The Sacramento, San Francisco, and Los Angeles Districts of the U.S. Army Corps of Engineers (USACE), along with the U.S. Fish and Wildlife Service (USFWS), the California Department of Fish and Wildlife (CDFW), the California Resources Agency, the National Marine Fisheries Service (NMFS), the United States Environmental Protection Agency (EPA), the State Water Resources Control Board (State Water Board), and the Natural Resources Conservation Service (NRCS) as potential participants in Interagency Review Teams (IRT) have updated the standard Mitigation Bank Enabling Instrument (BEI) template for use with mitigation banks that are established within the State of California. This notice is to inform interested parties of the availability of the completed template.
What: The Sacramento, San Francisco, and Los Angeles Districts of the U.S. Army Corps of Engineers (USACE), along with the U.S. Fish and Wildlife Service (USFWS), the California Department of Fish and Wildlife (CDFW), the California Resources Agency, the National Marine Fisheries Service (NMFS), the United States Environmental Protection Agency (EPA), the State Water Resources Control Board (State Water Board), and the Natural Resources Conservation Service (NRCS) as potential participants in Interagency Review Teams (IRT) have updated the standard Mitigation Bank Enabling Instrument (BEI) template for use with mitigation banks that are established within the State of California. This notice is to inform interested parties of the availability of the completed template.
SUBJECT:The attached, updated Mitigation Bank Enabling Instrument (BEI) template is for use in the development of mitigation and conservation banks that are within, or that propose service areas within the State of California. The Project Delivery Team (PDT) established by the 2011 interagency Memorandum of Understanding (MOU) concerning Mitigation and Conservation Banking and In-Lieu Fee Programs in California developed this final BEI template, following the consideration of comments received in response to the 2015 public notice,and subsequent public meetings, and following input from the Bank Agency Management Team (BAMT), also established by the MOU.The attached BEI Template becomes effective for use for any new proposed mitigation bank, where a prospectus is received after November 27, 2017.Mitigation banks currently in process may, and are encouraged to, use the attached BEI template, rather thanearlier versions. The updated BEI template will be used jointly by the U.S. Army Corps of Engineers’ (USACE) South Pacific Division's Sacramento, San Francisco, and Los Angeles Districts, along with the U.S. Fish and Wildlife Service (USFWS), the California Department of Fish and Wildlife (CDFW), the California Natural Resources Agency (CNRA), the National Marine Fisheries Service (NMFS), the United States Environmental Protection Agency (EPA), the State Water Resources Control Board (State Water Board), and the Natural Resources Conservation Service (NRCS), as potential participants in Interagency Review Teams (IRT). After approximately six months, a public meeting will be scheduled to discuss the experiences of mitigation bankers and others in using this template, in order to inform potential future changes to the template. This notice, as well as the original notice of the proposed updates, may be viewed at: http://www.spd.usace.army.mil/Missions/Regulatory/PublicNoticesandReferences.aspx.
AUTHORITY: The templates will be used in the development of mitigation banks, which provide mitigation for impacts from projects which have which have received authorizations to proceed under the authorities of Section 10 of the Rivers and Harbors Act of 1899 for structures or work in or affecting navigable waters of the United States and/or Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. Additionally, these templates are to be used when those mitigation banks would also propose to provide mitigation for projects which have been required to provide mitigation by USFWS, CDFW, NMFS, the State Water Board, and/or NRCS.These agencies have committed through the above mentioned MOU to establishing a combined and coordinated approach to mitigation and conservation banking which includes the development of template documents for use throughout the State of California. These templates reflect existing regulations, policies, and guidance and represent the way in which USACE, USFWS, NMFS, NRCS, EPA, the CNRA, the State Water Board, and CDFW intend to implement and provide a consistent approach to mitigation and conservation banking proposals.
If you have questions or need additional information please contact Tom Cavanaugh, 415-503-6574, Thomas.J.Cavanaugh@usace.army.mil.
Attachments:
California Mitigation Bank Enabling Instrument (rev. 9/2017)
MEMORANDUM OF UNDERSTANDING
Concerning
MITIGATION AND CONSERVATION BANKING AND IN-LIEU FEE PROGRAMS
IN CALIFORNIA
Between the
California Natural Resources Agency
And
California Department of Fish and Game
And
United States Army Corps of Engineers
And
United States Fish and Wildlife Service
And
NOAA's National Marine Fisheries Service
And
United States Environmental Protection Agency
And
USDA Natural Resources Conservation Service
And
State Water Resources Control Board
This Memorandum of Understanding (MOU) is entered into by the California Natural
Resources Agency (CNRA), the California Department of Fish and Game (CDFG), the U.S.
Army Corps of Engineers (Corps), represented by the South Pacific Division Engineer and
the Los Angeles, Sacramento, and San Francisco District Engineers, the U.S. Fish and
Wildlife Service (FWS), the National Oceanic and Atmospheric Administration's National
Marine Fisheries Service (NMFS), the U.S. Environmental Protection Agency (EPA), the
USDA Natural Resources Conservation Service (NRCS), and the State Water Resources
Control Board (State Water Board), collectively referred to herein as the "Parties."
RECITALS
WHEREAS, the Corps and EPA jointly promulgated the Compensatory Mitigation for
Losses of Aquatic Resources; Final Rule, Department of the Army, Army Corps of
Engineers and Environmental Protection Agency, 33 C.F.R. Part 332 and 40 C.F.R. Part
230, April 10, 2008, (Mitigation Rule) where the Corps has the primary responsibility to
review mitigation banks and in-lieu fee (lLF) programs that may be used to offset
unavoidable impacts to waters of the U.S.; and
WHEREAS, the FWS published Guidance for the Establishment, Use, and Operation of,
Conservation Banks, 68 Fed. Reg. 24,753 (May 8,2003); and
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
WHEREAS, the California Natural Resources Agency and California Environmental
Protection Agency, jointly published the State of California's Official Policy on
Conservation Banks, April 7, 1995; and
WHEREAS, the CDFG implements the Sacramento-San Joaquin Valley Wetlands
Mitigation Bank Act of 1993 (Fish and Game Code Section 1775 et seq.; 1784 et seq.; and
1790 et seq.); and
WHEREAS, the State Water Board is charged with preserving, protecting, enhancing, and
restoring water quality within the State of California; and
WHEREAS, the Parties agree that the creation and use of mitigation banks,
conservation banks, and ILF programs can be effective methods to protect
important habitat and also to mitigate for unavoidable impacts to resources under
the jurisdiction of one or more of the Parties; and
WHEREAS, the Parties agree that it will be beneficial to create a more
streamlined, coordinated approach for the submittal, review and approval of
mitigation and conservation banks and ILF programs.
NOW, THEREFORE, the Parties agree as follows:
Section 1 -Purpose
A. This MOU is entered into by the Parties for the purpose of establishing a
framework for developing and using combined or coordinated approaches to mitigation
and conservation banking and ILF programs in California to improve consistency of
processes, services and products. It is the intent of the Parties that this MOU will
provide a collaborative process for the development of standardized banking and ILF
program documents (see Sections 3 and 4) and guidance, and confirmation of an agreed
upon process for continuous improvement of those documents, guidance, and the
processes defined therein.
B. This coordinated approach will aid in more rapid and conclusive review,
comment, and completion of the review of proposed mitigation and conservation banks
and ILF programs. A clearly defined and widely recognized process for development,
review and approval of standardized banking and ILF program documents will facilitate
and accelerate the establishment process for banks and ILF programs, simplify and
clarify the process for bank sponsors and ILF program sponsors, save agency staff time,
and reduce the cost of evaluating proposed bank and ILF proposals.
C. The use of mitigation and conservation banks and ILF programs to offset
unavoidable adverse impacts shall be based on accepted ecological principles. The
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
appropriateness of the use of mitigation and conservation banks and ILF programs shall
be evaluated on a case-by-case basis as part of the permitting and consultation process.
Section 2 -Incorporation with Regional Planning Efforts
Mitigation and conservation banks and ILF programs may be used to support regional
planning efforts, including, but not limited to, Special Area Management Plans
(SAMP), Advance Identification (ADID), Habitat Conservation Plans (HCP), Natural
Community Conservation Plans (NCCP), Recovery Plans, County-wide integrated
permitting strategies, advance mitigation planning efforts with infrastructure
agencies, and watershed plans, as determined on a case-by-case basis by the Parties
and plan participants.
Section 3 -Banking and ILF Documents
Banking and ILF program documents (Templates) consist of the following:
A.
A Bank Enabling Instrument (BEl). The BEl documents agency and bank
sponsor concurrence, both on the objectives and administration of banks that
provide mitigation for impacts to aquatic resources, federal and state listed
species, and covered habitats, and on the physical and legal characteristics of
the bank.
B.
An In-Lieu Fee Enabling Instrument (ILFEI). The ILFEI documents agency and ILF
program sponsor concurrence, both on the objectives and administration of an
ILF program that provides mitigation for impacts to aquatic resources, federal
and state listed species, and covered habitats, and on the legal characteristics
of the ILF program and physical characteristics of mitigation project sites.
C.
A Conservation Bank Enabling Instrument (CBEI). The CBEI documents
concurrence of agency and bank sponsor on the objectives and administration
of banks containing natural resource values that are conserved and managed in
perpetuity and used to offset impacts to specified listed species.
D.
A Conservation Easement (CE). The CE is the instrument by which real
property will be protected in perpetuity, retaining land forever in its natural,
restored, or enhanced condition, with the purpose of preventing the
impairment of, or interference with, the conservation values of the real
property.
E.
A Long-Term Management Plan (LTMP). The LTMP is a document that describes
how the bank property or ILF mitigation project sites will be managed after
performance standards have been achieved to ensure the long-term
sustainability of the resources.
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
F.
A Bank Proposal Review Checklist (Checklist). The Checklist documents
information and exhibits required for a complete bank proposal.
G.
An tLF Proposal Review Checklist (lLF Checklist). The ILF Checklist documents
information and exhibits required for a complete ILF proposal.
H.
Other Templates, guidance documents, and processes as may be determined to
be necessary.
Section 4 -Responsibilities of the Parties
Each Party shall, unless otherwise indicated:
A. Appoint a representative
to the Banking Agency Management Team.
1. The Banking Agency Management Team (BAMT) is composed of one
representative from each Party who, at a minimum, has direct or delegated statewide
responsibility for that agency. Representatives shall be designated from:
a. Corps, South Pacific Division -San Francisco, CA
b. FWS, Pacific Southwest Region - Sacramento, CA
c. NMFS, Southwest Region - Long Beach, CA
d. CDFG, Headquarters - Sacramento, CA
e. EPA, Region IX- San Francisco, CA
f. NRCS, California State Office -Davis, CA
g. State Water Board -Sacramento, CA
h. CNRA - Sacramento, CA
There shall be no overlap between representatives of the BAMT and Interagency
Review Teams (lRTs) or Conservation Banking Review Teams (CBRT).
2. The BAMT shall:
a. Review and approve Templates, guidance documents, and processes
proposed by the Project Delivery Team (PDT);
b. Disseminate the final approved Templates, guidance documents, and
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
processes to the IRTs and/or CBRTs for use in reviewing and approving bank and
ILF program proposals;
c. As needed, meet to consider any recommended changes to Templates,
guidance documents, and processes proposed by the PDT;
d. As needed, hold public meetings to provide information regarding
Templates, guidance documents, and processes, and to address issues, such as
new regulatory items regarding mitigation and conservation banking and ILF
programs; and
e. Resolve, within 60 days, if practicable, disputes related to
interpretation and integration of agency policies and practices which may arise
during the development and application of Templates, guidance documents, and
processes. The BAMT shall consider information on the nature of the dispute
provided by their respective PDT representatives and make a decision which
resolves the issue.
B. Appoint representatives to the PDT.
1. The PDT shall be composed of representatives from the Parties, except in the
case of the CNRA, CDFG is the designee.
2. The PDT shall:
a. Develop standardized Templates for the various banking and ILF
program documents, and will develop proposed guidance and processes for
use in the evaluation of proposed mitigation and conservation banks and ILF
programs;
b. Periodically review previously developed and approved Templates,
guidance documents, and processes, and propose modifications as necessary.
Proposed modifications may also be based on input from BAMT representatives,
banking and ILF sponsors, or the public. The PDT will submit all proposed
modifications to the Templates, guidance documents, and processes to the
BAMT for consideration and approval; and
c. Conduct outreach to the banking and ILF provider communities, and
the public at large, to ensure the widest possible understanding of the
Templates, guidance documents, and processes.
C. Appoint representatives to the IRTs.
1. IRTs have the responsibility to review proposed mitigation and conservation
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
banks and ILF programs. The IRTs' areas of responsibility are typically based on the
regulatory boundaries of the Corps districts in California (Los Angeles, San Francisco, and
Sacramento). Typically, IRTs are composed of a representative from a Corps district and
representative from each Party, as appropriate. Some Parties may not participate on
every IRT.
2. Each IRT shall:
a. Review all bank or ILF program proposals to determine if they have the
potential to provide appropriate mitigation for activities regulated by the Parties,
and recommend to bank and ILF program sponsors that they use the BAMTapproved Templates in developing their proposals;
b. Thoroughly review any bank or ILF prospectus, draft and final BEl or
ILFEI (including associated exhibits) for consistency with BAMT-approved
Templates, guidance documents, and processes, and to ensure compliance with
all applicable laws, regulations, and written poliCies. The Mitigation Rule
established regulatory timelines for the review and approval of banks and ILF
programs and associated projects, and the Corps and EPA are responsible for
meeting these timelines. While the Mitigation Rule is a regulation specific to the
Corps and EPA, the remaining signatory Parties to this MOU agree that adhering
to the Mitigation Rule's review and approval timelines would be beneficial to
bank and ILF program sponsors and the regulated public, and will endeavor to
meet timelines when and where feasible;
c. Resolve disagreements between bank or ILF program sponsors and the
IRT, or among IRT representatives regarding proposed minor deviations from
Templates, guidance documents, or processes associated with the
establishment, operation, or management of the bank or ILF program;
d. Elevate to the BAMT, through the PDT, any proposed major deviations
from Templates, guidance documents, or processes for final approval before
moving forward with bank or ILF program proposal. This will ensure that
precedent setting changes or deviations that may have implications in the review
of subsequent banks or ILF programs, or those which may adversely affect the
operation of other IRTs in their evaluation of proposed banks and ILF programs,
will all be afforded appropriate consideration prior to implementation (e.g., a
decision to use an alternate form of financial assurance from that envisioned in
the approved banking or ILF Templates);
e. Provide for public input on bank and ILF program prospectuses as
required by the Parties' respective regulations, policies, practices, and guidance;
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
f. Conduct outreach to the banking and IlF provider communities, and
the public at large, to ensure the widest possible understanding of the
Templates, guidance documents, and processes; and
g. Ensure conflicting requirements are not placed on bank or IlF program
sponsors by different members of the IRT.
D. Appoint representatives to the CBRTs.
1. CBRTs have the responsibility to review proposed conservation banks. CBRTs
may be composed of representatives from the FWS, NMFS, and/or CDFG, as
appropriate. Other Parties may request or be requested to participate on a CBRT and
provide technical banking review and comments, with the understanding that final
approval of any such banks shall not be withheld solely on the basis of pending review
by said Party.
2. Each CBRT shall:
a. Review all conservation bank proposals to determine if they have the
potential to provide appropriate mitigation for activities regulated by the CBRT
agencies, and recommend to bank sponsors that they use the BAMT-approved
CBEI or other relevant Templates in developing their proposals;
b. Thoroughly review any bank prospectus and draft and final CBEI
(including associated exhibits) for consistency with BAMT-approved CBEI or
relevant Templates, guidance documents, and processes, and to ensure
compliance with all applicable laws, regulations, and written policies. The FWS,
NMFS, and CDFG agree that adhering to the review and approval timelines found
in the Mitigation Rule would be beneficial to bank sponsors and the regulated
public, and will endeavor to meet timelines when and where feasible;
c. Resolve disagreements between bank sponsors and the CBRT, or
among CBRT representatives, regarding proposed minor deviations from the
CBEI or other relevant Templates, guidance documents, or processes associated
with the establishment, operation, or management of a conservation bank;
d. Elevate to the appropriate BAMT members (e.g., FWS, NMFS, CDFG),
through the PDT, any proposed major deviations from the CBEI or other relevant
Templates, guidance documents, or processes for final approval before moving
forward with a bank proposal. This will ensure that precedent setting changes or
deviations that may have implications in the review of subsequent banks, or
those which may adversely affect the operation of other CBRTs in their
evaluation of proposed banks, will all be afforded appropriate consideration
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
prior to implementation (e.g., a decision to use an alternate form of financial
assurance from that envisioned in the approved CBEI or other relevant
Templates);
e. Provide for public input on bank prospectuses as required by the CBRT
agencies' respective regulations, policies, practices, and guidance; and
f. Conduct outreach to the banking community, and the public at large,
to ensure the widest possible understanding of the CBEI or other relevant
Templates, guidance documents, and processes.
Section 5 -Amendment, Modification and Termination
A. This MOU may be modified or amended only by written, mutual agreement of all
the Parties.
B. Any Party may terminate its participation in this MOU, without cause, by
providing thirty (30) days written notice to the other Parties.
Section 6 -Miscellaneous
A. This MOU does not address all aspects of banking or ILFs, such as types of
activities, regulatory authorities, crediting, and mitigation preferences.
B. Participation in this MOU does not imply endorsement of all aspects of a
banking or ILF program proposal. Nothing in this MOU is intended to diminish, modify,
or otherwise affect the statutory or regulatory authorities of the Parties.
C. This MOU does not obligate expenditure of funds by any Party.
D. This MOU does not confer any right or benefit, substantive or procedural,
enforceable at law or equity, upon any Party.
E. This MOU does not authorize funding or services, nor is it a legally binding
contract. Any funding commitments or services will be handled in accordance with
applicable laws, regulations, and procedures. Such commitments, if any, will be
covered by separate agreement(s) that shall be in writing, by representatives of the
Parties, and independently authorized by appropriate statutory authority. This MOU
does not provide such authority.
F. This MOU is intended only to improve the cooperation among the Parties. It is
not intended to, and does not create, any right, benefit, or trust responsibility,
substantive or procedural, enforceable at law or in equity, by a party against the United
States, its agencies, its officers, or any person or against the State of California, its
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
agencies, its officers, or any person.
G. This MOU shall not make, or be deemed to make, any Party to this MOU an
agent for, or the partner of, any other Party.
Section 7 - Duration
This MOU will remain in effect indefinitely.
Section 8 -Effective Date
This MOU will become effective when signed by all Parties.
[Remainder Left Intentionally Blank]
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the u.s. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the u.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
tG~
t\
DAT,
FOR NATURAL RESOURCES
Memorandum of Understanding
Mitigation and Conservation Banking and in-Lieu Fee Programs in California
September 22,2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Environmental Protection Agency, Region IX, USDA Natural
Southwest Region, the
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
u.s.
/DE./"
CHARLTON H. BONHAM
DIRECTOR, CALIFORNIA DEPARTMENT OF FISH AND GAME
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
DATE
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
MICHAEL C. WEHR, p..
COLONEL, U.S. ARMY
COMMANDING
SOUTH PACIFIC DIVISION
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
ZL/ (JtT 20tl
R. MARK TOY, P.E.
COLONEL, US ARMY
COMMANDER AND DISTRICT ENGINEER
LOS ANGELES DISTRICT
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
DATE
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
TORREY A. 01 IRO
LIEUTENANT COLONEL, US ARMY
COMMANDING
SAN FRANCISCO DISTRICT
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
1- OCfOp,en 1..Ot{
WILLIAM J. LEADY, P.E
COLONEL, U.S. ARMY
DISTRICT COMMANDER
SACRAMENTO DISTRICT
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
DATE
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
1/-:2/.11
DATE
REGIONAL DIRECTOR,
PACIFIC SOUTHWEST REGION
U.s. FISH AND WILDLIFE SERVICE
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
IN WITNESS THEREOF} the California Natural Resources Agency} the California
Department of Fish and Game} the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer} Los Angeles District Engineer}
San Francisco District Engineer} and Sacramento District Engineer} the U.S. Fish and
Wildlife Service} Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region} the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
Ie I~RODNEY R. MCINNIS
/() fa
0
/~ i' 1/
DATE
REGIONAL ADMINISTRATOR
SOUTHWEST REGION
NOAA's NATIONAL MARINE FISHERIES SERVICE
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
o:J!; /)(// U /(
ALEXIS STRAUSS
DIRECTOR, WATER DIVISION
U.S. ENVIRONMENTAL PROTECTION AGENCY, REGION IX
Memorandum of Understanding
Mitigation and Conservation Banking and In-lieu Fee Programs in California
DATE
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officers the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the U.S. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
~:!y)cuted
using counterpart original signatures.
\-~tLc!? ~b
LINCOLN E. BURTON
STATE CONSERVATIONIST, USDA NATURAL RESOURCES
CONSERVATION SERVICE, CALIFORNIA STATE OFFICE
Memorandum of Understanding
Mitigation and Conservation Banking and In-lieu Fee Programs in California
/O-L(-ff
DATE
September 22, 2011
IN WITNESS THEREOF, the California Natural Resources Agency, the California
Department of Fish and Game, the U.S. Army Corps of Engineers acting by and through
its authorized officer the South Pacific Division Engineer, Los Angeles District Engineer,
San Francisco District Engineer, and Sacramento District Engineer, the U.S. Fish and
Wildlife Service, Pacific Southwest Region, the National Marine Fisheries Service,
Southwest Region, the u.s. Environmental Protection Agency, Region IX, USDA Natural
Resources Conservation Service, California State Office, and the State Water Resources
Control Board have executed this MOU on the dates set forth below. The signatures
may be executed using counterpart original signatures.
THOMAS HOWARD
EXECUTIVE DIRECTOR
STATE WATER RESOURCES CONTROL BOARD
Memorandum of Understanding
Mitigation and Conservation Banking and In-Lieu Fee Programs in California
September 22, 2011
MITIGATION BANK ENABLING INSTRUMENT
Table of Contents
RECITALS .................................................................................................................... 1
AGREEMENT ................................................................................................................. 3
Section I: Purpose and Authorities .............................................................................. 3
A. Purpose ................................................................................................................ 3
B. Authorities............................................................................................................. 3
Section II: Definitions ................................................................................................... 5
Section III: Stipulations.................................................................................................. 9
A. Baseline Condition................................................................................................ 9
B. Disclaimer ............................................................................................................. 9
C. Exhibits ................................................................................................................. 9
Section IV: Bank Evaluation and Development ........................................................... 10
A. Bank Site Assessment by the IRT ...................................................................... 11
B. Bank Sponsor's Responsibilities for Bank Development .................................... 11
C. Phase I Environmental Site Assessment ............................................................ 11
D. Approvals ........................................................................................................... 11
E. Phases ............................................................................................................... 11
F. Modification of the Development Plan ................................................................ 12
G. Property Assessment and Warranty ................................................................... 12
Section V: Bank Establishment Date .......................................................................... 13
Section VI: Financial Assurances ................................................................................ 13
A. Construction Security ......................................................................................... 13
B. Performance Security ......................................................................................... 14
C. Interim Management Security ............................................................................. 14
D. Letters of Credit .................................................................................................. 14
E. Endowment Fund ............................................................................................... 14
Section VII: Credit Release .......................................................................................... 16
A. Waters of the U.S. Credit Release...................................................................... 16
B. Waters of the State Credit Release[If applicable] ............................................. 19
C. Covered Species and Covered Habitat Credit Release ...................................... 19
Section VIII: Operation of the Bank ............................................................................... 24
A. Service Area ....................................................................................................... 24
B. Transfer and Use of Credits................................................................................ 24
C. Interim and Long-term Management and Monitoring .......................................... 25
D. Bank Closure Plan .............................................................................................. 26
E. Financial Operations........................................................................................... 26
F. Remedial Action Plan ......................................................................................... 30
Section IX: Reporting .................................................................................................. 31
A. Annual Inflation Adjustments to Endowment Fund Report ................................. 31
B. Annual Report..................................................................................................... 31
C. Credit Transfer Reporting ................................................................................... 32
i
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
D. Reporting Compliance Measures ....................................................................... 32
Section X: Responsibilities of the Bank Sponsor and Property Owner ....................... 33
Section XI: Responsibilities of the IRT ........................................................................ 34
A. IRT Oversight ..................................................................................................... 35
B. IRT Review ......................................................................................................... 35
C. Compliance Inspections ..................................................................................... 35
Section XII: Other Provisions........................................................................................ 35
A. Extraordinary Circumstances.............................................................................. 35
B. Dispute Resolution ............................................................................................. 37
C. Conveyance of Bank or Bank Property or Other Interests .................................. 38
D. Modification and Termination of the BEI ............................................................. 38
E. Default ................................................................................................................ 41
F. Controlling Language ......................................................................................... 41
G. Entire Agreement................................................................................................ 41
H. Reasonableness and Good Faith ....................................................................... 41
I.
Successors and Assigns .................................................................................... 42
J. Partial Invalidity .................................................................................................. 42
K. Notices ............................................................................................................... 42
L. Counterparts ....................................................................................................... 44
M. No Third-Party Beneficiaries ............................................................................... 44
N. Availability of Funds............................................................................................ 44
O. No Partnerships .................................................................................................. 45
P. Applicable Laws.................................................................................................. 45
Q. No Federal Contract or Monetary Damages ....................................................... 45
R. CDFW Remedies................................................................................................ 45
Section XIII: Execution .................................................................................................. 46
Appendix 1 Minimum Requirements for Each Exhibit................................................. 49
1. "Exhibit A" - Bank Location Maps ...................................................................... 49
A-1. General Vicinity Map ................................................................................. 49
A-2. Map of Property including Bank Property ............................................... 49
A-3 Map of Conserved Areas in Bank Property Vicinity...........................48
2. "Exhibit B" Service Area Map(s) and Description(s) ....................................... 49
B-1. Map(s) of the Bank's Service Area(s) ...................................................... 49
B-2. Narrative description(s) of the Bank's Service Area(s) .......................... 49
3. "Exhibit C" - Development Plan ......................................................................... 49
C-1. Development Plan ..................................................................................... 49
C-2. Construction Security Analysis and Schedule ....................................... 50
C-3. Performance Security Analysis and Schedule ....................................... 50
4. "Exhibit D" - Bank Management and Operation Documents.............................. 50
D-1. Interim Management Security Analysis and Schedule........................... 50
D-2. Endowment Fund Analysis and Schedule .............................................. 51
D-3. Agreements, Instructions and Forms for Submission or Disbursement
of Endowment Funds ........................................................................................... 51
D-4. Interim Management Plan ......................................................................... 51
D-5. Long-term Management Plan ................................................................... 52
ii
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
D-6. Bank Closure Plan..................................................................................... 52
5. "Exhibit E" - Real Estate Records and Assurances ........................................... 52
E-1. Preliminary Title Report, Legal Description, and Parcel Map(s) ........... 53
E-2. Property Assessment and Warranty ........................................................ 53
E-3. Plat Map(s) ................................................................................................. 53
E-4. Real Estate Instrument.............................................................................. 53
E-5. Title Insurance [attach once received] .................................................... 53
Applicable for final BEI approval under all circumstances. ..................................... 53
6. "Exhibit F" - Bank Crediting and Credit Transfers .............................................. 53
F-1. Credit Evaluation and Credit Table .......................................................... 53
F-2. Credit Purchase Agreement and Payment Receipt Templates ............. 53
F-3. Credit Transfer Ledger Template ............................................................. 53
F-4
Instructions for Species Credit Transfers Using RIBITS [if applicable] 54
F-5
Credit Release Schedule and Funding Schedule for Covered Species
and Covered Habitats .......................................................................................... 54
F-6
Implementation Fee Schedule [if applicable] .......................................... 54
7. "Exhibit G" - Phase I Environmental Site Assessment....................................... 54
8. "Exhibit H" - Biological Resources Survey ......................................................... 54
9. "Exhibit I" Jurisdictional Determination and Delineation of Waters of the U.S.
and/or Waters of the State. ........................................................................................ 54
10. "Exhibit J" Cultural, Historical, Archeological, and Native American Resources
("Cultural Resources"). ............................................................................................... 55
J-1
Identification, Inventory, and Evaluation................................................. 55
J-2
Compliance Documentation [if applicable] ............................................. 55
J-3
Historic Properties Treatment Plan (HPTP) [if applicable]..................... 55
11. "Exhibit K" Other Documentation, Permits, Amendments or Revisions .......... 55
1
iii
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Note: Do not change or remove parts of the template, including: version date,
footers (except to add the Bank Name), table of contents, or Appendix 1 (list of
required exhibits).
California Multi-agency Project Delivery Team Bank Enabling Instrument
(Template Version Date: September 28, 2017)
BANK ENABLING INSTRUMENT
[BANK NAME] MITIGATION BANK
This Bank Enabling Instrument ("BEI"), dated this _______ day of ____________, 20__,
is made by and among [Bank Sponsor's full legal name(s)] ("Bank Sponsor"), [Property
Owner's full legal name(s)] ("Property Owner"), and [delete name(s) of any of the
following agencies which is not a party]: the_________ District of the U.S. Army
Corps of Engineers ("USACE"), Region IX of the U.S. Environmental Protection Agency
("USEPA"), the U.S. Fish and Wildlife Service ("USFWS"), the National Oceanic and
Atmospheric Administration's National Marine Fisheries Service ("NMFS"), State Water
Resources Control Board ("State Water Board"), California Regional Water Quality
Control Board, Region_______("Regional Water Board"), and the California Department
of Fish and Wildlife ("CDFW"). [Choose one: These agencies comprise and are
referred to jointly as the Interagency Review Team ("IRT") or in the event some IRT
members are not a party use: These agencies comprise and are referred to jointly as
the "Signatory Agencies".(The second option triggers the need for conforming
changes to other parts of the BEI). The Bank Sponsor, Property Owner, and the IRT
are hereinafter referred to jointly as the "Parties." This BEI sets forth the agreement of
the Parties regarding the establishment, use, operation and maintenance of the [Bank
name] Mitigation Bank (the "Bank").
RECITALS
A. The Bank Sponsor is responsible for establishing, operating, and maintaining the
Bank according to this BEI.
B. The Property Owner is the owner of real property containing approximately
______ acres (the "Property"), located at _________ [insert address and
county], State of California, designated Assessor's Parcel No(s).
________________. The Property is generally shown on the Bank Location
Maps (Exhibit A) and legally described in the Real Estate Records and
Assurances (Exhibit E), attached to and made a part of this BEI.
C. [Choose one: Bank Sponsor's name(s), as Bank Sponsor and Property Owner
or Bank Sponsor and Property Owner] desire(s) to create the Bank over [add if
applicable: a _____-acre portion of] the Property (the "Bank Property"). The
Bank Property is generally shown on the Bank Location Maps (Exhibit A) and
legally described in the Real Estate Records and Assurances (Exhibit E)
1
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
attached to and made a part of this BEI. The Bank Property is to be conserved
and managed in perpetuity as provided in Section V and VIII.
D. [Remove if CDFW is not a party] CDFW has jurisdiction over the conservation,
protection, and management of fish, wildlife, native plants and the habitat
necessary for biologically sustainable populations of these species pursuant to
California Fish and Game Code § 1802 and other provisions of California law.
E. [Remove if USFWS is not a party] USFWS, an agency within the U.S.
Department of the Interior, has jurisdiction over the conservation, protection,
restoration and management of fish, wildlife, native plants, and the habitat
necessary for biologically sustainable populations of these species within the
U.S. pursuant to the Endangered Species Act, 16 U.S.C. § 1531, et seq., the
Fish and Wildlife Coordination Act, 16 U.S.C. §§ 661-666c, the Fish and Wildlife
Act of 1956, 16 U.S.C. § 742(f), et seq., and other provisions of Federal law.
F. USEPA and USACE have [or, if USEPA is not a party: USACE has]
jurisdiction over Waters of the U.S. pursuant to the Clean Water Act, 33 U.S.C §
1251, et seq. and USACE has jurisdiction over navigable waters of the United
States pursuant to the Rivers and Harbors Act of 1899, 33 U.S.C. § 401, et
seq.Waters of the U.S. is defined in Section II.
G. [Remove if State or Regional Water Board is not a party] State Water Board
and ___Regional Water Board, within their respective areas of jurisdiction, are
responsible for protecting and regulating the quality of Waters of the State, as
defined in Section II, under the Porter-Cologne Water Quality Control Act, Cal.
Water Code § 13000 et seq., and regulating the discharge of pollutants into the
Waters of the U.S. under the Clean Water Act, 33 U.S.C. §1251 et seq.
H. [Remove if NMFS is not a party] NMFS has jurisdiction over the conservation,
protection, restoration and management of certain living marine resources and
the habitat necessary for biologically sustainable populations of these resources
within the United States pursuant to the Fish and Wildlife Coordination Act,16
U.S.C. §§ 661-666c, the Endangered Species Act,16 U.S.C. § 1531, et seq., the
Magnuson-Stevens Fishery Conservation and Management Act, as amended, 16
U.S.C. § 1801, et seq., and the Marine Mammal Protection Act of 1972, as
amended, 16 U.S.C. § 1361, et seq., and other provisions of Federal law.
I. The IRT is the interagency group which oversees the establishment, use,
operation, and maintenance of the Bank.
J. The goals and objectives for the Bank are set forth in the Development Plan
(Exhibit C) and the Bank Management and Operation Documents (Exhibit D)
attached to and made a part of this BEI.
K. Initially-capitalized terms used and not defined elsewhere in this BEI are defined
in Section II.
2
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
AGREEMENT
NOW, THEREFORE, the Parties agree as follows:
Section I:
Purpose and Authorities
A. Purpose
The purpose of this BEI is to set forth the agreement of the Parties regarding the
establishment, use, operation, and maintenance of the Bank. The purpose of the Bank
is to compensate for unavoidable impacts to, and conserve and protect, [delete as
applicable] Waters of the U.S., Waters of the State, Covered Species, and Covered
Habitat. The Bank Sponsor [if different from Bank Sponsor, add: and Property
Owner] shall preserve, restore, establish, and/or enhance and then manage and
maintain Waters of the U.S., Waters of the State, Covered Species, and Covered
Habitat in accordance with this BEI, the Development Plan, Interim Management Plan
and Long-term Management Plan.
B. Authorities
The establishment and use of the Bank for off-site compensatory mitigation or
conservation is subject to one or more of the following statutes, regulations, policies,
and guidelines:
1.
Federal [delete those that do not apply]
a.
Clean Water Act (33 U.S.C. § 1251, et seq.)
b.
Rivers and Harbors Act (33 U.S.C. § 403)
c.
National Environmental Policy Act (42 U.S.C. § 4321, et seq.)
d.
Endangered Species Act (16 U.S.C. § 1531, et seq.)
e.
Fish and Wildlife Coordination Act (16 U.S.C. § 661, et seq.)
f.
Magnuson-Stevens Fishery Conservation and Management Act (16
U.S.C. § 1801, et seq.)
g.
National Historic Preservation Act (54 U.S.C. § 306101, et seq.)
h.
Regulatory Program of the U.S. Army Corps of Engineers (33 C.F.R.
Parts 320-332)
i.
Guidelines for Specification of Disposal Sites for Dredged and Fill
3
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Material (40 C.F.R. Part 230)
2.
j.
Executive Order 11990 - Protection of Wetlands
k.
Executive Order 11988 - Floodplain Management
l.
Memorandum of Agreement between the U.S. Environmental
Protection Agency and the Department of the Army concerning the
Determination of Mitigation Under the Clean Water Act, § 404(b)(1)
Guidelines (February 6, 1990), as amended
m.
Endangered Species Act Compensatory Mitigation Policy (81 FR 95316,
December 27, 2016)
n.
Interim Guidance on Implementing the Endangered Species Act
Compensatory Mitigation Policy (USFWS Director's Memo, January 17,
2017)
o.
USACE San Francisco District Public Notice 02-03, dated March 5,
2003, titled "Mitigation Bank Policy on the Santa Rosa Plain"
State [delete those that do not apply]
a.
California Environmental Quality Act (CEQA) (Public Resources Code
§ 21000, et seq.) and State CEQA Guidelines (Tit. 14 Cal. Code Regs.,
Ch. 3)
b.
California Endangered Species Act (Fish and Game Code § 2050, et
seq.)
c.
California Natural Community Conservation Planning Act (Fish and
Game Code § 2800, et seq.)
d.
California State Office of Historical Preservation (Public Resources
Code § 5020, et seq.) Archaeological, Paleontological and Historical
Sites (Public Resources Code § 5097, et seq.) Native American
Historical, Cultural and Sacred Sites (Public Resources Code §
5097.9); and Historical Resources (Public Resources Code § 21084.1)
e.
Conservation of Wildlife Resources (Fish and Game Code § 1800, et
seq.)
f.
Lake and Streambed Alteration Program (Fish and Wildlife Protection
and Conservation, Fish and Game Code § 1600, et seq.)
g.
Official Policy on Conservation Banks, April 7, 1995, by California
Resources Agency and California Environmental Protection Agency,
jointly
h.
Porter-Cologne Water Quality Control Act (Water Code § 13000, et
4
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
seq.)
Section II:
i.
Conservation Bank and Mitigation Bank Applications and Fees (Fish
and Game Code § 1797, et seq.)
j.
California Government Code, Title 7, Division 1, Chapter 4.6, §§
65965-65968
k.
California Fish and Game Code, Division 2, Chapter 1, Article 1, § 713
l.
California Probate Code, Division 9, Part 7, §§ 18501-18510
Definitions
The initially-capitalized terms used and not defined elsewhere in this BEI are defined,
for the purposes of this BEI, as set forth below.
"Adaptive Management" means an approach to natural resource management which
incorporates changes to management practices, including corrective actions as
determined to be appropriate by the IRT in discussion with the Bank Sponsor and/or the
Property Owner, as appropriate, based upon Bank annual report results and IRT review
of overall Bank performance and compliance.
"Bank Establishment Date" is the date determined pursuant to Section V, when the
Bank is considered established and Transfer of Credits may begin.
"Conservation Easement" [Remove if Grant Deed] means a perpetual conservation
easement, as defined by California Civil Code § 815.1, in the form of Exhibit E-4
attached to and made a part of this BEI.
"Construction Phase," means a phase of the Bank in which all components required by
33 C.F.R. § 332.4(c) are fully developed, beyond concept, and included within the
exhibits of the BEI, but is implemented in stages over time. Implementation of a
Construction Phase does not require an amendment of the BEI.
"Construction Security" means the financial assurance specified in Section VI.A and
Exhibit C-2, to be provided by the Bank Sponsor to guarantee the completion of
construction and planting to establish, restore or enhance Waters of the U.S., Waters of
the State, and Covered Habitat on the Bank Property in accordance with the
Development Plan.
"Covered Habitat" means habitat of concern or habitat upon which the Covered Species
depend for their continued viability that the IRT determines will be adequately
conserved as a result of implementation of this BEI. Covered Habitat Credits are
identified in Exhibit F-1 attached to and made a part of this BEI.
"Covered Species" means the species for which the Bank has been established and for
which Credits have been allocated as set forth in Exhibit F-1.
5
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
"Credits" are units of measure representing the accrual, attainment, or protection of
aquatic functions and/or the Covered Species or Covered Habitat on the Bank Property.
One Credit is equivalent to one acre, or as otherwise defined in Exhibit F-1.
"Credit Release" means an action by the agency that has jurisdiction over specified
Credits available for Transfer pursuant to this BEI, as set forth in Section VII.
"Development Plan" means the document attached as Exhibit C-1 that is the overall
plan governing construction and habitat establishment, restoration and enhancement
activities required to be conducted on the Bank Property to establish Credits.
"Endowment Agreement" means the document attached as Exhibit D-3 (which may
serve as a mitigation agreement pursuant to California Government Code §
65965(f)(1)), which establishes the terms and conditions pursuant to which the
Endowment Holder will accept custody of and manage the Endowment Fund.
"Endowment Amount" is the amount Section VI.E requires the Bank Sponsor to provide
as Endowment Deposits to the Endowment Holder to fund the Endowment Fund. The
Endowment Amount is determined in Exhibit D-2.
"Endowment Deposit" is the deposit or series of deposits made or required to be made
by the Bank Sponsor to the Endowment Holder to fund the Endowment Fund.
Endowment Deposits received by the Endowment Holder shall be deposited into the
Endowment Fund.
"Endowment Fund" is a financial account, held in trust for the benefit of the long-term
stewardship of the Bank Property. The Endowment Fund is intended to be maintained
and managed in perpetuity in accordance with Government Code §§ 65965-69568,
Probate Code §§18501-18510, the BEI, and the Endowment Agreement. The
Endowment Fund is intended to be invested in accordance with an investment policy
statement that is designed to generate earnings and appreciation in value over the longterm. The Endowment Fund is to be used in funding perpetual management,
maintenance, monitoring, and reporting pursuant to the Long-term Management Plan.
The term "Endowment Fund" as used in this BEI shall include the Endowment Deposits
and all interest, dividends, gains, other earnings, additions and appreciation thereon, as
well as any additions thereto.
"Endowment Holder" means an entity qualified to hold the Endowment Fund pursuant to
Government Code §§ 65965-65968 and is otherwise approved by the IRT.
"Extraordinary Circumstances" shall mean an event or circumstance that has a material
and detrimental impact on the Bank Property or on the ability of Bank Sponsor to attain
Performance Standards and: (1) was neither foreseen nor foreseeable by the Bank
Sponsor, Property Owner, or IRT agencies; and (2) neither Bank Sponsor nor Property
Owner (or anyone acting on behalf or under the control of either of them) caused or
could have prevented; and (3) prevents Bank Sponsor or Property Owner from
achieving an objective or undertaking an action required of it under this BEI.
Extraordinary Circumstances excludes mere economic hardship.
6
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
"Grant Deed" [Remove if Conservation Easement] means a deed conveying fee title
to the Bank Property in the form of Exhibit E-4.
"Grantee" means the entity authorized to hold the Conservation Easement pursuant to
California Civil Code §815.3 and Government Code §§65966 and 65967 and is
otherwise approved by the IRT.
"Habitat Establishment" means the manipulation of the physical, chemical, or biological
characteristics present on the Bank Property to develop an aquatic or terrestrial habitat
resource for Covered Species. Habitat Establishment will result in a gain in resource
area and/or function.
"Habitat Conservation Plan (HCP)" means an HCP prepared pursuant to § 10(a)(2)(A)
of the ESA (16 U.S.C. § 1539(a)(2)(A)).
"Implementation Fee" is the fee that Fish and Game Code § 1799(e)(2) requires CDFW
to collect to pay for all or a portion of banking program costs as specified in Exhibit F-6.
"Interim Management Period" means the period from the Bank Establishment Date until
Performance Standards have been met and the third anniversary of the full funding of
the Endowment Amount has occurred.
"Interim Management Plan" means the document attached as Exhibit D-4 that
describes the management, monitoring, Adaptive Management, reporting and other
activities to be implemented by the Bank Sponsor during the Interim Management
Period.
"Interim Management Security" is the financial assurance specified in Section VI.C and
Exhibit D-1, to be provided by the Bank Sponsor to guarantee the implementation of
the Interim Management Plan, and to guarantee all Remedial Action(s) required under
Section VIII.F or Section XII.A are completed during the Interim Management Period.
"Long-term Management Period" means the period beginning upon conclusion of the
Interim Management Period and continuing in perpetuity, during which the Bank
Property is to be managed, monitored, and maintained pursuant to the Long-term
Management Plan.
"Long-term Management Plan" means the document attached as Exhibit D-5 that
provides measures intended to ensure the Bank Property is managed, monitored, and
maintained in perpetuity to conserve and protect its Waters of the U.S., Waters of the
State, Covered Species, and Covered Habitat.
"Natural Community Conservation Plan (NCCP)" means an NCCP created pursuant to
Fish and Game Code § 2800, et seq.
"Performance Security" means the financial assurance specified in Section VI.B and
Exhibit C-3, to be provided by the Bank Sponsor to guarantee the Bank Sponsor's
obligations under this BEI through Bank closure.
7
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
"Performance Standards" means the minimum standards set forth to define the
successful development of Waters of the U.S., Waters of the State, and Covered
Habitat and Covered Species Credits.
"Phase I Environmental Site Assessment" is an assessment of the environmental
condition of the Property performed in accordance with the American Society of Testing
and Materials (ASTM) Standard E1527-05 "Standard Practice for Environmental Site
Assessments: Phase I Environmental Site Assessment Process," or any successor to
such ASTM Standard which is active at the time of the assessment.
"Preservation" means the protection of existing ecologically important wildlife, habitat, or
other ecosystem resources in perpetuity. This term applies to Covered Species and
Covered Habitat.
"Property Assessment and Warranty" means the written property evaluation and
assurance signed by the Property Owner and attached as Exhibit E-2.
"Property Owner" means the owner(s) of fee simple title to the Bank Property and
grantor of the Conservation Easement.
"Remedial Action" means any measures needed to remedy any failure to achieve the
Performance Standards or any injury or adverse impact to the Bank Property.
"Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS)" is a webbased application that provides information to the IRT, Bank Sponsors, agencies, and
the general public on mitigation banks and in-lieu fee (ILF) programs, associated
documents, credit availability, service areas, and information on policies and procedures
that affect mitigation bank and ILF development and operation.
"Service Area" means the geographic area(s) within which impacts to Waters of the
U.S., Waters of the State, Covered Species, or Covered Habitat that occur may be
mitigated or compensated through Transfer of Credits from the Bank.
"Subordination Agreement" means a written, recorded agreement in which the holder of
an interest in, or lien or encumbrance on the Bank Property makes the lien or
encumbrance subject to and of lower priority than the Conservation Easement, even
though the lien or encumbrance was recorded before the Conservation Easement.
"Subsequent Phase" means a phase of a bank that is either planned conceptually or
added after the Bank Establishment Date and for which complete components required
by 33 C.F.R. § 332.4(c) are not included in the exhibits and approved as part of the BEI.
Subsequent Phases are added through an amendment of the BEI or developed as a
new bank, as determined by the IRT.
"Transfer" means the use, sale, or conveyance of Credits by the Bank Sponsor.
"Waters of the State" means any surface water or groundwater, including saline waters,
within the boundaries of the State of California.
8
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
"Waters of the U.S." means all waters and wetlands over which the USACE and/or the
USEPA are granted jurisdiction in the Clean Water Act, 33 U.S.C. § 1251, et seq., and
the Rivers and Harbor Act of 1899, 33 U.S.C. § 401, et seq. This definition
encompasses both the term "waters of the United States" as defined in 33 C.F.R. Part
328 and "navigable waters of the United States" as defined in 33 C.F.R. Part 329.
Section III:
Stipulations
A. Baseline Condition
The current condition of the Bank Property is described in the Development Plan
(Exhibit C-1) and the Biological Resources Survey (Exhibit H) attached to and made a
part of this BEI.
B. Disclaimer
This BEI does not in any manner limit the legal authorities or responsibilities of the IRT,
or of any IRT agency.
C. Exhibits
The following Exhibits are attached to and incorporated by this reference into this BEI:
1.
2.
3.
4.
"Exhibit A" - Bank Location Maps
A-1
General Vicinity Map
A-2
Map of Property including Bank Property
A-3
Map of Conserved Areas in Bank Property Vicinity [if applicable]
"Exhibit B" - Service Area Map(s) and Description(s)
B-1
Map(s) of the Bank's Service Area(s)
B-2
Narrative description(s) of the Bank's Service Area(s)
"Exhibit C" - Development Plan
C-1
Development Plan
C-2
Construction Security Analysis and Schedule
C-3
Performance Security Analysis and Schedule
"Exhibit D" - Bank Management and Operation Documents
D-1
Interim Management Security Analysis and Schedule
D-2
Endowment Fund Analysis and Schedule
D-3
Agreements, Instructions, and Forms for Submission or
Disbursement of Endowment Funds
9
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
5.
6.
D-4
Interim Management Plan
D-5
Long-term Management Plan
D-6
Bank Closure Plan
"Exhibit E" - Real Estate Records and Assurances
E-1
Preliminary Title Report, Legal Description, and Parcel Map(s)
E-2
Property Assessment and Warranty
E-3
Plat Map(s)
E-4
Real Estate Instrument
E-5
Title Insurance [attach once received]
"Exhibit F" - Bank Credits and Credit Transfers
F-1
Credit Evaluation and Credit Table
F-2
Credit Purchase Agreement and Payment Receipt Templates
F-3
Credit Transfer Ledger Template
F-4
Instructions for Species Credits Transfers Using RIBITS [if
applicable]
F-5
Credit Release Schedule and Funding Schedule for Covered
Species and Covered Habitats
F-6
Implementation Fee Schedule [if applicable]
7.
"Exhibit G" - Phase I Environmental Site Assessment
8.
"Exhibit H" - Biological Resources Survey
9.
"Exhibit I" - Jurisdictional Determination and Delineation of Waters of the U.S.
and/or Waters of the State [if applicable]
10.
11.
"Exhibit J" - Cultural, Historical, Archaeological, and Native American
Resources ("Cultural Resources").
J-1
Identification, Inventory, and Evaluation
J-2
Compliance Documentation [if applicable]
J-3
Historic Properties Treatment Plan (HPTP) [if applicable]
"Exhibit K" - Other Documentation, Permits, Amendments, or Revisions
Section IV:
Bank Evaluation and Development
10
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
A. Bank Site Assessment by the IRT
Representatives of the IRT have inspected the Bank Property and evaluated the Bank
Sponsor's proposed development of Waters of the U.S., Waters of the State, Covered
Species, and Covered Habitat in the Development Plan (Exhibit C-1) and have agreed
upon the assignment of Credits set forth in Exhibit F-1.
B. Bank Sponsor's Responsibilities for Bank Development
The Bank Sponsor agrees to perform all necessary work, in accordance with the
provisions of this BEI, to establish, enhance, restore, monitor, and maintain the Waters
of the U.S., Waters of the State, Covered Species and Covered Habitat, as described in
the Development Plan (Exhibit C-1), on the Bank Property until the Bank Sponsor has
demonstrated to the satisfaction of the IRT that the Bank complies in all respects with all
requirements of this BEI.
C. Phase I Environmental Site Assessment
[Choose one: Bank Sponsor or Property Owner] has provided a current Phase I
Environmental Site Assessment of the Property (Exhibit G). If the Phase I
Environmental Site Assessment identifies any recognized environmental conditions, as
defined in the American Society of Testing and Materials (ASTM) Standard E1527-05
"Standard Practice for Environmental Site Assessments: Phase I Environmental Site
Assessment Process," or any successor to such ASTM Standard, in place at the time of
execution of instrument, the Property Owner represents and warrants to the IRT that all
appropriate assessment, clean-up, remedial or removal action has been completed and
the Property Owner has provided an updated Phase I Environmental Site Assessment
to the IRT that concludes no recognized environmental conditions are present on the
Property.
D. Approvals
The Bank Sponsor will obtain all permits, authorizations and other approvals necessary
or appropriate to construct, operate, and maintain the Bank, including those of any IRT
agency. This BEI does not constitute or substitute for any such approval.
E. Phases
1.
Subsequent Phases. Establishment of each Subsequent Phase is subject to
approval by the IRT. The Bank Sponsor may propose a Subsequent Phase
by submitting a written request to the IRT. Subsequent Phases will need to
comply with requirements in effect on the date of submission of the complete
documentation for the proposed Subsequent Phase. Any Subsequent Phase
will be considered as either an amendment of the BEI or a new bank, as
determined by the IRT agencies. Approval of this BEI does not obligate any
IRT agency to approve any Subsequent Phase
2.
[Remove paragraph if not applicable:] Construction Phases. The Bank
11
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Sponsor will establish the Bank in [Insert number of phases] Construction
Phases. Each Construction Phase is presented in full in this BEI and within
its Exhibits. [If each phase is independent: Each Construction Phase is
independent and can be constructed alone or in conjunction with other
phases and can be constructed in any sequence][If one or more phases is
dependent on another: The Construction Phases must be constructed in the
sequence specified in the Development Plan (Exhibit C-1)]. Implementation
of the Development Plan must be initiated no later than the first full growing
season after the date of the first Credit Transfer associated with that
Construction Phase. All Construction Phases must be completed within 10
years of the date of this BEI.
[Remove paragraphs if not applicable:] The Bank Sponsor shall notify the
IRT 30 calendar days before beginning and within 30 calendar days after
completing any Construction Phase.
If any Construction Phase has not begun after 10 years, from when it was first
approved by the IRT (either in this BEI or in a written amendment to it), the
Bank Sponsor must, prior to proceeding with any such Construction Phase,
demonstrate that site conditions affecting the feasibility of constructing the
Bank as designed have not changed and obtain written concurrence from of
the IRT. The IRT may require additional review of any such Construction
Phase, or that it is evaluated as a Subsequent Phase.
F. Modification of the Development Plan
In the event that the Bank Sponsor and/or the IRT determine that modifications must be
made to the Development Plan (Exhibit C-1), the Parties shall meet to discuss the
modifications, and the Bank Sponsor shall submit a written request for approval of such
modifications to each member of the IRT within 60 calendar days of the meeting. Upon
agreement of the Parties, the Bank Sponsor shall then implement all approved
modifications. Modification of the Development Plan may constitute an amendment. If
the IRT elects to authorize modifications to the Development Plan, such authorization
may be conditioned upon, among other things, a change in the number of Credits
available for release. The Bank Sponsor shall revise the Credit Table in Exhibit F-1 as
directed by IRT to reflect any change in the available Credits. The schedule for funding
the Endowment Amount shall be amended to reflect the revised Credit Table (Exhibit
F-1).
G. Property Assessment and Warranty
The Property Owner is responsible to ensure the Property Assessment and Warranty
(Exhibit E-2) is true, complete, and correct as of the date of this BEI. Should the
Property Owner become aware of any errors or omissions in the Property Assessment
and Warranty after the date of this BEI, the Property Owner shall notify the IRT
agencies in writing within 30 days of discovery. The IRT shall evaluate any impacts of
the errors or omissions on the Bank, Bank Property and the Grantee's interest in the
12
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Conservation Easement or the Bank Property and the IRT may find default pursuant to
Section XII.E in such circumstances.
Section V:
Bank Establishment Date
The Bank Establishment Date will occur and Transfer of Credits may begin only when
the IRT has received documentation confirming that all of the following actions have
occurred:
1.
The BEI has been fully executed by all of the Parties;
2.
The Conservation Easement has been (i) accepted by a Grantee that has
been approved by the IRT and (ii) recorded in the Official Records of the
county in which the Bank Property is located; [Or, if fee title to the State,
substitute: The Grant Deed to the State of California has been (i) accepted
on behalf of the State by CDFW (as evidenced by a duly executed Certificate
of Acceptance) and (ii) recorded in the Official Records of the county in which
the Bank Property is located];
3.
The Bank Sponsor has complied with its obligation to furnish financial
assurances in accordance with Section VI; and
4.
Any applicable Subordination Agreement(s) is executed and recorded.
Section VI:
Financial Assurances
The Bank Sponsor is responsible for providing financial assurances for the performance
and completion of Bank construction, management, monitoring, and Remedial Action in
accordance with this BEI, as set forth in this Section. The financial assurances shall be
held in accordance with Section VIII.E, held by [choose one: CDFW or USACE or
when approved by the IRT, a qualified third-party (Choosing a qualified third-party
triggers the need for conforming changes to other parts of the BEI, in particular
VIII.E, Financial Operations.)]. The Bank Sponsor shall provide written confirmation
from the agency or Endowment Holder, as applicable, that the requirement to provide
financial assurances was completed to each member of the IRT in accordance with
Section XII.K upon furnishing each of the following financial assurances:
A. Construction Security
Prior to the first Credit Release, the Bank Sponsor shall furnish a Construction Security
in the amount of a reasonable third-party estimate or contract to establish, restore, or
enhance Waters of the U.S., Waters of the State, and Covered Habitat in accordance
with the Development Plan in the amount specified in Exhibit C-2. The Construction
Security shall be in the form of [Choose one: an irrevocable standby letter of credit,
check, or a cashier's check (check or cashier's check may only be used if CDFW is
holding the security)]. The Bank Sponsor shall ensure the Construction Security shall
remain available in the full amount, until cancelled, in accordance with Section
VIII.E.1.a. If all construction and planting activities are completed in accordance with
13
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
the Development Plan prior to the Bank Establishment Date then a construction security
is not required.
B. Performance Security
Concurrent with the Transfer of the first Credit, Bank Sponsor shall furnish the
Performance Security in the amount of 20% of the Construction Security in the amount
specified in Exhibit C-3. The Performance Security shall be in the form of [Choose
one: an irrevocable standby letter of credit, check or a cashier's check (check or
cashier's check may only be used if CDFW is holding the security)]. The Bank Sponsor
shall ensure the Performance Security shall remain available in the full amount, until
cancelled, in accordance with Section VIII.E.1.b.
C. Interim Management Security
Concurrent with the Transfer of the first Credit, Bank Sponsor shall furnish the Interim
Management Security in the amount specified in Exhibit D-1. The amount of the
Interim Management Security shall be equal to the estimated cost to implement the
Interim Management Plan during three years of the Interim Management Period, as set
forth in the Interim Management Security Analysis and Schedule (Exhibit D-1). The
Interim Management Security shall be in the form of [Choose one: an irrevocable
standby letter of credit, check or a cashier's check (check or cashier's check may only
be used if CDFW is holding the security)]. The Bank Sponsor shall ensure the Interim
Management Security shall remain available in the full amount, until cancelled, in
accordance with Section VIII.E.1.c.
D. Letters of Credit
Letters of credit, when selected, shall be submitted to and approved by the IRT before
they satisfy any financial assurance requirement. The [CDFW or USACE] shall be the
beneficiary of the letter of credit. Any letter of credit shall be issued for a period of at
least one year, and shall provide that the expiration date will be automatically extended
for at least one year on each successive expiration date unless, at least 120 calendar
days before the current expiration date Bank Sponsor and the [CDFW or USACE] have
received notice from the issuing institution of its decision not to extend the expiration
date, as evidenced by the return receipts. The letter of credit shall remain available for
120 calendar days after the date Bank Sponsor and the [CDFW or USACE] have
received such notice. If the issuer elects to not extend the expiration date of any letter
of credit, Bank Sponsor shall provide the [CDFW or USACE] with replacement security
in the form of [choose one: a letter of credit, check or cashier's check (check or
cashier's check may only be used if CDFW is holding the security)], as determined by
the [CDFW or USACE] within 60 calendar days after receiving notice of the issuer's
decision not to extend the expiration date. If Bank Sponsor does not provide such
replacement security on or before the expiration of the 60-day period, then the [CDFW
or USACE] shall have the right to immediately draw upon the letter of credit for which
the replacement security was required.
E. Endowment Fund
14
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
1.
a.
The Endowment Fund shall be held by the Endowment Holder, in an amount
sufficient to fully provide for the financial requirements of the long-term
management of the Bank in accordance with the Long-term Management
Plan (Exhibit D-5) and the Endowment Fund Analysis and Schedule (Exhibit
D-2). The Bank Sponsor shall fully fund the Endowment Amount through
Endowment Deposits according to the schedule below. The Endowment
Amount shall be 100% funded by the 10th anniversary of the first Credit
Release.
Funding schedule for Waters of the U.S. and Waters of the State Credit
Releases will be as follows:
i.
No Endowment Funding is required prior to 1) the first Waters of
the U.S. Credit Release; or 2) the first Waters of the State Credit
Release;
ii.
A minimum of 30% of the Endowment Amount shall be funded,
through Endowment Deposit(s), prior to the earliest of: 1) the
second Waters of the U.S. Credit Release; or 2) the second
Waters of the State Credit Release;
iii. A minimum of 55% of the Endowment Amount shall be funded,
through Endowment Deposit(s), prior to the earliest of: 1) the third
Waters of the U.S. Credit Release; or 2) the third Waters of the
State Credit Release;
iv. A minimum of 70% of the Endowment Amount shall be funded,
through Endowment Deposit(s), prior to the earliest of: 1) the
fourth Waters of the U.S. Credit Release; or 2) ) the fourth Waters
of the State Credit Release;
v.
b.
Funding schedule for Covered Species and Covered Habitat Preservation
Credit Releases will be as follows:
i.
c.
100% of the Endowment Amount shall be funded, through
Endowment Deposit(s), prior to the earliest of: 1) the fifth Waters of
the U.S. Credit Release; or 2) the fifth Waters of the State Credit
Release.
The percentage of the Endowment Amount funded through
Endowment Deposits shall be equal to or greater than the
percentage of Covered Species and Covered Habitat Preservation
Credits Released (See Section VII.C).
Funding schedule for Covered Species and Covered Habitat Establishment
Credit Releases (See Section VII.C.3) will be as follows:
i.
No Endowment Funding is required prior to the first Covered
Species and Covered Habitat Establishment Credit Release;
ii.
Prior to the third credit release of Covered Species and Covered
15
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Habitat Credits, the percentage of the Endowment Amount funded
through Endowment Deposits shall be equal to or greater than the
percentage of Covered Species and Covered Habitat Credits
Released.
iii. 100% of the Endowment Amount shall be funded through
Endowment Deposits prior to the release of 85% (cumulative) of
Covered Species and Covered Habitat Credits.
2.
Each year the Endowment Amount is not 100% funded, the Endowment
Amount in Exhibit D-2 shall be increased (but not decreased) to account for
inflation. The Bank Sponsor must make this adjustment on or before April 1
of each year ("Adjustment Year"), based upon the change in the Consumer
Price Index (CPI) for California. All Urban Consumers, All Items ("Index"),
published by the California Department of Industrial Relations ("DIR"),
Division of Labor Statistics and Research
(http://www.dir.ca.gov/OPRL/CAPriceIndex.htm). The Bank Sponsor shall
determine the change in the Index by comparing the Index published in March
of the Adjustment Year to the Index published in March of the year in which
this BEI is fully executed. The DIR website also provides an adjustment
calculator that may be used for this purpose. The Endowment Amount in
Exhibit D-2 shall be increased by the percent change in the CPI and the
product shall be the Endowment Amount for the Adjustment Year. If the
percentage change in the CPI is less than or equal to zero for any Adjustment
Year, then no adjustment will be made for that year.
3.
Bank Sponsor shall provide each member of the IRT a paper copy of the
receipt for each Endowment Deposit and upload to RIBITS within 30 calendar
days of such deposit.
Section VII: Credit Release
A. Waters of the U.S. Credit Release
1.
Upon receipt of Bank Sponsor's written request and accompanying
documentation of compliance with all applicable requirements set forth in this
Section, the USACE may release for Transfer Waters of the U.S. Credits
(Exhibit F-1), as described below. Monitoring for Performance Standards for
Credit Releases is for a minimum of five years. Early achievement of
Performance Standards will not accelerate Credit Releases. The actual
number of Credits Released shall be determined in writing by the USACE, in
consultation with the other members of the IRT, based upon as-built
conditions of the Bank Property, extent of Waters of the U.S. delineated on
the Bank Property, attainment of the Performance Standards, funding of the
Endowment Fund in accordance with Section VI.E, and compliance with
requirements of this BEI and any associated authorization. Upon each Credit
Release, USACE shall enter the number of Credits Released into RIBITS.
16
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
The applicable Credit Release shall occur prior to any Credit Transfer.
Credits may be released as follows:
a.
Credit Release 1.
i.
15% of the total anticipated Waters of the U.S Credits upon the
Bank Establishment Date.
No Endowment Funding is required prior to the first Waters of the
U.S. Credit Release.
b.
Credit Release 2. Up to an additional 25% of the total anticipated
Waters of the U.S. Credits (40% cumulative total) when all of the
following have occurred:
i.
The Bank Sponsor has submitted as-built drawings to the IRT
pursuant to Section VII.A.2.
ii.
The USACE has approved the as-built condition in writing.
iii. The Bank Sponsor has funded a minimum of 30% of the
Endowment Amount per Section VI.E.1.a.ii.
iv. Credit Release 1 has occurred.
c.
Credit Release 3. Up to an additional15% of the total anticipated
Waters of the U.S Credits (55% cumulative total) when all of the
following have occurred:
i.
The Bank Sponsor has submitted the annual report (Section IX.B).
ii.
Year 2 Performance Standards have been attained, as required by
the Development Plan.
iii. The Bank Sponsor has funded a minimum of 55% of the
Endowment Amount per Section VI.E.1.a.iii.
iv. Credit Release 2 has occurred.
v.
d.
A minimum of two years of monitoring have been conducted since
all requirements for Credit Release 2 have been met.
Credit Release 4. Up to an additional 15% of the total anticipated
Waters of the U.S Credits (70% cumulative total) when all of the
following have occurred:
i.
The Bank Sponsor has submitted the annual report (Section IX.B).
ii.
Year 3 Performance Standards have been attained.
iii. The Bank Sponsor has funded a minimum of 70% of the
17
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Endowment Amount per Section VI.E.1.a.iv.
iv. Credit Release 3 has occurred.
v.
e.
A minimum of one year of monitoring has been conducted since all
requirements for Credit Release 3 have been met.
Credit Release 5. Up to an additional 15% of the total anticipated
Waters of the U.S Credits (85% cumulative total) when all of the
following have occurred:
i.
The Bank Sponsor has submitted the annual report (Section IX.B).
ii.
Year 4 Performance Standards have been attained.
iii. The Sponsor has submitted a delineation of aquatic resources on
the Bank Property.
iv. The Bank Sponsor has funded 100% of the Endowment Amount
per Section VI.E.1.a.v.
v.
Credit Release 4 has occurred.
vi. A minimum of one year of monitoring has been conducted since all
requirements for Credit Release 4 have been met.
f.
Final Credit Release. Any remaining balance of Waters of the U.S
Credits (100% cumulative total) when all of the following have
occurred:
i.
The Bank Sponsor has submitted the annual report (Section IX.B),
including the final Monitoring Report as required by the
Development Plan.
ii.
Final Performance Standards have been attained.
iii. Any required Remedial Actions are completed.
iv. Any additional Performance Standards required as a result of
required Remedial Actions have been attained.
v.
Credit Release 5 has occurred.
vi. A minimum of one year of monitoring has been conducted since all
requirements for Credit Release 5 have been met.
2.
The Bank Sponsor shall submit as-built drawings of the Bank Property, with
accurate maps of the established, enhanced, and/or restored Waters of the
U.S. to the IRT no later than 90 calendar days following completion of
construction associated with the establishment, restoration, and/or
enhancement of the Waters of the U.S. on the Bank Property. The as-built
18
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
drawings shall consist of full size construction plans, with as-built conditions
clearly shown. The as-built drawings and any attachments must describe in
detail any deviation from the Development Plan.
3.
Each Waters of the U.S. Credit Release, with the exception of the first and the
second, is also contingent upon the Bank Sponsor's submission of the annual
report for the current reporting period in accordance with Section IX.B, and an
IRT site inspection at the appropriate time of year, as determined by the IRT.
B. Waters of the State Credit Release[If applicable]
The State Water Board or Regional Water Board may provide Credit
Releases for Waters of the State pursuant to the procedures set forth in
Section VII.A. For purposes of this Section, any reference in Section VII.A to
"Waters of the U.S." and "USACE" shall constitute a reference to "Waters of
the State" and "State Water Board or Regional Water Board," respectively.
C. Covered Species and Covered Habitat Credit Release
1.
Upon receipt of Bank Sponsor's written request and accompanying
documentation of compliance with all applicable requirements set forth in this
Section, the [Choose one: CDFW, NMFS or USFWS] may release for
Transfer Covered Species and Covered Habitat Credits (Exhibit F-1), as
described below. Generally, monitoring for Performance Standards for Credit
Releases is for a minimum of five years. Early achievement of Performance
Standards will not accelerate Credit Releases. The actual number of Credits
Released shall be determined in writing by the appropriate IRT agencies with
jurisdiction over the Credits, in consultation with the other members of the
IRT, based upon existing and as-built conditions of the Bank Property, extent
of appropriate habitat preserved or established, attainment of the
Performance Standards, funding of the Endowment Fund in accordance with
Section VI.E, and compliance with requirements of this BEI and any
associated authorization. Upon each Credit Release, the appropriate IRT
agency shall enter the number of Credits released into RIBITS. The
applicable Credit Release shall occur prior to any Credit Transfer.
2.
Preservation Credits for Covered Species and Covered Habitat are described
in the Credit Table (Exhibit F-1) and may be released as described below. If
the maximum percentage of released credits is not authorized at the time of
each numbered Credit Release below, subsequent Credit Releases may be
authorized.
a. Preservation Credit Release 1. 15% of the total anticipated
Preservation Credits when all of the following have occurred:
i.
Upon Bank Establishment Date.
ii.
A minimum of 15% of the Endowment Amount is funded according
19
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
to Section VI.E and Exhibit F-5.
iii. The Bank Sponsor demonstrates, to the satisfaction of the IRT
agency in whose jurisdiction the Credit resides, that any
associated Performance Standards have been met, and that the
habitat values have been maintained, as required by the BEI and
its exhibits.
b. Preservation Credit Release 2. Up to an additional 15% (30%
cumulative total) of the total anticipated Preservation Credits when all
of the following have occurred:
i.
The Bank Sponsor has funded a minimum of 30% of the
Endowment Amount per Section VI.E and Exhibit F-5.
ii.
The Bank Sponsor demonstrates, to the satisfaction of the IRT
agency in whose jurisdiction the Credit resides, that any
associated Performance Standards have been met, and that the
habitat values have been maintained, as required by the BEI and
its exhibits.
iii. Credit Release 1 has occurred.
c. Preservation Credit Release 3. Up to an additional 25% (55%
cumulative total) of the total anticipated Preservation Credits when all
of the following have occurred:
i.
The Bank Sponsor has funded a minimum of 55% of the
Endowment Amount per Section VI.E and Exhibit F-5.
ii.
The Bank Sponsor demonstrates, to the satisfaction of the IRT
agency in whose jurisdiction the Credit resides, that any
associated Performance Standards have been met, and that the
habitat values have been maintained, as required by the BEI and
its exhibits.
iii. Credit Release 2 has occurred.
d. Preservation Credit Release 4. Up to an additional 15% (70%
cumulative total) of the total anticipated Preservation Credits when all
of the following have occurred:
i.
The Bank Sponsor has funded a minimum of 70% of the
Endowment Amount per Section VI.E and Exhibit F-5.
ii.
The Bank Sponsor demonstrates, to the satisfaction of the IRT
agency in whose jurisdiction the Credit resides, that any
associated Performance Standards have been met, and that the
habitat values have been maintained, as required by the BEI and
20
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
its exhibits.
iii. Credit Release 3 has occurred.
e. Final Preservation Credit Release: Any remaining balance of
Preservation Credits when all of the following have occurred:
iv. The Bank Sponsor has funded 100% of the Endowment Amount
per Section VI.E and Exhibit F-5.
v.
The Bank Sponsor demonstrates, to the satisfaction of the IRT
agency in whose jurisdiction the Credit resides, that any
associated Performance Standards have been met, and that the
habitat values have been maintained, as required by the BEI and
its exhibits.
vi. Credit Release 4 has occurred.
3.
Establishment Credits for Covered Species and Covered Habitat described in
the Credit Table (Exhibit F-1) for each Covered Species and/or Covered
Habitat may be released as follows. If the maximum percentage of released
Credits is not authorized at the time of each numbered Credit Release below,
subsequent Credit Releases may be authorized.
a. Establishment Credit Release 1. 15% of the total anticipated
Establishment Credits when all of the following have occurred:
i.
Upon Bank Establishment Date.
ii.
No Endowment Funding is required prior to the first Covered
Species and Covered Habitat Credit Release.
iii.
The Bank Sponsor demonstrates, to the satisfaction of the IRT
in whose jurisdiction the Credit resides, that any associated
Performance Standards (Exhibit C-1) have been met (or in
special circumstances identified by the IRT during BEI
development, will be met), and that the habitat values identified
in Exhibit C-1 have been maintained.
b. Establishment Credit Release 2. Up to an additional 25% of the total
anticipated Establishment Credits (up to 40% cumulative total) when all
the following have occurred.
i.
The Bank Sponsor has submitted as-built drawings to the IRT
pursuant to Section VII.C.1.
ii.
The IRT has approved the as-built condition, in writing.
iii.
The Bank Sponsor has funded a minimum of 30% of the
Endowment Amount per Section VI.E and Exhibit F-5.
21
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
iv.
Credit Release 1 has occurred.
c. Establishment Credit Release 3. Up to an additional 15% of the total
anticipated Establishment Credits (up to 55% cumulative total) when all
the following have occurred:
i.
The Bank Sponsor has submitted complete and accurate
Annual Reports as required by the BEI and its exhibits.
ii.
Year 2 Performance Standards have been attained, as required
by the Development Plan.
iii.
The Bank Sponsor has funded a minimum of 55% of the
Endowment Amount per Section VI.E and Exhibit F-5.
iv.
Credit Release 2 has occurred.
v.
A minimum of two years of monitoring have been conducted
since all requirements for Credit Release 2 have been met.
d. Establishment Credit Release 4. Up to an additional 15% of the total
anticipated Establishment Credits (up to 70% cumulative total) when all
the following have occurred:
i.
The Bank Sponsor has submitted all annual and monitoring
reports as required by the BEI and its exhibits, and the reports
are deemed satisfactory by the IRT.
ii.
Year 3 Performance Standards have been attained, as required
by the Development Plan.
iii.
The Bank Sponsor has funded a minimum of 70% of the
Endowment Amount per Section VI.E and Exhibit F-5.
iv.
Credit Release 3 has occurred.
v.
A minimum of one year of monitoring has been conducted since
all requirements for Credit Release 3 have been met.
e. Establishment Credit Release 5. Up to an additional 15% of the total
anticipated Establishment Credits (up to 85% cumulative total) when all
the following have occurred:
i.
The Bank Sponsor has submitted all Annual and Monitoring
Reports as required by the BEI and its exhibits, and the reports
are deemed satisfactory by the IRT.
ii.
Year 4 Performance Standards have been attained, as required
by the Development Plan.
iii.
The Bank Sponsor has funded 100% of the Endowment Amount
per Section VI.E and Exhibit F-5.
22
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
iv.
Credit Release 4 has occurred.
v.
A minimum of one year of monitoring has been conducted since
all requirements for Credit Release 4 have been met.
f. Final Establishment Credit Release. Any remaining balance of the
Establishment Credits when all the following have occurred:
i.
The Bank Sponsor has submitted all Annual and Monitoring
Reports as required by the BEI and its Exhibits.
ii.
Final Performance Standards have been attained.
iii.
Any required Remedial Actions are complete.
iv.
Any additional Performance Standards required as a result of
required Remedial Actions have been attained.
v.
Credit Release 5 has occurred.
vi.
A minimum of one year of monitoring has been conducted since
all requirements for Credit Release 5 have been met.
4.
The Bank Sponsor shall submit as-built drawings of the Bank Property, with
accurate maps of the constructed habitats, to the IRT no later than 90
calendar days following completion of construction associated with the
constructed habitats on the Bank Property. The as-built drawings shall
consist of full size construction plans, with as-built conditions clearly shown.
The as-built drawings and any attachments must describe in detail any
deviation from the Development Plan (Exhibit C-1).
5.
Each Covered Species and Covered Habitat Credit Release, with the
exception of the first (and second for Establishment Credits), is also
contingent upon the Bank Sponsor's submission of the annual report for the
current reporting period in accordance with Section IX.B, and an IRT site visit
at the appropriate time of year, as determined by the IRT.
6.
Each CDFW Covered Species and Covered Habitat Credit Release is also
contingent upon the he Bank Sponsor payment to CDFW the
Implementation Fee, in the total amount of _______Dollars ($_______). This
sum may be payable in installments. Each installment shall be in an amount
that equals the ratio of the number of the CDFW (Covered Species and
Covered Habitat) Credits released to the total number of CDFW Credits in the
Bank. Each installment shall be due following each CDFW (Covered Species
and Covered Habitat) Credit Release and no later than the due date for
submission of the Bank's annual report covering the period in which the
associated Credit Release occurs (Exhibit F-6). The Implementation Fee
shall be paid in full by the Bank closure date.
The CDFW may require the Bank Sponsor to cease selling CDFW released
Credits and may stop CDFW Credit Releases until the amount due under this
23
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Section is paid in full. The CDFW shall assess, and the Bank Sponsor shall
pay to CDFW upon demand, a penalty of 10% of the amount of fees due
under this section if the Bank Sponsor fails to remit the amount payable when
due.
7.
Only federal and/or state Covered Species listed under Federal Endangered
Species Act ("ESA") and/or California Endangered Species Act ("CESA") at
the time of execution of this BEI, and associated Covered Habitat, can
provide compensatory mitigation under ESA and/or CESA. Subsequent
listing of any non-listed Covered Species and Covered Habitat would require
review of the Bank documents by the IRT agency(ies) with jurisdiction over
the newly listed Covered Species and/or Covered Habitat to ensure the
documents are consistent with the needs of the Covered Species and/or
Covered Habitat. An amendment, as described in Section XII.D.1,
(Amendment and Modification) may be required. Such amendment may
include, but is not limited to, additional management requirements or
modification of the Credit Evaluation and Credit Table (Exhibit F-1) and the
number and type of Credits. IRT agency(ies) with jurisdiction over the newly
listed Covered Species and Covered Habitat Credits may reject or suspend
its approval of any Transfer or Release of those Credits until required
changes have been completed.
Section VIII: Operation of the Bank
A. Service Area
The Service Area and its basis are described and shown in Exhibit B.
B. Transfer and Use of Credits
1.
The Transfer of Credits may begin only upon the Bank Establishment Date.
Bank Sponsor shall have the exclusive right to determine the price for any
and all Bank Credits it offers for sale.
2.
In no case shall the number of Credits of any particular type Transferred
exceed the total number of Credits of that type which have been released for
Transfer, as evidenced by written approval by the IRT agency(ies) under
whose jurisdiction the Credits reside.
3.
Use of Credits from the Bank to compensate for unavoidable impacts to
Waters of the U.S., Waters of the State, Covered Species, or Covered
Habitat, under any permit or biological opinion issued by an IRT agency, can
only occur after approval by the IRT agency or agencies executing such a
permit or issuing such an opinion. Approval is determined on a case-by-case
basis to ensure the use is appropriate to compensate for the impacts of the
specific project to which the Credits are proposed to be applied. Mitigation or
compensation requirements for individual project impacts may or may not be
compatible with the use of mitigation banks, generally, or any particular
24
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
mitigation bank, specifically.
4.
Bank Sponsor shall notify all members of the IRT upon any Credit Transfer in
accordance with Section IX.C of this BEI. Upon Transfer of Credits, the Bank
Sponsor shall enter the Credit Transfer into RIBITS. [Remove if USFWS is
not a party: Bank Sponsor shall enter pending Covered Species and
Covered Habitat Credit Transfers into RIBITS for approval by USFWS, per
Exhibit F-4.]
5.
If the Bank Property is damaged after the Bank Establishment Date and such
damage materially impairs any or all Waters of the U.S., Waters of the State,
or habitat related to Covered Species or Covered Habitat on such damaged
Bank Property, the Bank Sponsor and/or Property Owner shall implement the
provisions of Section VIII.F or Section XII.A. Failure to comply with either
Section shall constitute default, and the IRT will take action accordingly. Each
Credit Transfer shall be made pursuant to a written purchase agreement in
the form of Exhibit F-2. [Remove if USFWS is not a party: Prior to
Transfer, Bank Sponsor shall upload pending Covered Species and Covered
Habitat Credit purchase agreements into RIBITS for approval by USFWS, per
Exhibit F-4.]
6.
This BEI applies only to those Credits released by agencies that are signatory
to this BEI and set forth in Exhibit F-1.
C. Interim and Long-term Management and Monitoring
1.
Interim Management and Monitoring
Bank Sponsor shall be responsible for conducting management, monitoring,
and maintenance activities according to the Interim Management Plan
(Exhibit D-4) until the end of the Interim Management Period. The Bank
Sponsor shall upload all reports into RIBITS and furnish a hard copy to each
IRT member.
2.
Long-term Management and Monitoring
At the end of the Interim Management Period, Property Owner shall be
obligated to manage, monitor, and maintain the Bank Property in perpetuity
to preserve its habitat and conservation values in accordance with this BEI,
the Conservation Easement, and the Long-term Management Plan (Exhibit
D-5). Such activities shall be funded with funds disbursed from the
Endowment Fund according to Section VIII.E.2.b. Property Owner and the
IRT members shall meet and confer upon the request of any one of them, to
consider revisions to the Long-term Management Plan and Endowment
Analysis and Schedule (Exhibit D-2) which may be necessary or
appropriate to better conserve the habitat and conservation values of the
Bank Property. If either (1) the value of the Endowment Fund has
decreased to levels that may threaten its continued existence as a source of
25
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
perpetual funding for long-term management, whether due to unexpected
investment performance or otherwise; or (2) if long-term management
expenses exceed those estimated in the Endowment Fund Analysis and
Schedule (Exhibit D-2), the Property Owner shall consult with the IRT in
accordance with Section VIII.E.2.b.v. During the Long-term Management
Period, the Property Owner shall be responsible for submitting annual
reports to each member of the IRT, in accordance with Section IX.B of this
BEI. The Property Owner shall upload all reports into RIBITS and furnish a
hard copy to each IRT member.
D. Bank Closure Plan
1.
Upon Bank closure, no further Credit Transfers shall occur.
2.
The Bank closure shall be deemed to take place upon written approval of the
IRT following occurrence of all of the following:
a.
All Performance Standards have been met and all Remedial Action
required under Section VIII.F has been completed as evidenced by:
i.
Submission of all required annual reports in accordance with
Section IX.B.
ii.
The completion of all Remedial Action, if any, in accordance
with the applicable Remedial Action plan(s).
iii.
An on-site inspection by the IRT.
b.
And either (1) The last authorized Credit has been Transferred; or (2)
The Bank Sponsor requests Bank closure by written notice to the IRT
and IRT provides written approval of the closure.
c.
All financial responsibilities of the Bank Sponsor have been met,
including 100% funding of the Endowment Amount for no less than three
years and full funding of the Implementation Fee, if applicable.
E. Financial Operations
1.
Securities
In the event [Choose one, as applicable: CDFW or USACE], as the holder
of the Construction Security, Interim Management Security, and Performance
Security, terminates its participation in this BEI, the Bank Sponsor shall
provide replacement Construction Security, Interim Management Security,
and Performance Security in the amount specified in this BEI within 20
calendar days' after receiving written notice of termination from [Choose one,
as applicable: CDFW or USACE]. In the event the remaining members of
the IRT are unable to hold the Construction Security, Interim Management
Security, and Performance Security specified in Section VI, the remaining
parties agree to modify the BEI to name a third-party holder of each of these
26
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
securities.
a.
Construction Security
i.
The [Choose one, as applicable: CDFW or USACE], as the
holder of the security, after coordination with the IRT, shall be
entitled to draw upon the Construction Security for default,
including but not limited to,
(a) Any Transfer of Credits has been made; and either (1) after
the Bank Establishment Date, but no later than the first full
growing season after the date of the first Credit Transfer,
the IRT determines that the Bank Sponsor has not initiated
construction and planting in accordance with the
Development Plan, or (2) two years has elapsed since the
Bank Sponsor has initiated implementation of the
Development Plan, and construction and planting in
accordance with the Development Plan is not complete.
ii.
If any portion of the Construction Security is drawn upon pursuant
to this Section, then the Bank Sponsor shall replenish the
Construction Security to the amount specified in Exhibit C-2
within 90 calendar days after written notice from [Choose one, as
applicable: CDFW or USACE].
iii.
The Construction Security shall be cancelled or the monies
provided as Construction Security returned to the Bank Sponsor
by [Choose one, as applicable: CDFW or USACE], after
coordination with the IRT, only after the Bank Sponsor completes
the construction and planting activities in accordance with the
Development Plan, as demonstrated by:
(a) Bank Sponsor's submission of as-built drawings in
accordance with Section VII.A.2 and Section VII.C.3.b.
(b) A site inspection by the IRT and confirmation by the IRT of
satisfactory completion of construction and planting
activities in accordance with the Development Plan.
b.
Performance Security
i.
The [Choose one, as applicable: CDFW or USACE], as the
holder of the security, in coordination with the other members of
the IRT, shall be entitled to draw upon the Performance Security
for default.
ii.
If any portion of the Performance Security is drawn upon pursuant
to this Section, then the Bank Sponsor shall replenish the
Performance Security to the amount specified in Exhibit C-3
within 90 calendar days after written notice from [Choose one, as
27
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
applicable: CDFW or USACE].
iii.
c.
2.
The Performance Security shall be cancelled or the monies
provided as Performance Security returned to the Bank Sponsor
by [Choose one, as applicable: CDFW or USACE] upon Bank
closure or termination in accordance with Section XII.D.2.a or the
[Choose one, as applicable: CDFW or USACE] terminates its
participation in this BEI pursuant to Section XII.D.2.e.
Interim Management Security
i.
The [Choose one, as applicable: CDFW or USACE], as the
holder of the security, in coordination with the other members of
the IRT, shall be entitled to draw upon the Interim Management
Security for default, including but not limited to, failure to perform
all tasks as required under the Interim Management Plan or
Remedial Action plan during the Interim Management Period.
ii.
In the event that the Interim Management Security is drawn upon
pursuant to this section, the Bank Sponsor shall restore the
Interim Management Security to the amount specified in Exhibit
D-1 within 90 calendar days after written notice from [Choose
one, as applicable: CDFW or USACE].
iii.
The Interim Management Security shall be cancelled or the
monies provided as Interim Management Security returned to the
Bank Sponsor by [Choose one, as applicable: CDFW or
USACE] upon conclusion of the Interim Management Period or
[Choose on as, applicable: CDFW or USACE] terminates its
participation in this BEI pursuant to Section XII.D.2.e.
Endowment Fund
a.
Endowment Deposits
i.
b.
The Endowment Deposits that the Endowment Holder receives
are to be held in the Endowment Fund.
Endowment Fund Management
i.
The Endowment Fund should be governed by an investment
policy statement that is designed, over long periods of time, to
generate investment returns sufficient to keep pace with inflation
and pay the costs of long-term management, net of any financial
investment and administrative fees. After the Endowment
Amount is 100% funded, no additional Endowment Amount
monies will be required from the Bank Sponsor.
ii.
The Parties shall ensure that the Endowment Agreement
(Exhibit-D-3) includes a provision that disbursements will not be
28
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
made from the Endowment Fund any earlier than three years
after the Endowment Amount has been 100% funded.
3.
iii.
The Parties anticipate that disbursements from the Endowment
Fund will be made available by the Endowment Holder to the
Property Owner to fund annual long-term management of the
Bank Property as anticipated in the Long-term Management Plan
and estimate of costs in accordance with the Endowment
Agreement.
iv.
Notwithstanding Probate Code sections 18501-18510, in the
event either (1) the value of the Endowment Fund has decreased
to levels that may threaten its continued existence as a source of
perpetual funding for long-term management, whether due to
unexpected investment performance or otherwise; or (2) if longterm management expenses exceed those estimated in the
Endowment Fund Analysis and Schedule (Exhibit D-2), long-term
management expenses the Property Owner shall consult with the
IRT and the Grantee to identify the most effective means to
implement the management measures and tasks with the
resources available. Property Owner shall submit a proposed
temporary revised Long-term Management Plan and Endowment
Fund Analysis in writing to the IRT and Grantee within 60
calendar days after completion of Property Owner's consultation
with the IRT and Grantee. Upon written approval of the
temporary revised Long-term Management Plan by the IRT and
any required notification to the Endowment Holder, in accordance
with the Endowment Agreement, the Property Owner shall
implement the approved revised management measures and
tasks. The original Long-term Management Plan shall be
restored in full force and effect upon expiration of the temporary
revised Long-term Management Plan or sooner if the
circumstances in subsections (1) or (2) above, as the case may
be, cease to exist.
Financial Records and Auditing
a.
Bank Sponsor and Property Owner are required to maintain complete
and accurate financial records relating to the operation of the Bank for
which it is responsible, using generally accepted accounting principles
(GAAP), developed by the Federal Accounting Standards Advisory
Board. At the request of the IRT, no more frequently than annually, the
Bank Sponsor and Property Owner shall each have its financial records
relating to the operation of the Bank audited by an independent licensed
Certified Public Accountant and shall submit the auditor's report to the
IRT upon completion.
29
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
b.
The IRT or their designated representatives shall also have the right to
review and copy any records and supporting documentation pertaining to
the performance of this BEI. Bank Sponsor and Property Owner agree
to maintain such records for possible audit for a minimum of three years
after Bank closure, or three years after the date of performance,
whichever is later. Bank Sponsor and Property Owner agree to allow the
auditor(s) access to such records during normal business hours and to
allow interviews of any employee or representative who might
reasonably have information related to such records. Further, Bank
Sponsor and Property Owner agree to include a similar right of State and
federal auditors to audit records and interview employees and
representatives in any contract related to the performance of this BEI.
F. Remedial Action Plan
1.
Prior to Bank closure, if any Party discovers any failure to achieve the
Performance Standards or any injury or adverse impact to the Bank Property
as Preserved, restored, or enhanced, and the IRT does not determine that
such damage is a result of Extraordinary Circumstances, the Party making
the discovery shall notify the other Parties. The IRT may require the Bank
Sponsor to develop and implement a Remedial Action plan to correct such
condition, as described below. The annual report required under Section IX.B
shall identify and describe any Remedial Action proposed, approved, or
performed and, if the Remedial Action has been completed, evaluate its
effectiveness.
2.
Within 60 calendar days of the date of written notice from the IRT, the Bank
Sponsor shall develop a Remedial Action plan and submit it to each member
of the IRT for written approval. The Remedial Action plan must identify and
describe proposed actions to achieve the Performance Standards or remedy
injury or adverse impact to the Bank Property and set forth a schedule within
which the Bank Sponsor will implement those actions. The Bank Sponsor
shall, at Bank Sponsor's cost, implement the necessary and appropriate
Remedial Action in accordance with the Remedial Action plan approved by
the IRT.
3.
If (A) the Bank Sponsor fails to develop a Remedial Action plan and submit it
to each member of the IRT or to implement Remedial Action identified by the
IRT, in accordance with this section, or (B) a Remedial Action plan is agreed
upon and implemented, but the conditions do not satisfy the plan's objective
and measurable Performance Standards by the dates specified in the plan,
then the IRT may find the Bank Sponsor in default pursuant to Section XII.E
and take action accordingly.
4.
If the IRT determines that the Bank is operating at a Credit deficit (i.e., that
Credit Transfers made exceed the Credits authorized for release, as adjusted
in accordance with this BEI), the IRT shall notify the Bank Sponsor of its
30
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
default pursuant to Section XII.E, and take action accordingly. Upon receipt
of notification, Bank Sponsor shall cease Credit Transfers immediately and is
not authorized to resume Credit Transfers until notified in writing by the IRT.
5.
If there is damage to the Bank Property as a result of Extraordinary
Circumstances, the provisions of Section XII.A apply.
Section IX:
Reporting
A. Annual Inflation Adjustments to Endowment Fund Report
By April 1st of each year following the Bank Establishment Date and until the
Endowment Amount is 100% funded, the Bank Sponsor shall report to the IRT and the
Endowment Holder, in hard copy, in editable electronic format, and uploaded to RIBITS
the following:
1.
The adjusted Endowment Amount determined in accordance with Section
VI.E.2.
2.
The resulting adjusted Endowment Deposit amounts.
B. Annual Report
Bank Sponsor or Property Owner, as specified below, shall submit an annual report to
the IRT, in hard copy, editable electronic format, and uploaded to RIBITS, on or before
[insert IRT approved date; for consistency consider August 15th ] of each year
following the Bank Establishment Date. Each annual report shall cover the period from
July 1 of the preceding year (or if earlier, the Bank Establishment Date for the first
annual report) through June 30th of the current year (the "Reporting Period"). Prior to
Bank closure, the Bank Sponsor shall be responsible for reporting Bank development
and interim management tasks described below, and Property Owner shall be
responsible for reporting long-term management tasks described below. After Bank
closure, the Property Owner shall be responsible for annual reporting per the Long-term
Management Plan. The annual report shall address the following:
1.
Bank Development
The Bank Sponsor shall submit an annual report that includes data,
documentation, and discussion of the Bank's progress toward meeting
Performance Standards described in this BEI and its Exhibits. The annual
report shall describe any deficiencies in attaining and maintaining
Performance Standards and any Remedial Action proposed, approved, or
performed. If Remedial Action has been completed, the annual report shall
also evaluate the effectiveness of that action.
2.
Interim Management and Long-term Management
The Interim and Long-term Management Plans contain reporting
requirements that are separate from, and in addition to, the requirements
31
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
listed below for the annual report.
During the Interim Management Period, the Bank Sponsor shall submit an
annual report that contains an itemized account of the management tasks in
accordance with the Interim Management Plan and any Remedial Actions
conducted during the Reporting Period. During the Long-term Management
Period, the Property Owner shall submit an annual report that contains an
itemized account of the management tasks in accordance with the Long-term
Management Plan and any Remedial Actions conducted during the Reporting
Period. Each annual report shall also include the following:
3.
a.
The time period covered, i.e. the dates "from" and "to."
b.
A description of each management task conducted, the dollar amount
expended and time required.
c.
The total dollar amount expended for management tasks conducted
during the Reporting Period.
d.
A description of the management and maintenance activities proposed
for the next reporting year.
e.
A description of the overall condition of the Bank, including photos
documenting the status of the Bank Property during the Reporting Period
and a map documenting the location of the photo points.
Transfer of Credits
a.
The Bank Sponsor shall submit an annual report that includes an
updated Credit Transfer ledger (Exhibit F-3) showing all Credits
Transferred since the Bank Establishment Date and an accounting of
remaining Credits.
b.
The Bank Sponsor shall submit an annual report that documents the
Implementation Fee payment status, if applicable.
C. Credit Transfer Reporting
Upon the Transfer of each and every Credit the Bank Sponsor shall enter the Credit
Transfer into the RIBITS ledger, upload an electronic copy of the finalized Credit
purchase agreement into the appropriate RIBITS folder, and submit to each member of
the IRT:
1.
A copy of the fully executed Credit purchase agreement in the form provided
at Exhibit F-2.
2.
An updated Credit Transfer ledger, in hard copy and in editable electronic
format in the form provided at Exhibit F-3.
D. Reporting Compliance Measures
32
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
If Bank Sponsor fails to submit complete reports on time, the Bank Sponsor is in default.
1.
Annual reports not received by the IRT will result in automatic Credit Transfer
suspension effective the 30th day that the report is past due. The suspension
will be lifted within 10 calendar days after the IRT receives a complete annual
report.
2.
If the Bank Sponsor has been notified by the IRT of an incomplete report, the
IRT will then notify the Bank Sponsor of the date by which the report must be
made complete.
Section X:
Responsibilities of the Bank Sponsor and Property Owner
A. Without limiting any of its other obligations, including without limitation, under the
Conservation Easement, Bank Sponsor and Property Owner each hereby agrees
and covenants that during the time the Bank is in operation, prior to Bank closure:
1.
[Remove if Grant Deed: If the entity proposed to hold the Conservation
Easement is not an IRT agency, Bank Sponsor and Property Owner shall,
prior to the execution of the Conservation Easement at Exhibit E-4 hereof,
provide the IRT with satisfactory evidence that the entity proposed to hold the
Conservation Easement (Grantee) is authorized to do so pursuant to
California Civil Code § 815.3 and Government Code § 65966-65967, has a
primary purpose of long-term land stewardship for conservation purposes
consistent with the purpose of the Bank, and has agreed to hold the
Conservation Easement, and otherwise complies with the requirements of the
IRT.]
2.
Bank Sponsor shall be responsible for all activities and costs associated with
the establishment and operation of the Bank, including but not limited to
construction, planting, Remedial Action, documentation, maintenance,
management, monitoring, and reporting, until completion of the Interim
Management Period.
3.
Bank Sponsor shall assume responsibility for compensatory mitigation
requirements of USACE permits for which it Transfers Credits once a USACE
permittee has secured the appropriate number and type of Credit(s) from the
Bank Sponsor. Bank Sponsor shall provide USACE with the written Credit
purchase agreement (Exhibit F-2) confirming the Bank Sponsor has
accepted the responsibility for providing the required compensatory mitigation
requirements of such USACE permit.
4.
The Bank Sponsor agrees to perform the actions described in this BEI and its
Exhibits to support all Credits that project proponents/action agencies secure.
The Bank Sponsor shall provide [Choose as appropriate: NMFS, USFWS,
CDFW] with the written Credit purchase agreement (Exhibit F-2) for all
Credits secured by project proponents/action agencies that confirms that the
33
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Bank Sponsor will continue to perform the aforementioned actions.
5.
It shall not discharge or release on, to or from the Bank Property, or permit
others to discharge or release on, to or from the Bank Property, any material,
waste or substance designated as hazardous or toxic or as a pollutant or
contaminant under any Federal, state, or local environmental law or
regulation (each a "Hazardous Substance").
6.
Property Owner shall not create or suffer any lien or encumbrance upon the
Bank Property other than as set forth in the Property Assessment and
Warranty approved by the IRT. Property Owner shall not execute, renew, or
extend any lien, lease, license, or similar recorded or unrecorded right or
interest in the Bank Property without the prior written consent of the IRT and
the Grantee, if a Conservation Easement has been granted.
7.
It shall not construct or install any structure or improvement on, or engage in
any activity or use of, the Bank Property, including mineral exploration or
development, excavation, draining, dredging, or other alteration of the Bank
Property that is prohibited by, or not consistent and in accordance with this
BEI and its Exhibits.
8.
Bank Sponsor shall ensure that the Bank Property is managed and
maintained in accordance with the Interim Management Plan, this BEI and its
Exhibits.
9.
Property Owner shall allow, or otherwise provide for, access to the Bank
Property by Bank Sponsor, Grantee, the IRT agencies and third parties, as
described in the Conservation Easement.
10.
Property Owner shall grant to Bank Sponsor all rights and authority necessary
to carry out, and shall not limit the Bank Sponsor in performing its
responsibilities and obligations, on and affecting, the Bank Property in
accordance with this BEI and its Exhibits.
11.
Property Owner shall ensure that the Bank Property is managed and
maintained in accordance with the Long-term Management Plan, this BEI,
and its Exhibits.
B. Reasonably foreseeable technical problems, or unanticipated or increased costs or
expenses associated with the implementation of actions called for by this BEI, or
changed financial or business circumstances in and of themselves shall not serve as
the basis for modifications of this BEI or extensions for the performance of the
requirements of this BEI.
C. An extension of one compliance date based upon or related to a single incident shall
not extend any subsequent compliance dates.
Section XI:
Responsibilities of the IRT
34
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
A. IRT Oversight
Subject to the "Availability of Funds" provision of this BEI, the IRT agrees to oversee the
performance of this BEI.
B. IRT Review
The members of the IRT will make a good faith effort to review the annual reports and
Remedial Action plans within 60 calendar days from the date of receipt of complete
submittal. If any member of the IRT is unable to complete its review within the time
specified in this section, this fact will be reflected in any schedule established for
performance of Remedial Action and any evaluation of timely performance of Remedial
Action by Bank Sponsor.
C. Compliance Inspections
The IRT shall conduct compliance inspections for any purpose(s) it determines as
necessary to assess compliance with this BEI.
Section XII: Other Provisions
A. Extraordinary Circumstances
1.
The Bank Sponsor, Property Owner and IRT in its review of the BEI, have
made a concerted effort to identify the preservation, restoration and
management measures for the Bank Property, including Adaptive
Management, necessary to qualify as compensatory mitigation for Waters of
the U.S., Waters of the State, Covered Species, and Covered Habitat and to
manage and maintain these resources in perpetuity. However, the Parties
recognize that there may be a rare event (an Extraordinary Circumstance) in
which the Bank can no longer serve its intended purpose as compensatory
mitigation, in whole or in part, for the specific resources for which it was
established. An Extraordinary Circumstance of this type may lead to Bank
Sponsor and/or Property Owner being relieved of some or all of its obligations
under this BEI. The Parties agree that the IRT will consider whether it is
appropriate to relieve any obligations under the process outlined below:
a.
If the Bank Sponsor or Property Owner believes that an Extraordinary
Circumstances event has taken place that Party shall send written
notification to the IRT agencies as promptly as possible, but no later than
14 calendar days following the date of discovery of the event. The Party
sending the notification (invoking) will fully describe the nature of the
Extraordinary Circumstances event, its effect on the Party's performance
of the obligations under this BEI, the habitat values affected by the
event, and any expected timeframe of non-performance attributable to
the Extraordinary Circumstances event. As promptly as reasonably
possible after providing notification, the Party invoking Extraordinary
Circumstances shall meet with the IRT agencies to discuss whether the
35
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
event qualifies as an Extraordinary Circumstance. The Party invoking
Extraordinary Circumstances shall bear the burden of demonstrating that
Extraordinary Circumstances have occurred. Until such time the IRT
agencies determine whether the event qualifies as an Extraordinary
Circumstance and whether it is appropriate to suspend performance
pursuant to Section XII.A.1.d, the Property Owner or Bank Sponsor shall
continue to manage and maintain the Bank Property to the fullest extent
practicable consistent with this BEI and other applicable documents.
b.
If the IRT agencies concur that an Extraordinary Circumstances event
has taken place, such agencies will provide written notification to the
Bank Sponsor or Property Owner. Within 14 calendar days of notification
of concurrence from the IRT agencies that Extraordinary Circumstances
have occurred, or on a date mutually agreed upon by all Parties, the
Parties will meet to discuss the course of potential action to be taken in
response to such occurrence, including potential Remedial Action as
defined in Section II and potential suspension of Performance Standards
as described in Section XII.A.1.c. Remedial Action in such
circumstances may include, but is not limited to, restoration of the Bank
Property, out-of-kind improvements on the Bank Property, a smaller
restoration on the Bank Property (taking into account the diminution of
habitat values across the Service Area), improvements to another
property, or the purchase of credits from another bank. Once approved
by the IRT, the Party invoking Extraordinary Circumstances shall carry
out the Remedial Action within a mutually agreed upon timeframe.
c.
If the Bank Sponsor or Property Owner is prevented from or delayed in
performing an obligation under this BEI by Extraordinary Circumstances
that commences after the Bank Establishment Date, the IRT may
suspend the Bank Sponsor and/or Property Owner's obligation to
perform, as well as the ability of the Bank to provide any remaining
Credits released, but not yet Transferred, as compensatory mitigation.
d.
Following the meeting discussed in Section XII.A.1.b. to consider
potential actions to be taken in response to the event, the IRT agencies
will, in writing, (1) inform the Property Owner or Bank Sponsor as to
what, if any, performance is suspended, and (2) direct the Property
Owner or Bank Sponsor as to what specific Remedial Action is required.
The Bank Sponsor or Property Owner will continue to perform all other
obligations that are not suspended.
e.
Within 60 calendar days of notification described in Section XII.1.d., or
by a date mutually agreed upon by all Parties, the Party invoking
Extraordinary Circumstances will submit to the IRT, in writing, the
implementation plan to meet the required Remedial Action. At a
minimum, the Remedial Action will be sufficient to ensure that the habitat
36
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
values which underlie all previously Transferred Credits will be
supported.
f.
If the Remedial Action agreed upon and implemented do not meet an
agreed upon objective or standard within the agreed upon timeframe, the
Bank Sponsor or Property Owner and the IRT will reconvene to evaluate
if alternative Remedial Action would be appropriate.
2.
Failure to act in good faith to participate in the process outlined above in
Section XII.A.1 or to implement any IRT-approved Remedial Actions shall be
a default under this BEI.
3.
In accordance with Section VIII.B.4 of this BEI, the IRT agencies may, at their
discretion, direct Bank Sponsor to suspend the Transfer of Credits, prohibit
the release of additional Credits, and/or reduce the number of Credits
allocated to the Bank in proportion to such damaged area unless and until the
Bank Sponsor has remedied the defect pursuant to the Remedial Action as
described in Section XII.A.1.d.
4.
Disputes over whether an event is a result of Extraordinary Circumstances, or
any Remedial Action taken in response pursuant to this Section, shall be
resolved in accordance with Section XII.B.
5.
Bank Sponsor and Property Owner are not entitled to termination of this BEI
under Section XII.D as a result of Extraordinary Circumstances.
B. Dispute Resolution
The Parties agree to work together in good faith to resolve disputes concerning this
BEI. Unless a Party has initiated legal action in connection with the particular dispute,
any Party may elect ("Electing Party") to employ an informal dispute resolution
process whereby:
1.
The Electing Party shall notify all other Parties to this BEI of the dispute
through a Dispute Notice. The Dispute Notice shall identify the Parties against
which the Electing Party is commencing the informal dispute resolution
process ("Implicated Parties"), the position of the Electing Party (including, if
applicable, the basis for contending that a violation has occurred), and the
resolution the Electing Party proposes.
2.
Each Implicated Party shall have 45 calendar days after receipt of the Dispute
Notice (or such other time as the Parties may mutually agree) to respond to
the electing Party. During this time, any Party to this BEI that received the
Dispute Notice may seek clarification of the Dispute Notice.
3.
Within 45 calendar days after each Implicated Party's response was provided
or due, whichever is later, the Electing Party and the Implicated Parties shall
confer and negotiate in good faith toward a mutually satisfactory resolution, or
shall establish a specific process and timetable to seek such resolution.
37
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
4.
The dispute resolution process may be terminated by the Electing Party or
any Implicated Party upon written notice to all other Parties to this BEI.
C. Conveyance of Bank or Bank Property or Other Interests
1.
All transfers of any interest in the Bank Property are subject to the applicable
provisions of the Conservation Easement.
2.
Property Owner shall have the right to sell, assign, transfer or convey (each a
"transfer") its interest in the Bank Property at any time; provided, however,
that any such transfer on or after the execution date of this BEI must be made
in accordance with this BEI and the Conservation Easement, and shall be
subject to prior written concurrence by the IRT and Bank Sponsor. Such
concurrence shall be subject to the requirement that the transferee assumes
and agrees in writing to observe and perform all of the Property Owner's
obligations pursuant to this BEI and the Conservation Easement. From and
after the date of any transfer by Property Owner of its interest in the Bank
Property in which the transferee has assumed and agreed in writing to
observe and perform all of the transferor's obligations pursuant to this BEI,
the transferor shall have no further obligations hereunder and all references
to Property Owner in this BEI shall thereafter refer to such transferee, except
that the transferor's liability for acts, omissions, or breaches occurring prior to
the transfer shall survive the transfer. Any transfer of the Property Owner's
interest in the Bank Property made without the prior written concurrence of
the IRT constitutes default pursuant to Section XII.E and the IRT may take
action accordingly.
3.
Bank Sponsor may sell or convey its interest in the Bank at any time,
provided that no uncured event of default exists, Bank Sponsor is in full
compliance with all requirements of this BEI (including all financial assurance
requirements), and subject to the prior written approval of the IRT. If any of
the financial assurances required under this BEI are not completely funded at
the time the Bank Sponsor requests IRT approval of a sale or conveyance,
then the IRT shall not approve such sale or conveyance unless and until
either the current Bank Sponsor, or the proposed replacement Bank Sponsor,
shall have provided all required financial assurances. In addition, prior to sale
or conveyance, the Bank Sponsor shall provide to each member of the IRT a
written agreement signed by the replacement Bank Sponsor, acceptable to
the IRT in form and substance, in which the Bank Sponsor assigns to the
replacement Bank Sponsor, and the replacement Bank Sponsor assumes
and agrees to perform, all of the responsibilities and obligations of the Bank
Sponsor under the BEI. Any such sale or conveyance made without the prior
written concurrence of the IRT constitutes default pursuant to Section XII.E
and the IRT may take action accordingly.
D. Modification and Termination of the BEI
38
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
1.
2.
Amendment and Modification
a.
Prior to Bank closure, this BEI, including its Exhibits, may be amended
or modified only with the written approval of the Parties, which approval
may be withheld or denied. All amendments and modifications shall be
fully set forth in a separate document signed by all Parties that shall be
appended to this BEI.
b.
After Bank closure, amendments or modifications to this BEI, including
its Exhibits, which do not impact obligations of the Bank Sponsor under
this BEI must be approved in writing by the Property Owner and the IRT,
which approval may be withheld or denied. All amendments and
modifications shall be fully set forth in a separate document signed by all
required parties that shall be appended to this BEI.
c.
At the request of the Bank Sponsor, the IRT may consider an
amendment to the BEI to conform to an approved NCCP or HCP.
d.
Pursuant to Fish and Game Code § 1798.6(a), any person seeking to
amend the Bank shall submit to CDFW, a complete Bank amendment
package containing each of the original Bank agreement package
documents, including any prior amendments, as well as any documents
proposed to be amended or that would be affected by the proposed
amendment, together with the applicable amendment fee.
Termination
a.
The Bank Sponsor and Property Owner may jointly withdraw the entire
Bank Property and terminate this BEI at any time prior to the first Credit
Transfer, provided that Waters of the U.S., Waters of the State, and
other habitat values existing on the Bank Property prior to the initiation of
any efforts to restore or enhance the Bank Property shall be preserved in
a condition at least equal to that which existed prior to initiation of Bank
establishment efforts, and as the Conservation Easement may require.
b.
In the event this BEI is terminated or the Bank is closed prior to the
Transfer of all authorized Credits, any remaining Credits under this BEI
shall be extinguished and will no longer be available for Transfer.
c.
The IRT may terminate this BEI if the Bank Sponsor or Property Owner
sells or conveys the Bank or the Bank Property without the prior written
concurrence of the IRT, as required by Section XII.C.
d.
USEPA, [insert appropriate agencies signing, but not providing
credits: USACE, CDFW, USFWS, State Water Board, Regional Water
Board, and NMFS] may terminate its participation upon 30 calendar
days' written notice to all other Parties. This BEI shall continue in full
force and effect as to the remaining Parties.
39
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
e.
The [insert appropriate agencies: USACE, CDFW, USFWS, State
Water Board, Regional Water Board, and NMFS] may each terminate its
participation in this BEI upon 30 calendar days' written notice to all other
Parties, on the condition that each of the following has occurred:
i.
Bank Sponsor or Property Owner has defaulted on one or more
covenants, terms or conditions of this BEI.
ii.
Bank Sponsor and Property Owner, has each received notice of
such default from the terminating IRT agency in accordance with
Section XII.B, if applicable, and Section XII.K.
iii. Bank Sponsor or Property Owner, as applicable, has failed to cure
its default to the satisfaction of the terminating IRT agency.
f.
If any member of the IRT so requests, the member(s) of the IRT
proposing to terminate participation in the BEI agree to meet with the
other IRT members to discuss the reason(s) for such termination, prior to
the termination taking effect. Notice of a request for such meeting shall
be made by the requesting IRT member(s) not later than 15 calendar
days from receipt of the notice of termination.
g.
Termination by any member of the IRT from this BEI shall not terminate
this BEI or affect the relationship between the remaining members of the
IRT, toward each other or the Bank Sponsor or Property Owner, under
this BEI. Remaining Credits under the authority of the terminating
agency will no longer be available for Transfer. Consistent with Section
VIII.E.1., in the event [Choose one, as applicable: CDFW or USACE],
as the holder of the Construction Security, Interim Management Security,
and Performance Security, terminates its participation in this BEI, the
Bank Sponsor shall provide replacement Construction Security, Interim
Management Security, and Performance Security in the amount
specified in this BEI within 20 calendar days' after receiving written
notice of termination from [Choose one, as applicable: CDFW or
USACE]. In the event the remaining members of the IRT are unable to
hold the Construction Security, Interim Management Security, and
Performance Security specified in Section VI, the remaining parties
agree to modify the BEI to name a third party holder of each of these
securities.
h.
In the event termination is commenced, the Bank Sponsor agrees to
fulfill its pre-existing obligations to perform all establishment, monitoring,
maintenance, management, and remediation responsibilities that arise
directly from Credits that were transferred at the time of termination.
i.
Nothing in this Section is intended or shall be construed to limit the legal
or equitable remedies (including specific performance and injunctive
40
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
relief) available to the USACE, CDFW, NMFS, State Water Board,
Regional Water Board, and USFWS in the event of default by Bank
Sponsor and/or Property Owner.
E. Default
The Bank Sponsor and/or Property Owner shall be in default if that party fails to observe
or perform any obligations or responsibilities required of it by this BEI. In the event of
default, the IRT shall issue a notice of default to Bank Sponsor and/or Property Owner,
which includes direction and specified time period to cure the default. If the Bank
Sponsor and/or Property Owner fails to remedy the default within the allotted time, the
IRT will take appropriate action, which includes but is not limited to, suspending Credit
Transfers, reducing available Credits, utilizing financial assurances, and terminating the
BEI. This Section shall not be construed to modify or limit any specific right, remedy, or
procedure in any Section of this BEI or any remedy available under applicable State
and/or Federal Law.
F. Controlling Language
The Parties intend the provisions of this BEI and each of the documents incorporated by
reference in it to be consistent with each other, and for each document to be binding in
accordance with its terms. To the fullest extent possible, these documents shall be
interpreted in a manner that avoids or limits any conflict between or among them.
However, if and to the extent that specific language in this BEI conflicts with specific
language in any document that is incorporated into this BEI by reference, the specific
language within the BEI shall be controlling. The captions and headings of this BEI are
for convenient reference only, and shall not define or limit any of its terms or provisions.
G. Entire Agreement
This BEI, and all exhibits, appendices, schedules and agreements referred to in this
BEI, constitute the final, complete, and exclusive statement of the terms of the
agreement between and among the Parties pertaining to the Bank, and supersede all
prior and contemporaneous discussions, negotiations, understandings or agreements of
the Parties. No other agreement, statement, or promise made by the Parties, or to any
employee, officer, or agent of the Parties, which is not contained in this BEI or
incorporated herein by reference, shall be binding or valid, with respect to the subject
matter hereof. No alteration or variation of this instrument shall be valid or binding
unless contained in a written amendment in accordance with Section XII.D.1. Each of
the Parties acknowledges that no representation, inducement, promise or agreement,
oral or otherwise, has been made by any of the other Parties or anyone acting on behalf
of any of the Parties unless the same has been embodied herein.
H. Reasonableness and Good Faith
Except as specifically limited elsewhere in this BEI, whenever this BEI requires a Party
to give its consent or approval to any action on the part of the other, such consent or
approval shall not be unreasonably withheld or delayed. If the Party disagrees with any
41
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
determination covered by this provision and reasonably requests the reasons for that
determination, the determining Party shall furnish its reasons in writing and in
reasonable detail within 30 calendar days following the request.
I. Successors and Assigns
This BEI and each of its covenants and conditions shall be binding on and shall inure to
the benefit of the Parties and their respective successors and assigns subject to the
limitations on transfer set forth in this BEI.
J. Partial Invalidity
If a court of competent jurisdiction holds any term or provision of this BEI to be invalid or
unenforceable, in whole or in part, for any reason or as to any Party, the validity and
enforceability of the remaining terms and provisions, or portions of them, shall not be
affected unless an essential purpose of this BEI would be defeated by loss of the invalid
or unenforceable provision or its invalidity or unenforceability as to any Party.
K. Notices
1.
Any notice, demand, approval, request, or other communication permitted or
required by this BEI shall be in writing and deemed given when delivered
personally, sent by receipt-confirmed facsimile, or sent by recognized
overnight delivery service, addressed as set forth below, or five calendar days
after deposit in the U.S. mail, postage prepaid, and addressed as set forth
below.
2.
Notice by any Party to any other Party shall be given to all Parties. Such
notice shall not be effective until it is deemed to have been received by all
Parties.
3.
Any Party may change its notice address by giving notice of change of
address to the other Parties in the manner specified in this Section XII.K.
Bank Sponsor:
[NAME]
[ADDRESS]
Attn:
Fax:
[Insert: Property Owner:]
42
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
[NAME]
[ADDRESS]
Attn:
Fax:
[Insert appropriate agencies: IRT Members:]
U.S. Army Corps of Engineers
___________ District
[DISTRICT ADDRESS]
Attn: Chief, Regulatory Division
Fax:
U.S. Fish and Wildlife Service
_____________ Office
[FIELD OFFICE ADDRESS]
Attn: Field Supervisor
Fax:
National Marine Fisheries Service
[Insert: California Coastal or Central Valley]
_____________ Office
[OFFICE ADDRESS]
Attn: Assistant Regional Administrator
Fax:
U.S. Environmental Protection Agency
Region IX
43
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
75 Hawthorne Street
San Francisco, CA 94105
Attn: Supervisor, Wetlands Section
Fax: 415-947-3537
California Department of Fish and Wildlife
____________Region
[REGION ADDRESS]
Attn: Regional Manager
Fax:
California Regional Water Quality Control Board, Region _____________
Address
City, State, Zip code
Attn: Executive Officer
Fax:
L. Counterparts
This BEI may be executed in multiple counterparts, each of which shall be deemed an
original and all of which together shall constitute a single executed agreement.
M. No Third-Party Beneficiaries
This BEI shall not create any third-party beneficiary hereto, nor shall it authorize anyone
not a Party hereto to maintain any action, suit or other proceeding, including without
limitation, for personal injuries, property damage or enforcement pursuant to the
provisions of this BEI. The duties, obligations, and responsibilities of the Parties to this
BEI with respect to third parties shall remain as otherwise provided by law in the event
this BEI had never been executed.
N. Availability of Funds
Implementation of this BEI by the IRT is subject to the requirements of the AntiDeficiency Act, 31 U.S.C. § 1341, and the availability of appropriated funds. Nothing in
this BEI may be construed to require the obligation, appropriation, or expenditure of any
money from the U.S. Treasury or the California State Treasury. No agency of the IRT is
44
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
required under this BEI to expend any appropriated funds unless and until an authorized
official affirmatively acts to commit to such expenditures as evidenced in writing.
O. No Partnerships
This BEI shall not make or be deemed to make any Party to this BEI an agent for or the
partner or joint venturer of any other Party.
P. Applicable Laws
Among the Bank Sponsor, Property Owner and the Federal agencies, the applicable
statutes, regulations, policies, directives, and procedures of the United States will
govern this BEI and all documents and actions pursuant to it. Among the Bank
Sponsor, Property Owner and State of California agencies, this BEI shall be governed
by and construed according to the applicable laws, statutes, regulations, orders, policies
and requirements of the State of California and its agencies with jurisdiction, including
without limitation the authorities identified in Section I.B of this BEI as applicable
Q. No Federal Contract or Monetary Damages
USACE approval of this BEI constitutes the regulatory approval required for the
Mitigation Bank to be used to provide compensatory mitigation for Department of Army
permits pursuant to 33 C.F.R. § 332.8(a)(1). This BEI is not a contract between the
Bank Sponsor or Property Owner and USACE or any other agency of the Federal
government. Any dispute arising under this BEI will not give rise to any claim by the
Bank Sponsor or Property Owner for monetary damages. This provision is controlling
notwithstanding any other provision or statement in the BEI to the contrary.
R. CDFW Remedies
CDFW is entering into this BEI in its own right and not as the agent or representative of
any other entity, including without limitation the IRT or any other member of the IRT. If
CDFW defaults in the performance of any of its obligations under this BEI, Bank
Sponsor and Property Owner will have the right to seek, subject to the limitations set
forth below, damages or specific performance as provided by law as the exclusive
remedy for such defaults.
Despite the foregoing, Bank Sponsor and Property Owner each hereby waives:
1.
Any right to receive consequential or punitive damages against CDFW or
any officer, employee, agent or representative of CDFW; and
2.
Any right to seek specific performance against CDFW based on a dispute
relating to any CDFW decisions, made either independently or as a member
of the IRT, directly related to Credits for Covered Species and Covered
Habitat creation or preservation under the jurisdiction of CDFW, including
but not limited to decisions under Sections VII.C (Covered Species and
Covered Habitat Credit Release), VIII.B (Transfer of Credits), XII.A
(Extraordinary Circumstances), and XII.E (Default) of this BEI. This waiver
45
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
shall not preclude Bank Sponsor or Property Owner from the recovery of
any compensatory damages directly related to CDFW decisions regarding
Credits for Covered Species and Covered Habitat creation or preservation
provided for in the BEI, which Credits are under the sole jurisdiction of
CDFW.
3.
Recovery of damages due to a default by CDFW will only be available after
CDFW and the Bank Owner or Property Owner have undergone informal
dispute resolution as specified in Section XII.B of this BEI.
Section XIII: Execution
Each of the undersigned certifies that he or she has full authority to enter into this BEI.
This BEI shall be deemed executed on the date of the last signature by the Parties.
Within 30 calendar days of BEI execution, the Bank Sponsor shall upload the final
signed BEI, including all of its Exhibits, to the appropriate folders in RIBITS and provide
an electronic copy to each member of the IRT.
IN WITNESS WHEREOF, the Parties have executed this BEI as follows:
Bank Sponsor
By: ____________________________________
[Name]
[Title, if applicable]
_________________
Date
Property Owner
By: ____________________________________
[Name]
[Title, if applicable]
_________________
Date
U.S. Army Corps of Engineers, ____________ District
By: ____________________________________
[Name]
_________________
Date
46
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
[Correct title as necessary]District Engineer
U.S. Fish and Wildlife Service, __________Office
By: ____________________________________
[Name]
Field Supervisor
_________________
Date
National Marine Fisheries Service, West Coast Region
By: ____________________________________
[Name]
Regional Administrator
__________________
Date
California Department of Fish and Wildlife, _____________Region
By: _____________________________________
[Name]
Regional Manager
_________________
Date
State Water Resources Control Board
By: _____________________________________
[Name]
Executive Director
_________________
Date
California Regional Water Quality Control Board, Region _____________
By: _____________________________________
_________________
47
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
[Name]
Executive Officer
Date
U.S. Environmental Protection Agency, Region IX
By: _____________________________________
[Name]
Supervisor, Wetlands Section
_________________
Date
48
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Appendix 1 Minimum Requirements for Each Exhibit
1.
2.
3.
"Exhibit A" - Bank Location Maps
A-1.
General Vicinity Map
This map should show the Bank location in relation to cities, towns,
or major roads, and other distinguishable landmarks with sufficient
detail to allow the Bank Property to be easily located.
A-2.
Map of Property including Bank Property
This map should illustrate Property and Bank Property boundaries,
Construction Phases, and any planned Subsequent Phases on a
topographic map.
A-3
Map of Conserved Areas in Bank Property Vicinity [if
applicable]
This map should depict other conserved lands in the vicinity of the
proposed Bank Property.
"Exhibit B" Service Area Map(s) and Description(s)
B-1.
Map(s) of the Bank's Service Area(s)
Include Service Area map(s) showing the area within which each
type of Credit (i.e., Waters of the U.S., Waters of the State, Covered
Species or Covered Habitat) may be sold or obligated.
B-2.
Narrative description(s) of the Bank's Service Area(s)
Include a detailed description of the area, and a basis for that
Service Area, within which each type of Credit may be sold or
obligated. Include sufficient details to be able to determine the
boundaries; including counties, landmarks, roads, etc. on all sides of
the Service Area.
"Exhibit C" - Development Plan
C-1.
Development Plan
This plan should include the baseline conditions of the Bank
Property including: biological resources, geographic location and
features, topography, hydrology, vegetation, past present and
adjacent land uses, a delineation of Waters of the U.S. and/or
Waters of the State and jurisdictional determination (if applicable),
and a list of species and habitats occurring on the Bank Property.
Include a description of the objectives of the Mitigation Bank and
activities and methodologies for establishing, restoring, and/or
enhancing Waters of the U.S. and/or Waters of the State or other
habitat types. Detail anticipated increases in functions and services
of existing aquatic resources and their corresponding effect within
49
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
the watershed (i.e. habitat diversity and connectivity, floodplain
management, or other landscape scale functions). Include map(s)
of the overall mitigation bank design, a description of habitat
establishment goals, objectives and Performance Standards, a
discussion of ecological suitability of the site to achieve the stated
goals and objectives (i.e. watershed/hydrology analysis, soils,
topography, compatibility with adjacent land uses, watershed
management plans, critical habitat designation, NCCP, HCP, and
species recovery plans). Include maps detailing the anticipated
location, acreages, and types of proposed Credits. Include historic
aerial photographs and/or historic topographic maps (if available). If
restoration is proposed; monitoring methodologies required to
evaluate and meet the Performance Standards; an approved
schedule for reporting monitoring results; a discussion of possible
Remedial Actions; surrounding land uses and zoning along with the
anticipated future development in the area; and any other
information deemed necessary by the IRT. The Development Plan
must clearly specify how each Construction Phase will be
constructed and monitored in sufficient detail that a third-party acting
on the Construction Security could complete establishment of any
given phase.
4.
C-2.
Construction Security Analysis and Schedule
Provide a copy of the third-party estimate or contract that is being
relied upon to determine the amount of the Construction Security.
Include a specific Construction Security Analysis and Schedule for
each Construction Phase.
C-3.
Performance Security Analysis and Schedule
Specify the amount of the Performance Security based upon the
amount of Construction Security in Exhibit C-2. Include a specific
Performance Security Analysis and Schedule for each Construction
Phase.
"Exhibit D" - Bank Management and Operation Documents
Any and all standard required forms to be used for the submission of
financial information shall be included in this Exhibit D in template form.
D-1.
Interim Management Security Analysis and Schedule
This analysis and schedule shall consist of a table and/or
spreadsheet that shows all of the tasks (management, monitoring,
reporting); task descriptions; labor (hours); cost per unit; cost,
frequency, timing or scheduling of the tasks; the total annual funding
necessary for each task; and any associated assumptions for each
task required by the Interim Management Plan. The total annual
50
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
expenses should include administration and contingency costs.
Include a specific Interim Management Security Analysis and
Schedule for each Construction Phase.
Cost estimates should be based on tasks implemented by a thirdparty in present day dollars or equipment prices in present day
dollars
D-2.
Endowment Fund Analysis and Schedule
This analysis and schedule shall consist of a table and/or
spreadsheet that shows the projected annual capitalization rate, all
of the tasks (management, monitoring, reporting); task descriptions;
labor (hours); cost per unit; cost, frequency, timing or scheduling of
the tasks; the total annual funding necessary for each task; and any
associated assumptions for each task required by the Long-term
Management Plan. The total annual expenses should also include
administration and contingency expenses. The Endowment Fund
Analysis and Schedule is developed assuming that each
Construction Phase is constructed and managed by itself without
the economies of scale or other cost reductions that may occur if all
Construction Phases are implemented.
Cost estimates should be based on tasks implemented by a thirdparty in present day dollars or equipment prices in present day
dollars.
This Endowment Fund Analysis and Schedule in this Exhibit D-2 is
specific to funding long-term management of the Bank Property by
the Property Owner. The endowment funding required by the
Grantee to hold and monitor the Conservation Easement must be
addressed by the Bank Sponsor in a separate and distinct
Endowment Agreement to be included as part of Exhibit E. Such
separate Endowment Agreement is not considered part of Exhibit D3.
D-3.
Agreements, Instructions and Forms for Submission or
Disbursement of Endowment Funds
a. Endowment Agreement
b. Deposit Document
c. Deposit Procedures
d. Annual Funding Report Templates
D-4.
Interim Management Plan
The Interim Management Plan identifies the short-term
51
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
management, monitoring, Adaptive Management, reporting and
other activities to be implemented by the Bank Sponsor during the
Interim Management Period. The Interim Management Plan should
include provisions for managing each Construction Phase
independently as well as together.
D-5.
Long-term Management Plan
The Long-term Management Plan identifies the perpetual
management, monitoring, and reporting activities to be conducted
after the Interim Management Period, and should include at
minimum:
a. Purpose of Bank establishment and purpose of Long-term
Management Plan;
b. A baseline description of the setting, location, history and
types of land use activities, geology, soils, climate,
hydrology, habitats present (once Bank meets Performance
Standards) and species descriptions;
c. Overall management, maintenance and monitoring goals;
specific tasks and timing of implementation; and a
discussion of any constraints which may affect goals;
d. The Endowment Fund Analysis and Schedule (Exhibit D2);
e. Discussion of Adaptive Management actions for reasonably
foreseeable events and possible thresholds for evaluating
and implementing Adaptive Management;
f. Monitoring and Reporting requirements and schedule;
g. Rights of access to the Bank Property and prohibited uses
of the Bank Property as provided in the [Choose one:
Conservation Easement or Grant Deed]; and
h. Procedures for amendments and notices.
i.
D-6.
5.
Include a reference to the Historic Properties Treatment
Plan (Exhibit J-3), if applicable.
Bank Closure Plan
Provide Bank closure plan. See Section VIII.D
"Exhibit E" - Real Estate Records and Assurances
The Property Owner shall provide each member of the IRT the following,
with the understanding that the Bank will not be deemed established and
authorized to sell Credits until the Bank Property has been protected in
perpetuity by acceptance and recording of the [Choose one: Conservation
52
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
Easement or Grant Deed] and all of the other requirements for Bank
establishment set forth in the BEI have been met:
6.
E-1.
Preliminary Title Report, Legal Description, and Parcel Map(s)
Parcel map(s) and a legal description, as well as a Preliminary
Report which includes pertinent exceptions (e.g., excepted or
reserved easements or rights, liens, encumbrances and other
matters affecting title), of the Property and Bank Property
E-2.
Property Assessment and Warranty
Property Assessment and Warranty prepared in accordance with the
approved template.
E-3.
Plat Map(s)
Plat maps supporting the Property Assessment and Warranty which
illustrate the physical extent of the title exceptions and identify the
locations of all structures, roads, fences, and other physical
improvements.
E-4.
Real Estate Instrument
The form of the Conservation Easement using the approved
template [or, if fee title to the State, substitute: The form of the
Grant Deed.]
E-5.
Title Insurance [attach once received]
Applicable for final BEI approval under all circumstances.
"Exhibit F" - Bank Crediting and Credit Transfers
F-1.
Credit Evaluation and Credit Table
A "Credit Evaluation" is an explanation of the evaluation undertaken
to formulate the value of each type of Credit and the total number of
each type of Credit. The "Credit Table" should show the number
and type of Credits Released as mitigation or compensation for
agency-approved projects and other impacts in the Service Area(s).
The table should distinguish between the following categories of
Credits: Waters of the U.S.; Waters of the State; Covered Species
and Covered Habitat Preservation; Covered Species and Covered
Habitat Establishment.
F-2.
Credit Purchase Agreement and Payment Receipt Templates
F-3.
Credit Transfer Ledger Template
Credit Transfer Ledger shall include at a minimum:
a.
Bank name;
b.
Total number of each type of Bank Credit;
c.
Initial Credit purchaser name, address and phone number;
53
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
d.
Project name;
e.
Project applicant name, address, and phone number;
f.
Agency project file numbers;
g.
Date of Credit Transfer;
h.
Type(s) of Credit(s) sold or obligated;
i.
Number of Credits sold or obligated;
j.
Number of Credits applied; and
k.
Balance of each type of Credit remaining.
l.
A declaration that the Bank Sponsor has entered the Transfer
into RIBITS.
F-4
Instructions for Species Credit Transfers Using RIBITS [if
applicable]
F-5
Credit Release Schedule and Funding Schedule for Covered
Species and Covered Habitats
F-6
Implementation Fee Schedule [if applicable]
7.
"Exhibit G" - Phase I Environmental Site Assessment
8.
"Exhibit H" - Biological Resources Survey
Biological Resources Survey(ies) of the Bank Property shall describe the
biotic and abiotic baseline of the Bank Property and should include
descriptions of the following with maps: a) the Bank Property's geographic
location and features, including topography, hydrology, soils, and
vegetation; b) current functions and services of aquatic resources; c)
inventory of all biological resources, including: description of vegetation
communities and a complete plant species list, presence of Federallythreatened or endangered species, and/or their habitats, as determined by
protocol surveys or other appropriate survey methodology, state-listed
threatened and endangered species and other species of special concern,
other wildlife species that may be present, and presence of non-native
species on the Bank Property; and d) past and present land uses, including
grazing practices.
9.
"Exhibit I" Jurisdictional Determination and Delineation of Waters of the
U.S. and/or Waters of the State.
Bank Sponsor shall provide a copy of the delineation of Waters of the U.S.
54
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
and/or Waters of the State and jurisdictional determination issued by
USACE and/or Regional Board for the Bank Property, if applicable.
10.
"Exhibit J" Cultural, Historical, Archeological, and Native American
Resources ("Cultural Resources").
Cultural Resources requirements met for all Construction Phases.
J-1
Identification, Inventory, and Evaluation
Cultural resources inventory and evaluation shall include the
following: a) a description and map of the area of potential effects
("APE"), b) a description of each cultural resource and a brief
statement identifying the specific location of each cultural resource
within the APE, c) a description of how the boundary was
determined for each cultural resource identified, and d) a
determination of eligibility for the National Register of Historic Places
(National Register), as determined by the lead Federal agency in
consultation with the State Historic Preservation Officer (SHPO),
and e) where appropriate, eligibility recommendation for listing on
the California Register of Historical Resources. Cultural resources
that are recommended eligible for listing in the National Register are
called "historic properties" under the Federal regulations and
"historical resources" under the California regulations.
J-2
Compliance Documentation [if applicable]
If the USACE finds that the undertaking will have no effect or no
adverse effect upon cultural resources, the BEI shall include the
USACE's determination of effect and the required concurrence by
the SHPO and the Advisory Council on Historic Preservation, as
applicable. However, if it is determined that the undertaking will
have an adverse effect on a historic property, the BEI is to include
either an executed Programmatic Agreement or Memorandum of
Agreement (Section 106 agreement) as documentation of
compliance with Section 106 of the National Historic Preservation
Act of 1966, as amended. If the undertaking may cause a
substantial adverse change in the significance of a historical
resource then, pursuant to California Code of Regulations, Title 14,
§ 15064.5(b), preparation of an environmental impact report is
required.
J-3
Historic Properties Treatment Plan (HPTP) [if applicable]
A historic properties treatment plan, approved by USACE and the
SHPO, shall be prepared prior to any ground-disturbing activities
conducted on the Bank Property. The HPTP will be included in the
Section 106 agreement as an appendix. Ground disturbing
55
[Bank Name] Mitigation Bank [Version Date]
CA BEI template September 28, 2017
activities must be conducted in accordance with the stipulations of
the Section 106 agreement (Exhibit J-2). The plan shall include
both short and long-term management of the historic properties. In
addition, the Federal Agency will make compliance with the Section
106 Agreement a condition of any Federal authorization or
approval.
11. "Exhibit K" Other Documentation, Permits, Amendments or Revisions
To the extent not already obtained, the Bank Sponsor or Property Owner
will be responsible for obtaining all appropriate environmental
documentation, permits, permit amendments, or other authorizations
needed to establish and maintain the Bank, including but not limited to the
following. Enclose the required documentation for all Construction Phases.
Include only those that apply and add others as necessary:
a. Department of the Army Permit;
b. Environmental documents, findings and notices prepared or filed by
Lead Agency to comply with CEQA and NEPA;
c. Water Quality Certification or Waiver under § 401 of the Clean Water
Act;
d. General or Individual Waste Discharge Requirements Under the
PorterCologne Water Quality Control Act, Water Code § 13000 et
seq.;
e. Streambed Alteration Agreement (Fish and Game Code § 1600 et
seq.);
f. Federal Endangered Species Act compliance (16 U.S.C. § 1535 et
seq.) (ESA) (§ 7 or § 10);
g. California Endangered Species Act compliance (Fish and Game
Code § 2050 et seq.);
h. Magnuson-Stevens Fishery Conservation and Management Act
compliance (16 U.S.C. § 1801, et seq.);
i.
Flood Protection Board Permit for streams listed in Table 8.1 in title
23 of the California Code of Regulations; and,
j.
County/City Grading Permit(s) or other local approvals
56
[Bank Name] Mitigation Bank [Version Date]