Collier, THOMASSON PHX LLC, Naples, Florida

PROJECT PURPOSE:

Basic: The basic project purpose is for a residential development.

Overall: To construct a multi-family residential development with associated parking areas, landscaping and a stormwater system in Collier County, Florida.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: THOMASSON PHX, LLC

BRIAN HOWELL – MANAGING MEMBER

13180 LIVINGSTON ROAD, SUITE 204

NAPLES, FL 34109

WATERWAY AND LOCATION: The 3.78± acre Compass Place project site is located in Section 23, Township 50S, and Range 25E, of Collier County, Florida. More specifically; the site is located east of Bayshore Drive and immediately south of Thomasson Drive, in Naples, Florida (26°06’30.98” N, 81°46’06.40” W).

Directions to the site are as follows: Start of Project: From Interstate 75, Take Exit 105. Head West onto County Rd 886/Golden Gate Pkwy. Head South onto Santa Barbara Blvd. Head West onto Rattlesnake Hammock Rd. Continue straight to stay on Rattlesnake Hammock Rd. Continue straight onto Thomasson Dr. Site will be on South just before intersection of Bayshore Drive

APPROXIMATE COORDINATES: Latitude: 26.10860°

Longitude: -81.76844°

PROJECT PURPOSE:

Basic: The basic project purpose is for a residential development.

Overall: To construct a multi-family residential development with associated parking areas, landscaping and a stormwater system in Collier County, Florida.

EXISTING CONDITIONS: The site is undeveloped and is composed of exotic infested disturbed lands with hydric disturbed land habitat. The site is bordered on the north of Thomasson Drive, the south and east by residential homes along Thomasson Drive and Cottage Grove Avenue, and to the west by a general food store, and storage yard, along Bayshore Drive, with undeveloped, but disturbed natural areas.

PROPOSED WORK: To discharge of 4,372 cubic yards of fill in 2.71 acres of freshwater forested wetlands for the construction of two (2) 15,788 square foot, 10-unit row-houses, along with parking area in the rear, utility infrastructure, storm-water management system, landscaping, and irrigation system. Approximately 2.71± acres of direct impacts are proposed for this project along with 0.38 acres which will be preserved and placed in a Conservation Easement.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:

The wetlands on the property are low in quality and dominated by exotic species. The site plan was minimized to provide approximately 0.38± acres of wetland preserve area that also acts as additional buffer to the residents to the south of the site. Based on the surrounding land uses and lack of adjacent undeveloped areas, off-site mitigation was considered to be the best alternative for the majority of the unavoidable wetland impacts. Wetland impacts are necessary in order to best utilize the available land and create a feasible project.

COMPENSATORY MITIGATION: The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:

Compensatory mitigation for the proposed 2.71 acres of direct and secondary freshwater forested wetland impacts will be provided by the purchase of 0.83 UMAM credits from an approved mitigation bank. In addition, 0.38 acres of onsite wetlands will be preserved in perpetuity under a conservation easement.

CULTURAL RESOURCES: The referenced project area was previously coordinated with and reviewed by the Florida Department of State – Division of Historical Resources (DHR.)

Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the project area.

ENDANGERED SPECIES:

The Corps has determined the proposed project may affect, but is not likely to adversely

affect the Eastern indigo snake (Drymarchon corais couperi). Based on the Eastern

Indigo Snake Effect Determination Key (dated August 1, 2017), the Corps determination sequence resulted in A > B > C > D > NLAA. The Permittee agrees to use the Standard Protection Measures for the Eastern Indigo Snake (dated August 12, 2013). The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through use of the aforementioned determination keys.

The Corps has determined the project may affect, but is not likely to adversely the wood stork (Mycteria americana). The Corps received FWS concurrence letter, dated May 18, 2010 (amended on August 13, 2013) for all work that results in a “may affect, not likely to adversely affect” determination using the Wood Stork Effect Determination Key. The applicant will provide the required short/long hydroperiod compensation through the purchase of federal credits at a mitigation bank within the service area. The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through use of the aforementioned determination keys.

The Corps has determined the proposed project may affect, but is not likely to adversely

affect the Florida scrub-jay (Aphelocoma coerulescens) or its designated habitat. The

proposed project is within the consultation area for the Florida scrub-jay. No habitat

types utilized by Florida scrub-jays are found within or adjacent to the project area. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act.

The Corps assessed the potential for the proposed project to impact the endangered Florida bonneted bat (FBB) (Eumops floridanus), because a portion of the project is located within the consultation area and not a focus area within Collier County. The project will impact 3.40 acres of disturbed upland and disturbed wetland habitat. The project site is less than 5 acres and does not include potential roost sites (e.g., large cavity trees or trees with hollows, snags, or abandoned buildings). There was little to no habitat located on-site for the FBB; there were no potential roost sites were found to occur within the work area, during species surveys or other site visits by the consultant. Therefore, the Corps has determined the project “may affect, not likely to adversely affect” (MANLAA) the Florida bonneted bat if BMPs are used. The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through use of the Florida Bonneted Bat Consultation Guidelines (July 2017).

The Corps has determined the proposal would have no effect on any other listed

threatened or endangered species or designated critical habitat.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the project area of reference. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification is under reviewed from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Fort Myers Permits Section, 1520 Royal Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 within 14 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Stephen Fleming, in writing at the Fort Myers Permits Section, 1520 Royal Palm Square Boulevard, Fort Myers, Florida 33919; by electronic mail at stephen.j.fleming@usace.army.mil; by facsimile transmission at (239)334-0797; or, by telephone at (239) 334-1975.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS FORT MYERS REGULATORY OFFICE 1520 ROYAL PALM SQUARE BLVD., SUITE 310 FORT MYERS, FLORIDA 33908 REPLY TO ATTENTION OF

Regulatory Division West Permits Branch Fort Myers Permits Section

September 28, 2017

PUBLIC NOTICE Permit Application Number SAJ-2017-00991 (SP-SJF) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: THOMASSON PHX, LLC BRIAN HOWELL ­ MANAGING MEMBER 13180 LIVINGSTON ROAD, SUITE 204 NAPLES, FL 34109 WATERWAY AND LOCATION: The 3.78± acre Compass Place project site is located in Section 23, Township 50S, and Range 25E, of Collier County, Florida. More specifically; the site is located east of Bayshore Drive and immediately south of Thomasson Drive, in Naples, Florida (26°06'30.98" N, 81°46'06.40" W). Directions to the site are as follows: Start of Project: From Interstate 75, Take Exit 105. Head West onto County Rd 886/Golden Gate Pkwy. Head South onto Santa Barbara Blvd. Head West onto Rattlesnake Hammock Rd. Continue straight to stay on Rattlesnake Hammock Rd. Continue straight onto Thomasson Dr. Site will be on South just before intersection of Bayshore Drive APPROXIMATE COORDINATES: Latitude: 26.10860° Longitude: -81.76844° PROJECT PURPOSE: Basic: The basic project purpose is for a residential development. Overall: To construct a multi-family residential development with associated parking areas, landscaping and a stormwater system in Collier County, Florida. EXISTING CONDITIONS: The site is undeveloped and is composed of exotic infested disturbed lands with hydric disturbed land habitat. The site is bordered on the north of Thomasson Drive, the south and east by residential homes along Thomasson Drive and Cottage Grove Avenue, and to the west by a general food store, and storage yard, along Bayshore Drive, with undeveloped, but disturbed natural areas.

PROPOSED WORK: To discharge of 4,372 cubic yards of fill in 2.71 acres of freshwater forested wetlands for the construction of two (2) 15,788 square foot, 10-unit row-houses, along with parking area in the rear, utility infrastructure, storm-water management system, landscaping, and irrigation system. Approximately 2.71± acres of direct impacts are proposed for this project along with 0.38 acres which will be preserved and placed in a Conservation Easement. AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The wetlands on the property are low in quality and dominated by exotic species. The site plan was minimized to provide approximately 0.38± acres of wetland preserve area that also acts as additional buffer to the residents to the south of the site. Based on the surrounding land uses and lack of adjacent undeveloped areas, off-site mitigation was considered to be the best alternative for the majority of the unavoidable wetland impacts. Wetland impacts are necessary in order to best utilize the available land and create a feasible project. COMPENSATORY MITIGATION: The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: Compensatory mitigation for the proposed 2.71 acres of direct and secondary freshwater forested wetland impacts will be provided by the purchase of 0.83 UMAM credits from an approved mitigation bank. In addition, 0.38 acres of onsite wetlands will be preserved in perpetuity under a conservation easement. CULTURAL RESOURCES: The referenced project area was previously coordinated with and reviewed by the Florida Department of State ­ Division of Historical Resources (DHR.) Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the project area. ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the Eastern indigo snake (Drymarchon corais couperi). Based on the Eastern Indigo Snake Effect Determination Key (dated August 1, 2017), the Corps determination sequence resulted in A > B > C > D > NLAA. The Permittee agrees to use the Standard Protection Measures for the Eastern Indigo Snake (dated August 12, 2013). The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through use of the aforementioned determination keys.

2

The Corps has determined the project may affect, but is not likely to adversely the wood stork (Mycteria americana). The Corps received FWS concurrence letter, dated May 18, 2010 (amended on August 13, 2013) for all work that results in a "may affect, not likely to adversely affect" determination using the Wood Stork Effect Determination Key. The applicant will provide the required short/long hydroperiod compensation through the purchase of federal credits at a mitigation bank within the service area. The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through use of the aforementioned determination keys. The Corps has determined the proposed project may affect, but is not likely to adversely affect the Florida scrub-jay (Aphelocoma coerulescens) or its designated habitat. The proposed project is within the consultation area for the Florida scrub-jay. No habitat types utilized by Florida scrub-jays are found within or adjacent to the project area. The Corps will request U.S. Fish and Wildlife/National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act. The Corps assessed the potential for the proposed project to impact the endangered Florida bonneted bat (FBB) (Eumops floridanus), because a portion of the project is located within the consultation area and not a focus area within Collier County. The project will impact 3.40 acres of disturbed upland and disturbed wetland habitat. The project site is less than 5 acres and does not include potential roost sites (e.g., large cavity trees or trees with hollows, snags, or abandoned buildings). There was little to no habitat located on-site for the FBB; there were no potential roost sites were found to occur within the work area, during species surveys or other site visits by the consultant. Therefore, the Corps has determined the project "may affect, not likely to adversely affect" (MANLAA) the Florida bonneted bat if BMPs are used. The Corps has U.S. Fish and Wildlife Service concurrence for the proposed activities through use of the Florida Bonneted Bat Consultation Guidelines (July 2017). The Corps has determined the proposal would have no effect on any other listed threatened or endangered species or designated critical habitat. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the project area of reference. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

3

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification is under reviewed from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Fort Myers Permits Section, 1520 Royal Palm Square Boulevard, Suite 310, Fort Myers, Florida 33919 within 14 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Stephen Fleming, in writing at the Fort Myers Permits Section, 1520 Royal Palm Square Boulevard, Fort Myers, Florida 33919; by electronic mail at stephen.j.fleming@usace.army.mil; by facsimile transmission at (239)334-0797; or, by telephone at (239) 334-1975. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested 4

parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

5

SITE DEVELOPMENT PLAN - PL20150000188 FOR

SECTION 23

TOWNSHIP 50 S

RANGE 25 E

COLLIER COUNTY SITE PARAMETERS

NAPLES, FLORIDA

GENERAL INFORMATION

SITE DATA

SHEET INDEX SHEET NO.

OWNER SQ. FEET

ACRES

PERCENTAGE

TOTAL AREA

164,735

3.78

100%

BUILDING AREA

38,416

0.88

23%

IMPERVIOUS - PAVEMENT

32,237

0.74

20%

THOMASSON PHX, LLC 13180 LIVINGSTON ROAD, SUITE NO. 204 NAPLES, FLORIDA 34109

SHEET TITLE

C-1

COVER SHEET

SDP-1

SITE DEVELOPMENT PLAN

SDP-2

DIMENSIONAL PLAN

PROJECT ENGINEER:

PROJECT SURVEYOR:

SDP-3

WATER MANAGEMENT PLAN

COASTAL ENGINEERING CONSULTANTS, INC. 3106 SOUTH HORSESHOE DRIVE NAPLES, FLORIDA 34104 (239) 643-2324

SDP-4

UTILITY PLAN

SDP-4.1

UTILITY DETAILS

IMPERVIOUS - MISC

12,745

0.29

8%

PERVIOUS

37, 173

0.85

22%

PHOENIX ASSOCIATES OF FLORIDA, INC. 13180 LIVINGSTON ROAD, SUITE NO. 204 NAPLES, FLORIDA 34109 (239) 596-9111

PERVIOUS - WATER MANAGEMENT

13,273

0.31

8%

AGENT:

PROJECT LANDSCAPE ARCHITECT:

SDP-4 ..2

UTILITY DETAILS

PERVIOUS - NATIVE PRESERVATION

30,891

0,71

19%

PHOENIX ASSOCIATES OF FLORIDA, INC. 13180 LIVINGSTON ROAD, SUITE NO. 204 NAPLES, FLORIDA 34109 (239) 596-9111

BIG CYPRESS LANDSCAPING CO., INC. 5931 SEA GRASS LANE NAPLES, FLORIDA 34116 (239) 417-2688

SDP-5

EROSION CONTROL PLAN

L-1

LANDSCAPE PLAN

L-2

IRRIGATION PLAN

ZONING SUBJECT PROPERTY: RMF-6-BMUD-R2

LEGAL DESCRIPTION - PARCEL ID: 52600200009, 52600240001, 52600280003, 52600320002, 52600360004

SURROUNDING PROPERTIES: NORTH - R.0.W. (THOMASSON DR) THEN RPUD-BMUD'R2 (CIRRUS POINTE) SOUTH - RMF-6-BMUD-Rl EAST - RMF-6-BMUD-R2 WEST - RMF-6-BMUD-R2

L.&.I

u

> < ...I

BUILDING INFORMATION

DIMENSIONAL STANDARDS REQUIRED

PROVIDED

25'-0 11

600'-0"

MIN. LOT W IDTH MIN. FLOOR AREA MIN. LOT DEPTH

1,000 SF

1,306 SF

NIA

NIA

BUILDING #100 TOTAL - 15,788 SF NC- 13 060 SF NON NC - 2,728 SF TYPE 111-B CONST. SPRINKLERED ONE STORY

BUILDING #200 TOT AL - 15,788 SF NC-13 060 SF NON NC - 2, 728 SF TYPE 111-B CONST. SPRINKLERED ONE STORY

BUILDING #300 TOTAL - 342 SF NC-0 SF NON NC - 342 SF

25'--0" 15'--0'' 5'-0" 5'-0"

25'-0" 93'-6" 45'-11" 46 1-6"

>Q,. Cl;:: z ... 1-

ZONED MAX. BUILDING HGT.

35'-0''

15'-10"

ACTUAL BLDG. HEIGHT

NIA

.2s·-1 o~'

BUILDING SEPARATION

N/A

19'-011

8.0' NAVD

8.0' NAVD

Ill"

ONE STORY

REVISIONS DATE 09/14/2016 08/10/2017

I

~

-

GENERAL NOTES

v ,

"s

~

1Qma:;.501,

REQUIRED TOTAL PARKING SPACES REGULAR SPACES HANDICAPPED SPACES

40

PROVIDED 42

40

40

2

2

El

or

0

T~omas,on

r- ----------- --1I I

...

Nll?lt! flll/Mr.·.41 D·rri,..

II

fl« l'.-i_4

SITE

·

·

3

(111J~ge Ginvt '""''

B Thorna;;.s1.1n 0

01

I

U,jlttltlt- r;ravE-,

2

SCOPE OF WORK TO CONSTRUCT (2) 10-UNIT ROWHOUSES ALONG WITH PARKING AREA IN THE REAR, UTILITY INFRASTRUCTURE, STORMWATER MANAGEMENT SYSTEM, LANDSCAPING & IRRIGATION SYSTEM.

t

~

~Rr,t

Or

iW-:n D

6. GENERAL CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS BEFORE THE START OF CONSTRUCTION.

ii'

"1'

i?

"';/

F ~ I rJlfJi~

.

-'

,..,!,.IJ '1'!'1'

i(l'mif ~lt~ '·cw

HDr1 ~C:hul\"fl -.,

..

-

NOT AUTHORIZE THE CONSTRUCTION OF REQUIRED IMPROVEMENTS, WHICH ARE INCONSISTENT WITH EXISTING EASEMENTS OF RECORD.

5. VEGETATION TO REMAIN SHALL BE PROTECTED WITH APPROVED BARRICADING (DETAIL SHOWN) AND BARRICADING, WILL REMAIN IN PLACE UNTIL COMPLETION OF CONSTRUCTION.

l,!.

DENSITY RMF-6 = 6 UNITS PER ACRE 3.78 ACRES x 6 = 23 UNITS ALLOWED BUILDING #100 = 10 UNITS BUILDING #200 = 10 UNITS TOTAL = 20 UNITS PROVIDED

0 u

2. THE REVIEW AND APPROVAL OF IMPROVEMENT PLANS DOES

MAINTENANCE OF ALL FEATURES OF THE SURFACE WATER MANAGEMENT SYSTEM AS OUTLINED BY THE DESIGN ENGINEER ON THESE DRAWINGS.

., _

> v

0

< f5Z ~ 0M

"' ~

.!i .,

r! 0

·;;;

'"""

c-=

LU

SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER.

4. THE PROPERTY OWNER IS RESPONSIBLE FOR THE PERPETUAL

f l·m'°"IWV ir. l1iicil ~

Cl.

<

~~~DsS~¥~~~~~NJN~ii;._t ~~~~~t~:~~~XE?i~RP~~PlfJ1¥~E

3. THE PROPERTY OWNER IS RESPONSIBLE FOR REPLACEMENT OF ALL LANDSCAPE MATERIAL AND FOR THE MAINTENANCE OF THE REQUIRED IRRIGATION SYSTEM.

t

1 -~---------- J·

=

-

"

:

I

.!1

BICYCLE SPACES

'

~

PER COLLIER COUNTY LDC 4.02.16 (F) MULTI-FAMILY (3 OR MORE BEDROOM)= 2 PER UNIT

<

rJ) V) Cl 0 V)"" u rJ)

1. EXOTIC VEG ElATION AS DEFINED BY THE COLLIER COUNTY

PARKING CALCULATIONS 20 UNITS x 2 = 40 PARKING SPACES

REVISION PER COLLIER COUNTY COMMENTS DATED 3/9/2016 PER COLLIER COUNTY COMMENTS DATED 10/12/2016

l~~ e!l.-(.lhor~

0

""z

~i~!~ r~1~~tl:slED

~c

LU

O<=i

1

Bo1~nr....itN!OGl' D:ln(J ~flll!1j1,1m

::;

LU

0.:: N

VICINITY MAP

MIN. YARD REQUIREMENTS NORTH: SOUTH: EAST: WEST:

FINISH FLOOR ELEVATION

'

LOTS 5 THROUGH 10, tONESVILLE, ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 4, PAGE 41, PUBLIC RE ORDS OF COLLIER COlJNTY, FLORIDA.

0

§

0

.i!i

z ~ ~ ~ 0"'

~

~

--

~

.... "" 0 0 Sf ~ ~~

-l

u

.. ~<= zc:i 0

0 z

z

~ ,.g 0

.

SHEET

l·;u1l l1a111an Oill5llf'lr3 111.~llor !I OOf~I

R~ouJ>i'C t:r

~~PIJUllC DI

-

-"'"' ~...~

C-1

..0

"" ~ ·

A SECTION 'A'

N.T.S.

--------

--------

3.67'

60' PUBLIC RIGHT-OF-WAY

21.33 2.5% SLOPE

4.6'

A COUNTY PERMIT TO PERFORM WORK AN_D I O_R_MAINTEN~NC_J'.J~ !'_U_BJ_;>IC~_, -

THOMASSON DRIVE __

-~~c=~ -

25.0' 4.4'

4.3'

4.4'

4.3'

-~

----- .,

,4.0'

--------

RIGHT-OF-WAY IS REQUIREED FOR WORK WITHIN THE PUBLIC R.O.W.

"-------------------------------------------

_--- - -- -- - - - -- - - --- - -- -- - - - -- - - --- - -- -- -

M ES-1Di=="l.;==='~E==)~=!GM_!S-1_ THOMASSON

-------------------------------------------------------------------------------

==================

~ ~

CB-S - - ------ ---- -- ---

- ---

~ ~

- ------ ------ ---- -- ---

- ---

- ---

4 .6' r -----

~

~ ~ ~~~:=:-=.~=~~~"·~·~~~··=='f=icG_ == =~

~ ~

- ------ ------ ---- -- ---

4.5'

- ------ ------ ---- -

--

--

DRIVE

WSWT - 0.00' NAVO

! ii!P"-~'l i_J

UN IT 210

SECTION 'B'

N.T.S.

UNIT 207

UNIT 206

II

UNIT 204

UNIT 205

UNIT 203

UNIT 202

UNIT 201

UNIT 110

UNIT 109

UNIT 108

UNIT 106 II' UNIT 105

UNIT 107

BUILDING #200

BUILDING #100

TOTAL-15,78BSF AIC-13060SF NON A/c- 2,728 SF TYPE 111-B CONST. SPRINKLERED ONE STORY F.F.E. -8.0' NAVD

TOTAl- 15,788 SF AIC- 13 060 SF NON 2,728 SF TYPE 111-B CONST. SPRINKLERED ONE STORY F.F.E. - 8.0' NAVD

UNIT 104

UNIT 103

UNIT 102

~

UNIT 101 5.4'

Ne-

B

I

I

10.0'

5.0'

20.0'

2% SLOPE

2% SLOPE

2% SLOPE

6.0'

UN IT 208

E

46.4'±

6.2'

UNIT 209

VARIES-10.7' TO 12.1'

5.4'

5.0'

4.1 '

...

4.1'

'l. -_J

I'

7.9'

'

---~_._§_MQ~---- -------------

RE:TAINING WALL

7.9'

I \

REFER:--.f:=~J

TO SDP-2 FOR DETAIL

··············································································································wswr· o.oo' ;;;.;;I''

7.2'

~

I 6.\' I

SECTION 'C'

6.9'

N.T.S.

j

r

-

-

-

-

-

~ ~~'·''~'~#;I~

--------------j 2.0' I -----------j 2.0· I

63.2'

22.0'

6.5'

56.7' NATIVE PRESERVATION

25%

1

8.4'

10.2'

5.2'

25% SLOPE

B.4'

9.2'

25% SLOPE

25% SLOPE

\

I

I

------------~-----------------------------------""(,,/ I -~ ----c:v --- -~ ----c:v --- -~----c:v- -- -~- - 1 :

~--~-----------------------------------l:IEr------------

"

:

l

''--:

I I

:

1

"

:

-

-- -

-

-- -

-

(IQ'.]- -

-- -

-

-- -

------------- ------------,1 / I

I

:

I

I

~

-----------r/ -----------·--,

----- -

- 12.o· f-

----c:v --- ---- ---~

~

-~-

LLJ__.....---....:"__________ - ------------------

L

..............................................................................................................................

-

-

--

-

-- -

-

-

I

w

NATIVE PR

__.__w___w __w____w__

--- --- -.J/ ~

I

,,

I

I

'·,I

I

"

I

w

I

RVATION = 30891 S.F. 0.71 AC

'.-j/---~-_j___- ---

30.0'

3.6' 1

NATIVE PRESERVATION

' '

33% SLOP 2.9'

8.4'

25% SLOPE

11.2' 25% SLOPE

4.1'

·----

1'

~

l --.;.I __ __

N .T.S.

RIM ELEV. INV. ELEV.

------~.__Q_MQ~_

--

' ~

I

·--------···"

2'-8"

~

[

2"

:::H :::H

H

H

H

H

~

1'-14"

"::\= '"

:<:

H

~

-

FLOW

)-

L_

WSWT - O.!X>' NAVO

I

--

,..If - -FLOW ') 18" RCP

---_.. J ~,\ - -

--

.

·

4'-0"

B"

5'-4"

TYPE

LENGTH

SLOPE

1

15

RCP

68

0.2%

CS..2

2.0'

-0.25'

2

15

RCP

81

0.2%

CEJ..3

4.0'

0.15'

3

15

RCP

199

0.2%

CB-4

2.0'

-0.25'

·

18

RCP

90

0.2%

CS..5

1.6'

- 1.86'

5

18

RCP

132

0.2%

JB·1

7.6'

-1.59'

6

15

RCP

199

0.2%

MES-3

24" CMP BAFFLE

SIZE

0.15'

MES-2

'- RIP RAP

I B" 2"

p

4.2'

ME54

3" ORIFIC E

-

ELEVATION DATA

1.8'

2.0' 2.15'

PLAN VIEW

SECTION 'E'

DRAINAGE STRUCTURE DETAILS

N.T.S. USF 6210 D.S.J.--~ C.I. FRAME & GRATE NO. 5 BARS

VARIES-10.9' TO 12.3'

i

4.7'

20.0' 2% SLOPE

10.0' 2% SLOPE

5.0'

2% SLOPE -

5.6'

4.7'

6.1'

6.2'

s+·-b:

/

.

·

-, ----,

-

6.4'

'l.

.-

2t" '-

BOTIOMOF DETENTION AREA ELEV.= 2.0' ORIFICE ELEV. · 1.0'

~

~

·-

!~RATE_/

1

'r

,

2" CL.

r

I

d

,

T -EYE BOLT SEE INDEX 201

I

f. #4 BARS 0 12" CTRS.

4'-0"

NOTES:

5'-4"

5'-4"

1.) ALL CATCH BASINS TO BE POURED IN PLACE OR PRECAST 2.) All CONCRETE TO BE 8E4,000 P.S.I.

SECTION

FRONT VIEW

4'-0"

8" 2"

2" 8"

.p.>

3.) WHERE TOP SLAB CONSTRUCTION IS NECESSARY, USE B" THICK SLAB W/#5 BARS AT 4· ON CENTER CONTINUOUS INTO CATCH BASIN WALLS.

< ....

w

~

C.::

1:1..

N

I-

Q.. o~~ z"' z

0 u

WATER MANAGEMENT DESIGN CALCULATIONS I JOLX' I NEW GRADE ELEVATIONS

z

zw

~

NOTE: ALL GRADES ARE NAVD.

EXISTING GRADE ELEVATIONS SQ. FEET

ACRES

w

164,735

3.78

100%

IMPERVIOUS- BUILDING AREA {FOOTPRINn

38,416

0.88

23.3%

IMPERVIOUS - PAVEMENT, SIDEWALKS & TRASH ENCLOSURES

44,982

1.03

27.3%

PERVIOUS

68,064

1.56

41.2%

PERVIOUS - DRY DETENTION AREA

13,273

0.31

8.2%

u.J

-

~

1-a..U

~~

CIJi:

w

I-

0

<

C""l

:::

-~

~ c

WATER QUALITY RETENTION/DETENTION DESIGN CRITERIA: IF A DRY DETENTION I RETENTION SYSTEM IS USED, THEN THE SITE MUST DETAIN:

~

.el c"'

"'c:0 z0 ~ ·;;

A. THE FIRST INCH OF RUNOFF FROM THE ENTIRE SITE: 164,735 S.F. X 0.0833 = 13,728 C.F. (0.32 ACJFT) REQUIRED DETENTION

-

"' " " "' 0 ~ """ 0 ....0 0 ...j '.:l $ lil u "~ g ~ .. "';.:.c z0 z ~ i 0 I? ., z

·:;:

B. THE AMOUNT OF 2.5 TIMES THE PERCENTAGE OF IMPERVIOUS: SITE AREA - 3.78 AC- BUILDING AREA 0.88 AC - 2.90 AC - 35.6% OF SITE AREA 2.5" X 35.6% X 126,319 AC= 12,221 CF (0.28 AC-FT) REQUIRED DETENTION

-

-

0. THE REQUIRED DRY DETENTION IS 10,296 C.F. (0.24 ACJFT) 10,296 CF X 150% = 15,444 C.F. (0.35 AC/FT) REQUIRED DETENTION

ITOT AL DRY DETENTION AREA PROVIDED= 16,337 SF (0.38 AC/FT)

0

PERCENTAGE

TOTAL PROJECT/SITE AREA IN WATER MANAGEMENT BASIN

PROVIDED DETENTION FOR WATER QUALITY:

5'

tl:J Vl<> · tl:J :::?: < 0"" < u.. _ -' 0 __. z w -' "'-' < < Q.. :c~o 1;l

C. BECAUSE A DRY DETENTION IS BEING USED, A 25% REDUCTION IS ALLOWED 13,728 C.F. (0.32 AC/Fn X 75% - 10,296 C.F. (0.24 AC/FT)

RECOMMENDED MAXIMUM PIPE SIZE 2'-0" WALL- 18" PIPE 3'-1" WALL- 24" PIPE

TO SDP-2 FOR DETAIL

WSWT = 0.(JO' NAVO

~

SECTION TYPE 'C' CATCH BASIN (CB)

.· 2" 8"

-·

J5+"

PLAN

- -FLOW 18" RCP INV. - 1.40

...................................................................................................................................

2t"

2·-0·

T:::...r~~~;;;jifl..L2 "

I

__J _ _. .

I ------------- ___(~_,_QgAQ_~------------

2'-0"

1-~'-l~ ~-+'~

~-t-t- 3"

~ FLOW

· - -

·

r-------c:~=>==-RETA;~;~-~--~~~~ REFER

3'-4"

@8"0.C.

46.6' ±'

N.T.S.

3'-4"

1-1/2" RECESS

....I

~

LAND USE CHART:

CONTROL ELEVATION - 1.0' NAVD lOYR/1 DAY-3.12'NAVD 25 YR/ 3 DAY = 3.99' NAVO 100 YR/3 DAY= 4.15' NAYD 100 YR/ 3 DAY ZERO DISCHARGE = 4.70' NAVD FEMA FIRM ELEVATION= 7.0' NAVD

1.9'

< <

CS..1

MES-1

u

0 < :::> cnc

STORMWATER STRUCTURE TABLE

4'-0" 8.4' 25% SLOPE

c

D

CONTROL STRUCTURE DETAIL (CS..1)

12.2'

'

u.i

~~~~--~~~-+----~~----~~~~--~~~~ 600.00' N89°45'34'E

c

N.T.S.

16.8'

I

-------------------------- ~, I

i_:_~_w

34.6'

I

-

w

I

WSWT - 0.00' NAVO

63.6'

I

I l<----------- -~ -----------------'» __________________ Jw

_..-----__;x,__G_~Q~-------------------------------------\1.~~~---c:M:_:AX::.;1~1

SECTION 'D'

!

I ·,,_ I

')----------------------------------~------------

'

=

--- ~-----------~, "· ------@ ------- -------------- ~°'.

.L - - - - _/

:

· ,-~CS.1

:

I

I 1

I

I I

~ _,..,{ _________ _ I I ;/

4. 11 4

-----··

/

------------- ------------- ------------- ------------- ------------- ------------- --------------{ ------------- ------------- ------------- ------------- ------------- ------------- -------------?~

r

- - - - - - - - _ : ···= r _=·

~~

SLOPE

2.7'

=~~-=qc-~-=-~=~==/P! 6.5'

69'

------------~-----------------------------------------_, / I 95.4'

j

I

"

0

.Q

'

.!2.

NATIVE PRESERVATION REQUIREMENT-CCLDC 3.05.07(B)(1) RESIDENTIAL & MIXED USE DEVELOPMENT EQUAL TO OR GREATER THAN 2.5 ACRF.S = 25% LOTS 6 THROUGH 9 AND THE WEST '16 OF LOT 5 = 123,541 S.F. (2.84 ACRES) NATIVE PRESERVATION REQUIRED-123,541 S.F. X 25% = 30,885 S.F. (0.71 ACRES) NATIVE PRESERVATION PROVIDED = 30,891 S.F. (0.7 1 ACRES)

SHEET

SDP-3 -------

0

30'

SCALE: 1" = 30'-0"

60'

"-

--------

A COUNTY PERMIT TO PERf-ORM WORK

THOM_ASSON DRl~E.~_,_,A,,NQ/ O_R_MAINTENA~.(]!J~ _fiJ_B_L_IC_ 60' PUBLIC R!GHT-OF·WAY

~

- -----

--------

RIGHT-OF-WAY IS REQUIREED FOR WORK WITHIN THE PUBLIC R.O.W.

><~ -

"

~· 8 ~ ~

600.00'

E

N89 ~ 48'22"

~~~~~~~~~~~~~~~~~~~~--T --

~

z

·I

Q

I I

~

Uw

:ou

r--·

~z

!;;<

~rJ

z~

o~

r--·

LrJ

r--·

LrJ

r--·

LrJ

r--·

LrJ

r--·

LrJ

r--·

LrJ

r--·

LrJ

r--·

LrJ

r--,

r--1

---,

L~J

LrJ

·--,

L~J

·--,

L~J

·--,

L~J

---,

L~J

---,

L~J

·--,

L~J

·--,

L~J

I

I

t

I I I I I I L---'

I

I

t

I I I I I I I

,.-,

I I I I I _,I

. __

t

I I I I I I I

.. __

,.-,

I I I I I I I

I I I I I ....I

t

.. __

I I I I I _,I

,.-,

t

I I I I I I I

.. __

,.-,

t

I I I I I I I

I I I I I _,I

. __

t

I I I I I I I

I I I I I _,I

. __

,.-,

t

I I I I I I I

I I I I I _,I

.. __

,.-,

I I I I I _,I

t

I I I I I I I

.. __

,.-,

I I I I I I I

I I I I I _,I

. _...

,.-~

'

.. __

I I I I I _,I

.- .-... .-... .- .- .- .-... .-... .-

\

I I I I I I I

I I I I I I

...\

I I I I I I I

I I I I I I

I I I I I I I

\ I I I I I I

\ I I I I I I

I I I I I I I

...\

...\

I I I I I I I

I I I I I I

I I I I I I I

I I I I I I

...\

I I I I I I

I I I I I I I

\ I I I I I I

I I I I I I I

'---· '---· '---· '---· '---· '---· '---· '---·

\ I I I I I I I I I I I I I '---·

0

:ti.,

w u. u.

...\

~1!11

gJi~ 15'~

li

a "'.:.:'-' .,to .. 0

.~~ ~ a

~

~.~.s :~

~!! ~'fil~

~

~~~

~

Jl ~~~

~ -E !i'S-

.o;""·ii.]ll g -!'l I< ~

.. ~"'"'<--< ""

·~

-

~ll ~~1!

;:!;

~~·~:~

iI!

l

:!l

..

0

fo-

N

lr-"zi~~

ll

:5-\';olll

c-:'l ~!@ :-;i~

~H ~ ·~ ~ ~ fij ·~·ii>< ~°'

'

-0 1 u 0

'1;l..; Z

1!

~ c

I

i

Q.~

I

0

~

;;;

· u·

:;a

i:il

&1! .,'6 ~

·s

< ; ~

~

~SJ i:i±l

15:""' ',_1 Ii ~ -" :" ~ °§ 1i ! _, ' .. ;;:;1"~:2

0

L--·

!":' _,.§: 1.1,

11~~.e

~

I

~ "~

[-<~~""'~ §

<-.., ·~ ~

I

~~~ -§

1,, lo .fi ,,. ~

... ·6

I.Ii

·--, ·--,

~

r< ;§';l:a-~

l/J

IN PLACE UNTIL THE COMPLETION OF CONSTRUCTION

E

!ll;:::;

!!.~"~'Ls

~

SILT FENCE TO REMAIN

L--·

§

-P ~- d'l __,

0 "'

0z I I

~ ~ ~ ~~

~

Q.

I I I I I I ._ __ J

~ -.."'

~~~ ;1

~

0 .I

BUILDING FOOTPRINT

,.-,

N

""~·~L§.:.

N

I

,.-,

w

~

ui:O

BUILDING FOOTPRINT

Sl

:l: ~ -"' Qli "' ~e

L~~

I

m

- ~ I'! · ~

'

·--,

L~J

~:"!,;

"' - ~.1'- E ,.§ -,. "'·~ ¥ -- ;E j '-' ~~ ~ ;5.l

!;;: "' lj'~fl tJ ~·!:'

s.u

~~.. !!:!:,.<>~ -i ~

$"

~

ifi "' ~'B -Ei

=

00

"'""

...~-1?5

'

DOUBLE SILT FENCE IN FRONT OF NATIVE

PRESERVE. TO REMAIN---, IN PLACE UNTIL THE

COMPLETION OF CONSTRUCTRION

I

I

I

'.]/ - - - -

I I

~ -

- - - -'1/ - - - - 'l7 - - - -'1/ - - - - 'l7 - - - -'1/- - - - ;:i;- -

- - - '1/-

---

~

- - - -'1/- -1

1'1/

I

w

w

w

w

w

w

w

w

w

w

I I I I

'1

I IL - - - - - - - - - - - - - - - - - - - - - - - - - - - -

w

I I

L___

w

w w

w

w

w

w w

w

w w

--

w

w

'1/

w

"'" --

w w

w

'V

w

w

--

----------------------------------------------------------

w

w

INATIVE PRESERVATION

--

w

--

w

w

w

w w

J'j/

w

w

- 30,891 S.F. !0.71 ACJI

w

w

600.00' N89°45'34"E

--

w

w

w

w

w

w

w

w

w

"'"

w

w

w

w

w

w

w

w

w

w

w

w

w

w

w

w

w

'V

w

w

w

w

--

'v

--

w

--

w

w

w

w

I I

L.1.1

I

I

u

~ __J_ __

< ...I

z

LU

< ....

~

Cl<:N

.... · Cl.

Q. o:;~ z"" z

0 5' 0 Clll:

0 < ::> .nc 0 V) 0.: u

"" z tl"J :::!:

tl"J

< ~

GRAVEL CONSTRUCTION ENTRANCE B.M.P.

1.01

0 u

FILTER FABRIC SILT FENCE INSTALLATION

GENERAL NOTE S· PRIOR TO C0tv1MENCEMENT OF CC1NSTRUCTION ACTIVIT Y .D,PPROPRIATE EROSION CONTROL DE VICES SH.L\LL BE INSTALLED TO CONTROL AND REDUCE SOIL EROS ION A~JD SEDIM ENT T RANSPORT TO OFF-SITE AREAS. THE CONTRACTOR SHP-.LL i\.~ A I NTAI N THESE DEV ICES THROUGHOUT T HE DURATION OF CONSTRUCT ION. ALL DEV ICES SHP-.LL REM A IN IN PLACE UNTIL THE SURROUND ING AREAS ARE ESTABLI SHED. 2.

2. Exctr"'1t"

~ f' i>C!t'G ()f

'TO

at

?CST:> 6-10 fEET APMfl

<1

THESE BEST MAN.A.GEMENT PRACTICE S CBMPJ ARE TYPICAL OF REQUIREMENTS FOR SOIL ERO SION CONTROL PER DIVIS ION 3.7 OF THE COLLI ER COUNTY LAND DE VELOPMENT CODE. T HE Y MAY NOT CONSTITUTE COMPLE TE REQUIRE!v\ENTS FOR COMPLI ANCE \AJ'IT H REGULA TORI AG ENCIE S A ND SPEC IF IC PERi\.11 T CONDI TIONS.

) ____ "-°"

RESIDENTIAL & MIXED USE DEVELOPMENT EQUAL TO OR GREATER THAN 2.5 ACRES LOTS 6 THROUGH 9 AND THE WEST ~ OF LOT 5 = 123,541 S.F. (2.84 ACRES) NATIVE PRESERVATION REQUIRED-123,541S.F.X25% = 30,B85 S.F. (0.71 ACRES) NATIVE PRESERVATION PROVIDED= 30,B91 S.F. (0.71 ACRES)

--- -~

2' MIN.

'- FCF! NJOJTICJN>._ Sll'i£NCTH Flll'El'f rAAlaC O!Ait'.l! IAL CAN

! . ' ' ;

-··

BE ATlAC!iED TO A

&ACKF'!LUCI 'mE:Nt:H

oi.TIACK S(:UR(lY TO UPSTI

STffi OR 36" HIGH

/

M.I.~ .

At>~

-4 . B<>d""tml S<.>i!

Pltflf Mal..nol To St<:ik~

E>

hlESfl WIRE S<..:ta:~"N 'Mil~i HAS BEf!M 1'ASTE'-'ED TQ THE PVSTS

Shao~

·

SIOE

or

l'Cst

RU.~ Of~

\

A<».

PU.Ct: 1HE END

\

T

\\

· x

ti" TRENCH

~111 ~!".ACTED

~T

DF TME

POOT

or

Sl()()N!) ~CE ltEl:o: THE END

o -,--

TilE

I

S IONIM ~Q

PfI)JL

I """'' f'q'.r1t1 A Sh!)llld

B~

H'91'aor Tho1 P<>in \ 8

2,

(front Eltlwtion)

re:rice: "'nR'

t:ACH STOOW E'VENT AN!:- ROiOV£ S£i)ilolfNT

RtliiO\ofll SEO.ENT SHAU BE Ot:POSITEO TO AA AREA lH.l.f 'Ml!. NOT

COWTRISU'IE SUliMCHT orr-srrr #ljfj C;il.N er PElTMA.'>lENTlY ST.\Sl i.JZ W. l. Sfl.1 Ftt4CI:: SHAU E!E l"l..Acrtl ON SlOP£ CO ~ lOURS TO hlJ..)(MIZE' PO~ING EfFICl~NCY.

0

0

Clll:

C"'"l

LU

-~

-li

~ 0 .El

c EROSION CONTROL GENERAL NOTES;

~

c: 0

0 "in 0.:

....

0

0

0 z

4. ALL EXPOSED AREAS AT FINAL GRADE WILL RECEIVE SEED AND MULCH WITHIN 30 DAYS OF CONSTRUCTION PER F.D.E.P. "GUIDELINES FOR USING EROSION AND SEDIMENT CONTROL PRACTICES",

-l

~

"

0

0

~

u ";:. 0

.. "' ~ c

SDP-5 -------

0

SCALE:

30' 60' 1" = 30'-0"

z

1l~ l

SHEET

6. BEFORE SITE DJSTURBANCE OCCURS PERIMETER CONTROL. SEDIMENT TRAPS. BASINS,AND DEVERSIONS SHOULD BE IN PLACE TO CONTROL RUNOFF AND CAPTURE SEDIMENT.

B. TEMPORARY SEEDING SHALL BE APPLIED TO AREA THAT WILL NOT BE BROUGHT UP TO FINAL GRADE FOR 14 DAYS OR MOR TO REDUCE EROSION IN SEDIMENTATION.

-$ ~ -~

~ a:> a:>

-

~

3. SILT FENCES/ ENVIROFENCE SHALL BE PLACED ALONG ALL PROPERTY LINES. ADIACENT TO CONSERVATION TRACTS OR EASEMENTS. AND AROUND THE AREAS OF NATIVE VEGETATION. SUCH BARRICADES SHALL REMAIN IN PLACE UNTIL COMPLETION OF CONSTRUCTION.

7. INLETS TO STORM SEWERS SHOULD BE PROTECTED BY SUITABLE FILTRATIO N DEVICES DURING CONSTRUCTION TO KEEP POLLINATES FROM ENTERING CONVENIENT SYSTEM.

z ~ ~ ~ c"'

-~

5. THE CONTRACTOR MUST USE BEST MANAGEMENT PRACTICES !BMPSJ DURING CONSTRUCTION TO MINIMIZE EROSION AND SEDIMNETATION AND TO PROPERLY MANAGE RUNOFF FOR BOTH STORM WATER GUARANTY AND QUALITY.

0tQ0'U)!je "$1Ql~tl

en

'·p Tr!ENC>{ 'l'AlH NATI\£ 8ACKf1U.

FOOT 0 1--~ COMSE AGGREGAT E

\)·

. 3' !.llJll.

!'!ACK F LL

6" Mll\llMUM

55~

25%

2. WHERE INDICATED. OR AS NECESSARY. SILT FENCES AND/OR HAY BALES SHALL BE PLACED ALONG THE PROIECT PERIMETER TO PREVENT SEDIMENT IN RUNOOF AND TURBOD WATER FROM LEAVING THE SITE.

· IIIr--u-

F'H!il f1'NC£

12" h!IN.

11\~talk>ll<>~

(P"""l>f'~IJV!t Via.)

PC»lll NG Hr.

riLTE~ F'11S~ 1;:, 1

(hl1'X}

Sl:~·

ATTACH NG T'hO SILT FE"'CES

PmiOltoG HT. \IQOO POST

j- J~C~

J.

=

1. IT SHALL BE THE RESPONSIBILTY OF THE CONTRACTOR TO ENSURE THAT ANY WATER DISCHARGED FROM THE SITE DURING CONSTRUCTION SHALL MEET OR EXCEED STATE WATER QUALITY STANDARDS. SPECIFICALLY. THE TURBIDITY OF DISCHARGED WATER SHALL NOT EXCEED 29 NTU ABOVE THE BACKGROUND LEVEL WATER QUALITY AND SILTATION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL EROSION CONTROL MEASURES ARE INSTALLED, ESTABLISHED AND ACCEPTED.

RIGHT OF lf)A I

-

0

1-"-U

NATIVE PRESERVATION REQUIREMENT - CCLDC 3.05.07(8)(1)

6 -500).

3.

-

U-1 LL_

lb· U111 Ct !:'tcl-e!

·~

.i::1 .' '' - 'i -.l-

II

Up~ Alo~

THE FOLLOWING M INIMUN RE QUIREM ENTS At

I-

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas