The primary goal of the project is to develop a joint species conservation and stream and wetland mitigation Bank in the Cache La Poudre watershed (HUC 8) in association with the granting of Department of Army (USACE) permits through restoration, enhancement, and preservation of wetlands, stream channels, and associated buffers along North Fork Rabbit Creek. Improving stream and wetland functions are also key objectives that will enhance and protect water quality. Additional Bank objectives are to preserve and protect this valuable Preble’s habitat from commercial development and to utilize the Bank site to provide highly desirable connectivity between the large, adjacent, high quality habitat corridors.

Location The 640-acre Bank property is located in Section 16, Township 10N, and Range 71W of Larimer County, Colorado, northwest of Livermore.

Description of work The project will restore, enhance, and protect 5,000 linear feet (LF) of the North Fork of Rabbit Creek, and over 6,300 LF of an intermittent tributary along with associated riparian buffers under the guidance of the Compensatory Mitigation for Losses of Aquatic Resources, Final Rule. Regulation 40CFR Part 230 (USACE & USEPA 2008). The project will also provide natural, restored, and enhanced habitat for the Preble’s meadow jumping mouse (Preble’s) (Zapus hudsonius preblei), a federally threatened species under the ESA (63 FR 2651).

PUBLIC NOTICE US Army Corps of Engineers Omaha District

REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd Littleton, CO 80128-6901 FAX (303) 979-0602

Application No: Project: Applicant: Waterway: Issue Date: Expiration Date:

NWO-2017-01638-DEN RCMB Prospectus Applied Land Restoration, LLC North Fork Rabbit Creek September 12, 2017 October 12, 2017

30 DAY NOTICE

PUBLIC NOTICE FOR SECTION 404 COMPENSATORY MITIGATION BANK SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a proposal to establish Rabbit Creek Mitigation Bank, from SCP Conservation, LLC and Applied Land Restoration, LLC. Summary The primary goal of the project is to develop a joint species conservation and stream and wetland mitigation Bank in the Cache La Poudre watershed (HUC 8) in association with the granting of Department of Army (USACE) permits through restoration, enhancement, and preservation of wetlands, stream channels, and associated buffers along North Fork Rabbit Creek. Improving stream and wetland functions are also key objectives that will enhance and protect water quality. Additional Bank objectives are to preserve and protect this valuable Preble's habitat from commercial development and to utilize the Bank site to provide highly desirable connectivity between the large, adjacent, high quality habitat corridors. Location The 640-acre Bank property is located in Section 16, Township 10N, and Range 71W of Larimer County, Colorado, northwest of Livermore. Description of work The project will restore, enhance, and protect 5,000 linear feet (LF) of the North Fork of Rabbit Creek, and over 6,300 LF of an intermittent tributary along with associated riparian buffers under the guidance of the Compensatory Mitigation for Losses of Aquatic Resources, Final Rule. Regulation 40CFR Part 230 (USACE & USEPA 2008). The project will also provide natural, restored, and enhanced 1 Project: RCMB Prospectus Waterway: North Fork Rabbit Creek

Corps File No: NWO-2017-01638-DEN Applicant: SCP Conservation, LLC and Applied Land Restoration

habitat for the Preble's meadow jumping mouse (Preble's) (Zapus hudsonius preblei), a federally threatened species under the ESA (63 FR 2651). ********************* OTHER GOVERNMENTAL AUTHORIZATIONS: The Interagency Review Team responsible for the review and approval of the proposed mitigation bank may include representatives from the Corps, U.S. Environmental Protection Agency, California Department of Fish and Wildlife, and U.S. Fish and Wildlife Service, or other agencies as appropriate. HISTORIC PROPERTIES: The Corps will initiate consultation with the State Historic Preservation Officer under Section 106 of the National Historic Preservation Act, as appropriate. ENDANGERED SPECIES: The proposed activity may affect Federally-listed endangered or threatened species or their critical habitat. The Corps will initiate consultation with the U.S. Fish and Wildlife Service and the National Marine Fisheries Service, pursuant to Section 7 of the Endangered Species Act, as appropriate. ESSENTIAL FISH HABITAT: The Corps will initiate consultation with the National Marine Fisheries Service, pursuant to Magnuson-Stevens Fishery Conservation and Management Act, as appropriate. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The Corps is soliciting comments from the public, Federal, State, and local agencies and officials, Indian tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors. Comments are used in the evaluation of the proposed mitigation bank per 33 CFR Part 332.8 and in the preparation of an Environmental Assessment pursuant to the National Environmental Policy Act. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. Any agency or individual having an objection to the work should identify it as an objection with clear and specific reasons. All replies to the public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact Stephen Decker at (303) 979-4120 or stephen.j.decker@usace.army.mil or visit the Denver Regulatory Office web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx The District Engineer will consider requests for holding a public hearing, for the purpose of gathering additional information. Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held. Requests for a public hearing should state specifically the reasons for holding a public hearing, and what additional information would be obtained. Should the District Engineer decide that additional information is required and a public hearing should be held, interested parties will be notified of the date, time and location. Comments received after the close of business on the expiration date of this public notice will not be considered.

2 Project: RCMB Prospectus Waterway: North Fork Rabbit Creek

Corps File No: NWO-2017-01638-DEN Applicant: SCP Conservation, LLC and Applied Land Restoration

Rabbit Creek Conservation/Mitigation Bank Prospectus

Prepared by: SCP Conservation, LLC and

TABLE OF CONTENTS INTRODUCTION

1

1.0 Project Objectives 2.0 Ecological Suitability of the Site 2.1 Sufficient Water Rights 2.2 Baseline Information 2.3 Watershed Approach 3.0 Proposed Service Area and General Need for the Bank 4.0 Bank Establishment 4.1 Site Protection Instrument 4.2 Determination of Credits 4.3 Mitigation Work Plan 4.3.1 North Fork Rabbit Creek 4.3.2 Intermittent Tributary (Reaches A) 4.3.3 Wetlands 4.3.4. Riparian Buffer/Preble's meadow jumping mouse 4.4 Technical Feasibility 5.0 Bank Operations 5.1 Sponsor Qualifications 5.2 Performance Standards 5.3 Monitoring Requirements 5.4 Long-term Management Strategy 5.5 Adaptive Management 5.6 Financial Assurances 5.7 Project Representatives (Contact List)

1 2 3 3 4 5 5 5 5 6 6 7 7 7 8 8 8 8 8 8 9 9 9

LIST OF TABLES Table 1: Summary information for the proposed Bank Table 2: List of global and state ranked species within the proposed Bank Table 3: Timeline of mitigation activity for the proposed Bank Table 4: List of stream reaches, stream and wetland types, and associated lengths within the proposed Bank

2 3 6 7

APPENDIX A: Figures Figure A-1: Vicinity Map for the proposed Rabbit Creek Mitigation Bank Figure A-2: Bank proximity to State Wildlife Areas and public lands Figure A-3: Preble's meadow jumping mouse range map Figure A-4: Topographic map for the proposed Rabbit Creek Mitigation Bank (USGS 24K) Figure A-5: Proposed primary service area for the Rabbit Creek Mitigation Bank Figure A-6: Aerial map of stream and wetland classifications at the proposed Bank

12 13 14 15 16 17

APPENDIX B: Photo documentation APPENDIX C: Water rights documentation

SCP CONSERVATION, LLC

i

DRAFT Rabbit Creek Mitigation Bank Prospectus

Introduction SCP Conservation, LLC (SCP) submits this Prospectus as Sponsor for the Rabbit Creek Conservation/Mitigation Bank (Bank). This project combines stream and wetland mitigation with species conservation (Preble's meadow jumping mouse), pursuant to 33 CFR and 81 FR 95316, respectively. The Prospectus intends to provide information in sufficient detail to support informed public comment and review by the Interagency Review Team (IRT). Subsequent to adequate public comment and IRT evaluation, SCP requests that the IRT issue an initial evaluation letter finding that the proposed Bank has the potential to provide appropriate compensatory mitigation for unavoidable impacts authorized under Section 404 of the Clean Water Act and the Endangered Species Act (16 U.S.C. § 1531 et seq.) (ESA). This Prospectus provides the basis for the development of the Mitigation Banking Instrument (MBI). The 640-acre Bank property sits in the North Poudre watershed (HUC 10) and will be developed as compensatory mitigation for unavoidable impacts authorized under Section 404 of the Clean Water Act and the ESA. The project encompasses all of Section 16, Township 10N, and Range 71W of Larimer County, Colorado, northwest of Livermore (Figure A-1). The Colorado State Land Board (CSLB) owns the entire Bank site in fee-simple and is working with SCP to develop the Bank. The Bank site is subject to commercial development by the landowner and is currently leased for cattle grazing and limited public access for seasonal hunting. There are no mineral reservations to third parties or other similar site encumbrances that would interfere with Bank establishment by CSLB. As discussed in Section 2.1 below, sufficient instream flow protection and surface and ground water rights exist to support the establishment and longterm sustainability of the Bank. The project will restore, enhance, and protect 5,000 linear feet (LF) of the North Fork of Rabbit Creek, and over 6,300 LF of an intermittent tributary along with associated riparian buffers under the guidance of the Compensatory Mitigation for Losses of Aquatic Resources, Final Rule, Regulation 40CFR Part 230 (USACE & USEPA 2008). The project will also provide natural, restored, and enhanced habitat for the Preble's meadow jumping mouse (Preble's) (Zapus hudsonius preblei), a federally threatened species under the ESA (63 FR 2651). IRT participation, led by the Omaha District-Denver Regulatory Office, U.S. Army Corps of Engineers (USACE) and the U.S. Fish and Wildlife Service, Region VI (FWS) will include: the U.S. Environmental Protection Agency, Region VIII (EPA); the Colorado Division of Water Resources (DWR); Colorado Department of Public Health and the Environment (CDPHE); Colorado Parks and Wildlife (CPW); the Colorado Water Conservation Board (CWCB); and the Colorado Natural Heritage Program (CNHP). 1.0 Project Objectives The primary goal of the project is to develop a joint species conservation and stream and wetland mitigation Bank in the Cache La Poudre watershed (HUC 8) in association with the granting of Department of Army (USACE) permits through restoration, enhancement, and preservation of wetlands, stream channels, and associated buffers along North Fork Rabbit Creek. Improving stream and wetland functions are also key objectives that will enhance and protect water quality. Additional Bank objectives are to preserve and protect this valuable Preble's habitat from commercial development and to utilize the Bank site to provide highly desirable connectivity between the large, adjacent, high quality habitat corridors.

SCP CONSERVATION, LLC

1

DRAFT Rabbit Creek Mitigation Bank Prospectus

Table 1: Summary information for the proposed Bank

BACKGROUND INFORMATION Project Name

Rabbit Creek Mitigation Bank

Project Sponsor

SCP Conservation, LLC

Project Consultant

Applied Land Restoration, LLC

Project Land Owner

Colorado State Land Board

Site Location

Section 16, Township 10N, Range 71W

Counties within the watershed

Larimer and Weld

HGM Classifications

Freshwater Forested / Shrub Wetland and Riverine

6-digit HUC

South Platte 101900

8-digit HUC

Cache La Poudre 10190007

12-digit HUC

Rabbit Creek 101900070702 Cache La Poudre 10190004 Big Thompson 10190006

Proposed Primary Service Area Clear 10190004* St. Vrain 10190005*

*Only the portion of these watersheds above 6000' east of the hogback of the Front Range

Ecoregion

Foothills Shrublands (L4) - Southern Rockies (L3)

Protection Mechanism

Conservation easement

Monitoring Frequency

Annually

Anticipated Date of Final Monitoring

2023

Size of Project Area

~640 acres

Threatened Species

Preble's meadow jumping mouse (Zapus hudsonius preblei )

NWI wetland area

~4-acres Freshwater Forest/Shrub Wetland Riverine

Stream Lengths

~11,960 LF of perennial, intermittent, and ephemeral streams

~3-acre

2.0 Ecological Suitability of the Site Situated within the foothills of the Rocky Mountains, the Bank property is characterized by granite outcrops, steep cliffs, gently sloped terraces, rolling hills, and meandering streams. Importantly, the Bank site is surrounded to the east, south, and west by 8,427 acres of the Cherokee State Wildlife Area (SWA) (Figure A-2) and is considered an important ecological buffer between the Cherokee SWA and future development activity. North Fork Rabbit Creek is a perennial channel that runs north to south along the eastern edge of the Bank property before joining the Middle Fork Rabbit Creek a quarter mile downstream. This stream is part of the North Fork Poudre watershed (HUC 10) and is designated with a "high biodiversity significance" and "high urgency" protection rating for connectivity of the riparian corridor (Doyle et al 2005). CPW along with the USFWS lists the site as an occupied corridor for the federally listed Preble's mouse (Figure A-3), Lewis woodpecker (Melaerpes Lewis) and Townsend's big-earred bat (Corynorhinus townsendii pallescens) (Table 2). The site is considered an important summer concentration for bighorn

SCP CONSERVATION, LLC

2

DRAFT Rabbit Creek Mitigation Bank Prospectus

sheep (Ovis canadensis), black bear (Ursus americanus), mountain lion (Puma concolor), and a winter concentration for elk (Cervus elaphus) and mule deer (Odocoileus hemionus) (CWP 2015). The site also provides habitat for hawks and other raptors, including the Peregrin falcon (Falco peregrinus). In addition to being primarily surrounded by state lands, the USFS Roosevelt National Forest is approximately 2.5 miles to the west and seven miles to the south. Table 2: List of global, state, and CWAP ranked species (CWP 2015) within the proposed Bank State Scientific Name

State Common Name

Melaerpes lewis Corynorhinus townsendii pallescens Zapus hudsonius preblei

Lewis Woodpecker Townsend's Big-eared bat subsp Meadow jumping mouse subsp Rocky Mountain juniper/Mountain Juniperus scopulorum/ Cercocarpus montanus woodland mahogany woodland Populus deltoides/Symphoricarpos occidentalis woodland Cottonwood/Western snowberry woodland Cercocarpus montanus/Elymus lanceolatus ssp Mountain mahogany/Griffith's wheatgrass Hesperostipa comata -Bouteloua gracilis-Carex filifolia Needle and thread-blue grama mixed grass Cercocarpus montanus/Muhlenbergia montana shrublandMixed mountain shrubland Callophrys mossii schryveri Schryver's elfin Celastrina humulus Hops feeding azure Aletes humilis Larimer aletes Besseya wyomingensis Wyoming coral-drops Potentilla rupincola Rocky mountain cinquefoil Pinus ponderosa/Leucopoa kingii woodland Foothills ponderosa pine savanna Populus augustifolia/Alnus incana woodland

Montane riparian forest

Global Rank

State Rank

Species Priority

G4 G3G4T3T4 G5T2

S4 S2 S1

Tier 1 Tier 1

G2

S2

G2G3 GU G5 GU G4T4 G2G3 G2G3 G5 G2 G3

S2 S2 S2 S2 S2S3 S2 S2S3 S1 S2 S3

G3

S3

Tier 2

Tier 2 Tier 2

2.1 Sufficient Water Rights The Colorado Water Conservation Board (CWCB) holds an instream flow right along the entire 13 mile stretch of North Fork Rabbit Creek, including the portion within the Bank property. Recommended flow rates range from 0.78-CFS in late summer/fall to 4.85-CFS during the spring. This right was established in 1985 and provides instream flow protection sufficient to ensure the long-term sustainability of the Bank. By utilizing the existing surface and ground water rights of the project site (Appendix C), the Colorado Office of the State Engineer will verify the sufficiency of water rights to support the restoration activities. 2.2 Baseline Documentation Pre-Cambrian granite and granodiorite outcrops form the scenic setting through which North Fork Rabbit Creek flows. The proposed Bank is in the Cache La Poudre watershed (HUC 10190007), with the majority of the watershed in Larimer and Weld counties of north central Colorado. The Bank is located within the Southern Rockies (21); subsection 21d ­ Foothill shrubland ecoregion (Chapman et.al 2004). This Foothill shrubland ecoregion contains a mix of grassland types, including blue grama (Bouteloua gracilis), Junegrass (Koeleria macrantha), and western wheatgrass (Pascopyrum smithii). Willows (Salix sp.) and cottonwood galleries (Populus augustifolia) are found along the stream channels with mountain mahogany (Cercocarpus ledifolius) and three-leaf sumac (Rhus trilobata). Scattered ponderosa pines (Pinus ponderosa) are found throughout the uplands. Invasive species such as cheatgrass (Bromus tectorum), Canada thistle (Cirsium arvense), Dalmation toad flax (Linaria dalmatica), and leafy spurge (Euphorbia esula) occur in concentrated patches throughout the Bank. SCP CONSERVATION, LLC

3

DRAFT Rabbit Creek Mitigation Bank Prospectus

The valley within the Bank site is steep, with elevations ranging from 6180 MSL along the along the thalweg of North Fork Rabbit Creek to 6820 MSL along the granite ridges (USGS 2014, Figure A-5). The Silver Plume Granite formation creates the outcrops and bluffs of the site and are is source of the coarse alluvium forming the soil matrix of the North Fork Rabbit Creek floodplain (Braddock and Connor 1988). The soils within the Bank represent Quaternary alluvium derived from weathered granite. Farnuf-Boyle-Rock outcrop complex is the primary soil unit along the floodplain of North Rabbit Creek making up 33% of the Bank. The soils consist of a mixture of well-drained clay loam, loam, and silty clay loam resulting from alluvial or eolian deposits. The Wetmore-Boyle-Moen complex (5-40% slopes) is the majority soil type making up 52% of the site. These soils are gravelly coarse sandy loams that range from 5-16 inches from bedrock (NRCS 2017). The site has been under grazing management since the late 1800's. Currently, cattle have unlimited access to North Fork Rabbit Creek and the intermittent tributary. In 2004, the SLB conducted a site survey of the property noting pockets of noxious weed infestations and stream channel incision/bank erosion. Overall, the site was given a "below potential" rating for Functional Integrity due to the presence of invasive species and historic grazing degradation. Removing cattle access to the stream and riparian area was a recommended management strategy (SLB 2004). 2.3 Watershed Approach The Cache La Poudre watershed (HUC 8) is historically and ecologically significant, becoming Colorado's first National Wild and Scenic River in 1986. Decades ago, pioneer trails were established along the North Fork Poudre where the native shortgrass prairie met with the sloped foothills of the Rockies. With intact tracts of prairie-to-foothills habitat quickly dwindling along the Front Range, the Bank's establishment offers a rare opportunity to restore, protect and preserve a valuable large-scale parcel of this unique transitional landscape. The Bank parcel's adjacency to other conserved lands adds to its strategic value. The Larimer County Open Lands Master Plan identifies the importance of establishing and maintaining this type of valuable habitat connectivity stating: "Future conservation projects in this focus area will seek to further realize a mountain to plains concept by protecting additional key areas adjacent to and within existing conservation lands and protecting corridors that link these lands together" (LCDNR 2014). Linking these corridors is vital to the survival of both aquatic and wildlife species, especially the Preble's mouse, whose habitat is extremely limited to these areas alone. Approximately 70% of the watershed is privately owned and thus largely unprotected from development, with the remaining acreage in public lands or trusts; land use here is primarily rangeland/grassland (46%), followed by forest (32%) and urban/built up (2%) (USDA 2009). In addition, the Cache La Poudre watershed is one of the primary drinking water supply sources for the City of Fort Collins, delivering millions of gallons to this rapidly growing municipality. Water quality and conservation measures within the watershed are an important component to the water utility resource plans for the area. At this time, there are several organizations and conservation groups with missions focused on protecting the watershed.

SCP CONSERVATION, LLC

4

DRAFT Rabbit Creek Mitigation Bank Prospectus

3.0 Proposed Service Area and General Need for the Bank The proposed primary service area for the Bank is the entire Cache La Poudre watershed (HUC 8) (10190007) within Colorado and Big Thompson (10190006), and the portions of St. Vrain (10190005) and Clear (10190004) watersheds above 6000 MSL (Figure A-7). Most of the watershed lies within two rapidly developing areas of north central Colorado. The populations of Larimer and Weld counties have grown 13.5% and 16.7% respectively, from 2010 to 2016 (USCB 2016). Growth of the Greeley metropolitan area is the 6th fastest of a city its size in the nation and Fort Collins was ranked 10th. This rate of population expansion and subsequent residential development places a great amount of pressure on land and water resources in the watershed and is expected to continue. Therefore, the Bank is designed and intended to offset unavoidable impacts from the high degree of development activity in the area and to ensure a more sustainable aspect to growth. There are few credits left at established area wetland mitigation banks and there are no stream mitigation banks or credits of which we are aware. Although the Bank is situated adjacent to a state wildlife area, no sufficient protective measures (deed restriction, conservation easement, etc.) exist to protect the Bank site from grazing, mining, or development, nor is there currently a restoration plan in place to restore the incised stream channel and riparian zone that resulted from historic grazing practices. The addition of the Bank property to surrounding conserved lands will provide vital connectivity to the adjacent state wildlife areas and enhance the migration corridors. 4.0 Bank Establishment 4.1 Site Protection Instrument The Colorado State Land Board owns the Bank site in fee simple and, absent the Bank's proposed site protection instrument, would be free to lease the land for cattle grazing or pursue developing the property for commercial purposes. If approved, the Bank mitigation property will be placed under a conservation easement in favor of a certified land trust acceptable to the IRT. The conservation easement will be recorded in the Larimer County deed records and will not only prohibit cattle grazing and commercial development but also restrict any site activities and disturbance that do not support the functional objectives of the project. The site will be monitored annually by the land trust to ensure that these easement restrictions are followed. The conservation easement will include the USACE's rights to enforce the easement and the right to comment on any modifications that could occur at the Bank. 4.2 Determination of Credits The Sponsor anticipates the adoption of the Stream Function Pyramid Framework (Harman et al. 2012) as the assessment methodology for Colorado streams. In the interim, the Sponsor proposes using a modified North Carolina version of the Pyramid Framework to determine the amount of stream credits generated from the project. Credit values will be converted to the Colorado version when available and at the request of the IRT. Functional replacement for wetlands within the project area will be evaluated using the Functional Assessment of Colorado Wetlands (FACWet) methodology (Johnson et al. 2010). Preble's credits will be determined using the methodology recommended by the IRT. Preble's credits that result from habitat acres underlying either stream or wetland credits (404 Credits) will be bundled (but not stacked) with 404 Credits and thereby create "Bundled Credits." The Bundled Credits will not be sold for impacts under different development projects or for more than one permitted activity (332.3(j)(1)(ii).

SCP CONSERVATION, LLC

5

DRAFT Rabbit Creek Mitigation Bank Prospectus

4.3 Mitigation Work Plan The mitigation workplan will be developed in consultation with the CPW and USFWS (Preble's). The workplan will focus primarily on the restoration of the North Fork Rabbit Creek stream corridor. A geomorphic survey of selected areas and stream reaches will be conducted in order to develop final design criteria with the purpose of improving streambank stability and stream function. Existing conditions will be evaluated for departure from reference conditions and restored appropriately. All of the construction will be performed during the dry season with consideration of the Preble's habitat requirements. A Phase I Environmental Assessment, including cultural resources review, will be completed in 2018 (Table 3). Once the existing plant community is determined, a comprehensive plan will be implemented to address the noxious weed infestation. The entire project area will be re-vegetated in a succession of native trees, shrubs, grasses, and forbs designed to represent the natural system. Table 3: Timeline of mitigation activity for the proposed Bank

Mitigation Activity Initial site survey and planning Baseline documentation Geomorphological assessment Design Conservation easement Permitting Restoration activity Riparian buffer planting Monitoring Year 1 Monitoring Year 2 Monitoring Year 3 Monitoring Year 4 Monitoring Year 5

Timeframe

2017-2018

Summer/Fall 2018 Winter 2018/2019 May-September 2019 May-September 2020 May-September 2021 May-September 2022 May-September 2023

4.3.1 North Fork Rabbit Creek Within the Bank, North Fork Rabbit Creek begins at the eastern edge of the Cherokee SWA ­ Lower Unit and flows approximately one-mile south to the southern border of the property. As it crosses this boundary, North Fork Rabbit Creek is a 2nd order stream draining roughly 18 mi2. The mean annual precipitation is approximately 17 inches. The mean annual flow is 7.92 CFS with 7-day 2-year maximum and minimum flow values of 39.6 CFS and 0.086 CFS, respectively (Capesius and Johnson 2009). In September 2013, Larimer County received approximately 15 inches over a three day period resulting in a 25-50yr flood event. In contrast to the average flows, the estimated peak flows for this reach during the flood are estimated between 550-753 CFS (Kohn et al 2016). The result was extensive streambank erosion and mass amounts of debris and material deposition. Channel incision increases as one moves downstream along the reach. Cottonwood galleries and willow samplings exist on the abandoned terraces where several dead trees have fallen into the channel. Cattle currently have unfettered access to the stream where the loamy bank soils are extremely susceptible to erosion. The riparian zone is poorly vegetated along the right descending bank with portions grazed or foraged to bare dirt (APPENDIX B, Photos 1-16). Restoration efforts will

SCP CONSERVATION, LLC

6

DRAFT Rabbit Creek Mitigation Bank Prospectus

focus on reconnecting North Fork Rabbit Creek to a floodplain, if not the historical floodplain. Special attention will be given to the restoration feasibility of allowing heavy equipment within the Preble's habitat. Streambanks will be stabilized by sloping the banks and reseeding/ live-staking with native vegetation. These plantings will not require irrigation. A major focus will be placed on riparian plantings to restore the historic presence of dense willows, cottonwoods, etc. and a thick understory of native grasses and forbs that were reduced or removed by intense grazing practices. A management plan based on CPW recommendations will be developed to control the non-native species and reestablish the floodplain with an optimized mix of native trees, shrubs and grasses. 4.3.2 Intermittent Tributary (Reach A) There is one unnamed intermittent tributary, Reach A, which bisects the Bank from the west. This channel is approximately 6,376 LF with a valley slope of 1.4%. This stream winds through the granite outcrops down to the North Fork Rabbit Creek at station 2+999. The channel is exposed along the bedrock substrate, and flows subsurface where alluvium is present. Cattle access will be restricted in order for plant community populations to recover. 4.3.3 Wetlands Freshwater forested/shrub wetlands exist along the North Fork Rabbit Creek corridors with riverine wetlands found along Reach A (USFWS, Figure A-6). A formal wetland delineation will be conducted to determine the jurisdictional status of these areas. Table 4: List of stream reaches, stream and wetland types, and associated lengths within the proposed Bank

Name

Stream Type

North Rabbit Creek

Perennial

5,000

Reach A

Intermittent

6,380

Wetlands

Length (LF)

Freshwater Forested / Shrub

~ 4-acres

Riverine

~3-acres

4.3.4 Riparian Buffer / Preble's meadow jumping mouse Preble's thrive in a diverse and densely populated riparian corridor. Usage of the adjacent upland buffer, several hundred feet beyond the 100-year floodplain, is important for forage and flood avoidance (USFWS 2010). The entire mitigation area will be re-vegetated through hand planting of native tree, shrub, and herbaceous species with applicable stems/acre densities. A minimum 300-ft buffer will be maintained where property boundaries allow and increased to include upland buffers where slopes steepen. During the dormant season, willows (Salix sp.), chokecherry (Acer negundo) and cottonwood (Platanus occidentalis) stakes will be placed along the streambanks of North Fork Rabbit Creek. Tree and shrub seedlings will be planted in winter 2018-2019. The floodplain zone will consist of the appropriate floodplain species with a representative understory, while the upland buffers will consist of a shortgrass prairie mix. An invasive species control plan will also be developed. Establishment of baseline plant community monitoring transects is planned for summer 2018.

SCP CONSERVATION, LLC

7

DRAFT Rabbit Creek Mitigation Bank Prospectus

4.4 Technical Feasibility The restoration and management methods proposed for the Bank are standard activities that have been conducted for similar stream mitigation sites and have been shown to be effective. There will be no operable control structures within the Bank site that will require management in perpetuity. Performance standards will be in place to evaluate the success of restoration efforts, and an adaptive management and adaptive monitoring plan will provide the ability to detect problems and devise specific solutions if they arise. 5.0 Bank Operations 5.1 Sponsor Qualifications The Bank Sponsor, SCP Conservation LLC, (SCP) is a Colorado limited liability company majority owned and managed by Gray Stevens. SCP will not only develop and implement the Bank project but also maintain and monitor the site with annual reports submitted to USACE and USFWS (Preble's) for review. Gray has an eleven-year track record as a successful mitigation banker and has extensive experience in mitigation bank management, habitat offset markets, real estate, and environmental finance. He is a regular instructor on the business of banking at the USFWS Training Center in Shepherdstown, WV and is a frequent conference speaker on the topic of successful mitigation banking practices. Gray served for several years on the Board of Directors of the Florida Association of Mitigation Bankers. In addition, SCP will be utilizing the consulting expertise of Applied Land Restoration (ALR) and its President Page Shurgar in developing the Cherry Creek Conservation/Mitigation Bank. ALR is a design/build stream and wetland restoration firm specializing in mitigation. Page has been working in the conservation field for twenty years and holds a MS in Biological Engineering with a specialized expertise in stream restoration. She has restored over fifteen miles of streams and associated wetlands with the permitting of multiple mitigation projects. Page currently serves on the Board of Directors of the Ecological Restoration Business Association (formerly National Mitigation Banking Association). 5.2 Performance Standards The overall performance standard and success criteria for wetland and stream compensation will center on demonstrable ecological lift within the project site. This lift will be measured through biological surveys and reinforced through geomorphic monitoring, vegetative monitoring, and qualitative stability indices. The performance standards will follow guidelines from the Compensatory Mitigation Standard Operating Procedure (USACE 2006) and approved by the IRT and USACE. 5.3 Monitoring Requirements Monitoring will be conducted by SCP for five years or until the USACE determines the project is completed. Permanent cross-sections and longitudinal feature parameters will be established following the guidelines set forth in the approved stream mitigation method. Monitoring stations for the Preble's will be established in the riparian corridor. This data will be collected and analyzed annually to determine if success criteria are being met. 5.4 Long-term Management Strategy The long-term management strategy for the Bank will consist of long-term management activities

SCP CONSERVATION, LLC

8

DRAFT Rabbit Creek Mitigation Bank Prospectus

including monitoring, boundary maintenance, and site protection, along with adequate funding for these activities. There will be no artificial structures to maintain or operate on the site. A Long-Term Management Plan (Plan) will be included with the MBI, which will detail management needs, performance standards, costs, and funding mechanism consistent with 33 CFR 332.7(d). The Plan will be developed to ensure perpetual maintenance of the Bank site after all success criteria have been met and all credits released. The Sponsor, or its heirs, assigns, or purchasers, shall be responsible for protecting the Bank in perpetuity. The Long Term Management Plan will be recorded as an attachment to the CE deed. An escrow account will be established by SCP to adequately service long-term management goals. The long-term management activities will initially be conducted by SCP. At a later time, and with approval from the USACE, SCP may designate a long- term steward or an entity to act as steward. 5.5 Adaptive Management Upon a determination by USACE that performance standards have not been met or the compensatory mitigation project is not on track to meet those standards, the monitoring period may be extended. USACE may also revise monitoring requirements when remediation and/or adaptive management are required. In the event that the success criteria have not been met, remedial action will be taken within 90 days. 5.6 Financial Assurances Financial assurances will be provided by SCP following the guidelines set forth in Implementing Financial Assurance for Mitigation Project Success (USACE 2016). 5.7 Project Representatives (Contact List) Bank Sponsor: SCP Conservation, LLC Name: Gray Stevens Address: 1030 3rdAvenue S #304 Naples, FL 34102 Phone Number: 847.404.7509 Email: gstevens@sandycp.com Bank Manager: SCP Conservation, LLC Name: Gray Stevens Address: 1030 3rd Avenue S #304 Naples, FL 34102 Phone Number: 847.404.7509 Email: gstevens@sandycp.com Consultant: Applied Land Restoration, LLC Name: Page Shurgar Address: P.O. Box 7901, Little Rock, AR 72217 Phone Number: 479.200.0504 Email: page@alrland.com Property Owner: Colorado State Land Board Name: Mindy Gottsegen Address: 1127 Sherman Street, Suite 300, Denver, CO 80203 Phone Number: 303.866.3454 x-3318 Email: mindy.gottsegen@state.co.us

SCP CONSERVATION, LLC

9

DRAFT Rabbit Creek Mitigation Bank Prospectus

References

Capesius, J.P., and Stephens, V. C.(2009) Regional Regression Equations for Estimation of Natural Streamflow Statistics in Colorado: U. S. Geological Survey Scientific Investigations Report 2009-5136, 32 p. Chapman, S.S., Griffith, G.E., Omernik, J.M., Price, A.B., Freeouf, J., and Schrupp, D.L., 2006, Ecoregions of Colorado (color poster with map, descriptive text, summary tables, and photographs): Reston, Virginia, U.S. Geological Survey (map scale 1:1,200,000) Colorado Parks and Wildlife (2015) Statewildlife Action Plan Doyle, G.A., S.L. Neid, and R.J. Rondeau (2005) Final Report: Survey of Critical Biological Resources, Larimer County, Colorado. Colorado Natural Heritage Program, Fort Collins, CO. Harman, W., R. Starr, M. Carter, K. Tweedy, M. Clemmons, K. Suggs, C. Miller (2012) A Function-Based Framework for Stream Assessment and Restoration Projects. US Environmental Protection Agency, Office of Wetlands, Oceans, and Watersheds, Washington, DC EPA 843-K-12-006 Johnson, J. Bradley, Mark Beardsley, and Jessica Doran. 2010. The Functional Assessment of Colorado Wetlands (FACWet) Methodology. Retrieved from: http://rydberg.biology.colostate.edu/FACWet/ Kohn, M.S., Stevens, M.R., Harden, T.M., Godaire, J.E., Klinger, R.E., and Mommandi, A.(2016) Paleoflood investigations to improve peak-streamflow regional-regression equations for natural streamflow in eastern Colorado, 2015: U.S. Geological Survey Scientific Investigations Report 2016­5099, 58 p. Larimer County Department of Natural Resources (2014) Larimer County Open Lands Master Plan Draft. Larimer County DNR Open Lands Program USACE (2013) Montana Stream Mitigation Procedure (MTSMP). Omaha District. February 2013 USEPA and USACE (2008) Compensatory Mitigation for Losses of Aquatic Resources, Final Rule. Regulation 40CFR Part 230 USACE (2016) Implementing Financial Assurance for Mitigation Project Success Institute for Water Resources U.S. Army Corps of Engineers Alexandria, VA. March 2016 USDA (2009) Cache La Poudre Rapid Assessment. Colorado Department of Agriculture State Conservation Board, United States Department of Agriculture, Natural Resources Conservation Service, Lakewood, Colorado RWA 10190007 October 2009 USEPA (1972) Clean Water Act, CWA. 33 U.S.C. §1251 et seq. Regulation 40 C.F.R. pts. 104-149. Charleston Regulatory Division - Standard Operating Procedure Issued September 19, 2002 Compensatory Mitigation USFWS (2010) Designation of revised critical habitat for the Preble's meadow jumping mouse in Colorado, Zapus hudsonius preblei, United States Fish and Wildlife Service Ecological Services Field Office, Lakewood, Colorado. USGS (2016) Colorado Streamstats Basin Characteristics. Retrieved from: http://streamstatsags.cr.usgs.gov/v3_beta/BCreport.htm USCB (2015) United States Census Bureau, Quick Facts V2015 Retrieved from: http://www.census.gov/quickfacts/table/PST045215/08031 Decker (2007) Rocky Mountain Lower Montane Foothill Shrubland Ecological System Ecological Integrity Assessment, Colorado Natural Heritage Program, Colorado State University. Soil Survey Staff, Natural Resources Conservation Service, United States Department of Agriculture. Web Soil Survey. Available online at https://websoilsurvey.sc.egov.usda.gov/. Accessed [05/5/2017]. SCP CONSERVATION, LLC

10

DRAFT Rabbit Creek Mitigation Prospectus

Appendix A Figures

SCP CONSERVATION, LLC

11

DRAFT Rabbit Creek Mitigation Prospectus

Figure A-1: Vicinity Map for the Rabbit Creek Mitigation Bank

SCP CONSERVATION, LLC

12

DRAFT Rabbit Creek Mitigation Prospectus

Figure A-2: Bank proximity to Cherokee SWA_Lower Unit and Roosevelt National Forest

SCP CONSERVATION, LLC

13

DRAFT Rabbit Creek Mitigation Prospectus

Figure A-3: Preble's meadow jumping mouse range map (http://ndis.nrel.colostate.edu/ftp/index.html)

SCP CONSERVATION, LLC

14

DRAFT Rabbit Creek Mitigation Prospectus

Figure A-4: Topographic map for the proposed Bank (USGS 24K)

SCP CONSERVATION, LLC

15

DRAFT Rabbit Creek Mitigation Prospectus

Figure A-5: Proposed primary service areas for the Bank

SCP CONSERVATION, LLC

16

DRAFT Rabbit Creek Mitigation Prospectus

Figure A-6: Aerial map of stream and wetland classifications at the proposed Bank

SCP CONSERVATION, LLC

17

DRAFT Rabbit Creek Mitigation Bank Prospectus

Appendix B Photo documentation

SCP CONSERVATION, LLC

18

DRAFT Rabbit Creek Mitigation Prospectus

Figure B-1: Photo points taken in July 2016 of the proposed Cherry Creek Mitigation Bank

SCP CONSERVATION, LLC

19

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 1: Beginning of North Fork Rabbit Creek as it enters the Bank site

Photo 2: North Fork Rabbit Creek facing downstream (12/20016)

SCP CONSERVATION, LLC

20

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 3: View of riparian area on the right descending bank of North Fork Rabbit Creek

Photo 4: Begining of channel with moderate incision

SCP CONSERVATION, LLC

21

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 5: Bank erosion along right descending bank of North Fork Rabbit Creek

Photo 6: View of incised North Fork Rabbit Creek with actively eroding bank facing upstream

SCP CONSERVATION, LLC

22

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 7: Cottonwood gallery along the abandoned terrace of the North Fork Rabbit Creek

Photo 8: North Fork Rabbit Creek facing downstream SCP CONSERVATION, LLC

23

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 9: North Fork Rabbit Creek showing cattle access to the stream

Photo 10: Eroding streambank along the left descending bank of North Fork Rabbit Creek

SCP CONSERVATION, LLC

24

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 11:Trees in the channel along a collapsed streambank

Photo 12: View of mainstem North Fork Rabbit Creek facing downstream

SCP CONSERVATION, LLC

25

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 13: Cactus plant along the riparian zone

Photo 14: Bare dirt along the right bank of the North Fork Rabbit Creek

SCP CONSERVATION, LLC

26

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 15: View of collapsed bank along North Fork Rabbit Creek

Photo 16: View of upland area between Reach A and North Fork Rabbit Creek

SCP CONSERVATION, LLC

27

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 17: Bighorn sheep along North Fork Rabbit Creek, December 2016

Photo 18: View of the Reach A looking upstream

SCP CONSERVATION, LLC

28

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 19: Reach A bedrock controlled step-pool

Photo 20: Bedrock lined pool along Reach A below the waterfall

SCP CONSERVATION, LLC

29

DRAFT Rabbit Creek Mitigation Bank Prospectus

Photo 21: Waterfall at the base of the granite outcrop

Photo 22: Upper portion of Reach A facing downvalley toward the floodplain of North Fork Rabbit Creek

SCP CONSERVATION, LLC

30

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas