creamery, however, had been converted to a filling station,
and the lumber company also had a filling station.
Between 1969 and 1979, the Souris River was realigned west of the assessment area. The U.S.
Highway 83 bridge and several buildings were demolished in the process of realigning the river.
Current land use in the assessment area is a mix of vacant land, residential, commercial, and industrial.
Industrial and commercial uses include the Home Sweet Home gift shop; Giscon concrete pumping
service; Souris Valley Feed and Seed grain elevator; Souris River Design, Taxi 9000; and Helm's & Mork's
Storage, which consists of a furniture store, a small used car sale lot, and a portable heater storage area.
There are also a large vacant church and the bridges for U.S. Highway 83 and Third Street SE (Figure 3-12).
A search of regulatory database records covering the assessment area and adjoining areas was conducted
to identify known environmental sites that could be affected by the Project. Three sites were identified in
the assessment area: Werner Oil Company, North Dakota Concrete Products, and Porter Brothers Salvage
Yard (Figure 3-13). Werner Oil Company and Porter Brothers have registered storage tanks, likely for
petroleum storage. North Dakota Concrete Products is listed as a leaking storage tank site, with site
cleanup completed in 1989.
Interviews were also conducted with city staff knowledgeable about the area. The interviews did not
identify any sites of concern for the HTRW assessment area beyond the sites identified in the regulatory
records. Site inspections were completed in March and May 2015, from public rights-of-way. No buildings
were entered and inspected.
Notable items in the surrounding area to the north were a generator in Lowe's Printing yard, two padmounted electrical boxes in good condition in the city park, three pole-mounted transformers in good
condition, and a 55-gallon drum, large plastic liquids container, lawn mowing equipment, and heavy
equipment near a shop behind Philotechnics Ltd. No stained ground was observed.
129
In January 2015, Braun Intertec conducted a geotechnical investigation in the HTRW assessment area, and
fill was observed in all borings ranging in depth up to 15 feet below ground surface (bgs). Debris,
including asphalt, brick, glass, wood, and concrete, was present in about 25 percent of the borings.
3.5.2.2
Phase II Assessment
Based on the results of the Phase I HTRW assessment of this segment, it was determined that a limited
Phase II investigation was needed in the vicinity of some industrial properties (Werner Oil Company, North
Dakota Concrete Products, and Porter Brothers Salvage Yard) located in the eastern portion of the Fourth
Avenue NE segment (Figure 3-14). The purpose of the investigation was to evaluate soil and groundwater
conditions at these properties to determine if contaminants are present. The investigation consisted of
placing six borings in the investigation area and collecting soil and groundwater samples from the
boreholes. These samples were analyzed for gasoline range organics (GRO), diesel range organics (DRO),
semi-volatile organic compounds (SVOCs), and volatile organic compounds (VOCs), and Resource
Conservation and Recovery Act (RCRA) metals.
A summary of the Phase II investigations, including analytical results of the soil and groundwater samples,
can be found in Appendix E. The soil analytical results were compared to Environmental Protection
Agency's (EPA) Industrial Carcinogenic and Non-Carcinogenic values and NDDH Guidelines for the
Assessment and Cleanup of Saltwater Releases Soil Cleanup Standards. The analytical groundwater
results were compared to EPA Secondary Drinking Water Regulations, NDDH Guidelines for the
Assessment and Cleanup of Saltwater Releases Groundwater Cleanup Standards, EPA Maximum
Contaminant Levels, and North Dakota surface water standards (North Dakota Water Quality Criteria
Human Health Values, and North Dakota Maximum Limits for Substances in or Characteristics of Class 1
Streams Chronic).
The analytical results of the soil and groundwater samples did not identify significant contaminant
concerns at these industrial properties, so no further HTRW assessments were conducted. It was
concluded that construction activities in this industrial area would not be of markedly higher risk for
release of HTRW solutes or materials.
130
HTRW Assessment Area
11
1TH AVE NW
TH AVE NW
Project Footprint
11TH AVE NW
11TH AVE NE
Standard Oil Company
HTRW - Hazardous, Toxic and Radioactive
Waste
UNIVERSITY AVE NW
8TH ST NW
UNIVERSITY AVE NE
5T
H
3RD ST NE
UNIVERSITY AVE NW
AV
E
NW
Ice Cream Company /
Filling Station
North Dakota Concrete
Brothers, Porter Brothers
Salvage Yard (Standard Oil)
6T H
Dry Cleaner
ST
NW
Minot Water
Treatment Plant
5TH AVE NE
£
¤
RR AV
E
4TH AVE NE
NE
4T H AVE NE
- RD
Minot Flour Mill
7TH ST NE
6TH ST NW
Great Northern
Lumber Company
3RD ST SE
Feed & Stable/
Cox-Emerson Lumber/
Bond Lumber Company
3RD AVE NW
I
0
CENTRAL AVE
300
600
1,200
2ND AVE SE
3RD AVE SE
B2
Data Source: Appendix E
Imagery Source: USDA NAIP Imagery 2014
Figure 3-11
T ST
ON
FR
£
¤
3RD ST SE
N
ST SW
R
TE
S
E
W
E
AV
2ND AVE SW
1ST ST SW
E RD
LAN
FIRE
W
2ND AVE S
1ST AVE SE
1ST ST SE
1ST AVE SW
3RD ST SE
Feet
6TH
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:15 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-11 - Historic Businesses Phase 1.mxd User: kac2
83
£
¤
B52
HISTORIC BUSINESSES:
PHASE 1
Mouse River Enhanced Flood
Protection Project
HTRW Assessment Area
HAVENW
11T
1THAVENW
11THAVENW
Project Footprint
11THAVENE
Helm's & Mork Storage
HTRW - Hazardous, Toxic and Radioactive
Waste
8TH STNW
U NI
VERSI
TYAVENW
5T
H
U NI
VERSI
TYAVENE
AV
E
He lm'
s &Mork'
s
Storage
NW
NW
ST
6TH
Taxi9000
Vacant
Church
5TH AVENE
£
¤
83
Souri
s Valle y
De si
gn
Home Sw e e t
Home Gi
f
t Shop
Souri
s Valle y
Fe e d and Se e d
Grai
nEle vator
RRAV
ENE
4THAVENE
-RD
7TH STNE
6TH STNW
3RD AVENW
3rs St SE
Bri
dge
Gi
sconConcre te
Pumpi
ngSe rvi
ce
3RD STSE
4THAVENE
Hi
ghw ay 83
Bri
dge
CENTRAL AVE
I
0
300
600
1,200
2NDAVESE
B2
3RD STSE
3RDAVESE
£
¤
Data Source: Appendix E
Imagery Source: USDA NAIP Imagery 2014
3RD STSE
2NDAVESW
Figure 3-12
TST
ON
FR
E
AV
RN
TE
S
E
W
1STAVESE
1STSTSW
NERD
RELA
FI
W
2ND AVES
1STAVESW
1STSTSE
Feet
STSW
6TH
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:14 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-12 - Current Key Businesses Phase 1.mxd User: kac2
3RD STNE
VERSI
U NI
TYAVENW
£
¤
B52
CURRENT KEY BUSINESSES:
PHASE 1
Mouse River Enhanced Flood
Protection Project
HTRW Assessment Area
11
1TH AVE NW
TH AVE NW
Project Footprint
11TH AVE NW
11TH AVE NE
HTRW - Hazardous, Toxic and Radioactive
Waste
UNIVERSITY AVE NW
8TH ST NW
UNIVERSITY AVE NE
5T
H
3RD ST NE
UNIVERSITY AVE NW
AV
E
NW
6T H
Werner Oil
ST
83
RR AV
E
3RD ST SE
- RD
7TH ST NE
6TH ST NW
3RD AVE NW
NE
North Dakota Concrete
Products, Porter Brothers
4T H AVE NE
Salvage Yard
4TH AVE NE
I
0
CENTRAL AVE
300
600
1,200
2ND AVE SE
3RD AVE SE
B2
Data Source: Appendix E
Imagery Source: USDA NAIP Imagery 2014
Figure 3-13
T ST
ON
FR
£
¤
3RD ST SE
N
ST SW
R
TE
S
E
W
E
AV
2ND AVE SW
1ST ST SW
E RD
LAN
FIRE
W
2ND AVE S
1ST AVE SE
1ST ST SE
1ST AVE SW
3RD ST SE
Feet
6TH
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:12 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-13 - Known Environmental Sites Phase 1.mxd User: kac2
NW
5TH AVE NE
£
¤
£
¤
B52
KNOWN ENVIRONMENTAL
SITES: PHASE 1
Mouse River Enhanced Flood
Protection Project
Phase II HTRW
Investigation Area
Project Footprint
* All locations are approximate
3RD ST NE
HTRW - Hazardous, Toxic and
Radioactive Waste
Heating & Air Conditioning/
Werner Oil
Dry Cleaner
North Dakota Concrete
Brothers, Porter Brothers
Salvage Yard
5TH AVE NE
Feed & Stable/
Cox-Emerson Lumber/
Bond Lumber Company
4T H AVE NE
Filling Station
3RD ST SE
Standard Oil Co.
Minot Flour Mill
I
Formerly Great
Northern
Lumber Company
0
75
150
300
Feet
7TH ST NE
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:10 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-14 - Phase II HTRW Assessment Area.mxd User: kac2
Minot Bakery
Data Source: Appendix E
Imagery Source: USDA NAIP Imagery 2014
Figure 3-14
PHASE II HTRW
ASSESSMENT
AREA
Mouse River Enhanced Flood
Protection Project
3.5.3
HTRW Assessment of Other Phases of Construction Stage 1.5
Inactive underground storage tanks have been identified along the Maple Avenue High-Flow Diversion
and the tieback levee through desktop analysis and review of environmental regulatory reports. The
storage tank along the Maple Avenue High-Flow Diversion is located at the Magic City Lumber, Inc. site
while the one near the tieback levee is located at as the Main Electric Construction, Inc. (Figure 3-16).
Additional HTRW assessments will be conducted prior to construction in these areas, as appropriate.
3.5.4
HTRW Assessment for Other Segments
Because it is possible that site conditions and land use will change over the duration of the Project, a full
HTRW assessment was not completed at this time. Instead, a general HTRW assessment was conducted
based on a desktop study and review of available environmental regulatory reports.
Land use in the project area upstream of Minot is a mix of low-to medium-intensity developed areas in
Burlington and other small communities in Harrison Township, amidst the rural agricultural land and
wetland areas directly adjacent to the Souris River channel. Likewise, downstream from Minot, the project
area is characterized by less densely developed communities that have a more rural character with
adjacent agricultural lands and wetland areas. Section 3.4.1 provides additional detail on current and
historical land use in the project area.
A search of regulatory database records covering the remainder of the Project segments and adjoining
areas was conducted to identify any known environmental sites that could be affected by the Project.
Historical Information Gatherers Inc.'s (HIG) regulatory report was obtained and reviewed to identify
known environmental sites within 500 feet of the assessment area. A wider search area of one mile
beyond this assessment area was used to review HIG's databases associated with more significant
environmental sites, including sites listed in the Superfund, Comprehensive Environmental Response,
Compensation and Liability Act (CERCLA) Information System, and No Further Remedial Action Planned
Sites (NFRAP).
Thirty sites were identified in the regulatory reports within the assessment area, including three CERCLA
sites, one NFRAP site, one Delisted National Priorities List (DNPL) site, one No Longer Regulated Resource
Conservation and Recovery Act (RCRA) Generator Facility (NLRRCRAG), 19 storage tanks, two Special
Waste Landfills (SPWLF), and three leaking storage tanks (LUST). All of the identified sites are
concentrated in the Minot area as shown on Figure 3-156.
Seven properties with storage tank listings were identified within the impact area; many with multiple
above or below-ground storage tanks. Tanks are listed as active and inactive Fed-Ex Freight is listed as a
SPWLF but no additional information was provided.
135
HTRW Locations (Approximate)
!
(
CERCLIS
!
(
CERCLIS, NFRAP
!
(
NLRRCRAG
!
(
RST, LRST
!
(
UST
!
(
SPWLF
SCHATZ RETREAD
!
(
UAST
ROBINSON
INSULATION
MINOT PLANT
!
(
UST, LUST
MAIN ELECTRIC
CONSTRUCTION
INC.
Barr Footer: ArcGIS 10.4.1, 2017-05-09 10:19 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-15 - Known Environmental Sites in Construction Stage 1.5 Impact Area.mxd User: kac2
KEELBLER COMPANY
FED EX FREIGHT
WERNER OIL
COMPANY
NORTH DAKOTA
CONCRETE PRODUCTS
PORTER BROTHERS
!
(
MINOT FARMERS ELEVATOR
!
(
!
(
!
(
!
!
( (
BURLINGTON NORTHERN
BRAY S CLEANERS
!
(
!
((
!
( !
I KEATING INC
MINOT FIRE
DEPARTMENT
!
(
!
(
!
(
LACOUNT PROPERTY
MINOT
LIVESTOCK
AUCTION
FERRELLGAS
FUEL SITE
!
(
!
(
!
(
Project Footprint
HTRW - Hazardous, Toxic and Radioactive
Waste
FARMERS
UNION
OIL COMPANY
ENERBASE
!
(
FIRESTONE
STORE OF
MINOT
!
(
!
(
!
(
!
(
AMTRAK-MINOT
!
(
ALAN KURTH
OLDS NISSAN
MAGIC CITY
LUMBER INC
SOURIS RIVER WEST MINOT
!
(
BELL
COMMUNICATIONS
MINOT
TOWN GAS
!
(
FOOD
SERVICES
OF AMERICA
!
(
I
0
750
1,500
3,000
Feet
Figure 3-15
Data Source: Appendix D & E
Imagery Source: USDA NAIP Imagery 2014
KNOWN ENVIRONMENTAL
SITES IN CONSTRUCTION
STAGE 1.5 IMPACT AREA
Mouse River Enhanced Flood
Protection Project
NORTH DAKOTA
CONCRETE PRODUCTS
KEELBLER COMPANY
FED EX FREIGHT
PORTER BROTHERS
ROBINSON
INSULATION
MINOT PLANT
MINOT FARMERS ELEVATOR
4TH AVE NE
(
!
(!
!
(
(
!
(
(!
!
(!
BRAY S CLEANERS
MINOT FIRE
DEPARTMENT
!
(
(
(!
!
(!
!
(
!
(
!
(
!
(
!
(
ST
16TH
SW
!
(
!
(
MINOT
LANDFILL
FIRESTONE
STORE OF
MINOT
ALAN KURTH
OLDS NISSAN
!
(
MAGIC CITY
LUMBER INC
BELL
COMMUNICATIONS
8TH AVE SE
MINOT
TOWN GAS
!
(
FOOD SERVICES
OF AMERICA
£
¤
B2
!
(
11TH AVE SE
£
¤
B52
STRATA
CORPORATION
16TH AVE SE
2ND ST SE
£
¤
83
AV F
E ON
SW TAG
E
FARMERS UNION OIL COMPANY
ENERBASE
AMTRAK-MINOT
16TH AVE SW
22
ND
!
(!
(
!
(
!
(
6TH ST SW
SOURIS RIVER WEST MINOT
!
(
CERCLIS, NFRAP
!
(
CERCLIS, DELNPL
!
(
NLRRCRAG
!
(
RST, LRST
!
(
UST
!
(
SPWLF
!
(
UAST
!
(
UST, LUST
Project Footprint
HTRW - Hazardous, Toxic and Radioactive
Waste
!
(
KELLER
PAVING AND
LANDSCAPING
!
(
20TH AVE SE
RD
20TH AVE SW
20TH AVE SE
£
¤
13TH RD
2
HAIR DEPOT
!
(
16TH ST SW
Barr Footer: ArcGIS 10.4.1, 2017-05-09 10:19 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-16 - Known Environmental Sites within One Mile of Project.mxd User: kac2
2ND AVE SW
I KEATING INC
CERCLIS
13TH ST SE
MINOT
LIVESTOCK
AUCTION
3RD ST SE
B83
6TH ST SW
£
¤
LACOUNT PROPERTY
FERRELLGAS
FUEL SITE 4TH AVE NE
42ND ST SE
BURLINGTON NORTHERN
4TH AVE NW
!
(
SCHATZ RETREAD
27TH ST SE
8TH ST NW
16TH ST NW
20TH ST NW
WERNER OIL
COMPANY
3RD ST NE
1TH AVE NW
HTRW Locations (Approximate)
MAIN ELECTRIC
CONSTRUCTION
INC.
I
31ST AVE SW
0
31ST AVE SW
1,250
2,500
5,000
Feet
£
¤
52
37TH AVE SW
Figure 3-16
Data Source: Appendix D & E
Imagery Source: USDA NAIP Imagery 2014
KNOWN ENVIRONMENTAL
SITES WITHIN ONE MILE
OF PROJECT
Mouse River Enhanced Flood
Protection Project
3.6
Socioeconomics
3.6.1
Population
Minot is the fourth largest city in North Dakota and the county seat for Ward County. Minot serves as a
hub locally, as well as a trade center for northwestern North Dakota and southern portions of Canadian
provinces of Manitoba and Saskatchewan. Minot Air Force Base and its approximate 7,500 on-base
personnel also contribute to the city's economy [reference [48]]. In January 2016, The North Dakota
Department of Commerce Census Office, published the 2016 population projections for the state
(reference [49]). The projections were made using high, expected, and low rates of migration between
2015 and 2040. All three scenarios assume in-migration will exceed out-migration for the next several
years. The report presents population data for the Economic Planning Region 2, which includes Minot.
Based on most recent projections, under the expected migration scenario, population in the Minot region
is expected to grow but at a decreasing rate over time (15% growth between 2010-2015 to 3% growth
between 2035-2040) (reference [49]).
Table 3-8 presents population characteristics for the communities in the project area. According to the
2013 population estimate, Minot represents 67 percent of the total population for Ward County, while
Burlington accounts for about 2 percent of the total population in the county. The total population of
Ward County has grown about 9 percent since 2000. Minot has experienced rapid growth with a 17
percent population increase from 2000 to 2013. Burlington, however, has seen little change in population
since 2000 (1.2 percent population growth).
Table 3-8
Population
Population
Burlington
Minot
Township of
Burlington
Township of
Harrison
Township of
Nedrose
Ward
County
North
Dakota
Population (2013)(1)
1,109
42,870
333
1,828
1,858
64,008
689,781
Population (2000)
1,096
36,567
356
1,402
2,149
58,795
642,200
Population Change
(2000-2013)
13
6,303
-23
426
-291
5,213
47,581
Population Percent
Change (20002013)
1.20%
17.20
%
-6.50%
30.40%
-13.50%
8.90%
7.40%
Notes:
Table sourced from reference [50]
The data in this table are calculated by ACS using annual surveys conducted during 2009-2013 and are representative of average
characteristics during this period (U.S. Department of Commerce. 2013. Census Bureau, American Community Survey Office,
Washington, D.C.; U.S. Department of Commerce. 2000. Census Bureau, Systems Support Division, Washington, D.C.).
Median age is fairly consistent across the communities in the project area; median ages are slightly higher
outside Burlington and Minot. Table 3-9 shows the age and gender distribution of the populations in the
project area.
138
Table 3-9
Age and Gender Distribution, 2013
Burlington
Minot
Township of
Burlington
1,109
42,870
333
1,828
Total Female
514
21,436
180
Total Male
595
21,434
153
Total
Population
Township of Township of
Harrison
Nedrose
Ward
County
North
Dakota
1,858
64,008
689,781
807
883
31,080
339,834
1,021
975
32,928
349,947
MEDIAN AGE
Median Age
(2013(1))
31.3
32.6
34.5
46.2
45.9
31.9
36.4
Median Age
(2000)
30.8
35
40.1
39
35.3
32.4
36.2
1.60%
-6.90%
-14.00%
18.50%
30%
-1.50%
0.60%
Median Age %
Change
Notes:
Table sourced from reference [50]
The data in this table are calculated by ACS using annual surveys conducted during 2009-2013 and are representative of average
characteristics during this period (U.S. Department of Commerce. 2013. Census Bureau, American Community Survey Office,
Washington, D.C., Department of Commerce. 2000. Census Bureau, Systems Support Division, Washington D.C.).
3.6.2
Employment and Industry
The economy of the project area is based primarily on government, manufacturing, retail trade, and
service (education, health, hospitality) sectors. Economic activity in the project area is centered in Minot
for a number of reasons:
Minot is an important service center for the region, which meets health care needs and provides
service and shopping needs of a trade area extending into eastern Montana and Canada.
The Minot Air Force Base is an economic engine for Minot and Ward County resulting in demand
for goods, services, housing, and tertiary business that support the base.
Oilfield development in North Dakota caused an economic boom in Minot, and unemployment
rates are low, both locally and state wide.
As the major regional economic center, Minot is home to a number of the region's major employers. The
Minot Air Force Base is the largest employer in the Minot area with 7,500 employees, followed by Trinity
Health with 2,790 employees. Of the top 14 employers, three are government related, three provide social
service assistance, two provide medical/health care services, and two are in hospitality. The primary
industries in the project area are education, health care and social assistance, retail trade, and construction
(Table 3-10).
Between 2010 and 2014, as workers for the petroleum industry and associated support service industries
flocked to the area, there was an increase in demand for housing, goods, and services. In late 2014 North
139
Dakota's oil production fell considerably with a crash in oil prices. However, local costs and
unemployment have remained relatively stable due to the emphasis the State of North Dakota has placed
on diversification and value-added industry. This has enabled North Dakota's present day economy to be
more diversified, increasing the state's ability to navigate the economic ebb and flows associated with its
key economic drivers; agriculture and energy [reference [51]].
140
Table 3-10
Employment by Industry, 2013
County
Township of Township of Township of
Subdivision
Burlington
Harrison
Nedrose
Region(1)
Ward
County
North
Dakota
26,442
33,103
371,612
10.7%
6.3%
7.4%
8.9%
10.3%
9.9%
9.5%
9.2%
7.4%
0%
7.2%
4.6%
3.4%
3.7%
7.1%
4.2%
6.5%
2.3%
1.7%
4.0%
4.1%
3.2%
16.6%
15.5%
5.5%
12.5%
18.1%
15.4%
14.7%
12.1%
Transportation, warehousing & utilities
5.2%
4.9%
0%
8.1%
4.5%
5.0%
5%
5.4%
Information
1.3%
1.7%
3.5%
0%
0%
1.6%
1.5%
1.5%
Finance and insurance & real estate
6.1%
6.2%
7%
2.0%
2.4%
5.8%
5.6%
5.8%
Professional, scientific, management,
administration, & waste management
5.6%
6.1%
13.9%
6.2%
5.5%
6.2%
6.1%
6.4%
21.1%
23%
19.4%
33.1%
22.9%
23.4%
22.8%
25.0%
6.6%
10%
4%
3.3%
8.3%
9.5%
9.1%
7.8%
3%
4.80%
7.50%
6%
6.10%
4.9%
4.80%
4.50%
6.30%
5.10%
5%
3.20%
5.20%
5.0%
6%
4.90%
Burlington
Minot
Civilian employed population >16 years
(persons)
640
23,315
201
1,194
1,092
Agriculture, forestry, fishing & hunting, and
mining
2.8%
6.1%
10.9%
5.8%
Construction(2)
18%
9.2%
16.9%
Manufacturing
2.3%
3.3%
Wholesale trade
5.3%
Retail trade(2)
Education, health care, & social assistance(2)
Arts, entertainment, recreation,
accommodation, & food service
Other services, except public administration
Public administration
Notes:
Table sourced from reference [50]
The data in this table are calculated by ACS using annual surveys conducted during 2009-2013 and are representative of average characteristics during this period (U.S. Department
of Commerce. 2013. Census Bureau, American Community Survey Office, Washington, D.C.).
The top three industries in each jurisdiction are indicated in bold text.
(1) County Subdivision Region includes the cities of Burlington and Minot, and the townships of Burlington, Harrison, and Nedrose.
(2) Primary industries throughout the project area
141
3.6.3
Housing Characteristics
3.6.3.1
General Characteristics
Housing units in the project area and their average rate of occupancy and vacancy from 2009 to 2013 are
summarized in Table 3-11. The cities of Minot and Burlington both had lower vacant-housing rates than
Ward County or the state of North Dakota during that time.
Table 3-11
Housing Characteristics, 2013
County
Township of Township of Township of
Subdivision
Burlington
Harrison
Nedrose
Region(1)
Ward
County
North
Dakota
22,016
27,966
324,712
87.9%
90.5%
90.0%
88.5%
12.1%
9.5%
10.0%
11.5%
Burlington
Minot
Total
Housing
Units
416
19,868
129
743
860
Occupied
(%)
92.1%
90.6%
87.6%
89.4%
Vacant
(%)
7.9%
9.4%
12.4%
10.6%
Notes:
Table sourced from reference [50]
The data in this table are calculated using annual surveys conducted during 2009-2013 and are representative of average
characteristics during this period (U.S. Department of Commerce. 2013. Census Bureau, American Community Survey, Washington,
D.C.).
(1) County Subdivision Region includes the cities of Burlington and Minot, and the townships of Burlington, Harrison, and Nedrose.
In the early 2010s, there was a rapid expansion of oil field facilities in North Dakota, including in the Minot
area. As a result, there was an increased demand for additional housing to accommodate oil industry
workers who relocated to the Minot area. During peak production of oil during this timeframe, the
population growth in the Minot area pressured housing availability and affordability as housing demands
outstripped supply. Development of new housing was limited by a number of factors, which included:
Increasing land prices, especially for agricultural or vacant land, driven by growth in the oil sector
in the Minot area.
High demand for existing water and wastewater systems are struggling to meet current demands,
and this infrastructure is limited in its capacity to serve new, denser development.
Increased construction costs.
The 2011 flood, which destroyed or severely damaged thousands of existing homes, further exacerbated
the situation. Thousands of homes in Minot sustained extensive damage during the flooding and many of
these were damaged beyond repair. The most severe flood damage occurred in the heart of Minot, the
most densely populated area with much of the oldest and most affordable housing (reference [48].
Post-flood disaster response efforts included an assessment of the state of housing in Minot, to affirm
that post-flood recovery actions consider fair and affordable housing within the flooded area [48]. The
142
assessment found an ongoing need for additional housing units that are affordable for low and moderate
income households, large families, persons with disabilities, the elderly, and those with special needs.
Minot is focused on recovery of neighborhoods that were affected by the 2011 flood, to repair, replace,
and augment available housing stock [52].
Recent trends indicate that the real estate market in the Minot area is experiencing a slower pace of sales
and leveling (reference [53]). The number of homes sold is down from its 2012 peak and home prices are
declining. In 2016, Minot's real estate listings show 840 residential properties sold in the Minot area. As of
early March 2017, there were more than 80 active single-family residential properties, townhomes, or
condominiums priced between $100,000 and $250,000. This represents approximately 60% of the
available housing inventory in Minot at the time.
The construction of numerous housing developments followed to account for the housing needs. Since oil
prices began to fall, the demand for owner occupied and rental housing has decreased substantially.
However, Minot is expected to continue to grow as the major economic center for north-central North
Dakota. The growth of this city has played a key role in the rise of the median home value in North
Dakota, which has gone up 4.3% since April 2015, and is forecasted to rise another 2.7% in the next year
[reference [54].
3.6.3.2
Relocations and Buyouts
Since the 2011 Souris River flood, the City of Minot has been actively buying properties located within the
flood inundation area, using U.S. Department of Housing and Urban Development (HUD) and local
funding. Minot was incorporated into HUD's Community Block Development Grant Disaster Recovery
(CBDG-DR) program for the 2011 disasters. Under this program, Minot received two CDBG-DR funding
allocations: B-12-MT-38-0001; and B-13-MS-38-0001. Home and business buyouts through HUD's CDBGDR program are voluntary, and are separate from the Requester's Preferred Alternative.
The first allocation was approved in 2012 and enabled Minot to acquire flood damaged properties near
the Souris River, subject to the willingness of owners and the availability of funding. These acquisitions
typically involved acquiring the lots, all structures, and mineral rights, and removing all existing structures.
The second allocation was approved in 2013 and enabled Minot to buy properties located within the
flood inundation area, including single and multi-family residences, mobile homes and pads, and religious
and commercial establishments. Once the purchases were completed, all existing structures were removed
with the intent that the parcels would remain as open space or be used for flood risk reduction purposes.
In January 2016, Minot was awarded $74,340,770 in NDRC funding from the National Disaster Resilience
Community Development Block Grant (CDBG-NDR) to achieve the following goals as prescribed in the
City's application: reduce flood risk; build affordable, resilient neighborhoods; and foster economic
resilience and diversification. Based on the grant agreement, $20,975,000 is available to the City through
the CDBG-NDR program for reducing flood risk. These funds will be used for acquisition of properties,
relocation or demolition of structures, restoration of the land, and planning activities associated with
reducing flood risk. The City has indicated that it intends to utilize this funding to acquire properties that
143
are within the footprint of the project, focusing on the Leite-Brekke, Moose Lodge, and Kemper
neighborhoods.
The SRJB is currently finalizing the Rural StARR (Structure Acquisition, Relocation, or Ring Dike) Program
(Draft January 1, 2015). This program will provide funding from various sources for the purchase and
demolition, relocation, or ring diking of structures in certain areas of the Souris River basin. This program
would be voluntary, and interested parties were to have completed right-of-entry forms by May 2015.
Relocation assistance benefits will be provided under the North Dakota Century Code Chapter 54-01.1:
Relocation Assistance or the Uniform Relocation Assistance and Real Property Acquisition Policies Act of
1970 (Uniform Act). Home and business buyouts through the Rural StARR Program and CDBG-NDR
program are independent from the Requester's Preferred Alternative.
3.6.4
Environmental Justice
Environmental justice is the fair treatment and meaningful involvement of all people regardless of race,
color, national origin, or income in developing, implementing, and enforcing environmental laws,
regulations, and policies [55]. The purpose of this section is to identify and describe the minority and lowincome populations within the project area.
3.6.4.1
Regulatory Responsibilities
An evaluation of environmental justice impacts is mandated by Executive Order 12898, Federal Actions to
Address Environmental Justice in Minority Populations and Low-Income Populations (February 11, 1994).
This Executive Order directs federal agencies to identify and address, as appropriate, disproportionately
high and adverse health or environmental effects of its programs, policies, and activities on minority and
low-income populations. The effects of an action can be considered disproportionately high and adverse
if the percentage of total impacts imposed on a specific group is greater than the percentage of the total
population in a given area represented by that group. For this analysis, a community of concern is defined
by either race or ethnicity (i.e., minority) or by low income.
The Council on Environmental Quality (CEQ) and U.S. Environmental Protection Agency (EPA) developed
guidance documents to provide EPA and other federal agencies with a process for identifying
communities of concern and addressing potential impacts to them. According to these guidance
documents, the CEQ's Environmental Justice: Guidance Under the National Environmental Policy Act (1997,
reference [56]) and the EPA's Final Guidance For Incorporating Environmental Justice Concerns in EPA's
NEPA Compliance Analyses (1998, reference [57]), the basic components of an environmental justice
assessment should include:
A demographic assessment of the affected community to identify minority and low-income
populations that may be present.
An integrated assessment to determine whether any adverse impacts would disproportionately
affect minority and low-income populations.
144
3.6.4.2
Environmental Justice Assessment Process
The geographic area for this environmental justice analysis consists of the 14 census block groups
intersected by the Project. These census block groups are considered representative of the general
population in the project area and provide the best approximation of the area within which potential
disproportionate adverse impacts from the Project could occur. The region covered by these selected
census block groups is referred to as the Region of Interest (ROI). Demographic and poverty data for the
ROI are compared with data for Burlington, Minot, Ward County, and North Dakota. These larger areas are
referred to as the Regions of Comparison (ROC). Figure 3-17 shows the location of the census block
groups in relation to the Project.
EPA guidance specifies two measures to determine whether there is a minority or low-income community
in the Project impact area that must be considered in the scope of the EIS (reference [57]).
Minorities or low-income persons make up more than 50 percent of the population of the impact
area.
The minority or low-income population percentage in the impact area is "meaningfully greater"
than the minority or low-income population in the general population. For this assessment, a 10
percentage-point threshold was used to measure whether the percentage of a low-income
population or minority group in an ROI census block group was "meaningfully greater" than in the
ROC.
3.6.4.3
Environmental Justice Assessment for the Region of Interest
Minority Populations
Minority populations in the ROI, as well as in Burlington, Minot, Ward County, and North Dakota are
provided in Table 3-12. Minority population information for the fourteen geographic census block groups
of the ROI are presented in Table 3-13.
The ROI as a whole has a lower minority population than the ROC areas (Table 3-12). The total minority
population is 3.9 percent of the ROI as a whole, lower than in Minot by 5.3 percentage points, in Ward
County by 6.1 percentage points, and in North Dakota by 6.5 percentage points
Within the ROI, total minority population percentages of the three census block groups with the largest
minority populations (12.8 percent, 10.9 percent, and 9.7 percent) are similar to the total minority
population percentages of Minot, Ward County, and North Dakota (9.2 percent, 10 percent, and 10.4
percent respectively). These three census block groups, identified in Table 3-13 with italicized and bolded
text, are located in central Minot and just east of downtown Minot. The total minority population in the
remainder of the individual census block groups in the ROI varies from 0.6 percent to 7.1 percent.
Overall, demographic data indicate that the distribution of minority populations in the project area does
not meet the thresholds which require the EIS to assess the potentially disproportionate impacts to
minority communities from the Project. In the ROI as a whole, and in all individual census blocks, the
minority population is less than 50 percent of the population. Also, none of the minority population
145
percentages, nor the total minority population percentage, in the ROI are "meaningfully greater" than the
minority population percentages in the ROC areas.
146
US Census Block Groups
US Census Blocks with Project
Features
Project Footprint
Municipalities
CITY OF
BURLINGTON
0103011
0108003
0113002
0102001
£
¤
0103012
B83
£
¤
83
0103023
0103024
0103013
Barr Footer: ArcGIS 10.4, 2017-04-30 13:33 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-17 - Environmental Justice Analysis Area.mxd User: kac2
0103022
0104003
0104004
0102002
0103021
0102003
0104006
0104001
0104005
0101001
0104002
£
¤
CITY OF MINOT
£
¤
2
0102004
B2
0101003
0105001
0101004
0101002
0107005
0105003
0107003
£
¤
B52
0107002
I
0107004
0105004
0
0113001
2,000
4,000
8,000
Feet
0105002
0107001
0106003
0106001
0106002
£
¤
83
£
¤
52
Figure 3-17
0112001
Data Source: 2009-2013 American Communities Survey, 5-Year Profiles
Imagery Source: USDA NAIP Imagery 2014
ENVIRONMENTAL JUSTICE
ANALYSIS AREA
Mouse River Enhanced Flood
Protection Project
Table 3-12
Minority Population Composition Comparison with the Region of Interest (ROI)
Ethnic Minority
(%)(3)
Racial Minority Populations (%)
Total Population
(number of
persons)(2)
White
%
Black or
African
American
North
Dakota
723857
89.6%
1.8%
5.4%
Ward
County
67998
89.9%
3.6%
Burlington
1051
94.2%
Minot
46321
ROI(1)
17,462
Area
Native Hawaiian &
Other Pacific
Islander
Some
Other
Race
Total Racial
Minority (%)
Hispanic or
Latino
Ethnicity
1.2%
0.1%
1.9%
10.4%
2.9%
2.4%
1.2%
0.2%
2.6%
10.0%
4.8%
0.1%
2.7%
0.2%
0.0%
2.1%
5.1%
2.1%
90.2%
2.3%
3.2%
0.9%
0.1%
2.7%
9.2%
2.7%
94.1%
1.6%
1.8%
0.4%
0.0%
0.1%
3.9%
1.8%
American Indian
Asian
& Alaskan Native
Notes:
Data Source: 2009-2013 American Community Survey 5-Year Profiles
Persons may opt to identify with more than one racial minority, therefore, the sum of all racial categories in the table may equal more than 100%.
(1) The Region of Interest (ROI) represents the geographic area in which the project may exert some influence. It is an aggregate of census block group data of the census blocks
that the Project transects (census block groups traversed by the project are shown in Table 3-13). The ROI is calculated by dividing the total population for a minority in the block
groups by the total population of the block groups.
(2) Total Racial Minority populations and White populations may not add up to 100 percent as not all racial minority populations were included in this analyses. Racial minority
populations that were excluded were the smaller sub-classifications such as those of two of more races.
(3) The Hispanic or Latino ethnicity is not included in the total racial minority population percentages as it can be claimed by a person of any race. The Hispanic or Latino ethnicity is
therefore included separately and reflects an ethnic minority.
148
Table 3-13
Minority Population Composition Comparison with Census Block Groups in the ROI
Census Block
Jurisdiction
Group Identifier
Total
Population
(number of
persons)(2)
Ethnic
Minority
(%)(3)
Racial Minority Populations (%)
White %
Black or
African
American
American Indian
& Alaskan Native
Asian
Native Hawaiian & Some
Hispanic or
Total Racial
Other Pacific
Other
Latino
Minority (%)
Islander
Race
Ethnicity
North
Dakota
NA
723,857
89.6%
1.8%
5.4%
1.2%
0.1%
1.9%
10.4%
2.9%
Ward
County
NA
67,998
89.9%
3.6%
2.4%
1.2%
0.2%
2.6%
10.0%
4.8%
Burlington
NA
1,051
94.2%
0.1%
2.7%
0.2%
0.0%
2.1%
5.1%
2.1%
Minot
NA
46,321
90.2%
2.3%
3.2%
0.9%
0.1%
2.7%
9.2%
2.7%
ROI(1)
381010106003
1,492
96.2%
1.1%
0.5%
0.0%
0.0%
0.0%
1.6%
0.0%
ROI(1)
381010104005
710
93.9%
0.0%
6.1%
0.0%
0.0%
0.0%
6.1%
0.0%
ROI(1)
381010104006
590
92.9%
7.1%
0.0%
0.0%
0.0%
0.0%
7.1%
2.7%
ROI(1)
381010105001
1,517
94.7%
2.0%
3.2%
0.0%
0.0%
0.0%
5.3%
2.4%
ROI(1)
38101010700
3
1,081
77.4%
6.7%
0.0%
3.1%
0.0%
0.0%
9.7%
0.0%
ROI(1)
381010107004
1,408
94.5%
0.3%
0.0%
0.0%
0.0%
0.5%
0.8%
0.5%
ROI(1)
381010102004
1,091
99.4%
0.0%
0.6%
0.0%
0.0%
0.0%
0.6%
1.4%
ROI(1)
38101010100
1
939
86.0%
5.8%
1.5%
2.2%
0.0%
1.4%
10.9%
3.3%
ROI(1)
381010102002
1,082
97.6%
0.0%
2.3%
0.0%
0.0%
0.0%
2.3%
2.1%
ROI(1)
38101010700
5
884
87.2%
5.3%
7.5%
0.0%
0.0%
0.0%
12.8%
7.7%
ROI(1)
381010108003
1,809
99.1%
0.0%
0.5%
0.0%
0.0%
0.1%
0.6%
0.8%
149
Census Block
Jurisdiction
Group Identifier
Total
Population
(number of
persons)(2)
Ethnic
Minority
(%)(3)
Racial Minority Populations (%)
White %
Black or
African
American
American Indian
& Alaskan Native
Asian
Native Hawaiian & Some
Hispanic or
Total Racial
Other Pacific
Other
Latino
Minority (%)
Islander
Race
Ethnicity
ROI(1)
381010112001
1,760
96.4%
0.0%
1.9%
0.0%
0.0%
0.0%
1.9%
1.0%
ROI(1)
381010113002
1,859
93.4%
0.2%
3.2%
0.6%
0.0%
0.1%
4.1%
3.7%
ROI(1)
381010113001
1,240
98.8%
0.0%
0.4%
0.8%
0.0%
0.0%
1.2%
1.1%
Notes:
Data Source: 2009-2013 American Community Survey 5-Year Profiles
Persons may opt to identify with more than one racial minority, therefore, the sum of all racial categories in the table may equal more than 100%.
(1) The Region of Interest (ROI) represents the geographic area in which the project may exert some influence. ROI for this environmental justice analysis includes census block groups
traversed by the project.
(2) Total Racial Minority populations and White populations may not add up to 100 percent as not all racial minority populations were included in this analysis. Racial minority
populations that were excluded were the smaller sub-classifications such as those of two or more races.
(3) The Hispanic or Latino ethnicity is not included in the total racial minority population percentages as it can be claimed by a person of any race. The Hispanic or Latino ethnicity is
therefore included separately and reflects an ethnic minority.
150
The racial composition of the population in Minot is changing (reference [52]), and the environmental
justice assessment considered the possible effects of these changes. As Minot's population increased
between 2000 and 2010, (from 36,567 to 40,888, a 12 percent increase) the black population grew the
most, increasing by 92 percent, followed by the Asian population (62 percent) (Table 3-14). It is
anticipated that the increase in non-white residents and those of Hispanic ethnicity is driven by the Minot
Air Force Base and the petroleum industry in the Bakken shale region, which are drawing people to this
area from across the United States (reference [52]). Despite the large percent increases in minority
populations during this period, racial minorities remain a small percentage of the total population.
Table 3-14
Racial Composition of the Population in Minot: Change from 2000 to 2010
Race
Population
in 2000
Percent change
Population
within racial class
in 2010
from 2000-2010
White
93.18%
90.20%
8.24%
Black
1.34%
2.30%
92.00%
American Indian
2.76%
3.20%
29.60%
Asian
0.62%
0.90%
62.10%
Native
Hawaiian/Pacific
Islander
0.07%
0.10%
57.70%
Other
0.49%
0.60%
36.90%
Multiracial
1.54%
2.70%
49.00%
100.00%
100.00%
-
1.47%
2.70%
51.30%
Total
Hispanic/Latino
Data Source: reference [52] p. 3-6
Low-Income Populations
Low-income populations (defined as individuals living in households below the poverty threshold) in the
ROI, as well as in Burlington, Minot, Ward County, and North Dakota are provided in Table 3-15. The U.S.
Census uses a set of income thresholds that vary by family size and composition to determine who is in
poverty (reference [56], reference [57]). If the total household income falls below the relevant poverty
threshold, then all members of the household are counted as "below the poverty level."
151
Table 3-15
Poverty and Income Characteristics (2009-2013)
Jurisdiction
Total Population % Below Poverty Median Household
(number of persons)
Threshold
Income
State of North
Dakota
723,857
11.9%
$53,741
Ward County
67,998
9.1%
$56,580
1,051
4.1%
$63,487
Minot
46,321
10.3%
$53,524
ROI(1)
17,462
5.2%
$54,017
Burlington
Data Source: 2009-2013 American Community Survey 5-Year Profiles
(1) The Region of Interest (ROI) represents the geographic area in which the project may exert
some influence. ROI for this environmental justice analysis includes the census block
groups traversed by the project.
With the exception of Burlington, the ROI as a whole has a smaller low-income population than the ROC
areas (Table 3-15). The median household income in the ROI is comparable to that of Minot and North
Dakota.
Figure 3-18 and Table 3-16provide an overview of low-income populations within the ROI census block
groups. Within the ROI, the low-income population percentages of the three census block groups with the
largest low-income populations (9.3 percent, 10.2 percent, and 13.1 percent) are similar to the low-income
population percentages of Minot, Ward County, and North Dakota (10.3 percent, 9.1 percent, and 11.9
percent, respectively). These three census block groups, identified in Table 3-15 with italicized and bolded
text, are located in central and east-central Minot.
Residential areas in central and east-central Minot are more densely populated, and housing stock is
typically older and priced lower than outlying, more recent developed residential areas in the Minot area.
However, areas (i.e., Census Blocks) representing low to medium, low-income population percentages are
not necessarily indicative or representative of actual low-income populations. For example, it is possible
pockets of low-income populations are located in large Census Blocks where the majority of the
population or households is not below the poverty threshold.
The level of demographic analysis data indicate that the distribution of low-income populations in the
project area does not meet the thresholds which would require the EIS to assess potential,
disproportionate impacts of the Project on low-income communities. In the ROI as a whole, and in all
individual census blocks, the low-income population is less than 50 percent of the population. Also, the
low-income population percentages are not "meaningfully greater" than the low-income population
percentages in the ROC areas. Overall, the analysis concludes that there are low-income (and minority)
populations present throughout the project area, and flood protection benefits of the project would reach
all segments of the population.
152
US Census Block Groups
Project Footprint
Municipalities
Percentage Below Poverty
Threshold
0 - 4.9%
CITY OF
BURLINGTON
5 - 9.9%
0103011
>10%
0108003
0113002
Pockets of Potential Low
Income Populations
0102001
£
¤
0103012
B83
£
¤
83
0103023
0103024
0103013
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:43 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-18 - Low Income Population in Project Area.mxd User: kac2
0103022
0104003
0104004
0102002
0103021
0102003
0104006
0104001
0104005
0101001
0104002
£
¤
CITY OF MINOT
£
¤
2
0102004
B2
0101003
0105001
0101004
0101002
0107005
0105003
0107003
£
¤
B52
0107002
I
0107004
0105004
0
0113001
2,000
4,000
8,000
Feet
0105002
0107001
0106003
0106001
0106002
£
¤
83
£
¤
52
Figure 3-18
0112001
Data Source: 2009-2013 American Communities Survey, 5-Year Profiles
Imagery Source: USDA NAIP Imagery 2014
LOW-INCOME POPULATIONS IN
PROJECT AREA
Mouse River Enhanced Flood
Protection Project
Table 3-16
Poverty Threshold and Median Household Income Comparison
Jurisdiction
Census Block Group
Identifier
Total Population
% Below Poverty
(number of persons)
Threshold
Median
Household
Income
State of North
Dakota
NA
723,857
11.9%
$53,741
Ward County
NA
67,998
9.1%
$56,580
Burlington
NA
1,051
4.1%
$63,487
Minot
NA
46,321
10.3%
$53,524
ROI(1)
381010106003
1,492
3.9%
$58,750
ROI(1)
381010104005
710
5.1%
$44,712
ROI(1)
381010104006
590
6.3%
$41,714
ROI(1)
381010105001
1,517
3.2%
$74,444
ROI(1)
381010107003
1,081
9.3%
$54,605
ROI(1)
381010107004
1,408
7.7%
$35,305
ROI(1)
381010102004
1,091
3.1%
$57,009
ROI(1)
381010101001
939
13.1%
$23,073
ROI(1)
381010102002
1,082
10.2%
$34,227
ROI(1)
381010107005
884
6.3%
$30,500
ROI(1)
381010108003
1,809
0.1%
$75,781
ROI(1)
381010112001
1,760
1.4%
$75,703
ROI(1)
381010113002
1,859
1.0%
$76,042
ROI(1)
381010113001
1,240
2.7%
$74,375
Data Source: 2009-2013 American Community Survey 5-Year Profiles
(1) The Region of Interest (ROI) represents the geographic area in which the Project may exert some influence. ROI
for this environmental justice analysis includes the census block groups traversed by the Project.
3.6.4.4
Targeted Community Outreach
Outreach to all population groups has been and continues to be undertaken through a long-term flood
resiliency planning process. As discussed in Section 3.6.4.3, low income and minority populations are
dispersed throughout the project area and are concentrated in a few specific locations. The following
engagement tools were used to reach all population groups:
Public meetings;
Community planning groups and stakeholder groups (e.g., long-term flood resiliency planning,
revitalization plans, etc.);
Newsletters and fact sheets; and
154
Public websites (e.g., City of Minot Flood Control and Resiliency Efforts, CDBG CR and NDR
programs, etc.)
Some of the public meetings and outreach activities intended to engage the community, including low
income and minority populations, are described in further detail in Section 3.6.5.
3.6.5
3.6.5.1
Community Planning and Public Engagement
Souris Basin Recovery Plan
Early community outreach and public involvement meetings occurred soon after the 2011 flood event and
were a precursor for the development of the Souris Basin Regional Recovery Plan, (Recovery Plan)
(reference [58]). The Recovery Plan was a collaboration of representatives from the state leaders and
representatives from Ward County, City of Burlington, City of Minot, Minot, local school districts, Souris
Basin Planning Council, and Minot Citizens' Flood Recovery System.
The Recovery Plan aimed to build community ownership with a long-term vision of rebuilding within the
project area and beyond. The long-term recovery directly ties into the programmatic designation of this
EIS. The size and complexity of the Project accounts for near- and long-term phases (20 to 25-years). The
recovery projects outlined in the Recovery Plan are based on key input received during this early
community involvement effort that has set the long-term recovery process in motion. The local
community was a key resource while the Recovery Plan's projects were refined and prioritized.
A series of three open houses was conducted in September 2011 to provide stakeholders (residents,
business owners, community groups, etc.) long-term recovery viewpoints on the topics identified in Table
Table 3-17. Stakeholders were asked to identify and provide comments on the topics most important to
them.
155
Table 3-17
Topics to Address Long-Term Recovery in Project Area
Topics
Agriculture
Affordable Housing
Bicycle and Pedestrian Plan
Burdick Expressway Corridor Plan
Business Development
Community Character
Develop Housing of All Kinds
Downtown Revitalization
Education
Expanding Retail Base
Flood Control
Health and Human Services
Housing for Everyone
Housing and Recovery
Infrastructure
Parks and Recreation
Population
Public Facilities
Roosevelt Park Zoo Recovery
Safe Communities
Save "Our" History
Souris River Greenway
Sustainability
Tourism
Transportation
A second series of open houses took place in October 2011, and stakeholders further prioritized their
topics of importance. Through this process, stakeholders identified their top recovery priorities: develop
affordable housing, create a Souris Valley greenway with recreational amenities, and conduct a regional
transportation study. These and other projects in the Recovery Plan outlined below are largely a result of
this open public planning process.
Regional Concept and Planning Process (Flood Control, Souris Valley Historic Flood Protection,
Future Flood Protection)
Housing (Permanent Housing Policy Initiatives, Affordable Housing Zones, Potential Permanent
Housing Site at Virgil, Mortgage and Rental Assistance Programs, Subsidized Housing)
Economic Vitality (Downtown Revitalization, Burdick Expressway Corridor Plan, Create a Diverse
and Sustainable Economy, Expand the Retail Base)
Parks and Recreation (Souris Valley Greenway, Rebuild Roosevelt Zoo, Burlington Community
Center)
Transportation (Transportation Study, Bicycle and Pedestrians Plan)
Health Services
Community Planning (City of Burlington Master Plan, Historic Preservation)
156
3.6.5.2
Downtown and Neighborhood Revitalization
The City of Minot and Souris Basin Planning Council received a federal grant from the U.S. Department of
Commerce's Economic Development Administration (EDA) to assist in the development of a disaster
recovery plan and strategy to support long-term economic resiliency. The federal grant focused on the
Minot riverfront, Downtown, and six adjoining neighborhoods (including Phases 1-3) that were hit hardest
by the 2011 flood. The Minot Front and Center: Downtown and Neighborhood Plans was developed and
prepared based as a result of this effort (referene [59]).
Commencement of the plans began early in 2013 and were developed through a series of open
neighborhood meetings spanning several months. This plan was divided into the Downtown Plan and six
Neighborhood Plans (Plans 1-6). However, the overarching goal of the project was to give all
neighborhood residents and businesses a voice in neighborhood renewal, defining a vision, and
establishing unified neighborhoods and a vibrant and accessible downtown. The Downtown emphasizes a
series of key goals:
Maintain Downtown Minot as the focal point of the region;
Encourage pedestrian oriented, mixed-use projects;
Create a riverfront system to become a community asset;
Improve Downtown parking;
Develop a multi-modal transportation network;
Promote sustainable design practices throughout Downtown;
Make strategic public investments in Downtown; and
Provide clear definition of Downtown gateway corridors and edges.
The six individual neighborhood plans provided an overview of the neighborhoods, maps of existing land
use, preliminary flood mitigation plans, and mitigation plans. The six individual plans discussed issues and
opportunities in the context and goals for that specific neighborhood. Common goals in the
Neighborhood Plans consisted of:
Maintain and expand the supply of safe, affordable, and lifecycle housing;
Maintain viable neighborhood commercial and employment centers;
Maintain parks and community facilities within the neighborhoods as assets to the neighborhood;
Develop a multi-season trail system that is safe, enjoyable, and accessible to the public with
connections to neighborhood destinations;
Provide safe and functional streets that serve vehicles, bicycles, pedestrians, and transit;
157
Manage on-street parking in the neighborhood;
Maintain and improve public safety in the neighborhoods;
Maintain and improve the appearance and condition of property and buildings in neighborhoods;
and
Encourage investments and improvements that will maintain existing infrastructure to City
standards.
3.6.5.3
Community Development Block Grant National Disaster Resilience
Program
In 2016, the City of Minot received federal funding from HUD with the purpose of assisting the city to
grow more resilient for the future (Community Development Block Grant National Disaster Recovery
(CDBG-NDR) Program). The Minot CDBG NDR Program goals consist of:
1.
Prepare and Implement Additional Property Acquisition Reduce flood risk and increase
resilience. Develop short-term strategies to acquire and buy out neighborhoods that would be
most impacted during a flood event.
2.
Create a "Public Gathering Space" Establish at least one public gathering place that could be
used in varying ways, such as concerts, parks, street fairs, etc. The goal is to create a space that
will improve neighborhood cohesion and increase commerce in the selected neighborhood(s).
3.
Develop Vulnerable Population Action Plan - This plan will assist to address needs of the city, such
as the development of a family shelter. The goal is to efficiently identify and establish a method to
create more resilient neighborhoods.
4.
Create More Affordable Housing This goal ties directly to Goal 3, to build more resilient
neighborhoods. The City recently updated the Affordable Housing Study (Fall 2016) to better
understand "how much" affordable housing is needed in the city. This goal, as the other goals, will
rely heavily on public input at public meetings to get direction of how much and where affordable
housing is needed.
3.6.5.4
City of Minot Resiliency and Recovery
As part of Minot's long-term flood recovery, public meetings have been scheduled to gain the
community's input to revamp under-developed areas into neighborhood parks and gathering places.
Meetings were open to all persons who wished to provide thoughts on how the city could potentially use
underdeveloped areas located within their neighborhoods (e.g., structures removed as a result of the 2011
flood event). The primary purpose of the public meetings was to receive input from the public with
conceptual ideas on what they or do not want. The goal was to get the support of the Minot Park District
and school districts and prepare a long-term plan for creation of neighborhood parks and gathering
places (reference [53]).
158
3.7
Recreation
Recreation is an important consideration to the communities throughout the project area. According to
the North Dakota State Parks and Recreation Department's State Comprehensive Outdoor Recreation Plan,
72 percent of North Dakota households throughout Ward, Burke, Renville, Bottineau, Mountrail, and
McHenry counties are interested in going to a park, natural area, or green space to play on a playground,
enjoy nature, or relax, and 66 percent are interested in picnicking (reference [60]). Minot and the Minot
Park District seek to preserve and promote a park system that meets the needs of all, and recognize that
community facilities such as parks, trails, and open space are integral components of Minot's community
character (reference [42]).
The 2011 floods damaged parks and other recreational facilities within Minot; many of these parks,
however, also provide some flood attenuation by providing flood storage during high water events. The
Minot Comprehensive Plan views parks as a major component of future flood protection, through
developing a continuous greenway that would be a linear network of open spaces and natural areas
compatible with the main purpose of flood control.
Recreational opportunities in the project area include sport fishing in the Souris River and the use of
recreational facilities such as parks, trails, and golf courses along the river. Recreational facilities and
features in the project area are shown in Map 3-9. Designated recreational areas, especially parks, are
mostly located within Minot, and recreational access to the Souris River is primarily limited to these parks
and public fishing piers. Seasonal sport fishing at channel flow-control features, which concentrate fish by
blocking their movement, is the primary recreational activity on the river. Although the fishery is affected
by variable flow regimes (due to weather and upstream reservoir operation) and regularly occurring
periods of minimal flow and low dissolved oxygen, natural resource field surveys documented
considerable use of the river by sport fisherman. There are no state or federal parks, recreational areas,
nature preserves/areas, or scenic byways in the immediate project area. NWRs are located upstream and
downstream of the project area, as discussed in Section 3.3.3.
Recreational features near Burlington include Old Settlers Park, a city sports complex, and portions of two
trail systems. Old Settlers Park, located northwest of Burlington on the northern side of the Des Lacs River,
has a campground, picnic areas, and a variety of recreational amenities (e.g., playground, baseball
diamonds, volleyball court, etc.), and provides access to the Des Lacs River for fishing. The Old Settlers
Association Historic Monument, dedicated to the first settlers in this area, is also located in the park. The
Burlington sports complex was built in 1991 and is south of the Souris River channel and just south of
River Road. The complex includes picnic areas and various recreational amenities (e.g., playground,
baseball diamond, volleyball court) (reference [61]). There are two trails within the city; an approximate
0.27-mile multi-use trail along Johnson Street in south/southwest Burlington and portions of a regional
snowmobile trail system that goes north out of the city and east towards Minot (Map 3-9). There is also a
small playground located near the Burlington City Hall and a playground with tennis courts near the
Burlington-Des Lacs Elementary School.
159
Downstream of Burlington and upstream of Minot, the predominant recreational feature is the Vardon
Golf Club. The original golf course (Minot Country Club) was built in 1928 and included a golf course,
clubhouse, and swimming pool. It was severely damaged in the 2011 flood. After the flood, the owners of
the Minot Country Club built a new course and club house on a site located outside the floodplain in
southeastern Minot (reference [62]). The original Minot County Club was restored and reopened in August
2013 as the Vardon Golf Club.
Designated recreational areas in the project area in Minot include several parks and golf courses with
various recreational amenities and trail systems. Table 3-18 lists the parks, designated open space, and
other recreation facilities in Minot in the vicinity of the Project, and summarizes their amenities. Parks
located within or near the proposed flood risk-reduction features are listed in bold on Table 3-18.
Map 3-9 shows the locations of Minot recreational facilities. Trails in the vicinity of Minot, but outside of
the project footprint include a portion of a regional snowmobile trail system and the Minot Base Trail
located in east-central Minot leading up to the Minot AFB.
One of the larger recreational features in the immediate vicinity of the Project is the Roosevelt Park and
Zoo. Roosevelt Park is within the bends of the Souris River and is adjacent to an existing interior ponding
area north of East Burdick Expressway and south of Fourth Avenue NE. The trail/sidewalk system within
the park is approximately 1.4 miles long, and the park also provides water access for fishing. The
Roosevelt Park Zoo has a variety of mammals, birds, reptiles, amphibians, and invertebrates, along with
other amenities.
The Souris Valley Golf Course and the Wee Links Golf Course are facilities of the Minot Park District. The
Souris Valley Golf Course is an 18-hole, par 72 course. The Wee Links Golf Course is a 9-hole course
specifically designed for young golfers. These courses are located within the Napa Valley segment of the
proposed Project.
160
Minot Parks and Open Space in the Project Area
Play Structure
Tennis Court(s)
X
X
X
Water Access/
Fishing
Picnic Area/Grills
X
Volleyball Court(s)
Pavilion/Picnic
Shelter
X
Trails
Parking
Skate Park
Horseshoe Court(s)
Ice Skating
Hockey Rink
Dog Park
Amenity
Golf Course
Acres
Baseball field(s)
Name/Location
Basketball Court(s)
Table 3-18
Neighborhood Parks
Green Valley
1.5
X
Hammond Park
4.4
X
Leech Park
4.0
X
Moose Park
4.5
Riverside Park
7.4
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Community Parks
Oak Park
90.0
Roosevelt Park
85.0
Roosevelt Park Zoo
20.0
X
X
X
X
X
X
X
X
X
School Community Playfield/Athletic Complex
Jack Hoeven Baseball Park
21.0
X
Corbett Field
7.0
X
X
X
X
X
Open Space Park
Via View Park
5.2
Nubbin Park
7.4
X
X
161
X
Souris Valley Golf Course
169.0
X
X
Wee Links Golf Course
17.0
X
X
Dakota Bark Park
3.0
X
reference [42]
162
Special Use Facility
Water Access/
Fishing
Volleyball Court(s)
Trails
Tennis Court(s)
Play Structure
Picnic Area/Grills
Pavilion/Picnic
Shelter
Parking
Acres
Skate Park
Horseshoe Court(s)
Ice Skating
Hockey Rink
Dog Park
Golf Course
Basketball Court(s)
Baseball field(s)
Name/Location
Amenity
Several recreational facilities, mostly in Minot, have received federal funds for their development or
maintenance. The U.S. Department of the Interior, National Park Service has issued grant money through
the Land and Water Conservation Fund (LWCF) to support the development or maintenance of parks and
recreational facilities within Ward County. Table 3-19 lists federally funded recreational features in the
project area. Those in the Project impact area are listed in bold. Several of these LWCF grant-funded parks
and recreational amenities in Minot were damaged during the 2011 flooding event. These facilities were
repaired to pre-flood conditions using local and private grant funds.
Table 3-19
Grant ID &
Element
Recreational Facilities Funded by the Federal Land and Water Conservation Fund
in the Vicinity of the Project
Grant Element Title
City
Funding Amount
Year Approved/
Expiration
38-01160
Ward County Playground Improvement
(Old Settlers Park)
Burlington
NA
NA
38-00798
Burlington Tennis Court
Burlington
$6,500
1979/1984
38-00009
Souris Valley Golf Course
Minot
$104,772
1966/1967
38-00311
Minot Golf Course Improvement
Minot
$12,348
1972/1973
38-00951
Minot Golf Course Facility
Minot
$75,000
1983/1984
38-00393
Minot School Park
Minot
NA
NA
38-00124
Minot Oak Park South Hill Acquisition
Minot
$23,875
1968/1968
38-00877
Minot Oak Park Pool
Minot
$74,000
1981/1986
38-00332
Minot Longfellow Hockey Rink
Minot
NA
NA
38-00207
Minot Roosevelt Park Swimming Pool
Minot
$119,947
1971/1972
38-00314
Minot Roosevelt Tenniplay
Minot
$5,428
1972/1973
38-00628
Minot Roosevelt Park Footbridge
Minot
$65,300
1977/1979
38-00422
Minot Green Valley Park
Minot
$9,700
1973/1976
38-00895
Minot Softball Complex
Minot
$189,500
1981/1986
38-00451
Minot Recreation Developments (River
Drive Park and Via View Park
improvements)
Minot
$19,505
1973/1976
38-00629
Minot Parks Improvement (Roosevelt Park,
Spring Lake Park, Polaris Park, 24th Street
Park, Oak Park)
Minot
$15,347
1977/1979
38-01130
Minot Fitness Trail
Minot
$16,245
1995/1999
38-01184
Minot Parks Playground Improvement
(Leach Park, Oak Park, River Side Park,
Roosevelt Park, Green Valley Park)
Minot
NA
NA
163
3.8
Aesthetics and Visual Resources
The aesthetic and visual resources of a landscape are defined as the existing natural and built features
visible to the public which affect the visual quality and character of an area. This section discusses the
existing aesthetic and visual resources visible from areas where the Project is likely to be within view,
referred to as the "viewshed." The size of the Project viewshed varies based on location. Project segments
in open and agricultural areas would have a more expansive viewshed, as they are free of visual
obstructions. Conversely, Project features in urban and residential areas may have a smaller viewshed, due
to the presence of visual obstructions from trees and buildings.
In order to gauge how the aesthetics of the landscape could be affected by the Project, it is valuable to
first assess the character of the existing landscape. A landscape's character is largely influenced by
topography, vegetation, and water resources. The Project is within the Northern Black Prairie and Drift
Plains of the Northern Glaciated Plains eco-region. This area of the Northern Glaciated Plains is
characterized by subtle undulating topography, with wetland areas interspersed among vegetated
forested areas. Many of the viewsheds of the western and eastern segments of the Project consist of
agricultural fields, primarily row crops, grasslands, pastures, and hay fields. Views in the agricultural areas
of the Project are generally unimpeded, because of a lack of visual obstructions and the subtle rolling
topography. The Souris River is the central defining visual resource in the landscape of the project area.
The aesthetics of the river corridor have been previously altered by flood control projects (i.e., the existing
federal projects), including river channel re-alignments, channel cutoffs, and the addition of levees, pump
stations, and ponding areas to the viewshed.
The visual character of a landscape is also largely influenced by the presence of the built environment,
such as residential, commercial, and municipal buildings, transportation infrastructure, and industrial
features. The built environment transitions from a more rural area that is sparsely populated near
Burlington to more urbanized areas in Minot. In the Burlington area, the Souris River passes primarily
through residential areas visually characterized by one- and two-story homes with large lots and mature
trees. The Minot area is more urbanized, consisting of low-, medium-, and high-density areas of singleand multi-family homes.
In general, neighborhoods zoned for single-family homes located near the Project footprint are visually
characterized by homes less than 35 feet tall, with large, mature trees scattered over large lots. Resident
viewsheds are limited by the presence of trees and neighboring homes and buildings. Neighborhoods
zoned for multi-family homes allow for a variety of housing types, including single-family dwellings and
multi-family stacked dwellings. These neighborhoods are generally higher-density than neighborhoods
zoned for single-family homes. Views in these neighborhoods are again limited due to the presence of
view-obstructing homes, multi-story buildings, and trees.
Some manufactured home parks are also present within the project area and within the viewshed on the
eastern side of Minot. Manufactured home neighborhoods are visually characterized by single-family
detached or attached manufactured homes which do not exceed a height of 35 feet. Due to the low
height of these dwellings and the presence of open space, viewsheds in these neighborhoods are not
164
typically limited by the build structures, but rather by tall trees bordering the perimeter of the
neighborhoods.
The visual character of the project area is also influenced by Minot's downtown civic area and parks. The
civic area of downtown Minot is of visual significance for the historic and architectural presence of its
public facilities, including the Minot Public Library, Minot City Hall, and the Minot Police Department. The
aesthetics of the Project footprint and the associated viewshed within this area are urban and dense,
comprised of taller buildings, shopping/commercial businesses, and multi-family housing with sparse
vegetation. The prominence of these buildings restricts views in this civic area. The Project also goes
through Roosevelt Park, the largest park in Minot, visually characterized by the presence of large, old trees
scattered throughout grassy open spaces. Other parks such as the Jack Hoeven Park and public baseball
fields are also located within the viewshed of the Project.
3.9
Historic and Cultural Resources
It is not within the scope of this EIS to provide detailed overview of the cultural setting specific to the
study area. For detail concerning the historic contexts of the area see Historic Preservation, National
Register Historic Contexts or publications by the State Historical Society of North Dakota. Cultural
resources include historic properties such as districts, sites, buildings, structures and objects that may be
included in, or eligible for inclusion in the National Register; artifacts and materials related to historic
properties, significant events and people; historic records; and the lifeways, traditions and ceremonies of
communities. A historic property is any prehistoric or historic site, structure, building, object, or district
included in, or eligible for inclusion in the National Register of Historic Places (NRHP).
Four surveys have been performed to identify cultural resources in the project area. Listed below and
attached as Appendix G, Appendix H, and Appendix I, are reports documenting the findings of the
surveys.
Class I Cultural Resources Survey, Mouse River Enhanced Flood Protection Project, Burlington to
Minot, Ward County, North Dakota
Class III Archaeological Survey, Mouse River Enhanced Flood Protection Project, Forest Road Levee,
4th Avenue NE Floodwall, Napa Valley Levee, Minot Ward County, North Dakota
Class III Standing Structure Survey, Mouse River Enhanced Flood Protection Project, Forest Road
Levee, 4th Avenue NE Floodwall, Napa Valley Levee, 2nd Avenue SE Stormwater Pool, Minot, Ward
County, North Dakota
Class III Cultural Resources Investigation of Mouse River Enhanced Flood Protection Plan Borrow
Site, Ward County, North Dakota
The study area for the Class I Cultural Resources Survey encompassed the entire Project footprint with an
additional 1 mile buffer from Burlington through Minot except for historic structures within the City of
Minot. The Class III Archaeological and Standing Structure surveys narrowed down this study area to the
165
areas of potential effect (APE) associated with Stage 1 (Phases 1 through 3) and the Highway 2 borrow
area. Cultural resource surveys at other potential borrow areas have not been conducted at this time.
3.9.1
Class I Cultural Resources Survey
The Class I Cultural Resources Survey was conducted to identify all known archaeological sites and
historical structures that could be affected by the Project [63]. Sites within the study area were identified
using records at the North Dakota State Historic Preservation Office (SHPO). The Class I background
research was conducted in May 2015 in accordance with guidelines outlined by SHPO. Using the
methodology noted below, historic structures are addressed in the Class III Standing Structure Survey
discussed in Section 3.9.3.
Since the 2011 flood, Minot has been actively acquiring and redeveloping housing infrastructure through
the U.S. Department of Housing and Urban Development (HUD) Community Development Block Grant
Disaster Recovery (CDBG-DR) Program. As this effort is a federal action, it is also subject to NEPA and
compliance under Section 106 of the National Historic Preservation Act (NHPA). That effort and this EIS
for the Souris River Enhanced Flood Protection Project are being evaluated through separate NEPA
documents. In order to avoid duplicating surveys, the Class I survey did not evaluate historic structures
within Minot because a survey of standing structures was already underway within Minot for the City's
HUD CDBG-DR program.
The Class I Cultural Resources Survey methodology was as follows:
Search existing records for known archaeological sites and historic structures in the study area.
Identify sites that might be eligible for the NRHP, so they can be considered and investigated to
inform the planning processes.
Design a Class III Cultural Resources Survey methodology, where appropriate.
The following subsections identify and summarize known archaeological sites and historic structures and
features identified in the Class I Cultural Resources Survey as having potential NRHP eligibility. The Class I
survey report recommended that a Class III Cultural Resources Survey be prepared where there will be
ground-disturbing activities that could affect features potentially eligible for the NRHP. The Class III
archaeological and standing structure surveys are summarized in Section 3.9.2 and Section 3.9.3.
3.9.1.1
Prehistoric Archaeology
The Class I survey identified four archaeological sites within the study area (Table 3-20, reference [63]).
The four archaeological sites (32WD24, 32WD58, 32WD59, 32WD130) were inventoried from 1982-1992.
During the initial documentation (1982, 1989, and 1992) of the sites, subsurface testing was
recommended to discern eligibility for the NRHP. The archaeological sites listed in Table 3-20 are not
within the APE for Stage 1. Future phases of the Project are covered under stipulations within the
Programmatic Agreement between the USACE and ND SHPO. In addition, the USACE has statutory
responsibility to consider the effect of permit decisions on historic properties when they are known, or
166
suspected, to exist in the USACE permit area. In order to obtain a permit, all aspects of the programmatic
agreement must be completed. This could include surveys, consultation with the North Dakota SHPO and
execution of a Memorandum of Agreement(s), if necessary. If there is another Federal agency with
historic properties responsibilities in the permit area, the USACE is obligated to ensure that they have
completed their obligations under Section 106 of the Historic Preservation Act.
Table 3-20
Class I Cultural Resource Survey Prehistoric Archaeological Sites
Date Recorded & Description
Site
NRHP Eligibility
32WD24
1982: Charcoal scar and faunal remains from eroding terrace.
Potentially eligible
32WD58
1989: Lithics, debris, faunal bone fragments. No subsurface
testing at time of 1989 recordation.
Potentially eligible
32WD59
1989: Cultural material scatter, including lithics, bison, or bovid
bone. No subsurface testing at time of 1989 recordation.
Potentially eligible
32WD130
1992: Stone circles and rock features. No subsurface testing at
time of 1992 recordation.
Potentially eligible
Data source: reference [63]
3.9.1.2
Historic Archaeology
The former Soo Line Railroad corridor (present day Canadian Pacific Railroad), which extends through the
project area, is recommended as potentially eligible for the NRHP (Table 3-21) because of the significance
of railroads in North Dakota and the American West. Segments of the former Soo Line corridor are
adjacent to the APE.
Table 3-21
Class I Cultural Resource Survey Historic Archaeological Sites
Site
Location
32WD1631
Soo Line-Canadian
Pacific Railroad
Date Recorded & Description
2010 - Soo Line Railroad
NRHP Eligibility
Check Statewide
Context
Status/
Recommendation
Recommended
Eligible
Data source: reference [63].
3.9.1.3
Standing Structure/Historic Architectural History
The Class I survey identified four standing structures in the project area that are potentially eligible for the
NHRP (Table 3-22). Site 32WD34 is an historic farmstead, and sites 32WD1613, 32WD1615, and
32WD1841 are bridges.
167
Table 3-22
Class I Cultural Resource Survey Standing Structures/Historic Architectural Sites
within Class I Study Area
Date Recorded &
Description
Site
NRHP Eligibility
Status/ Recommendation
32WD34
1982: Vellejo Farm
N/A
Possibly Eligible/
Recommend revisit site
32WD1613
2001: Bridge
NRHP
Statewide Context:
Recommended eligible
32WD1615
2001: Bridge
NRHP
Statewide Context:
Recommended eligible
32WD1841
2014: Steel bridge
N/A
Further investigation
needed/ Avoidance
recommended
Data Source: reference [63]
3.9.2
Class III Archaeological Survey Phases 1 through 3
A Class III Archaeological Survey for Stage 1 of the Project was conducted in May, 2015, to determine the
presence of archaeological sites, historical sites, or buried soils that have the potential to contain
archaeological materials (reference [64]). The Class I Cultural Resources Survey noted that there were no
previously identified archaeological or historic sites within the Class III survey areas. All of Stage 1 was
surveyed by foot. Stage 1 surveys were separated into three phases and the extent of the APEs for the
Class III Archaeological Survey are shown on Figure 3-19 and Figure 3-20.
The Class III Archaeological Survey methodology was as follows:
Visual inspection of the survey area and a significant buffer for above ground indicators and
landscape features that might indicate earthworks, burial mounds, cemeteries, foundations or
other cultural resources.
Where visibility was adequate (>30 percent of ground surface visible), pedestrian survey of the
APE to locate artifacts, features, architectural remains, or other evidence of human occupation or
utilization, using parallel transects not more than 30 meters apart.
Manual three-quarter-inch soil cores were taken to confirm that the pedestrian survey was
adequate (i.e., no buried soils likely to contain archaeological materials were present.)
Soils within the APE had been stripped by erosion or construction of earlier flood risk-reduction
features and were not intact; no subsurface testing was deemed necessary.
The Class III Archaeological Survey of Stage 1 did not identify archaeological or historical sites and did not
detect intact soils likely to contain archaeological materials. Survey results for the separate phases is
provided below.
168
11TH AVE NW
UNIVERSITY AVE NW
11TH AVE NE
UNIVERSITY AVE NW
8TH ST NW
UNIVERSITY AVE NE
AV
E
NW
6T H
ST
NW
5TH AVE NE
Home Sweet Home
RR AV
E
NE
4TH AVE NE
£
¤
83
6TH ST NW
Minot Flour Mill
7TH ST NE
3RD ST SE
4T H AVE NE
3RD AVE NW
I
0
CENTRAL AVE
300
600
1,200
2ND AVE SE
Figure 3-19
£
¤
B2
Data Source: References [60] and [61]
Imagery Source: USDA NAIP Imagery 2014
3RD ST SE
3RD AVE SE
T ST
ON
FR
E
W
ST SW
N
ER
ST
E
AV
2ND AVE SW
1ST ST SW
E RD
LAN
FIRE
W
2ND AVE S
1ST AVE SE
1ST ST SE
1ST AVE SW
3RD ST SE
Feet
6TH
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-19 - Class III Archaeological and Standing Structures Survey - Phase 1.mxd User: kac2
5T
H
Project Footprint
3RD ST NE
11
1TH AVE NW
Class III Archaeological
and Standing Structures
Survey Areas
TH AVE NW
£
¤
B52
CLASS III ARCHAEOLOGICAL
AND STANDING STRUCTURES
SURVEYS
PHASE 1
Mouse River Enhanced Flood
Protection Project
D
2N
CENTRA L AVE W
K
OA
DR
1ST AVE SW
WESTFIELD AVE
2ND AVE SW
AVE SW
3RD AVE SW
£
¤
4TH AVE SW
FOREST RD
5TH AVE SW
17TH ST SW
21ST ST SW
25TH
7TH AVE SW
L R
IO
5TH AV
ES
W
4TH AVE SW
18TH ST SW
DE
SW
ST
24TH ST SW
B83
7TH ST NW
1ST AVE NW
8TH ST SW
SW
ST
2ND AVE NW
7TH ST SW
16TH ST SW
10TH ST NW
3RD AVE NW
18
TH
SW
T AVE SW
1S
Project Footprint
4TH AVE NW
MAPLE AVE
TH
26
TH
25
22ND
ST
ST
SW
SW
ST
28
TH
SW
ST
24TH ST SW
30
TH
1ST AVE SW
Class III Archaeological
and Standing Structures
Survey Areas
8TH ST NW
18TH ST NW
19TH ST NW
20TH ST NW
2ND AVE NW
16TH ST NW
17TH ST NW
19TH ST NW
20TH ST NW
21ST ST NW
22ND ST NW
22ND ST NW
23RD ST NW
4TH AVE NW
CENTRAL AVE W
CAMINO
6TH AVE SW
6TH AVE SW
8TH AVE SW
7TH AVE SW
ST
R
D
E
SS RD
FO
R
I
T
16
H
SW
ACCE
ST
0
11TH AVE SW
400
800
1,600
Feet
£
¤
8TH ST SW
9TH ST SW
10TH ST SW
KD
R
AVE SW
11TH ST SW
Figure 3-20
COO
DR
CO
Data Source: References [60] and [61]
Imagery Source: USDA NAIP Imagery 2014
SW
14TH
OK
RD
VE
12TH A
18T
H ST SW
ACCESS
12TH AVE SW
27TH ST SW
£
¤
2
28TH ST SW
B2
29TH ST SW
Barr Footer: ArcGIS 10.4, 2017-05-01 11:06 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 3-20 - Class III Archaeological and Standing Structures Survey - Phases 2 and 3.mxd User: KAC2
23RD ST NW
24TH ST NW
25TH ST NW
ST SW
28TH ST NW
27TH ST NW
57TH ST NW
26TH ST NW
30TH ST NW
57TH ST NW
5TH AVE NW
CLASS III ARCHAEOLOGICAL
AND STANDING STRUCTURES
SURVEYS
PHASES 2 AND 3
Mouse River Enhanced Flood
Protection Project
3.9.2.1
Phase 1 Fourth Avenue NE
The survey for Phase 1 of the Project was conducted from the line of the proposed floodwall and levee
segments on the northern and southern sides of the Souris River to the banks of the Souris River. Soil
probes indicated that soils within the survey area had been substantially stripped by fluvial erosion or
construction of the existing levees. The survey did not identify any archaeological or historical sites, and
detected no intact soils likely to contain archaeological materials. No additional archaeological survey is
recommended for Phase 1.
3.9.2.2
Phase 2 Napa Valley
The Phase 2 APE is primarily developed golf courses that have been extensively landscaped. An existing
levee runs through the area. The pedestrian survey was conducted from the line of the proposed levee on
the northern side of the Souris River to the bank of the Souris River. A pedestrian survey was also
conducted on a floodplain terrace south of the Souris River. Soil probes in the area indicated that soils
within the survey area for this Project phase had been substantially stripped by fluvial erosion or
construction of the existing levee line. The survey did not identify archaeological or historical sites, and
detected no intact soils likely to contain archaeological materials.
Within the Phase 2 APE, the area near Second Avenue SW had been previously cultivated and is now
planted with trees. This wooded field adjacent to Second Avenue SW and the railroad line would be used
as a stormwater pond. Soil probes in this survey area indicated a minimal potential for buried
archaeological deposits. No further archaeological survey is recommended for any of the areas associated
with Phase 2 of the Project.
3.9.2.3
Phase 3 - Forest Road
The Phase 3 cultural resources survey was conducted from the line of the proposed levees on the
northern and southern sides of the Souris River to the banks of the Souris River. The APE also included a
proposed section of floodwall and two ponding areas. The results of soil probing indicated that soils
within the APE had been substantially stripped by fluvial erosion or construction of the existing levees. The
survey did not identify archaeological or historical sites, and detected no intact soils likely to contain
archaeological materials. No further archaeological survey is recommended for the Phase 3.
3.9.3
Class III Standing Structures Survey Stage 1
A Class III Standing Structures Survey for Stage 1 was conducted in May, 2015 [65]. The survey was limited
to identifying standing structures within the survey areas that were eligible or potentially eligible for the
NRHP. Stage 1 surveys were separated into three phases. The APEs for the Class III Standing Structure
Survey are shown on Figure 3-19 and Figure 3-20.
The Class III Standing Structures Survey methodology was as follows:
Identify all historic structures in existing SHPO records.
171
Identify all historic structures in existing SHPO records designated as eligible or potentially
eligible for the NRHP.
Conduct 100-percent visual inspection survey of all structures to confirm that potentially eligible
structures had been identified.
Four structures within the APE have been identified as eligible for the NRHP (Table 3-23).
Table 3-23
Site
Class III Standing Structures Survey Historic Structures within Phases 1-3 APE
Name
Location relevant to
project
Location
NRHP Eligibility
32WD507
Home Sweet
Home
103 Fourth Avenue
NW, Minot
Within Phase 1
footprint
Eligible
32WD652
Minot Mill
400 Third Street
NE, Minot
Within Phase 1
footprint
Eligible as a contributing
element to the NRHP Minot
Mill District
32WD681
20th century
residence
25 Fifth Avenue
NE, Minot
Adjacent to (north
of) Phase 1
Not Eligible
32WD1631
Soo Line-Canadian
Pacific Railroad
Linear corridor
following current
railway
Adjacent to Phase 2
and Phase 1 (west to
east)
Eligible
Data Source: reference [65]:
At the same time as this Class III survey, a comprehensive architectural study of several neighborhoods in
the project area in Minot was underway as part of the HUD CDBG-DR program under the MOA between
Minot and the North Dakota SHPO.
3.9.3.1
Phase 1 Fourth Avenue NE
The Phase 1 Class III Standing Structure Survey was conducted from the line of the proposed floodwall
and levee segments on the northern and southern sides of the Souris River to the banks of the Souris
River. The record search for the northern side of the Souris River included all structures within and
immediately beyond the boundaries of the APE, and all structures between Fifth Avenue NE and the
Souris River and Sixth Street NE. The record search for the southern side of the Souris River consisted of a
scattering of industrial buildings immediately adjacent to the Burlington Northern Santa Fe Railroad
tracks, and everything recorded between the Souris River, Third Street NE, Central Avenue E, and Seventh
Street N.
Home Sweet Home (32WD507)
Home Sweet Home is within the Phase 1 Project footprint. This site consists of a two-and-a-half-story
house built on or before 1907 with a façade of stucco, brick, and horizontal wood siding. The gambrel
roof is covered in asphalt shingles, with a gable dormer on the northern elevation. Ornamental towers are
on the eastern elevation.
172
Although the inventory of standing structures initially identified Home Sweet as "not eligible," in further
consultation with SHPO it was confirmed that Home Sweet Home was eligible for NRHP.
Minot Mill (32WD652)
The Minot Mill is within the Phase 1 Project footprint. Last documented in 1985, the Minot Mill consists of
a central four-story building, flanked by one-story warehouse extensions on the eastern and western sides
of the central building. The Minot Mill has been identified as a contributing element of the NRHP Minot
Industrial District. Although the structure has been heavily modified since the 1986 creation of the NRHP
Minot Industrial District, it may still retain integrity sufficient to be a contributing element to that district.
25 Fifth Street NE (32WD681)
The 25 Fifth Street NE site is recorded as a one-story T-frame house with a cross gable roof, built between
1905 and 1907. The T-frame house is outside the Project footprint and is part of the extended APE.
Additionally, the house has been heavily modified and no longer has structural integrity sufficient for
NRHP eligibility. No further investigation or mitigation efforts are recommended.
Soo Line-Canadian Pacific Railroad (32WD1631)
The Soo Line-Canadian Pacific Railroad (32WD1631) was previously discussed in Section 3.9.1.2.
Modifications to the existing railroad corridor are not anticipated to occur as part of Phase 1 of the
Project.
3.9.3.2
Phase 2 Napa Valley
The Phase 2 APE is primarily developed golf courses that have been extensively landscaped. An existing
levee runs through the area. The pedestrian survey was conducted from the line of the proposed levee on
the northern side of the Souris River to the bank of the Souris River. Some proposed retention ponds and
a small area of levee on the southern side of the river were also surveyed. The record search and
100-percent visual inspection survey identified one site that might be eligible for the NRHP: site
32WD1631, the Soo Line-Canadian Pacific Railroad.
Soo Line-Canadian Pacific Railroad (32WD1631)
The Soo Line-Canadian Pacific Railroad (32WD1631) was previously discussed in Section 3.9.1.2.
Modifications to the existing railroad corridor are not anticipated to occur as part of Phase 2 of the
Project.
3.9.3.3
Phase 3 Forest Road
The Phase 3 survey was conducted from the line of the proposed levees on the northern and southern
sides of the Souris River to the banks of the Souris River. The APE also includes a proposed section of
floodwall and two retention pond areas. The record search and 100-percent visual inspection survey
identified no structures eligible for the NRHP. No additional survey is recommended.
173
3.9.4
Class III Archaeological Survey Highway 2 Borrow Site
In March 2016, a Class III cultural resource investigation was conducted at a potential borrow site (i.e.,
Highway 2 borrow site) for the proposed Project. The fieldwork involved a pedestrian survey of the
approximately 32 acre site. No cultural resources or historic properties were identified during field
investigations of the site. Likewise, no trace could be found of one site lead (32WDX0115) previously
recorded in the area (reference [66]).
3.9.5
Native Tribes
The USACE is responsible for consultation with federally recognized tribes that have historical and cultural
associations within the project area. In accordance with 36 CFR 800.3(f)(2) of the Advisory Council on
Historic Preservation's regulation implementing Section 106 of the National Historic Preservation Act of
1966, as amended, the USACE has identified 15 Tribes as having historical and cultural associations with
the project's geographic location. These Tribal parties were contacted by phone and then official letter on
March 9, 2016 to notify them of the Project and request comment. The USACE received response from the
Spirit Lake Sioux Tribe expressing interest when reached by phone. The USACE does not have written
letters from tribal parties identifying interest; however, the USACE considers all requests sufficient for
continued consultation. Project information has continued to be provided to the Spirit Lake Sioux Tribe.
The Project was coordinated with the Tribes listed below.
Cheyenne River Sioux Tribe (SD)
Chippewa Cree Cultural Resources (MT)
Crow Creek Sioux Tribe (SD)
Crow Nation (MT)
Fort Peck Tribes (MT)
Northern Cheyenne Nation (MT)
Oglala Sioux Tribe (SD)
Rosebud Sioux Tribe (SD)
Santee Sioux Nation (NE)
Sisseton-Wahpeton Oyate (SD)
Spirit Lake Sioux Nation (ND)
Standing Rock Sioux Tribe (ND)
Three Affiliated Tribes (ND)
Turtle Mountain Band of Chippewa (ND)
Yankton Sioux Tribe (SD)
174
3.10
3.10.1
3.10.1.1
Air and Noise Quality
Air Quality
Criteria Pollutants
The Clean Air Act (CAA) of 1970 (42 United States Code [USC] 7401 et seq.), as amended in 1977 and
1990, is the primary federal statute governing ambient air pollution. The CAA designates standards for the
following criteria pollutants that have been determined to affect human health and the environment:
particulate matter (PM10 and PM2.5), carbon monoxide (CO), sulfur dioxide (SO 2), nitrogen dioxide (NO2),
lead (Pb), and ozone (O3). Volatile Organic Compounds (VOC) and NO2 are precursors to O3, which is not
an emitted source but is formed by these pollutants in the atmosphere (40 CFR Part 50).
The USEPA has developed National Ambient Air Quality Standards (NAAQS) for these criteria pollutants to
protect public health and welfare. When a designated air quality area or airshed exceeds a NAAQS, that
area may be designated as a "nonattainment" area. Areas with levels of pollutants below the health-based
standard are designated as "attainment" areas. To determine whether an area meets the NAAQS, air
monitoring networks have been established and are used to measure ambient air quality and determine
attainment status.
The NDDH Air Quality Division regulates air quality throughout the state, except for on Indian
reservations. North Dakota has promulgated ambient air quality standards (NDAAQS) in addition to the
NAAQS. These standards include hydrogen sulfide and SO2; for all other pollutants, the NAAQS are
equivalent or more stringent than the NDAAQS. Both the NAAQS and NDAAQS apply to the Project.
NDDH's most recent Annual Air Quality Monitoring Summary indicates that no sulfur dioxide, nitrogen
dioxide, ozone or particulate matter exceeds either the state or federal ambient air quality standards
measured at any state operated ambient air monitoring sites. North Dakota is one of 13 states that are in
attainment for all criteria pollutants (reference [67]). Because of North Dakota's attainment status and
because primary emissions associated with the Project would be from non-major sources, it is not
anticipated that any air-quality permits or authorizations would be required from the NDDH Air Quality
Division.
New projects within attainment or unclassified areas must conform to limits defined under the Prevention
of Significant Deterioration (PSD) Program. For actions resulting in emissions that exceed a threshold (250
tons per year or more of any air contaminant regulated under North Dakota Century Code Chapter 2325), PSD requirements provide maximum allowable increases in pollutant concentrations for areas that are
already in compliance with the NAAQS.
3.10.1.2
Greenhouse Gases
Climate change refers to any significant change in measures of climate lasting for an extended period of
time. Greenhouse gases (GHGs) are gaseous emissions that trap heat in the atmosphere. These emissions
occur from natural processes but are exacerbated by human activities. The most common GHGs emitted
from human activities include carbon dioxide (CO2), methane (CH4), and nitrous oxide (N2O)
(reference [68]). On December 18, 2014, the Council on Environmental Quality (CEQ) issued revised draft
175
guidelines "to provide federal agencies direction on when and how to consider the effects of GHG
emissions and climate change in their evaluation of all proposed federal actions in accordance with the
National Environmental Policy Act (NEPA) and CEQ Regulations implementing NEPA" (reference [69]).
These revised draft guidelines are intended to describe requirements for controlling GHGs under the
terms of NEPA and the CEQ regulations. CEQ's revised draft guidelines indicate that NEPA requires both
documentation of the proposed Project's potential impacts on GHG emissions and an assessment of how
climate change would affect the proposed Project (reference [69]). Climate-related impacts are occurring
across regions of the country and across many sectors of our economy. Many state and local
governments are already preparing for the impacts of climate change through "adaptation," which is
planning for the changes that are expected to occur (reference [70]).
On the federal level, USEPA and other agencies have implemented various programs to encourage the
reduction of GHG emissions. On June 2, 2014, USEPA proposed draft rules under Section 111(d) of the
CAA to cut carbon emissions from existing fossil fuel-fired power plants. The draft rules are commonly
referred to as "the Clean Power Plan." The Clean Power Plan would establish goals for reducing carbon
emissions, but the states would determine the means of achieving the standards: "EPA's guidelines
provide flexibility and encourage states to look across their whole electric system to identify strategies to
include in their plans that reduce carbon pollution from fossil fuel-fired power plants" (reference [71]).
3.10.1.3
Climate
The High Plains Regional Climate Center provides data and climate-trend assessments for the Great Plains
region of the United States, including data over a 116-year period (1895-2011). Based on this data the
Great Plains region shows an average temperature warming trend relative to the baseline of the 19011960 average. The warming trend shows an average of a 0.2°F increase in temperature per decade for the
Great Plains Region. By comparison, the warming trend in North Dakota specifically is an annual average
temperature increase of 0.26°F per decade, which is higher than the trend for the Great Plains Region, as
well as the greatest annual average increase in the nation.
Annual precipitation for the entire Great Plains region was greater than the 1895-2011 average during the
1990s, less than the average during the early 2000s, and greater than average during the last few years on
record. Over this period, observations indicate an upward trend in the number of extreme precipitation
events for the region (reference [72]). Climate models project a warming in the High Plains region of
about 4°F by 2050 and 8°F or more by 2090. With regard to precipitation, models show general drying in
summer and autumn, with wetter conditions in winter. Spring is also projected to be wetter in the
northern part of the region (reference [73]).
One key climate change consideration for the proposed project is the potential impact of climate change
on flooding. As part of a national policy on resilience and risk reduction consistent with President
Obama's Climate Action Plan, the National Security Council staff has coordinated an interagency effort to
create a new flood risk-reduction standard for federally funded projects.
As a result, in January 2011, President Obama issued Executive Order 13690, which requires that agencies
expand management from the current base flood level to a higher vertical elevation and corresponding
176
horizontal floodplain to address current and future flood risk and ensure that projects funded with
taxpayer dollars last as long as intended. For example, the floodplain may be established using science
that considers climate information and projections and that uses the best-available, actionable hydrologic
and hydraulic data and methods that integrate current and future changes in flooding based on climate
science.
Alternatively, the executive order allows that the agencies address flood risk-reduction goals by building
two feet above the 100-year (1 percent-annual-chance) flood elevation for standard projects, and three
feet above for critical buildings like hospitals and evacuation centers, or build to the 500-year (0.2%annual-chance) flood elevation. Climate change considerations addressed in defining the floodplain and
analyzing the effectiveness of the proposed Project are discussed further in Section 3.2.2.
3.10.2
Noise
Noise is generally defined as unwanted sound and is commonly measured in units of decibels (dB) on a
logarithmic scale. Because human hearing is not equally sensitive to all frequencies of sound, certain
frequencies are given more "weight." The A-weighted decibel scale (dBA) is used to emphasize the range
of sound frequencies that are most audible to the human ear. The human range of hearing extends from
approximately 0 dBA to 140 dBA, and the human ear can usually detect the difference when a sound
changes by 3 dBA, while a 5 dBA change in sound is clearly noticeable to the human ear. Decibels are on a
logarithmic scale, thus an increase in dBA of 10 is perceived as a doubling of the noise level.
Minot has adopted an ordinance that limits noise levels within the city limits. Minot's code of ordinances
(Ch. 23 article VI Sec 23-108) sets noise level limits for three different use classifications: residential,
commercial, and industrial. Table 3-24 identifies these use classification as well as the corresponding
zoning districts and summarizes daytime and nighttime noise standards for each.
Table 3-24
Limiting Noise Levels for Zoning Districts
Zoning District
Residential (R1, R2, R3,
R4, PD-MH)
Commercial (C1,
C2, C3, C4)
Industrial
(M1, M2)
Maximum number of decibels permitted from 7:00
a.m. until 11:00 p.m., daily
55
65
80
Maximum number of decibels permitted from
11:00 p.m. until 7:00 a.m. of the following day
50
60
75
Minot has identified a number of activities that are exempt from these noise standards, including noises
of safety signals, warning devices, and emergency relief valves, any construction or maintenance activities,
and any other noise resulting from activities of a temporary duration permitted by law and for which a
special permit (Ch. 23 article VI Sec 23-108(g)) has been granted by the City.
177
4.0 Environmental Consequences
This chapter describes the potential environmental and social consequences of the Requester's Preferred
Alternative and the No-Action Alternative. Consequences generally fall into two categories
consequences related to constructing and operating flood risk-reduction features, and consequences
related to flooding. Alternatives were evaluated for flood-related effects at three flood discharges: 5,000
cfs, 10,000 cfs, and 27,400 cfs. The Requester's Preferred Alternative consists of alignments and features as
described in Section 2.1. The No-Action Alternative assumes a successful flood fight to 10,000 cfs in
conjunction with the existing federal project. Further detail on the No-Action Alternative can be found in
Section 2.2.5.
Mitigation measures used to avoid, minimize, or offset adverse impacts of the Requester's Preferred
Alternative are discussed in many of the following sections. Specific permit conditions would require
certain mitigation actions. In addition, the requester has identified a number of mitigation measures that
would be pursued outside of permitting requirements. Both required and voluntary mitigation actions are
described in the following sections. Permit conditions have not yet been identified and therefore cannot
be differentiated from voluntary measures with complete certainty.
4.1
Geology, Soils, and Groundwater
4.1.1
4.1.1.1
Requester's Preferred Alternative
General Effects and Mitigation Measures
Geology
No significant geological resources are located in the impact area; therefore, the Requester's Preferred
Alternative would not adversely affect geological resources.
Soils
Construction of the flood risk-reduction features would disturb up to approximately 224 acres of urban
soils and 539 acres of other soil types (Table 3-1), including 291 acres that are classified as prime farmland
(described in Section 4.1.1.2). The Requester's Preferred Alternative could adversely affect soils in the
impact area in several ways, including increasing the potential for erosion, compaction, loss of
productivity, and through contamination from leaking construction equipment. The most serious potential
impacts would be temporary and could include soil erosion and loss of soil productivity through soil
compaction and mixing productive topsoil with less productive subsoil. Any of these effects could
interfere with crop production or impair revegetation within the impact area. The potential loss of soil
productivity due to compaction or mixing of soil horizons would be greatest in cultivated agricultural
fields and greenspace in the impact area.
Construction of the flood risk-reduction features would require the use of heavy equipment, which could
de-stabilize the soil surface and increase erosion potential. A soil's susceptibility to erosion varies and is a
function of characteristics such as soil texture and structure, topography, surface roughness, amount of
vegetative cover, and climate. Erosion may also be influenced by the length of time the soils are left bare
178
during construction. Erosion from water occurs primarily on loose soils on moderate to steep slopes,
particularly during high intensity storm events. The flat topography of the floodplain makes the soils in
the impact area less susceptible to erosion. The potential for erosion is greatly reduced once construction
is completed and permanent erosion controls, such as vegetation and rip rap, are established.
Appropriate best management practices (BMPs) would be used to minimize soil erosion in disturbed
areas. These areas would be identified in the Project's Stormwater Pollution Prevention Plan (SWPPP).
These BMPs would consist of both temporary and permanent erosion control measures, including, but not
limited to, minimizing the duration of soil disturbance, and installing measures such as silt fences, erosion
control blankets, temporary sedimentation basins, and reestablishing contours and vegetative cover by
seeding and mulching or by hydromulching as soon as practicable following construction.
Heavy construction vehicles moving off existing roadways could compact the soil. The degree of
compaction would depend on the moisture content and texture of the soil. Compaction damages soil
structure and reduces pore space, which impedes the movement of air and water to plant roots, resulting
in loss of soil productivity and lower growth rates. Soil compaction would be most severe where high
ground weight equipment operates on wet soils with high clay content.
Measures to avoid or minimize soil compaction include avoiding construction or the use of high ground
weight equipment during wet weather, segregating topsoil from the construction areas, and doing
subsurface plowing following construction. If topsoil or subsoil were severely compacted, as determined
by testing, a deep tillage device could be used to de-compact the soil.
The mixing of soil horizons during construction could also lower soil productivity by diluting the
productive topsoil with the less productive subsoil. The mixing of soil horizons can be avoided or
minimized by separating stripped topsoil and excavated subsoil, and returning subsoil and topsoil to their
original horizons during backfilling.
Overall, the Requester's Preferred Alternative would have a minor and temporary adverse effect on soils in
the project area.
Groundwater
Temporary dewatering activities during construction (lasting 1 to 9 months per construction phase) would
withdraw water from the water table aquifer. Groundwater withdrawn for dewatering would be discharged
to storm sewers or to the Souris River via temporary sediment basins. Given the hydraulic separation
between the water table aquifer and the deeper resource aquifers (Souris Valley aquifer system), no
effects to groundwater resources would be expected.
If features associated with the Requester's Preferred Alternative require impacts to NDSWC observation
wells, coordination shall take place with the Water Appropriations Division to ensure wells are properly
abandoned.
179
4.1.1.2
Potential Effects on Specific Unique and Sensitive Resources
The Requester's Preferred Alternative would require the disturbance, and permanent conversion of, 291
acres of prime farmland to construct Project features. Farmland is under cultivation within the impact area
in three primary Project segment locations: near Talbot's, Apple Grove, and Eastside Estates. Elsewhere,
land within the impact area classified as prime farmland is currently developed for non-agricultural uses.
Construction of the Requester's Preferred Alternative could adversely affect prime farmland in the impact
area in several ways, including increasing the potential for erosion, compaction, loss of productivity,
contamination from leaking equipment, and disturbance to farming activities and schedules. A discussion
of these potential impacts and mitigation measures is provided in Section 4.1.1.1.
With the Requester's Preferred Alternative, approximately 1,465 acres of prime farmland would be
inundated under the flood scenario of 27,400 cfs. Inundation of prime farmland is not expected to cause
permanent adverse effects, but could cause temporary adverse effects such as crop damage and
disruption of farming activities.
Because prime farmland is widespread in the project area (the prime farmland within the impact area
represents less than 0.1% of the prime farmland in Ward County), the overall adverse effect to prime
farmland in the project area would be minor.
4.1.1.3
Site-Specific Effects for Construction Stage 1.5
Construction and operation of the Requester's Preferred Alternative is not expected to have a significant
impact on specific geology, soil, or groundwater resources in the Construction Stage 1.5 impact areas.
Likewise, the impact to prime farmland would be minor.
4.1.2
No-Action Alternative
The No-Action Alternative would inundate more acres of prime farmland than the Requester's Preferred
Alternative under all three flow conditions evaluated. The No-Action Alternative would have varying
effects to productivity increasing with the frequency and intensity of flooding. The acres of prime
farmland that would be flooded or disrupted under each alternative are shown in Table 4-1.
Table 4-1
Inundation of Prime Farmland under the No-Action and Preferred Alternatives
Inundation Area (acres)
5,000 cfs
10,000 cfs
27,400 cfs
Requester's Preferred Alternative(1)
364
988
1,465
No-Action Alternative
408
1,298
2,280
(1)
In addition, 291 acres of prime farmland would be directly impacted by the Requester's Preferred Alternative.
180
4.2
4.2.1
Surface Waters
Requester's Preferred Alternative
4.2.1.1
General Impacts
Constructing, operating, and maintaining the Requester's Preferred Alternative would result in temporary
and permanent impacts on surface water resources, as described below.
Souris River
The Requester's Preferred Alternative would have temporary impacts to water resources including
localized physical disturbance caused by construction equipment during site preparation, such as
vegetation clearing, grading, excavation, and soil stockpiling. These activities would increase the potential
for soil erosion and subsequent sedimentation of surface waters. The presence of exposed topsoil or
disturbed vegetation during construction could also increase sediment runoff from stormwater, which
could affect turbidity and dissolved oxygen levels in receiving waters, such as the Souris River. However,
the Requester's Preferred Alternative is not anticipated to alter impairment status or existing
impoundment functions along the Souris River.
Relative to the existing federal project, the Requester's Preferred Alternative would have a minimal effect
on average and low flows, with most of the changes to the river system occurring during very high flows.
The Requester's Preferred Alternative proposes very little straightening of the Souris River channel. The
Requester's Preferred Alternative would increase the area available for flow conveyance in many locations
due to the increased setback of new levees from the channel and overbank excavation around bridges
and other constrained locations.
Potential impacts to erosion and sedimentation associated with the Project are most likely to occur at
higher flows, with an increased risk of erosion due to constructed flood flows and associated increased
net erosive forces. Overbank excavation and widening of many bridge openings included as part of the
Requester's Preferred Alternative would help decrease erosive forces at locations that have historically
seen significant erosion.
Erosion control measures would be installed by the contractor prior to the start of construction, as
identified by the Project's SWPPP. The SWPPP would use BMPs to reduce the potential for and quantity of
sediment and other pollutants reaching surface waters. Temporary erosion control measures used along
the Souris River could include, but would not be limited to, one or more of the following: rock
construction entrance, sediment ponds, silt fence, erosion-control blanket, inlet siltation protection,
concrete washout, floating silt curtain, or rock filter levee. Disturbed areas of streambed or banks beyond
the limits of project features would need to be restored to pre-construction conditions.
Permanent, indirect effects on surface waters could include removal of riparian or shoreline forest areas
adjacent to the Souris River. In addition to riparian habitat changes, this vegetation clearing could
increase light penetration to the Souris River, potentially resulting in localized increases in water
temperatures and changes to the river's aquatic communities.
181
Construction of the Project would also result in permanent impacts to the Souris River, as several Project
features would require work to be done below the river's ordinary high water mark (OHWM). The river
would be widened in some locations through overbank excavation, and the river's banks would be
stabilized in several locations through the use of riprap both above and below the OHWM. Near the Kings
Court subdivision and downstream of East Burdick Expressway, proposed channel realignments, would
alter the course of the river or create areas that are cut off from the main Souris River channel (known as
cutoff channels). Cutoff channels and former oxbows can store water during periods of high flow. Because
they do not convey flow, however, these features tend to become stagnant pools with poor water quality
once high flows recede. Realigned channels can be designed using natural channel design concepts to
provide some functions similar to natural channels; however, they take time to develop and are not likely
to provide all comparable functions.
Placement of fill below the OHWM and channel realignment activities would require a USACE Section 404
Permit. Under Section 404, a project can be permitted if it meets the requirements of the 404(b)(1)
Guidelines. The guidelines specifically require that impacts to the aquatic ecosystem be avoided and
minimized to the maximum extent practicable prior to mitigating for unavoidable impacts. Mitigation is
project specific and varies greatly depending on the aquatic ecosystem being impacted. The existing
authorized federal project (from Burlington to Logan) features consist of channel modifications, channel
cutoffs, and levees, as well as flood control storage behind the Burlington Dam. As part of the existing
federal project, extensive channel modifications, including lining much of the channel with riprap slope
protection, was previously completed.
Currently the USACE does not have a standard for mitigating channel loss in North Dakota. Generally
unavoidable channel impacts are mitigated by providing a new channel in a similar configuration and, at a
minimum, the length of the impacted channel. Mitigation for unavoidable impacts will be addressed for
each permitted phase after all avoidance and minimization measures are implemented and a
determination is made that mitigation is required. Details on mitigation will be determined as part of the
404 permitting processes.
The USGS North Dakota Water Science Center will be contacted and given advance notice prior to any
project activities that would occur near the USGS streamgage at site 05117500 Souris (Mouse) River
upstream of Minot. Efforts will be made to preserve the streamgage and minimize impacts to the data
integrity collected at the streamgage site.
Floodplain
The Requester's Preferred Alternative would involve constructing flood risk-reduction features within the
Souris River's floodplain and floodway. These activities would require a Non-Building Floodplain
Development Permit from the Burlington, Minot, or Ward County floodplain administrator, as appropriate.
Activities to modify the floodway would require authorization from the local floodplain administrator, as
well as the North Dakota State Water Commission.
One objective of the Requester's Preferred Alternative is to remove areas from the regulatory floodplain,
thus eliminating flood insurance requirements for properties in those areas. These actions would have to
182
be reviewed and approved by FEMA. A Conditional Letter of Map Revision (CLOMR) serves as FEMA's
comment on a proposed Project that would, upon construction, result in the modification of the existing
regulatory floodway, the effective base flood elevations (BFEs), or Special Flood Hazard Areas (SFHAs). A
CLOMR indicates whether a project, if built as proposed, would be recognized by FEMA. Once a project
has been completed, the community must request a revision to the effective Flood Insurance Rate Maps
(FIRMs) to reflect the changes. A Letter of Map Revision (LOMR) is used by FEMA to modify published
FIRMs.
As part of the floodplain permitting process, the Project sponsor would need to show that adverse
flooding impacts caused by the construction of Project features would be mitigated. This is typically
accomplished by providing additional storage elsewhere in the floodplain. In the case of the Requester's
Preferred Alternative, additional floodplain storage would be accomplished through targeted areas of
overbank excavation.
The Requester's Preferred Alternative would result in some downstream impacts during flows over 10,000
cfs, relative to the No-Action Alternative. Under the No-Action Alternative, flows over 10,000 cfs would
overtop the existing levees and emergency flood risk reduction features. Construction of the Requester's
Preferred Alternative would not allow water to overtop the levees, sending the full volume of flood water
downstream. Downstream impacts from the Requester's Preferred Alternative would result in less than 0.5
feet of increased flood elevation and would likely be greatest for floods that peak in the 12,000 cfs to
15,000 cfs range (reference [4]). These profile impacts would attenuate near Sawyer.
Hydraulic modeling indicates that the flood profile would increase upstream of Minot for the design flood
event but that these increases would not extend past the Colton Avenue bridge in Burlington. Mitigation
of upstream profile increases would be accomplished as part of the Project by replacing existing levee
systems with new levees designed to accommodate the Project design flood profile.
Wetlands
The construction of flood risk-reduction features could temporarily or permanently affect wetlands.
Permanent wetland impacts would generally be from construction in the location of an existing wetland,
grading within a wetland to prepare a foundation, or reconstruction of a community amenity (such as a
park or golf course). Based on preliminary estimates, the completed Project could permanently affect up
to 21 acres of wetland and temporarily affect up to 36 acres of wetland; both permanent and temporarily
impacts would be primarily to riverine wetlands with some freshwater emergent wetland types also
affected..
Temporary wetland impacts would primarily be from driving construction equipment through wetlands or
from soil erosion and deposition during construction. Sedimentation and ground disturbance in wetlands
can make them more susceptible to invasive plant species, such as reed canary grass, which could
adversely affect wetland function by reducing vegetative biodiversity and altering wildlife habitat.
Wetlands immediately adjacent to the Project impact area could potentially be affected by inadvertent
spills or leaks of fuels or other hazardous substances from construction equipment. Actions identified
above for impacts to surface waters would also be used to minimize erosion and sedimentation of
183
wetlands. In addition, a spill plan would be required as part of the Project's SWPPP. The spill plan would
identify measures to protect water resources from accidental releases of harmful substances and would
include stipulations such as prohibiting vehicle refueling in wetlands or storing hazardous materials in
wetlands.
A USACE Section 404 permit and associated NDDH Section 401 water quality certification are required for
impacts to wetlands. Under Section 404, a project can be permitted if it meets the requirements of the
404(b)(1) Guidelines. The Guidelines specifically require that impacts to the aquatic ecosystem be avoided
and minimized to the maximum extent practicable prior to mitigating for unavoidable impacts. Mitigation
is project specific and varies greatly depending on the aquatic ecosystem being impacted and the
permanence of the impact. Mitigation can be required for any unavoidable impact. Generally, mitigation
for wetlands in North Dakota is regional service area (RSA) based and at ratios established by a Federal
and state team and published in the North Dakota Mitigation Banking Guidance Document. The RSAs and
wetland mitigation ratios contained in the document are typically applied to all compensatory mitigation
plans. Mitigation requirements will be addressed for each permitted phase after all avoidance and
minimization measures are implemented. It is anticipated that future wetland impacts may be mitigated
through the Ducks Unlimited in-lieu fee program, development of site-specific compensatory mitigation,
or another method deemed suitable at that time. Mitigation for impacts below the OHWM will also be
determined during permitting for future project phases.
4.2.1.2
Site-Specific Impacts for Construction Stage 1.5
Phase 1- Fourth Avenue NE
Phase 1 would include construction of a floodwall and levee within the Souris River floodplain. Overbank
excavation beneath the Broadway bridge would also be completed as part of Phase 1, and associated
armoring of the channel would extend below the OHWM, resulting in 2,906 linear feet (2.1 acres) of
permanent impact as shown in Figure 4-1. Impacts would be managed and mitigated as described at the
end of this section.
Site-specific impacts to wetlands are not anticipated for Phase 1 project elements.
Phase 2 - Napa Valley
Phase 2 would include construction of levees, road grade raises, and reconfiguration of the Souris Valley
and Wee Links Golf Courses within the Souris River floodplain, resulting in a total of 3.31 acres of
permanent impact and 0.74 acres of temporary impact below the OHWM, as shown in Figure 4-2. Riprap
would be placed along the banks of the river and beneath the Sixteenth Street SW bridge to minimize
potential for erosion and scour. The need for riprap has been minimized through using it in conjunction
with other erosion protection methods (e.g., turf-reinforced mats) and natural bioengineering practices for
streambank stabilization, as well as proposing riprap primarily in areas that are highly susceptible to
erosion due to channel velocities and other stream factors.
In addition, Phase 2 would require modification to utilities located beneath the Souris River channel in two
locations. Utility modifications would be completed using cofferdams to contain the river's flow while
184
open trenches are dug to access the utility and would result in temporary impacts below the OHWM, as
shown in Figure 4-2. In addition, reconfiguring the Souris Valley Golf Course would also temporarily affect
a small area below the OHWM.
In total, bank stabilization activities associated with Phase 2 would impact 3,810 linear feet below the
OHWM, with 820 linear feet due to bioengineering bank stabilization (including toewood and VRSS/riprap
combination) and 2,990 linear feet due to riprap placement exclusively. Impacts would be managed and
mitigated as described at the end of this section.
Constructing the Phase 2 levees would permanently affect USACE-jurisdictional wetlands. Phase 2 project
features would permanently affect approximately 0.73 acre of primarily palustrine emergent or palustrine
forested wetland, as shown in Figure 4-3. Approximately 0.20 acre of temporary wetland impact are
expected with respect to levee construction and grading. Impacts would be managed and mitigated as
described at the end of this section.
Phase 3 - Forest Road
Phase 3 would include construction of levees on both sides of the channel within the Souris River
floodplain. The areas between the levees and the channel would be excavated to provide additional
capacity during flood events and would be lined with riprap to minimize the potential for riverbank
erosion. Some of this riprap would be placed below the OHWM of the Souris River. Riprap placement
would permanently affect approximately 1.47 acres below the OHWM, as shown in Figure 4-2. As
discussed in the previous section, the need for riprap has been minimized by using natural designs, where
able, and placement in areas highly susceptible to erosion.
In addition, Phase 3 would require modification to utilities running beneath the Souris River channel in
one location. Utility modifications would be completed using cofferdams to contain the river's flow while
open trenches are dug to access the utility. Utility modifications are expected to temporarily affect
approximately 0.1 acre of area below the OHWM, as shown in Figure 4-2.
In total, bank stabilization activities associated with Phase 3 would impact 2,040 linear feet below the
OHWM, with 680 linear feet due to bioengineering (including VRSS/riprap combination) and 1,360 linear
feet due to riprap placement. Impacts would be managed and mitigated as described at the end of this
section.
Other Phases of Construction Stage 1.5
Based on conceptual plans of the three other phases in Construction Stage 1.5, construction of the
Tierrecita Vallejo segment and Maple Avenue High-Flow Diversion would result in impacts to the Souris
River and adjacent USACE-jurisdictional wetlands. The tieback levee is not anticipated to affect any
wetlands or waterbodies.
Construction of the levee and excavation of the overbank areas in the Tierrecita Vallejo segment would
result in approximately a 0.51 acres of permanent impact to riparian areas below the OHWM of the river
(Figure 4-4). Of this, 808 linear feet is due to bank stabilization using riprap. In addition, these flood risk
185
reduction features would permanently affect approximately 0.48 acre of wetlands and temporarily affect
another approximately 0.16 acre of wetlands (Figure 4-5). These impacts would be mitigated in
coordination with mitigation efforts for Phases 1, 2, and 3, as noted below.
The Maple Avenue High-Flow Diversion would permanently affect approximately 0.96 acre below the
OHWM (Figure 4-6) through overbank excavation, riprap installation, and placement of closure structures.
The Maple Avenue High-Flow Diversion would result in approximately 0.09 acres of temporary wetland
impact due to excavation to connect the diversion channel to the Souris River (Figure 4-7). Permanent
wetland impacts associated with construction of the Maple Avenue High-Flow Diversion are not
anticipated.
Table 4-2
Summary of Construction Stage 1.5 Wetland and OHWM Impacts
Wetland Impacts
Location
OHWM Impacts
Permanent
(acres)
Temporary
(acres)
Permanent
(acres)
Temporary
(acres)
Length (ft)
0
0
2.10
0
2,906
0.73
0.20
3.31
0.74
3,810
0
0
1.47
0.09
2,040
Terracita
Vallejo
0.48
0.16
0.51
0
1,593
Maple Avenue
Bypass
0
0.09
0.96
0
260
Total
1.21
0.45
8.35
0.83
10,609
Phase 1:
4th Avenue NE
Phase 2:
Napa Valley
Phase 3:
Forest Road
4.2.1.3
Wetland and OHWM Mitigation Strategies
The following paragraphs describe how mitigation will be approached and how impacts will be refined for
Construction Stage 1.5, as well as future project phases.
Construction Stage 1.5 Mitigation
A mitigation plan has yet to be developed for unavoidable impacts to aquatic resources associated with
Construction Stage 1.5; however, one will be provided as part of the application for a Section 404 permit.
The mitigation plan is expected to generally take three resources into consideration: 1) Souris River, 2)
wetlands, 3) and trees associated with aquatic resources.
Mitigation for impacts to the Souris River will address cumulative impacts of bank stabilization through
the Minot Reach. Some areas along the Souris River already had riprap placed below the OHWM as part
of the existing federal project. The Requester's Preferred Alternative would replace riprap in some of these
186
areas with riprap of appropriate size and quantity to provide erosion protection. In addition, riprap
placement and streambank modifications would take place in other areas that do not currently have bank
protection. Impacts to the Souris River that exceed those of the existing federal project will be mitigated
for. Mitigation, if necessary, may include modification of existing lowhead dams to enhance fish passage,
reconnecting previously cutoff oxbows or by other methods.
Wetland impacts are likely to be offset either through on-site, in-kind permittee-responsible mitigation, or
by purchasing mitigation credits from the Ducks Unlimited, Inc. North Dakota Aquatic Resource In-Lieu
Fee Program. It is anticipated that credits will be correlated to the Souris River Basin Regional Service Area
at a ratio that has yet to be determined.
Tree losses will also be refined to determine how many are required to be removed in conjunction with
maintenance of the existing Federal Souris River Project and how many will be removed to accommodate
construction of the features of Stage 1.5. Trees will be replaced at an acceptable ratio or in accordance
with an acceptable assessment method, as defined in the mitigation plan.
The mitigation plan will be made available to interested parties during the public comment period
required by the Section 404 Permitting Program.
Mitigation for Future Project Phases
Mitigation for impacts associated with aquatic resources incurred in future phases beyond Construction
Stage 1.5 area expected to be provided by similar means, depending on regulations in effect at the time
of permitting. Future mitigation plans would be developed in coordination with the USACE.
187
Ordinary High Water Mark
AVE NE
7TH
SHIRLEY CT
3RD ST NE
Project Footprint
6TH ST NE
5TH AVE NE
WALDERS ST
AVE NW
5TH
MAIN ST N
5TH AVE NE
4T H
7TH ST NE
6TH AVE NE
2ND ST NE
6TH AVE NE
4TH ST NE
1ST ST NE
LAKE ST
NW
Approximate Permanent
Impacts Below OHWM
Impact Area
6TH AVE NE
1ST ST NW
5TH AVE
WALDERS ST
4TH ST NW
6TH AVE NW
3RD ST NW
7TH AVE NE
AVE
NE
4TH AVE NE
NW
£
¤
£
¤
83
83
6TH ST NE
3RD ST SE
3RD ST NW
VE
DA
3R
NW
4TH ST
2ND AVE NE
NE
I
7 TH ST
1ST AVE NE
SW
VE
TA
S
1
Imagery Source: USDA NAIP Imagery 2014
1ST AVE SW
150
300
600
Feet
5TH ST NE
4TH ST NE
2ND ST SE
L
TR A
CEN
AVE
1ST ST SE
CENTRAL AVE
1ST AVE SE
3RD ST SE
AV
W
EN
MAIN ST S
1ST
1ST ST SE
0
1ST ST SW
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:42 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-1 - Phase 1 OHWM Impacts.mxd User: kac2
NE
AVE
4TH
Figure 4-1
1ST AVE SE
PHASE 1 OHWM IMPACTS
Mouse River Enhanced Flood
Protection Project
HS
T SW
Approximate Permanent
Impacts Below OHWM
Approximate Temporary
Impacts Below OHWM
SW
- CT
T
1ST AVE SW
A
K
DS
DR
O
22N
SW
T SW
Project Footprint
WESTFIELD AVE
VE S
2ND A
28
TH
ST
S
TH
26
Impact Area
CENTRAL AVE W
24TH ST SW
25TH ST SW
30
T
CENTRAL AVE W
1ST AVE SW
Ordinary High Water Mark
18TH ST NW
19TH ST NW
20TH ST NW
22ND ST NW
23RD ST NW
24TH ST NW
2ND AVE NW
AVE W
N
H ST SW
16T
27TH ST NW
25TH ST NW
3R
D
- LN
2ND AVE
W
SW
- CT
3RD AVE SW
RIO
FOREST R
D
5TH AVE SW
5TH AVE SW
5TH AVE SW
17TH ST SW
18TH ST SW
21ST ST SW
SW
ST
D
22
N
7TH AVE SW
D EL
- CT
25TH ST
CAMINO
6TH AVE SW
8TH AVE SW
R
R
D
I
16
TH
FO
T
ES
-L
N
7TH AVE SW
ST
SW
0
300
600
1,200
ACCESS RD
Feet
£
¤
B2
11TH AVE SW
£
¤
B2
-B
- DR
18TH ST SW
27TH ST SW
SW
28TH ST SW
12TH ST
SW
SW
ST
E
12TH AV
TH
£
¤
2 Source: USDA NAIP Imagery 2014
Imagery
- RD
13
29TH ST SW
LVD
Barr Footer: ArcGIS 10.4.1, 2017-05-01 20:04 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-2 - Phases 2 and 3 OHWM Impacts.mxd User: kac2
SW
R
B83
4TH AVE SW
-D
£
¤
24TH ST SW
4TH AVE SW
Figure 4-2
PHASES 2 AND 3 OHWM
IMPACTS
Mouse River Enhanced Flood
Protection Project
HS
T SW
18TH ST NW
19TH ST NW
20TH ST NW
22ND ST NW
23RD ST NW
24TH ST NW
2ND AVE NW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Permanent Wetland
Impacts
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Temporary Wetland
Impacts
Project Footprint
SW
- CT
T
1ST AVE SW
A
K
DS
DR
O
22N
SW
!
!
!
!
!
!
Impact Area
WESTFIELD AVE
VE S
2ND A
28
TH
T SW
!
!
!
!
!
!
CENTRAL AVE W
24TH ST SW
25TH ST SW
30
T
ST
S
TH
26
!
!
!
!
!
!
Field Delineated Wetlands
CENTRAL AVE W
1ST AVE SW
AVE W
N
H ST SW
16T
27TH ST NW
25TH ST NW
3R
D
- LN
2ND AVE
W
SW
- CT
3RD AVE SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
FOREST R
D
21ST ST SW
SW
ST
D
22
N
7TH AVE SW
!
!
!
!
!
17TH ST SW
!
!
!
!
!
5TH AVE SW
5TH AVE SW
5TH AVE SW
6TH AVE SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
8TH AVE SW
7TH AVE SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
R
R
D
I
16
TH
FO
T
ES
-L
N
RIO
18TH ST SW
D EL
- CT
25TH ST
CAMINO
ST
SW
0
300
600
1,200
Feet
ACCESS RD
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
! ! ! ! ! ! !
!
!
! !
! !
! !
! !
!
!
£
¤
B2
11TH AVE SW
£
¤
B2
-B
- DR
18TH ST SW
27TH ST SW
SW
28TH ST SW
12TH ST
SW
SW
ST
E
12TH AV
TH
£
¤
2 Source: USDA NAIP Imagery 2014
Imagery
- RD
13
29TH ST SW
LVD
Barr Footer: ArcGIS 10.4.1, 2017-05-01 20:04 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-3 - Phases 2 and 3 Wetland Impacts.mxd User: kac2
SW
R
B83
4TH AVE SW
-D
£
¤
24TH ST SW
4TH AVE SW
Figure 4-3
PHASES 2AND 3 WETLAND
IMPACTS
Mouse River Enhanced Flood
Protection Project
Ordinary High Water Mark
Approximate Permanent
Impacts Below OHWM
Project Footprint
2ND AVE SW
CAM
I NO
REA
L
L RIO
T SW
37TH
S
£
¤
B83
TH
36
ST
SW
Barr Footer: ArcGIS 10.4.1, 2017-05-12 15:10 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-4 - Tierrecita Vallejo OHWM Impacts.mxd User: kac2
36T
HS
TS
W
CAMINO DE
37T
I
HS
T SW
0
175
350
700
Feet
ACCESS RD
Figure 4-4
Imagery Source: USDA NAIP Imagery 2014
TIERRECITA VALLEJO
OHWM IMPACTS
Mouse River Enhanced Flood
Protection Project
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Permanent Wetland
Impacts
Temporary Wetland
Impacts
Field Delineated Wetlands
Field Verified Wetlands
2ND AVE SW
Project Footprint
CAM
I NO
REA
L
L RIO
T SW
37TH
S
£
¤
B83
TH
36
ST
SW
Barr Footer: ArcGIS 10.4.1, 2017-05-12 15:10 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-5 - Tierrecita Vallejo Wetland Impacts.mxd User: kac2
36T
HS
TS
W
CAMINO DE
37T
HS
T SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
I
!
!
!
!
!
!
!
!
!
!
0
175
350
700
Feet
ACCESS RD
Figure 4-5
Imagery Source: USDA NAIP Imagery 2014
TIERRECITA VALLEJO
WETLAND IMPACTS
Mouse River Enhanced Flood
Protection Project
NW
4TH AVE NW
10TH ST NW
4TH AVE NW
4TH AVE NE
Ordinary High Water Mark
3RD ST NW
9TH ST NW
Approximate Permanent
Impacts Below OHWM
3RD AVE NW
6TH ST NW
5TH ST NW
2ND AVE NW
8TH ST NW
10TH ST NW
Project Footprint
NW
4TH ST
2ND AVE NW
7TH ST NW
4TH AVE
1ST AVE NW
1ST AVE NW
CENTRAL AVE W
6TH ST SW
CENTRAL AVE W
1ST AVE SW
1ST AVE SW
SW
VE
A
T
1S
£
¤
£
¤
83
83
2ND A
V
E RD
LAN
FIRE
E SW
2ND AVE SW
N
E
W
Imagery Source: USDA NAIP Imagery 2014
5TH ST SW
8TH ST SW
MAPLE AVE
5TH AVE SW
6TH AVE SW
B2
0
175
350
700
Feet
3RD ST SW
¤
£
¤ £
6TH ST SW
3RD AV E SW
B2
I
1ST ST SW
ER
ST
E
AV
4TH ST SW
MAPLE AVE
Barr Footer: ArcGIS 10.4.1, 2017-05-01 20:03 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-6 - Maple Avenue High-Flow Diversion OHWM Impacts.mxd User: kac2
CENTRAL AVE
5TH AVE SW
5TH AVE SW
Figure 4-6
6TH AVE SW
MAPLE AVENUE HIGH-FLOW
DIVERSION OHWM IMPACTS
Mouse River Enhanced Flood
Protection Project
NW
4TH AVE NW
4TH AVE NW
4TH AVE NE
!
!
!
!
!
!
10TH ST NW
!
!
!
!
!
!
!
!
!
!
!
!
3RD ST NW
9TH ST NW
3RD AVE NW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Permanent Wetland
Impacts
6TH ST NW
5TH ST NW
2ND AVE NW
8TH ST NW
10TH ST NW
Project Footprint
NW
4TH ST
2ND AVE NW
1ST AVE NW
1ST AVE NW
-B
CENTRAL AVE W
D
LV
CENTRAL AVE
6TH ST SW
- BLVD
CENTRAL AVE W
1ST AVE SW
1ST AVE SW
SW
VE
A
T
1S
£
¤
£
¤
83
83
2ND A
V
E RD
LAN
FIRE
E SW
2ND AVE SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
1ST ST SW
E
W
3RD AV E SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
¤
£
¤ £
Imagery Source: USDA NAIP Imagery 2014
8TH ST SW
MAPLE AVE
5TH AVE SW
6TH AVE SW
B2
5TH ST SW
B2
6TH AVE SW
I
0
175
350
700
Feet
3RD ST SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
N
6TH ST SW
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
ER
ST
E
AV
4TH ST SW
MAPLE AVE
Barr Footer: ArcGIS 10.4.1, 2017-05-01 20:03 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-7 - Maple Avenue High-Flow Diversion Wetland Impacts.mxd User: kac2
!
!
!
!
!
!
Field Delineated Wetlands
7TH ST NW
4TH AVE
5TH AVE SW
5TH AVE SW
Figure 4-7
MAPLE AVENUE HIGH-FLOW
DIVERSION WETLAND
IMPACTS
Mouse River Enhanced Flood
Protection Project
4.2.2
No-Action Alternative
Under the No-Action Alternative, surface water resources would continue to function as they have
historically during large flood events. Flows less than 10,000 cfs would generally be confined within the
existing levees. Some flood-fighting measures would be necessary to close gaps and raise low spots in the
existing levees where the top elevations are lower than the 10,000 cfs inundation profile.
4.2.2.1
Souris River
Flood fighting efforts to 10,000 cfs would minimize property damage behind existing levees. With the NoAction Alternative, the Souris River would begin overtopping some existing levee systems at flows
between 10,000 cfs and 15,000 cfs, causing flood-related damages to public infrastructure and private
properties behind the levees.
Preventing flooding behind the existing levees could cause water surface elevations to increase up to 0.5
feet both upstream and downstream of areas included in the flood fight. Increases in water surface
elevation depend on the magnitude of a given flood and would most likely occur for flood events that
peak in the 8,000 cfs to 10,000 cfs range.
The No-Action Alternative would continue to cause riverbank erosion during large flood events, but not to
any levels that would be expected to alter the impairment status or existing impoundment functions
along the Souris River.
4.2.2.2
Floodplain
Floodplain areas would remain unchanged under the No-Action Alternative. Minot and neighboring
communities successfully fought floods to 10,000 cfs during the early stages of the 2011 flood. The flood
fight to 10,000 cfs would consist primarily of filling in low spots in the existing levee system. These
emergency measures would be outside of the effective regulatory floodplain.
Much of the area that was inundated during the 2011 flood are anticipated to be in the new regulatory
floodplain, requiring thousands of property owners to purchase flood insurance. Once the new regulatory
floodplain is made effective, some of locations where temporary fill is currently placed during a flood fight
would be in the new floodplain and floodway.
4.2.2.3
Wetlands
The No-Action Alternative could result in direct but temporary impacts to wetlands if flood fighting
measures require placement of fill (i.e., sand bags, temporary levees, etc.) directly in wetland areas. During
flood events greater than 10,000 cfs, wetlands outside the existing levees would become inundated.
Wetlands that are inundated with either more water or for longer duration than usual may be vulnerable
to seasonal vegetation die-off or transition to different wetland plant community types.
195
4.3
4.3.1
Biological Resources
Requester's Preferred Alternative
4.3.1.1
General Impacts and Mitigation Measures
Constructing, operating, and maintaining the Requester's Preferred Alternative could temporarily and
permanently affect biological resources, as described below.
Vegetation
The Requester's Preferred Alternative would both temporarily and permanently affect plant communities
in the project area. These effects would be both adverse and beneficial.
Removing existing plant communities for clearing, grading, excavating, or constructing Project features
would permanently and adversely affect vegetation. Details of construction-related vegetation removal
are provided in Section 2.1.11.2. While plant communities are generally low quality throughout the project
area, construction would result in the loss of up to 61 acres of land with desirable forest or moderate tree
cover, including deciduous, coniferous, and mixed forest communities. These trees provide habitat for
nesting birds, insects, and small mammals. In addition, trees near the Souris River can provide shade over
the river, reducing water temperatures and improving fish habitat. Mitigation could be required for the
loss of forested areas.
Loss of marginal plant communities would be partially offset by the potential expansion and recovery of
native plant communities elsewhere within the project area. Site restoration and revegetation is discussed
in Section 2.1.11.2. As noted in Section 4.2.1.1, vegetation clearing under the Requester's Preferred
Alternative could also change the composition of Souris River aquatic plant communities, due to both
increased light penetration and subsequent localized increases in water temperatures. In general, this
would reduce the quality of habitat for fish and other aquatic species.
In addition, indirect permanent adverse impacts could result from the potential alteration of hydrology
and nutrient and sediment deposition within existing plant communities. The Requester's Preferred
Alternative's alteration of the existing seasonal flood regime could potentially change the frequency and
location of flooding in plant communities along the project area. This in turn could potentially alter the
current patterns of sedimentation and supply of nutrients to plant communities along the project area,
which could lead to long-term change in the species composition.
Finally, the Requester's Preferred Alternative would result in permanent adverse effects that indirectly
promote the spread of non-native species. Similar to effects resulting from hydrology and
nutrient/sediment deposition, the Requester's Preferred Alternative's alteration of the existing seasonal
flood regime could influence the spread and abundance of non-native plant species. This type of
permanent effect would be adverse if it resulted in the establishment of non-native species in areas where
they currently do not exist, or are present in low-percent coverage. Non-native species can be aggressive
competitors with native plant species, reducing or eliminating native species cover. Native plant
communities have evolved over tens of thousands of years, and typically comprise many different species.
Native wildlife species have evolved with the native plant communities, and are adapted to the habitats
196
they provide. Therefore, when native plant species are reduced or eliminated from the vegetative cover,
there is not only a decline in plant diversity, but also a reduction in the number of wildlife species present.
For this reason, disturbed areas will be minimized and re-seeded with native species mixtures.
Ten non-native invasive species are aggressive to the point of being listed by the North Dakota
Department of Agriculture (NDDA) as "noxious weeds." Under state law, noxious weeds must be
controlled [reference [32]]. Four of the listed noxious weed species occur along Souris River from
Burlington into Minot [reference [31]]. The two most prevalent noxious weeds along Souris River between
Burlington and Minot are leafy spurge (Euphorbia elusa) and Canada thistle (Cirsium arvense). Both of
these species are known to reduce crop yields and can also injure or, in the case of leafy spurge, poison
livestock. Two other listed noxious weeds mapped along Souris River are absinthe wormwood (Artemisia
absinthium) and Dalmatian toadflax (Linaria genistifolia).
In addition to the North Dakota noxious weed list, the NDGF administers the Aquatic Nuisance Species
(ANS) Rules, designed to prevent the introduction of undesirable species of aquatic plants and animals.
Contractors and subcontractors working on construction of the Project will be required to contact the
NDGF ANS biologist to obtain guidance on required measures for preventing the transfer of ANS between
North Dakota waters of the state. Contractors and subcontractors will also be required to contact the
NDGF ANS biologist to schedule inspections of any and all vehicles, vessels, pumps and equipment that
will be used in or on the waters of the state prior to those items being launched or placed in the water.
Overall, impacts related to the spread of non-native plant species would likely be minor and would not
differ significantly from the current spread of non-native plant species within the existing project area.
Temporary adverse impacts to vegetation from the Requester's Preferred Alternative could also be caused
by additional clearing and grading required outside of the permanent project features for construction of
temporary workspaces, soil stockpiling, and contactor and equipment yards. In addition to these effects of
clearing, this temporary construction could potentially cause soil erosion and sedimentation of surface
waters and adjacent riparian areas. These temporary construction impacts could, however, be avoided or
minimized by using BMPs, as discussed in Section 4.1.1.1.
Fish and Wildlife
The Requester's Preferred Alternative would require that Project features be constructed within the Souris
River floodplain or floodway. These changes could result in alterations to natural elements that currently
provide fish habitat such as dominant vegetation, light penetration, and current velocities. However, these
changes are not expected to be significant, nor would they alter the in-stream aquatic environment in a
manner that would preclude fish and other aquatic organisms from using the river. The current
distribution and abundance of fish species and other aquatic organisms in the Souris River would not be
notably altered.
Utilities would be relocated across the river, requiring in-stream construction using cofferdams. This
would result in temporary indirect adverse effects on fish and other aquatic organisms, due to temporary
re-suspension of sediment and minor alteration of flow patterns. For fish species, these impacts are
197
unlikely to result in any meaningful loss of fish. For smaller, less mobile aquatic organisms (e.g.,
macroinvertebrates), individuals could potentially be lost. The magnitude of the loss is, however, expected
to be minor, and would not significantly alter the size and distribution of macroinvertebrates or other
smaller aquatic organism populations.
The Project would require extensive placement of erosion and scour protection measures (e.g., riprap). In
some stretches, the river channel would be almost completely lined with riprap. While the placement of
riprap has been shown to have both beneficial and detrimental impacts to aquatic habitat, it is likely to
have an overall adverse effect on the presence of fish and aquatic organisms.
Riprap directly affects habitat by altering the character of the substrate and riparian/aquatic associations
(reference [74]). Overall, riprap reduces habitat for breeding, spawning, nesting, and feeding for most fish
species. Riprap is less effective than natural cover for most fish species to escape or hide from predators,
and can also provide shelter for predators waiting for prey. The placement of riprap during construction
would cover substrate and the associated benthic organisms such as native mussels and other
invertebrates. However, riprap would quickly be colonized by aquatic invertebrates after completion of
rock placement. The placement of the fill would displace fish currently in the areas. However, fish would
quickly return following placement.
Riprap can, however, have a beneficial effect on certain species that favor spaces between rock surfaces,
such as smaller fish (minnows, etc.) and macroinvertebrates (reference [74]). The effect of riprap as shelter
is therefore variable. At a larger scale (e.g., stream reaches) riprap can have positive effects by creating
preferred habitat for some species, but can have negative effects by eliminating natural habitats and
vegetated banks favored by other species (reference [74], reference [75]). Where riprap is placed over
large areas of the river channel and banks, there would be a permanent adverse effect on aquatic habitat.
In addition, banks lined with riprap typically do not support the types of vegetation communities found
along natural banks. As a result, riprap banks provide reduced habitat for plant and wildlife species that
prefer riparian and streambank habitats. Riprap also impedes the movement of wildlife that frequently
move between terrestrial and aquatic habitats; examples include turtles, waterfowl, muskrats, etc.
Overbank excavation to provide additional storage in the floodplain could also have adverse impacts to
fish by providing more areas for them to become stranded during high water. Fish can become stranded
when they move into flooded areas outside of the main stream channel during flood events, and are left
with insufficient water depth to return to the channel as the flood waters recede. Incidences of fish
stranding would be related to the periodicity and magnitude of flood events. Incidence of fish stranding
would not, however, be expected to result in significant declines in fish populations.
It is anticipated that work would not take place in the river channel between April 15 and June 1 to
protect fisheries resources unless emergency conditions are present or the work activity has been
coordinated with the NDGF.
Despite the adverse impacts of the Requester's Preferred Alternative to fish and wildlife, some benefits
would result in these resource areas from the green spaces that would be created between levee setbacks.
198
This additional green space would allow the Souris River to better connect to its natural floodplain and
create enhanced opportunities for wildlife movement along the corridor.
There would be minor, temporary losses of wildlife habitat expected with the construction of the
Requester's Preferred Alternative. It is anticipated that wildlife would use adjacent similar habitats during
the construction of the Project and that many species would quickly recolonize the area of impact soon
after Project completion.
Endangered and Threatened Species
There are six federally endangered, threatened, or candidate species known to occur in Ward County. Of
these, there may be potential habitat in the project area for the Dakota skipper and northern long-eared
bat. However, preventative measures would be taken to avoid any direct impacts and there would be no
effect on either species.
The Dakota skipper is a species of butterfly known to occur in various patches of native grasslands in the
vicinity of the Requester's Preferred Alternative. Sites with moderate to high quality native vegetation will
be avoided during construction and during the acquisition of borrow material to prevent any adverse
effects to the species.
The presence of the northern long-eared bat has not been confirmed in the project area. However, it is
possible that they may use some of the mature trees in the project area during the summer months. To
avoid any harm to the bat, tree clearing will be limited to the winter months, when they are hibernating in
caves or mines. No designated critical habitat is present within the project area for either federally-listed
species. Winter tree clearing and habitat avoidance will be used to avoid any adverse impact to the
northern long-eared bat and the Dakota skipper. The determination of "no effect" was concluded for
these species after informal consultation with the USFWS. Potential Impacts on Specific Unique and
Sensitive Resources
National Wildlife Refuges
There are five NWRs within 50 miles of the project area, including the Upper Souris NWR, the Des Lacs
NWR, the J. Clark Salyer NWR, the Wintering River NWR, and the Cottonwood Lake NWR (Section 3.3.3).
The Upper Souris NWR and Des Lacs NWR are located far enough upstream of the Project that they
would not be unaffected by Project features. The J. Clark Salyer NWR is approximately 70 river miles
downstream of the project area. Changes to the flood profile caused by the Requester's Preferred
Alternative attenuate well before the J. Clark Salyer NWR. The Wintering River and Cottonwood Lake
NWRs would be unaffected by the Requester's Preferred Alternative because there are no direct or
indirect hydrologic connections between the Souris River and these NWRs.
Nesting Birds
Migratory birds, as well as their nests and eggs are protected under the Migratory Bird Treaty Act (MBTA)
of 1918. Under the MBTA, it is illegal to remove an active, occupied bird nest. Construction of the Project
could potentially affect use of trees, shrubs, or ground vegetation in the project area by nesting birds.
199
During construction, it is anticipated that nesting birds would temporarily avoid using any otherwise
preferred nest sites within the active construction area. It is expected that nesting birds would resume use
of preferred nest sites within the project area once construction was completed. Permitting for the Project
would include conditions to avoid or minimize disturbance of bird nests, including fall and winter tree
clearing. Overall, there may be minor, temporary adverse effects resulting from construction-related
clearing.
There would also be potential effects on nesting birds that use bridges in the project area, specifically cliff
swallows and rock pigeons (Section 3.3.2). During construction of the Requester's Preferred Alternative,
nesting birds might be less likely to congregate and nest at bridge sites close to active construction. The
magnitude of this effect would vary between bridge structures. As noted in Section 3.3.2, use of the
bridge structures as nest sites in the Project area varies widely by location and species. Moreover, it is
expected that cliff swallows and rock pigeons would go back to using bridge structures within the project
area once construction was completed. Some of the bridges would, however, be modified as part of
future phases of the Project. These modifications would also result in the temporary abandonment of the
bridge nesting sites. Potential permanent loss of a bridge or bridges as nesting sites could also occur if
the modifications result in unfavorable conditions.
4.3.1.2
Site-Specific Impacts for Construction Stage 1.5
Phase 1-3 (Fourth Avenue NE, Napa Valley, and Forest Road)
The Requester's Preferred Alternative is not expected to affect specific biological resources in the Fourth
Avenue NE (Phase 1), Napa Valley (Phase 2), or Forest Road (Phase 3) areas because there is relatively little
native vegetation and limited fish and wildlife habitat in these areas. As discussed above, the dominance
of non-native and or invasive vegetation in the project area supports a less-diverse assortment of plant
and wildlife species, most of which are common and habituated to urbanized or developed habitats. As a
result, further development of the project area would have little impact on the existing biological
resources.
Other Phases of Construction Stage 1.5
The other phases of Construction Stage 1.5 are also not expected to significantly affect specific biological
resources because there is relatively little native vegetation and limited fish and wildlife habitat in these
areas.
Construction of the levee for Tierrecita Vallejo segment would result in minor impacts on fish habitat
within the river. The Maple Avenue High-Flow Diversion would affect fish habitat in the river during
construction and operation of the river closure structures. This diversion would only be used when flows
exceed 3,000 cfs (an approximately 15-year flood). During flows less than 3,000 cfs, the river would flow
through the main channel and continue to provide habitat for fish and other aquatic organisms. During
flood flows, the river channel would be temporarily closed off. Fish and other aquatic organisms may
experience restricted movement during these closures, but such occurrences would be infrequent and of
limited duration.
200
4.3.2
No-Action Alternative
Potential impacts to vegetation, fish, and wildlife would be the same as currently experienced for flood
scenarios of 5,000 cfs and 27,400 cfs. Emergency flood fighting efforts for flows over 5,000 cfs could result
in the placement of sandbags or fill material in wetland or upland vegetation communities, resulting in
temporary disturbance to these areas.
4.3.2.1
General Impacts
Vegetation
High-water events would continue to have mostly minor impacts on vegetation communities. Effects
would include potential loss of trees and shrubs due to high flow velocity or prolonged inundation.
Depending on the timing and duration of high-water events, there would also be potential disruption in
seasonal reproductive cycles (e.g., flowering or seed production). These impacts would be temporary, as
the majority of the plant community types in the project area have adapted in some degree to periodic
flooding and episodic inundation. The magnitude of the impacts to vegetation under the No-Action
Alternative would be expected to increase along a gradient between the 10,000 cfs flow condition and the
27,400 cfs flow condition.
Fish and Wildlife
Under the No-Action Alternative, wildlife species in the project area would be periodically displaced
during high water events, and fish species would temporarily relocate to slower backwaters off of the
main channel. Periodic high water events and their resulting effects on fish and wildlife are naturally
occurring and not necessarily adverse impacts, For instance, certain fish species respond favorably to
flooding as spawning and forage conditions are improved with the inundation of the floodplain. The
magnitude and duration of the impacts under the No-Action Alternative would be expected to increase
between the 10,000 cfs flow condition and the 27,400 cfs flow condition. Fish stranding under the NoAction Alternative would be larger under the 27,400 cfs flow conditions than under the 5,000 cfs or 10,000
cfs flow conditions as fish could stray further from the river channel. However, foraging and spawning
opportunities could be improved.
4.4
4.4.1
4.4.1.1
Land Use and Infrastructure
Requester's Preferred Alternative
General Impacts and Mitigation Measures
The following discussions of general impacts and mitigation measures apply to all phases of the
Requester's Preferred Alternative and are therefore not repeated in the "Site Specific Impacts"
subsections, unless there are more prominent unique resources or features that have been determined to
be sensitive or significant.
Existing/Potential Land Use
Constructing, operating, and maintaining the Requester's Preferred Alternative could both positively and
negatively affect existing and potential land use, as discussed below.
201
Construction of the proposed flood risk-reduction features would affect agricultural, commercial,
industrial, residential, and recreational land use by permanently converting those lands into use for flood
risk-reduction. FEMA is presently in the process of designating a new 100-year floodplain, and the new
floodplain designation would also affect the existing land use classifications in the project area.
The land directly adjacent to the Souris River channel, within the footprint of the Requester's Preferred
Alternative, is designated as future greenway and is a flood risk-reduction strategy designed to create a
community asset (reference [76] and reference [58]). The greenway would provide opportunities to
connect new open space and provide recreational amenities and opportunities for Minot (reference [42])
and the rest of the region while also providing additional flood storage.
Construction operations, temporary work easements, and staging of equipment would temporarily affect
land use to a small extent and would result in temporary detours and disruption to regular use and access
to residential-, recreational-, commercial-, or industrial-use properties. After construction has been
completed, land uses would generally be restored to pre-project conditions.
The Requester's Preferred Alternative would sustain and encourage use of land in the project area by
providing significant future flood risk reduction. Economic benefits of the Requester's Preferred
Alternative are discussed in Section 4.6.1.
Infrastructure
Flood Risk-reduction Infrastructure
The Requester's Preferred Alternative would modify the existing flood risk-reduction features along the
river and significantly improve the flood risk-reduction infrastructure in the project area. New levees,
floodwalls, high-flow bypasses, channel realignments, river and transportation closure structures, pump
stations, and overbank excavations would be constructed from Burlington to downstream of Minot. Many
of these features would be constructed within the rights-of-way of existing flood risk-reductions
structures, while others will be constructed in new areas. Section 2.0 describes major components of the
Requester's Preferred Alternative for each of the segments within the project area.
Transportation
A significant goal of the Requester's Preferred Alternative is to provide an operable and reliable
transportation system during and after a flood event similar to the 2011 flood. The Requester's Preferred
Alternative would substantially improve the flood risk-reduction infrastructure in the project area. It would
also permanently and significantly benefit the roadway network by allowing transportation of essential
goods, services, and the facilitation of emergency response during flood events.
Construction of the Requester's Preferred Alternative would temporarily disrupt traffic patterns,
connectivity, and accessibility to destinations within the project area. Closures of transportation routes
would also affect traffic flow on neighboring streets. These temporary adverse effects would be minor if
mitigated with proper signage, detours, and rerouting, as described below in the Mitigation Measures.
202
Roadways
The Requester's Preferred Alternative would permanently and significantly benefit the roadway network in
the project area. It would protect and enhance a network of principal arterial corridors (U.S. Highways 2,
52, and 83, and their bypasses) that would allow transportation of essential goods and services and
facilitate emergency response during flood events. Permanent adverse impacts to transportation would be
minor, and primarily limited to localized areas where streets would be realigned to accommodate the
flood risk-reduction features.
Bridges
Proposed bridge modifications would include horizontal and vertical realignments, roadway approaches,
and channel alterations. Four bridges (Colton Avenue bridge, U.S. Highway 83 Bypass bridge, Burdick
Expressway bridge, and U.S. Highway 2 bridge) would be modified so they could remain open during the
27,400 cfs flood event. Site-specific review of future phases would provide more detailed discussions on
the effects of bridge modifications.
Railways
The Requester's Preferred Alternative would protect significant portions of the Burlington Northern Santa
Fe and Canadian Pacific Railway tracks and operations during flood events, by installing railroad closure
structures where levees or floodwalls cross the railroad tracks. When in operation, these structures would
interrupt through-service rail activities, but physically would remain mostly intact. Sections of both
railways would remain outside the Requester's Preferred Alternative line of protection and would continue
to be subject to flooding. The railroads would have to approve any flood risk-reduction features sited on
railroad property or rights-of-way.
Public Transit Systems
Construction of the Requester's Preferred Alternative could temporarily disrupt public transit systems.
Effects on these transportation resources would minor and limited to the duration of each construction
phase.
Airports
The Requester's Preferred Alternative would not directly affect the Minot International Airport or Minot Air
Force Base. People, goods, and services, could continue to travel to and from the airports during flood
events via the enhanced transportation network
Utilities
The Requester's Preferred Alternative would significantly benefit both public and private utilities by
providing greater flood resilience, upgraded stormwater management, and improved infrastructure.
The Requester's Preferred Alternative would temporarily disrupt the services of both public and private
utilities, particularly during relocation of utilities that penetrate the levee. These adverse impacts would be
minor and could be mitigated through careful planning. Affected utilities on specific parcels and the
corresponding relocations and modifications to this infrastructure would be identified during final design
203
of each phase. It is possible that utilities could be decommissioned to be available for future green space
compatible developments, as needed. Upgraded utilities would be located and constructed to minimize
the risk of pipe leaking or rupture, trench settlement, and other failures, which could negatively affect the
line of protection. In addition, landside valves would be placed on all lines crossing the levees to provide
isolation from the riverside in the event of a line failure (reference [77]).
Private Utilities
The Requester's Preferred Alternative would affect existing private utility infrastructure (e.g., gas,
electricity, and telecommunication services). Relocations and abandonment of gas lines and other utility
infrastructure would be required. As more detailed design is developed, the requester has indicated that
specific mitigation measures would be developed in coordination with affected private utilities.
Water Supply
The Requester's Preferred Alternative would temporarily affect water distribution. Project improvements
would include reconstructing or relocating the affected portions of the water distribution system and
realigning adjacent portions to maintain adequate circulation and water quality (reference [27]).
The Requester's Preferred Alternative would affect portions of the existing 36-inch diameter NAWS line
that conveys potable water from the Minot Water Treatment Plant to the west. Effects of the Requester's
Preferred Alternative on the NAWS line would be minimized to the extent practicable. Sections of the
NAWS line that would be affected include:
The transmission line crossing of the Souris River on the western side of the U.S. Highway 83
Bypass;
Vicinity of the Perkett Pump Station;
The transmission line crossing beneath the levee in the vicinity of the Wee Links Golf Course; and
The transmission line crossing of the Souris River on the northeast side of Sixteenth Street
Southwest.
The 48-inch diameter Sundre raw water line in Minot would be impacted by the Requester's Preferred
Alternative at the following locations:
Minot Water Treatment Plant;
Maple Diversion alignment;
Broadway; and
Along Fourth Avenue N from Broadway to 3rd Street NE.
204
Sanitary Sewer Systems
The Requester's Preferred Alternative would temporarily affect sanitary sewer collection lines and force
mains in the project area. Flood risk reduction improvements would consist of reconstructing the affected
portions of the sanitary sewer system, decommissioning gravity sanitary sewers within the Requester's
Preferred Alternative footprint, and constructing lift stations and force mains that convey wastewater
across the Souris River corridor to wastewater treatment facilities. Associated isolation valves would be
placed on the landside of all force main river crossings.
Storm Sewer Systems
Proposed improvements to storm sewer systems would vary throughout the project area and would be
discussed under site specific reviews. Improvements to stormwater pipes and storage areas would
correspond with roadway realignments and modifications and would accommodate other flood riskreduction features.
Emergency Services
The Requester's Preferred Alternative would indirectly and permanently benefit emergency services in the
project area by improving the transportation network so that major transportation corridors could remain
open during flood events similar to the 2011 flood.
Constructing the Requester's Preferred Alternative would temporarily disrupt existing roadways, which
could cause delays in emergency services. Close coordination of the Project's construction status with
emergency services would ensure these temporary adverse effects would be minor.
Mitigation Measures
Mitigation of Temporary Construction Impacts
Mitigation measures to offset the potential effects of the Requester's Preferred Alternative on land use,
and infrastructure, in the project area could be implemented both during and after the construction
phase.
Implementing the Requester's Preferred Alternative in phases would help confine temporary construction
impacts to smaller areas across the extent of the Project. During the different phases of Project
construction, site-specific mitigation measures would be used.
During construction, contractors could work with public authorities, railways, utilities, and emergency
services to coordinate temporary curtailment of services, and could notify them and others of such
restrictions in advance. Access to transportation services, driveways, and private roads should be kept
open as much as possible, and adequate parking for construction vehicles should be provided. Once
construction has been completed, damaged roadways would be repaired.
Compatibility with Land Use Plans
The requester has indicated that any mitigation measures would be compatible with land use plans and
would be consistent with the short- and long-term goals of the jurisdictions involved. Such plans include:
205
City of Minot's 2012 Comprehensive Plan (reference [42]).
City of Minot's Community Development Block Grant Disaster Recovery Action Plan
(reference [44]).
State of North Dakota Action Plan for Disaster Recovery (reference [43].
North Dakota 2015 State Water Management Plan (reference [45]).
The Uniform Relocation Assistance and Real Property Acquisition Act of 1970 (Uniform Act or
URA) (42 U.S.C. § 61 (2015)).
In accordance with the URA, the Requester's Preferred Alternative must ensure that adequate time,
funding and staffing are available for acquiring real property and for fulfilling other responsibilities under
the Uniform Act. The Requester's Preferred Alternative is consistent with the objectives of the URA, which
include providing uniform, fair, and equitable treatment to persons whose real property is acquired.
4.4.1.2
Unique and Sensitive Land Use and Infrastructure
The Requester's Preferred Alternative is not expected to affect any specific unique or sensitive land use or
infrastructure features aside from recreational facilities (discussed in Section 4.7) and prime farmland
(discussed in Section 4.1).
4.4.1.3
Site-Specific Impacts for Construction Stage 1.5
The following subsections describe unique site-specific impacts to land use and infrastructure that would
be associated with Phases 1 through 3 of the Requester's Preferred Alternative.
Phase 1 Fourth Avenue NE
Existing/Potential Land Use
The existing land use in the Phase 1 area consists of commercial, medium-density residential and open
space (Map 3-5). The Phase 1 footprint of the new levee and floodwall would directly affect portions of
these land uses and change them to flood risk-reduction land use.
Infrastructure
Flood Risk-reduction Infrastructure
New flood risk-reduction features for Phase 1, described in Section 2.1.5.4, would significantly improve the
flood risk-reduction infrastructure in this area.
Transportation
Phase 1 would modify existing streets to accommodate the flood risk-reduction improvements and
maintain access to properties within the affected area. Road closures for floodwall crossings would be
located on Fourth Avenue SW. Phase 1 roadway modifications are shown on Figure 4-8.
206
Phase 1 would permanently benefit this area by protecting transportation systems, public and private
utilities, and emergency services in this area under flood conditions up to 27,400 cfs. The adverse effects
of Phase 1 transportation disruptions would be minor.
Utilities
Phase 1 would replace all public and private utilities along Fourth Avenue from Walders Street to East of
Third Street. Phase 1 would affect private utilities as follows:
Montana-Dakota Utilities - relocations and abandonment of several gas lines, extension of a gas
line across North Broadway south of Fourth Avenue NW, addition of a gas line parallel to Third
Street NE on the western side starting at the intersection of Fourth Avenue NE going south under
the Souris River continuing to Third Avenue NE
Midcontinent Communications - changes to the network
Souris River Telephone - crossings of two lines
Xcel Energy - Removals, modifications, and relocations of primary underground electric lines,
overhead power lines, and underground electric service lines
Phase 1 would permanently benefit utilities by protecting them from future flooding under flood
conditions up to 27,400 cfs. Construction of Phase 1, however, would create temporary disruptions to the
existing utility infrastructure in the project area.
Water Supply
The Requester's Preferred Alternative would replace or relocate a significant portion of the watermain
within the Phase 1 area, with approximately 2,285 feet of 16-inch PVC watermain being installed.
The new watermain would tie into existing watermain at the intersections of North Broadway and Fourth
Avenue NW and Fourth Avenue NE and Third Street NE. Watermains that currently run on First Street NW,
Main Street N, and First Street NE would be shortened to tie into the new alignment.
Phase 1 would permanently and substantially benefit the water supply within the affected area by
improving the existing system and offering enhanced protection from future flood events. Construction of
Phase 1, however, could temporarily disrupt the water supply in the project area.
207
Construction Limits
AVE NE
7TH
4T H
AVE NW
MAIN ST N
83
5TH
£
¤
WALDERS ST
5TH AVE NE
Construction Limits
7TH ST NE
6TH ST NE
5TH AVE NE
Road
Realignment
Road Modifications and
Parking Areas
6TH AVE NE
2ND ST NE
6TH AVE NE
4TH ST NE
1ST ST NE
NW
3RD ST NE
SHIRLEY CT
LAKE ST
6TH AVE NE
1ST ST NW
5TH AVE
WALDERS ST
4TH ST NW
6TH AVE NW
3RD ST NW
7TH AVE NE
AVE
NE
4TH AVE NE
NW
6TH ST NE
3RD ST SE
3RD ST NW
VE
DA
3R
NW
4TH ST
2ND AVE NE
NE
I
7 TH ST
£
¤
83
1ST AVE NE
SW
VE
TA
S
1
Imagery Source: USDA NAIP Imagery 2014
1ST AVE SW
150
300
600
Feet
5TH ST NE
4TH ST NE
2ND ST SE
L
TR A
CEN
AVE
1ST ST SE
CENTRAL AVE
1ST AVE SE
3RD ST SE
AV
W
EN
MAIN ST S
1ST
1ST ST SE
0
1ST ST SW
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:24 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-8 - Phase 1 Roadway Modifications.mxd User: kac2
NE
AVE
4TH
Figure 4-8
1ST AVE SE
PHASE 1 ROADWAY
MODIFICATIONS
Mouse River Enhanced Flood
Protection Project
Phase 2 - Napa Valley
Existing/Potential Land Use
The existing land use in the Phase 2 area is low- and medium-density residential and recreational (i.e.,
parks/open space and golf courses) (Map 3-5). The levee alignment currently extends across the Phase 2
area, along the Souris River. The Requester's Preferred Alternative would convert land currently
designated for recreational (or public) and single-family land uses to flood risk-reduction uses.
Construction activities would temporarily restrict recreational land use in this area. Direct and indirect
effects, and the associated mitigation opportunities, are discussed in more detail in Section 4.7.
Phase 2 would substantially and permanently benefit future land use in the area. Such land use changes
would be compatible with current and potential land uses, and would protect and enhance land use in
this area.
Infrastructure
Flood Risk-reduction Infrastructure
New flood risk-reduction features for Phase 2, described in Section 2.1.5.1, would significantly improve the
flood risk-reduction infrastructure in this area.
Transportation
Phase 2 would modify existing roadways to accommodate the levee alignment and maintain access to
properties within the affected area, as shown on Figure 4-9. Phase 2 would provide significant, permanent
benefits by protecting and improving the transportation systems in this area. Phase 2 would also,
however, temporarily disrupt the transportation network in the project area. The adverse effects of
disrupting transportation in this area would be minor.
209
17TH ST NW
TH
25
ST
SW
T
1ST AVE SW
ST
18
TH
T SW
SW
22N
DS
SW
S
TH
26
28
TH
ST
SW
1ST AVE SW
24TH ST SW
30
T
CENTRAL AVE W
Road Modifications and
Parking Areas
16TH ST SW
18TH ST NW
21ST ST NW
19TH ST NW
20TH ST NW
22ND ST NW
23RD ST NW
24TH ST NW
25TH ST NW
27TH ST NW
HS
T SW
2ND AVE NW
Construction Limits
2ND
2 ND
AVE SW
AVE
SW
ST
D
7th Ave SW Roadway
Modification
6TH AVE SW
22
N
Phase 2 Napa
Valley Area
SW
25TH ST
CENTENNIAL
PARK
Limits
SW
B83
Phase 3 Forest
Road Area
21ST ST SW
£
¤ Construction
Roadway Closure
Structure and 16th Street
SW Road Raise
SOURIS VALLEY
GOLF COURSE
I
WEE LINKS
GOLF COURSE
0
TH
16
ST
B2
300
600
1,200
Feet
SW
£
¤
11TH AVE SW
£
¤
18TH ST SW
D
29TH ST SW
SR
12TH ST SW
CES
£
¤
2 Source: USDA NAIP Imagery 2014
Imagery
28TH ST SW
B2
AC
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:23 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-9 - Phases 2 and 3 Roadway Modifications.mxd User: kac2
4TH AVE SW
Figure 4-9
PHASES 2 AND 3
ROADWAY MODIFICATIONS
Mouse River Enhanced Flood
Protection Project
Utilities
Phase 2 would replace or remove utility infrastructure of several private utilities:
Souris River Telephone (SRT);
Montana-Dakota Utilities (MDU);
Xcel Energy; and
Midcontinent Communications.
Private utilities serving residential properties in the levee footprint would be removed prior to levee
construction. One overhead river crossing would be removed, and another overhead line would be moved
and raised to meet the USACE levee crossing requirements.
Phase 2 would permanently benefit utilities by protecting them from future flooding under flood
conditions up to 27,400 cfs. Construction of Phase 2, however, would create temporary disruption to the
existing utility infrastructure in the project area.
Water Supply
The Requester's Preferred Alternative would reconstruct all water and sanitary sewer lines crossing the
proposed levees, with the exception of the existing Northwestern Area Water Supply (NAWS) line, for
which modifications would be limited to "in-place" casing and installation of isolation valves. Water and
sanitary sewer lines that would be located beneath the proposed levees have been designed to meet
USACE standards.
Phase 2 flood risk-reduction improvements would significantly benefit the water supply within the
affected area by improving the existing system and offering enhanced protection from future flood
events.
Phase 3 - Forest Road
Existing/Potential Land Use
The existing land use in the Phase 3 area is low-density residential (Map 3-5). The Requester's Preferred
Alternative would convert some of this land to flood risk-reduction uses, but would substantially and
permanently benefit future land use in the area. This area is already subject to development consistent
with the existing federal project. Such land use changes would be compatible with current and potential
land uses.
211
Infrastructure
Flood Risk-reduction Infrastructure
New flood risk-reduction features for Phase 3, described in Section Error! Reference source not found.,
would significantly improve the flood risk-reduction infrastructure in this area.
Transportation
Phase 3 would modify existing roadways to accommodate the levee alignment and maintain access to
properties within the affected area, as shown on Figure 4-9. Phase 3 would provide significant, permanent
benefits by protecting and improving the transportation systems in this area. Phase 3 would also,
however, temporarily disrupt the transportation network in the project area, but the adverse effects of
disrupting transportation in this area would be minor.
Utilities
Phase 3 would replace or remove some of the public and private utilities in the area, affecting the same
private utilities affected by Phase 2. One Xcel Energy overhead transmission line river crossing would be
removed, and another overhead line would be moved and raised to meet the USACE levee crossing
requirements. Multiple utilities are buried along the shoulder of the Highway 83 Bypass. Utilities crossing
under the levee are designed based on USACE EM 1110-2-1913. Discussions are ongoing with the Project
requester and private utilities that would be affected by the Phase 3 flood risk-reduction improvements.
The Basis of Design Report (reference [4]) provides information regarding modification, relocation,
removal, and general mitigation of these utilities.
Phase 3 would permanently benefit utilities by protecting them from future flooding under flood
conditions up to 27,400 cfs. Construction of Phase 3, however, would create temporary disruption to the
existing utility infrastructure in the project area.
Water Supply
All water and sanitary sewer lines crossing the proposed levees would be reconstructed with the
exception of the existing NAWS line, as described in the Phase 2 site-specific impacts, above.
Other Phases of Construction Stage 1.5
Potential site-specific impacts to land use and infrastructure for the other three phases of Construction
Stage 1.5 are based on conceptual plans for the Tierrecita Vallejo, Maple Avenue High-Flow Diversion, and
the Tieback Levee phases. The following review is limited and based on the degree of detail available at
this time for these segments.
Existing/Potential Land Use
The existing land uses in the areas of the Tierrecita Vallejo, Maple Avenue High-Flow Diversion, and
Tieback Levee phases are agricultural, residential, light industrial, and commercial (Map 3-5). The
Requester's Preferred Alternative would substantially and permanently benefit future land use in the area.
The other three phases of Construction Stage 1.5 would impact land use directly within the Project
footprint and would convert some of this land outside of the existing federal project to flood risk212
reduction uses, though the existing land use pattern in adjacent areas are not expected to change. This
area is already subject to development consistent with the existing federal project. Such land use changes
would be compatible with current and potential land uses.
Infrastructure
Flood Risk-Reduction Infrastructure
New flood risk-reduction features for the other three phases of Construction Stage 1.5, described in
Section 2.1.4, Section 2.1.5.4, and Section 2.1.5.6, would significantly improve the flood risk-reduction
infrastructure in these areas. Once constructed, these phases would tie in with Phases 1-3 and provide a
continuous line of flood protection to the Tierrecita Vallejo community in western Minot through eastcentral Minot.
Transportation
The other three phases of Construction Stage 1.5, described below, would modify existing roadways to
accommodate the new flood risk-reduction features and maintain access to properties within the affected
areas. These phases would provide significant, permanent benefits by protecting and improving the
transportation systems in these areas. They would temporarily disrupt and permanently alter the
transportation network in the project area, however, the effects would generally be minor.
Tierrecita Vallejo
A closure structure would intersect the Canadian Pacific Railway at the levee tie-in locations along the
western side of this community (Figure 2-2). This would impede through-service rail activities when in
operation during flood conditions greater than 3,000 cfs. When in operation, the railroad closure structure
would protect the Canadian Pacific Railway east of the structure; portions of the railway west of the
structure would continue to be subject to flooding.
Maple Avenue High-Flow Diversion
A new Canadian Pacific Railroad Bridge would be designed and constructed to accommodate increased
flows (Figure 2-4). Second Avenue SW and Sixth Street NW would be reconstructed with roadway closure
structures installed, and roadway terminations at Fifth Street SW, Seventh Street SW, Central Avenue W,
and First Avenue W would be required to accommodate new flood risk-reduction features.
Tieback Levee
Fifth Avenue NE would be realigned and shifted slightly to the north to accommodate the levee footprint,
which would tie into the eastern end of the Phase 1 floodwall and extend east near the intersection of
Thirteenth Street NE and Fifth Avenue NE (Figure 2-5). The Tieback Levee would protect the
transportation system in this area from floods up to 10,000 cfs, but would be overtopped during 27,400
cfs. Transportation impacts for larger flood flows would not be as excessive as that during the 2011 event
because of the other Project phases that would have already been implemented.
213
4.4.2
No-Action Alternative
The following subsections describe potential impacts to land use and infrastructure of the No-Action
Alternative. Potential impacts under 5,000 cfs, 10,000 cfs, and 27,400 cfs flow conditions were considered.
The No-Action Alternative, and the associated inundation areas for these flow conditions are described in
Section 2.2.5.
4.4.2.1
Existing/Potential Land Use
In flood events greater than 10,000 cfs, floodwaters would overtop flood risk-reduction features, adversely
affecting land use in the project area. Potential adverse effects range from minor to significant, increasing
in severity with higher water levels. Under the No-Action Alternative, emergency flood risk-reduction
actions would begin to take place when conditions appear to be favorable for flooding. Temporary land
use limitations would result in the vicinity of these actions and would vary with the intensity and duration
of flooding.
Flood events topping 10,000 cfs would substantially and adversely affect existing and potential land uses.
Flood flows of 10,000 cfs would overtop existing flood risk-reduction elements, and residential,
commercial, industrial, rural (agricultural) and open space would be inundated. In agricultural areas this
could result in erosion and sedimentation which could disrupt seasonal cultivation and crop productivity.
Within urban areas, a 10,000 cfs flood event could result in weeks to months of clean up and restoration.
A flood event of 27,400 cfs would significantly and adversely affect existing and potential land uses. Flood
flows of 27,400 cfs would inundate, erode, and sediment agricultural and open space areas. Destruction
and damage to agricultural equipment and ancillary structures could disrupt crop productivity. Within
urban areas, the flooding of entire neighborhoods and large portions of the communities in the project
area would occur. Many of these properties would become permanently unusable, or too costly to restore,
resulting in permanent an unplanned land use changes. Clean up and recovery from such an event would
take many months and possibly several years.
4.4.2.2
Infrastructure
The No-Action Alternative would provide flood risk-reduction for infrastructure for all flows up to 10,000
cfs. Flows in excess of 10,000 cfs would result in adverse impacts to residential, commercial, industrial, and
recreational properties. Continual exposure to flooding could also adversely affect the structural integrity
of roads and utilities over time.
Under the No-Action Alternative, a flood event of 27,400 cfs would significantly and adversely affect
infrastructure in the affected area, especially in Burlington and in central and west-central Minot. This
alternative would cause long-term disruptions and destruction of the infrastructure in the project area,
resulting in widespread impacts that would be felt regionally and potentially statewide. Significant cleanup and repair efforts could last for months if not years.
With flows of 10,000 cfs and greater, public and private underground utilities would be submerged.
Adverse effects to utilities could include degradation of structural integrity or backflow of floodwaters
214
entering or accumulating through the systems. Services could be disrupted for an extended period, and
subsequently restoring the affected areas could be costly.
Transportation
Under the No-Action Alternative, local, regional, and state governments and agencies would continue to
monitor roadway and traffic circulation conditions, pursuing improvements throughout the project area as
needed. Local roads and bridges near the Souris River would continue to experience localized flooding
and closures during high water conditions.
Primary transportation routes would be accessible with flows up to 10,000 cfs and 27,400 cfs would result
in adverse effects to transportation systems in the affected area. Transportation systems serving local and
regional destinations would be inundated. Access disruptions could last from hours to months depending
on location and the severity of the flood event. Clean-up and repair that could last months or even years.
Alternative transportation routes could be used, but would take longer due to congestion and in many
cases the use of less efficient routes. At flows of 10,000 cfs over half of the bridges along primary
transportation would either have water over the bridge deck or at the approach. At flows of 27,400 all but
one bridge, the U.S. Highway 83 Bypass Bridge, would be affected by water. See Table 4-3 for additional
details.
215
Table 4-3
Accessible/Non-Accessible Primary Routes at 10,000 and 27,400 CFS
Inundation Elevation
Bridge / Road name
Top of Bridge Deck (min) @ 10k cfs
@ 27.4k cfs
County Road 10 (Colton Avenue-Burlington)
1575.254
1576.51
1580.914
54th Street NW
1570.044
1567.691(1)
1571.286
U.S. Highway 83 Bypass Bridge
1572.40
1561.291
1565.667
16th Street SW
1561.19
1557.457
1561.916
2nd Avenue SW
1556.77
1556.62
1559.158
3rd Avenue NW/4th Avenue NW (West)
1554.29
1555.466
1558.162
5th Avenue NW/6th Street NW
1557.65
1554.648(1)
1557.929
3rd Avenue NW/4th Avenue NW (East)
1553.15
1554.415
1557.877
U.S. Highway 83/ Broadway Bridge
1560.42
1554.168(1)
1557.755(1)
3rd Street NE
1555.54
1553.935(1)
1557.586
7th Street NE
1554.67
1553.114
1557.466
Burdick Expressway Bridge (U.S. Highway 2 Bypass Bridge)
1551.64
1551.962
1556.887
8th Avenue SE
1552.79
1551.087
1556.563
27th Street Bridge
1552.27
1549.14
1554.551
U.S. Highway 2 Bridge
1563.81
1548.01
1553.427(1)
Elevations where bridge decks would be inundated are bolded.
(1) Top of bridge deck is not inundated but roadway approach to bridge is inundated
Adverse effects on transportation systems could lead to increased response times for police, fire, and
emergency medical response services and inability to readily access all neighborhoods and communities.
4.5
4.5.1
4.5.1.1
Contaminated Sites
Requester's Preferred Alternative
General Impacts and Mitigation Measures
Based on the results of the HTRW assessments discussed in Section 3.5, there are numerous sites in the
project area that contain hazardous materials and petroleum products or have environmental concerns.
Potential impacts associated with these existing sites include construction impacts resulting from
disturbance of contaminated soil or groundwater, impacts associated with demolition of buildings
containing hazardous building materials, and excavation of debris in fill soil.
Impacts from hazardous materials and petroleum products could result from construction-related
activities in areas where contaminated soil or groundwater occur. These impacts could include exposure
of construction workers or nearby residents to hazardous substances that are encountered during
construction activities. Also, contaminants could inadvertently be spread to other areas as the result of
216
moving contaminated soils during excavation activities or pumping contaminated groundwater during
dewatering activities.
A Contingency Plan has been developed by the Requester to guide actions in the event that unanticipated
environmental conditions are encountered during construction of the Requester's Preferred Alternative.
Contingent conditions that could be encountered include uncovering an unknown underground storage
tank, a water well or vent pipe, debris, containers, contaminated soils, or contaminated water that
accumulates in an excavation. The requester has indicated that these and other unexpected conditions
would be addressed according to the procedures described in the Contingency Plan. Should an
unexpected condition be encountered, work would immediately stop, and an environmental professional
would be contacted to inspect, assess, and manage the situation in accordance with the Contingency Plan,
which is provided in the HTRW assessment reports (Appendix D and Appendix E).
Due to the age of the buildings present in the project area, it is possible that hazardous building materials
(such as asbestos-containing material (ACM) and lead-based paint) could have been used during
construction. Also, older buildings could have had heating oil storage, wells, septic systems, or other items
that could pose environmental concerns. Although the HTRW for Phases 1, 2, and 3 did not involve
building walkthroughs or interviews with owners, an inventory of such items should be conducted in the
future at buildings to be demolished and any identified environmental concern should be
addressed/abated/sealed/etc. prior to demolition in accordance with applicable local, state, and federal
requirements.
Debris is present in some areas of shallow fill soil, including glass, brick, and asphalt fragments. If the
Requester's Preferred Alternative involves excavation into these areas, then the excavated materials may
require further evaluation to determine whether the type and extent of the debris represents a concern for
reuse of the soil in project construction, and/or for potential export to off-site locations. If significant
amounts of debris are encountered in excavation areas, then it might be necessary to segregate the
excavated debris material and transport it to a landfill. Excavation of debris areas should be monitored by
an environmental professional to verify that the debris is consistent with the type of materials observed
during the geotechnical investigations (glass, brick, asphalt) and that no hazardous materials are present.
The proposed flood risk-reduction measures could result in inundation of some properties that were not
previously impacted, specifically south of the intersection of U.S. Highway 83 and Fourth Avenue NE.
Inundation of any tanks or septic systems on these properties could cause them to overflow or leak,
spreading the contents throughout the environment, and potentially contaminating soil, groundwater,
and surface water.
4.5.1.2
Site-Specific Impacts for Construction Stage 1.5
Phase 1(Fourth Avenue NE), Phase 2 (Napa Valley), and Phase 3 (Forest Road)
Several properties within the Fourth Avenue NE area that use or have used hazardous substances or
petroleum products are located near the proposed flood risk-reduction features. The results of the Phase
II investigation indicated that these properties do not pose a contamination risk during construction of
the proposed features. Several of these properties (Werner Oil Company, North Dakota Concrete
217
Products, and Porter Brothers Salvage Yard) have historically been inundated during previous flood
events; however the Requester's Preferred Alternative would protect these properties up to a 27,400 cfs
flood event.
The Requester's Preferred Alternative is not expected to impact specific contaminated sites in the Napa
Valley or Forest Road segments. If contaminated soils or groundwater are encountered during
construction activities, then the Contingency Plan would be followed to ensure proper management of
the contaminated material.
Other Phases of Construction Stage 1.5
Potential site-specific impacts for the other phases of Construction Stage 1.5 are based on the desktop
HTRW assessment described in Section 3.5.3, and the locations of environmental sites shown on
Figure 3-16.
No environmental sites were identified in the Tierrecita Vallejo impact area. The Maple Avenue High-Flow
Diversion impact area includes an underground storage tank at Magic City Lumber, Inc., and the tieback
levee impact area includes an underground storage tank at Main Electric Construction Inc. Phase I HTRW
assessments (and if needed, Phase II HTRW assessments) would be completed prior to final design and
construction of these segments of the Requester's Preferred Alternative. If these underground tanks are
located within the construction limits of the Project features, they would be removed prior to
construction. If construction occurs near these sites, soils and groundwater removed during construction
activities would be monitored for signs of contamination. If contaminated soils or groundwater are
encountered during construction activities, then the Contingency Plan would be followed to ensure
proper management of the contaminated material.
4.5.2
4.5.2.1
No-Action Alternative
General Impacts
River flows greater than 10,000 cfs could result in the inundation of potentially contaminated sites and the
dispersion of contaminants from these sites. Sites with storage tanks and septic systems could be
inundated, causing them to overflow, spreading the contents throughout the environment, and
potentially contaminating soil, groundwater, and surface waters. Known potentially contaminated sites
that could be flooded at various flood scenarios are shown in Table 4-4.
218
Table 4-4
Potentially Contaminated Sites That Could Be Flooded
5,000 cfs (50Year) Impact
27,400 cfs
Over 10,000 cfs
(2011 Flood)
(100-Year) Impact
Impact
Alan Kurth Olds Nissan
X
Enerbase
X
Farmers Union Oil Company
X
Fed Ex
X
Ferrellgas Fuel
X
Firestone Store Of Minot
X
Keelbler Company
X
Keller Paving and Landscaping
X
X
Magic City Lumber Inc
X
Main Electric Construction Inc.
X
Minot Farmers Elevator
X
X
Minot Fire Department
X
Porter Brothers
X
Robinson Insulation Minot Plant
X
Schatz Retread
X
Souris River - West Minot
X
Werner Oil Company
X
4.5.2.2
Site-Specific Impacts
Phase 1-3 (Fourth Avenue NE, Napa Valley, and Forest Road)
Several properties within the Fourth Avenue NE area currently use or have historically used hazardous
substances or petroleum products. No impacts from contaminants would be expected with flows under
10,000 cfs along the Fourth Avenue segment.
The No-Action Alternative would not affect any contaminated sites in the Napa Valley or Forest Road
areas.
Other Phases of Construction Stage 1.5
Several properties within the other phases of Construction Stage 1.5 area currently use or have historically
used hazardous substances or petroleum products. No impacts from contaminants would be expected
with flows under 5,000 cfs. Flows in excess of 10,000 cfs would inundate two properties known to use
hazardous substances or petroleum products; Keller Paving and Landscaping and Minot Farmers Elevator.
219
Several properties with potential for contaminated sites would be inundated with flows of 27,400 cfs. If
these properties were inundated, hazardous substances and petroleum products may be released into the
environment, potentially contaminating soil, groundwater, and surface waters.
4.6
4.6.1
4.6.1.1
Socioeconomics
Requester's Preferred Alternative
General Impacts
Constructing, operating, and maintaining the Requester's Preferred Alternative would cause businesses
and homes to be relocated and could affect property values, tax revenue, regional growth, employment,
business activity, community cohesion, community growth and development, and environmental justice.
Nearly 4,700 parcels would benefit from flood risk reduction at flows of 27,400 cfs with construction of the
Requester's Preferred Alternative (Table 4-5).
Relocations and Buyouts of Businesses and Homes
Since the 2011 Souris River flood, Minot has been actively buying properties located within the flood
inundation area, using federal, state, and local funding sources. The Requester's Preferred Alternative
would require the acquisition of additional properties. More than 900 parcels would be required to be
bought out to complete construction for all phases of the Project. If any owners of properties within the
footprint of the Requester's Preferred Alternative do not wish to sell, eminent domain proceedings could
be initiated. As designs for the various phases are finalized, additional properties could fall within the
footprint and would require acquisition for the Project to move forward.
The Requester's Preferred Alternative would reduce flood risk for nearly 4,700 parcels currently located
within the flood inundation area and would reduce the potential need to relocate future businesses and
homes from the protected area. The long-term benefits associated with the Requester's Preferred
Alternative would be direct, permanent, and substantial increases in the value of properties in the newly
protected areas. This would stimulate local business activity and support long-term business expansion.
All residential and business relocations and buyouts are planned to be conducted in accordance with 49
CFR Part 24, Uniform Relocation Assistance (URA) and Real Property Acquisition for Federal and FederallyAssisted Programs. The Requester's Preferred Alternative would comply with the objectives of the URA,
which include providing uniform, fair, and equitable treatment of persons whose real property is acquired.
In addition, the City recognizes that there may be circumstances in which an owner made post-flood
property improvements and may be upside down in their property mortgage. The City of Minot has
developed amendments to its relocation policy to accommodate these situations, including the
opportunity for property owners to appeal a property value determination.
Property Values
The Requester's Preferred Alternative would permanently and substantially increase the value of
properties as flood risk reduction features were build and became operable. Not only would property
220
values increase, but owners of protected parcels would also benefit from not having to acquire flood
insurance and from having fewer restrictions on improvements that could be made.
Owners of existing developments or developable parcels in the immediate vicinity of the protected area
would also benefit from increased accessibility and decreased disruption in the event of a flood.
Business Activity
Constructing, operating, and maintaining the Requester's Preferred Alternative would stimulate local
business activity by increasing direct, indirect, and induced expenditures. In the long term, the increased
flood protection provided by the Requester's Preferred Alternative would support business expansion and
would attract new businesses to the area.
221
Table 4-5
Protected and Inundated Parcels in 27,400 cfs Flood Event
Number of Parcels(1) Affected by a 27,400 cfs Flood Event
Jurisdiction
Inundated under No-Action Alternative
Inundated Despite Requester's Preferred
Alternative
Protected(2) by Requester's Preferred
Alternative
Parcels
without
Structures
Parcels with
Structures
Total
Parcels
Parcels
without
Structures
Parcels with
Structures
Total Parcels
Parcels
without
Structures
Parcels with
Structures
Total Parcels
Burlington
94
140
234
12
4
16
82
136
218
Burlington
Township
71
66
137
44
33
77
27
33
60
Harrison Township
196
229
425
113
65
178
83
164
247
1,034
3,648
4,682
351
329
680
683
3,391
4,002
Nedrose Township
158
154
312
86
28
114
72
126
198
Sundre Township
23
15
38
12
8
20
11
7
18
1,576
4,252
5,828
618
467
1,085
958
3,785
4,743
Minot
Total
Parcel data source: Ward County, ND Parcels. 2015. Available at: http://gis.wardnd.opendata.arcgis.com/datasets
(1) Parcels are tax parcels, which may or may not include a built structure
(2) Protected parcels would flood under the No-Action Alternative but not flood with the Requester's Preferred Alternative
222
Employment
Constructing the Requester's Preferred Alternative would create temporary jobs during each phase of
construction and for future operating and maintenance activities. Unemployment rates for construction
workers in the affected area were low during the oil boom, however with the slowdown in the oil industry,
construction jobs could primarily be filled from local labor pools. Some construction workers might be
recruited from communities outside the area.
Constructing the Requester's Preferred Alternative would also indirectly create and induce temporary job
growth. Indirect jobs are the jobs created in related support industries, resulting from economic activity
that could be generated by the project. Induced jobs are jobs created due to the increased household
spending of workers who are employed for construction of the Project. Indirect jobs would primarily be
filled by local labor, although, as with direct jobs, the surrounding region might also benefit from the
creation of indirect and induced jobs not filled by the local labor pool.
Regional Growth
Minot is an important service center for the region, meeting the health care, service, and shopping needs
of western North Dakota, eastern Montana, Canada, and the Minot Airforce Base. By reducing flood risk,
the Requester's Preferred Alternative would enhance Minot's capacity to function as a stable regional hub,
resulting in permanent, beneficial impacts to regional growth. As noted above, workers relocating to the
area would increase population in the short-term and would temporarily benefit regional growth.
Tax Revenue
The total estimated cost of the Project would be over $800 million, which would result in additional
revenues for both local and state economies. Expenditures on goods and services directly linked to
constructing and implementing the Requester's Preferred Alternative would temporarily increase state
and local tax revenues. Anticipated increases in direct spending would generate additional indirect,
induced and "value-added" spending--including increased spending on wages, rents, and interest--which
would result in higher total output spending.
The Requester's Preferred Alternative would also permanently increase tax revenues by better protecting
public and private investments, like infrastructure and homes, and by expanding developable land within
the affected area. By preserving property values for developed and developable areas located outside of
the designated floodplain, the Requester's Preferred Alternative would allow for the redevelopment of
properties and encourage the expansion of additional businesses and industry within the affected area.
Community Cohesion (Sense of Unity)
Past floods have significantly disrupted community cohesion in the affected area. Residential and business
buyouts have been, or are being, initiated in order to remove substantially damaged structures, and such
buyouts directly affect neighborhoods with lost residences and businesses. Several people commented on
the hardships caused from moving out of their homes and leaving neighborhoods which many have lived
in for most of their lives. Additionally, it is possible that those who have made post-flood property
improvements may be strongly opposed to relocation and feel that the appraisal process does not
223
accurately represent their financial investment toward home improvements. Those opposed to being
bought out may be at odds with those supporting the Project and community cohesion between the
groups could suffer as a result.
The Requester's Preferred Alternative would, overall, provide substantial and permanent benefits to
community cohesion in protected areas and the community as a whole. With increased stability and
security, residents and businesses would be less likely to relocate, and would increase the level of
commitment to the community, leading to greater involvement with community issues and needs.
The acquisition of a number of properties would also be required to construct the Requester's Preferred
Alternative. The majority of properties have or will be bought out voluntarily, but a number of others
would be acquired through eminent domain. Property owners that are forcefully ordered to give up
ownership are likely to be disgruntled which could cause potential unrest and adverse effects to
community cohesion.
Community Growth and Development
Following the 2011 flood, the Souris Basin Regional Recovery Strategy was developed as a framework for
identifying short- and long-term community vision and strategies for rebuilding flood-affected areas of
Minot, Burlington, and Ward County. Community members involved in developing the Souris Basin
Recovery Strategy identified permanent housing policy initiatives, affordable housing zones, mortgage
and rental assistance programs, and subsidized housing as top recovery priorities.
The Requester's Preferred Alternative would support these housing priorities by protecting public and
private investments--residences, businesses, infrastructure, and recreational resources--in the affected
area. This increased protection would support existing community uses and would encourage future
growth and development within the affected area and the region. This would provide a path towards
more sustainable and resilient communities, and would benefit long-term community growth and
development within the affected area.
Environmental Justice
The project would reduce flood impacts to existing residential, commercial, and industrial development in
the project area. While there are pockets of low-income and minority populations within the project area,
implemented flood protection benefits and the adverse impacts of Project construction would reach all
population groups, and would not result in a disproportionate adverse impacts. In addition to the
mitigation measures noted below, and despite the lack of disproportionately high and adverse effects, the
long-term recovery planning process will continue to ensure active and effective engagement with
affected areas within project area.
4.6.1.2
Mitigation Measures
As a means to avoid, minimize, or mitigate potential effects of the Requester's Preferred Alternative on
socioeconomic resources within the project area, the following strategies are recommended:
224
Coordinate with agency, local-government, residential, and business stakeholders to provide both
structural and non-structural approaches for minimizing unavoidable impacts.
Incorporate features--such as increased wildlife habitat, aesthetic character, and recreational
access to the Souris River--that will increase property values.
Incorporate ideas from local communities on how to mitigate the effects of flood risk-reduction
projects during recovery.
Leverage the planned phased-construction approach to lessen the severity of disturbances, and
develop phase-specific best management practices to reduce impacts on residential, commercial,
and industrial properties.
All-inclusive efforts have been and will continue to be undertaken to avoid and minimize adverse
effects as part of the long-term recovery process. Throughout the long-term recovery process the
potential effects of affected populations, including minority and low-income populations, will
continue to be considered in the decision to retain or modify future phases of the Project.
4.6.1.3
Potential Impacts on Specific Unique and Sensitive Resources
The Requester's Preferred Alternative would not affect any specific unique or sensitive socioeconomic
circumstances.
4.6.1.4
Site-Specific Impacts for Construction Stage 1.5
Socioeconomic effects of Construction Stage 1.5 would include property buyouts, increased employment,
and economic benefits of construction spending.
Phases 1, 2, and 3
Property buyouts as of May 2016 are summarized in Table 4-6. In general most of the properties acquired
(to date) through the CDBG program were parcels with structures present prior to the flood. Very few
parcels were vacant at the time of the flood. Most residential properties appear to include a typical single
family residential property configuration (residence and garage). These buyouts create temporary
disruptions for the individual property owners, but ultimately provide the permanent benefit of relocation
to properties not at risk for flooding.
225
Table 4-6
Property Buyouts for Phases 1, 2, and 3
Phase 1
Phase 2
Phase 3
Acquired
25
19
30
Pending acquisitions
0
4
1
Total residential buyouts
25
23
31
Acquired
20
0
0
Pending acquisitions
9
0
0
Total commercial and industrial buyouts
29
0
0
Acquired
0
0
0
Pending acquisitions
2
10
0
Total other buyouts
2
10
0
Residential Properties
Commercial and Industrial Properties
Other (zoned agricultural or public))
Increased employment associated with Phases 1, 2, and 3 would benefit the local communities both
directly and indirectly. Construction of Phase 1 would create approximately 1,100 to 1,900 direct, indirect,
and induced jobs. Construction of Phases 2 and 3 would create approximately 800 to 1,100 similar jobs. It
is anticipated that the vast majority of these jobs would be hired locally. The non-local hires would include
personnel highly qualified in mechanical, electrical, and instrumentation work and control tradesmen and
other workers to provide an adequate labor force to meet the Project needs.
Construction of the three phases would also benefit the local and state economies by generating
revenues for local and state governments and for local businesses. These revenues would be generated by
the approximately $63.2 million costs to construct Phase 1 and the approximately $43.3 million costs for
constructing Phases 2 and 3. The majority of these revenues would be collected from payroll taxes and
sales taxes on materials purchased during construction as well as direct expenditures at local businesses.
Other Phases of Construction Stage 1.5
Development of the other three phases of Construction Stage 1.5 would also result in property buyouts in
areas that would be used for construction of new flood risk reduction features. Property buyouts for the
Maple Avenue High-Flow Diversion are currently ongoing. Buyout numbers as of May 2016 are
summarized in Table 4-7. Property buyout requirements for the tieback levee and the Tierrecita Vallejo
segments are not yet known. A preliminary estimate for the tieback levee and Tierrecita Vallejo are
provided in Table 4-6. Only one of the 15 parcels anticipated for buyout in the Tierrecita Vallejo area
contains a house.
226
Table 4-7
Property Buyouts for Other Phases of Construction Stage 1.5
Maple Avenue
High-Flow
Diversion
Tieback Levee
Tierrecita Vallejo
Acquired
83
0
0
Pending acquisitions
18
0
0
Total residential buyouts
101
7
15
Acquired
4
0
0
Pending acquisitions
6
0
0
Total commercial and industrial buyouts
10
1
0
Acquired
0
0
0
Pending acquisitions
3
0
0
Total other buyouts
3
0
0
Residential Properties
Commercial and Industrial Properties
Other (zoned agricultural or public))
It is anticipated that employment and other economic benefits of the Tierrecita Vallejo segment and the
tieback levee would be similar to those described for Phases 1, 2, and 3. Because the estimated
construction costs of the Maple Avenue High-flow Diversion are the highest ($104 million), it is
anticipated that construction of this phase of the Project would provide the highest number of jobs and
the greatest economic benefit to the region.
4.6.2
No-Action Alternative
Under the No-Action Alternative, a flood event up to 10,000 cfs would generate minimal socioeconomic
impacts. Existing flood risk-reduction elements, when combined with emergency flood fighting, are
generally able to contain flood flows up to 10,000 cfs. However, a limited number of parcels would still be
inundated (Table 4-8).
Events greater than 10,000 cfs would overtop existing flood risk-reduction features, and portions of
Burlington, Harrison Township, Minot, and a small portion of Nedrose and Sundre Townships would be
inundated. This would cause damage to homes, businesses, and public infrastructure, and lead to
substantial and adverse effects to individuals, communities, and local economic activity.
A flood event of 27,400 cfs would result in significant adverse socioeconomic effects, with damages similar
to those from the flood of 2011. Flooding would inundate a large number of parcels (Table 4-8),
temporarily or permanently affecting communities and businesses. Damages to some properties could be
permanent, as the cost of clean-up might be prohibitive. This could result in permanent loss of homes and
227
businesses in the inundated area, leading to loss of community and permanent relocation of residents and
businesses.
228
Table 4-8
Number of Inundated Parcels: No-Action Alternative
5,000 cfs
Community
Parcels
Without
Structures
10,000 cfs
Parcels With
Total Parcels
Structures
27,400 cfs
Parcels
Without
Structures
Parcels With
Structures
Total Parcels
Parcels
Without
Structures
Parcels With
Structures
Total Parcels
City of Burlington
14
9
23
28
13
41
94
140
234
Burlington
Township
44
32
76
43
32
75
71
66
137
Harrison Township
106
86
192
115
102
217
196
229
425
City of Minot
218
143
361
286
227
513
1,034
3,648
4,682
Nedrose Township
98
65
163
115
90
205
158
154
312
Sundre Township
13
9
22
14
16
30
23
15
38
493
344
837
601
480
1,081
1,576
4,252
5,828
Total
229
4.7
Recreation
This section evaluates the potential effects of the proposed alternatives on recreational resources and
opportunities in the project area, and site-specific impacts within Phases 1 through 3. Recreational
resources and opportunities within the project area, as described in Section 3.6.4.4, include sport fishing,
canoeing, kayaking, and the use of designated facilities such as parks, trails, and golf courses.
4.7.1
4.7.1.1
Requester's Preferred Alternative
General Impacts and Mitigation Measures
Permanent benefits of the Requester's Preferred Alternative on recreational opportunities and recreational
areas within the project area would include providing more connections to use of local parks and trails
systems, and the establishment of the Mouse River Valley greenway system.
Adverse effects could include temporary disruption during construction and permanent loss of designated
recreational lands for flood risk-reduction use.
General Impacts
Constructing, operating, and maintaining the Requester's Preferred Alternative would affect the
accessibility, usefulness, and layout of recreational resources within the impact area. The degree of impact
depends largely upon the proximity of the existing recreational resource to the Project's footprint. The
Requester's Preferred Alternative would reallocate portions of land currently used for recreation to
temporary construction uses and permanent flood risk-reduction features. This change in land use could
result in either total loss or reconfiguration of open or recreational features. These changes could require
permanent modification to recreational access points, amenity layout, or reconstruction of existing
recreational features.
Constructing the proposed features within and adjacent to the Souris River corridor would temporarily
disrupt access to parks, trails, golf courses, and fishing locations. Increased noise and dust could detract
from outdoor activities, like running, golf, and baseball. Increased noise could also temporarily displace
wildlife, thereby interfering with bird watching, fishing, and nature walks. Future operation and
maintenance activities could temporarily disrupt recreational facilities and opportunities, although these
adverse effects are anticipated to be temporary and minor.
The features of the Requester's Preferred Alternative, such as channel realignments, overbank excavations,
and to a certain extent, high-flow diversion channels, would affect the flow path of the Souris River. These
changes could modify fish movement and fish concentration areas. Effects on recreational sport fishing
opportunities are anticipated to be minimal. However, channel grade control structures, where fish tend to
congregate, may be subject to modification or removal for future mitigation purposes.
The Requester's Preferred Alternative would permanently enhance existing recreational features and
would create new recreational opportunities. The Requester's Preferred Alternative would also significantly
230
contribute to the development of the future greenway corridor described in the Souris Basin Regional
Recovery Strategy (December 2011) and the 2012 Comprehensive Plan for Minot (reference [58] and
reference [42]). This greenway, which would incorporate flood risk-reduction features with recreational
opportunities, is part of long-term flood disaster recovery planning in the 2011 flood-affected region. The
greenway would feature an interconnected biking/walking path system that would eventually stretch the
length of the city. The greenway would connect open spaces along the Souris River, including several city
parks and existing natural areas along the river. Amenities in the green way would include interpretive
signage, a dog park, restrooms, tree plantings, and park benches.
The Requester's Preferred Alternative would also reduce inundation of recreational facilities (Table 4-9)
Mitigation Measures
As a means to avoid, minimize, or mitigate potential effects on recreational resources and opportunities
within the impact area, the requester has proposed the following actions:
Coordinate with agency, local-government, and recreation stakeholders to provide structural and
non-structural approaches to minimizing unavoidable impacts and recreational access to the
Souris River.
Incorporate recreational amenities into final designs, to the extent practicable, which would bring
additional benefits the area.
Coordinate maintenance activities to limit disturbances, where possible, to times when
recreational facilities are less used.
4.7.1.2
Potential Impacts on Specific Unique and Sensitive Recreational Resources
The Land and Water Conservation Fund (LWCF), funded by the National Park Service (NPS), has issued
grant funds for developing or maintaining a number of recreational facilities in the vicinity of the
Requester's Preferred Alternative (listed in Section 3.6.4.4). Recreational facilities that receive funding from
the LWCF must be retained and used in perpetuity solely for outdoor recreation. Many of the LWCFfunded recreational facilities in the project area were affected by the 2011 floods and have been restored.
Use of these LWCF-funded recreational facilities for other than their designated purpose must be
approved by the NPS. The Requester's Preferred Alternative would not change the use of LWCF-funded
recreational facilities.
4.7.1.3
Site-Specific Impacts for Construction Stage 1.5
Features constructed as part of Stage 1.5 would be part of the permanent future flood control efforts that
would protect recreational and other community resources adjacent to the project area. These phases of
the Requester's Preferred Alternative provide increased connections to Minot's park and trails system and
encourage the use of this system throughout Minot. Phase-specific best management practices,
construction operations, and other detailed information would be developed as part of the designs.
231
Phase 1- Fourth Avenue NE
At present, recreational opportunities within Phase 1 are limited (Map 3-9). The Phase 1 footprint is within
a future regional greenway system which could result in significant benefits by providing more
recreational opportunities through increased access and connections with trails, parks, and river activities.
Parks, open spaces, sidewalks, and trails are located within the Phase 1 footprint. Construction of Phase 1,
with heavy equipment traffic, noise, and dust, could temporarily limit access to the Victoria Pedestrian
bridge, connecting sidewalks, and the trail system.
Phase 2 - Napa Valley
Two parks, two golf courses, and part of the Minot trail system are located within the Phase 2 footprint
(Map 3-9).
Phase 2 construction, which would increase heavy equipment traffic, dust, and noise, would temporarily
affect these recreational resources and could lead to short-term closures and access restrictions.
Temporary mitigation measures would include dust control and roadway or trail detours.
More significantly, both golf courses would have to be modified, and the trail segment would be
removed. Both golf courses, however, would be improved, and a new trail segment would be built and
would provide more connections to Minot's parks and trails system which would encourage use of other
parks and trails.
In addition, the Dakota Bark Park would be expanded by about 20,000 square feet. New parking would
also be added as well as access to the regional greenway and the Minot parks and trail system.
Phase 3 - Forest Road
Phase 3 flood risk-reduction improvements could affect a small portion of the Minot park and trail system,
which is adjacent to the Phase 3 footprint (Map 3-9). Phase 3 levee construction would include
establishing trails on top of the newly constructed levees. The trails would connect with the existing Minot
park and trail system. This system along the river corridor is proposed to be integrated into the regional
greenway corridor.
Phase 3 construction activities could disrupt or cause temporary use restrictions to one trail segment and
adjacent recreational facilities. Phase 3 flood risk-reduction improvements would provide significant
benefits to recreational opportunities in the area by providing new trails and connections to Minot's parks
and trails system and by future incorporation into the greenway in this area along the Souris River
corridor.
Other Phases of Construction Stage 1.5
There are no specific recreational facilities located within the Tierrecita Vallejo or Tieback Levee impact
areas. Construction of the Maple Avenue High-Flow Diversion could affect Moose Park and a portion of
Minot's trail system. Measures to mitigate impacts on this park and trail system would be developed
during the detailed design process.
232
4.7.2
No-Action Alternative
Flood event under 10,000 cfs would affect recreational facilities within and adjacent to the current 100year floodplain (Table 4-7).
Flood events over 10,000 cfs would inundate and damage recreational facilities and infrastructure in
portions of Burlington, Harrison Township, Minot, Nedrose Township, and a small portion of Sundre
Township. Uses of existing recreational facilities would be restricted until flood waters receded and
cleanup and restoration were completed.
A flood event of 27,400 cfs would significantly damage existing facilities and infrastructure, erode soil, and
uproot vegetation. Recreational facilities and trails would be unusable until cleaned up and restored, and
some recreational facilities might never be fully restored to their former condition. This would
permanently reduce the quality and quantity of recreational opportunities within the affected area.
233
Table 4-9
Inundation of Recreational Facilities
5,000 cfs
Location Name
Burlington City Park
10,000 cfs
27,400 cfs
Requester's
Requester's
Requester's
No-Action Preferred No-Action Preferred No-Action Preferred
Alt.
Alt.
Alt.
Alt.
Alt.
Alt.
X
X
X
X
X
Corbett Field and Rink
X
Dakota Bark Park
X
Green Valley Park
X
Hammond Park
X
Jack Hoeven Baseball Park
X
Leech Park
X
Moose Park
X
X
X
X
North Dakota State Fairgrounds /
Nodak Speedway / Dacotah Flat Track
X
X
X
X
Nubbin Park
X
X
X
Oak Park
X
X
X
Old Settlers Park
X
Riverside Park
X
Roosevelt Park / Zoo
X
X
X
X
X
X
Roughrider Campground
X
X
X
X
X
X
Souris Valley Golf Course
X
X
X
X
X
X
Vardon Golf Club
X
X
X
X
X
X
X
X
X
X
X
X
X
Via-View Park
X
Wee Links Golf Course
X
X
X
X
X
X
Total Locations Inundated:
11
8
11
8
19
8
4.8
Aesthetics and Visual Resources
This section evaluates the potential effects of the Requester's Preferred Alternative and the No-Action
Alternative on the aesthetic values and visual resources in the project area. Both positive and negative
effects were considered to be noteworthy if an alternative would:
Change views of the Souris River corridor within existing trails, parks, open space, recreational
facilities, or residences.
Change landmarks or other defining features.
234
Obstruct public views or viewshed corridors.
Create development that is not balanced with the surrounding visual setting, and contrasts with
the rural topography (agricultural fields interspersed with wetland and forested areas), Souris
River corridor, or urban settings (residential, parks, open space, or recreational facilities).
4.8.1
Requester's Preferred Alternative
4.8.1.1
General Impacts and Mitigation Measures
The following general impacts and mitigation measures would apply to all phases of the Requester's
Preferred Alternative and are therefore not repeated under the "Site Specific Impacts" subsection, unless
there are more prominent aesthetic values and visual resources that have been determined as sensitive or
significant.
General impacts to the landscape's existing aesthetic value and visual resources from constructing,
operating, and maintaining the Requester's Preferred Alternative would include changes in vegetative
cover, topography, water resources, and built structures. The scale of impact is partially based on the
degree to which the landscape is temporarily or permanently changed. Viewer perceptions would also
influence the significance of effects on aesthetics and visual resources--two viewers could perceive the
same changes quite differently.
Changes to the landscape cannot be quantified, and there is no threshold at which all individuals will
agree a change is substantial. How a viewer perceives aesthetic value is primarily influenced by two
common factors: visual sensitivity and viewer exposure. Visual sensitivity varies by the individual, and
reflects the viewer's degree of interest and level of concern for the aesthetics of the landscape, and their
sensitivity to potential impacts. Viewer sensitivity is likely to be highest in residential areas near flood riskreduction features, as these viewers have the most frequent viewing opportunities and the highest degree
of concern.
Viewer exposure, however, varies by location, and refers to the number of viewers who frequent a
landscape location and how long they stay on each visit. Therefore, changes to the existing aesthetic value
of an area that many people visit, like areas surrounding the Minot Riverwalk, could have a greater effect.
Aesthetic impacts also depend upon viewing distance. Viewers located near flood risk-reduction features
would feel the greatest effect, although in areas with unimpeded views, like agricultural fields, effects
could be experienced from a greater distance.
Construction activities under the Requester's Preferred Alternative would temporarily affect both the
visual character of the landscape and viewing distance within the impact area. The Requester's Preferred
Alternative would require construction of numerous structural features, including levees, floodwalls, highflow diversion channels, channel realignment, and overbank excavations. Temporary adverse effects would
include visual changes to the existing landscape caused by construction yards, staging areas, landscape
grading changes, removal of vegetation, changes in the character and type of post-project vegetation,
increased construction traffic and the presence of equipment, materials, fences and other elements during
construction.
235
The presence of heavy vehicles on widened or unpaved roads could also increase amounts of visible dust,
which could affect air clarity and view distances. Increased light sources such as headlights of construction
vehicles, and nighttime construction site lighting, if needed, could also affect visual aesthetics. These
temporary adverse effects would be reduced by using best management practices during construction.
Constructing new structural features of the Requester's Preferred Alternative would permanently affect
the existing landscape. Levees are already present in many locations, however the Requester's Preferred
Alternative will build them higher. The total height of levees would vary from a minimum in areas where
the Requester's Preferred Alternative features tie-in to high ground, to a maximum of approximately 27
feet above grade elevation. Concrete floodwalls would typically vary in height from 5 to 15 feet, and both
levees and floodwalls could affect view distance and views of the Souris River corridor, resulting in minor
to substantial adverse effects by reducing the aesthetic quality of the viewshed.
Earth moving, stockpiling of materials, and physical changes to the channel alignments could visually
change the project area, as could the addition of riprap and erosion control features. These new features
would create additional openings within the viewshed and affect view distance. The view of excavated
features would also be influenced by the presence of other flood risk-reduction features such as
floodwalls or levees which could reduce the viewshed from neighborhoods, or enhance view distance
from the top of a levee.
The Requester's Preferred Alternative would also, however, enhance the aesthetic value of the project
area, by developing a greenway that would provide connections to parks, picnic areas, and fishing sites.
The greenway and connections would improve visual aesthetics by enhancing the viewing experience of
adjoining neighborhoods, hikers, and general recreational users, and would increase access to the Souris
River corridor.
In summary, constructing and operating the Requester's Preferred Alternative, along with implementing
temporary work easements and staging equipment, would have substantial permanent and temporary
effect on visual resources within the affected area. The severity of impacts would largely depend on the
type of flood risk-reduction feature being constructed and on the contrast between the feature and the
existing landscape. The severity of impacts would also depend on the visibility of the aesthetic changes,
the viewer exposure, and the visual sensitivity of viewers.
Strategies to avoid, minimize, or mitigate the Requester's Preferred Alternative's potential effects on
aesthetics and visual resources could include:
Stabilizing banks where possible to allow vegetation to be established on slopes of levees,
thereby minimizing visual contrast with the surrounding areas. Managed vegetation could also be
used for erosion control purposes, depending on channel use and desired aesthetics.
Incorporating vegetation within the vicinity of constructed levees and floodwalls to reduce visual
contrast and replace vegetative visual resources removed during construction.
236
Limiting straight line elements where possible and incorporating the curving nature of the Souris
River into structural design.
Avoiding project elements where possible that would block views, particularly along parks and
open space, recreation trails, and residential areas.
Installing vegetated ground cover on the levees, landscaping on the landside of the levees and
aesthetically designed floodwalls.
Designing riprap features, used as the primary erosion control method for the Requester's
Preferred Alternative, to increase the natural aesthetic appeal.
Designing Requester's Preferred Alternative features to consider public use, recreation, and
aesthetic elements. Already incorporated into the design is the Mouse River Valley greenway with
recreational amenities.
4.8.1.2
Potential Impacts on Specific Unique and Sensitive Resources
Unique aesthetic and visual resources--including scenic vistas, cultural landscapes, and wilderness areas--
are assets that characterize a landscape's visual appearance. No specific unique aesthetic or visual
resources are located in the project area, so none would be affected by the Requester's Preferred
Alternative.
4.8.1.3
Site-Specific Impacts for Construction Stage 1.5
The Requester's Preferred Alternative would have various adverse and beneficial effects to aesthetics and
visual resources. Project features would impede views in some areas, as the average height of levees
throughout developed portions of Minot would be approximately 14 feet. However, features would also
allow accessibility to pleasing sights along trails and green spaces. The following subsections discuss the
visual and aesthetic effects of constructing and operating specific phases of flood risk-reduction features
for the Requester's Preferred Alternative through Stage 1.5. General impacts and mitigation measures
discussed in Section 4.8.1.1 apply to these phases.
Phase 1- Fourth Avenue NE
Flood risk reduction features for Phase 1 would include a levee, two floodwalls, and two removable road
closure structures. Residents, walkers, and bikers on the landside of the levee and floodwalls would be
affected, as direct views of the Souris River corridor would be replaced by a view of the built features.
Flood risk reduction features would be integrated with recreational amenities along the Souris River,
facilitating the implementation of the greenway in the city (as described in Section 4.7.)
Phase 2 - Napa Valley
Flood risk reduction features for Phase 2 would include a road raise, levees, road realignments, a
temporary road closure structure, and a stormwater pump station. Residents, walkers, and bikers on the
237
landside of the levee would be affected, as direct views of the Souris River corridor would be replaced by
a view of the built features.
Phase 3 - Forest Road
Flood risk reduction features for Phase 3 would consist of levees, bank stabilizations, overbank excavation,
and roadway modifications. Residential properties in the Phase 3 footprint and directly adjacent to the
east and west sides of the river have been or would be removed prior to construction of Phase 3. Adjacent
residential properties on the landside of the Phase 3 levees would be aesthetically affected, as these
properties would now border levees and the expanded river corridor instead of other residential
properties.
Implementing the flood risk-reduction improvements, like increasing levee height and performing
overbank excavation, would cause residences on both sides of the Souris River corridor to be removed,
and would increase the amount of visual open space. The height of the levees would determine view
distances of the expanded corridor, although the overbank excavation would increase the width of the
river corridor and provide a longer view from the increased open space.
Other Phases of Construction Stage 1.5
Flood risk reduction features for the Tierrecita Vallejo segment would include a levee, overbank
excavation, and a stormwater pump station. The levee in this segment could reach a height of 27 feet,
thus affecting the local residences direct views of the Souris River corridor.
Flood risk reduction features for the Maple Avenue High-Flow Diversion would include a diversion
channel, levees, roadway modifications, and a new railroad bridge. The residences within the footprint of
these flood risk reduction features would be removed and replaced with these features. The existing
landscape in this area would be drastically changed resulting in substantial visual effects to nearby
residences as well as people traveling through this area on the modified roadways.
Flood risk reduction features for the Tieback Levee would include a levee and a modified roadway. The
residences on the landward side of the levee would likely have obstructed views of the railroad and river
corridors.
4.8.2
No-Action Alternative
Aesthetics and visual resources would be adversely effected by any flooding in the project area. Even with
flows contained by the No-Action Alternative, residents, walkers, and bikers with a view of the river could
experience minor aesthetic impacts as the river would be at a higher stage than normal and trash and
debris left after floodwaters subside could also create an unappealing visual.
At flows over 10,000 cfs flood risk-reduction features would be overtopped, inundating portions of
Burlington, Harrison Township, Minot, Nedrose Township, and a small portion of Sundre Township. Effects
would be most pronounced in residential areas near the Souris River corridor, as adjacent residences
would have the highest viewer sensitivity and the highest risk of becoming inundated. In agricultural
238
portions of the affected area, aesthetic impacts would be experienced at greater distances, due to the lack
of visual obstructions.
Flooding would cover public and private land and infrastructure with standing water, altering existing
views. As waters recede, debris, sedimentation, and damaged vegetation and infrastructure would be
revealed. Cleanup and restoration efforts could require an increased presence of construction or debris
removal services, causing temporary displeasing sights. Viewsheds and landscapes would be restored
within days to weeks.
Under the No-Action Alternative, a flood event of 27,400 cfs would significantly damage existing aesthetic
and visual resources. Flood waters would expand in all directions from the existing Souris River corridor,
and would inundate private and public land and infrastructure. During the flood of 2011, land was
inundated with two to fifteen feet of water, with water covering some homes all the way to the eaves.
As flood waters recede, they would reveal the destruction as described previously. Cleanup and
restoration activities in some areas could take months, and some natural and structural landmarks could
be permanently damaged. Damaged structures could be an eyesore if not demolished.
4.9
Historic and Cultural Resources
This section evaluates the potential effects of the Requester's Preferred Alternative and alternatives on
historic and cultural resources in the project area. Impacts are considered to be substantial if they alter,
directly or indirectly, any of the characteristics of a cultural resource that would qualify that resource for
the NRHP so that the integrity of the cultural resource location, design, setting, materials, workmanship,
feeling, or association is diminished.
4.9.1
4.9.1.1
Requester's Preferred Alternative
General Impacts and Mitigation Measures
The following general impacts and mitigation measures apply to all phases of the Requester's Preferred
Alternative. A Programmatic Agreement (per 36 CFR 800.14(b)) was executed between the USACE and the
ND SHPO to cover effects that could not be fully determined in advance of the undertaking and nonFederal parties being delegated major responsibilities (Appendix J).
The Class I Cultural Resources Survey identified all known archaeological sites and historic structures
within a one-mile study area of the Requester's Preferred Alternative except historic structures within the
City of Minot. They include:
Four previously identified archaeological sites Table 3-20, Section 3.9.1.1
The Soo Line Railroad corridor (present day Canadian Pacific Railroad) (32WD1631), Table 3-21,
Section 3.9.1.2
Four standing structures Table 3-22, Section 3.9.1.3
239
Since the 2011 flood, Minot has been actively acquiring and redeveloping housing infrastructure through
the U.S. Department of Housing and Urban Development (HUD) Community Development Block Grant
Disaster Recovery (CDBG-DR) Program. Through this program, all proposed activities are subject to
Federal review and will comply with HUD CDBG-DR regulations, policies, and procedures. The Requester's
Preferred Alternative is also subject to Federal review and will comply with the USACE regulations. Both
efforts are subject to NEPA compliance under Section 106 of the National Historic Preservation Act, and
are being evaluated separately.
The two efforts overlap in specific locations where flood-damaged properties were acquired through the
HUD CDBG-DR and construction related to the Requester's Preferred Alternative would occur. The
acquisition of structures in Minot for HUD has proceeded under a memorandum of agreement (MOA)
between Minot and the North Dakota State Historic Preservation Office (SHPO) and stipulates all
proposed activities comply with HUD CDBG-DR regulations, policies and procedures. The Requester's
Preferred Alternative will proceed under a Programmatic Agreement between the USACE and SHPO. In
addition, the USACE has statutory responsibility to consider the effect of permit decisions on historic
properties when they are known, or suspected, to exist in the USACE permit area. In order to obtain a
permit, all aspects of the programmatic agreement must be completed. This could include surveys,
consultation with the North Dakota SHPO and execution of a Memorandum of Agreement(s), if necessary.
If there is another Federal agency with historic properties responsibilities in the permit area, the USACE is
obligated to ensure that they have completed their obligations under Section 106 of the Historic
Preservation Act.
4.9.1.2
Site-Specific Impacts for Construction Stage 1.5
A Class I Cultural Resources survey was conducted for the entire study area, including all segments that
are part of Stage 1.5 of the Requester's Preferred Alternative. In addition, a Class III Archaeological Survey
and Class III Standing Structure Survey was completed for the Stage 1 of the Requester's Preferred
Alternative. The Class III surveys narrowed the scope to an area of potential effect (APE).
Four historic structures and the Soo Line Railway are located within Stage 1.5, and are identified as
potentially eligible for inclusion on the National Register of Historic Places (NRHP). The APE for areas not
covered by the Class III surveys completed for the first three phases will be determined during design and
permitting of these phases and will proceed under a Programmatic Agreement developed between the
USACE and SHPO.
Supplemental Class III Archaeological and Historic Structure reviews are being completed for areas not
previously reviewed within Construction Stage 1.5. The Programmatic Agreement identifies the process
for review and any subsequent required mitigation. The ongoing cultural resources investigations, as well
as future project phases, will be conducted in accordance with the Programmatic Agreement.
Phase 1- Fourth Avenue NE
The Class III Archaeological Survey identified no archaeological or historic sites within the Phase 1 area,
and detected no intact soils likely to contain archaeological materials. No additional archaeological survey
is recommended.
240
The Class III Standing Structures Survey identified four structures within the Phase 1 APE as eligible for the
NRHP (Table 3-23, Section 3.9.3.1). They include:
Home Sweet Home (32WD507)
Minot Mill (32WD652)
25 5th Street NE (32WD681)
Soo Line Railroad (32WD1631)
A finding of No Properties Affected is recommended for two of the structures (32WD681 and 32WD1631).
The structure at 25th Street NE, an early 20th century residence, has been modified and is no longer eligible
for the NRHP. The Soo Line - Canadian Pacific Railroad is within the APE but would not be affected by
flood risk-reduction features associated with Phase 1.
Home Sweet Home (32WD507) and Minot Mill (32WD652) would be directly affected. Home Sweet Home
is an early 20th century residence located within the Phase 1 levee footprint. This property is eligible for
NRHP, and should be avoided or relocated to a similar suitable location near the river (reference [78]). The
property on which 32WD507 resides is currently under the HUD CDBG-DR program and is undergoing
separate NEPA review. Because the property is under this program, the USACE is not assuming Section
106 responsibility for the resolution of adverse effects at this time. Stipulations for historic properties are
identified in the MOA between Minot and the North Dakota SHPO.
The Minot Mill (32WD0652) has been identified as a contributing element of the NRHP Minot Industrial
District. The property on which 32WD0652 resides is currently under the HUD CDBG-DR program and is
undergoing separate NEPA review. Because the property is under this program, the USACE is not
assuming Section 106 responsibility for the resolution of adverse effects at this time. A Memorandum of
Agreement between the City of Minot and North Dakota SHPO was executed in order to complete the
requirements of Section 106 of the National Historic Preservation Act.
Phase 2 - Napa Valley
The Class III Archaeological Survey identified no archaeological or historical sites within the Phase 2 area,
and detected no intact soils likely to contain archaeological materials. No additional archaeological survey
is recommended.
The Class III Standing Structures Survey identified one site, 32WD1631 (Soo Line-Canadian Pacific
Railroad) within the Napa Valley segment that could be eligible for the NRHP. Site 32WD1631 is within the
APE but would not be affected and a Finding of No Properties Affected is recommended.
The Requester's Preferred Alternative is not expected to affect historic and cultural resources in the Phase
2 area.
241
Phase 3 - Forest Road
The Class III Archaeological Survey identified no archaeological or historical sites within the Phase 3 area,
and detected no intact soils likely to contain archaeological materials. No additional archaeological survey
is recommended.
The Class III Standing Structures Survey identified no structures eligible for the NRHP, and no additional
survey is recommended.
The Requester's Preferred Alternative would not affect historic architectural values or prehistoric and
historic archaeological values, because no specific historic and cultural resources have been identified in
the Phase 3 area.
Borrow Sites
A number of borrow sites are being evaluated for their suitability as potential sources of fill material for
construction of the Requester's Preferred Alternative. A Class III Archaeological Survey was completed for
the Highway 2 borrow site and resulted in no trace of cultural resources or historic properties, including
one site that had previously been recorded in the area. No additional archaeological surveys are
recommended for this site. The Price Site has been identified as the borrow source for Phases 1, 2, and 3
of the Project.
Other potential borrow sites will be covered by stipulations within the Programmatic Agreement between
the USACE and the ND SHPO, if the initial studies determine they are suitable and the requester chooses
to pursue them further.
Other Phases of Construction Stage 1.5
The results of the Class I Cultural Resources Survey indicates that there are no known archaeological sites
or historic structures located within the impact areas of the later three phases of Construction Stage 1.5.
The Soo Line Railway (now known as the Canadian Pacific Railroad), which has been designated as
potentially eligible for listing on the NRHP, runs through the proposed location of the Maple Avenue
High-Flow Diversion. Construction of this diversion would require replacement of the railroad bridge
crossing the diversion channel. A Class III cultural resources investigation will be required to assess
potential impacts of the diversion on historic structures, including the Soo Line Railway. Class III
archeological and standing structures are scheduled for the affected CDBG-NDRC neighborhoods (Moose
Lodge, Leite-Brekke, Kemper) in addition to surveys that will be conducted for the HUD program covering
ground-disturbing activities that will be conducted for the Project. Furthermore, Class III cultural resources
investigations may also be required for the Tierrecita Vallejo segment and the Tieback Levee to assess
potential impacts of the new flood risk reduction features on archaeological sites and historic structures.
4.9.2
No-Action Alternative
Existing flood risk-reduction elements would be overtopped at flood flows greater than 10,000 cfs for the
No-Action Alternative. Cultural and historic resources would be inundated to various extents depending
on their location and the intensity of the flood event.
242
4.10
Air Quality and Noise
4.10.1
Requester's Preferred Alternative
4.10.1.1
General Impacts and Mitigation Measures
Air Quality
Constructing and operating the Requester's Preferred Alternative would result in direct and indirect
emissions of criteria air pollutants and greenhouse gases (GHGs). These emissions would result in minor,
primarily localized impacts.
Criteria Pollutants
Construction activities would temporarily increase air emissions as a result of the combustion of fossil
fuels in construction equipment and vehicles, and from the fugitive dust emissions associated with ground
disturbance. Typical construction equipment (e.g., backhoes, compactors, compressors, concrete mixers,
dozers, front loaders, generators, graders, excavators, backhoes, rollers, scrapers) and equipment carrying
materials and personnel would be used during construction. Equipment and material deliveries, the
removal of waste, and worker activities would produce indirect emissions on paved and unpaved roads.
The Requester's Preferred Alternative would be constructed over several years. Over this period,
construction impacts would be concentrated in different locations as construction progresses. These
impacts would be localized and temporary. Because specific scheduling and construction documentation
has not yet been developed, total emissions of criteria pollutants from construction cannot currently be
quantified accurately. Initial estimates, however, indicate that construction emissions would be well below
Prevention of Significant Deterioration (PSD) emission rates.
Because of North Dakota's attainment status and because primary emissions associated with the
Requester's Preferred Alternative would be from non-major sources, it is likely that no air quality permits
or authorizations would be required from the NDDH, Air Quality Division, for the Project.
Construction emissions can be minimized by using BMPs, including:
Minimizing idling of construction vehicles.
Using existing power sources (e.g., grid-supplied power) or clean fuel generators rather than
diesel-powered generators.
Ensuring that construction equipment is properly tuned and maintained prior to and during onsite operation.
Developing a project-specific dust-control plan, which could include the following additional
BMPs:
o
Restricting traffic to predetermined routes.
o
Maintaining as much natural vegetation as practicable.
243
o
Phasing of construction to reduce the area of land disturbed at any one time.
o
Using temporary mulching, or temporary vegetative cover, to reduce the need for dust
control.
o
Using mechanical sweepers on paved surfaces where necessary to prevent dirt buildup,
which can create dust.
o
Periodically moistening exposed soil surfaces to control dust.
Direct emissions of criteria pollutants from operating the Requester's Preferred Alternative are anticipated
to be minimal, and would come from minor amounts of gasoline and diesel combustion used to power
maintenance vehicles. The pump stations would be operated during floods, to pump stormwater runoff
from the landside of the levees to the river. The pumps would, however, be electrically powered and
would therefore not result in direct emissions of criteria pollutants.
Climate Change and GHG Emissions
Construction activities for all phases of the Requester's Preferred Alternative would result in similar
temporary increases in GHG emissions, from the combustion of fossil fuels used to power equipment and
vehicles, as described above. Combustion of fossil fuels would emit CO2, CH4, and N2O. Because specific
construction schedules and plans have not yet been developed, total emissions of GHGs from
constructing the Requester's Preferred Alternative cannot currently be quantified accurately. Initial
estimates, however, indicate that emissions would be less than 6,000 metric tons of CO2 equivalents (CO2e) for Phases 1 through 3. This amount is equivalent to approximately 0.01% of North Dakota's statewide
GHG emissions of 56.6 million metric tons of CO2-e in 2013. Emissions data is not available at the local or
regional level. However, the increased construction activity resulting from the Project would increase
emissions more appreciably at these scales.
As with criteria pollutant emissions, direct emissions of GHGs from operation of the Requester's Preferred
Alternative are anticipated to be minimal, limited to emissions from minor amounts of gasoline and diesel
combustion used to power maintenance vehicles. As mentioned above, the pump stations would be
operated only during floods, and the pumps would be electrically powered, thus resulting in no direct
emissions of GHGs. Due to the very small (less than 1,000 hp) total power needs associated with operating
the Requester's Preferred Alternative, indirect GHG emissions are also anticipated to be minimal. As noted
in Section 3.10, North Dakota is currently developing a plan to reduce carbon pollution from fossil fuelfired power plants in compliance with EPA's recently finalized Clean Power Plan rule. These measures
would aid in further reducing the very small indirect GHG footprint associated with operating the
Requester's Preferred Alternative.
At present, climate modeling is not advanced enough to evaluate the potential climate effects of GHGs
from an individual project. As noted in Section 3.10, however, the potential impacts of climate change on
the viability and effectiveness of the Requester's Preferred Alternative are an important consideration,
especially given the relationship between climate change and changes in flooding.
244
The design of the Requester's Preferred Alternative addresses climate-related changes in flooding, by
going above and beyond what would be required of a federally funded project by Executive Order 13690.
Executive Order 13690 allows flood risk reduction projects to address uncertainty with climate change by
building projects two feet above the 100-year (1-percent annual chance) flood elevation for standard
projects, and three feet above for critical buildings like hospitals and evacuation centers. The design
height of levees for the Requester's Preferred Alternative is at least three feet above the flood of record,
which is about ten feet higher than the current 100-year (1-percent annual chance) flood elevation,
exceeding the current recommendations for mitigation of climate-related changes in flooding.
Noise
During construction of the Requester's Preferred Alternative, temporary, localized noise from heavy
equipment and increased vehicle traffic would occur in the project area during daytime hours and would
be concentrated in different locations as construction progresses across the Requester's Preferred
Alternative footprint. Because specific construction schedules and plans have not yet been developed, the
effect of noise on specific receptors cannot currently be quantified explicitly. Typical noise levels from
heavy duty equipment commonly used for construction (at 50 feet from the source) are summarized in
Table 4-10. Typical noise levels of common activities are summarized in Table 4-11 for comparison. The
noise level at 50 feet away from the construction equipment would be similar to a noisy urban area or the
noise level at 100 feet away from a gas-powered land mower.
Construction noise could also affect residences in the project area when temporary construction sites or
access roads are located in the immediate vicinity of receptors. Impacts, however, are anticipated to be
minor, localized, and temporary. Construction noise would occur during daytime hours and is exempt
from the Minot noise ordinance. It would be intermittent, and levels would decrease by approximately 6
dBA with each doubling of distance from a point source. Residences immediately adjacent to the
construction area could experience noise levels up to 88 dBA.
245
Table 4-10
Typical Noise Levels of Construction Equipment
Maximum Noise
Level
(Lmax, dBA)
Utilization
Factor
Estimated Noise
Level (dBA) at
50 feet
Pickup Truck
55
0.4
51
Crew Cab
55
0.4
51
Compressor Trailer
80
0.4
76
Crane
85
0.16
77
Backhoe/Frontend loader
80
0.4
76
Auger Truck
85
0.2
78
Water Truck
84
0.4
80
Dump Truck
84
0.4
80
Concrete Truck
85
0.4
81
Fork Lift
86
0.4
82
Vibratory Pile Driver
95
0.2
88
Equipment
Type
Sources: Federal Highway Administration (reference [79]
Notes: Noise emission levels and utilization factors are based on FHWA guidelines.
246
Table 4-11
Typical Noise Levels
Common Outdoor Activities
Noise Level
dBA
--110--
Common Indoor Activities
Rock Band
Jet Fly0over at 300 m (1000 ft)
--100-Gas Lawn Mower a 1 m (3 ft)
--90-Diesel Truck at 15 m (50 ft)
at 80 km/hr (50 mph)
Noisy Urban Area, Daytime
Gas Lawn Mower, 30 m (100 ft)
Commercial Area
Heavy Traffic at 90 m (300 ft)
Quiet Urban Daytime
Quiet Urban Nighttime
Quiet Suburban Nighttime
--80---70---60---50---40---30--
Quiet Rural Nighttime
--20--
Food Blender at 1 m (3 ft)
Garbage Disposal at 1 m (3 ft)
Vacuum Cleaner at 3 m (10 ft)
Normal Speech at 1 m (3 ft)
Large Business Office
Dishwasher Next Room
Theater, Large Conference Room
(Background)
Library
Bedroom at Night, Concert Hall
(Background)
Broadcast/Recording Studio
--10-Lowest Threshold of Human
Hearing
--0--
Lowest Threshold of Human
Hearing
Note: Recreated from Technical Noise Supplement, (TeNS) A Technical Supplement to the Traffic Noise Analysis Protocol.
California Department of Transportation, October 1998. "Table N-2136.2 Typical Noise Levels".
4.10.1.2
Potential Impacts on Specific Unique and Sensitive Resources
Numerous schools, churches, nursing homes, and hospitals--which are particularly sensitive to noise and
air-quality impacts--are located in the project area. Table 4-12 provides a list of those sensitive receptors
located within about 1,000 feet of the impact areas for Phases 1, 2 and 3.
Potential impacts to the nearest sensitive receptors would vary as the Project advances. When
construction equipment is operating at the nearest points, noise levels could be as high as 75 dBA. Levels
this high would be limited, however, as construction activity would not continually occur at maximum
levels near any given receptor. Many of the nearest sensitive receptors are churches, and the most
sensitive times for these receptors are unlikely to correspond to the hours of peak construction activity.
Intervening homes, vegetation, and other structures would further mitigate noise levels potentially
reaching sensitive receptors.
247
Given the temporary duration and progressive movement of construction activity, the Requester's
Preferred Alternative is not expected to result in any prolonged adverse air quality or noise effects for any
specific unique or sensitive receptors.
Table 4-12
Sensitive Receptors within about 1,000 feet of Phases 1, 2, and 3
Minimum
Distance to
Peak Projected
Construction Construction Noise
Limits (feet)
Levels (dBA)
Project
Phase
Sensitive Receptor
1
Congregational United Church
225
75
1
McKinley Elementary School
305
72
1
First Lutheran Church
425
69
1
Old Soo Depot Transportation Museum
555
67
1
West Pedestrian Footbridge (Historic)
865
63
1
Trinity Homes
880
63
1
Erik Ramstad Middle School
935
63
1
Roosevelt Elementary School
1060
61
1
First Baptist Church
1075
61
2
Perkett Elementary School
250
74
2
First Church of the Nazarene
490
68
2
St. John the Apostle Catholic Church
900
63
2
Magic City Campus High School
1140
61
2
St. Mark's Lutheran Church
1260
60
3
Eagles Wings Community Fellowship
225
75
3
Magic City Campus High School
1,248
62
3
Perkett Elementary School
1115
61
Notes: Noise levels based on minimum distance and maximum noise source from Table 4-10 (Pile Driver =
88 dBA @ 50 feet).
4.10.1.3
Site-Specific Impacts for Construction Stage 1.5
Air quality and noise impacts from all phases of Construction Stage 1.5 would be the same as the general
impacts and mitigation measures described in Section 4.10.1.1. No site-specific effects would occur.
Residences and sensitive receptors in the vicinity of these three phases could experience minor, temporary
increases in air emissions (e.g., dust) and noise levels during construction of these phases.
248
4.10.2
4.10.2.1
No-Action Alternative
Air Quality
Under the No-Action Alternative there would be no change from existing air quality conditions described
in Section 3.10.
4.10.2.2
Noise
Under the No-Action Alternative there would be no change from existing noise conditions described in
Section 3.10, except during flood fighting efforts when noise levels could be higher in localized areas to
construct temporary flood risk-reduction features.
4.11
4.11.1
4.11.1.1
Human Health and Safety
Requester's Preferred Alternative
Human Health
Construction of the Requester's Preferred Alternative could temporarily affect human health.
Construction-related impacts that could affect the health of construction workers and nearby residents
include noise, vibrations, exhaust fumes, and dust, which are discussed in Section 4.10.1. Excavations could
uncover contaminated soils or groundwater that would need to be remediated, as discussed in
Section 4.5.1. Demolition of existing structures could disturb hazardous materials, such as asbestos.
Temporary impacts would be mitigated through best practices for managing health hazards associated
with demolition, heavy construction, and working in potentially contaminated sites.
The Requester's Preferred Alternative would have long-term benefits for human health. Many health
hazards occur after floods and during clean-up activities, including compromising the structural integrity
of roads, bridges, houses, and other structures in the damaged areas; dispersing sewage and pathogens
into residential areas; and creating unhealthy conditions (e.g., mold) in structures inundated by flood
waters. Reducing flood risk to the communities along the Souris River would reduce the potential for loss
of life or injuries during flood events and would minimize the many health hazards that result from
flooding of developed areas. In addition to reducing flood risks, the Requester's Preferred Alternative
would create park and recreational features along the river, which would make it easier for people in the
community to maintain active and healthy lifestyles.
4.11.1.2
Safety
Construction of the Requester's Preferred Alternative could temporarily affect human safety. Construction
activities would involve the use of heavy equipment to move, place and transport materials to and from
the site and would involve the demolition of existing structures. The requester has indicated that
temporary impacts to safety would be mitigated through best practices for ensuring safe construction
zones and travel routes to and from the site. Contractors for the Project would be required to develop
Project Health and Safety Plans (PHASP) which would specify safety procedures and programs to be
implemented for the safety and health of all persons and properties. The Contractor's PHASP would, at a
minimum, meet the regulatory requirements set forth by the Occupational Safety and Health
Administration (OSHA), specifically those set forth in the Code of Federal Regulations (CFR) at 29 CFR
249
Parts 1910 and 1926, in particular 1910.120 (Hazardous Waste Operations and Emergency Response), and
would comply with all other appropriate state and federal safety regulations.
4.11.2
No-Action Alternative
4.11.2.1
Human Health
The No-Action Alternative would have adverse impacts on human health during flood events and from
the resulting unhealthy conditions that are created in the flood-damaged areas. Residents in flood-prone
areas would be required to follow emergency health precautions to protect their health during and after
flood events.
4.11.2.2
Safety
The No-Action Alternative would have temporary adverse effects on human safety during floods, when
flood waters, the evacuation process, and flood fighting efforts would expose residents and workers to
unsafe conditions along the flooded river. The flood fighting associated with the No-Action Alternative
can be an intensive endeavor, carries a high level of risk and uncertainty, and has a higher potential for
failure than permanent flood risk reduction structures. There would be continual risks of loss of lives or
injuries during flood events under the No-Action Alternative, as in 2011 when two elderly residents in
Burlington died as a result of complications from flooding (reference [80]).
4.12
4.12.1
Cumulative Effects
Regulatory framework and overview
The Council on Environmental Quality's (CEQ) regulations (40 CFR §§1500 - 1508) implementing the
provisions of the National Environmental Policy Act (NEPA) of 1969 define cumulative effects as:
"the impact on the environment which results from the incremental impact of the action when
added to other past, present, and reasonably foreseeable future actions regardless of what agency
(Federal or non-Federal) or person undertakes such other actions (40 CFR §1508.7)."
Cumulative effects are defined in the context of the action, alternatives, and effects, and are evaluated
along with the Project's direct and indirect effects. The range of alternatives considered includes the noaction alternative as a baseline against which the cumulative effects on the environment are evaluated.
Analyzing cumulative effects requires identifying the environmentally relevant area, and the past, present
and future actions in that area that would contribute incrementally to the overall effect. The
environmentally relevant area is determined by both location and time. Future actions are those that are
reasonably likely to occur. A future project is only considered in this analysis if there is sufficient
information on the project to understand what its incremental contribution to cumulative effects might
be.
There have been numerous federal flood control projects in the Souris River Valley over the last 40 years,
including upstream flood storage reservoirs, levees, channel modifications, and pump stations. For the
purposes of the cumulative effects assessment, these projects are considered part of the existing
250
landscape and affected environment. They are described in detail in Section 1.4 and include existing flood
risk-reduction projects along the Souris River that were developed by the USACE as the Souris River Basin
Project.
4.12.2
Spatially and Temporally Relevant Projects
Some projects not related to the historical flood control efforts in the region could contribute to
cumulative effects in one or more resource areas. These projects are divided into two categories: projects
related to flood control and other relevant projects.
4.12.2.1
Projects Related to Flood Risk Reduction and Cleanup
Past Projects
1970s-1990s: The Souris River Basin Project The USACE constructed a series of flood risk reduction
projects under three separate congressional actions that are referred to collectively as the Souris River
Basin Project. These projects generally consist of upstream flood storage reservoirs, levees, modifications
to the Souris River channel, and pump stations. A detailed description of these projects can be found in
Section 1.4.
2011-2013: North Dakota Housing Rehabilitation and Citizen Retention Grant program In 2011,
the North Dakota legislature authorized the Housing Rehabilitation and Citizen Retention Grant program
and appropriated $10 million to help North Dakota homeowners cover the costs of repairing flooddamaged homes. The North Dakota Office of the Adjutant General awarded nearly $8 million in 2012 to
help residents in Minot and Ward County repair flood-damaged homes and to help cover the costs of
demolishing homes destroyed by the flood. The fund has also supported flood recovery efforts by Minot,
other flood-affected counties, and the Spirit Lake Nation.
In 2013, the legislature approved a plan to provide an additional $1.19 million in remaining program
funds to further assist residents in Minot and Ward County. About 600 households in Minot and Ward
County have received assistance through the Housing Rehabilitation and Citizen Retention Grant
program.
2012-2016: HUD Acquisition/Buyout Program In 2012, Minot began implementing an
acquisition/buyout program within the areas of the city affected by the 2011 flood. The program is funded
by the U.S. Department of Housing and Urban Development (HUD) Community Block Development Grant
Disaster Recovery (CBDG-DR) program. Under this program, Minot received two CDBG-DR funding
allocations (Section 4.6.1.1 includes details on the HUD CBDG-DR program). Home and business buyouts
through HUD's CDBG-DR program are voluntary, and are separate from the Requester's Preferred
Alternative.
The first allocation of ~$67.6M was approved in 2012, and enabled Minot to acquire properties, typically
including the lot, all structures, and mineral rights. All existing structures were removed from the acquired
properties as part of this effort. Under the first allocation, 83 homes were acquired. Nine were relocated
and the remaining 74 were demolished.
251
The second allocation of ~$35.1M was approved in 2013, and involved buying properties located within
the flood inundation area. Property buyouts included single- and multi-family residences, mobile homes
and pads, and religious and commercial establishments. Under the second allocation, an additional 80
properties were acquired, all of which were slated for demolition. Demolition of properties began in 2013
and is estimated to be completed in 2016.
Present and Ongoing (Future) Projects
2014-Present: System-Wide Improvement Framework (SWIF) In November 2013, the USACE
notified SRJB and WCWRD that all levee systems from Burlington through Minot would be rated
"Unacceptable." An "Unacceptable" rating is grounds for the USACE to assign the levee systems an
"inactive" status, making the levee sponsor ineligible for federal rehabilitation assistance following a flood
or natural disaster.
In order to prevent a lapse in rehabilitation assistance, the sponsors submitted requests to the USACE in
March 2014 for a conditional extension while they develop and implement a System Wide Improvement
Framework (SWIF). Two separate SWIF requests were submitted in the form of SWIF Letters of Intent, in
which the project sponsors presented an outline of actions taken to date, along with planned future
actions, to implement the system-wide improvements to the levee systems. Additional information on the
SWIF is provided in Section 1.4.
After the 2011 historic flood event, the NDSWC commissioned a study on how to reduce the risk of flood
damages within the Souris River Valley from a similar event in the future. This study resulted in
development of the Requester's Preferred Alternative. The SWIF plan, portions of which are still under
development, details the efforts associated with the Requester's Preferred Alternative and how it will
support the overall solution to bring the levee systems to an "Acceptable" rating.
The SWIF is intended to fulfill two objectives. First, it provides the SWIF plan requirements and outlines
the schedule and approach for the correction of USACE-identified deficiencies within the levee systems
from Burlington through Minot. Second, the SWIF provides the framework for coordination between the
remedial actions associated with the SWIF and the new construction activities associated with the
Requester's Preferred Alternative.
2015-Present: Federal Emergency Management Agency (FEMA) Floodplain Remapping Congress
requires FEMA to remap floodplains where growth has taken place. Proposed revisions to the FEMA
floodplain maps of the Souris River Valley were developed in 2015 and are currently under review by
FEMA, with approval anticipated in 2016. Previous FEMA flood maps were drawn to show a 100-year
(1-percent annual chance) flood event at 5,000 cfs. The proposed revisions to the floodplain maps would
draw the new boundaries of the 100-year (1-percent annual chance) flood event at 10,000 cfs, adding
about 3,200 properties to the regulatory floodplain. The proposed expansion of the regulatory floodplain
would require additional homeowners in the hazard areas to buy flood insurance.
2015-2017: Northern Area Water Supply; Minot Water Treatment Plant The Northern Area Water
Supply (NAWS) project is a large-scale regional effort to deliver water from the Missouri River to
252
northwest North Dakota, including Minot. One component of the NAWS project that could potentially
contribute to the cumulative effects in the project area is the proposed flood proofing of the Minot Water
Treatment Plant (WTP). During the 2011 flood, the Minot WTP was inundated and the water supply
contaminated with untreated river water. Because of the significant service this facility provides, Minot
determined that flood proofing of the WTP was a first priority in the development of the Project. All of the
proposed upgrades to the Minot WTP would occur within the existing boundaries of the WTP and would
not affect land use outside of those boundaries. Construction of the Water Treatment Plant Flood
Protection Project began in September 2015 and is anticipated to be completed in 2017.
2016: National Disaster Resilience Competition (NDRC) Grant The NDRC is a competitive grant
program that will make $1 billion available to communities struck by natural disasters in recent years.
Grants awarded through the competition promote risk assessment and planning and fund the
implementation of innovative resilience projects to better prepare communities for future storms and
other extreme events. Funding for the competition is from the Community Development Block Grant
disaster recovery (CDBG-DR) appropriation provided by the Disaster Relief Appropriations Act, 2013 (PL
113-2) (reference [81], reference [82]).
In January 2016, Minot was awarded $74,340,770 in NDRC funding to support its integrated approach to
addressing climate change and recent upstream development that has increased the risk of frequent
flooding. The City is launching a set of three integrated projects that will reduce flood risk and improve
water management, build affordable and resilient neighborhoods connected to transit and job centers,
and foster economic resilience by creating Centers for Technical Education.
2012-Present: Review of the International Operating Plan for Souris River Basin Reservoirs - The
sharing and management of water across the International Boundary between Canada and the United
States was established in the Boundary Waters Treaty of 1909. The Treaty also established an International
Joint Commission (IJC) to have jurisdiction over the use, obstruction or diversion of these waters. The
International Souris River Board (ISRB) was later established by the IJC and given responsible for ensuring
compliance with flow apportionment and low flow measures adopted by the two countries in the 1989
Canada-United States Agreement for Water Supply and Flood Control in the Souris River Basin.
The flooding in 2011 resulted in requests to: 1)review the Operating Plan contained in Annex A to the
1989 International Agreement, 2)evaluate additional flood protection measures, above and beyond what
is currently provided under the International Agreement, and 3)review the Operating Plan contained in
Annex A of the Agreement. As a result, the ISRB established the 2012 Souris River Basin Task Force which
developed a Plan of Study to conduct the review (reference [83]). The primary goal of the studies
identified in this Plan of Study is to enable the IJC to present recommendations for the consideration of
the Governments of Canada and the United States on alternatives to the operating rules contained in
Annex A of the 1989 agreement to maximize the provision of flood control and water supply benefits in
the Souris River basin. Alternatives evaluated may include raising of existing dams, changes to channel
alignment and capacity, provision of flood control measures in and around vulnerable communities, etc.
253
2016-Present: Souris River Basin Feasibility Study The USACE has initiated a Souris River Basin
Feasibility Study at the request of the Souris River Joint Water Resource Board who is serving as the
project sponsor. The feasibility study will identify ways to provide a flood risk management system to the
residents in the United States portion of the Souris River Basin. The steps of the study will involve problem
and opportunity identification, inventory, evaluation, screening alternatives, risk informed decision
making, determining the National Economic Development (NED) plan, identification of a Locally Preferred
Plan (LPP), designing and costing of the recommended plan, determining and disclosing the
environmental effects of the recommended plan, and documentation of the economic feasibility of a
recommended plan. The recommended plan may include, but is not limited to, the modification of
existing features or construction of new features such as levees, floodwalls, diversion channels, nonstructural flood-proofing, relocation of flood-prone structures, and flood storage, or no federal action.
4.12.2.2
Other Relevant Projects in the Area
Present and Ongoing (Future) Projects
2015-2017: Minot Downtown Infrastructure Improvements A series of infrastructure improvements
are underway in downtown Minot, in a project area generally bounded on the west by Broadway Street,
on the south by Burdick Expressway, on the east by Third Street SE, and on the north by the BNSF Railway
property and First Avenue NE. The improvements include constructing sanitary sewer mains and service
lines; storm sewer mains and inlets; water mains and service lines; sidewalks with ADA-compliant
pedestrian ramps; concrete streets with concrete curb and gutter; signage and street striping; street
lighting; and streetscape components. Improvements will also include demolition of existing items;
abandonment of existing sub-sidewalk vaults; traffic control; and erosion control. The infrastructure
improvements are expected to be completed in 2017.
2016: U.S. Highway 83 Bypass/U.S. Highway 2 interchange improvement In accord with the North
Dakota Department of Transportation (NDDOT) Statewide Transportation Improvement Plan (STIP), the
interchange of U.S. Highway 83 bypass and U.S. Highway 2 on the west side of Minot will be improved in
fiscal year 2016. Improvements will include a new bridge deck overlay and reconstruction of on and off
ramps. Construction of this project will result in temporary, localized traffic modifications until the work is
completed.
2017-2019: U.S. Highway 83/Broadway Viaduct Structure Replacement Also in accord with the
NDDOT STIP, the viaduct structure at U.S. Highway 83 and Broadway will be rebuilt in fiscal years 20172019. Construction of this project will result in temporary, localized traffic modifications until the work is
completed.
2016-2019: Minot Intersection Improvements and Turn Lane Additions The NDDOT STIP also
includes improvements at various local road intersections within Minot in fiscal years 2016-2019.
Intersection improvements can typically include turn lane additions or turn radius adjustments, and may
also include signal control changes. Construction of these projects will result in temporary, localized traffic
modifications until the work is completed, however, the incremental contribution of the proposed
254
intersection improvements to cumulative effects in the area would vary depending on the distance of a
particular intersection improvement from the Requester's Preferred Alternative.
2016: Other General Street and Infrastructure Improvements - Minot is currently accepting bids for
other street and infrastructure improvements to be completed in 2016. These include sidewalk, curb and
gutter replacements, street sealing and patching projects, and an extension of the Thirty-Sixth Avenue
sanitary sewer line to Broadway.
Anticipated Future Parks and Trails - The 2012 Minot Comprehensive Plan assessed the existing
availability of neighborhood parks, community parks, athletic facilities, special use parks and open
space/greenway corridors within Minot. The Comprehensive Plan projects a need for an additional 360 to
635 acres of park lands by 2030, which is based on a desired ratio of 20 to 25 acres of park land per 1,000
people, and the projected 2030 Minot population of 55,000 people. To meet this anticipated demand, the
Comprehensive Plan calls for an additional ten neighborhood parks, four community parks, additional ball
fields, soccer fields, a golf course, an additional special use park, and additional open space/greenway
acreage. The Comprehensive Plan also calls for an expansion of the existing trails system from the current
19.6 miles to 96.3 miles.
Anticipated New Housing Developments - In the early 2010s, there was a rapid expansion of oil field
facilities in North Dakota, including in the Minot area. As a result, there was an increased demand for
additional housing to accommodate oil industry workers who relocated to the Minot area. New housing
was also needed to accommodate Minot residents displaced by the 2011 flood. With the sharp decline in
oil prices in recent years, and the ensuing decrease in production in North Dakota oil, demand for housing
is currently lower than during the initial influx of oil-related workers. Rental prices dropped in 2015 by as
much as 20% in cities like Minot [reference [84]}. Nevertheless, the median home value in North Dakota
has gone up 4.3% since April 2015, and is forecast to rise another 2.7% in the next year [reference [54]}.
However, demand for housing for oil industry workers and others relocating to Minot is expected to
increase when oil prices and production rise (Housing Predictor 2015).
4.12.3
Assessment of Cumulative Effects
The primary cumulative socioeconomic effects of the Requester's Preferred Alternative and the past,
present, and future projects identified in Section 4.12.2 would include residence displacements, and
temporary and recurring traffic modifications. Projects not related to flood control and cleanup would
have little or no effect on property displacements. They would, however, affect traffic in the vicinity of the
project.
The Requester's Preferred Alternative and the past, present, and future flood risk reduction and cleanup
projects identified in Section 4.12.2.1 would contribute to adverse cumulative effects on property
displacement by adding to the number of residential and commercial properties bought out or removed
for flood risk reduction projects. This adverse cumulative effect would be offset, however, by the beneficial
long-term cumulative effects of the Requester's Preferred Alternative in combination with the other
projects. This is because the Requester's Preferred Alternative would provide long-term protection to
255
properties within potentially flood-prone areas, greatly reducing the likelihood for future flood-related
property displacements and buyouts.
In addition, the HUD CBDG-DR, the NDRC Grant, and the North Dakota Housing Rehabilitation and
Citizen Retention Grant programs would offset financial losses from flood damage and ensuing repairs
and demolition, and reduce the number of properties exposed to potential future flood damages.
Cumulatively and collectively, the Requester's Preferred Alternative and the other flood risk reduction
projects identified in Section 4.12.2.1 would have the long-term beneficial effect of stabilizing property
values and protecting properties from future flood damage.
The Requester's Preferred Alternative and all past, present, and future projects identified in
Section 4.12.2.1 and Section 4.12.2.2 would affect traffic because all of these projects would require some
degree of temporary or permanent traffic modification in the vicinity of the Project. Traffic modifications
during construction would be temporary, but once construction has been completed, traffic flow would be
improved and ultimately result in long-term and beneficial cumulative effects.
Overall, the Requester's Preferred Alternative and the past, present, and future projects identified in
Section 4.12.2 would not result in significant adverse cumulative effects on property displacements and
traffic. These projects would have a long-term beneficial cumulative effect on property displacements and
traffic. This is because, as discussed above, effects during the construction and implementation stages
would be temporary and would be outweighed by the long-term benefits.
A significant cumulative socioeconomic benefit of the Requester's Preferred Alternative and the past,
present, and future projects identified in Section 4.12.2 would be to limit the number of homeowners
required to purchase flood insurance as a result of the FEMA floodplain remapping. This effect would
occur due to the various property buyout programs, and to the reduced inundation area created by the
Requester's Preferred Alternative. Under the No-Action Alternative, the cumulative effect would be an
increased number of homeowners required to purchase flood insurance as a result of the FEMA floodplain
remapping.
In addition to impacts resulting from the Requester's Preferred Alternative, past, present, and future
pressures from urbanization, development, and agricultural practices would likely continue to adversely
affect wetlands. Wetlands that flow to Waters of the United States, such as the Souris River, fall under
jurisdiction of the USACE and may require mitigation. Mitigation through the Ducks Unlimited North
Dakota Aquatic Resource In-Lieu-Fee Program has become a frequently utilized mitigation option.
Although the Program provides mitigation, it may not result in wetlands to be restored, enhanced or
established in the immediate area, but within the larger Souris River Basin Regional Service Area.
With respect to wetlands not regulated by USACE, North Dakota does not currently have any regulatory
agencies that require mitigation for impacts to those wetlands; it is likely that there would continue to be
degradation and loss of these resources.
256
The Requester's Preferred Alternative and the past, present, and future flood control and cleanup projects
identified in Section 4.12.2 have and will continue to impact biological resources, including native
vegetation communities, wildlife and aquatic habitat and sensitive species. The project area is intensively
urbanized. The landscape has undergone substantial land use changes, including urban expansion and
alterations to riparian and aquatic habitat to provide flood risk reduction. For example, previous flood
projects have included channel widening and straightening, which has significantly altered aquatic and
riparian habitat and natural river processes. The requester's preferred alternative would include project
features that contribute further to some of these habitat stressors. However, permit conditions and
associated mitigation could help to off-set project-specific impacts.
The Requester's Preferred Alternative and other projects also generate cumulative effects on air quality,
health and safety, recreation, cultural resources, and contaminated sites. However, the cumulative effect
on these resources is expected to be relatively minor. This is because the project area is intensively
urbanized and developed. Noise and dust impacts would be temporary and minor, and would be further
mitigated through implementation of BMPs and constraints on hours of construction.
4.13
Interim Impacts
With the Requester's Preferred Alternative, flood risk reduction features would be built in phases over the
next 25 or more years. As phases are constructed, portions of the project area would have a reduced flood
risk. However, reducing flood risk with levees may cause increases in the frequency, depth, and duration
of flooding to areas where the Project has yet to be constructed. Areas without Project levees could have
increased flood risk; these impacts will be referred to as interim impacts. Most interim impacts would not
be appreciably different from what was described earlier in Section 4. However, changes in flood depth
and area of inundation do have the potential to alter the intensity of flood impacts on structures, which
will be the focus of this section.
Interim impacts were evaluated for four construction stages (Stages 1, 1.5, 2, and 3). Construction stages
are a combination of Project phases that can be used to describe larger portions of the Project. Stage 1
includes phases 1, 2, and 3 of the Project and represents the portion of the Project that is being pursued
for USACE Section 408 permission. Stages 1.5, 2, and 3 are made up of phases that when combined,
would provide independent flood risk reduction for portions of the project area.
Interim impacts for each construction stage are assessed relative to the No-Action Alternative, which
assumes a successful flood fight up to 10,000 cfs. This assessment demonstrates how inundation areas
and depths could change after the implementation of each construction stage.
4.13.1
Construction Stages
Design and construction of the Project would be in phases. These phases were grouped into construction
stages, defined by the likely sequence of construction, as identified by the Project requester. The Project
requester's rational for the construction sequencing was to minimize interim impacts from construction of
Project phases. Table 4-13 shows the extent of construction included in each construction stage.
257
The initial impacts analysis evaluated three construction stages (1, 2, and 3). The construction of Stage 4
results in the completion of the Requester's Preferred Alternative. Therefore there are no interim impacts
associated with Stage 4, rather only the permanent impacts of the Requester's Preferred Alternative, as
disclosed throughout Section 4. A fifth construction stage between Stage 1 and Stage 2 was identified
later in the analysis and is referred to as Stage 1.5. Stage 1.5 is also included in the interim impacts
analysis.
4.13.1.1
Construction Stage 1
Construction Stage 1 refers to the conditions after completion of the Project phases currently authorized
for design by the SRJB and being pursued for Section 408 permissions: Fourth Avenue NE (Phase 1), Napa
Valley (Phase 2), and Forest Road (Phase 3). In addition, Stage 1 would include the independent leveefloodwall system for the Minot Water Treatment Plant. Areas included in Stage 1 are shown in Table 4-13
and in Figure 4-10.
With the exception of the Water Treatment Plant levee-floodwall system, the changes implemented
during Construction Stage 1 would not remove areas from the regulatory floodplain. Flood risk-reduction
features of the Napa Valley, Forest Road North and Fourth Avenue NE phases would not tie into high
ground, so additional flood fighting would be required to prevent flows over 5,000 cfs from flowing
around the features.
4.13.1.2
Construction Stage 1.5
Construction Stage 1.5 was added as an intermediate construction stage after Construction Stages 1, 2, 3,
and 4 had been analyzed. Construction Stage 1.5 refers to conditions after completion of Construction
Stage 1, plus features along Tierrecita Vallejo; U.S. Highway 83 Bypass bridge replacement; Maple Avenue
high-flow diversion; and the tie-back levee extending east from the Fourth Avenue NE floodwall along the
north side of the railroad tracks. Areas included in Construction Stage 1.5 are shown in Table 4-13 and in
Figure 4-11.
Features in Phases 1, 2, and 3 (Stage 1) would be designed for the 27,400 cfs flood event. However, the
tie-back levee would only be designed for the 10,000 cfs flood event with at least three feet of additional
levee height above the 10,000 cfs water surface elevations. The tie-back levee was designed as a
temporary feature that would be superseded by features designed to 27,400 cfs in Construction Stage 2.
Upon completion of Stage 1.5, a substantial portion of NW Minot would have a functional levee system
designed to provide flood risk reduction to floods of 10,000 cfs. This would allow for FEMA accreditation
of the features, exclusion of the protected areas from the regulatory floodplain, and exemption of
properties in this area from needing to purchase flood insurance. The tie-back levee would be overtopped
during a 27,400 cfs event, but the inundation would not be as extensive or as deep as it was during the
2011 flood. The upstream flood risk reduction features would prevent flooding from upstream. As such,
the tie-back levee and landward area could only be overtopped and inundated by the flood elevation
adjacent to it. The flood elevation for the area adjacent to the tie-back levee is lower, which would result
in less extensive flooding.
258
4.13.1.3
Construction Stage 2
Construction Stage 2 refers to the conditions after completion of Construction Stage 1.5, plus the
construction of features in the following areas: Rodeo Road; North Roosevelt Park; Burdick bridge; North
Valker Road; South Valker Road; Twenty-Seventh Street SE High-Flow Diversion; and Burlington. The areas
included in Construction Stage 2 are shown in Table 4-13 and in Figure 4-12. This stage would complete
all Project features on the left bank (north side) of the Souris River in Minot. Areas behind the left bank
levee system would be eligible for accreditation by FEMA and removal from the regulatory floodplain.
4.13.1.4
Construction Stage 3
Construction Stage 3 refers to the conditions after completion of Construction Stage 2, plus the features
and bridge modifications in the following areas: South Downtown Floodwalls, South Roosevelt Park; South
Keller; U.S. Highway 2 bridge; Apple Grove Golf Course; Brooks Addition; Country Club; and Talbots. The
locations of features for Construction Stage 3 are shown in Table 4-13 and in Figure 4-13. This stage
would complete the remaining Project segments on the right bank (south side) of the Souris River in
Minot as well as three of the four independent segments between Burlington and Minot.
4.13.1.5
Construction Stage 4
Construction Stage 4 refers to the conditions after completion of the Requester's Preferred Alternative.
The remaining areas requiring construction in Stage 4 would include Kings Court, Eastside Estates,
Chaparelle, and a road raise for U.S. Highway 52 southeast of Minot. The portions of the Project included
in Construction Stage 4 are shown in Table 4-13 and in Figure 4-14. Impacts from completing this stage
are discussed in the previous environmental consequences sections where it is referred to as the
Requester's Preferred Alternative.
259
Table 4-13
Reach
Construction Stage Definitions
Project Segments
Construction Construction Construction Construction Construction
Stage 1
Stage 1.5
Stage 2
Stage 3
Stage 4
Brooks Addition
Country Club
Talbotts
Upstream of Minot
Burlington
Kings Court
Tierrecita Vallejo
U.S. Highway 83 Bypass Bridge
Napa Valley
Forest Road North
Water Treatment Plant(1)
Rodeo Road
North Roosevelt Park
Burdick Bridge
South Valker Road
North Valker Road
27th Street SE High-Flow
Diversion
South Downtown Floodwalls
South Roosevelt Park
South Keller
U.S. Highway 2 Bridge
Apple Grove
Maple Avenue High-Flow
Diversion
Broadway Bridge
Minot
4th Avenue NE
Eastside Estates
Chaparelle
U.S. Highway 52 Road Raise,
Minot
260
Current Construction Stage (1)
Future Construction Stages
(1.5, 2, 3, 4)
Municipality
Burlington
CITY OF
BURLINGTON
Brooks
Addition
£
¤
B83
Country
Club Acres
Barr Footer: ArcGIS 10.4, 2017-05-01 09:57 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-10- Construction Stage 1 Project Segments.mxd User: kac2
Talbotts
Nursery
£
¤
83
Kings
Court
4th Avenue NE
Rodeo
Road
4th Avenue
Tieback Levee
Maple Avenue
Diversion
Downtown
Floodwalls
Forest Road
Tierrecita
Vallejo
N Roosevelt
Park
£
¤
B2
Napa Valley
S Roosevelt
Park
CITY OF MINOT
Minot Water
Treatment Plant
S Valker
Road
I
N Valker
Road
0
27th St
Diversion
2,000
4,000
8,000
Feet
£
¤
B52
£
¤
2
South
Keller
River
Oaks
Apple
Grove
£
¤
Eastside
Estates
Figure 4-10
52
Chaparelle
Imagery: USDA NAIP Imagery 2014
CONSTRUCTION STAGE 1
PROJECT SEGMENTS
Mouse River Enhanced Flood
Protection Project
Minot, North Dakota
Previous Construction Stage (1)
Current Construction Stage (1.5)
Future Construction Stages
(2,3,4)
Municipality
Burlington
CITY OF
BURLINGTON
Brooks
Addition
£
¤
B83
Country
Club Acres
Barr Footer: ArcGIS 10.4, 2017-05-01 09:57 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-11 - Construction Stage 1 5 Project Segments.mxd User: kac2
Talbotts
Nursery
£
¤
83
Kings
Court
4th Avenue NE
Rodeo
Road
4th Avenue
Tieback Levee
Maple Avenue
Diversion
Downtown
Floodwalls
Forest Road
Tierrecita
Vallejo
N Roosevelt
Park
Napa Valley
£
¤
S Roosevelt
Park
CITY OF MINOT
Minot Water
Treatment Plant
I
B2
S Valker
Road
N Valker
Road
0
27th St
Diversion
2,000
4,000
8,000
Feet
£
¤
B52
£
¤
2
South
Keller
River
Oaks
Apple
Grove
£
¤
Eastside
Estates
Figure 4-11
52
Chaparelle
Imagery: USDA NAIP Imagery 2014
CONSTRUCTION STAGE 1.5
PROJECT SEGMENTS
Mouse River Enhanced Flood
Protection Project
Minot, North Dakota
Previous Construction Stages
(1, 1.5)
Current Construction Stage (2)
Future Construction Stages
(3,4)
Municipality
Burlington
CITY OF
BURLINGTON
Brooks
Addition
£
¤
B83
Barr Footer: ArcGIS 10.4, 2017-05-01 09:56 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-12 - Construction Stage 2 Project Segments.mxd User: kac2
Talbotts
Nursery
Country
Club Acres
£
¤
83
Kings
Court
4th Avenue NE
Rodeo
Road
4th Avenue
Tieback Levee
Maple Avenue
Diversion
Downtown
Floodwalls
Forest Road
Tierrecita
Vallejo
N Roosevelt
Park
£
¤
B2
Napa Valley
S Roosevelt
Park
CITY OF MINOT
Minot Water
Treatment Plant
S Valker
Road
I
N Valker
Road
0
27th St
Diversion
2,000
4,000
8,000
Feet
£
¤
B52
£
¤
2
South
Keller
River
Oak
Apple
Grove
£
¤
Eastside
Estates
Figure 4-12
52
Chaparelle
Imagery: USDA NAIP Imagery 2014
CONSTRUCTION STAGE 2
PROJECT SEGMENTS
Mouse River Enhanced Flood
Protection Project
Minot, North Dakota
Previous Construction Stages
(1, 1.5, 2)
Current Construction Stage (3)
Future Construction Stage (4)
Municipality
Burlington
CITY OF
BURLINGTON
Brooks
Addition
£
¤
B83
Country
Club Acres
Barr Footer: ArcGIS 10.4, 2017-05-01 09:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-13 - Construction Stage 3 Project Segments.mxd User: kac2
Talbotts
Nursery
£
¤
83
Kings
Court
Rodeo
Road
4th Avenue NE
4th Avenue
Tieback Levee
Maple Avenue
Diversion
Downtown
Floodwalls
Forest Road
Tierrecita
Vallejo
N Roosevelt
Park
£
¤
I
B2
Napa Valley
S Roosevelt
Park
CITY OF MINOT
Minot Water
Treatment Plant
S Valker
Road
N Valker
Road
0
27th St
Diversion
2,000
4,000
8,000
Feet
£
¤
B52
£
¤
2
South
Keller
River
Oaks
Apple
Grove
£
¤
Eastside
Estates
Figure 4-13
52
Chaparelle
Imagery: USDA NAIP Imagery 2014
CONSTRUCTION STAGE 3
PROJECT SEGMENTS
Mouse River Enhanced Flood
Protection Project
Minot, North Dakota
Previous Construction Stages
(1,1.5, 2, 3)
Current Construction Stage (4)
Municipality
Burlington
CITY OF
BURLINGTON
Brooks
Addition
£
¤
B83
Country
Club Acres
Barr Footer: ArcGIS 10.4, 2017-05-01 09:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-14 - Construction Stage 4 Project Segments.mxd User: kac2
Talbotts
Nursery
£
¤
83
Kings
Court
Rodeo
Road
4th Avenue NE
4th Avenue
Tieback Levee
Maple Avenue
Diversion
Downtown
Floodwalls
Forest Road
Tierrecita
Vallejo
N Roosevelt
Park
Napa Valley
£
¤
S Roosevelt
Park
CITY OF MINOT
Minot Water
Treatment Plant
I
B2
S Valker
Road
N Valker
Road
0
27th St
Diversion
2,000
4,000
8,000
Feet
£
¤
B52
£
¤
2
South
Keller
River
Oaks
Apple
Grove
£
¤
Eastside
Estates
Figure 4-14
52
Chaparelle
Imagery: USDA NAIP Imagery 2014
CONSTRUCTION STAGE 4
PROJECT SEGMENTS
Mouse River Enhanced Flood
Protection Project
Minot, North Dakota
4.13.2
Flood Events
Interim impacts were evaluated for the 5,000 cfs, 10,000 cfs and 27,400 cfs flood events. The 5,000 cfs
flood event was selected because it is the level at which the existing Souris River Basin Project provides
protection without intervention, it is the FEMA effective 100-year (1-percent annual chance) flood flow for
Ward County, and also because it is the maximum target discharge through Minot that governs releases
from Lake Darling Dam and Canadian reservoirs during a flood fight. The 10,000 cfs event was selected
because it is FEMA's proposed 100-year flood flow for Ward County as well as being the approximate flow
at which the existing discontinuous levees can provide protection by filling the gaps. The 27,400 cfs flood
event was selected because it is the flood of record and the design flood for the Requester's Preferred
Alternative.
Models simulating flows of 14,000 and 20,000 cfs were also created as part of project development;
however, the interim impacts at these flows were not appreciably different than the 10,000 cfs and 27,400
cfs events. Therefore, these model results are not presented in the EIS. Analysis of other flow rates are
provided in the Basis of Design Report [reference [4]].
4.13.3
Interim Impacts to Flood Depth and Area of Inundation
The Requester's Preferred Alternative would progressively block off areas of the floodplain from
inundation. Properties in these areas would have a reduced flood risk, but would also tend to increase the
depth of flooding in other areas. Higher flood levels would also cause waters to flow into areas that
wouldn't flood under existing conditions. Inundation depth changes are shown in a series of maps in
Appendix K. Table 4-14 list the three sets of inundation maps showing changes in depth with the
Requester's Preferred Alternative in respect to the No-Action Alternative.
Table 4-14
No-Action Alternative: Interim Project Inundation Area and Depth Impacts Maps
Construction Stages
1
5,000 cfs
10,000 cfs
27,400 cfs
Map 5k Stage1
Map 10k Stage1
Map 27k Stage1
Map 5k Stage1.5
Map 10k Stage1.5
Map 27k Stage1.5
2
Map 5k Stage2
Map 10k Stage2
Map 27k Stage2
3
Map 5k Stage3
Map 10k Stage3
Map 27k Stage3
4
Map 5k Stage4
Map 10k Stage4
Map 27k Stage4
1.5
See Appendix K for maps
The maps in Appendix K show the areas expected to be inundated or dry for each construction stage at
flows of 5,000 cfs, 10,000 cfs, and 27,400 cfs. The maps also show the anticipated change in depth
throughout the project area during the various construction stages. Categories describing changes in
depth that are displayed on the maps include: locations that would no longer be inundated; areas that
would be inundated with water depths expected to be less than 0.1 feet; locations where the inundation
depth increases by 0.1 feet to 0.5 feet; and locations where the inundation depth increases by more than
266
0.5 feet. Table 4-15 summarizes the approximate number of structures that are within each of these areas.
The tables show how there would be few structures affected by the Project at 5,000 cfs.
Table 4-15 provides an estimate of the number of structures that would be affected by the Project after
each construction stage. Structure counts were developed using LiDAR survey and aerial imagery.
Counted structures include homes, businesses, garages, sheds, barns, and other outbuildings. The
approximate number of affected structures are presented as a range because the number of structures in
the project area changes regularly; there are on-going buyouts and the demolition of properties. The
ranges also help account for slight margins of error associated with the modeling that structure counts
are based on. The structure counts exclude structures that are located within the Project footprint and
would need to be purchased prior to construction. The analysis assumes that the first floor elevation of
structures is the LiDAR based elevation at the centroid of the structure.
Table 4-15
No-Action Alternative: Summary of Inundation Changes for Structures
Inundation Changes by
Peak Flood Flow (1)
Approximate number of structures inundated during construction of the
Project
Construction
Stage 1
Construction
Stage 1.5
Construction
Stage 2
Construction
Stage 3
Construction
Stage 4
Less than 0.1 feet(2)
20 to 40
20 to 40
10 to 30
10 to 30
10 to 30
0.1 to 0.5 feet
0 to 10
0
0 to 20
0 to 20
0 to 20
More than 0.5 feet
0
0
0 to 10
0
0
No Longer Inundated
0
0
0
0 to 20
0 to 20
Construction
Stage 1
Construction
Stage 1.5
Construction
Stage 2
Construction
Stage 3
Construction
Stage 4
110 to 130
30 to 50
20 to 40
30 to 50
20 to 40
0
60 to 80
70 to 90
20 to 40
20 to 40
0 to 10
0 to 10
0 to 20
20 to 40
10 to 30
0
0 to 20
10 to 30
30 to 50
40 to 60
27,400 cfs
Construction
Stage 1
Construction
Stage 1.5
Construction
Stage 2
Construction
Stage 3
Construction
Stage 4
Less than 0.1 feet(2)
4010 to 4110
4580 to 4680
480 to 500
220 to 240
50 to 70
0.1 to 0.5 feet
90 to 110
70 to 90
70 to 90
60 to 80
60 to 80
More than 0.5 feet
770 to 790
20 to 40
590 to 610
30 to 50
50 to 70
No Longer Inundated
230 to 250
420 to 440
3980 to 4080
4780 to 4880
4940 to 5040
5,000 cfs
10,000 cfs
Less than 0.1 feet(2)
0.1 to 0.5 feet
More than 0.5 feet
No Longer Inundated
(1)
(2)
Maps in Appendix K show the areas that correspond to the four different inundation change categories in this table.
Flood elevation changes of less than 0.1 feet includes areas where the flood elevation decreases.
267
Interim impacts due to changes in inundation area and depth were also quantified. This portion of the
interim impacts analysis calculated the number of acres that would be inundated for a given flood event
in addition to the area that would no longer be inundated.
Inundation area changes were calculated for three geographic areas: Upstream of Minot, Minot, and
downstream of Minot. Upstream of Minot is defined as areas upstream of the U.S. Highway 83 Bypass
bridge to immediately upstream of the confluence of the Mouse and Des Lacs Rivers. Minot is defined as
the area between the U.S. Highway 83 Bypass bridge and the U.S. Highway 2 bridge. Downstream of
Minot is defined as the area between the U.S. Highway 2 bridge and just downstream of the ThirtySeventh Avenue SE bridge.
4.13.3.1
Impacts Upstream of Minot
There would be little change to the depth or area of inundation at 5,000 cfs upstream of Minot for any of
the construction stages. This is because the Requester's Preferred Alternative levees and floodwalls would
be constructed such that they would not restrict the 5,000 cfs flood event any more than the existing
federal levees. The few inundation depth and area changes at 5,000 cfs would be associated with
overbank excavation along the proposed levees and channel modifications near Kings Court.
There would be a net reduction in the inundation area at 10,000 cfs upstream of Minot after some
construction stages (Figure 4-15 and Figure 4-16). However, some areas upstream of Minot would be at
an increased risk of flooding during interim stages that coincide with major flood events (Appendix K).
While floods of this magnitude are unlikely (e.g., potentially a 100-year flood or greater), it's important to
realize some areas could see a greater risk of flooding under such conditions during interim construction.
Hydraulic modeling suggests some areas could see an increase in water elevations of up to a half-foot or
more for floods at or above 10,000 cfs. Areas with the greatest risk are immediately upstream of the City
of Minot, approximately between the U.S. Highway 83 bridge and King's Court. Some areas just
downstream of Burlington also could see an increased risk for flooding under later construction stages
during larger floods. The maps in Appendix K show locations upstream of Minot that may have increased
interim flood risk.
268
n.c.: no change from existing conditions
5: inundation area increases by 5 acres compared to existing condition
-5: inundation area decreases by 5 acres compared to existing conditions
Upstream of Minot
5,000 cfs
2500
10,000 cfs
29
2302
27,400 cfs
-111
-239
ACRES
2000
-559
1500
1000
-15
1472
1
721
-81
-94
-184
-168
8
7
-9
-603
-2
500
0
Existing Conditions
Stage 1
Stage 1.5
Stage 2
Stage 3
Stage 4
Minot
5,000 cfs
2475
2500
10,000 cfs
-65
27,400 cfs
-143
ACRES
2000
1500
-1435
1000
500
26
1
279
35
15
-4
538
33
26
-1832
-31
-1832
33
-33
0
Existing Conditions
Stage 1
Stage 1.5
Stage 2
Stage 3
Stage 4
Downstream of Minot
5,000 cfs
10,000 cfs
27,400 cfs
2500
ACRES
2000
1500
1000
500
nc
683
453
227
nc
-1
17
nc
nc
36
-4
1
-75
-204
-126
-76
-162 -292
0
Existing Conditions
Figure 4-15
Stage 1
Stage 1.5
Stage 2
Stage 3
Net Inundation Area Changes Relative to No Action Alternative
P:\Mpls\34 ND\51\34511010 Mouse River Phases 2 & 3 Prmt\WorkFiles\Task 4 - HandH\Job2_408Submittal2\030_ImpactAnalysis\Inundation Area\Area impacts analysis_FEIS.xlsx
Stage 4
5000 cfs (50-year)
5000 cfs (50-year)
5000 cfs (50-year)
100
3
3
19
45
55
-1
-11
-11
-36
-57
-100
No Longer Inundated
0
6
34
78
86
86
-5
-9
-52
-54
-54
-100
-200
-300
New Inundation
No Longer Inundated
0
2
22
54
60
-15
-96
-103
-222
-244
-100
New Inundation
No Longer Inundated
100
0
-200
Stage 4
12
-16
30
11
17
22
26
-2
-122
-256
-582
-628
-500
-1,000
-1,500
-2,000
Figure 4-16
New Inundation
No Longer Inundated
Stage 3
Stage 4
0
0
0
26
26
0
0
-4
-101
-101
100
-100
-200
Stage 4
77
-61
148
-113
158
-190
156
-190
New Inundation
No Longer Inundated
Stage 1
Increase
Stage 3
500
0
Stage 2
-100
-300
Decrease
Stage 2
Stage 3
New Inundation
No Longer Inundated
Stage 1
Stage 1.5
Stage 2
Stage 3
Stage 4
0
18
37
51
41
0
-1
-1
-176
-203
200
100
0
-100
-200
New Inundation
No Longer Inundated
-300
27,400 cfs (2011)
Changes in Inundation Area (acres)
Increase
Decrease
Changes in Inundation Area (acres)
Stage 1.5
Stage 1.5
200
27,400 cfs (2011)
Stage 1
Stage 2
10,000 cfs (100-year)
Stage 1.5
Stage 2
27,400 cfs (2011)
Stage 3
Stage 4
500
0
24
29
66
31
31
-89
-173
-1501
-1863
-1863
-500
-1,000
-1,500
-2,000
New Inundation
No Longer Inundated
Increase
-300
Stage 1.5
-300
Increase
100
-200
Stage 1
200
0
Decrease
Stage 1
Increase
Stage 4
Decrease
Stage 3
Changes in Inundation Area (acres)
Increase
Stage 2
Stage 4
10,000 cfs (100-year)
200
0
Decrease
Changes in Inundation Area (acres)
Stage 1.5
Stage 3
100
10,000 cfs (100-year)
Stage 1
Stage 2
Decrease
-300
New Inundation
Stage 1.5
Changes in Inundation Area (acres)
-200
Stage 1
200
Decrease
Stage 4
Changes in Inundation Area (acres)
Stage 3
Changes in Inundation Area (acres)
Stage 2
Decrease
Stage 1.5
Increase
Downstream of Minot
Increase
Minot
Changes in Inundation Area (acres)
Increase
Stage 1
50-year, 100-year, 2011
Upstream of Minot
200
0
Decrease
Changes in Inundation Area (acres)
Inundation Area Changes - All Construction Stages
Stage 1
Stage 1.5
Stage 2
Stage 3
Stage 4
0
0
1
0
4
0
0
0
-205
-296
500
0
-500
-1,000
-1,500
-2,000
New Inundation
No Longer Inundated
Net Inundation Area Impacts
P:\Mpls\34 ND\51\34511010 Mouse River Phases 2 & 3 Prmt\WorkFiles\Task 4 - HandH\Job2_408Submittal2\030_ImpactAnalysis\Inundation Area\Area impacts analysis_FEIS.xlsx
printed: 5/12/2017
4.13.3.2
Impacts in Minot
The total inundation area at 5,000 cfs within Minot changes little for the different interim construction
stages. This is because flow is generally contained within the channel, and the levees and floodwalls for
the Requester's Preferred Alternative would not restrict the 5,000 cfs flood event any more than the
existing federal levees. The locations that are inundated would change in some areas primarily due to
overbank excavation along proposed levees and channel modifications at Burdick Expressway.
The total inundation area at 10,000 cfs in Minot is roughly 430 acres for the No-Action Alternative
(Figure 4-16). Successive construction stages would move levees further back from their existing locations
resulting in an increase in the area of inundation.
Interim impacts would be more pronounced with major flood events above 10,000 cfs. The inundation
area at 27,400 cfs in Minot would be slightly reduced after Construction Stages 1 and 1.5, and significantly
reduced after Construction Stages 2 and 3 (Figure 4-16). The reductions in the inundation area would
come as the Requester's Preferred Alternative completes independent levee systems. The Requester's
Preferred Alternative would restrict the available conveyance area for the 27,400 cfs flood which would
increase the flood profile. While floods of this magnitude are unlikely, some areas could see a greater risk
of flooding under such conditions during interim construction. Hydraulic modeling suggests some areas
could see an increase in water elevations of up to 0.5-foot or more for floods of 27,400 cfs. Areas with the
greatest risk are around the Souris Valley Golf Course, the neighborhood on the east side of the 2 nd
Avenue bridge, and the area south of the river near Roosevelt Park. Interim flood risks would change
greatly with each construction stage (Appendix K).
4.13.3.3
Impacts Downstream of Minot
The inundation area at 5,000 cfs downstream of Minot would not be affected by Construction Stages 1,
1.5, and 2 because these stages would be constructed upstream. Construction Stages 3 and 4 would
construct flood risk-reduction features downstream of the U.S. Highway 2 bridge. Some of the
developments protected by Stages 3 and 4 do not have federal project levees, are more flood prone than
the rest of the project area, and would otherwise flood at flows between 5,000 and 10,000 cfs.
The inundation area at 10,000 cfs downstream of Minot would increase after Construction Stages 1.5, 2,
and 3 (Figure 4-16). The newly inundated areas are caused by an increase in the peak flow downstream of
Minot for the 10,000 cfs event because temporary flood storage in the floodplain in Minot would be
reduced. Construction Stages 3 and 4 would place flood risk-reduction features downstream of the U.S.
Highway 2 bridge and would remove some areas from the 10,000 cfs floodplain. However, some areas
downstream of Minot would be at an increased risk of flooding during the construction process if a flood
of this magnitude occurs. The location of elevated flood risk is dependent on flood size and the stage of
Project construction (Appendix K). For example, the Apple Grove area could see an elevated flood risk
until its levee is built in Construction Stage 3. Eastside Estates could see an elevated risk until its levee is
built in Construction Stage 4. Additionally, under current preliminary plans, not every structure
downstream of Minot would be protected by Project features. The maps in Appendix K show areas
downstream of Minot that may have increased interim flood risk.
271
4.13.4
Interim Impacts on Historic Structures
Interim impacts following completion of Construction Stage 1.5 (which includes Phases 1, 2 and 3 and
Maple Avenue High-Flow Diversion, Tierrecita Vallejo, and the Tieback Levee) were evaluated to
determine if changes in flood depth would impact previously identified historic structures within the
survey areas or APE. Figure 4-17 and Figure 4-18 show identified historic districts and historic structures
surveyed through the City of Minot CDBG-DR Program and identified historic structures surveyed through
the Class III standing structure report for Phases 1, 2, and 3. The evaluation looked at the 100-year flood
event (10,000 cfs) and 2011 flood event (27,400 cfs) for Construction Stage 1.5 as compared to the NoAction Alternative. In addition to areas identified as being no longer flooded, Figure 4-17 and Figure 4-18
depict flood depth categories ranging from flood elevation changes of less than 0.1-foot to flood
elevation increases greater than 0.5-feet.
Eleven historic structures (Table 4-16) and three historic districts (Eastwood Park Historic District, Minot
Industrial Historic District, and the Minot Commercial Historic District) were identified within Construction
Stage 1.5. Potential interim impacts associated with a 100-year flood event for Construction Stage 1.5
(Figure 4-17) indicate the eleven historic structures and the Minot Industrial Historic District are located in
areas that would no longer flood or are outside the limits of a flood event of this magnitude. The
northeast sector of the Minot Commercial Historic District and most of the Eastwood Park Historic District
would experience flood elevation increases greater than 0.5 feet.
Potential interim impacts associated with a 2011 flood event at Construction Stage 1.5 (Figure 4-18)
indicate that eleven historic structures and Eastwood Park Historic District are located in areas that would
experience less than a 0.1-foot flood increase or are outside the limits of a flood event of this magnitude.
The entire Minot Industrial Historic District and a small portion of the northwest corner of the Minot
Commercial Historic District would experience flood inundation levels greater than 0.5-foot increase. The
remaining area of the Minot Commercial District is outside the limits of a flood event of this magnitude.
272
Table 4-16
SITS No.
Previously Listed, Recommended Eligible or Potentially Eligible Properties
Address
Feature
NRHP Status
32WD568
414 1st St. NW
Dwelling, Single Unit
Recommended Individually Eligible
32WD507
103 4th Ave. NW
Dwelling, Single Unit
Recommended Individually Eligible
32WD514
422 4th Ave. NW
Dwelling, Single Unit
Recommended Individually Eligible
32WD515
426 4th Ave. NW
Dwelling, Single Unit
Listed
32WD516
504 4th Ave. NW
Dwelling, Single Unit
Recommended Individually Eligible
32WD517
510 4th Ave. NW
Dwelling, Single Unit
Listed
32WD1622
120 5th Ave. NW
Church Complex and
Cemetery
Recommended Eligible
32WD861
812 Main St. N
Church, Catholic
Recommended Individually Eligible
32WD652
400 3rd St. NE
Minot Mill
Recommended Individually Eligible
32WD681
25 5th St. NE
Dwelling, Single Unit
Listed
32WD1631
Varies
Soo Line Railroad
Recommended Individually Eligible
Data based on City of Minot CDBG-DR Program and Project Cultural Resources Inventories
273
Construction Phase 1
Construction Phase 2
Construction Phase 3
City of Minot CDBG - DR
Program Cultural Resources
Study Areas
32WD861
!
(
32WD1622
32WD516
£
¤
32WD517
B83
!
(
!!
!
((
( !
( 32WD514
Barr Footer: ArcGIS 10.4, 2017-05-01 11:10 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-17 - Cultural Resources Interim Impacts - Construction Stage 1.5 100 yr Event.mxd User: KAC2
32WD652
!
(
MREFPP Cultural Resources
Class III (Structures)
!
(
CDBG HUD Disaster
Recovery Program
Minot Industrial Historic
District
!
(
!
(
MREFPP Cultural Resources
Class I (Structures)
Eastwood Park Historic
District
32WD568
!
(
32WD515
!
(
32WD507
Minot Commercial Historic
District
32WD1631
!
(
32WD681
Previous SHPO Cultural
Resources Survey Areas
!
(
Interim Impacts (Construction Stage
1.5 - 100yr Flood Event)
Flood Elevation Change Less
Than +0.1 Feet
£
¤
83
Flood Elevation Increase
Between 0.1 Feet and 0.5 Feet
Flood Elevation Increase
Greater Than 0.5 Feet
£
¤
B2
Area No Longer Flooded
£
¤
B52
I
0
600
1,200
2,400
Feet
Figure 4-17
32WD1615
!
(
£
¤
2
Imagery Source: USDA NAIP Imagery 2014
CULTURAL RESOURCES
INTERIM IMPACTS
CONSTRUCTION STAGE 1.5
100 YEAR FLOOD EVENT
Mouse River Enhanced Flood
Protection Project
Construction Phase 1
Construction Phase 2
Construction Phase 3
City of Minot CDBG - DR
Program Cultural Resources
Study Areas
32WD861
(
!
32WD1622
32WD516
32WD514
(!
!!
(
( (
!
32WD515
£
¤
(
!
(
!
32WD507
MREFPP Cultural Resources
Class I (Structures)
(
!
MREFPP Cultural Resources
Class III (Structures)
(
!
CDBG HUD Disaster
Recovery Program
Eastwood Park Historic
District
32WD568
32WD517
B83
Barr Footer: ArcGIS 10.4.1, 2017-04-30 22:56 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Figure 4-18 - Cultural Resources Interim Impacts - Construction Stage 1.5 2011 Event.mxd User: kac2
(
!
(
!
32WD652
Minot Industrial Historic
District
(
!
Minot Commercial Historic
District
32WD1631
(
!
32WD681
Previous SHPO Cultural
Resources Survey Areas
(
!
Interim Impacts (Construction Stage
1.5 - 2011 Flood Event)
Flood Elevation Change Less
Than +0.1 Feet
£
¤
83
Flood Elevation Increase
Between 0.1 Feet and 0.5 Feet
Flood Elevation Increase
Greater Than 0.5 Feet
£
¤
B2
Area No Longer Flooded
£
¤
B52
I
0
600
1,200
2,400
Feet
Figure 4-18
32WD1615
(
!
£
¤
2
Imagery Source: USDA NAIP Imagery 2014
CULTURAL RESOURCES
INTERIM IMPACTS
CONSTRUCTION STAGE 1.5
2011 FLOOD EVENT
Mouse River Enhanced Flood
Protection Project
5.0 Agency and Public Involvement
Agency coordination and public involvement have been ongoing throughout the development of the
Project, as further described below.
5.1
Agency Coordination
Agency coordination on the Project has been ongoing since early 2012, when the PER was being
developed. A Scoping Document was developed during the preparation of the EIS. The Scoping
Document summarized comments received from both public agencies and other stakeholders during the
Project definition and scoping process (Appendix A). Agency coordination that has taken place as part of
the development of this EIS is summarized in the following sections.
5.1.1
Pre-application Permitting Meeting
A Section 404 pre-application meeting was held with the USACE and members of the requester's team on
October 1, 2014, to review estimated impacts from Phases 1, 2, and 3 of the Requester's Preferred
Alternative and to seek guidance on what would be required for a complete Section 404 permit package.
Field surveys for wetlands or other waters, threatened and endangered species, nesting migratory birds,
or cultural resources had not been completed at the time of this meeting. Instead, the survey approach for
each of these resources was discussed.
The USACE advised that a clearly defined purpose and need for the Project would be important in the
Section 404 permit application, as well as an evaluation of the Least Environmentally Damaging
Practicable Alternative. The attendees reviewed potential mitigation measures, including those for
wetlands in overbank excavation areas and for managing existing dead loops within Minot.
5.1.2
Cooperating Agencies
In accordance with 40 CFR 1501.6, the USACE contacted several state and federal agencies on April 3,
2015, to notify them of the April 8 and 9, 2015, public meetings for the Project and to seek interest as
cooperating agencies for the EIS. The agencies contacted included the EPA, FEMA, USFWS, and NDGF.
Both the EPA and USFWS expressed interest in serving as cooperating agencies for the Project, but noted
staff availability would make full participation difficult. As such, no cooperating agreement was formalized
between the USACE and another agency. However, the USACE did coordinate with both agencies on key
issues where their expertise provided value in the development of this EIS. For example, EPA has been
involved with review and preliminary comment on Environmental Justice considerations within the EIS.
The USACE also coordinated with the USFWS about potential concerns associated with the Fish and
Wildlife refuges found upstream and downstream of the Project, as well as potential impacts to species
protected under the Endangered Species Act.
5.1.3
Consultation Meetings
An agency consultation teleconference meeting was held on January 29, 2015, to provide agencies with
Project status updates. Twenty-two people, representing 10 agencies and the requester's team, attended
276
the meeting. During this meeting, an overview of the Project and PER process was given, followed by a
description of the consultant teaming arrangement for design, environmental review, and permitting. The
group discussed the purpose and need for the Project, key potential environmental impacts, and federal
actions/NEPA triggers.
Potential environmental impacts discussed included those on wetlands/waterbodies, floodplains, channel
realignment and high-flow bypasses, flow velocities and bank erosion, contaminated soils/cleanup,
cultural resources, recreation (including fisheries), and migratory birds. Indirect impacts, mitigation, and
identification of borrow sources were also discussed. The Section 408 process and the need for a
Section 404 permit were identified as the federal actions that trigger review under NEPA. The meeting
concluded with a discussion of the environmental review process and tentative Project schedule.
An agency scoping meeting was held on May 27, 2015, in Bismarck, North Dakota. The purpose of this
meeting was to solicit specific comments and concerns regarding the Project from resource agencies.
Twenty-four people, representing 11 agencies and the requester's team, attended the meeting. In this
meeting, the USACE recommended that the No-Action Alternative with flood fighting be added to the
requester's ongoing analysis looking at the no flood fight conditions. In addition, FEMA reviewed their
CLOMR requirements with the group. Channel realignment and the proposed high-flow bypasses were
also discussed. Other agency concerns included downstream erosion as a result of changed velocities,
threatened and endangered species, fish and wildlife habitats, low-income housing areas, downstream
effects on agriculture/ranching, and cultural resources. During this meeting potential mitigation measures
were also identified.
5.1.4
Alternatives Analysis Meeting
USACE staff met with members of the requester's team on October 27, 2015, to review alternatives
considered in this EIS document. During this meeting, the group reached consensus on which alternatives
should be considered and which alternatives should be studied in additional detail. The Purpose and
Need Statement submitted by the Requester included flood risk reduction for an event similar to that
experienced in 2011 regardless of where it should occur in the basin. It was determined that if the 2011
event occurred in particular locations in the basin that there would be no time to execute emergency
flood fighting (though unlikely). Therefore, a No-Action Alternative with no flood fighting was also
evaluated. Given the unlikelihood of a flood event with no flood fighting, this analysis is provided as an
appendices to the main document (Appendix K).
5.1.5
Workgroup Meetings
The USACE developed agency workgroups for several key environmental resource topics, including fish
and wildlife resources, cultural resources, environmental justice, floodplains, and wetlands. Agency
workgroups corresponded as needed to share information or gain input when questions about a specific
resource arose.
The fish and wildlife workgroup met on November 24, 2015, to discuss erosion protection methods
incorporated into Phases 2 and 3 of the Requester's Preferred Alternative. During this meeting, an
277
overview of erosion protection design considerations (including modeling efforts, design guidelines, and
velocity summaries) was provided, followed by design measures proposed to control erosion. Design
elements discussed included levee and bank protection through use of traditional riprap, buried riprap,
turf reinforced matting, natural bank protection, and launchable riprap.
The cultural resources workgroup met on December 22, 2015, to review the results of the cultural
resource investigations and to discuss the development of a Programmatic Agreement (PA) between the
USACE and SHPO to address the Project's cultural resources impacts. The use of the PA as a tool to cover
effects that cannot be fully determined in advance of the undertaking and non-Federal parties being
delegated major responsibilities.
The floodplain working group met on January 21, 2016, with representatives of the USACE, FEMA, and
NDSWC. The purpose of this meeting was to discuss coordination of the Project and the regulatory
programs related to the regulatory floodplain and floodway. Topics included a summary of hydrologic
modeling; residual floodplain mapping; CLOMR/LOMR and other permitting requirements; and
Section 408 coordination.
5.2
5.2.1
Public Involvement
Public Meetings
Several Federally hosted public meetings took place to inform the public on the Project and solicit
comments and concerns. Federal scoping meetings for the project occurred soon after the SRJB requested
Section 408 permission to alter the existing Federal flood risk management projects in and around Minot.
Early scoping meetings were used to identify Project impacts and determine impact significance. An
additional scoping meeting took place after a Notice of Intent to prepare an EIS for the Project was
published in the Federal register. Lastly, a public meeting was held during the public comment period to
help explain the requested project an answer any questions from the public. The public comments
touched on several concerns including the property acquisitions, dead loops, Project alignment and
phasing, pedestrian crossings, project communication, and impacts to low income populations. There
were also several comments expressing general support for the Project. Comments received from the
scoping meetings and public meeting are included in Appendix L.
The Burlington Public Scoping Meeting took place April 8, 2015, at the Burlington-Des Lacs Elementary
School, and was attended by nine members of the public and 17 requester and federal agency
representatives. This meeting used an open-house format, followed by presentations from the requester
and USACE representatives. Following the presentations, questions and comments were taken from the
public. Key public concerns included modifications to the Colton Avenue bridge, existing levee inspection
and repair, keeping the public informed on Project progress, and the schedule for Project completion.
The Minot Public Scoping Meeting took place April 9, 2015, at the Minot Municipal Auditorium, and was
attended by 41 members of the public and 20 requester and federal agency representatives. The meeting
used an open-house format, followed by presentations from a requester representative and from USACE
representatives. Following the presentations, members of the public were divided into small groups based
278
on randomly assigned numbers. Each small group identified items of concern, with individual group
members ranking which items were the most important to them. Results from each small group were then
shared with the larger group. Each participant then ranked items from any of the small groups that were
most important to them. The meeting concluded with the USACE summarizing the overall rankings, and
questions and comments were taken from the public. Key public concerns included Souris River
management, the Project's influence on flood insurance, cost-benefit analysis of Project alternatives, and
the schedule for Project permitting and construction.
A third Public Scoping Meeting took place August 19, 2015, at the Minot Municipal Auditorium, after the
Notice of Intent was published in the Federal Register announcing that the USACE would be preparing an
EIS for the Project. Forty-one members of the public and seven requester and federal agency
representatives were in attendance. This meeting used an open-house format, followed by presentations
from a requester representative and from USACE representatives. Following the presentations, questions
and comments were taken from the public. Key public concerns included changes in reservoir operations,
the Project's influence on flood insurance, schedule for Project permitting and construction, and Project
funding sources.
An additional public meeting was held during the public comment period for the DEIS at the Minot
Municipal Auditorium on December 15, 2016. The meeting provided the public an opportunity to
comment on the DEIS, discuss the findings presented in the DEIS, and ask questions about the Project.
The meeting was attended by 10-15 members of the public and several USACE and requester
representatives. The meeting format was similar to the other public meetings, with an open-house to
start, followed by presentations from a requester representative and from USACE representatives.
Representatives from USACE and the requester were available after the presentations to speak with the
public and review detailed inundation maps individually. Questions and comments from the public were
focused on additional detail for the timeline of project construction, buyouts, and flood insurance.
In addition, the SRJB held numerous public meetings during development of the PER and has solicited
and responded to thousands of comments and questions dating back to 2011. Comments collected at
these meetings were also considered during preparation of this EIS.
5.2.2
Neighborhood Meetings
On June 30, 2015, the SRJB and the City of Minot hosted a neighborhood meeting for Napa Valley and
Forest Road residents. The purpose of this meeting was to update residents on the status of the Project,
especially on features proposed for those neighborhoods. The meeting was held at Perkett Elementary
School and began with an open house to review planned features of the Requester's Preferred Alternative
in the neighborhoods. Maps and an aerial fly-through video of the Requester's Preferred Alternative were
displayed, and a formal presentation was given by the engineering team. The public was invited to ask
questions after the presentation, and comment cards were available for those who wished to provide
written comments. The majority of the comments focused on dam management, funding sources,
residential buyouts, and flood insurance. Approximately 160 residents attended this meeting, along with
SRJB members, Minot staff and representatives, and members of the engineering team.
279
On November 9, 2015, the SRJB and the City of Minot hosted a neighborhood meeting for the Fourth
Avenue Floodwall residents. The purpose of this meeting was to update residents on the status of the
Project, especially on features proposed for that neighborhood. The meeting was held at the McKinley
Elementary School Gymnasium and began with an open house. Maps and an aerial fly-through video of
the Requester's Preferred Alternative were displayed, and a formal presentation was given by the
engineering team. The public was invited to ask questions after the presentation, and comment cards
were available for those who wished to provide written comments. The majority of the comments focused
on roadway modifications, the purpose of the storm sewer lift station, and the floodwall's effect on
pedestrian access to the nearby footbridge. Approximately 120 residents attended this meeting, along
with SRJB members, Minot staff and representatives, and members of the engineering team.
The City of Minot hosted public meetings for the neighborhoods affected by the NDRC Grant award. The
City of Minot notified property owners within the Moose Lodge and Leite-Brekke neighborhoods of the
City's intent to acquire the properties via a letter dated October 20, 2016. Public meetings were held for
the Moose Lodge and Leite-Brekke neighborhoods on November 9, 2016 and November 10, 2016,
respectively. The primary concern voiced at the Moose Lodge neighborhood meeting included whether
appraisals consider post-flood repairs. At the Leite-Brekke neighborhood meeting, questions were asked
related to the acquisition timeline, rationale for selecting this location, whether appraisals consider postflood repairs, and further explanation of fixed and actual relocation amounts.
The City of Minot notified property owners within the Kemper neighborhood of the City's intent to
acquire the properties via a letter dated December 28, 2016. A public meeting was held for the Kemper
neighborhood on January 16, 2017. Questions and concerns voiced at this meeting were primarily related
to how market value would be assessed, the comparable home identification process, timeline to qualify
for benefits, funding sources, and cost responsibilities for various associated items (i.e., appraisals,
demolition, etc.).
5.3
5.3.1
Document Review and Comment
Draft Environmental Impact Statement (DEIS)
The DEIS was made available for public review and comment on November 4, 2016, and the public
comment period closed on December 22, 2016. Four comments from the general public were received
during the DEIS public review and comment period. The public comments on the DEIS focused primarily
on pedestrian access concerns and also general support for the Project. In addition, resource
management agencies including the EPA, USGS, USFWS, NDGF, NDSWC, and State Historical Society of
ND also provided technical comments on the report. The comments received are included in Appendix L.
5.3.2
Addendum to the DEIS
In January 2016, Minot was awarded NDRC funding to achieve the following goals: build affordable,
resilient neighborhoods, and foster economic resilience and diversification. Based on the grant
agreement, the portion of the funding made available for reducing flood risk will be used for acquisition
of properties, relocation or demolition of structures, restoration of the land, and planning activities
associated with reducing flood risk. The City has indicated that it intends to utilize this funding to acquire
280
properties in the floodplain, including 67 properties that had been identified as being protected by levees
in previous Project design and the November 2016 DEIS. These requested changes to the Project resulted
in the additional analysis of impacts which were disclosed in an addendum to the DEIS. All property
owners were mailed a letter explaining USACE involvement, announcing the availability of the addendum,
and providing a link to the documents location online.
Changes in the Requester's Preferred Alternative did not appreciably alter the flood stage or duration for
areas outside of the additional properties that would be acquired. Minor adverse social impacts would be
expected from the acquisition of the 67 additional properties, as not all owners are willing to sell. The
primary benefits of the changes included the removal of properties from the floodplain, increased
floodplain capacity, the reduction of 3 acres of permanent wetland impact, the reduction of 4 acres of tree
clearing, and the reduction of approximately 1,000 linear feet of fill placed below the OHWM.
The addendum was made available for public review and comment April 13, 2017, and the comment
period closed on April 28, 2017. A limited number of comments were received during the comment
period and were incorporated into the final EIS as appropriate. Public comments on the Addendum to the
DEIS are included in Appendix L.
281
6.0 Major Findings and Conclusions
This EIS has analyzed the effects of the Requester's Preferred Alternative on natural and cultural resources,
land use and infrastructure, socioeconomics, recreation, aesthetics, and air and noise quality. In general,
the construction activities of the Requester's Preferred Alternative would have some permanent adverse
impacts and many temporary adverse effects to these resources. However, long-term permanent changes
would substantially reduce or prevent numerous adverse effects brought about by flooding. This is true
for both the Requester's Preferred Alternative alone and for the Requester's Preferred Alternative in
conjunction with other past, present and foreseeable future projects in the area. This section presents
these major findings.
6.1
Requester's Preferred Alternative and Other Alternatives
Several alternatives and combinations of alternatives were considered in developing the Requester's
Preferred Alternative, including upstream flood storage, major upstream diversion channels, local site
diversion channels, high-flow bypasses, channel modifications, floodproofing, relocations/buyouts, and
additional floodplain regulations. Alternatives were eliminated for one or more of the following reasons:
ineffectiveness at 27,400 cfs, political infeasibility, engineering infeasibility, significant environmental
impacts, and cost. The Requester's Preferred Alternative was able to fulfil all criteria listed in the purpose
and need for the Project and is being proposed for construction by the SRJB.
6.2
Geology, Soils, and Groundwater
The Requester's Preferred Alternative would not affect geologic or groundwater resources. Construction
could temporarily adversely affect soils in the impact area, including prime farmland, in several ways,
including increasing the potential for erosion, compaction, loss of productivity, and contamination from
leaking equipment. BMPs, however, would be used to mitigate these effects. Overall, the Requester's
Preferred Alternative would have a minor and temporary adverse effect on soils in the project area.
The No-Action Alternatives would result in no direct effects to geologic, soil, or groundwater resources.
Soils would be temporarily affected by inundation, but the effects would not be permanent. Flooding
could have temporary adverse effects on prime farmland, depending on the timing and severity of the
flooding, such as diminished yields or loss of one season's crop. Flooding is not expected to permanently
affect prime farmland.
6.3
Surface Waters
The Requester's Preferred Alternative would temporarily affect the Souris River because construction
activities like vegetation clearing, grading, excavation, and soil stockpiling would cause localized physical
disturbances. Project features like overbank excavation and riprap placement would require that work be
done below the Souris River's OHWM, which would permanently affect the Souris River. Other permanent
effects would include realigning the river channel in select areas, which would alter the course of the river
or create cutoff channels. Permanent impacts to the river would be subject to permitting and mitigation
as appropriate.
282
The Requester's Preferred Alternative is expected to temporarily affect wetlands by causing sedimentation
and ground disturbances, and to permanently affect wetlands where project features are constructed
directly in wetland areas. Unavoidable wetland impacts would seek permitting and mitigation as
appropriate.
The No-Action Alternative would not directly affect surface waters. The Souris River channel would
continue to overtop existing levee systems during large flood events. The No-Action Alternative could
temporarily affect wetlands if flood fighting measures required placement of fill in wetland areas.
6.4
Biological Resources
There are six federally endangered, threatened, or candidate species known to occur in Ward County. Of
these, there is potential habitat in the project area for the Dakota skipper and northern long-eared bat.
There is no designated critical habitat present within the project area for either federally-listed species.
Trees within the project area may provide habitat for northern long-eared bat; however, avoidance
measures during construction would prevent any adverse effects to this species. Dakota skipper habitat
was identified in a potential borrow area during investigations; a new borrow area has been located to
avoid any impacts to the species. Few, if any, of the 100 North Dakota Species of Conservation Priority are
typically associated with the developed and artificial cover types that typify the project area.
The Requester's Preferred Alternative features constructed within the Souris River channel, floodplain, or
floodway could permanently and temporarily alter existing fish habitat and passage through changes in
flow, substrate, composition, and the direct elimination of habitat.
The Requester's Preferred Alternative would both temporarily and permanently affect plant communities
in the project area. These effects would be both adverse and beneficial and would include removal of
existing plant communities, including up to 61 acres of land with forest or moderate tree cover. Indirect
impacts on vegetation would include alteration of hydrology, nutrient inputs and sediment deposition
within existing vegetation communities, and changes in the spread and abundance of non-native plant
species. The type and magnitude of indirect impacts on plant communities would vary widely with
location. Impacts could be either improve or degrade plant communities depending on the existing
composition ecological function, as many areas are of low quality or primarily non-native species.
Under the No-Action Alternative, high-water events would continue to affect vegetation communities and
could potentially include loss of trees and shrubs due to high flow velocity or prolonged inundation.
Wildlife species in the project area would be periodically displaced, and fish species would also
temporarily relocate during high-flow events to slower backwaters. The No-Action Alternative would have
little or no direct or indirect effect on federal- or state-listed species, or state Species of Conservation
Priority, as these species are not known to occur in areas impacted by flooding.
283
6.5
6.5.1
Land Use and Infrastructure
Land Use
The Requester's Preferred Alternative, by converting land for flood risk reduction, could permanently
affect existing agricultural, commercial, industrial, residential, and recreational land use. Construction,
operations, temporary work easements, and staging of equipment would have minor, temporary, adverse
effects, particularly through detours and disrupted access to residential, recreational, commercial, or
industrial properties. The Requester's Preferred Alternative would create substantial permanent benefits
by sustaining and encouraging use of land in the project area, and by creating a greenway along the river
that would be a community asset and provide recreational opportunities.
The No-Action Alternative would not change zoning, land use, and development within the project area.
In flood events under 10,000 cfs, the existing project, along with emergency flood fighting, would keep
most flood water contained. Flood events over 10,000 cfs would overtop levees, resulting clean up and
restoration at residential, commercial, industrial, institutional, and recreational properties could last weeks
or even months. In agricultural areas, flood events of this magnitude could result in erosion and
sedimentation and could disrupt seasonal crop production. Flood impacts of an event of 27,400 cfs would
significantly and adversely affect existing and potential land use. Impacts described for a 10,000 cfs would
be further intensified with a flood of 27,400 cfs. Buildings, infrastructure, and agricultural land could
become too costly to repair or unproductive resulting in the abandonment of the current land use.
6.5.2
Infrastructure
The Requester's Preferred Alternative would significantly improve the flood risk-reduction infrastructure in
the project area. It would permanently and significantly benefit the roadway network, allowing
transportation of essential goods and services and facilitating emergency response during flood events.
Temporary transportation disruptions would occur during construction, but would be mitigated with
proper signage, detours, and rerouting. The Requester's Preferred Alternative would also significantly
benefit both public and private utilities by providing greater flood resilience, upgraded stormwater
management, and improved infrastructure.
Under the No-Action Alternative, infrastructure in areas that have experienced flooding in the past would
continue to suffer flood damage in the event of a flood. A flood event of 5,000 cfs would not affect
infrastructure, because the existing federal project would protect areas from flows up to this level. Under
the No-Action Alternative, emergency flood risk features and levees would be overtopped with flows over
10,000 cfs, and floods would disrupt access and services, damage infrastructure, and hamper subsequent
clean-up and repair efforts. A flood event of 27,400 cfs would significantly and adversely affect
infrastructure, especially in Burlington and in central and west-central Minot. Long-term disruptions and
destruction of infrastructure would have regional and statewide effects.
6.6
Contaminated Sites
Based on the results of the Hazardous, Toxic, and Radioactive Waste (HTRW) assessment, numerous sites
in the project area contain hazardous materials and petroleum products or have other environmental
284
concerns. Potential impacts associated with these existing sites could be caused through by construction
of the Requester's Preferred Alternative through the disturbance of contaminated soil or groundwater,
demolishing buildings containing hazardous materials, and excavating debris in fill soil.
A limited Phase II investigation was conducted in the Fourth Avenue NE segment (Phase 1) to evaluate soil
and groundwater conditions. Petroleum-related constituents exceeding the Guidelines for the Assessment
and Cleanup of Saltwater Releases Groundwater Cleanup Standard would be pumped out for temporary
dewatering during construction and discharged to the Souris River (reference [85]). The discharge would
not exceed water quality standards but would add low levels of contaminants to the river.
The No-Action Alternative would not directly affect potentially contaminated sites. Some sites would be
temporarily affected by inundation of storage tanks and septic systems, potentially causing them to
overflow and spread the contents throughout the environment, which could contaminate soil,
groundwater, and surface waters. Flooding is not expected to result in permanent adverse effects to
potentially contaminated sites.
6.7
Socioeconomics
The Requester's Preferred Alternative would increase flood protection for nearly 4,700 parcels currently
located within the flood inundation area, and would reduce the potential need to relocate future
businesses and homes from the protected area. It would directly, permanently, and significantly increase
the value of developed and undeveloped property in the newly protected areas. This would stimulate local
business activity and would support long-term business expansion and increased employment in the
region. The Requester's Preferred Alternative also supports recovery strategies for rebuilding floodaffected areas and would substantially and permanently benefit community cohesion within the project
area. Constructing the Requester's Preferred Alternative would create jobs by requiring workers for each
phase of construction, which would in turn create additional indirect and induced jobs.
Requester's Preferred Alternative would require the acquisition of properties for construction to take
place. Properties that cannot be purchased voluntarily will likely be acquired through eminent domain.
Property owners that are forcefully ordered to give up ownership are likely to be disgruntled which could
potentially cause unrest and result in adverse effects to community cohesion. As of November 2016,
approximately 110 of homes and businesses have been purchased (and many removed) using federal,
state, and local funds for the construction of Stage 1.5 of the Project. Local tension would be expected to
increase as eminent domain becomes increasingly exercised on property owners reluctant to sell. A
demographic analysis of the impacted communities indicates that the project would not encompass
disproportionately minority or low-income communities; therefore, no environmental justice impacts are
expected.
The No-Action Alternative would generate no additional sustainable jobs or business activities. During
flood events areas adjacent to the Souris River would continue to suffer socioeconomic impacts
associated with flooding. Under the No-Action Alternative approximately 940 parcels would be inundated
for a flood event of 10,000 cfs. A flood event of 27,400 cfs could cause damages similar those from the
285
flood of 2011, which included the inundation of approximately 5,800 parcels. Damages to some properties
could be permanent, leading to loss of community and permanent relocation of residents and businesses.
6.8
Recreation
The Requester's Preferred Alternative would permanently enhance existing recreational features, create
new recreational opportunities, and significantly contribute to the development of the planned greenway
corridor. Constructing and maintaining the Requester's Preferred Alternative would temporarily disrupt
access to some recreational resources, but these negative effects could be mitigated through
coordination with the community.
The No-Action Alternative would not likely have any permanent adverse effects to recreational facilities
but could have a number of temporary adverse impacts. Recreational use of levees, the river corridor,
parks, fishing locations, and other recreational features would continue as established, with usage
periodically disrupted by flooding. Flood events over 10,000 cfs would damage existing recreational
facilities, and usage would be restricted until flood waters receded and the sites were cleaned up and
restored. A flood event of 27,400 cfs would significantly damage existing recreational facilities which
would not be unusable until cleaned up and restored.
6.9
Aesthetics and Visual Resources
The Requester's Preferred Alternative would enhance the aesthetic value of the project area, by
developing a greenway that would provide connections to parks, picnic sites, and fishing sites. The
greenway and connections would permanently improve visual aesthetics by enhancing the viewing
experience of adjoining neighborhoods, hikers, and general recreational users, and would increase access
to the Souris River corridor. Constructing the Requester's Preferred Alternative would temporarily affect
aesthetic and visual resources within the project area. The severity of impacts would largely depend on
the type of flood risk-reduction feature being constructed and on the contrast between the feature and
the existing landscape.
The No-Action Alternative would not directly affect aesthetics and visual resources. During flood events,
temporary adverse visual and aesthetic effects would occur, with standing water, debris, sedimentation
deposits, and damaged vegetation.
6.10
Historic and Cultural Resources
A Class I Cultural Resources Survey of previously identified archaeological and historical sites was
completed for the areas within 1 mile of Project features, to gage the potential impact of the Project. The
survey identified 4 archaeological sites, the Soo Line Railroad corridor, and 4 standing structures. Detailed
investigations could not be completed for the entire project in advance of the EIS and a Programmatic
Agreement has been executed between the USACE and the ND SHPO to cover potential impacts to
cultural resources and historic structures that have not yet been identified. In addition, the USACE has
statutory responsibility to consider the effect of permit decisions on historic properties when they are
known, or suspected, to exist in the USACE permit area. In order to obtain a permit, all aspects of the
programmatic agreement must be completed. This could include surveys, consultation with the North
286
Dakota SHPO and execution of a Memorandum of Agreement(s), if necessary. If there is another Federal
agency with historic properties responsibilities in the permit area, the USACE is obligated to ensure that
they have completed their obligations under Section 106 of the Historic Preservation Act.
A more intensive Class III Archaeological Survey and a Class III Standing Structure Survey was completed
for the first three phases of the Requester's Preferred Alternative, revealing direct effects to two historic
structures recommended eligible for the National Register of Historic Places (NRHP). Construction of
features in Stage 1.5 would require the replacement of a railroad bridge on the Soo Line Railroad which is
potentially eligible for listing on the NRHP.
The No-Action Alternative would not have any direct affect to historic and cultural resources. Eight historic
structures, four archaeological sites, and others that have not yet been identified in the inundation area,
would remain vulnerable to flood impacts.
6.11
Air Quality and Noise
The Requester's Preferred Alternative would temporarily affect air quality and noise in the project area,
including for residences and sensitive receptors (schools, churches, etc.), by temporarily increasing
daytime noise levels or air emissions from construction equipment and vehicles.
The No-Action Alternative would result in no direct effects on air quality and noise resources. Flooding
could result in temporarily elevated noise levels and air emissions in localized areas if flood fighting and
cleanup efforts occur.
6.12
Human Health and Safety
Noise, vibrations, exhaust fumes, and dust from constructing the Requester's Preferred Alternative could
temporarily affect the health of construction workers and nearby residents. Construction activities
involving the use of heavy equipment to move, place and transport materials would pose general safety
risks associated with the use of heavy machinery. Contractors for the Project would be required to
develop Project Health and Safety Plans which would specify safety procedures and programs to protect
the safety and health of all persons and properties.
The Requester's Preferred Alternative would benefit human health in the long-term. Many health hazards
occur after floods and during clean-up activities, including compromising the structural integrity of roads,
bridges, houses, and other structures in the damaged areas; dispersing sewage and pathogens into
residential areas; and creating unhealthy conditions (like mold) in inundated structures. Reducing flood
risk to the communities along the Souris River would reduce the potential for loss of life or injuries during
flood events and would minimize the many health hazards that result from the flooding of developed
areas.
6.13
Cumulative Impacts
The primary cumulative effects resulting from the Requester's Preferred Alternative and the past, present,
and future flood risk reduction projects would include residence displacements and traffic modifications.
287
The Requester's Preferred Alternative and other future flood risk reduction projects would add to the
number of properties bought out or removed. Cumulatively and collectively, the Requester's Preferred
Alternative and the other identified past, present, and future flood risk reduction projects provide the
long-term beneficial effect of stabilizing property values and protecting against future flood damage.
Projects not related to flood control would have little impact on property displacements, but would
contribute to cumulative effects on traffic in the vicinity of the Project. The long-term cumulative effect of
these projects would, however, be beneficial, because these projects would improve traffic flow along the
specific routes where construction is proposed.
The Requester's Preferred Alternative and other projects contribute additional cumulative effects on
wetlands and other natural resources. The Requester's Preferred Alternative's contribution to cumulative
effects on natural resources includes the realignment and stabilization of the Souris River and the
permanent loss of up to 21 acres of wetland. Unavoidable impacts would be mitigated.
The Requester's Preferred Alternative and other projects also generate cumulative effects on air quality,
health and safety, recreation, cultural resources, and contaminated sites. However, the cumulative effect
on these resources is expected to be relatively minor.
Under the No-Action Alternative, there would be no contribution to the cumulative effects generated by
past, present and foreseeable future projects on natural, socioeconomic cultural and other resources.
6.14
Interim Impacts
For the 5,000 cfs flood event, the total area flooded would remain about the same for each of the three
geographic areas evaluated (upstream, in-town, and downstream of Minot). The Requester's Preferred
Alternative would have little impact on the 5,000 cfs flood profile. This is because the 5,000 cfs flood event
is already contained within existing federal levees.
For the 10,000 cfs flood event, there would be a net increase in the total area inundated in Minot, in large
part because in many locations the alignment of the Requester's Preferred Alternative is further back from
the banks of the river than the existing federal project levees. There is the potential for inundation depths
to increase by roughly 0.5 feet in some areas.
For the 27,400 cfs design flood event, the total area flooded would tend to decrease with the
implementation of each construction stage. The biggest reduction in inundation area would come after
Construction Stage 2 when the area north of the river would have a complete levee system. The most
significant adverse impacts would also come after Construction Stage 2, when higher flood elevations
could be expected for areas south of the river and east of downtown Minot.
The completion of Construction Stage 1.5 would prevent 11 historic structures and the Minot Industrial
Historic District from being inundated with flows of 10,000 cfs. However, the northeast sector of the Minot
Commercial Historic District and most of the Eastwood Park Historic District would experience flood
elevation increases greater than 0.5 feet for this event.
288
An event similar to the 2011 flood event, would experience increases greater than 0.5 feet in the entire
Minot Industrial Historic District and a small area in the northwest corner of the Minot Commercial
Historic District after construction of Stage 1.5.
6.15
Environmental Laws and Regulations
The requester is responsible for complying with all applicable environmental laws and regulations. A
description of applicable laws and regulations for the Project through Construction Stage 1.5 are provided
in the following section. Table 6-1 provides a summary of the current compliance status for federal
environmental laws and regulations, at the signing of the Record of Decision (ROD).
6.15.1
Archaeological and Historic Preservation Act
The Archeological and Historic Preservation Act specifically provides for the preservation of historical and
archeological data which might otherwise be irreparably lost or destroyed as the result of (1) flooding, the
building of access roads, the erection of workmen's communities, the relocation of railroads and
highways, and other alterations of the terrain caused by the construction of a dam by any agency of the
United States, or by any private person or corporation holding a license issued by any such agency or (2)
any alteration of the terrain caused as a result of any Federal construction project or federally licensed
activity or program. A Programmatic Agreement (per 36 CFR 800.14(b)) was executed to cover effects that
could not be fully determined in advance of the undertaking; however, the USACE also has statutory
responsibility to consider the effect of permit decisions on historic properties when they are known, or
suspected, to exist in the USACE permit area. Historic and cultural resource surveys have been completed
and reports are being finalized to cover effects up to Construction Stage 1.5.
6.15.2
Bald and Golden Eagle Protection Act of 1940
The Bald and Golden Eagle Protection Act of 1940 (16 U.S.C 668-668d) protects both bald eagles
(Haliaeetus leucocephalus) and golden eagles (Aquila chrysaetos). Under the Act, eagles are protected
against agitation that could result in the abuse, substantial interference with lifestyle, including shelter,
breeding, and feeding, or nest abandonment. A raptor nest survey was completed during the planning of
the Project. No eagle nests were identified at that time.
6.15.3
Clean Water Act
The Clean Water Act (CWA) establishes the basic structure for regulating discharges of pollutants into the
Waters of the United States and regulating quality standards for surface waters. Regulatory components
of the CWA include Section 404 permitting, the National Pollutant Discharge Elimination System (NPDES)
Program, and Section 401 water quality certification. The Clean Water Act is jointly implemented by the
EPA and USACE. USACE issues permits under Section 404 and monitors compliance with the issued
permits. The NDDH reviews and issues NPDES permits and 401 Water Quality Certifications in the State of
North Dakota.
Section 404 of the CWA regulates the placement of dredged or fill material into wetlands, lakes, streams,
rivers, estuaries and certain other types of waters. The goal of Section 404 is to restore and maintain the
289
physical, chemical and biological integrity of the Nation's waters. A sequencing process of avoidance,
minimization and compensation is required for each activity for which the USACE may only permit the
least damaging practicable alternative. A Section 404 permit is being sought by the requester through
the USACE Omaha District. Section 408 permissions on the Project must be approved prior to the
issuance of a Section 404 permit.
The NDDH reviews and issues NPDES permits and 401 Water Quality Certifications in the State of North
Dakota. The NPDES Program regulates point sources that discharge pollutants into Waters of the United
States. Section 401 water quality certification is also required for any applicant for a Federal license or
permit to conduct any activity which may result in discharge into the navigable waters. Water quality
certification will be pursued concurrent with the request for a Section 404 permit. Water quality
certification will be required prior to the issuance of the Section 404 permit.
6.15.4
Endangered Species Act
The purpose of the Endangered Species Act is to protect and recover imperiled species and the
ecosystems upon which they depend. It is administered by the USFWS and the Commerce Department's
National Marine Fisheries Service. Potential impacts to two threatened species, the northern long-eared
bat and the Dakota skipper, were identified during project scoping and concerns were discussed with the
USFWS through informal Section 7 coordination. However, through the development of avoidance
measures and project modifications, impacts to the species can be avoided. Therefore, a "no effect"
determination was made for threatened and endangered species from the Project.
6.15.5
Fish and Wildlife Coordination Act
The Fish and Wildlife Coordination Act (16 USC 661-667e) requires that wildlife conservation be given
equal consideration to other features of water-resource development programs through planning,
development, maintenance and coordination of wildlife conservation and rehabilitation for Federal
actions. Federal agencies involved with water resource development projects are required to consult with
the USFWS and the respective state fish and wildlife agencies regarding the potential impacts of projects
on fish and wildlife resources. Consultation has occurred with the USFWS and other federal and state
agencies with natural resource interests throughout the planning and impact assessment of the Project to
evaluate impacts to fish and wildlife.
6.15.6
Migratory Bird Treaty Act
The Migratory Bird Treaty Act makes it illegal to take, possess, import, export, transport, sell, purchase,
barter, or offer for sale, purchase, or barter, any migratory bird, or the parts, nests, or eggs of such a bird
except under the terms of a valid permit issued pursuant to Federal regulations. A number of migratory
birds are known to nest in the area. However, tree clearing would be performed outside of the migratory
bird nesting season and no take of any migratory birds is expected.
6.15.7
National Environmental Policy Act
The NEPA was one of the first laws ever written that establishes the broad national framework for
protecting our environment. NEPA's basic policy is to assure that all branches of government give proper
290
consideration to the environment prior to undertaking any major federal action that significantly affects
the environment. The preparation of this EIS fulfills the requirements of NEPA through Construction Stage
1.5 of the Project. Subsiquent NEPA documents may be required for future phases of the Project.
6.15.8
National Historic Preservation Act
The National Historic Preservation Act establishes national policy for historic preservation, authorizes
expansion and maintenance of the National Register of Historic Places, and creates the Advisory Council
on Historic Preservation (ACHP). Section 106 of the Act specifies that Federal agencies shall, prior to the
approval of the expenditure of any funds on an undertaking, take into account the effect of an
undertaking on any property included in or determined eligible for the National Register and shall afford
the Advisory Council a reasonable opportunity to comment with regard to such undertaking. A
Programmatic Agreement (per 36 CFR 800.14(b)) was executed to cover effects that could not be fully
determined in advance of the undertaking. The USACE identified 15 Tribes as having historical and
cultural associations with the Project's geographic location. The Tribes and have been coordinated with on
this Project. The USACE also invited the ACHP to review and comment. The ACHP declined to participate
in consultation.
6.15.9
Floodplain Management (E.O. 11988)
Executive Order 11988 requires federal agencies to avoid to the extent possible the long and short-term
adverse impacts associated with the occupancy and modification of floodplains and to avoid direct and
indirect support of floodplain development wherever there is a practicable alternative. Eight steps to fulfill
the requirements of E.O. 11988 have been developed to ensure compliance with the order. The steps are
listed below along with comments on the Project's status in italics.
1.
Determine if a proposed action is in the base floodplain (that area which has a one percent or
greater chance of flooding in any given year).
-The proposed Project is within the base floodplain of the Souris River.
2.
Conduct early public review, including public notice.
-Public reviews and public notices have taken place throughout the development of the Project and
this EIS. See Section 5.2 for a detailed description of public review on the Project.
3.
Identify and evaluate practicable alternatives to locating in the base floodplain, including
alterative sites outside of the floodplain.
-Numerous alternatives were evaluated in Section 2.0 of the EIS. The Requester's Preferred
Alternative (through Construction Stage 1.5) was determined to result in the least impact to the
environment while meeting the purpose and need for the Project.
4.
Identify impacts of the proposed action.
-Impacts to the human environment have been evaluated in this EIS. Impacts of the Project are
discussed in Section 4.0 of this EIS.
291
5.
If impacts cannot be avoided, develop measures to minimize the impacts and restore and
preserve the floodplain, as appropriate.
-Impacts to the human environment were avoided and minimized to the extent possible. Mitigation
for impacts to wetlands, trees, and riparian areas below the OHWM will be identified through
Construction Stage 1.5 and is described in Section 4.3.1.2. The Project would also restore
connectivity in the floodplain by setting back levees and allowing the Souris River to inundate areas
that are protected by the current levee system.
6.
Reevaluate alternatives.
-This EIS has evaluated numerous alternatives that achieve the purpose and need for the Project.
The Requester's Preferred Alternative achieves the purpose and need while minimizing the impacts
to the environment.
7.
Present the findings and a public explanation.
-Impact analysis was conducted on the Requester's Preferred Alternative and was presented to the
public during comment periods on the DEIS and the Addendum to the DEIS. Public comments
received during these periods were considered and incorporated into the Final EIS, were appropriate.
8.
Implement the action.
-After the signing of the ROD, NEPA documentation on the Requester's Preferred Alternative will be
sufficient through Stage 1.5. Implementation of the Project may begin once the requester has
obtained all necessary permits and approvals.
292
Table 6-1
Status of compliance with federal environmental laws and regulations through
Construction Stage 1.5
Compliance
Environmental Requirement
Federal Statutes
Archaeological and Historic Preservation Act
Partial1
Bald and Golden Eagle Protection Act of 1940, as amended
Full
Clean Air Act, as amended
Full
Clean Water Act, as amended
Partial2
Coastal Zone Management Act, as amended
N/A
Endangered Species Act of 1973, as amended
Full
Farmland Protection Policy Act of 1981
Full
Federal Water Project Recreation Act, as amended
Full
Fish and Wildlife Coordination Act, as amended
Full
Land and Water Conservation Fund Act of 1965, as amended
Full
Migratory Bird Treaty Act of 1918, as amended
Full
National Environmental Policy Act of 1969, as amended
Full
National Historic Preservation Act of 1966, as amended
Partial1
National Wildlife Refuge Administration Act of 1966
Full
Noise Pollution and Abatement Act of 1972
Full
Watershed Protection and Flood Prevention Act
Full
Wild and Scenic Rivers Act of 1968, as amended
N/A
Executive Orders, Memoranda
Floodplain Management (E.O. 11988)
Full
Safeguarding the Nation from the Impacts of Invasive Species (E.O. 13112)
Full
Protection and Enhancement of Environmental Quality (E.O. 11514)
Full
Protection of Wetlands (E.O. 11990)
Full
Analysis of Impacts on Prime and Unique Farmland (CEQ Memorandum, 30
August 1976)
Full
(1)
(2)
A Programmatic Agreement (per 36 CFR 800.14(b)) was executed to cover effects that could not be fully determined in
advance of the undertaking; however, the USACE also has statutory responsibility to consider the effect of permit decisions
on historic properties when they are known, or suspected, to exist in the USACE permit area. All aspects of the
programmatic agreement and regulatory requirements within 33 CFR 325 would be complied with prior to the requester
obtaining a Section 404 permit.
The requester is seeking a permit in compliance with Section 404 of the CWA as well as water quality certification in
compliance with Section 401 of the CWA. However, these cannot be issued until after the ROD for the EIS has been signed
and 408 permission has been granted. It is anticipated that all regulatory requirements with the CWA would be obtained
soon after this EIS is finalized.
293
7.0 List of Reviewers and Preparers
U.S. Army Corps of Engineer St. Paul District
Ingvalson, Derek Environmental Review Project Manager
B.S., Biology, University of Minnesota Duluth, 2007
Alberto (Hamer), Vanessa - Cultural Resources Manager
B.A., Anthropology, University of Minnesota Twin Cities, 2011
Wallerstedt, Nathan Project Engineer/Project Manager
B.S., Civil Engineering, University of Minnesota Twin Cities, 2004
U.S. Army Corps of Engineers Omaha District
Erhardt, Toni Section 404 Permitting Project Manager
Regulatory Manager 30 yrs experience
Barr Engineering Co.
Braun, Shanna EIS Lead, Alternatives, Surface Waters
M.S., Water Resources Science, University of Minnesota Twin Cities, 2016
B.S., Natural Resources Management, North Dakota State University, 2004
Mike Mayer Senior NEPA Advisor
J.D. (Certificate in Environmental and Natural Resources Law), Lewin & Clark Law School, 2002
M.S., Wildlife and Fisheries Conservation, University of Massachusetts Amherst, 1999
B.S., Wildlife and Fisheries Conservation, University of Massachusetts Amherst, 1994
Pollak, Melisa - Geology, Soils and Groundwater
M.S., Science, Technology, and Environmental Policy, Univ. of Minnesota - Twin Cities, 2008
B.S., Geophysics, University of Minnesota - Twin Cities, 1983
Jones, Daniel Biological Resources, Cumulative Impacts
M.S., Ecology and Evolution, University of Oregon, 1995
B.S., Botany and Plant Pathology, Michigan State University, 1982
Bohnenblust, Mandy Contaminated Sites
M.S., Environmental Pollution Control, Penn State University, 2006
B.S., Biology, Truman State University, 2004
Kloss-Molina, Julie Cultural Resources
M.S., Industrial Heritage, Michigan Technological University, 2002
B.A., Anthropology, University of Minnesota, 1999
294
Skoglund, Andrew Noise
B.S., Engineering Science, Iowa State University, 2004
Waln, Joe Hydraulics and Hydrology, Interim Impacts
M.Ed., Science, University of Notre Dame, 2001
B.S., Civil Engineering, University of Portland, 1999
Wild, Kelly GIS, Graphics
M.S., Geographic Information Science, University of Minnesota Twin Cities, 2011
B.S., Cartography/GIS and Geography, University of Wisconsin - Madison, 2008
Lee, Jeff QA/QC Review
M.Ed., Secondary Education and Aquatic Ecology, University of Wisconsin - La Crosse, 1987
B.S., Biology, University of Wisconsin - La Crosse, 1977
Houston Engineering, Inc.
Lind, Katherine Land Use and Infrastructure, Socioeconomics
B.S., Environmental Science and Policy Management, University of Minnesota-Twin Cities, 2012
Olm, Rachel Recreation, Aesthetics and Visual Resources
M.S., Water Resources Science, University of Minnesota - Twin Cities, 2015
B.S., Environmental Studies and Biology, University of Minnesota - Morris, 2009
Lutz, Jeff Senior Review and Editing
B.S., Geography, South Dakota State University, 1987
Kramka, Larry - QA/QC Review
Minnesota Executive Program, University of Minnesota - Carlson School of Management, 2010
B.S., Natural Resources and Environmental Studies, University of Minnesota, 1990
Trefoil Cultural and Environmental
Rothaus, Richard Cultural and Historic Resources
Ph.D., History, The Ohio State University, 1993
M.A., Classics, Vanderbilt University, 1989
B.A., English and Classics, The Florida State University, 1985
295
The Holton Group
Holton, Rick Technical Editor
Ph.D., English, Edinburgh University, 1979
M.A., English, University of Virginia, 1975
A.B., English, Harvard University, 1973
Advanced Professional Certificate in Business Administration, New York University Business School,
1982
296
8.0 References
[1]
Barr Engineering Co., Ackerman-Estvold Engineering, Moore Engineering and CPS, Ltd, Mouse River
Enhanced Flood Protection Plan Preliminary Engineering Report, 2012.
[2]
U.S. Army Corps of Engineers, Periodic Inspection Report, Burlington to Minot Flood Risk Managment
Project, Burlington to Minot, North Dakota, Periodic Inspection Report No. 1-Draft, 2013.
[3]
SRF Consulting Group, Inc., City of Minot, ND 2035 Transportation Plan, 2015.
[4]
Barr Engineering Co.; Ackerman Estvold, Mouse River Enhanced Flood Protection Project -- Phases
MI-2 and MI-3 Basis of Design Report -- 100% Draft Design Submittal, 2016.
[5]
Houston Engineering Inc., Mouse River Enhanced Flood Protection Project Phase MI-1 4th Avenue
NE, Basis of Design Report, Prepared for the Souris River Joint Board - 60% Design Submittal, 2016.
[6]
U.S. Army Corps of Engineers, Design and Construction of Levees Engineering Manual EM 1110-21913, 2000.
[7]
U.S. Army Corps of Engineers, Hydraulic Design of Flood Control Channels Engineering Manual (EM
1110-2-1601), 1991.
[8]
Hydraulic Engineering Circular No. 22, Third Edition (FHWA-NHI-10-009), Federal Highway
Administration, Revised August 2013.
[9]
U.S. Army Corps of Engineers, Final Feature Environmental Impact Statement Lake Darling Flood
Control Project Souris River - Renville, Ward, McHenry, and Bottineau Counties, North Dakota, 1985.
[10] Barr Engineering Co., Ackerman-Estvold Engineering, Moore Engineering and CPS, Ltd, Rural Flood
Risk Reduction Alternatives Evaluation, 2013.
[11] Barr Engineering Co., Comparative Analysis of King's Court Channel Realignment Alternatives Project File Memorandum, 2015.
[12] Barr Engineering Co., Comparative Analysis of Burdick Segment Channel Realignment Alternatives Project File Memorandum, 2015.
[13] U.S. Army Corps of Engineers National Nonstructural/Flood Proofing Committee, Flood Damange
Reduction Measures, 2010.
297
[14] U.S. Army Corps of Engineers, Final Feasibility Report and Environmental Impact Statement: FargoMoorhead Metropolitan Area Flood Risk Managment-Appendix P (USACE-MVP-0000087980), 2011.
[15] U.S. Army Corps of Engineers, Recent US Climate Change and Hydrology Literature Applicable to US
Army Corps of Engineers Missions - Souris-Red-Rainy Region 09, 2015.
[16] A. E. Kehew, Geology and Geotechnical Conditions of the Minot Area, North Dakota, 1983.
[17] F. J. Anderson and L. A. Manz, Geology of the Minot Area - Geological Investigations No. 46, 2007.
[18] W. A. Pettyjohn, Geohydrology of the Souris River Valley in the Vicinity of Minot, North Dakota, 1967.
[19] S. W. Pusc, Hydrogeology of the Minot Aquifer, Ward County, North Dakota, North Dakota State
Water Commission, 1994.
[20] U.S. Geological Survey, Seismic-Hazard Maps for the Conterminous United States - Scientific
Investigations Map 3325, U.S. Department of the Interior, 2015.
[21] R. L. Howey, C. Farris, F. Glatt, F. Hauff, S. Lahlum, S. Larson, L. Neubauer and F. Wahl, Soil Survey of
Ward County, North Dakota, United States Department of Agriculture - Soil Conservation Service in
cooperation with North Dakota Agricultural Experimentation Station, 1974.
[22] W. A. Pettyjohn and R. D. Hutchinson, Ground-water Resources of Renville and Ward Counties, 1971.
[23] North Dakota State Water Commission, "Ground and Surface Water Data Query," [Online].
Available:
http://www.swc.state.nd.us/4dlink2/4dcgi/WellSearchForm/Map%20and%20Data%20Resources.
[Accessed 24 August 2015].
[24] U.S. Environmental Protection Agency, "2014 Waterbody Report for Souris River," 214. [Online].
Available:
http://ofmpub.epa.gov/tmdl_waters10/attains_waterbody.control?p_list_id=&p_au_id=ND09010008-001-S_00&p_cycle=2014&p_state=ND.
[25] Swenson, Hagen & Co., and Houston Engineering, Inc., City of Minot Flood Insurance Study, 2002.
[26] Houston Engineering Inc., Interim Hydraulics Report for Ward County, ND, FY 2011 Risk Map Project,
FEMA Case #07-08-0688S, FEMA Region VIII, 2014.
298
[27] Barr Engineering Co., Ackerman-Estvold Engineering, Moore Engineering and CPS, Ltd, Hydrologic
and Hydraulic Modeling Report - Mouse River Enhanced Flood Protection Plan, North Dakota State
Water Commission, 2013.
[28] U.S. Army Corps of Engineers, Environmental Laboratory, Corps of Engineers Wetlands Delineation
Manual. Technical Report Y-87-1. U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS,
1987.
[29] U.S. Environmental Protection Agency, "Prairie Potholes," 2012. [Online]. Available:
http://water.epa.gov/type/wetlands/potholes.cfm. [Accessed 20 May 2015].
[30] L. V. C. F. G. R. L. Cowardin, "Classification of Wetlands and Deepwater Habitats of the United
States," U.S. Fish and Wildlife Service, 1979.
[31] North Dakota Department of Agriculture, "North Dakota Weed Mapper," 2015. [Online]. Available:
https://apps.nd.gov/ndda/mapping/. [Accessed 27 May 2016].
[32] North Dakota Department of Agriculture, "Noxious Weeds," 2016. [Online]. Available:
https://www.nd.gov/ndda/program/noxious-weeds. [Accessed 7 May 2016].
[33] Houston Engineering Inc., Wetlands, Waters, and Biological Inventory Report, 2015.
[34] HDR, Inc., Dakota Skipper Habitat Assessment Report - Mouse River Enhanced Flood Protection
Project (MREFPP), 2016.
[35] Federal Register, Endangered and Threatened Wildlife and Plants; Determination That Designation of
Critical Habitat Is Not Prudent for the Northern Long-Eared Bat (50 C.F.R. Part 17), vol. 81, 2016, pp.
24707-24714.
[36] U.S. Fish and Wildlife Service , "Final Designation of Critical Habitat for Breeding Piping Plovers in
North Dakota," 2016. [Online]. Available:
https://www.fws.gov/northdakotafieldoffice/gis/ppcrithab/ND/ndcrithab.htm. [Accessed 14 June
2016].
[37] S. Hagen, P. Isakson and S. Dyke, North Dakota Comprehensive Wildlife Conservation Strategy,
Bismarck: North Dakota Game and Fish Department, p. 454.
[38] U. S. Census Bureau, "Quick Facts - Minot city, North Dakota," [Online]. Available:
http://quickfacts.census.gov/qfd/states/38/3853380.html. [Accessed March 2016].
299
[39] Burlington, ND, City of, "History," [Online]. Available:
http://www.burlingtonnd.gov/index.asp?SEC=A61B00BA-2CB9-4696-8117F2E957E185E2&Type=B_BASIC. [Accessed 14 May 2015].
[40] North Dakota Year Book - Ward County, pp. 240-244.
[41] Ward County Planning and Zoning Department, "Ward County Zoning Districts," [Online].
Available: http://www.wardnd.com/DocumentCenter/View/1022. [Accessed 16 July 2015].
[42] Stantec, City of Minot 2012 Comprehensive Plan.
[43] North Dakota Department of Commerce, State of North Dakota Action Plan for Disaster Recovery,
2013.
[44] City of Minot, Community Development Block Grant Disaster Recovery Action Plan, Minot, ND, 2012.
[45] North Dakota State Water Commission, 2015 North Dakota State Water Management Plan, 2015.
[46] Burlington, ND, City of, "Departments," [Online]. Available:
http://www.burlingtonnd.gov/index.asp?SEC=032A2ACD-368C-49E7-89D71ECE36C048CC&Type=B_BASIC. [Accessed 27 August 2015].
[47] U.S. Army Corps of Engineers, Water Resources Policies and Authorities, Hazardous, Toxic and
Radioactive Waste Guidance for Civil Works Projects (ER 1165-2-132), 1992.
[48] City of Minot, North Dakota, Minot Affordable Housing Strategy: Affordable Housing Action Plan,
Vols. October 25, 2013, Prepared by CDM Smith, 2013.
[49] North Dakota Department of Commerce, North Dakota Census Office Population Projections of the
State, Regions and Counties 2016, 2016.
[50] Headwaters Economics, "Economic Profile System - Human Dimensions Toolkit," 1 July 2015.
[Online]. Available: http://headwaterseconomics.org/tools/economic-profile-system/about.
[51] J. Schramm, Developing Dakota: State takes role in promoting economic growth, Minot Daily News,
2016.
[52] City of Minot, North Dakota, Analysis of Impediments to Fair Housing Choice for Minot, North
Dakota, Vols. July 29, 2013, Prepared by CDM Smith, 2013.
300
[53] Associated Press, "Minot Sees Slower Pace of Sales in Real Estate Market," 25 February 2017.
[Online]. Available: https://www.usnews.com/news/north-dakota/articles/2017-02-25/minot-seesslower-pace-of-sales-in-real-estate-market.
[54] Zillow, "North Dakota Home Prices & Values," 2016. [Online]. Available:
http://www.zillow.com/nd/home-values/. [Accessed 16 June 2016].
[55] U.S. Environmental Protection Agency, "Environmental Justice," 10 06 2015. [Online]. Available:
http://www.epa.gov/environmentaljustice/. [Accessed 05 07 2015].
[56] Council on Environmental Quality, Executive Office of the President, "Environmental Justice,
Guidance Under the National Environmental Policy Act," 10 December 1997. [Online]. Available:
http://www.epa.gov/compliance/ej/resources/policy/ej_guidance_nepa_ceq1297.pdf. [Accessed 27
February 2015].
[57] U.S. Environmental Protection Agency, "Final Guidance for Incorporating Environmental Justice
Concerns in EPA's NEPA Compliance Analyses," April 1998. [Online]. Available:
http://www.epa.gov/environmentaljustice/resources/policy/ej_guidance_nepa_epa0498.pdf.
[Accessed 7 July 2015].
[58] Souris Basin Planning Council, Souris Basin Regional Recovery Strategy - Minot, Burlington and Ward
County, North Dakota. Prepared with Assistance by FEMA, 2011.
[59] Stantec, Minot Front & Center - Downton & Neighborhood Plans, 2014.
[60] North Dakota Parks and Recreation Department, 2013-2017 North Dakota State Comprehensive
Outdoor Recreation Plan.
[61] Burlington, ND, City of, "Parks/Recreation/Golf/Sr. Center," 29 April 2013. [Online]. Available:
http://www.burlingtonnd.gov/index.asp?SEC=1FA60552-13B4-4FCE-89DBEFB163FA057D&Type=B_BASIC. [Accessed 21 May 2015].
[62] Minot Country Club, "Our Story," [Online]. Available: http://www.minotcountryclub.com/-our-story.
[Accessed 26 May 2015].
[63] P. Richard Rothaus, Class I Cultural Resources Survey, Mouse River Enhanced Flood Protection
Project, Burlington to Minot, North Dakota, Trefoil, August 9, 2015.
[64] P. a. J. M. Richard Rothaus, Class III Archaeological Survey, Mouse River Enhanced Flood Protection
Project, Forest Road Levee, 4th Avenue NE Floodwall, Napa Valley Levee, Minot, Ward County, North
Dakota, Trefoil, August 18, 2015.
301
[65] P. a. A. B. M. Richard Rothaus, Class III Standing Structures Survey, Mouse River Enhanced Flood
Protection Project, Forest Road Levee, 4th Avenue NE Floodwall, Napa Valley Levee, 2nd Ave SW
Stormwater Pool, Minot, Ward County, North Dakota, Trefoil, August 09, 2015.
[66] Ackerman-Estvold, Class III Cultural Resources Investigation of Mouse River Enhanced Flood
Protection Plan Borrow Site, Ward County, North Dakota, 2016.
[67] North Dakota Department of Health, North Dakota Air Quality Monitoring Data Summary 2013
Annual Report, 2014.
[68] U.S. Environmental Protection Agency, "Overview of Greenhouse Gases," 7 May 2015. [Online].
Available: http://www.epa.gov/climatechange/ghgemissions/gases/fgases.html. [Accessed 20 May
2015].
[69] U.S. Council on Environmental Quality, "Revised Draft Guidance for Greenhouse Gas Emissions and
Climate Change Impacts," [Online]. Available:
https://www.whitehouse.gov/sites/default/files/docs/nepa_revised_draft_ghg_guidance_searchable.
pdf. [Accessed 15 March 2015].
[70] U.S. Environmental Protection Agency, "Climate Change Impacts and Adapting to Change,"
[Online]. Available: http://epa.gov/climatechange/impacts-adaptation/index.html. [Accessed 20
May 2015].
[71] U.S. Environmental Protection Agency, "FACT SHEET: Clean Power Plan State Roles," 2015. [Online].
Available: http://www2.epa.gov/carbon-pollution-standards/fact-sheet-clean-power-plan-stateroles. [Accessed 5 February 2015].
[72] U.S. Department of Commerce National Oceanic and Atmospheric Administration, Regional
Climate Trends and Scenarios for the U.S. National Climate Assessment Part 4. Climate of the U.S.
Great Plains, Washington, D.C., 2013.
[73] High Plains Regional Climate Center, Climate Change on the Prairie: A Basic Guide to Climate
Change in the High Plains Region - UPDATE, 2013.
[74] Fischenich, J. Craig, Effects of riprap on riverine and riparian ecosystems (REDC/EL TR-03-4),
Vicksburg, MS: U.S. Army Corps of Engineers, 2003.
[75] J. T. Quigley and D. J. Harper, Eds., Streambank Protection with Rip-rap: An Evaluation of the Effects
on Fish and Fish Habitat, Vancouver, B.C.: Fisheries and Oceans Canada, 2004, p. 76.
302
[76] ND Department of Emergency Services, 2011 Flood Report: Response and Recovery, NDDES
Homeland Security State Radio, 2011.
[77] North Dakota Department of Transportation, North Dakota's Statewide Strategic Transportation
Plan - TransAction III, 2012.
[78] State Historical Society of North Dakota, ND SHPO REF: 14-7774 HUD CDBG Acquisition and
Demolition, 103 4th Avenue NW, Minot, Ward County, North Dakota Letter to CDM Smith (on behalf
of the City of Minot, ND), 2015.
[79] Federal Highway Administration (FHWA), FHWA Roadway Construction Noise Model User's Guide.
FHWA-HEP-05-054, 2006.
[80] U.S. Army Corps of Engineers, St. Paul District, 2011 Post-Flood Report for the Souris River Basin,
2012.
[81] U.S. Department of Housing and Urban Development, "HUD Awards $1 Billion through National
Disaster Resilience Competition," 21 January 2016. [Online]. Available:
http://portal.hud.gov/hudportal/HUD?src=/press/press_releases_media_advisories/2016/HUDNo_1
6-006.
[82] U.S. Department of Housing and Urban Development, National Disaster Resilience Competition.
[83] 2012 Souris River Basin Task Force, Plan of Study: For the Review of the Operating Plan Contained in
Annex A of the 1989 International Agreement Between the Government of Canada and the
Government of the United States of America, 2013.
[84] Housing Predictor, "2015 North Dakota Real Estate and Housing Market Predictions," 2015.
[Online]. Available: http://www.housingpredictor.com/2015-north-dakota-real-estate/. [Accessed
16 June 2016].
[85] North Dakota Department of Health, Guidelines for the Assessment and Cleanup of Saltwater
Releases, 2014.
303
References available upon request.
304
Maps
Levee Footprint
Floodwall
o
us
60TH ST NW
i ve
R
r
iv e
E
AV
NW
!
.
Transportation Closure
Road Modifications and
Parking Areas
Overbank Excavation
72ND ST NW
s
COUNTY 15 RD
r
TH
W
eR
46
De
sL
ac
62ND ST NW
M
Interior Ponding Areas
(Existing)
BURLINGTON
Colton Ave.
Bridge Construction
COLTON AVE
Approximate Proposed Pump
Station (New)
!
.
Existing Pump Station
(Replacement)
Municipalities
NT Y
COU
RD
15
CITY OF
BURLINGTON
62ND ST NW
!
.
ST
96
TH
N
SO
ST
NW
HN
JO
AV
E
I
29
TH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 2-1 - Project Features of the Requesters Preferred Alternative.mxd User: KAC2
!
.
NW
0
BROOKS
ADDITION
CO
U
£
¤
83
500
1,000
2,000
Feet
NT
Y
15
HW
Y
NW
Burlington
Minot
!
.
Map 2-1
£
¤
2
PROJECT FEATURES
OF THE REQUESTER'S
PREFERRED ALTERNATIVE
Map (1 of 6)
Mouse River Enhanced Flood
Protection Project
£
¤
52
£
¤
83
VARDON GOLF
COURSE
Imagery: FSA 2014
VARDON GOLF
COURSE
Levee Footprint
Road Modifications and
Parking Areas
Overbank Excavation
Stream Realignment
ROBINWOOD RD
THOMAS DR
RIV
ER
RD
!
.OD
15
H
Existing Pump Station
(Replacement)
!
.
Approximate Pump Station
(Existing)
W
Y
W
K
R
PA
O
W
CO
UN
TY
!
.
N
50TH
COUNTRY CLUB
ACRES
ROBINWOOD
DR
RD
COT
NW
AVE
MAS
DR
19TH AVE NW
MEADOW RD
ER
RIV
19TH
THO
TON
W
!
.
OO
D RD
TALBOTT'S
Interior Ponding Areas
(Existing)
NW
NG
KI
CT
54TH ST NW
S
CO
UN
I
TY
15 HWY NW
T
NSW
STT
41S
ST
41
0
500
1,000
2,000
Feet
NW
£
¤
83
Burlington
D
62N
Minot
Map 2-1
ST
£
¤
2
SW
£
¤
52
FRONTAGE
RD
ST S
W
ST
SW
PROJECT FEATURES
OF THE REQUESTER'S
PREFERRED ALTERNATIVE
Map (2 of 6)
Mouse River Enhanced Flood
Protection Project
ND
£
¤
83
22N
D
62
Barr Footer: ArcGIS 10.4, 2017-05-01 10:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 2-1 - Project Features of the Requesters Preferred Alternative.mxd User: KAC2
ST
KING'S COURT
!
.
Imagery: FSA 2014
ST NW
HA
RM
16TH ST NW
T NW
20TH ST NW
30TH ST NW
Floodwall
!
.
Transportation Closure
D
River Closure Structure
NW
CO
UN
R
YS
HI L
LTO
P
ON
HO
ME
S TE
AD
Levee Footprint
TY
15 HWY NW
4TH AVE NW
High Flow Diversion
E
AV
T
NSW
STT
41S
ST
41
4TH
NW
Road Modifications and
Parking Areas
3RD AVE
3RD
NW
AVE NW
NW
Trails
Overburden Waste
Bank Stabilization Rip-Rap
AVE SW
2ND
Overbank Excavation
Interior Ponding Areas (New)
16TH ST SW
2ND AVE SW
Turf Reinforcement Mat
Canadian Pacific
Railroad Bridge
Construction
Hwy 83 Bypass
Bridge Construction
TIERRECITA VALLEJO
W
RN
TE
ES
FOREST ROAD
(NORTH)
NAPA VALLEY
CITY OF MINOT
!
.
!
.
Interior Ponding Areas
(Existing)
!
.
Approximate Proposed Pump
Station (New)
!
.
Existing Pump Station
(Replacement)
!
.
Approximate Pump Station
(Existing)
Gatewell
ACCE
SS R D
Municipalities
I
11TH AVE SW
ST SW
0
500
1,000
2,000
Feet
16TH
£
¤
15TH AV
E SW
83
31ST ST SW
Burlington
Minot
£
¤
83
N
52
O
W
£
¤
ND
2
SU
£
¤
Map 2-1
33RD ST SW
Barr Footer: ArcGIS 10.4, 2017-05-01 10:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 2-1 - Project Features of the Requesters Preferred Alternative.mxd User: KAC2
!
.
E
AV
DR
PROJECT FEATURES
OF THE REQUESTER'S
PREFERRED ALTERNATIVE
Map (3 of 6)
Mouse River Enhanced Flood
Protection Project
16TH AVE SW
22
N
D
AV
E
SW
Imagery: FSA 2014
8TH ST NW
Levee Footprint
Floodwall
11TH AVE NW
11TH AVE NE
Transportation Closure
River Closure Structure
High Flow Diversion
3RD ST NE
UNIVERSITY AVE NW
UNIVERSITY AVE NE
Road Modifications and
Parking Areas
Trails
Bank Stabilization Rip-Rap
6TH
!
.
Turf Reinforcement Mat
N
ST
W
4TH
RR AV
E
4TH AVE NE
NE
Stream Realignment
57TH ST NW
!
.
Interior Ponding Areas (New)
!
.
DOWNTOWN
FLOODWALLS
RODEO ROAD
!
.
Interior Ponding Areas
(Existing)
RD
!
.
!
.
Approximate Proposed Pump
Station (New)
!
.
Existing Pump Station
(Replacement)
!
.
Approximate Pump Station
(Existing)
AVE SW
2N D
Canadian Pacific
Railroad Bridge
Construction
1ST ST SE
CENTRAL AVE
FIRELANE RD
!
.
CITY OF MINOT
ROOSEVELT
PARK (SOUTH)
ROOSEVELT
PARK (NORTH)
Gatewell
E
AV
3RD AVE SE
Municipalities
1ST ST SW
N
ER
ST
E
W
Burdick Expressway
Bridge Construction
I
VALKER ROAD
(SOUTH)
!
.
HIAWATHA
ST
8TH AVE SE
£
¤
83
Burlington
11TH AVE SW
£
¤
52
£
¤
83
6TH ST SW
ST SW
2
3RD ST SE
£
¤
0
VALKER
ROAD
(NORTH)
500
1,000
2,000
Feet
!
.
11TH AVE SE
Minot
!
.
Map 2-1
13TH ST SE 13
TH S
TS
E
11TH AVE SW
16TH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 2-1 - Project Features of the Requesters Preferred Alternative.mxd User: KAC2
NW
MAPLE AVENUE
HIGH-FLOW
DIVERSION
Overbank Excavation
5TH AVE NE
7TH ST NE
E
AV
3RD AVE
3RD
NWAVE NW
TIEBACK LEVEE
4TH AVE NE
PROJECT FEATURES
OF THE REQUESTER'S
PREFERRED ALTERNATIVE
Map (4 of 6)
Mouse River Enhanced Flood
Protection Project
Imagery: FSA 2014
27TH STREET SE
HIGH-FLOW
!
.
HIAWATHA
ST
Levee Footprint
RD
VALKER
ROAD
(NORTH)
Floodwall
Transportation Closure
31ST ST SE
!
.
8TH AVE SE
River Closure Structure
High Flow Diversion
11TH AVE SE
CITY OF
MINOT
13TH ST SE 13
TH
ST
SE
42ND ST SE
!
.
Stream Realignment
Interior Ponding Areas (New)
!
.
Interior Ponding Areas
(Existing)
27TH STREET SE
HIGH-FLOW
DIVERSION
!
.
14TH AVE SE
27TH ST SE
!
.
Approximate Proposed Pump
Station (New)
!
.
Existing Pump Station
(Replacement)
Municipalities
16TH AVE SE
16TH AVE SE
KELLER
Highway 2 Bridge
Construction
!
.
RIVER
OAKS
!
.
20TH AVE SE
!
.
13TH R
D
20TH
H AVE SE
20T
I
AVE
SE
0
21ST AV E SE
52
£
¤
83
39TH ST SE
RD
19
TY
UN
CO
£
¤
Map 2-1
S
Imagery: FSA 2014
H ST SE
2
D
ST SE
Minot
£
¤
31ST AVE SW
13TH
R
27TH ST SE
13TH ST SE
Burlington
2,000
APPLE
GROVE
24TH AVE SE
22ND ST SE
E
23RD AVE S
83
1,000
39TH ST S E
£
¤
500
Feet
SE
24TH ST
Barr Footer: ArcGIS 10.4, 2017-05-01 10:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 2-1 - Project Features of the Requesters Preferred Alternative.mxd User: KAC2
Overbank Excavation
LN
27th Street NE
Bridge Construction
Road Modifications and
Parking Areas
PROJECT FEATURES
OF THE REQUESTER'S
PREFERRED ALTERNATIVE
Map (5 of 6)
Mouse River Enhanced Flood
Protection Project
Levee Footprint
APPLE
GROVE
39TH ST SE
Floodwall
39TH ST SE
13TH
R
D
Transportation Closure
Road Modifications and
Parking Areas
Overbank Excavation
Interior Ponding Areas (New)
1
TY
UN
CO
Interior Ponding Areas
(Existing)
9
48TH ST SE
47TH ST SE
S
!
.
55TH ST SE
RD
!
.
Approximate Proposed Pump
Station (New)
33RD AVE SE
34TH AVE SE
35TH AVE SE
37TH AVE SE
37TH AVE SE
U
CO
N
TY
19
RD
S
LA
NE
DR
I
OW
ME
AD
43
R
D
AV
E
SE
0
£
¤
83
Burlington
TH
38
ST
SE
42ND ST SE
!
.
CHAPARELLE
500
1,000
2,000
Feet
DR
LE
DR
EL
LE
AR
EL
AP
AR
CH
AP
CH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:41 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 2-1 - Project Features of the Requesters Preferred Alternative.mxd User: KAC2
EASTSIDE ESTATES
Minot
Map 2-1
£
¤
2
50TH AVE SE
£
¤
52
£
¤
83
54TH AVE SE
SE
H AVE FSA
2014
54TImagery:
PROJECT FEATURES
OF THE REQUESTER'S
PREFERRED ALTERNATIVE
Map (6 of 6)
Mouse River Enhanced Flood
Protection Project
Modeled Inundation Extents
27,400 cfs flow
NW
Existing Federal Flood
Control Features
CITY OF
BURLINGTON
NW
Municipalities
38TH AVE NW
30TH ST NW
T
NS
SO
101
HN
JO
ST
COLTON AVE
ST
10,000 cfs flow
60TH ST NW
46TH ST NW
E
AV
62ND ST NW
TH
72ND ST NW
46
COUNTY 15 RD W
5,000 cfs flow
21ST AVE NW
CO
UN
TY
£
¤
2
RIVER
NW
15
ROBINWOOD RD
HW
Y
RD
NW
19TH AVE NW
19TH AVE NW
OW
AD
ME
CI
PA
RD
SU
NS
ET
£
¤
83
C
FI
BL
VD
RA
54TH ST NW
30TH ST NW
AD
NW
HARMONY ST
RO
IL
86TH
ST N
W
20TH ST NW
AV
E
86TH ST NW
19T
H
AN
DI
NA
CA
I
4TH AVE NW
41
0
ST
1,250
2,500
5,000
ST
NW
CITY OF MINOT
Feet
T
D S
62N BU
R
SW
D ST
22N
LIN
G
5TH AVE
TO
N
NO
RT
Map 2-2
HE
RN
SA
N
TA
F
E
ACCESS
11TH AVE SW
100TH ST SW
SW
2ND AVE SW
SW
RA
ILR
O
RD
Barr Footer: ArcGIS 10.4, 2016-09-09 13:10 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-2 - No Action Alternative Inundation.mxd User: jrv
100TH ST NW
96TH ST NW
30TH AVE NW
AD
£
¤
2
NO ACTION ALTERNATIVE
INUNDATION
Map (1 of 2)
Mouse River Enhanced Flood
Protection Project
ST NW
11TH AVE NW
UNIVERSITY AVE NW
42ND ST NE
27TH ST NE
2 ND
5,000 cfs flow
NW
3RD ST NE
16TH ST NW
30TH ST NW
HARMONY ST
20TH ST NW
Modeled Inundation Extents
NE
BL
VD
3R D S T
8TH ST NW
SU
NS
ET
10,000 cfs flow
27,400 cfs flow
Existing Federal Flood
Control Features
Municipalities
4TH AVE NE
4TH AVE NW
4TH AVE NE
3RD AVE NW
£
¤
4TH AVE SE
RD
83
2
CA
NA 8TH AVE SE
DI
AN
PA
CI
FI
C
RA
IL
22
N
D
AV FO
E
N
SW TAG
E
£
¤
83
RD
11TH AVE SE
E SE
20TH AV
13TH RD
£
¤
20TH AV E SE
2
£
¤
52
24TH
H
37T
E
AV
I
27TH ST SE
13TH ST SE
RD SE
RD
16TH ST SW
30TH ST SW
31ST AVE SW
SE
37TH AVE SW
37TH AVE SW
LN
16TH AVE SE
ST
31ST AVE SW
2
16TH AVE SE
E
20TH AVE S
20TH AVE SW
£
¤
39TH ST SE
33RD ST SW
16TH AVE SW
AD
13TH ST SE
OAD
RO
RD
RD
2ND ST SE
FE RAILR
6TH ST SW
ANTA
THERN S
TON NOR
BURLING
16T
H
RD
ST SW
11TH AVE SW
RD
42ND ST SE
6TH ST SW
ACCESS
0
1,250
2,500
5,000
Feet
SW
£
¤
52
CO
UN
TY
37TH AVE SE
19
RD
M
R
VE
A
BE
CREEK RD
EA
O
D
LA
W
TH
38
N
ST
E
Map 2-2
DR
SE
42ND ST SE
SE
43RD
AV
E
16TH ST SW
S
Barr Footer: ArcGIS 10.4, 2016-09-09 13:10 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-2 - No Action Alternative Inundation.mxd User: jrv
£
¤
27TH ST SE
CITY OF MINOT
SW
2
FE RAILROAD
BURLINGTON NORTHERN SANTA
2ND AVE SW
2ND AVE SE
1ST ST SW
5TH AVE
£
¤
6TH ST SW
2ND AVE SW
2ND AVE SW
CENTRAL AVE
NO ACTION ALTERNATIVE
INUNDATION
Map (2 of 2)
Mouse River Enhanced Flood
Protection Project
o
us
R
Ponding Areas
!
.
Pump Stations
Municipalities
NW
r
iv e
E
AV
72ND ST NW
La
cs
COUNTY 15 RD
TH
r
46
W
i ve
eR
De
s
Channel Modifications
60TH ST NW
62ND ST NW
M
60TH S
TN
W
Levee Centerline
JOHNSON ADDITION/
BURLINGTON
COLTON AVE
N
COU
RD
15
TY
96
TH
!
.
62ND ST NW
ST
N
W
RO
AIL
CR
IFI
AC
NP
T
DIA
NS
NA
SO
CA
HN
JO
AD
£
¤
2
AV
E
I
29
TH
Barr Footer: ArcGIS 10.4, 2016-10-26 15:05 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-3 - Existing Flood Risk Reduction Features.mxd User: jrv
CITY OF
BURLINGTON
NW
0
500
1,000
2,000
BROOKS ADDITION
CO
UN
TY
£
¤
83
Feet
15
HW
Y
NW
Burlington
Minot
£
¤
2
Map 2-3
!
.
EXISTING FLOOD RISK
REDUCTION FEATURES
Map (1 of 6)
Mouse River Enhanced Flood
Protection Project
£
¤
52
£
¤
83
Imagery: FSA 2014
Levee Centerline
Channel Modifications
Ponding Areas
!
.
Pump Stations
COUNTRY CLUB ACRES
& ROBINWOOD ESTATES
ROBINWOOD RD
CO
DR
RIV
COT
THOMAS D R
RD
MEADOW RD
ER
RIV
NW
VE
19T H A
MAS
DR
TON
W
THO
!
.
OO
D RD
TALBOTT'S
19TH AVE NW
ER
RD
!
.
TY
15
HW
Y
NW
K
R
PA
O
W
D
O
UN
50TH
ST
R
D
EL
N
O
DR
!
.
NG
KI
S
CT
£
¤
54TH ST NW
2
AN
DI
NA
CA
I
CI
PA
C
FI
RA
RO
IL
0
500
1,000
2,000
ST
41
AD
ST
Feet
NW
£
¤
83
Burlington
Minot
£
¤
2
SA
N
£
¤
52
£
¤
83
22N
D
ST
SW
TA
F
Map 2-3
ER
AIL
RO
AD
W
HE
RN
W
NO
RT
DS
TS
TO
N
S
ST
LIN
G
FRONTAGE
EXISTING FLOOD RISK
REDUCTION FEATURES
Map (2 of 6)
Mouse River Enhanced Flood
Protection Project
RD
62N
BU
R
D
62N
Barr Footer: ArcGIS 10.4, 2016-10-26 15:05 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-3 - Existing Flood Risk Reduction Features.mxd User: jrv
NW
KING'S COURT &
ROSTAD'S ADDITION
Imagery: FSA 2014
ST NW
HA
RM
NT
Y
16TH ST NW
20TH ST NW
30TH ST NW
Channel Modifications
!
.
Ponding Areas
D
!
.
NW
CO
U
R
ST NW
HIL
LTO
P
Y
ON
HO
ME
S TE
AD
Levee Centerline
15 HWY
NW
Municipalities
MINOT RIGHT
BANK
4TH AVE NW
Pump Stations
41
ST
ST
3RD AVE NW
NW
2ND AVE SW
2ND AVE SW
£
¤
CI FIC RA
CANADIAN PA
ILROAD
CITY OF MINOT
TIERRECITA VALLEJO
MINOT LEFT
BANK
ACCE
SS RD
!
.
BU
R
ON
GT
N
LI
R
HE
RT
NO
N
SA
A
NT
FE
RA
RO
IL
AD
I
11TH AVE SW
0
500
1,000
2,000
Feet
52
£
¤
83
N
£
¤
AD
FE RAILRO
O
W
£
¤
ERN SANTA
2
ND
TH
TON NOR
BURLING
2
£
¤
SU
Minot
2
ST S
W
Burlington
£
¤
16T
H
15TH AV
E SW
83
31ST ST SW
£
¤
33RD ST SW
Barr Footer: ArcGIS 10.4, 2016-10-26 15:05 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-3 - Existing Flood Risk Reduction Features.mxd User: jrv
!
.
16TH ST SW
83
DR
Map 2-3
EXISTING FLOOD RISK
REDUCTION FEATURES
Map (3 of 6)
Mouse River Enhanced Flood
Protection Project
16TH AVE SW
22
N
D
AV
E
SW
£
¤
2
Imagery: FSA 2014
8TH ST NW
11TH AVE NW
Levee Centerline
Channel Modifications
11TH AVE NW
11TH AVE NE
Ponding Areas
!
.
UNIVERSITY AVE NW
Municipalities
MINOT LEFT
BANK
N
ST
6TH
!
.
UNIVERSITY AVE NE
3RD ST NE
UNIVERSITY AVE NW
5TH AVE NE
W
MINOT RIGHT
BANK
RR AV
E NE
4TH AVE NE
57TH ST NW
4TH AVE
NE
BU
N
TO
NG
RLI
RT
NO
RN
HE
N
SA
TA
R
FE
RO
AIL
AD
7TH ST NE
6TH ST NW
3RD AVE NW
3RD ST SE
4TH AVE NW
Pump Stations
4TH AVE NE
RD
!
.
RD
LANE
£
¤
83
W
!
.
WE
N
ER
ST
E
AV
2ND AVE SE
3RD ST SE
S
6TH ST
2ND AVE SW
FIRE
1ST ST SE
CITY OF MINOT
CA
NA
DI
AN
3RD AVE SE
£
¤
1ST ST SW
2
!
.
PA
CI
FI
C
RA
IL
RO
AD
I
6TH ST SW
HIAWATHA
ST
ST
£
¤
83
SW
Burlington
11TH AVE SW
11TH AVE SE
1,000
2,000
£
¤
52
MINOT LEFT
BANK
11TH AVE SE
52
Map 2-3
13TH ST SE
£
¤
6TH ST SW
2
3RD ST SE
!
.
£
¤
ST SW
500
Feet
Minot
16T
H
0
8TH AVE SE
3RD ST SE
TH
16
Barr Footer: ArcGIS 10.4, 2016-10-26 15:05 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-3 - Existing Flood Risk Reduction Features.mxd User: jrv
CENTRAL AVE
EXISTING FLOOD RISK
FEATURES
Map (4 of 6)
Mouse River Enhanced Flood
Protection Project
MINOT RIGHT
BANKREDUCTION
£
¤
83
Imagery: FSA 2014
RD
8TH AVE SE
Levee Centerline
RD
£
¤
2
RD
Channel Modifications
Ponding Areas
31ST ST SE
CITY OF MINOT
MINOT LEFT
BANK
!
.
Pump Stations
42ND ST SE
Municipalities
11TH AVE SE
!
.
13TH ST SE
LN
MINOT RIGHT
BANK
£
¤
52
13TH ST SE
C
AN
AD
16TH AVE SE
IA
N
PA
C
IF
IC
R
AI
LR
O
AD
20TH AVE SE
I
13TH RD
20TH
H AVE SE
20T
AVE
SE
2
52
Feet
£
¤
EXISTING FLOOD RISK
REDUCTION FEATURES
Map (5 of 6)
Mouse River Enhanced Flood
Protection Project
52
D
9R
£
¤
83
31ST AVE SW
2,000
Map 2-3
1
TY
UN
CO
£
¤
1,000
24TH AVE SE
Minot
£
¤
500
39TH ST SE
13TH ST SE
Burlington
2
27TH ST SE
E
23RD AVE S
83
£
¤
22ND ST SE
£
¤
20TH ST SE
0
21ST AVE SE
SE
24TH ST
S
Barr Footer: ArcGIS 10.4, 2016-10-26 15:05 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-3 - Existing Flood Risk Reduction Features.mxd User: jrv
16TH AVE SE
27TH ST SE
14TH AVE SE
CANADIA
N PACIFIC RAILRO
AD
Imagery: FSA 2014
£
¤
2
13TH
R
D
48TH ST SE
47TH ST SE
55TH ST SE
SE
39TH ST
33RD AVE SE
34TH AVE SE
35TH AVE SE
37TH AVE SE
37TH AVE SE
CI
PA
TY
RO
IL
UN
RA
O
C
FI
C
RD
AD
19
S
OW
LA
NE
DR
I
ME
AD
43
R
D
AV
E
SE
0
500
1,000
2,000
£
¤
83
TH
38
Burlington
ST
SE
42ND ST SE
Feet
DR
LE
DR
EL
LE
AR
EL
AP
AR
CH
AP
CH
Barr Footer: ArcGIS 10.4, 2016-10-26 15:05 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Draft EIS\Map 2-3 - Existing Flood Risk Reduction Features.mxd User: jrv
52
AN
DI
NA
CA
£
¤
Minot
Map 2-3
£
¤
2
50TH AVE SE
£
¤
52
£
¤
83
54TH AVE S E
SE
TH AVEFSA 2014
54Imagery:
EXISTING FLOOD RISK
REDUCTION FEATURES
Map (6 of 6)
Mouse River Enhanced Flood
Protection Project
Project Footprint
60TH ST NW
F996
W
F996 F576A
F596A
TH
F576A:Velva loam, moist, 0 to 2
percent slopes, occasionally
flooded
E
AV
F577A:Velva, moist-Fluvaquents,
channeled fine sandy loams, 0 to 2
percent slopes, frequently flooded
NW
72ND ST NW
46
F577A
COUNTY 15 RD
F996
F147F:Buse-Barnes-Darnen
loams, 9 to 35 percent slopes
62ND ST NW
60TH S
TN
W
Map Unit Name
F576A
F578A:Velva fine sandy loam,
moist, wooded, 0 to 2 percent
slopes, frequently flooded
F996
F596A:Darnen loam, 0 to 2
percent slopes
F596B:Darnen loam, 2 to 6
percent slopes
F578A
F577A
COLTON AVE
F147F
F680D:Barnes-Sioux complex, 6 to
15 percent slopes
F576A
F680D
N
COU
F576A
NA
CA
F578A
F576A
62ND ST NW
ST
N
W
AD
RO
AIL
CR
IFI
T
AC
NS
NP
SO
DIA
HN
JO
96
TH
RD
15
TY
F996
F578A
F596A
£
¤
2
I
F596B
AV
E
F577A
29
TH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-1 - Soil Units.mxd User: KAC2
F996:Water
NW
0
F576A
CO
UN
TY
£
¤
83
500
1,000
2,000
Feet
15
HW
Y
NW
Burlington
F577A
Minot
£
¤
2
F576A
Map 3-1
£
¤
52
£
¤
83
F996
Data Source: NRCS 2016
Imagery: FSA 2014
SOIL UNITS
Map (1 of 6)
Mouse River Enhanced Flood
Protection Project
Project Footprint
F996
Map Unit Name
F383B:Maddock-Hecla fine sandy
loams, 0 to 6 percent slopes
F527A:Ludden silty clay, very
poorly drained, 0 to 1 percent
slopes, frequently flooded
F577A
F562A:La Prairie-Fluvaquents,
channeled complex, 0 to 2 percent
slopes, frequently flooded
F596A
F996
RD
F527A
RIV
F577A
F577A
F576A
F576A
F527A D
O
O
W
F996 F577A
K
R
PA
F576A
F577A
F527A
F996
F576A
F576A
UN
TY
15
F578A:Velva fine sandy loam,
moist, wooded, 0 to 2 percent
slopes, frequently flooded
HW
Y
F576A
F596A:Darnen loam, 0 to 2
percent slopes
50TH
F996
CO
F576A
NW
F577A
ER
RD
F577A:Velva, moist-Fluvaquents,
channeled fine sandy loams, 0 to 2
percent slopes, frequently flooded
F596A
COT
F996
F639F
THOMAS DR
F576A:Velva loam, moist, 0 to 2
percent slopes, occasionally
flooded
DR
F596A
ER
RIV
NW
VE
19T H A
MAS
DR
TON
W
THO
F996
19TH AVE NW
MEADOW RD
OO
D RD
ROBINWOOD RD
F577A
ST
F639F:Orthents-Aquents-Urban
Land, highway complex, 0 to 35
percent slopes
NW
F576A
F578A
F996
D
EL
F576A
F578A
F996
F527A
S
CT
F578A
F576A
F996
54TH ST NW
£
¤
2
F383B
NA
CA
AN
DI
I
C
FI
CI
PA
R
LR
AI
0
500
1,000
2,000
ST
41
AD
O
ST
Feet
NW
£
¤
83
Burlington
ST
£
¤
£
¤
52
£
¤
83
22N
D
ST
SW
Map 3-1
ER
AIL
RO
AD
W
2
SA
NT
AF
DS
TS
ER
N
SW
LIN
GT Minot
ON
NO
RT
H
62N
BU
R
D
62N
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-1 - Soil Units.mxd User: KAC2
F996:Water
NG
KI
F680D
F596A
F996
DR
N
O
R
F562A
F680D:Barnes-Sioux complex, 6 to
15 percent slopes
F527A F527A
F996
FRONTAGE
RD
Data Source: NRCS 2016
Imagery: FSA 2014
SOIL UNITS
Map (2 of 6)
Mouse River Enhanced Flood
Protection Project
ST NW
HA
RM
16TH ST NW
20TH ST NW
30TH ST NW
HIL
LTO
P
ST NW
NT
Y
F272E:Sioux-Arvilla-Renshaw
complex, 9 to 25 percent slopes
F576A:Velva loam, moist, 0 to 2
percent slopes, occasionally
flooded
D
NW
CO
U
R
Map Unit Name
Y
ON
HO
ME
S TE
AD
Project Footprint
15 HWY
NW
F577A:Velva, moist-Fluvaquents,
channeled fine sandy loams, 0 to 2
percent slopes, frequently flooded
4TH AVE NW
41
ST
ST
3RD AVE NW
NW
F578A:Velva fine sandy loam,
moist, wooded, 0 to 2 percent
slopes, frequently flooded
F596B:Darnen loam, 2 to 6
percent slopes
F643B:Urban land-Udorthents
loamy complex, 0 to 6 percent
slopes
F643B
F997
F645B:Urban land-Udifluvents
loamy complex, 0 to 6 percent
slopes
2ND AVE SW
£
¤
83
F645B
2ND AVE SW
F577A
F272E
5TH AVE SW
F577A
F650:Pits, gravel and sand
F646B
F643B
F645B
F577A
F576A
F997
F645B
F577A
F576A
F996
F996
F577A
F996
F576A
F578A
D
F576A
ACCE
SS R
F645B
F996
F996
F577A
F577A
F577A
F996
F577A
F996
F577A
F576A
F578A
F577A
F996
F577A
BU
N
TO
G
N
I
RL
N
RT
O
F596B
F996:Water
RN
HE
N
SA
TA
FE
R
O
LR
AI
AD
I
11TH AVE SW
£
¤
F576A
2
0
500
1,000
2,000
Feet
52
£
¤
83
Map 3-1
N
£
¤
AD
FE RAILRO
O
W
£
¤
ERN SANTA
2
ND
TH
TON NOR
BURLING
2
£
¤
SU
Minot
2
ST S
W
Burlington
£
¤
16T
H
15TH AV
E SW
83
31ST ST SW
£
¤
33RD ST SW
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-1 - Soil Units.mxd User: KAC2
F646B:Urban land, 0 to 6 percent
slopes
F645B
F997:Water, intermittent
F997
F996
F577A
F577A
ST
SW
36T
H
37TH
ST
SW
F576A
F996
16TH ST SW
D
F576A
CIFIC RAILR OA
CANADIAN PA
F650
F577A
F650
F650
F576A
DR
16TH AVE SW
22
N
D
AV
E
SW
£
¤
2
Data Source: NRCS 2016
Imagery: FSA 2014
SOIL UNITS
Map (3 of 6)
Mouse River Enhanced Flood
Protection Project
8TH ST NW
Project Footprint
11TH AVE NW
UNIVERSITY AVE NW
F576A:Velva loam, moist, 0 to 2
percent slopes, occasionally
flooded
11TH AVE NE
F577A:Velva, moist-Fluvaquents,
channeled fine sandy loams, 0 to 2
percent slopes, frequently flooded
UNIVERSITY AVE NW
UNIVERSITY AVE NE
3RD ST NE
11TH AVE NW
Map Unit Name
F596A:Darnen loam, 0 to 2
percent slopes
F596B:Darnen loam, 2 to 6
percent slopes
6TH
F639F:Orthents-Aquents-Urban
Land, highway complex, 0 to 35
percent slopes
N
ST
W
4TH AVE NW
4TH AVE NE
F996
4TH AVE
NE
F996
F645B
F996
BURLIN
F576A
F643B
GTON
NOR
F996
F996
F996
F996
F639F
7TH ST NE
6TH ST NW
F639F
3RD ST SE
3RD AVE NW
RR AV
E NE
F645B
F996
F645B
F643B:Urban land-Udorthents
loamy complex, 0 to 6 percent
slopes
F596B
5TH AVE NE
THERN
57TH ST NW
F596B
SA NTA
F576A
F645B:Urban land-Udifluvents
loamy complex, 0 to 6 percent
slopes
4TH AVE NE
F E RA
ILROA
D
RD
F646B:Urban land, 0 to 6 percent
slopes
F576A
F996
CENTRAL AVE
F996:Water
F997:Water, intermittent
F576A
FIRE
RD
LANE
£
¤
83
S
WE
F996
RN
TE
E
AV
CA
NA
3RD AVE SE
£
¤
F577A
1ST ST SW
2
F646B
F643B
F997
DI
AN
PA
CI
FI
C
RA
IL
RO
AD
F997
F645B
I
F996
F645B
F996
6TH ST SW
HIAWATHA
ST
ST
£
¤
83
SW
Burlington
11TH AVE SW
0
8TH AVE SE
3RD ST SE
F996
TH
16
£
¤
1,000
2,000
F996
52
F997
F577A
11TH AVE SE
11TH AVE SE
F997
52
6TH ST SW
£
¤
13TH ST SE
£
¤
3RD ST SE
F645B
2
ST SW
500
Feet
F645B
Minot
16T
H
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-1 - Soil Units.mxd User: KAC2
W
F577A
F645B
F577A
F996
2ND AVE SE
3RD ST SE
S
6TH ST
2ND AVE SW
1ST ST SE
F645B
F996
F996
F596B
F645B
F576A
F596A
F646B
£
¤
83
Data Source: NRCS 2016
Imagery: FSA 2014
Map 3-1
SOIL UNITS
Map (4 of 6)
Mouse River Enhanced Flood
Protection Project
F645B
Project Footprint
F996
RD
8TH AVE SE
RD
£
¤
2
F147F:Buse-Barnes-Darnen
loams, 9 to 35 percent slopes
31ST ST SE
F645B
Map Unit Name
RD
F996
F997
F272E:Sioux-Arvilla-Renshaw
complex, 9 to 25 percent slopes
F527A:Ludden silty clay, very
poorly drained, 0 to 1 percent
slopes, frequently flooded
42ND ST SE
F577A
11TH AVE SE
F997
F645B
F996
F55A:Ludden silty clay, 0 to 1
percent slopes, frequently flooded
F996
F576A:Velva loam, moist, 0 to 2
percent slopes, occasionally
flooded
F576A
F596A
F645B
F646B
F577A
F55A
F576A
F577A
13TH ST SE
F645B
F527A
F996
F643B
F645B
F55A
F577A:Velva, moist-Fluvaquents,
channeled fine sandy loams, 0 to 2
percent slopes, frequently flooded
LN
F596B
F578A:Velva fine sandy loam,
moist, wooded, 0 to 2 percent
slopes, frequently flooded
F577A F578A
14TH AVE SE
£
¤
52
16TH AVE SE
27TH ST SE
F645B
C
AN
F596A:Darnen loam, 0 to 2
percent slopes
F996
F596B:Darnen loam, 2 to 6
percent slopes
F576A
AD
16TH AVE SE
IA
N
F639F:Orthents-Aquents-Urban
Land, highway complex, 0 to 35
percent slopes
F527A
PA
C
IF
IC
F996
F576A
R
AI
LR
F577A
O
AD
F147F
F643B:Urban land-Udorthents
loamy complex, 0 to 6 percent
slopes
F578A
F577A
F55A
13TH ST SE
F639F F577A F55A
F55A
F645B:Urban land-Udifluvents
loamy complex, 0 to 6 percent
slopes
F577A
F996
F646B:Urban land, 0 to 6 percent
slopes
F147F
F576A
20TH AVE SE
F680D:Barnes-Sioux complex, 6 to
15 percent slopes
13TH RD
20TH
H AVE SE
20T
I
F996:Water
F577A
AVE
SE
F996
0
£
¤
21ST AV E SE
2
F578A
F997:Water, intermittent
500
1,000
2,000
Feet
F55A
F576A
13TH ST SE
Burlington
Minot
£
¤
2
52
83
£
¤
52
D
9R
£
¤
F55A
1
TY
UN
CO
£
¤
31ST AVE SW
39TH ST SE
23RD AVE
27TH ST SE
83
24TH AVE SE
22ND ST SE
£
¤
SE
SE
24TH ST
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-1 - Soil Units.mxd User: KAC2
F577A
F577A
Map 3-1
F576A
F272E
F527A
F527A
F527A
F527A
F577A F576A
F639F
CANADIA
N PACIFIC RAILRO
AD
Data Source: NRCS 2016
Imagery:
FSA 2014
F576A
SOIL UNITS
Map (5 of 6)
Mouse River Enhanced Flood
Protection Project
F576A
F55A
£
¤
2
Map Unit Name
F576A
F996
F272E:Sioux-Arvilla-Renshaw
complex, 9 to 25 percent slopes
39TH ST SE
13TH
R
Project Footprint
F578A
D
F527A:Ludden silty clay, very
poorly drained, 0 to 1 percent
slopes, frequently flooded
F55A:Ludden silty clay, 0 to 1
percent slopes, frequently flooded
F55A
F576A
F577A
F527A F527A
F639F
F576A
F577A:Velva, moist-Fluvaquents,
channeled fine sandy loams, 0 to 2
percent slopes, frequently flooded
F577A
F578A
55TH ST SE
F576A
48TH ST SE
F527A
F576A:Velva loam, moist, 0 to 2
percent slopes, occasionally
flooded
F527A
47TH ST SE
F272E
F527A
F578A:Velva fine sandy loam,
moist, wooded, 0 to 2 percent
slopes, frequently flooded
F576A
F527A
F596A:Darnen loam, 0 to 2
percent slopes
33RD AVE SE
F639F
F639F:Orthents-Aquents-Urban
Land, highway complex, 0 to 35
percent slopes
34TH AVE SE
NA
CA
AN
DI
52
C
FI
CI
PA
£
¤
F996:Water
35TH AVE SE
R
LR
AI
37TH AVE SE
37TH AVE SE
AD
O
C
F596A F639F F639F F576A
TY
19
RD
S
LA
OW
ME
AD
43
RD
AV
E
NE
DR
I
0
F596A
TH
38
Burlington
ST
SE
42ND ST SE
83
1,000
2,000
Feet
F639F
£
¤
500
F576A
DR
LE
DR
EL
LE
AR
EL
AP
AR
CH
AP
CH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-1 - Soil Units.mxd User: KAC2
UN
O
SE
F596A
Minot
£
¤
2
Map 3-1
50TH AVE SE
£
¤
52
£
¤
83
54TH AVE S E
Data Source:
SE 2016
VENRCS
54TH AFSA 2014
Imagery:
SOIL UNITS
Map (6 of 6)
Mouse River Enhanced Flood
Protection Project
Prime farmland
60TH ST NW
Farmland of statewide
importance
NW
Prime farmland if drained
46TH ST NW
E
AV
62ND ST NW
TH
72ND ST NW
46
COUNTY 15 RD W
Farmland Classification (NRCS
SSURGO Soils)
38TH AVE NW
Municipalities
ST
30TH ST NW
N
SO
101
ST
CITY OF
BURLINGTON
NW
Project Footprint
HN
JO
ST
COLTON AVE
100TH ST NW
96TH ST NW
30TH AVE NW
21ST AVE NW
CO
UN
TY
£
¤
HW
Y
RD
RIVER
AN
DI
RD
C
FI
CI
PA
NW
19TH AVE NW
19TH AVE NW
OW
AD
ME
SU
NS
ET
£
¤
83
BL
VD
R
LR
AI
20TH ST NW
54TH ST NW
30TH ST NW
T NW
NW
HARMONY ST
AD
O
86TH
S
15
ROBINWOOD RD
2
NW
86TH ST NW
AV
E
NA
CA
I
4TH AVE NW
41
0
ST
1,250
2,500
5,000
ST
NW
CITY OF MINOT
Feet
T
D S
62N BU
R
SW
D ST
22N
LIN
5TH AVE
GT
ON
NO
RT
HE
RN
SA
NT
AF
E
Map 3-2
ACCESS
11TH AVE SW
100TH ST SW
SW
2ND AVE SW
SW
RA
ILR
O
RD
Barr Footer: ArcGIS 10.4, 2017-05-01 10:43 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-2 - Prime Farmland.mxd User: KAC2
19T
H
AD
£
¤
2
Data Source: NRCS 2016
Imagery: FSA 2014
PRIME FARMLAND
Map (1 of 2)
Mouse River Enhanced Flood
Protection Project
ST NW
UNIVERSITY AVE NW
NW
Project Footprint
4TH AVE NE
3RD AVE NW
£
¤
Farmland of statewide
importance
Prime farmland if drained
4TH AVE NE
4TH AVE NW
Prime farmland
42ND ST NE
27TH ST NE
2 ND
11TH AVE NW
3RD ST NE
16TH ST NW
30TH ST NW
HARMONY ST
20TH ST NW
Farmland Classification (NRCS
SSURGO Soils)
NE
BL
VD
3R D S T
8TH ST NW
SU
NS
ET
Municipalities
4TH AVE SE
RD
83
33RD ST SW
16TH AVE SW
22
N
D
AV FO
E
N
SW TAG
E
£
¤
83
RD
11TH AVE SE
13TH RD
£
¤
20TH AV E SE
2
£
¤
52
H
37T
E
AV
I
27TH ST SE
13TH ST SE
RD SE
RD
16TH ST SW
31ST AVE SW
SE
30TH ST SW
LN
E SE
20TH AV
24TH
37TH AVE SW
37TH AVE SW
2
16TH AVE SE
ST
31ST AVE SW
£
¤
16TH AVE SE
E
20TH AVE S
20TH AVE SW
AD
RD
RD
2ND ST SE
OA D
RO
13TH ST SE
6TH ST SW
ST SW
16T
H
RD
FE RAILR
RD
39TH ST SE
ACCESS
CA
NA 8TH AVE SE
DI
AN
PA
CI
FI
C
RA
IL
42ND ST SE
6TH ST SW
2
11TH AVE SW
AN TA
THERN S
TON N OR
BURLI NG
0
1,250
2,500
5,000
Feet
SW
£
¤
52
CO
UN
TY
37TH AVE SE
19
RD
M
R
VE
A
BE
CREEK RD
EA
O
D
L
W
TH
38
AN
ST
E
DR
SE
Map 3-2
42ND ST SE
SE
43RD
AV
E
16TH ST SW
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:43 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-2 - Prime Farmland.mxd User: KAC2
£
¤
27TH ST SE
CITY OF MINOT
SW
2
FE RAILROAD
BURLINGTON NORTHERN SANTA
2ND AVE SW
2ND AVE SE
1ST ST SW
5TH AVE
£
¤
6TH ST SW
2ND AVE SW
2ND AVE SW
CENTRAL AVE
Data Source: NRCS 2016
Imagery: FSA 2014
PRIME FARMLAND
Map (2 of 2)
Mouse River Enhanced Flood
Protection Project
Floodway
60TH ST NW
100-yr Floodplain
NW
500-yr Floodplain
ST
30TH ST NW
N
SO
101
ST
Municipalities
38TH AVE NW
HN
JO
ST
COLTON AVE
CITY OF
BURLINGTON
NW
Project Footprint
46TH ST NW
E
AV
62ND ST NW
TH
72ND ST NW
46
COUNTY 15 RD W
Wetlands (National Wetland
Inventory)
21ST AVE NW
CO
UN
TY
£
¤
2
AN
DI
RD
C
FI
CI
PA
HW
Y
NW
19TH AVE NW
19TH AVE NW
OW
AD
ME
SU
NS
ET
£
¤
83
BL
VD
R
LR
AI
20TH ST NW
54TH ST NW
30TH ST NW
T NW
NW
HARMONY ST
AD
O
86TH
S
RIVER
NW
15
ROBINWOOD RD
RD
AV
E
86TH ST NW
19T
H
NA
CA
I
4TH AVE NW
41
0
ST
1,250
2,500
5,000
ST
NW
CITY OF MINOT
Feet
T
D S
62N BU
R
SW
D ST
22N
LIN
5TH AVE
GT
ON
NO
RT
Map 3-3
HE
RN
SA
NT
AF
E
ACCESS
11TH AVE SW
100TH ST SW
SW
2ND AVE SW
SW
RA
ILR
O
RD
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-3 - Floodplain and NWI Overview Map.mxd User: KAC2
100TH ST NW
96TH ST NW
30TH AVE NW
AD
£
¤
2
Data Sources:
National Wetland Inventory 2014
Ward County 2015
Imagery: FSA 2014
FLOODPLAIN AND NWI
OVERVIEW MAP
Map (1 of 2)
Mouse River Enhanced Flood
Protection Project
ST NW
UNIVERSITY AVE NW
500-yr Floodplain
NW
Municipalities
4TH AVE NE
3RD AVE NW
£
¤
100-yr Floodplain
Project Footprint
4TH AVE NE
4TH AVE NW
Floodway
42ND ST NE
27TH ST NE
2 ND
11TH AVE NW
3RD ST NE
16TH ST NW
30TH ST NW
HARMONY ST
20TH ST NW
Wetlands (National Wetland
Inventory)
NE
BL
VD
3R D S T
8TH ST NW
SU
NS
ET
4TH AVE SE
RD
83
2
CA
NA 8TH AVE SE
DI
AN
PA
CI
FI
C
RA
IL
22
N
D
AV FO
E
N
SW TAG
E
£
¤
83
RD
E SE
20TH AV
13TH RD
£
¤
20TH AV E SE
2
£
¤
52
24TH
H
37T
E
AV
I
27TH ST SE
13TH ST SE
RD SE
RD
16TH ST SW
30TH ST SW
31ST AVE SW
SE
37TH AVE SW
37TH AVE SW
LN
16TH AVE SE
ST
31ST AVE SW
2
16TH AVE SE
E
20TH AVE S
20TH AVE SW
11TH AVE SE
£
¤
39TH ST SE
33RD ST SW
16TH AVE SW
AD
13TH ST SE
OA D
RO
RD
RD
2ND ST SE
FE RAILR
6TH ST SW
AN TA
THERN S
TON N OR
BURLI NG
16T
H
RD
ST SW
11TH AVE SW
RD
42ND ST SE
6TH ST SW
ACCESS
0
1,250
2,500
5,000
Feet
SW
£
¤
52
CO
UN
TY
37TH AVE SE
19
RD
M
R
VE
A
BE
CREEK RD
EA
O
D
LA
W
TH
38
N
ST
E
Map 3-3
DR
SE
42ND ST SE
SE
43RD
AV
E
16TH ST SW
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-3 - Floodplain and NWI Overview Map.mxd User: KAC2
£
¤
27TH ST SE
CITY OF MINOT
SW
2
FE RAILROAD
BURLINGTON NORTHERN SANTA
2ND AVE SW
2ND AVE SE
1ST ST SW
5TH AVE
£
¤
6TH ST SW
2ND AVE SW
2ND AVE SW
CENTRAL AVE
Data Sources:
National Wetland Inventory 2014
Ward County 2015
Imagery: FSA 2014
FLOODPLAIN AND NWI
OVERVIEW MAP
Map (2 of 2)
Mouse River Enhanced Flood
Protection Project
60TH S
TN
W
Project Footprint
Land Cover (USGS 2011)
TH
62ND ST NW
Open Water
Developed, Open Space
Developed, Low Intensity
E
AV
Developed, Medium Intensity
NW
72ND ST NW
46
COUNTY 15 RD
W
60TH ST NW
Developed, High Intensity
Deciduous Forest
Herbaceuous
Hay/Pasture
Cultivated Crops
COLTON AVE
Woody Wetlands
N
COU
RD
15
TY
Emergent Herbaceuous
Wetlands
D
OA
2
AV
E
I
29
TH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:49 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-4 - Land Cover.mxd User: KAC2
96
TH
ST
N
W
HN
JO
R
AIL
CR
IFI
AC
NP
T
DIA
NS
SO
62ND ST NW
NA
CA
£
¤
£
¤
83
NW
0
CO
UN
TY
500
1,000
2,000
Feet
15
HW
Y
NW
Burlington
Minot
£
¤
2
Map 3-4
£
¤
52
£
¤
83
Data Source: USGS 2011
Imagery: FSA 2014
LAND COVER
Map (1 of 6)
Mouse River Enhanced Flood
Protection Project
Project Footprint
Land Cover (USGS 2011)
Open Water
Developed, Open Space
Developed, Low Intensity
ROBINWOOD RD
Developed, Medium Intensity
19TH AVE NW
CO
DR
RIV
Hay/Pasture
COT
THOMAS DR
RD
Herbaceuous
MEADOW RD
ER
RIV
NW
VE
19T H A
MAS
DR
TON
W
THO
OO
D RD
Deciduous Forest
ER
RD
TY
15
Woody Wetlands
HW
Y
Emergent Herbaceuous
Wetlands
NW
K
R
PA
O
W
D
O
Cultivated Crops
UN
50TH
ST
D
EL
N
O
R
NW
DR
S
£
¤
54TH ST NW
2
NA
CA
AN
DI
I
C
FI
CI
PA
R
LR
AI
0
500
1,000
2,000
ST
41
AD
O
ST
Feet
NW
£
¤
83
Burlington
ST
£
¤
£
¤
52
£
¤
83
22N
D
ST
SW
Map 3-4
ER
AIL
RO
AD
W
2
SA
NT
AF
DS
TS
ER
N
SW
LIN
GT Minot
ON
NO
RT
H
62N
BU
R
D
62N
Barr Footer: ArcGIS 10.4, 2017-05-01 10:49 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-4 - Land Cover.mxd User: KAC2
NG
KI
CT
FRONTAGE
RD
Data Source: USGS 2011
Imagery: FSA 2014
LAND COVER
Map (2 of 6)
Mouse River Enhanced Flood
Protection Project
ST NW
HA
RM
NT
Y
16TH ST NW
20TH ST NW
30TH ST NW
Land Cover (USGS 2011)
Open Water
D
Developed, Open Space
NW
CO
U
R
ST NW
HIL
LTO
P
Y
ON
HO
ME
S TE
AD
Project Footprint
15 HWY
NW
Developed, Low Intensity
4TH AVE NW
41
Developed, Medium Intensity
ST
ST
3RD AVE NW
NW
Developed, High Intensity
Barren Land
Deciduous Forest
Evergreen Forest
Herbaceuous
2ND AVE SW
Hay/Pasture
Cultivated Crops
2ND AVE SW
£
¤
SW
D
FIC RAILR OA
5TH AVE SW
Emergent Herbaceuous
Wetlands
ST
SW
Woody Wetlands
ACCE
SS R
D
36T
H
37TH
ST
BU
R
ON
GT
N
LI
R
HE
RT
NO
N
SA
A
NT
FE
RA
RO
IL
AD
I
11TH AVE SW
0
500
1,000
2,000
Feet
52
£
¤
83
Map 3-4
N
£
¤
AD
FE RAILRO
O
W
£
¤
ERN SANTA
2
ND
TH
TON NOR
BURLING
2
£
¤
SU
Minot
2
ST S
W
Burlington
£
¤
16T
H
15TH AV
E SW
83
31ST ST SW
£
¤
33RD ST SW
Barr Footer: ArcGIS 10.4, 2017-05-01 10:49 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-4 - Land Cover.mxd User: KAC2
CI
CANADIAN PA
16TH ST SW
83
DR
16TH AVE SW
22
N
D
AV
E
SW
£
¤
2
Data Source: USGS 2011
Imagery: FSA 2014
LAND COVER
Map (3 of 6)
Mouse River Enhanced Flood
Protection Project
8TH ST NW
11TH AVE NW
Project Footprint
Land Cover (USGS 2011)
11TH AVE NW
11TH AVE NE
Open Water
Developed, Open Space
UNIVERSITY AVE NW
Developed, Low Intensity
UNIVERSITY AVE NE
3RD ST NE
UNIVERSITY AVE NW
Developed, Medium Intensity
Developed, High Intensity
Deciduous Forest
Herbaceuous
6TH
N
ST
Cultivated Crops
W
5TH AVE NE
4TH AVE NW
Woody Wetlands
RR AV
E NE
4TH AVE NE
57TH ST NW
BU
NN
TO
NG
I
L
R
T
OR
RN
HE
N TA
SA
R
FE
RO
AIL
AD
7TH ST NE
6TH ST NW
3RD AVE NW
3RD ST SE
4TH AVE
NE
4TH AVE NE
Emergent Herbaceuous
Wetlands
RD
FIRE
RD
LANE
£
¤
83
RN
TE
CA
NA
3RD AVE SE
£
¤
1ST ST SW
2
DI
AN
PA
CI
FI
C
RA
IL
RO
AD
I
6TH ST SW
HIAWATHA
ST
ST
£
¤
83
SW
Burlington
11TH AVE SW
0
8TH AVE SE
3RD ST SE
TH
16
11TH AVE SE
500
1,000
2,000
Feet
£
¤
52
11TH AVE SE
£
¤
52
6TH ST SW
ST SW
2
Map 3-4
13TH ST SE
£
¤
3RD ST SE
Minot
16T
H
Barr Footer: ArcGIS 10.4, 2017-05-01 10:49 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-4 - Land Cover.mxd User: KAC2
W
S
WE
E
AV
2ND AVE SE
3RD ST SE
S
6TH ST
2ND AVE SW
1ST ST SE
CENTRAL AVE
£
¤
83
Data Source: USGS 2011
Imagery: FSA 2014
LAND COVER
Map (4 of 6)
Mouse River Enhanced Flood
Protection Project
RD
8TH AVE SE
Project Footprint
RD
£
¤
2
RD
Land Cover (USGS 2011)
31ST ST SE
Open Water
Developed, Open Space
42ND ST SE
Developed, Low Intensity
11TH AVE SE
Developed, Medium Intensity
Developed, High Intensity
Barren Land
13TH ST SE
LN
Deciduous Forest
Herbaceuous
14TH AVE SE
52
13TH ST SE
Hay/Pasture
27TH ST SE
£
¤
16TH AVE SE
C
AN
AD
Cultivated Crops
Woody Wetlands
Emergent Herbaceuous
Wetlands
16TH AVE SE
IA
N
PA
C
IF
IC
R
AI
LR
O
AD
20TH AVE SE
I
13TH RD
20TH
H AVE SE
20T
AVE
SE
0
£
¤
21ST AV E SE
Minot
£
¤
2
52
52
D
9R
£
¤
83
31ST AVE SW
Map 3-4
£
¤
1
TY
UN
CO
£
¤
2,000
39TH ST SE
13TH ST SE
Burlington
1,000
24TH AVE SE
27TH ST SE
E
23RD AVE S
83
500
Feet
22ND ST SE
£
¤
2
SE
24TH ST
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:49 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-4 - Land Cover.mxd User: KAC2
Evergreen Forest
CANADIA
N PACIFIC RAILRO
AD
Data Source: USGS 2011
Imagery: FSA 2014
LAND COVER
Map (5 of 6)
Mouse River Enhanced Flood
Protection Project
£
¤
Project Footprint
2
Land Cover (USGS 2011)
39TH ST SE
13TH
R
D
Open Water
Developed, Open Space
Developed, Low Intensity
Developed, Medium Intensity
Barren Land
Deciduous Forest
47TH ST SE
48TH ST SE
55TH ST SE
Evergreen Forest
Herbaceuous
Hay/Pasture
Cultivated Crops
33RD AVE SE
Woody Wetlands
34TH AVE SE
Emergent Herbaceuous
Wetlands
35TH AVE SE
52
NA
CA
£
¤
AN
DI
37TH AVE SE
37TH AVE SE
C
FI
CI
PA
R
19
RD
S
LA
OW
ME
AD
43
RD
AV
E
NE
DR
I
0
500
1,000
2,000
£
¤
83
TH
38
Burlington
ST
SE
42ND ST SE
Feet
DR
LE
DR
EL
LE
AR
EL
AP
AR
CH
AP
CH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:49 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-4 - Land Cover.mxd User: KAC2
TY
AD
O
UN
O
LR
AI
C
SE
Minot
£
¤
2
Map 3-4
50TH AVE SE
£
¤
52
£
¤
83
54TH AVE S E
Data Source:
USGS 2011
VE SE
54TH A FSA 2014
Imagery:
LAND COVER
Map (6 of 6)
Mouse River Enhanced Flood
Protection Project
Project Footprint
TH
Agriculture / Residence
District
Agriculture District
E
AV
NW
72ND ST NW
46
COUNTY 15 RD
W
60TH ST NW
62ND ST NW
60TH S
TN
W
Zoning
COLTON AVE
N
COU
RD
15
TY
D
OA
96
TH
AV
E
2
29
TH
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-5 - Land Use Zones.mxd User: KAC2
ST
N
W
HN
JO
R
AIL
CR
IFI
AC
NP
T
DIA
NS
SO
62ND ST NW
NA
CA
£
¤
£
¤
83
NW
CO
UN
TY
15
HW
I
Y
NW
Burlington
0
500
1,000
2,000
Feet
Minot
£
¤
2
Map 3-5
£
¤
52
£
¤
83
Data Source: City of Minot 2015
Imagery: FSA 2014
LAND USE ZONES
Map (1 of 6)
Mouse River Enhanced Flood
Protection Project
Project Footprint
Zoning
Agriculture / Residence
District
Agriculture District
General Commercial District
Interim Use
Manufacture Home District
CO
DR
RIV
ER
RD
D
O
None Provided
UN
TY
15
Single Family Residence
District
HW
Y
NW
K
R
PA
O
W
Light Industrial / Agriculture
District
Light Industrial District
COT
THOMAS DR
RD
19TH AVE NW
MEADOW RD
ER
RIV
NW
VE
19T H A
MAS
DR
TON
W
THO
OO
D RD
ROBINWOOD RD
50TH
Special use
ST
NG
KI
S
CT
£
¤
54TH ST NW
2
NA
CA
AN
DI
C
FI
CI
PA
R
LR
AI
ST
41
AD
O
ST
I
NW
£
¤
83
Burlington
83
2,000
Feet
£
¤
£
¤
ST
SW
Map 3-5
ER
AIL
RO
AD
W
2
SA
NT
AF
DS
TS
£
¤
1,000
SW
ER
N
52
22N
D
500
ST
LIN
GT Minot
ON
NO
RT
H
62N
BU
R
0
D
62N
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-5 - Land Use Zones.mxd User: KAC2
D
EL
N
O
R
NW
DR
FRONTAGE
RD
Data Source: City of Minot 2015
Imagery: FSA 2014
LAND USE ZONES
Map (2 of 6)
Mouse River Enhanced Flood
Protection Project
ST NW
HA
RM
NT
Y
16TH ST NW
20TH ST NW
30TH ST NW
R
Zoning
Agriculture / Residence
District
Agriculture District
D
NW
CO
U
ST NW
HIL
LTO
P
Y
ON
HO
ME
S TE
AD
Project Footprint
General Commercial District
15 HWY
NW
4TH AVE NW
Heavy Industrial District
41
ST
Light Industrial / Agriculture
District
ST
3RD AVE NW
NW
Light Industrial District
Limited Commercial District
Manufacture Home District
Medium Density Residence
District
2ND AVE SW
Multiple Residence District
2ND AVE SW
None Provided
£
¤
SW
D
CI FIC RAILR OA
CANADIAN PA
5TH AVE SW
SW
Planned (Commercial)
Planned (Residential)
ST
Public Zone
36T
H
37TH
ST
Single Family Residence
District
ACCE
SS R
D
Townhouse
BU
£
¤
52
£
¤
83
AD
FE RAILRO
11TH AVE SW
2
ST S
W
0
500
1,000
2,000
Feet
Map 3-5
N
£
¤
ERN SANTA
SA
RA
£
¤
O
W
TH
TON NOR
BURLING
2
2
ND
Minot
N
FE
Two-Family Residence
District
AD
16T
H
Burlington
£
¤
SU
83
R
ON
GT
N
LI
R
HE
RT
NO
A
NT
RO
IL
I
31ST ST SW
£
¤
15TH AV
E SW
33RD ST SW
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-5 - Land Use Zones.mxd User: KAC2
16TH ST SW
83
DR
16TH AVE SW
22
N
D
AV
E
SW
£
¤
2
Data Source: City of Minot 2015
Imagery: FSA 2014
LAND USE ZONES
Map (3 of 6)
Mouse River Enhanced Flood
Protection Project
8TH ST NW
Project Footprint
11TH AVE NW
Zoning
11TH AVE NW
Agriculture District
11TH AVE NE
Central Business District
General Commercial District
UNIVERSITY AVE NW
UNIVERSITY AVE NE
Heavy Industrial District
3RD ST NE
UNIVERSITY AVE NW
Light Industrial District
Limited Commercial District
Manufacture Home District
6TH
Medium Density Residence
District
N
ST
W
5TH AVE NE
4TH AVE NW
Multiple Residence District
RR AV
E NE
4TH AVE NE
57TH ST NW
BU
NN
TO
NG
I
L
R
T
OR
RN
HE
N TA
SA
R
FE
RO
AIL
AD
None Provided
4TH AVE NE
Office
7TH ST NE
6TH ST NW
3RD AVE NW
3RD ST SE
4TH AVE
NE
RD
Planned (Commercial)
Planned (Residential)
Public Zone
RD
LANE
£
¤
83
W
WE
N
ER
ST
E
AV
2ND AVE SE
Single Family Residence
District
CA
NA
3RD AVE SE
£
¤
DI
AN
Townhouse
PA
CI
FI
C
3RD ST SE
ST
HIAWATHA
ST
8TH AVE SE
£
¤
83
SW
Burlington
11TH AVE SW
Two-Family Residence
District
RA
IL
RO
AD
6TH ST SW
1ST ST SW
2
TH
16
11TH AVE SE
I
£
¤
52
0
500
1,000
2,000
Feet
11TH AVE SE
£
¤
52
6TH ST SW
ST SW
2
Map 3-5
13TH ST SE
£
¤
3RD ST SE
Minot
16T
H
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-5 - Land Use Zones.mxd User: KAC2
FIRE
3RD ST SE
S
6TH ST
2ND AVE SW
1ST ST SE
CENTRAL AVE
£
¤
83
Data Source: City of Minot 2015
Imagery: FSA 2014
LAND USE ZONES
Map (4 of 6)
Mouse River Enhanced Flood
Protection Project
Project Footprint
RD
8TH AVE SE
RD
£
¤
2
Zoning
RD
31ST ST SE
Agriculture / Residence
District
Agriculture District
42ND ST SE
General Commercial District
11TH AVE SE
Heavy Industrial District
Light Industrial District
Limited Commercial District
Manufacture Home District
13TH ST SE
LN
Medium Density Residence
District
Multiple Residence District
14TH AVE SE
52
13TH ST SE
C
AN
AD
Planned (Residential)
Public Zone
Single Family Residence
District
16TH AVE SE
IA
N
PA
C
IF
IC
Special use
R
AI
LR
Two-Family Residence
District
O
AD
20TH AVE SE
13TH RD
H
20T
13TH ST SE
Burlington
Minot
£
¤
2
52
500
1,000
2,000
Feet
Map 3-5
52
D
9R
£
¤
83
31ST AVE SW
0
£
¤
1
TY
UN
CO
£
¤
I
24TH AVE SE
39TH ST SE
23RD AVE
2
27TH ST SE
83
AVE
SE
£
¤
22ND ST SE
£
¤
SE
20TH
AVE SE
21ST AV E SE
SE
24TH ST
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-5 - Land Use Zones.mxd User: KAC2
27TH ST SE
£
¤
16TH AVE SE
None Provided
CANADIA
N PACIFIC RAILRO
AD
Data Source: City of Minot 2015
Imagery: FSA 2014
LAND USE ZONES
Map (5 of 6)
Mouse River Enhanced Flood
Protection Project
Project Footprint
£
¤
2
Agriculture / Residence
District
39TH ST SE
13TH
R
Zoning
D
Agriculture District
General Commercial District
Light Industrial District
Manufacture Home District
Multiple Residence District
None Provided
55TH ST SE
48TH ST SE
47TH ST SE
Public Zone
Single Family Residence
District
Special use
33RD AVE SE
34TH AVE SE
35TH AVE SE
52
NA
CA
£
¤
AN
DI
37TH AVE SE
37TH AVE SE
R
LR
AI
TY
AD
O
UN
O
19
RD
LA
OW
83
TH
38
Burlington
ST
SE
I
DR
LE
DR
EL
LE
AR
EL
AP
AR
CH
AP
CH
£
¤
42ND ST SE
ME
AD
43
RD
AV
E
NE
DR
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-5 - Land Use Zones.mxd User: KAC2
C
FI
CI
PA
C
SE
0
500
1,000
2,000
Feet
Minot
£
¤
2
Map 3-5
50TH AVE SE
£
¤
52
£
¤
83
54TH AVE S E
Data Source: City
Minot 2015
VEofSE
TH A
54FSA
Imagery:
2014
LAND USE ZONES
Map (6 of 6)
Mouse River Enhanced Flood
Protection Project
Principal Arterial Expressway
72ND ST NW
Major Collector
E
AV
NW
Minor Arterial
ST
N
Local
38TH AVE NW
Railroads
HN
JO
10
1S
T
COLTON AVE
CITY OF
BURLINGTON
W
Collector
46TH ST NW
TH
W
62ND ST N
COUNTY 15 RD
W
46
Principal Arterial - Other
60TH ST NW
ST
30TH ST NW
N
SO
Project Footprint
Municipalities
100TH ST NW
96TH ST NW
30TH AVE NW
21ST AVE NW
CO
UN
TY
£
¤
2
HW
Y
RD
RD
C
FI
CI
PA
86TH ST NW
AN
DI
NW
19TH AVE NW
19TH AVE NW
SU
OW
AD
ME
£
¤
N
83
SE
T
BL
VD
R
20TH ST NW
W
54TH ST NW
T NW
30TH ST NW
AD
O
HARMONY ST N
LR
AI
86TH
S
15
ROBINWOOD RD
RIVER
AV
EN
W
NA
CA
I
41
4TH AVE NW
ST
0
1,250
2,500
5,000
ST
NW
CITY OF MINOT
2R
D
BU
R
LIN
5TH AVE SW
GT
ON
NO
RT
H
ER
N
SA
NT
AF
Map 3-6
E
RD
RA
ILR
OA
D
ACCESS
17
SW
D ST
22N
Feet
2ND AVE SW
TY
1
TY
11TH AVE SW
100TH ST SW
CO
UN
UN
CO
RD
62ND ST SW
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-6 - Transportation Overview.mxd User: KAC2
19TH
£
¤
2
Data Source: NDDOT 2014
Imagery: FSA 2014
TRANSPORTATION
OVERVIEW
Map (1 of 2)
Mouse River Enhanced Flood
Protection Project
27TH ST NE
42ND ST NE
ST NW
2 ND
7TH ST NE
Minor Arterial
Collector
O
LR
6TH ST NW
4TH AVE SE
3RD ST SE
Municipalities
3RD AVE SE
£
¤
2
RD
£
¤
83
16TH AVE SW
BURDICK EXPRESSWAY
IC
11TH AVE SE
LN
11TH AVE SW
8TH AVE SE
CA
NA
DI
AN
PA
CI
F
31ST ST SE
CITY OF MINOT
HIAWATHA ST
ACCESS
ON
GT
R
NO
N
ER
TH
A
NT
SA
FE
RO
IL
Project Footprint
1ST AVE SE
6TH ST SW
5TH AVE SW
RA
AD
1ST ST SW
2ND AVE SW
Railroads
CENTRAL AVE
1ST ST SE
£
¤
Local
AD
RAILWAY AVE
3RD AVE NW
BU
Major Collector
AI
4TH AVE NE
83
IN
RL
Principal Arterial - Other
ER
16TH ST NW
AF
NT
20TH ST NW
SA
4TH AVE NW
RA
IL
RO
AD
AV FO
N
E
SW TAG
E
RD
20TH AVE SW
13TH RD
£
¤
20 TH AV E SE
52
£
¤
2
39TH ST SE
ND
13TH ST SE
22
2ND ST SE
33RD ST SW
16TH AVE SE
RD SE
SE
30TH ST SW
ST
TH
31ST AVE SW
31ST AVE SE
I
27TH ST SE
24
0
1,250
2,500
5,000
Feet
£
¤
52
37TH AVE SW
COUNTY 14 RD
CO
UN
TY
37TH AVE SE
19
RD
R CREEK
VE
A
BE
RD
EA
M
SE
D
N
38
Map 3-6
DR
ST
SE
AV
E
43RD
LA
W
O
E
TH
42ND ST SE
16TH ST SW
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:54 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-6 - Transportation Overview.mxd User: KAC2
Principal Arterial Expressway
E RN
UNIVERSITY AVE W
19TH AVE NW
RTH
BURL INGTON NO
HW
NE
RT
NO
VE
T A 11TH AVE NW
S
E
NW
8TH ST
W
HARMONY ST N
30TH ST NW
BL
VD
3RD ST
SU
NS
ET
Data Source: NDDOT 2014
Imagery: FSA 2014
TRANSPORTATION
OVERVIEW
Map (2 of 2)
Mouse River Enhanced Flood
Protection Project
!
(
!
(
E
AV
NW
(
!!
(
Road Bridge
!
(
Railroad Bridge
!
(
Pedestrian Bridge
Project Footprint
Railroads
!
(
CITY OF
BURLINGTON
NW
Rivers and Streams
38TH AVE NW
Municipalities
ST
30TH ST NW
N
SO
101
ST
!
(
HN
JO
ST
COLTON AVE
60TH ST NW
46TH ST NW
TH
72ND ST NW
46
COUNTY 15 RD W
!
(
62ND ST NW
!
(
21ST AVE NW
CO
UN
TY
£
¤
2
AN
DI
RD
C
FI
CI
PA
HW
Y
NW
19TH AVE NW
19TH AVE NW
OW
AD
ME
SU
NS
ET
£
¤
83
BL
VD
R
LR
AI
20TH ST NW
54TH ST NW
!
(
30TH ST NW
T NW
NW
HARMONY ST
AD
O
86TH
S
RIVER
NW
15
ROBINWOOD RD
RD
AV
E
86TH ST NW
19T
H
NA
CA
I
4TH AVE NW
!
(
41
ST
0
1,250
2,500
5,000
ST
NW
CITY OF MINOT
2ND AVE SW
!
(
100TH ST SW
SW
!
(
SW
D ST
22N
!
(
LIN
5TH AVE
!
(
GT
ON
!
(
NO
RT
HE
RN
SA
NT
AF
E
!
(
ILR
O
RD
RA
Map 3-7
ACCESS
11TH AVE SW
!
(
T
D S
62N BU
R
Feet
SW
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-7 - Bridges in the Project Area.mxd User: KAC2
100TH ST NW
96TH ST NW
30TH AVE NW
AD
(
!!
(
£
¤
2
Data Sources: NDDOT 2013
Imagery: FSA 2014
BRIDGES IN THE
PROJECT AREA
Map (1 of 2)
Mouse River Enhanced Flood
Protection Project
ST NW
ACCESS
22
N
D
AV FO
E
N
SW TAG
E
83
42ND ST NE
11TH AVE SE
LN
16TH AVE SE
!
(
E SE
20TH AV
13TH RD
£
¤
2
!
(
!
(
RD
2
!
(
!
(
£
¤!(
!
(
!
(
20TH AV E SE
52
ST
31ST AVE SW
H
37T
E
AV
SE
16TH ST SW
AD
£
¤
16TH AVE SE
E
20TH AVE S
37TH AVE SW
37TH AVE SW
!
(
RO
RD
RD
!
(
13TH ST SE
£
¤
20TH AVE SW
31ST AVE SW
RD
!
(
RD
!
(
!
(
2
CA
NA 8TH AVE SE
DI
AN
PA
CI
FI
C
RA
IL
RD SE
33RD ST SW
16TH AVE SW
30TH ST SW
£
¤
!
(
2ND ST SE
OA D
!
(
24TH
I
0
1,250
2,500
5,000
Feet
(
!!
(
SW
£
¤
52
CO
!
(
UN
TY
37TH AVE SE
!
(
19
RD
43RD
M
R
VE
A
BE
CREEK RD
EA
O
D
LA
W
TH
38
N
ST
E
DR
SE
Map 3-7
!
(
42ND ST SE
SE
!
(!
(
AV
E
16TH ST SW
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-7 - Bridges in the Project Area.mxd User: KAC2
(
!!
(
FE RAILR
FE RAILROAD
BURLINGTON NORTHERN SANTA
!
(
6TH ST SW
ST SW
AN TA
THERN S
TON N OR
BURLI NG
16T
H
2
!
(
2ND AVE SW
2ND AVE SE
11TH AVE SW
RD
£
¤
!
(
6TH ST SW
SW
!
(
!
(
CENTRAL AVE
CITY OF MINOT
!
(
Pedestrian Bridge
Municipalities
4TH AVE SE
42ND ST SE
!
(
!
(
39TH ST SE
!
(
!
(
Railroad Bridge
RD
!
(
!
(
2ND AVE SW
2ND AVE SW
4TH AVE NE
(
!!
(
1ST ST SW
83
!
(
6TH ST SW
£
¤
!
(
Rivers and Streams
4TH AVE NE
27TH ST SE
!
(
!
(
27TH ST NE
2 ND
3RD AVE NW
Road Bridge
Project Footprint
27TH ST SE
!
(
4TH AVE NW
!
(
Railroads
13TH ST SE
16TH ST NW
UNIVERSITY AVE NW
3RD ST NE
NW
20TH ST NW
30TH ST NW
HARMONY ST
11TH AVE NW
!
(
!
(
5TH AVE
!
(
NE
BL
VD
3R D S T
8TH ST NW
SU
NS
ET
Data Sources: NDDOT 2013
Imagery: FSA 2014
BRIDGES IN THE
PROJECT AREA
Map (2 of 2)
Mouse River Enhanced Flood
Protection Project
Municipalities
COLTON AVE
NW
Burlington
City Police
Department
!
(
38TH AVE NW
30TH ST NW
CITY OF
BURLINGTON
101
ST
NW
ST
!
(
60TH ST NW
46TH ST NW
E
AV
Burlington
Fire
Department
Emergency Services
Project Footprint
62ND ST NW
TH
72ND ST NW
46
COUNTY 15 RD W
!
(
100TH ST NW
21ST AVE NW
CO
UN
TY
£
¤
2
AN
DI
RD
C
FI
CI
PA
HW
Y
NW
19TH AVE NW
19TH AVE NW
OW
AD
ME
£
¤
83
SU
NS
ET
BL
VD
R
LR
AI
20TH ST NW
54TH ST NW
30TH ST NW
T NW
NW
HARMONY ST
AD
O
86TH
S
RIVER
NW
15
ROBINWOOD RD
RD
AV
E
86TH ST NW
19T
H
NA
CA
4TH AVE NW
41
ST
I
0
1,250
2,500
5,000
ST
NW
Feet
CITY OF MINOT
T
D S
62N
BU
R
SW
D ST
22N
5TH AVE
LIN
GT
ON
NO
RT
Map 3-8
HE
RN
E
RA
ILR
O
RD
SA
NT
AF
ACCESS
11TH AVE SW
100TH ST SW
SW
2ND AVE SW
SW
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-8 - Emergency Services Location in Relation to the Project.mxd User: KAC2
96TH ST NW
30TH AVE NW
AD
£
¤
2
Data Sources: City of Minot 2015
Imagery: FSA 2014
EMERGENCY SERVICES
IN PROJECT AREA
Map (1 of 2)
Mouse River Enhanced Flood
Protection Project
ST NW
UNIVERSITY AVE NW
NW
4TH AVE NE
ST
41
4TH AVE NW
4TH AVE NE
ST
3RD AVE NW
£
¤
Municipalities
4TH AVE SE
RD
US Marshalls Office
ACCESS
£
¤
2
Medical Arts
Trinity
Hospital
8TH AVE SE
CA
NA
DI
AN
PA
CI
FI
C
33RD ST SW
16TH AVE SW
D
AV FO
E
N
SW TAG
E
£
¤
83
!
(
13TH RD
£
¤
31ST AVE SW
H
37T
E
AV
20TH AV E SE
2
13TH ST SE
RD SE
RD
16TH ST SW
37TH AVE SW
37TH AVE SW
LN
E SE
20TH AV
SW
£
¤
52
ST
SE
31ST AVE SW
11TH AVE SE
AD
24TH
!
(
Trinity Health
South Ridge
!
(
16TH AVE SE
North Dakota
Highway Patrol
!
(
RA
IL
RO
16TH AVE SE
RD
Fire Station
Headquarters
2
2ND ST SE
OA D
22
N
13TH ST SE
UND Medical
Center
16T
H
FE RAILR
!
(
£
¤
Public Works
Building
I
0
1,250
2,500
5,000
Feet
13TH ST SE
ST SW
AN TA
THERN S
TON N OR
BURLI NG
30TH ST SW
!
(
11TH AVE SW
RD
2
!
(
6TH ST SW
SW
CITY OF MINOT
42ND ST SE
5TH AVE
!
(
!
(
FE RAILROAD
BURLINGTON NORTHERN SANTA
Ward County Sheriffs Department
39TH ST SE
!
(
Fire Station #2
27TH ST SE
2ND AVE SW
Police Station
£
¤
CENTRAL AVE
!
(
1ST ST SW
NW
83
2ND AVE SW
£
¤
52
CO
UN
TY
37TH AVE SE
19
RD
M
R
VE
A
BE
CREEK RD
EA
O
D
LA
W
TH
38
N
ST
E
Map 3-8
DR
SE
42ND ST SE
SE
43RD
AV
E
16TH ST SW
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-8 - Emergency Services Location in Relation to the Project.mxd User: KAC2
Emergency Services
Project Footprint
42ND ST NE
27TH ST NE
2 ND
11TH AVE NW
3RD ST NE
16TH ST NW
30TH ST NW
HARMONY ST
20TH ST NW
!
(
NE
BL
VD
3R D S T
8TH ST NW
SU
NS
ET
Data Sources: City of Minot 2015
Imagery: FSA 2014
EMERGENCY SERVICES
IN PROJECT AREA
Map (2 of 2)
Mouse River Enhanced Flood
Protection Project
Burlington City
Park
!
(
Recreational Location
60TH ST NW
Municipalities
ST
30TH ST NW
N
SO
101
ST
38TH AVE NW
HN
JO
ST
COLTON AVE
CITY OF
BURLINGTON
NW
Project Footprint
46TH ST NW
!
(
Snowmobile Trails
72ND ST NW
COUNTY 15 RD W
!
(
62ND ST NW
Trails
Old Settlers Park
100TH ST NW
Vardon
Golf Club
!
(
21ST AVE NW
CO
UN
TY
15
ROBINWOOD RD
RIVER
NW
HW
Y
NW
19TH AVE NW
19TH AVE NW
SU
NS
ET
OW
AD
ME
BL
VD
ile
ob
m
Roughrider
Campground
20TH ST NW
54TH ST NW
!
(
30TH ST NW
T NW
NW
HARMONY ST
ls
ai
Tr
86TH
S
RD
RD
AV
E
86TH ST NW
19T
H
ow
Sn
4TH AVE NW
ST
Jack Hoeven
Baseball Park
(Centennial Park)
ST
Trails
NW
1,250
2,500
5,000
Feet
mobil
e
2ND AVE SW
!
(
Snow
SW
SW
D ST
22N
0
Leech Park
!
(
CITY OF MINOT
!
(
ACCESS
100TH ST SW
T
D S
62N
11TH AVE SW
I
Dakota
Bark Park
41
Souris
Valley Golf
Course
!
(
!
(
RD
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-9 - Recreational Resources in Project Area.mxd User: KAC2
96TH ST NW
30TH AVE NW
Maysa
Arena
!
(
Data Source:
City of Minot 2015
Imagery: FSA 2014
Map 3-9
Wee Links
RECREATIONAL
RESOURCES
Golf Park
IN PROJECT AREA
Map (1 of 2)
Mouse River Enhanced Flood
Protection Project
ST
ST NW
42ND ST NE
2 ND
4TH AVE NE
RD
Project Footprint
Municipalities
4TH AVE SE
Snowmobile Trails
!
(
!
(
!
(
Roosevelt Zoo
Dacotah
Flat Track
!
(
8TH AVE SE
Corbett Field
and Rink
!
(
11TH AVE SE
LN
16TH AVE SE
16TH AVE SE
2ND ST SE
16T
H
16TH AVE SW
Green Valley
Park
27TH ST SE
ST SW
RD
RD
RD SE
RD
31ST AVE SW
37TH AVE SW
31ST AVE SW
H
37T
E
AV
SW
20TH AV E SE
ST
SE
13TH ST SE
13TH RD
24TH
16TH ST SW
20TH AVE SW
37TH AVE SW
E SE
20TH AV
E
20TH AVE S
39TH ST SE
AV FO
E
N
SW TAG
E
I
27TH ST SE
33RD ST SW
!
( !
(
11TH AVE SW
!
(
D
!
(
Wee Links
Golf Park
!
(
22
N
!
(
Roosevelt Park
CITY OF
MINOT
6TH ST SW
Moose Park
!
(
6TH ST SW
ACCESS
Souris
Valley Golf
Course
Maysa
Arena
Civic
Center/Auditorium
42ND ST SE
!
(
13TH ST SE
Snow
mobil
e
2ND AVE SW
2ND AVE SW
0
1,250
2,500
5,000
Feet
13TH ST SE
NW
CENTRAL AVE
Leech Park
!
(
30TH ST SW
North Dakota
State Fairgrounds
Oak Park
!
(
CO
UN
TY
37TH AVE SE
19
RD
M
R
VE
A
BE
CREEK RD
EA
O
D
LA
W
TH
38
N
ST
E
Map 3-9
DR
SE
42ND ST SE
SE
43RD
AV
E
16TH ST SW
S
Barr Footer: ArcGIS 10.4, 2017-05-01 10:55 File: I:\Client\Mouse_River\Work_Orders\Part_3\Maps\Reports\Final EIS\Map 3-9 - Recreational Resources in Project Area.mxd User: KAC2
27TH ST NE
16TH ST NW
!
(
!
(
3RD AVE NW
Nodak
Speedway
Hammond Park
Minot/Base Trail
ST
41
Jack Hoeven
Baseball Park
(Centennial Park)
!
(
Via-View Park
!
(
Riverside Park
4TH AVE NW
Trails
!
(
3RD ST NE
NW
20TH ST NW
30TH ST NW
HARMONY ST
UNIVERSITY AVE NW
Recreational Location
Trails
11TH AVE NW
Nubbin Park
Dakota
Bark Park
!
(
NE
BL
VD
3R D S T
8TH ST NW
SU
NS
ET
Data Source:
City of Minot 2015
Imagery: FSA 2014
RECREATIONAL RESOURCES
IN PROJECT AREA
Map (2 of 2)
Mouse River Enhanced Flood
Protection Project
Public Notice
Subject: Public Notice of Permit Application
Action ID:
NWO-2014-01468-BIS
Comments Period: 27 September 2017 18 October 2017
SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit
application to construct part of the Mouse River Enhanced Flood Risk Reduction Project
(MREFPP) in Minot, North Dakota. The application includes all phases included in
Construction Stage 1.5, as identified in the Corps Final Programmatic Environmental Impact
Statement (FPEIS) published in July 2017. This notice is to inform interested parties of the
proposed activity and to solicit comments. This notice, the FPEIS and the permit application
package may be viewed at the Corps website at
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx
AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act
for the discharge of dredged or fill material in waters of the United States.
APPLICANT:
Souris River Joint Board
Attn: Mr. Dave Ashley
1025 31st Street SE
Minot, North Dakota 58701
LOCATION: Construction Stage 1.5 extends along the Mouse River from upstream of the ND
Highway 83 Bypass to downstream of 3rd Street NE in Minot, North Dakota. The project site is
located on and near the River in Sections 13, 18, 21, 22, 23 and 24, Township 155 North,
Range 83 West, Latitude 48.228060° North, Longitude -101.315584° West, Ward County,
North Dakota.
BACKGROUND INFORMATION: Several Federal flood control projects have been
constructed on the Souris (Mouse) River in the past. Damages incurred during the 2011 Flood
prompted the Souris River Joint Board to develop a plan to reduce future flood risks by
constructing a series of new levees, floodwalls and other flood risk reduction features. This
plan has become known locally as the MREFPP. The MREFPP would be constructed and
permitted in a number of stages over a period of more than 25 years, depending on available
funding. Each permitted stage would be able to provide interim flood risk reduction for flows of
at least 10,000 cubic feet per second (cfs). Ultimately, at completion of construction, the
MREFPP would provide flood risk reduction to 27,400 cfs.
The Federal Emergency Management Agency (FEMA) is responsible for reviewing potential
impacts in the regulatory floodplain. Preliminary results of studies underway suggest that the
100-year floodplain may be updated from the current effective flow rate of 5,000 cfs to 10,000
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
CENWO-OD-RND
Page 2
Action ID: NWO-2014-01468-BIS
cfs. If accepted by FEMA, this modification would considerably expand the 100-year
floodplain.
PROJECT PURPOSE: The overall project purpose is to provide flood protection to a level
consistent with the flood of record (27,400 cfs), while achieving interim flood protection to the
proposed 100-year flood (11,000 cfs) at each permitted stage of construction.
The basic project purpose is flood protection.
The purpose and need for the project is discussed in Chapter 1, Section 1.1 of the FPEIS.
PROJECT DESCRIPTION: The first permittable stage has been identified as Construction
Stage 1.5. This stage consists of a series of levees, structural road closures, riprap, raising
bridges, floodwalls, tie-back levees and a high water bypass channel. The attached narrative
and drawings provide additional project details. As stated above, the entire permit application
is available at the link identified above.
ADDITIONAL INFORMATION:
Environmental Setting. Construction Stage 1.5 will result in 1.21 acres of permanent
wetland loss and 0.46 acre of temporary wetland impacts. In addition, 8.35 acres below the
Ordinary High Water Mark (OHWM) will be permanently impacted through placement of riprap,
8.3 acres will be temporarily impacted during construction. Approximately 10,609 linear feet of
Mouse River bankline is proposed to be stabilized. Of that, 9,109 linear feet will riprapped and
1,500 linear feet will be stabilized using bioengineering. Approximately 7,573 linear feet will be
new stabilization with 3,020 linear feet occurring in areas not previously impacted by previous
Federal flood control projects. The plans include 11.2 acres of Greenspace between the
OHWM and proposed line of protection. Some of the areas will be lowered to OHWM
(overbank excavation) to increase storage capacity. Pages 6 and 9 of the attached mitigation
plan are impact tables that may provide better explanation of the impacts. Chapter 3 of the
FPEIS discusses Affected Environment, Chapter 4 discusses Environmental Consequences
and Chapter 6 discusses Major Findings and Conclusions.
Alternatives. The applicant has provided information concerning project alternatives. The
information was utilized in developing the alternatives analysis contained in Chapter 2 of the
FPEIS. All reasonable project alternatives, in particular those which may be less damaging to
the aquatic environment, will be considered.
Mitigation. The Corps requires that applicants consider and use all reasonable and
practical measures to avoid and minimize impacts to aquatic resources. If the applicant is
unable to avoid or minimize all impacts, the Corps may require compensatory mitigation. The
applicant has proposed to offset impacts to three specific environments, including riparian
corridor (trees), wetlands and Mouse River. The attached Mitigation Plan proposes tree
plantings, wetland mitigation through a combination of permittee-responsible mitigation and
purchase of credits from the Ducks Unlimited North Dakota Aquatic Resource In-Lieu Fee
Program, and reconnecting an oxbow cutoff by past Federal project.
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
CENWO-OD-RND
Page 3
Action ID: NWO-2014-01468-BIS
OTHER GOVERNMENTAL AUTHORIZATIONS: Water quality certification or a waiver, as
required under Section 401 of the Clean Water Act from the North Dakota Department of
Health, Water Quality Division, is required for this project. A copy of the application will be
forwarded to the Department for their review and consideration.
This project will affect past Federal flood control projects; therefore, the MREFPP requires
permission from the Corps by way of Section 14 of the Rivers and Harbors Act of 1899 (33
USC 408), referred to as Section 408.
HISTORIC PROPERTIES: Potentially eligible cultural resources may be affected by the
proposed project. The Corps, St. Paul District, is designated as the lead for compliance. Initial
compliance for the FPEIS included execution of a Programmatic Agreement (PA), which
outlines how the Corps will achieve compliance prior to construction. A Section 404 permit
cannot be issued until the process outlined in the PA have been completed. Currently, the St.
Paul District is reviewing survey reports for all areas proposed to be affected by the MREFPP
through Construction Stage 1.5. St. Paul District will initiate consultation with the State Historic
Preservation Officer under Section 106 of the National Historic Preservation Act, as
appropriate. Chapter 3, Section 3.9, of the FPEIS addresses Historic and Cultural Resources.
ENDANGERED SPECIES: The project would not affect any Federally-listed threatened or
endangered species or their critical habitat that are protected by the Endangered Species Act.
Chapter 6, Section 6.4, of the FPEIS provides rationale for the `No Effect' determination.
ESSENTIAL FISH HABITAT: The proposed project would not adversely affect Essential Fish
Habitat (EFH) as defined in the Magnuson-Stevens Fishery Conservation and Management
Act.
The above determinations are based on information contained in the EIS.
EVALUATION FACTORS: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts, of the described activity on
the public interest. That decision will reflect the national concern for both protection and
utilization of important resources. The benefit, which reasonably may be expected to accrue
from the described activity, must be balanced against its reasonably foreseeable detriments.
All factors which may be relevant to the described activity will be considered, including the
cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food and fiber production,
mineral needs, consideration of property ownership and, in general, the needs and welfare of
the people. The activity's impact on the public interest will include application of the Section
404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40
CFR Part 230).
The Corps is soliciting comments from the public, Federal, State, and local agencies and
officials, Indian tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the Corps to
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
CENWO-OD-RND
Page 4
Action ID: NWO-2014-01468-BIS
determine whether to issue, modify, condition, or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the
overall public interest of the proposed activity.
SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2014-01468BIS must be submitted to the office listed below on or before 18 October 2017.
Toni Erhardt, Project Manager
US Army Corps of Engineers, Omaha District
North Dakota Regulatory Office
Email: Toni.R.Erhardt@usace.army.mil
The Corps is particularly interested in receiving comments related to the proposal's probable
impacts on the affected aquatic environment and the secondary and cumulative effects.
Anyone may request, in writing, that a public hearing be held to consider this application.
Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If
the Corps determines that the information received in response to this notice is inadequate for
thorough evaluation, a public hearing may be warranted. If a public hearing is warranted,
interested parties will be notified of the time, date, and location. Please note that all comment
letters received are subject to release to the public through the Freedom of Information Act. If
you have questions or need additional information please contact the applicant or the Corps'
project manager Toni Erhardt, (701) 255-0015 X 2003, Toni.R.Erhardt@usace.army.mil.
Attachments: 17 pages
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
1.1 - Block 14
ST NE
14TH
H S T SE
13TH ST SE
C
T
RIS E
S E
13TH ST SE
12TH ST SE
15TH ST SE
10TH ST SE
17TH AVE SE
WALNUT
19 TH AVE SE
NITY L
16TH ST SE
18TH AVE SE
OOP
19TH AVE SE
6TH ST SE
5TH ST SE
5TH ST SE
16TH AVE SE
16TH ST SE
14TH AVE S E
11TH ST SE
15 1/2 AVE SE
5TH ST SE
17TH ST SE
17TH ST SE
H
12
T
12TH AVE SE
13TH
15TH AVE SE
4TH ST SE
14TH ST SE
12TH ST SE
13TH ST S
S
E
ST
8TH ST SE
HIAWATHA
N
HIAWATHA ST
ELMWOOD DR
8TH AVE SE
E
7TH ST SE
11TH AVE SE
1 6 TH ST SE
14T
9TH ST SE
7TH ST SE
52
HIAWATHA ST
3RD ST SE
18TH AVE SW
£
¤
SE
7TH
10TH AVE SE
2ND ST SE
16TH AVE SW
10TH ST NE
9TH ST NE
SE
ST
E
S
9TH AVE SE
3RD ST SE
10TH ST SE
6TH ST SE
3RD ST SE
2ND ST SE
1ST ST SE
BEACON ST
8TH AVE SE
AV
E
EY
ST
SO
OS
T
A
R
O
V
E
ARB
ST
3RD ST NE
3RD ST NE
7TH AV E
AVE SE
1ST ST SE
£
¤
83
MAIN ST S
1ST ST SW
3RD ST SW
4TH ST SW
EA
ST
ER
N
VA
LL
13TH AVE SE
14TH AVE SW 14TH
BURDICK EXPY E
5TH AVE SE
HIAWATHA ST
S BROADWAY
5TH ST SW
S BROADWA
Y
5TH ST SW
5TH ST SW
6TH ST SW
7TH ST SW
8TH ST SW
2ND ST SE
4TH ST SW
S UMM
IT D R
3RD ST SW
MAPLE ST
9TH ST SW
9TH ST SW
8TH ST SW
18 1/2 AVE SW
BURDICK EXPY E
5TH ST SE
MAIN ST N
3RD ST NW
5TH ST NW
6TH ST NW
MAPLE ST
10TH ST SW
10TH ST SW
10TH ST SW
15
TH
13TH ST SW
11TH ST SW
15TH ST SW
AV
E
SW
SW
W
13 1/2 ST SW
12TH ST SW
ST
7TH ST SW
SW
ST
TH
12
ST
16T
H
15T
HS
TS
RD
H
5TH AVE SE
7TH AVE SE
1ST ST SE
7TH ST NW
9TH ST NW
N DR
DO
RD
ST
RE
SW
T H AVE
1
DR
TH
K
RP
A RK
8TH ST NW
NORMAL ST
9TH ST NW
10TH ST NW
11TH ST NW
12TH ST NW
13TH ST NW
13TH ST NW
14TH ST NW
15TH ST NW
16TH ST NW
17TH ST NW
SW
ST
E CO T T
P AR
K RD
ILE
DR
28TH ST SW
TRA
18TH AVE SW
SW
2
IE
SW
£
¤
BB
ST
AVE
17TH AVE SW
52
SERE
ERGREEN
15 1/2 ST SW
N
S
S
DR
TA
W
DE
24
TH
17 1/2 AVE SW
DAKO
P
EV
BY
16TH AVE SW
15TH AVE SW
£
¤
12TH AVE SE
13TH AVE SW
14TH AVE SW
1 5 1/2 AVE SW
83
2
1ST AVE SE
DR SE
18 TH A VE SW
52
14T
1 inch = 1,400 feet
1,450
Feet
11TH ST SW
WE
27 T H ST
28TH ST SW
D
Mouse River CL
HW
Y
EL
2
A
K
DR ND
W
12TH ST SW
AVE
SW
TH
11
33RD ST SW
2
Overbank Excavation
19TH AV E SW
V
£
¤
SW
10TH AVE SW
£
¤
£
¤
E
ST SE
Road Realignments
O
COO
15 T H
E
AV
9TH AVE SW
13TH AVE SW
14TH AVE SW
4
5TH AVE SW
11TH AVE SW
SW
ST
2
Minot
IDE
DR
AVE
4TH A
VE N
E
AV
High Flow Bypass
D
UN
8TH AVE SW
AVE A
2
RIV
ER
S
ST
RAILWAY
1ST AVE SE
SU
W
Levee Footprint
18
TH
Begin
Maple Diversion
MD-R 27+00
£
¤
£
¤
FR
ON
T
3RD AVE SE
2ND ST SE
Bridge / Roads / Parking Areas
13
A
R
River Closure Structure
725
A ILER
ONW
E
AV
SW
N
End
Water Treatment Plant
MWTP Sta 111+00
2
OOD
£
¤
Levee Linework
PY
EX
W
TR
K
DIC
BUR
2
Floodwall Alignment
PY
£
¤
12TH
2
Closure Structure
CK
DI
R
BU
EX
W
12TH AVE SW
14TH AVE SW
£
¤
2
6TH AVE SW
FO
Begin
Water Treatment Plant
MWTP Sta 93+00
£
¤
ER
E
AV
S
ST
15TH A
VE SW
5TH AVE SW
ST
WE
End
Maple Diversion
MD-R 68+70
SW
1ST S T
£
¤
2
CENTRAL AVE W
1ST AVE S
End
NE Levee Extention
NE-LE Sta 44+42
E
AVE N
3R D
End
4th Ave
4th Ave Sta 73+00
Begin
Broadway Bridge
BB Sta 00+00
M AI N
24TH ST SW
W
ES
Begin
Forest Road
NV/FR 66+00A
End
Napa Valley
NV/FR 66+00A
37TH
18TH ST NW
19TH ST NW
21ST ST NW
20TH ST NW
19TH ST NW
20TH ST NW
23RD ST NW
W
S
22ND S
TF
IE L
DC
IR
24TH ST SW
21ST ST NW
25TH ST NW
25TH ST NW
26T
H
ST
28TH
S T SW
SW
SW
ST
30TH
2ND AVE SW
4TH AVE SW
SW
Begin
83 Bypass
83 BP Sta 00+00
MREFPP
16TH AVE SW
Construction Stage 1.5
H:\Fargo\JBN\8300\8313\14_8313_007\CS 1.5 Permit Application\GIS\Prj_LocationV2.mxd
STFIELD AVE
End
Forest Road
NV/FR 89+50A
83
WAY
S BROAD
RD
2
0
SW
7TH AVE SW
TA
GE
£
¤
1S T AV E
4TH AV E NE
8TH AVE NE
Begin
NE Levee Extention
NE-LE Sta 00+00
6TH AVE NE
End
Broadway Bridge
BB Sta 08+15
£
¤
9TH AVE NE
NE
±
1TH
H
15T
Begin
Napa Valley
NV/FR 00+00A
End
83 Bypass
83 BP Sta 24+43
FR
ON
AVE SW
SW
HWY
83 B
YP S
T
1S
ST
ST S
CENTRAL AVE W
W
25
T
Begin
2ND AVE NW
Maple Diversion
MD-L Sta 82+30
H
13T
ST S
W
NW
W
24TH ST NW
27TH ST NW
ST
End
Terracita Vallejo
TV Sta 36+39
1ST AVE SW
TH
30
NW
T
Begin
Terracita Vallejo
TV Sta 00+00
22ND ST NW
ST NW
27TH
P
MP
ON RA
28TH ST NW
NW
OF
FR
AM
5T
30TH ST NW
OFF RAMP
HILLTOP ST NW
D
S
41
83
End
Maple Diversion
MD-L Sta 126+20
8TH AVE
8TH AVE NW
A ND DR
CE
10TH AVE NE
UNIVERSIT Y AVE W
Begin
4th Ave
4th Ave Sta 40+00
11TH A
VE NE
10TH AVE NE
N
R
2ND AVE NW
WILDWOOD AVE
UNIVERSITY AVE W
HILLCREST DR
ST
AV E NW
£
¤
83
CORT L
H
RT
NO
11TH AVE NE
E
W
1 1TH AVE NW
E
AV
1
TN
8TH AVE NW
T
ES
Project
Vicinity Map - Construction Stage 1.5
HW
VISTA
7TH AVE NW
BEL AIR CT
ST
TH
£
¤
AI
DR
HS
W
L
L
T
27
N
11TH AVE NW
BELAIR DR
7TH A
V E NW
MP
RA
ON
D
4TH AVE NW
T
BE
RP
BYP N
HWY 83
ST NW
NY
MO
H AR
A
H OMESTE
H S
26T
HIGHVIEW AVE NW
1.2 Block 18. Nature of Activity
Terracita Vallejo consists of a levee that begins at the hillside north of the existing Canadian Pacific
railroad, extending south towards the west side of the community. A structural closure with floodwall
transition sections will be built at the railroad's intersection with the flood protection alignment. The
closure structure allows for normal railroad operation and protection of the community during flood
events. The levee extends southward from the railroad, on the west side of the community, before
turning and extending to the east and matching the ground elevation near the Highway 83 bypass. A
new storm water pump station will be installed on the south side of the project reach to convey interior
drainage. This section of the Project has been designed only through the Mouse River Enhanced Flood
Protection Project Preliminary Engineering Report (PER) level of design, which is about a 10-15% design.
Additional details are included in the Project Plans in Section 2.2 of this document.
The Highway 83 Bypass will be modified from a 220-foot span to an approximately 350-foot span as part
of the Project. The bridge will also be raised approximately 3.5 feet. The modifications are required to
develop increased flow area under the bridge and keep this critical transportation route open during the
design flood event. The roadway approach south of the bridge will be raised to one foot above the
Mouse River Enhanced Flood Protection Project (MREFPP) design water surface elevation to maintain
transportation access. Modifications include overbank excavation in the area under the bridge and
immediately adjacent to it. This component of the Project has been designed only through the PER (1015% design). Additional design of this phase will be completed by the North Dakota Department of
Transportation. Additional details are included in the Project Plans in Section 2.2 of this document.
The proposed Phase MI-2 Napa Valley project consists of a levee and structural road closure system
that extends from the Highway 83 Bypass to 16th St SW on the north side of the Mouse River. The
proposed Phase MI-3 Forest Road project consists of a levee and road closure system that extends
from 16th St SW to the Canadian Pacific railroad on the north side of the Mouse River. These sections
(MI-2 and MI-3) of the Project have been completed through a 100% design. Additional details are
included in the Project Plans in Section 2.2 of this document.
The City of Minot Water Treatment Plant Flood Protection Project consists of a floodwall/tie-back
levee system to reduce the flood risk to Minot's Water Treatment Plant (USACE Permit Ref No. NWO2014-1890-BIS). The flood protection system consists of approximately 1,900 feet of floodwalls/levees
with two structural road closures and tie-back levees west of the plant and east of the high service
pumping station. This section of the Project has been completed through 100% design and is currently
under construction. Additional details are included in the Project Plans in Section 2.2 of this document.
The Maple Avenue Bypass consists of an approximately 4,200-foot long channel excavated from north
of 16th St SW and south of the Canadian Pacific Railroad on the upstream side to just west of Broadway
Bridge on the downstream side. A gated diversion structure will be located on the Mouse River south of
the Canadian Pacific railroad, and a diversion weir will be located in the diversion channel. All
discharges less than 3,000 cfs are to remain in the existing Mouse River channel. This section of the
Project has been designed only through the PER (10-15% design). Additional details are included in the
Project Plans in Section 2.2 of this document.
Phase MI-1 4th Avenue NE is located on the north side of the Mouse River and extends from just west
of Broadway Bridge to east of 3rd Street NE on the north side of the river. This section of the Project has
been completed through 100% design. Additional details are included in the Project Plans in Section 2.2
of this document.
The Broadway Bridge will be modified to meet the MREFPP design flow hydraulic criteria and keep the
bridge open during flood events. The existing 1000-foot long bridge will be demolished and replaced
with an 815-foot bridge of similar width, located along the same alignment. The flood protection will
consist of a water-tight row of sheet piling located through the approach embankment. Overbank
excavation, under and immediately adjacent to the new bridge, on the right bank, will provide additional
flow conveyance under the bridge. This section has been completed through 100% design by the North
Dakota Department of Transportation. The embankment protection for this section on the north side of
the Mouse River is included in the Phase MI-1 4th Avenue NE design documentation. Additional details
are included in the Project Plans included in Section 2.2 of this document.
The Northeast Levee Extension ties into the east end of the Phase MI-1 4th Avenue NE floodwall
project and extends along the north side of the Canadian Pacific railroad, connecting into high ground
on the eastern edge of the city. This section of the Project has been completed through an approximate
10% level of design. Additional details are included in the Project Plans in Section 2.2 of this document.
Fargo, ND | HEI No. 8313_007
August 16, 2017
CONSTRUCTION STAGE 1.5
MITIGATION PLAN
SRJB Mouse River Enhanced Flood
Protection Project
TABLE OF CONTENTS
1 GENERAL PROJECT INTRODUCTION..................................................................................1
1.1 PURPOSE OF THIS REPORT ........................................................................................................1
1.2 DESCRIPTION OF CONSTRUCTION PHASE 1.5 .........................................................................1
2 WETLANDS .............................................................................................................................2
2.1 PERMANENT AND TEMPORARY IMPACTS.................................................................................2
2.2 MITIGATION NEED DETERMINATION METHOD .........................................................................4
2.3 MITIGATION DETERMINATION RESULTS ...................................................................................5
3 CHANNEL STABILIZATION MEASURES WATERS IMPACTS..........................................7
3.1 SOURIS RIVER/PRIOR USACE FEDERAL FLOOD CONTROL PROJECT..................................7
3.2 PERMANENT IMPACTS OF RIPRAP AND CHANNEL WORK......................................................7
3.3 MITIGATION....................................................................................................................................8
4 FLOODPLAIN FOREST AND TREE IMPACTS ....................................................................10
4.1 DESCRIPTION OF RIPARIAN FORESTS AND TREES IN THE AREA .......................................10
4.2 MITIGATION NEED DETERMINATION METHOD .......................................................................10
4.3 MITIGATION DETERMINATION RESULTS .................................................................................10
5 REFERENCES .......................................................................................................................12
TABLES
Table 1: Wetland Impact Table.....................................................................................................................2
Table 2: Description of impacts and wetland quality descriptions ................................................................3
Table 3: Comparison of impacted wetlands vs. mitigation wetlands ............................................................6
Table 4: Channel Impact Data ......................................................................................................................9
Table 5: Worksheet and results for determination of tree mitigation requirements ....................................11
APPENDICES
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Wetland Impact Maps
Napa Valley Wetland Creation Plan
Impacts below OHWL
Combined Impact Table
Nubbin Park Channel Restoration Map
Net Greenspace Maps
Tree Impact Maps
1 GENERAL PROJECT INTRODUCTION
The Mouse River Enhanced Flood Protection Project (MREFPP) is proposed by the Souris River Joint
Water Resource Board (SRJB) as a multiple phased action located along the Mouse River. Construction
Stage 1.5 is a component of the overall project as described in the Final Programmatic Environmental
Impact Statement (EIS), Mouse River Enhanced Flood Protection Project, July 2017. The flood
protection provided by this project will remove a portion of Northwest Minot from the 100-year FEMA flood
plain. Work is anticipated to begin in the fall of 2017.
1.1 PURPOSE OF THIS REPORT
This report describes proposed mitigation requirements and methods for impacts identified in the
Wetlands, Waters, and Biological Inventory Report (2015) and other analysis completed as part of the
EIS document. This document is intended to be used in conjunction with the Mouse River CS 1.5 Section
404 Permit Application (CS 1.5 Application) for three types of impacts, wetlands, the river channel, and
trees.
1.2 DESCRIPTION OF CONSTRUCTION PHASE 1.5
Construction Stage 1.5 includes the following features, which are described in greater detail in the
Section 404 Permit (listed from upstream to downstream):
Terracita Vallejo
Highway 83 Bypass Bridge Replacement (to be permitted separately by NDDOT)
Phase MI-2 Napa Valley
Phase MI-3 Forest Road
Minot Water Treatment Plant (Permitted previously under Section 404)
Maple Avenue Bypass
Broadway Bridge Replacement (to be permitted separately by NDDOT)
Phase MI-1 4th Avenue NE
North East Levee Extension
The SRJB has finalized design of three phases of the project: Phase MI-1 (4th Avenue NE), Phase MI-2
(Napa Valley), and MI-3 (Forest Road). Based on prior consultation, the US Army Corps of Engineers
(USACE) recommended the permitting for these three phases (as well as the remainder of Construction
Stage 1.5) be combined since the system will work together to provide desired protection.
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
1
2 WETLANDS
2.1 PERMANENT AND TEMPORARY IMPACTS
Both temporary and permanent wetland impacts are anticipated from construction of flood protection
measures within the project. The impacts will result from construction of various project features including
levees, outlet pipes, riprap, grading, excavation, and vegetation disturbance from vehicles. Temporary
impacts to wetlands will occur at four wetland sites resulting in 0.46 acres of impacts. Permanent impacts
to wetlands within the project area will occur at eight wetland sites resulting in 1.21 acres of impact.
Wetland impacts are listed in Table 1 and are also shown on project maps in Appendix A. Impacted
wetland types and other descriptive information is shown in Table 2.
Table 1: Wetland Impact Table
Temporary
Impacts
(acres)
0.16
Permanent
Impacts
(acres)
0.48
Phase 2 Napa Valley 1
0.04
0.02
Phase 2 Napa Valley 2
Phase 2 Napa Valley 3
Phase 2 Napa Valley 4
Phase 2 Napa Valley 5
Phase 2 Napa Valley 6
Phase 2 Napa Valley 8
Total Acres
0.07
0.00
0.00
0.10
0.00
0.09
0.46
0.10
0.28
0.16
0.00
0.17
0.00
1.21
Phase Wetland Impact
Number
Terracita Vallejo 1
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
Project Construction
Levee
Levee, gatewell pipe, riprap, relief well
outlet pipes
Levee, gatewell pipe, riprap
Levee, golf course grading
Levee, golf course grading
Revegetation
Culvert installation, golf course grading
Overbank excavation, levee, riprap
2
Table 2: Description of impacts and wetland quality descriptions
Phase
Wetland
Impact
number
Wetland
Type
(Cowardin
etal. 1979)
Overall
Quality of
Wetland
vegetation
General Description of wetland site
Existing
Vegetation and
native status
PEM1C
Ponding site Receives stormwater from residential areas, water levels are managed as a
stormwater pond.
40% invasive Phalaris
arundinacea (reed
canary grass)*
Medium/low
Napa
Valley - 1
PEM1C
Wetland/stormwater pond - Receives stormwater from residential areas and surface water
from the Highway 83 Bypass ditches, water levels are managed as a stormwater pond, two
stormwater inlet pipes enter the wetland and one outlet pipe controls the water level.
100% invasive
P. arundinacea
Low
Napa
Valley - 2
R2UBH
Wetland/historic oxbow, receives stormwater runoff from another wetland via a culvert
Napa
Valley - 3
PEMC
Shallow depression wetland formed from oxbow, impacted by the golf course and bike path
Napa
Valley - 4
PEMC
Shallow depression wetland formed from oxbow, impacted by the golf course and bike path
Napa
Valley - 5
R2UBH
(NWI listed
PEMC)
Wetland, receives stormwater from an outlet pipe, adjacent to the river channel
40% invasive - P.
arundinacea
Medium
Napa
Valley - 6
PEMC (not
NWI listed)
Wetland shallow depression bordered by the bike path. Potentially was a borrow site
for levee/bike path construction.
100% invasive P. arundinacea
Low
Maple Ave
Bypass - 8
PEM1C
Historic oxbow, receives surface runoff from the Moose Lodge Facility and residential
streets. Receives stormwater runoff from through two stormwater pipes and one outlet pipe
controls the water level. Partly filled by previous levee construction and park development.
60% invasive - P.
arundinacea
Low
Terracita
Vallejo - 1
20% invasive P.
arundinacea
20% introduced Taraxacum
officinale
(dandylion)**
20% introduced T. officinale
Medium
Low
Low
*Listed as invasive in Minnesota (MN DNR 2017), ** Listed as introduced/native in USDA NRCS (2017)
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
3
2.2 MITIGATION NEED DETERMINATION METHOD
The USACE uses a set of guidelines regarding the determination of wetland mitigation ratios (USACE
2011). The guidelines are used to compare the features of impacted wetlands with the predicted features
of proposed mitigation sites. The guidelines include, but are not limited to:
1. Qualitative Loss: An impact causing a qualitative loss will require a mitigation site with a qualitative
gain. The replacement wetland should be of equivalent or better quality (vegetation) compared with the
impacted site. If the mitigation site will not yield this result, the mitigation ratio may increase.
2. Location: Mitigation sites should be located within the same bank service area (watershed). If
mitigation sites selected for a project are outside of the impacted watershed, this will often require a
higher replacement ratio.
3. Type Conversions: Mitigation sites should be of the same wetland type as the impacted wetland. If the
mitigation site is another type, this generally requires an increased replacement ratio unless the
proposed mitigation habitat type serves the aquatic resource needs of the watershed/ecoregion.
4. Uncertainty: This factor is used to adjust replacement ratios while considering the inherent
unpredictability of mitigation in general. This guideline includes any variable related to mitigation which
may cause decreased mitigation site success. Factors include, but are not limited to permitteeresponsible mitigation, mitigation site did not formerly support targeted aquatic resource, difficult-toreplace resources, modified hydrology, artificial hydrology, and long-term maintenance concerns.
Mitigation for permanent impacts to wetland areas will be achieved by constructing a combination of on-site
wetland creation sites and also by purchasing credits using the North Dakota Ducks Unlimited (DU) In-Lieu Fee
Program. The on-site mitigation will provide replacement for the impacts to wetland areas that are fluvial in
nature (oxbow wetland areas). The DU program will be used to replace any additional wetland impacts. The
replacement ratios for the onsite mitigation will be at a 1:1 basis because the mitigation site will be an expansion
of an existing oxbow. This is anticipated to provide the same quality, general location and wetland type as the
impacted oxbow wetlands. The Napa Valley Wetland Impacts #1 and #2 as shown in Table 3 will be replaced
on site near Wetland Impact #1 as shown in Appendix B. The oxbow wetland impacts (Wetland Impact #1) for
the Terracita Vallejo phase will be replaced with a similar replacement site located within that project phase as
part of the Terracita Vallejo project construction. Replacement ratios for the DU In-Lieu Fee program are
discussed below using the USACE guidelines.
Ducks Unlimited currently operate an in-lieu fee program that allows them to sell credits to applicants and then
restore wetlands after payment. Currently they are the only entity in North Dakota that can operate this
program. Like the on-site mitigation process, the bank sponsor is required to follow the same steps to get
credits approved. These include locating sites, conducting land or easement purchases, gaining authorization
activities, and conducting final delineations followed by ongoing long-term maintenance. This process also
includes the preparation of an environmental document (prospectus) which also requires agency review and
approval.
For Qualitative Loss, we compared the gain in quality between the original wetland vegetation and the
proposed mitigation site. The current quality of the wetland sites impacted by the project is low to
medium. Because DU wetlands are required by the USACE, specified in their guidance document,
Wetland Mitigation Banking in North Dakota, Interagency Guidance for Mitigation Bank Sponsors
(2015), to be high quality, the gain will be positive and the ratio not more than 1:1.
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
4
For Location, all mitigation banking sites will be purchased from DU within the same watershed (ratio
not more than 1:1).
For Type Conversion: based on USACE consultation, mitigation sites in North Dakota are usually
restored pothole basins consisting of the classifications PEMA, PEMC, PEMF, and complexes of these.
These wetland types are available as mitigation sites through Ducks Unlimited (DU). These types of
wetlands are considered as the replacement site condition for the purposes of this mitigation plan (ratio
variable).
For Uncertainty: the credits purchased through DU are for completed, high quality wetland sites. The
uncertainty is removed from this transaction (ratio not more than 1:1).
2.3 MITIGATION DETERMINATION RESULTS
Table 3 shows the resulting replacement ratios and calculated acres using the four criteria identified in
the USACE guidance document (Wetland Mitigation Banking in North Dakota, Interagency Guidance for
Mitigation Bank Sponsors, 2015) for permanent impacts. Replacement for permanent wetland impacts will
be at a 1:1 ratio. The total mitigation proposed is 0.60 acres of created on-site wetlands and 0.61 acres
of restored wetland in the Souris River Bank Service Area through the DU in-lieu fee program. The SRJB
has currently secured DU credits to meet the proposed 0.61 acres. No mitigation is proposed for the
temporary impacts since the sites will generally be restored to their pre-project condition following the
project construction.
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
5
Table 3: Comparison of impacted wetlands vs. mitigation wetlands
Phase
Wetland Impact
Number
Terracita Vallejo
-1
Napa Valley - 1
Napa Valley - 2
Napa Valley - 3
Napa Valley - 4
Napa Valley - 5
Napa Valley - 6
Maple Ave
Bypass - 8
Qualitative
Loss?
Quality:
Impacted vs.
Mitigation
No
medium-low /
high
No
low / high
No
medium / high
No
low / high
No
low / high
No
medium / high
No
low / high
low / high
No
Type
Conversion?
Classifications:
Impacted vs.
Mitigation
Location
Change?
Mitigation
sites in
different
Banking
Service Area?
Uncertainty
of
Mitigation
Success?
No
No
No
No
No
PEMC/PEMC
No
PEMC/PEMC
No
No
PEMC/PEMC
No
PEM1C/PEMC
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
Replacement
Ratio
Permanent
Wetland
Impact
acres
Proposed
Mitigation
Wetland
acres
Mitigation
Method
No
1:1
0.48
0.48
On-Site
No
No
1:1
0.02
0.02
On-Site
No
No
1:1
0.10
0.10
On-Site
No
No
1:1
0.28
0.28
DU
No
No
1:1
0.16
0.16
DU
No
No
2:1
0.00
0.00
N/A
No
No
1:1
0.17
0.17
DU
No
No
1:1
0.00
0.00
N/A
Total
1.21
1.21
6
3 CHANNEL STABILIZATION MEASURES WATERS IMPACTS
3.1 SOURIS RIVER/PRIOR USACE FEDERAL FLOOD CONTROL
PROJECT
A federally authorized flood control project was constructed in the 1970's and 1980's along the stretch of
the Souris River throughout the city of Minot. This project featured clearing, snagging, debris removal,
channel excavation, channel structures, bank protection, levees, modifications to bridges, new bridges,
provisions for storm flows to enter the river, interior drainage systems, ponding areas, and pumping
stations.
During completion of the project in the 1970's, project levees were constructed where riverbank
elevations were less than two feet above the project design flood level of 5,000 cubic feet per second
(cfs). Discontinuous emergency embankments, containing surplus material, were subsequently
incorporated into the federal project. The project operations and maintenance manual identifies a total
39,941 feet of levee embankment including the retained emergency embankments. The left bank and
right bank closed systems are created by tying together the existing levees during emergency operations.
As part of the federal project, an Operation and Maintenance Manual was developed in November of
1981. This manual requires the local sponsor to inspect and repair all scoured or sloughed channel
banks following flooding events. Since the original project was constructed, numerous maintenance
projects were completed to install additional riprap protection along the channel to repair scoured or
sloughed channel banks.
In November 2013, the United States Army Corps of Engineers (USACE) notified the project sponsors
that based upon the draft periodic and routine inspection reports, all levee systems from Burlington, ND
through Minot, ND would be rated "Unacceptable". In order to prevent a lapse in rehabilitation assistance
under PL 84-99, the sponsors submitted requests to the USACE in March 2014 for a conditional
extension while they develop and implement a System Wide Improvement Framework (SWIF).
In addition, in December of 2016, a System-wide Improvement Framework (SWIF) was developed for the
project in Minot and submitted to the USACE. The SWIF outlines the schedule and approach for the
correction of USACE identified deficiencies within the levee systems through Minot ND. These include a
number of additional slope stability and erosion/bank caving activities are expected to be repaired using
additional bank stabilization methods within the city, or through the implementation of the MREFPP
projects (specifically Phases MI1-MI3).
Recent repairs (2016) that have been completed involving the placement of riprap have been completed
under Nationwide Permit 31 Maintenance of Existing Flood Control Facilities.
In total, the federal flood control project resulted in extensive channel modification and/or rock
stabilization placement within approximately 72% of the areas shown to have OHWL impact under the
current Construction Stage 1.5.
3.2 PERMANENT IMPACTS OF RIPRAP AND CHANNEL WORK
Construction of the Construction Stage 1.5 project will result in permanent impacts to the Souris River, as
several project features will require work to be done below the river's ordinary high water mark (OHWM).
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
7
The river banks would be stabilized in several locations through the use of riprap or other bioengineering
solutions both above and below the OHWM.
Overall, Construction Stage 1.5 will permanently impact 10,609 feet of channel (or 8.35 acres) below the
OHWL. Of this length, only 3,020 (28.5%) was not previously impacted by channelization bank excavation
or riprap stabilization as part of the Federal Flood Control project. In addition, approximately 820 of the
remaining stabilization impact length is being completed using bio-engineering solutions. As a result, the
remaining new hard riprap stabilization length is reduced to 2,200 feet of channel that was not previously
modified. Impacts below the OHW area shown on project maps in Appendix C, additional details
regarding the impacts are included in the Combined Impact Table - Appendix D. Table 4 on the next page
summarizes the proposed impacts by project reach/feature.
3.3 MITIGATION
Mitigation for the channel impacts will be accomplished by both enhancement of riparian habitat as well
as the creation of new channel and associated river bank habitat.
As part of the original flood control
project, the river channel geometry
was altered, the banks were lined
with rock, and flood control levees
were constructed at the top of the
banks as shown on the image to the
right. This provides limited aquatic
habitat value.
As part of the Maple Avenue Bypass
phase of Construction Stage 1.5,
historic riverine habitat will be
created by reconnecting a river
meander that was disconnected from the river as part of a Federal Flood Control Project. The meander at
Nubbin Park will be reconnected by breaching the embankments and directing base river flows through
the oxbow, see Appendix E. This project will be completed in conjunction with the Maple Avenue High
Flow Bypass Phase, since it is not until then that the storm water detention purpose of the Nobbin Park
meander oxbow can be abandoned. This project will provide approximately 1,800 feet of new river
channel and approximately 3,700 feet of restored river bank habitat.
In addition, a series of oxbows were cutoff as part of the straightening and used for storm water detention
ponds. The riparian zone adjacent to the river banks is mostly residential in nature and includes
residential yards, sidewalks and city streets. As part of Construction Stage 1.5, adjacent homes will be
purchased and the levees will be moved away from the river providing additional natural riparian habitat
areas (greenspace).
The project is anticipated to provide approximately 11.2 acres new greenspace adjacent to the Mouse
River Channel. A series of maps are included in Appendix F showing the locations of the additional green
space that will result from the project.
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
8
Table 4: Channel Impact Data
Proposed
Riprap
Length
(LF)
Proposed
BioEngineering
Length (LF)
Length of
Proposed
OHWL
Impact
(LF)
Impact
Outside of
Prior
USACE
Riprap
Placement
(LF)
Impact
Outside
Prior USACE
Riprap and
Channel
Bank
Excavation
(LF)
Impact
Outside Prior
Riprap, Prior
Channel Bank
Excavation,
and Proposed
BioEngineering
(LF)
Perm.
Area
(acres)
Temp
Area
(acres)
Porposed
OHWL Impact
Outside Prior
Rirap, Prior
Channle Bank
Excavation,
and Proposed
BioEngineering
(acres)
Net
Greenspace
Area
between
OHWL and
Proposed
Line of
Protection
(acres)
Terracita Vallejo
1,593
0
1,593
1,446
0
0
0.51
0
0
-1.7
Phase MI-2:
Napa Valley
2,990
820
3,810
3,724
3,020
2,200
3.31
0.74
2.12
2.2
Phase MI-3:
Forest Road
1,360
680
2,040
824
0
0
0
0.09
0
5.2
Maple Avenue
Bypass
260
0
260
60
0
0
0
0
0
0
Phase MI-1:4th
Avenue NE
2,906
0
2,906
1,519
0
0
0
0
0
5.5
Northeast Levee
Extension
0
0
0
0
0
0
0
0
0
0
Total
9,109
1,500
10,609
7,573
3,020
(28.5%)
2,200
8.35
0.83
2.12
11.2
Project Feature
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
9
4 FLOODPLAIN FOREST AND TREE IMPACTS
4.1 DESCRIPTION OF RIPARIAN FORESTS AND TREES IN THE AREA
Riparian corridors are generally defined as the green thread of the river, or the vegetated corridor that
transitions from the terrestrial environment to the riverine environment. These areas are important to
aquatic systems for several reasons including connectivity and habitat. Forested areas within the project
boundaries are mainly naturally occurring stands, with occasional planted ornamental and fruit trees.
Naturally occurring trees in North Dakota include few species, Fraxinus pennslyvanica (green ash), Acer
negundo (ash-leaf maple), Quercus macrocarpa (bur oak), and Populus deltoides (cottonwood).
4.2 MITIGATION NEED DETERMINATION METHOD
For purposes of determining tree impacts, we inventoried all potentially impacted trees within the project
construction limits. Individual trees that could be counted using aerial photography were identified and
mapped in GIS, see Appendix G. In the stands where tree density was too great for counting individuals,
a mean measured density was used to estimate tree numbers. This mean density was determined during
biological inventory work (Wetlands, Waters, and Biological Inventory Report, 2015). Tree species and
frequency were surveyed within quadrats (30 ft. radius unless otherwise specified, trees defined as 3-inch
diameter at breast height) to determine populations.
Once the inventory was completed, the need for mitigation was determined for different categories of
trees:
Trees within the construction limits: All trees present within the construction limits were identified.
USACE right-of-way requirements: The total count was then filtered by this criterion. The USACE
requires a 15-foot buffer adjacent to flood protection features to be permanently clear of trees. In the
previous flood prevention projects, some levee areas had not been maintained and trees had grown
inside the buffer zone. Because these trees should not be present under the current operational
guidelines, trees within this category were removed from the total tree count.
Riparian Forested Communities: The remaining trees were subsequently filtered by community. We
identified stands of trees that are located adjacent to the river channel and inventoried those areas as
riparian forested communities. Some areas of trees are not likely subject to floodplain dynamics (e.g.
behind a structure or on elevated ground), and were not counted as riparian. Only riparian trees were
included in the mitigation requirement.
From this final value, we estimated the number of trees required for mitigation (only riparian trees within
the construction limits outside the USACE right-of-way). A replacement ratio of 1:1 was initially used to
calculate the number of trees to reestablish. This ratio was obtained from the NDDOT Design Manual
(2014), which states this is the appropriate ratio for urban areas. However, this number was increased to
2:1 since replacement trees will require time before providing the same function and value of the mature
trees that are being impacted in some cases.
4.3 MITIGATION DETERMINATION RESULTS
The total number of trees within the project construction limits is estimated to be 4375 individuals (Table
5). From this value, after subtracting the trees within the USACE right-of-way and the non-riparian trees,
we estimate 884 riparian trees will be impacted. At a ratio of 2:1, the number of replacement trees is
1,768 trees.
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
10
Table 5: Worksheet and results for determination of tree mitigation requirements
Category
Total number of trees within the construction limits
Of these, trees within riparian forested communities outside of the
USACE right-of-way
Of these, trees within riparian forested communities
Total number of trees requiring mitigation
Total number of trees after mitigation using 2:1 replacement ratio
Number of Trees
4,375
3,348
884
884
1,768
Replacement sites will be identified within the Mouse River Valley including previous buyout properties.
Replacement trees will be planted using seedlings, small bare root stock or large trees depending on the
planting site conditions.
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
11
5 REFERENCES
Houston Engineering, Inc. (2015) Wetlands, Waters, and Biological Inventory Report.
MN DNR (2017) http://www.dnr.state.mn.us/invasives/terrestrialplants/grasses/reedcanarygrass.html
(Accessed June 2017)
NDDOT (2014). Chapter II, Environmental and Public Involvement. In NDDOT Design Manual. Retrieved
from http://www.dot.nd.gov/manuals/design/designmanual/Chapter%202.pdf
USACE (2011) Instructions for Completing Mitigation Ratio-Setting Checklist. Standard Operating
Procedure for Determination of Mitigation Ratios (Attachment 12501.2). Retrieved from
http://www.spd.usace.army.mil/Missions/Regulatory/Public-Notices-andReferences/Article/1048531/12501-spd/
USACE (2015) Wetland Mitigation Banking in North Dakota, Interagency Guidance for Mitigation Bank
Sponsors, Appendix E6,
http://cdm16021.contentdm.oclc.org/cdm/ref/collection/p16021coll11/id/349.
USDA NRCS (2017) Plants Database
https://plants.usda.gov/java/invasiveOne?startChar=T&queryParam=sciname&sort=origin
(Accessed June 2017)
USACE (2017) Final Programmatic Environmental Impact Statement Mouse River Enhanced Flood
Protection Project, Ward County, North Dakota.
.
CONSTRUCTION STAGE 1.5 MITIGATION PLAN
12