The applicant has requested to discharge dredged and/or fill material into 6

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant has requested to discharge dredged and/or fill material into 6,820 linear feet (0.417 acre) of streams and 0.15 acre of wetlands, in association with the construction of the Smithburg Natural Gas Processing facility located on a 244-acre property.

TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act. This notice serves as the United States Army Corps of Engineers’ (Corps) request to the West Virginia Department of Environmental Protection (WVDEP) to act on the Section 401 Water Quality Certification for the following application.

APPLICANT: Sherwood Midstream LLC Attn: Richard Lowry 4600 J. Barry Ct., Suite 500 Canonsburg, Pennsylvania 15317

LOCATION: As depicted on the attached Figure 1 (Sheet 1 of 17), the proposed project would be located within the Meathouse Fork and the Buckeye Creek watersheds in Smithburg, Doddridge County, West Virginia. The proposed discharge of dredged and/or fill material would occur within the streams and wetlands specified in Table 1 and Table 2 below. The on-site streams are indirect tributaries to the Ohio River, a traditional navigable water of the United States. The project site is located at latitude 39.28279°N and longitude -80.73322°W.

DESCRIPTION OF THE PROPOSED WORK: The applicant has requested a DA authorization to discharge of dredged and/or fill material into 6,820 linear feet (0.417 acre) of streams and 0.15 acre of wetlands, as shown on Table 1 and Table 2 below, in association with the construction of the Smithburg Natural Gas Processing facility located on a 244-acre property (Sheet 2 of 17). The purpose of the natural gas processing facility would be to increase raw gas processing capacity to accommodate an increase in shale gas production volume, specifically to support Antero Resources Corporation (Antero). The facility would support Antero’s approximately 195,000 acres of shale gas production in Tyler, Wetzel and Ritchie Counties, West Virginia. The proposed Smithburg Natural Gas Processing facility would involve site preparation that would disturb approximately 98 acres and result in approximately three (3) million cubic yards of cut and fill earthwork (Sheets 13-17 of 17). The proposed facility would be able to support six (6) cryogenic gas processing units, two (2) de-ethanizer units, and supporting infrastructure. Plans for the proposed work are attached to this Public Notice (Sheets 1 of 17).

ALTERNATIVE ANALYSIS: A total of 655 linear feet of perennial stream, 2,717 linear feet of intermittent streams, 3,448 linear feet of ephemeral streams and 0.15 acre of palustrine emergent wetlands would be filled as a result of the proposed facility. The project does not require access or proximity to, or siting within, the wetlands to fulfill its basic purpose and is considered a non-water dependent activity. The Section 404(b)(1) Guidelines state that for non-water dependent activities in special aquatic sites, practicable alternatives that do not involve wetlands are presumed to be available, unless clearly demonstrated otherwise. The applicant is required to provide an alternative analysis that must overcome that presumption prior to receiving authorization for the discharge of dredged and/or fill material into the wetlands. The applicant has submitted the required alternatives analysis and it is currently under review. A complete copy of the applicant’s alternatives analysis can be reviewed by appointment at the above address. No permit will be issued until our review of the alternatives analysis clearly shows that practicable upland alternatives are not available to achieve the overall project purpose.

AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the United States, consideration must be given to avoiding impacts on this site. If waters of the United States cannot be avoided, then the impacts must be minimized. Approximately 4,947 linear feet of perennial streams, 5,920 linear feet of intermittent streams, 7,561 linear feet of ephemeral streams, 0.717 acre of palustrine emergent wetlands and 0.010 acre of palustrine forested wetlands, subject to Section 404 Clean Water Act regulation, exists on the project site. Avoidance and minimization efforts were incorporated into the proposal. The proposed project has been designed to avoid 86.8% of the on-site perennial streams, 54.1% of the on-site intermittent streams, 54.4% of the on-site ephemeral streams, 100% of the on-site palustrine forested wetlands, and 79% of the on-site palustrine emergent wetlands. The applicant has indicated that impacts would be minimized by implementing proper erosion and sediment control devices to reduce downstream impacts. The applicant would be required to obtain stormwater permits from the WVDEP and to implement stormwater pollution prevention plans as needed for site construction following the requirements of the National Pollutant Discharge Elimination System program.

COMPENSATORY MITIGATION PLAN: The applicant has submitted a conceptual compensatory mitigation statement indicating they will either purchase available credits from federally-approved mitigation banks and/or the West Virginia in-lieu fee mitigation program.

WATER QUALITY CERTIFICATION: A Section 401 Water Quality Certification is required for this project. It is the applicant’s responsibility to obtain certification from the WVDEP.

HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places (NRHP) has been consulted and it has been determined there are properties eligible for the NRHP which could be indirectly affected by the proposed project. Archaeological and architectural investigations were performed in consultation with the West Virginia State Historic Preservation Office (WVSHPO). In a letter dated August 14, 2017, the WVSHPO concluded theproposed project would have no adverse effect on architectural resources. In a letter dated August 22, 2017, the WVSHPO stated that no further consultation is necessary regarding archaeological resources. A copy of this Public Notice will be furnished to the WVSHPO for their review. Comments concerning archaeological sensitivity of the project area should be based upon collection data.

THREATENED AND ENDANGERED SPECIES: The proposed project is located within the known or historic range of the following federally-protected species: endangered Indiana bat (Myotis sodalis); threatened northern long-eared bat (Myotis septentrionalis); endangered clubshell mussel (Pleurobema clava); and the endangered snuffbox mussel (Epioblasma triquetra). The Corps has consulted the most recently available information on listed species, the project may affect, but is not likely to adversely affect either the Indiana bat or the northern long-eared bat. Based on the implementation of erosion and sedimentation measures, the proposed project may affect, but not likely to adversely affect the clubshell mussel or the snuffbox mussel. Based on this information, the proposed project is not likely to adversely affect the continued existence of any of the other above mentioned endangered or threatened species, or result in the destruction or adverse modification of habitat of such species which has been determined to be critical. This Public Notice serves as a request for concurrence to the United States Fish and Wildlife Service for any additional information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended).

PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow the guidelines published by the United States Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR 230). The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; among those factors are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, Federal, state and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasonsfor support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements on these factors received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.

CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:

United States Army Corps of Engineers ATTN: CELRH-RD-E Public Notice No. LRH-2017-614-OHR 502 Eighth Street Huntington, West Virginia 25701-2070.

Please note names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation's water resources. If you have any questions concerning this Public Notice, please contact Mr. Christopher L. Carson of the Energy Resource Branch at 304 399-5210, by mail at the above address, or by email at Christopher.l.carson@usace.army.mil.

Table 1 – Proposed discharge of dredged and/or fill material into streams associated with the Smithburg Natural Gas Processing facility.

Name

Stream Length On-Site (Linear Feet)

Proposed Discharge of Fill Material (Linear Feet)

Proposed Discharge of Fill Material (ft^2)

Proposed Discharge of Fill Material (acres)

Proposed Discharge of Fill Material (Cubic Yards)

Proposed Activity

UNT 1

Ephemeral

77

77

135

0.003

1.2

Grade Establishment

UNT 1

Intermittent

1,586

1,211

3,086

0.071

19.0

Grade Establishment

UNT 2

Ephemeral

61

61

92

0.002

5.1

Grade Establishment

UNT 4

Ephemeral

131

131

164

0.004

1.5

Grade Establishment

UNT 6

Ephemeral

156

134

134

0.003

0.8

Grade Establishment

UNT 8

Intermittent

516

283

425

0.010

2.0

Grade Establishment

UNT 9

Ephemeral

65

65

130

0.003

0.8

Grade Establishment

UNT 10

Ephemeral

179

179

179

0.004

1.1

Grade Establishment

UNT 10

Intermittent

471

471

3,768

0.087

46.5

Grade Establishment

UNT 10

Perennial

655

655

3,930

0.090

72.8

Grade Establishment

UNT 13

Ephemeral

389

370

370

0.008

2.3

Grade Establishment

UNT 14

Ephemeral

298

298

358

0.008

1.1

Grade Establishment

UNT 15

Ephemeral

464

464

1,044

0.024

16.1

Grade Establishment

UNT 16

Ephemeral

149

149

186

0.004

4.0

Grade Establishment

UNT 17

Ephemeral

256

256

512

0.012

9.5

Grade Establishment

UNT 18

Intermittent

491

491

579

0.013

7.1

Grade Establishment

UNT 19

Ephemeral

271

271

488

0.011

1.5

Grade Establishment

UNT 20

Ephemeral

336

336

467

0.011

7.2

Grade Establishment

UNT 21

Intermittent

261

261

848

0.019

15.7

Grade Establishment

UNT 22

Ephemeral

96

96

256

0.006

6.3

Grade Establishment

UNT 100

Ephemeral

94

94

564

0.013

12.2

Grade Establishment

UNT 101

Ephemeral

62

62

41

0.001

0.6

Grade Establishment

UNT 103

Ephemeral

533

135

101

0.002

0.2

Grade Establishment

UNT 200

Ephemeral

143

134

168

0.004

1.6

Grade Establishment

UNT 201

Ephemeral

175

136

136

0.003

0.8

Grade Establishment

Totals

7,915

6,820

18,159

0.417

237.1

.

Table 2 – Proposed discharge of dredged and/or fill material into wetlands associated with the Smithburg Natural Gas Processing facility.

Name

Cowardin Class

Wetland Acreage (Acres) On-Site

Proposed Discharge of Fill Material (Acres)

Proposed Discharge of Fill Material (Cubic Yards)

Proposed Activity

Wetland 5

Palustrine Emergent

0.102

0.030

22.1

Grade Establishment

Wetland 6

Palustrine Emergent

0.035

0.030

27.9

Grade Establishment

Wetland 7

Palustrine Emergent

0.059

0.020

14.8

Grade Establishment

Wetland 14

Palustrine Emergent

0.010

0.010

8.1

Grade Establishment

Wetland 15

Palustrine Emergent

0.011

0.010

9.3

Grade Establishment

Wetland 18

Palustrine Emergent

0.010

0.010

7.9

Grade Establishment

Wetland 19

Palustrine Emergent

0.014

0.010

11.5

Grade Establishment

Wetland 20

Palustrine Emergent

0.030

0.030

23.8

Grade Establishment

Totals

0.271

0.150

125.4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas