Broward and Miami-Dade Counties. Florida Power & Light Company. Juno Beach. FL. PROJECT PURPOSE: Basic: The basic project purpose is to construct a new aerial transmission line. Overall: The overall project purpose is to construct 37 miles of 500kV Transmission Line within an existing FPL established ROW and permitted by the Corps in 1991 and 1992 (SAJ-1991-01186 and SAJ-1992-00783) from Conservation Substation (Broward County) to Levee Substation (Miami-Dade County) to serve Broward and Miami-Dade Counties.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Florida Power & Light Company
Attention: Matthew J. Raffenberg
700 Universe Boulevard
Juno Beach, FL 33408
WATERWAY AND LOCATION: The transmission line project is approximately 37 miles long and would affect 70.90 acres of waters of the United States associated with non-tidal freshwater wetlands and South Florida Water Management District canals. The northern end of the proposed transmission line starts west of the Florida Power & Light’s (FPL) Conservation Substation and extends south to the FPL Levee Substation traversing along the south boundary of Water Conservation Area 2B, along the east side of the L-68A levee, across Water Conservation Area 3A parallel to the L-33 levee and on the north side of the L-30 canal and traverses the L-36, L-37, L-68A, L-67A, C-11, North New River Canal, Miami Canal and L-30 Canal within Broward and Miami-Dade Counties, Florida.
County
Sections
Township
Range
Broward
12,13,14,22,23,26,27,28,31,32,33
49S
40E
Broward
5,6
50S
40E
Broward
27,28,32,33,34,35,36
49S
39E
Broward
7
49S
41E
Broward
28,32,33
49S
39E
Broward
5,8,16,17,20,21,28,29
50S
39E
Broward
28,33
50S
39E
Broward
4,9,16,21,28,33
51S
39E
Miami-Dade
4,9,16,17,21,28,33
52S
39E
Miami-Dade
4,9,16,21
53S
39E
Directions to the site are as follows: For the northern terminus take I-95 to Exit 32, Commercial Blvd (SR 870), head west 9 miles to the Conservation Substation. For the southern terminus take exit 4 off of Interstate 95 west toward Miami International Airport, merge onto FL-112 W/Airport; take the LeJeune Road South exit and merge onto LeJeune Road; take the exit toward 836 west; take Florida's Turnpike Homestead Extension north; Exit 29 from the Turnpike Homestead Extension for NW 41st Street; slight right at NW 117th Avenue; take the first left onto NW 41st to Levee Substation.
APPROXIMATE CENTRAL COORDINATES:
Location
Latitude
Longitude
Northern Terminus
26.197826o
-80.299251o
Central Area
26.024169o
-80.445904o
Southern Terminus
25.814369o
-80.439263o
PROJECT PURPOSE:
Basic: The basic project purpose is to construct a new aerial transmission line.
Overall: The overall project purpose is to construct 37 miles of 500kV Transmission Line within an existing FPL established ROW and permitted by the Corps in 1991 and 1992 (SAJ-1991-01186 and SAJ-1992-00783) from Conservation Substation (Broward County) to Levee Substation (Miami-Dade County) to serve Broward and Miami-Dade Counties.
EXISTING CONDITIONS: The wetland system is freshwater. Phases 3.1 and 3.4 have most clearing and filling completed while clearing and filling for Phases 3.2 and 3.3 is proposed for construction. The existing vegetation for Phases 3.1, 3.2, 3.4 and the northern portion of 3.3 consists primarily of mixed marsh which has been disturbed by prior man-made activities. The mixed marsh is mostly Sawgrass with Common/Southern Cattail and minor occurrences of shrub and hammock wetlands. Melaleuca Forest begins south of Krome Avenue and consists mostly of Melaleuca and Sawgrass. The existing area surrounding the project area consists of the same.
PROPOSED WORK: The applicant seeks authorization to place fill material over 70.90 acres (see Table 1A for details) of marsh wetlands (49.54 acres), shrub wetland (0.04 acres) and Melaleuca wetlands (21.32 acres) with clearing (see Table 1B for details) of 0.67 acres of hammock and 3.76 acres of marsh, and 289.59 acres (see Table 1C for details) of temporary impact (123.50 marsh, 0.07 shrub wetland, 0.07 hammock, and 165.95 Melaleuca) and 86.41 acres (See Table 1C for details) of indirect impact (59.96 marsh, 0.03 shrub wetland, 0.09 hammock and 26.33 Melaleuca) associated with the construction of a new 500kV transmission line (See Figure 3 for wetland locations).
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
Construction has been planned to minimize wetland impacts to the greatest extent practicable for access and structure placement, and to still safely provide ingress/egress for the necessary construction equipment and vehicles. The proposed road and pad dimensions were minimized to limit impacts and still provide safe access for construction and long term maintenance and repair. Existing levee and access roads and structure pads will be used where feasible. FPL will contract with construction companies experienced in working in wetland environments. The construction methodology includes the use of low ground pressure vehicles (e.g., a Marsh-Master) and equipment for work within wetlands and the use of Best Management Practices (BMPs) to reduce the temporary impacts. All slopes of roads and pads will be sodded to restore ground cover and minimize erosion after construction. Areas disturbed by temporary impacts, e.g. from Marsh-Master activities, will rely on natural recruitment for revegetation. Turbidity and erosion controls will not be removed until construction surfaces have been stabilized.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
Since the project was previously permitted, FPL has satisfied the mitigation requirements of the entire project agreeing to contribute funds for land acquisition and construction costs associated with the Everglades Nutrient Removal Project and Stormwater Treatment Areas specified in the Everglades Surface Water Improvement and Management Plan. In addition, FPL has enhanced 553.2 acres of wetlands within the District’s Dupuis Reserve, 3.81 acres of wetlands in St. Lucie County, and 2.72 acres of wetlands in Martin County. FPL has also installed two water control structures at the west and east end of Hog Pen Ditch to enhance wetlands within the Savannas Preserve State Park in St. Lucie County. The Corps had determined the mitigation is adequate to offset the loss of wetlands resulting from the project as permitted by SAJ-1991-01186 and SAJ-1992-00783. The above-mentioned permits have been renewed on several occasions by the Corps.
CULTURAL RESOURCES:
The Corps previously determined through consultation with the State Historic Preservation Office (SHPO) that there is little likelihood of impact upon a historic property. As necessary, the Corps will initiate an updated consultation with SHPO’s office, federally recognized Tribes with concerns in Florida and the Permit Area, and the Advisory Council of Historic Preservation as applicable to 33 CFR 325, Appendix C and Section 106 of the National Historic Preservation Act, by separate letter.
ENDANGERED SPECIES:
The Corps found that the project was not likely to affect any federally listed species or designated critical habitat protected by the Endangered Species Act of 1973 (Act), as amended (16 U.S.C. 1531 et. seq.). The U.S. Fish and Wildlife Service (USFWS) has reviewed the information provided and finds that the proposed action is not likely to adversely affect any federally listed species or designated critical habitat protected by the Endangered Species Act of 1973 (Act), as amended (16U.S.C. 1531 et seq.). A record of the previous consultations is on file at the USFWS - South Florida Ecological Service Office.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal will not impact essential fish habitat because no EFH is located within the project area. Our initial determination is that the proposed action would not have a substantial adverse impact on the EFH or Federally managed fisheries in the South Atlantic Region. The final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel in previous permit authorizations.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification has been obtained from the Florida Department of Environmental Protection.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410 within 30 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Carolyn Farmer, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410, by electronic mail at carolyn.h.farmer@usace.army.mil, or by telephone at (561) 472-3527.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FLORIDA 33478
October 3, 2017
REPLY TO
ATTENTION OF
Regulatory Division
South Permits Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application Nos. SAJ-1991-01186 & SAJ-1992-00783 (SP-CF)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Florida Power & Light Company
Attention: Matthew J. Raffenberg
700 Universe Boulevard
Juno Beach, FL 33408
WATERWAY AND LOCATION: The transmission line project is approximately 37 miles
long and would affect 70.90 acres of waters of the United States associated with nontidal freshwater wetlands and South Florida Water Management District canals. The
northern end of the proposed transmission line starts west of the Florida Power &
Light's (FPL) Conservation Substation and extends south to the FPL Levee Substation
traversing along the south boundary of Water Conservation Area 2B, along the east
side of the L-68A levee, across Water Conservation Area 3A parallel to the L-33 levee
and on the north side of the L-30 canal and traverses the L-36, L-37, L-68A, L-67A, C11, North New River Canal, Miami Canal and L-30 Canal within Broward and MiamiDade Counties, Florida.
County
Sections
Township
Range
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Miami-Dade
Miami-Dade
12,13,14,22,23,26,27,28,31,32,33
5,6
27,28,32,33,34,35,36
7
28,32,33
5,8,16,17,20,21,28,29
28,33
4,9,16,21,28,33
4,9,16,17,21,28,33
4,9,16,21
49S
50S
49S
49S
49S
50S
50S
51S
52S
53S
40E
40E
39E
41E
39E
39E
39E
39E
39E
39E
Directions to the site are as follows: For the northern terminus take I-95 to Exit 32,
Commercial Blvd (SR 870), head west 9 miles to the Conservation Substation. For the
southern terminus take exit 4 off of Interstate 95 west toward Miami International
Airport, merge onto FL-112 W/Airport; take the LeJeune Road South exit and merge
onto LeJeune Road; take the exit toward 836 west; take Florida's Turnpike Homestead
Extension north; Exit 29 from the Turnpike Homestead Extension for NW 41st Street;
slight right at NW 117th Avenue; take the first left onto NW 41st to Levee Substation.
APPROXIMATE CENTRAL COORDINATES:
Location
Northern Terminus
Central Area
Southern Terminus
Latitude
26.197826o
26.024169o
25.814369o
Longitude
-80.299251o
-80.445904o
-80.439263o
PROJECT PURPOSE:
Basic: The basic project purpose is to construct a new aerial transmission line.
Overall: The overall project purpose is to construct 37 miles of 500kV Transmission Line
within an existing FPL established ROW and permitted by the Corps in 1991 and 1992
(SAJ-1991-01186 and SAJ-1992-00783) from Conservation Substation (Broward
County) to Levee Substation (Miami-Dade County) to serve Broward and Miami-Dade
Counties.
EXISTING CONDITIONS: The wetland system is freshwater. Phases 3.1 and 3.4 have
most clearing and filling completed while clearing and filling for Phases 3.2 and 3.3 is
proposed for construction. The existing vegetation for Phases 3.1, 3.2, 3.4 and the
northern portion of 3.3 consists primarily of mixed marsh which has been disturbed by
prior man-made activities. The mixed marsh is mostly Sawgrass with
Common/Southern Cattail and minor occurrences of shrub and hammock wetlands.
Melaleuca Forest begins south of Krome Avenue and consists mostly of Melaleuca and
Sawgrass. The existing area surrounding the project area consists of the same.
PROPOSED WORK: The applicant seeks authorization to place fill material over 70.90
acres (see Table 1A for details) of marsh wetlands (49.54 acres), shrub wetland (0.04
acres) and Melaleuca wetlands (21.32 acres) with clearing (see Table 1B for details) of
0.67 acres of hammock and 3.76 acres of marsh, and 289.59 acres (see Table 1C for
details) of temporary impact (123.50 marsh, 0.07 shrub wetland, 0.07 hammock, and
165.95 Melaleuca) and 86.41 acres (See Table 1C for details) of indirect impact (59.96
marsh, 0.03 shrub wetland, 0.09 hammock and 26.33 Melaleuca) associated with the
construction of a new 500kV transmission line (See Figure 3 for wetland locations).
2
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
Construction has been planned to minimize wetland impacts to the greatest extent
practicable for access and structure placement, and to still safely provide ingress/egress
for the necessary construction equipment and vehicles. The proposed road and pad
dimensions were minimized to limit impacts and still provide safe access for construction
and long term maintenance and repair. Existing levee and access roads and structure
pads will be used where feasible. FPL will contract with construction companies
experienced in working in wetland environments. The construction methodology
includes the use of low ground pressure vehicles (e.g., a Marsh-Master) and equipment
for work within wetlands and the use of Best Management Practices (BMPs) to reduce
the temporary impacts. All slopes of roads and pads will be sodded to restore ground
cover and minimize erosion after construction. Areas disturbed by temporary impacts,
e.g. from Marsh-Master activities, will rely on natural recruitment for revegetation.
Turbidity and erosion controls will not be removed until construction surfaces have been
stabilized.
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
Since the project was previously permitted, FPL has satisfied the mitigation
requirements of the entire project agreeing to contribute funds for land acquisition and
construction costs associated with the Everglades Nutrient Removal Project and
Stormwater Treatment Areas specified in the Everglades Surface Water Improvement
and Management Plan. In addition, FPL has enhanced 553.2 acres of wetlands within
the District's Dupuis Reserve, 3.81 acres of wetlands in St. Lucie County, and 2.72 acres
of wetlands in Martin County. FPL has also installed two water control structures at the
west and east end of Hog Pen Ditch to enhance wetlands within the Savannas Preserve
State Park in St. Lucie County. The Corps had determined the mitigation is adequate to
offset the loss of wetlands resulting from the project as permitted by SAJ-1991-01186
and SAJ-1992-00783. The above-mentioned permits have been renewed on several
occasions by the Corps.
CULTURAL RESOURCES:
The Corps previously determined through consultation with the State Historic
Preservation Office (SHPO) that there is little likelihood of impact upon a historic
property. As necessary, the Corps will initiate an updated consultation with SHPO's
office, federally recognized Tribes with concerns in Florida and the Permit Area, and the
Advisory Council of Historic Preservation as applicable to 33 CFR 325, Appendix C and
Section 106 of the National Historic Preservation Act, by separate letter.
3
ENDANGERED SPECIES:
The Corps found that the project was not likely to affect any federally listed species or
designated critical habitat protected by the Endangered Species Act of 1973 (Act), as
amended (16 U.S.C. 1531 et. seq.). The U.S. Fish and Wildlife Service (USFWS) has
reviewed the information provided and finds that the proposed action is not likely to
adversely affect any federally listed species or designated critical habitat protected by
the Endangered Species Act of 1973 (Act), as amended (16U.S.C. 1531 et seq.). A
record of the previous consultations is on file at the USFWS - South Florida Ecological
Service Office.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal will not impact essential fish
habitat because no EFH is located within the project area. Our initial determination is
that the proposed action would not have a substantial adverse impact on the EFH or
Federally managed fisheries in the South Atlantic Region. The final determination
relative to project impacts and the need for mitigation measures is subject to review by
and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel in previous permit authorizations.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification has been
obtained from the Florida Department of Environmental Protection.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Palm Beach
Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, Florida 33410
within 30 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Carolyn Farmer, in writing at the Palm Beach Gardens Permits Section, 4400 PGA
Boulevard, Suite 500, Palm Beach Gardens, Florida 33410, by electronic mail at
carolyn.h.farmer@usace.army.mil, or by telephone at (561) 472-3527.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
4
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
PHASE
3.1
PHASE
W ETLAND
AREA
3.2
"BS"
W ETLAND
AREA
"D1"
E
0
OCl
ti)
SCALE: 1·
"~
,..:
N
PHASE
3.3
4
2
ii:)
= 4 Mile s
WETLAND
AREA
"D2"
- - - - Proposed Transmission Line
~~T-~!::;!e,~~ Wetland Lines and Numbers
Toe of Slopes/Silt Fencing
·· 477
Proposed Structure Location
and Number
~Existing Roads and Pads
~~Proposed Pads in Wetlands
Figure 3 (COE PN)
c:
' jj;
0
0
LEVEE- MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.1
Sheet 1 of 7
Index Sheet - Transmission Structure Locations and
Access Roads-Phase 3.1 ( US Hwy 27 to S-9 Pump Station)
Source: FDOT; WPE Consultin , Inc. , 2017.
·
FPL
0
100
200
SCALE: 1"
400
= 400'
SEESHEET1FORLEGEND
E
I')
If)
,;.;
I
"0
N
,....·
N
.,
Vl
3:
"O
""
I
N
I
C1>
I
I')
(.;)
G:I
z
0..
w
s,~~~~~~~~~~~~~
riF
0..
3
c
·~
~
Figure 3 (COE PN)
LEVEE · MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.1
Sheet 2 of 7
Transmission Structure Locations and Access
Roads-Phase 3.1 (US Hwy 27 to S-9 Pump Station )
Source: FDOT Aerials. Browafd County, 2011, Dade County, 2012; WPE Ccnsulting, Inc., 2017.
·
FPL
o\:::======================================================================:::::::!:==============::!J
WETLAND B-4A -~i.-.
z
.....J
EXISTING
ACCESS ROAD
I
~
~
________...,..
MATCHLINE;~C
:
E
"0
N
,...:
N
"
Vl
:!
m
.,.~
'
~~
j
-I
:!
m
0
>
z
>
z
-I
0
OJ
J,.
OJ
J,.
0
c
~
200
400
_ Mh.TCHLINE C
Figure 3 (COE PN)
'j;
100
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.1
Sheet 3 of 7
Transmission Structure Locations and Access
Roads-Phase 3.1 (US Hwy 27 to S-9 Pump Station )
Source: FOOT Aerials, Broward County, 2011, Dade County, 2012; WPE Consulting, Inc., 2017.
·
FPL
D\:::======================================================================:::::::!:===============!J
....~~,---·--------...
MATCHLINE E
..,..,~
E
"0
N
,..:
N
"
Vl
0
100
I
I
200
SCALE: 1"
I
=
400'
400
I
SEESHE,
___..._..,_________
__T1 FORLEGEND
MATCHLINE E
MATCHLINE F
~>======================:;:::======================================:::=;:============::-<
Figure 3 (COE PN)
Sheet 4 of 7
a..
3
c
·~
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.1
Transmission Structure Locations and Access
Roads-Phase 3. 1 (US Hwy 27 to S-9 Pump Station)
Source: FOOT Aerials,
Broward County, 2011, Dade County, 2012; WPEConsulting, Inc., 2017.
·
FPL
D\.:::======================::::::::============================================::::::::::============~
MATCHLINE G
-:::;: "U
o;o
qQ
><
"U
0"' 0
(J)
E
",;.;
qm
-o
"U
If)
c
r
r
I
"0
"U
)>
N
0
,..._·
N
.,
Vl
SEESH
·-·-u.__..__..._
ET 1 F~LEGEND
MATCHLINE I
ri>:=====================:;:::======================================:::=;:============:;<
Figure 3 (COE PN)
Sheet 5 of 7
0.
3
c
·~
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.1
Transmission Structure Locations and Access
Roads-Phase 3.1 (US Hwy 27 to S-9 Pump Station)
Source: FDOT Aerials. Browafd County, 2011, Dade County, 2012; WPE Ccnsulting, Inc., 2017.
·
FPL
o\:::======================::::::::============================================::::::::::============':!J
MATCHLINE K
E
!X)
If)
,;.;
I
"0
N
,...·
N
.,
Vl
3:
"O
""
I
N
I
C1>
I
I')
(.;)
G:I
z
0.
0
100
200
400
SCALE: 1· = 400'
Figure 3 (COE PN)
c
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.1
Sheet 6 of 7
Transmission Structure Locations and Access
Roads-Phase 3.1 (US Hwy 27 to S-9 Pump Station )
·
FPL
o\:::======================::::::::==========================================================::!J
·~
~
Source: FDOT Aerials, Browafd County, 2011, Dade County, 2012; WPE Ccnsulting, Inc., 2017.
E
!X)
If)
,;.;
I
"0
N
,...·
N
.,
Vl
3:
"O
""
I
N
I
C1>
I
I')
(.;)
G:I
z
0.
w
8
0
100
200
SCALE: 1"
400
= 400'
SEE SHEET 1 FOR LEGEND
ri>F===========~====================:::::::;:======~
Figure 3 (COE PN)
Sheet 7 of 7
0.
3
c
·~
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.1
Transmission Structure Locations and Access
Roads-Phase 3.1 (US Hwy 27 to S-9 Pump Station)
Source: FDOT Aerials, Browafd County, 2011, Dade County, 2012; WPE Ccnsulting, Inc., 2017.
·
FPL
o\:::======================================================================:::::::!:==============::!J
PHASE WETLAND
3.1
AREA "84"
PHASE
3.2
WETLAND
AREA
"BS"
WETLAND
AREA
"D1''
0
i
2
SCALE: , · =
4
4 Mil es
E
5
6i
,..._
5N
,..:
N
PHASE
3.3
WETLAND
AREA
"D2"
LEGEND
CV
(/)
- - - - Proposed Transmission Line
"'.!'_~T~~e.~i> Wetland Line and Number
~
"
,..;
I
,..._
Toe of Slopes/Silt Fencing
N
I
x
O>
I
DC-29
I')
Proposed Culvert
Location and Number
(!)
CL
I
Proposed Access Road,
Pad, Structure Location
and Number in Wetlands
z
a_
w
8
N
ri
;,fr:============================~=================================================================;:==================~
Figure 3 (COE PN)
Sheet 1 of 7
~
LEVEE - MIDWAY
SOOkV TRANSM ISSION LINE
PHASE 3.2
Index Sheet - Transmission Structure Locations and
Access Roads, Phase 3.2 ( S-9 Pump Station to County Line)
Source: FOOT ff hwa Ma ; WPE Consultin , Inc., 2017.
·
FPL
E
.....
0
N
CV
(/)
!
c
j
,,
11
II
"...
II
~
~
"O
".....I
N
I
O>
I
I')
(!)
CL
I
0
100 200
z
a_
SCALE: 1"
w
=
400'
SEE SHEET 1 FOR LEGEND
8
N
MATCHLINE A
ri
;rr:====================~=================================================;:==============~
Figure 3 (COE PN)
Sheet 2 of 7
c
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.2
Transmission Structure Locations and Access Roads
Phase 3.2 (S-9 Pump Station to County Line)
'
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
MATCHLINE A
OJ
-
~
t
=E
~
r-
>
z
0
g:
i
r-
.,,r-tl
.,,rii
~
I'll
.
"1l
~
t::J
200' FPL R/W
8
~
t
~
z
g} =E
§
::::!
E
~
):,,.
~
,..._
0
~
0
1O' WIDE TURNOUT (TYP)
11'
(II
i
14' WIDE PROPOSED
ACCESS ROAD
N
CV
(/)
~
"O
"I
,..._
N
I
O>
I
I')
(!)
CL
I
z
a_
MATCHLINE B
0
100 200
400
w
8
SCALE: , - =
400'
SEE SHEET 1 FOR LEGEND
N
ri
;rr===================~==============================================;::=============~
Figure 3 (COE PN)
Sheet 3 of 7
c
~
LEVEE - MIDWAY
SOOkV TRANSM ISSION LINE
PHASE 3.2
Transmission Structure Locations and Access Roads
Phase 3.2 (S-9 Pump Station to County Line)
'
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
MATCHLINE B
MATCHLINE C
200' FPL R/W
t
:E
m
t
-f
~
c
:E
m
.
-f
s;
Ill
UI
z
i
c
rp
UI
"'O
i
)> "'O .....
() ::U~
c
r
r
"'O
E:i
()Q~
m -o cno o
cn cn m
.....
;u m
00
)>
C)
0
~
~
:::0
-l ......
cq
::ti
z :E
_
§
::::!
E
~
~
,..._
0
I
N
oo
cm
~
-~
-l
OJ
~
~
.
~
1
CV
~
(/)
0
~
"O
"I
,..._
N
I
O>
I
I')
(!)
MATCHLINE E
CL
I
z
a_
0
w
8
100 200
SCALE: 1"
N
400
= 400'
;rr=::::::::::::::::=::M=A=T=C==H=l=IN=E=C~================~M~A~T~C~H~l~IN~E~D====================:::=;=s=cc=s=H=Ec=r=1=FO=R=L=cG=c=N=o~
Figure 3 (COE PN)
Sheet 4 of 7
LEVEE - MIDWAY
c
SOOkV TRANSMISSIONLINE Transmission Structure Locations and Access Roads
~
PHASE 3.2
Phase 3.2 (S-9 Pump Station to County Line)
'
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
.,...~----M~A·T~C·H·Ll~N-E-E.______ _ ____.....;M·A·T~CH_Ll_N_E~F--------~~~~~~~
·-------'
I
I
I
I
I
I
I
·
E
r-.q.
,;")
r--
0
N
,..:
N
CV
(/)
~
"O
"I
r--
N
I
O>
I
I')
(!)
CL
I
z
200' FPL R/W
a_
w
0
(.)
N
ri
a_
0
MATCHLINE F
100 200
SCALE: 1"
400
= 400'
MATCHLINE G
Sec SHEET 1 FOR LEGEND
:::;
_J
~
c
"i
0
6
Figure 3 (COE PN)
LEVEE - MIDWAY
500kV TRANSM ISSION LINE
PHASE 3.2
Sheet 5 of 7
Transmission Structure Locations and Access Roads
'
Phase 3.2 (S-9 Pump Station to County Line)
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
w
Z
~
(.)
I
~
t-
..::::
I
W
~
~
I
(.)
<(
I-
"""
..::::;
~
·
,~~. '
.
!ii?
ci
Q:;·
11f(
-
!ii? Ill
;f' _.
~ll · ~
0~
_J
...
..>..
"
[;.i
lg
~ LU
<0
~8 ~;::
w :t:ttl
o ...,
·-·
,,
~
liJ - .,_'..
-"
~-
~
'f--i.J.'
--~
c).t
· YI -
. . ~·
.r~
?lo
1
~
·-...
-
··
~
...
~
it.I-'
~
~~
r ' -.
...
·
... ...., Ui"li,
""' "
'i'
. ,.
.,,-
~
-
~
. ''~...,1~-
m
,fBC:2J
I
TYPE"P"~
JAt"~
.
u
~
-
1....1.
'
---WETLAND B - 5 -
~..·
1
l' ;-'.'\O _. ..,
~
·
. ...., _.
~
~" .~ ...-.:..
-0
- ,.
.~
,,"l
·, ·
·
-
~
.,r
c., ~ .·
-
~
--
.K. -.
.'
"' . ' .
'"ii:~ -
·
C'
~
~
'
";
1O' WIDE
·
·a
as
-
- - · -
,
r..."
'
I
.-
""
··'
~
JI
·
...
J - . ...
-
-:.
' '
-
'
[:::!
BC'1§fu
.,
1
- '"'
-
PAD~
~
~- "' ' ., ..".
'.: ·':-·'
~ . ~
·:
""~,
·
'h
~{
pft
·~
·
(I
~· J
7-S.;
'·
ILl
~ 1.rNd
\ ·
....
' \...
Mp·n- a - 6- £
00
N
1~1
-
'
.. _
PROPOSED PULL
,
~
-
TURNOUT(lYP)
T - noz
,
"-f>. ... .)
~- ·. ~ t...~~--
·-
.;_· < ');
·· ·.,1 '
r. - ._..... . . .
114' WIDE
,.... , .,:; ·'"' ·
PROPOSED
"
1ACCESS ROAD
, ;-'
· ~~ .1 . -~ _
.....
'i~f
:Ji,._...
1..i
..:i~
.f~. - '· :.~/~' ~ ~"";:- :_~
~fll,;I"
.~.-J
.-;
BC-24A
"
.
··
1
,- ·
~....r.
""J... ,
ll-
...!l; _.::...t.("
·
4
lif', . ... ~
.t,,·
-t L.?~.., ·-',_.,.i.T
I::
"tJ"" ' ,...-
tl
""'
~·
~
(...-.n --....
BC-21Af
.'JoL-t
~ ~ ~," .~.'.;!. r"(.~~..:~;.:;~i'!~ ~.'
~- -~·
..!: · ··~'
-
~
·., .
:t
·u
<.;r-. J
l\-3t-J . :
..a
'
~1;:.o
:::!JI
.
-
-WETlANO 8·5--'
wao~
"' ;
~
I 111
(/)
.,}
0
<:
]
-,....;
~
.
~ ~It
'1
~
,.._
0
......
rn
_J
~
ii!
~
a.
Q)(/)
:;
8"'
;:J ;:J
....
u
E
+-'
o:o=
ro
·- .....,
c
u o
CO 0
ro o
(/) 0
uc +-'
c:::J
<(
~~
8 :.:i>.
VI . - _
,,...
&.
~ ~
Q)
Q)
..C
(/)
z
,-.
(/) (/)
fC
-
a... .!:::; a... ~
m ~·1
0w (f)
C
I
~
0 .Q~ .!!l'
_. (J)N
m
(/)
. ;:::
('I)
·('I)
E a> o
a>
......
iii
(/)
(/)
e
CCU
~
~..c
w
~
z
>Z
<( Q
0 (/) ("')
> (/)
- N.
>
I
~~w
wz~
U!MDJO
lO
0~
O
>
~ gCL
~
:ani
:J
C>
ii: I- a...
vn
\\!111
(.)
I
<(
1-
:2
I
r
.
<(
-1
~.
-'
:2
I-
I
0
~
-
w
z
~ r"
._
,
~
30::> z·£d
OJ
~
~
)i
~
~
~
0
100 200
SCALE: 1"
=
400
400'
SEE SHEET 1 FOR LEGEND
200'
FPL R/W
t
~
z
-I ....
cq
~
OJ
~
~
):.:
:::o~
Z oo
cm
-I
c
~
z:
.3!
i
t
~
m
OJ
-t
~
~
c
~
);>.
~
i
)> "U ....
():::0~
00::E:
m -u cnoo
en en m
;om
00
E
)>
0
200' FPL R/W
.....
0
N
·
CV
(/)
~
"O
".....I
BROWARD COUNTY
N
MAIMl-OADE COUNTY
I
O>
I
I')
(!)
CL
I
z
a_
w
8
MATCHLINE K
N
ri
;rr:====================~=================================================;:==============~
Figure 3 (COE PN)
Sheet 7 of 7
c
~
LEVEE · MIDWAY
SOOkV TRANSM ISSION LINE
PHASE 3.2
Transmission Structure Locations and Access Roads
Phase 3.2 (S-9 Pump Station to County Line)
'
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
PHASE WETLAND
3.1
AREA "84"
PHASE
3.2
WETLAND
AREA
"BS"
WETLAND
AREA
"D1''
0
i
2
SCALE: , · =
E
4
4 Mil es
6i
,..._
0
N
,..:
N
CV
PHASE
WETLAND
3.3
AREA
"D2"
LEGEND
(/)
- - - - Proposed Transmission Line
"'.!'._~T~r::!,!?,~~ Wetland Line and Number
~
"
,..;
I
,..._
Toe of Slopes/Silt Fencing
N
I
x
O>
I
I')
DC-14
(!)
Proposed Culvert
Location and Number
CL
I
z
Proposed Access Road,
Pad, Structure Location
and Number in Wetlands
a_
w
8
I')
ri
~>;=====================:;::===============================================::;:=============~
Figure 3 (COE PN)
Sheet 1 of 8
_J
~
LEVEE - MIDWAY
SOOkV TRANSM ISSION LINE Index Sheet - Transmission Structure Locations and
Access Roads Phase 3.3 (County Line to Levee Substation)
PHASE 3.3
Source: FOOT; WPE Consultin , Inc., 2017.
·
FPL
t
WETLANDB-6
MAIMl-DADE COUNTY
!
0
100 200
WETLANDD-1
I
1
I~'
E
,..._
0
N
CV
(/)
~
"O
"I
,..._
N
I
......-~ 200'FPL
O>
I
I')
(!)
CL
I
z
a_
w
8
I')
ri
MATCHLINE A
;rr=====================~==============~~~~~~====================::;:=============~
Figure 3 (COE PN)
Sheet 2 of 8
c
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.3
Transmission Structure Locations and Access Roads
Phase 3.3 (County Line to Levee Substation)
'
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
MATCHLINE C
300'
FPL R/W
w
~
w
:::!:
0
0:::
~I
S; I
m
0:::
C/J
:::
6i
;
c
....lj1
t
E
t
!
c
....lj1
,..._
·
0
N
,..:
N
CV
(/)
~
"O
"I
,..._
N
I
O>
I
I')
(!)
CL
I
z
a_
w
400
0
(.)
SCALE: 1" = 400'
SEE SHEET 1 FOR LEGEND
I')
ri
a_
:::;
_J
~
c
"i
0
6
Figure 3 (COE PN)
LEVEE - MIDWAY
500kV TRANSM ISSION LINE
PHASE 3.3
Sheet 3 of 8
Transmission Structure Locations and Access Roads
'
Phase 3.3 (County Line to Levee Substation)
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
MATCHLINE D
200' FPL R/W
E
N
l()
""
.....
0
N
CV
(/)
~
"O
".....I
N
I
O>
I
I')
(!)
CL
I
a_
z
MATCHLINE G
w
0
8
I')
ri
MATCHLINE F
100 200
SCALE: 1" =
400
400'
SEESHEET1FORLEGEND
~>;=================~~========================================:::=;:============~
Figure 3 (COE PN)
Sheet 4 of 8
_J
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
-~
PHASE 3.3
c
6
Transmission Structure Locations and Access Roads,
Phase 3.3 (County Line to Levee Substation)
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
E
.....
0
N
CV
(/)
~
"O
".....I
N
I
O>
I
I')
(!)
CL
I
a_
z
MATCHLINE J
w
0
8
100 200
SCALE: 1" =
I')
400
400'
~fr===========M=A=T=C=H==Ll=N=E=H~==============================================::=;:=S~EE~S~H~EE~T=1=FO~R~L~EG~E~ND~
_J
Figure 3 (COE PN)
LEVEE - MIDWAY
c
SOOkV TRANSMISSION LINE
-~
PHASE 3.3
6
Sheet 5 of 8
Transmission Structure Locations and Access Roads,
Phase 3.3 (County Line to Levee Substation)
Source:
FOOTAerials, 2015;WPEConsultin , Inc., 2017.
·
FPL
MATCHLINE J
MATCHLINE K
E
.....
0
N
CV
(/)
~
"O
".....I
N
I
O>
I
I')
(!)
CL
I
a_
z
MATCHLINE M
w
0
8
100 200
SCALE: 1" =
I')
400
400'
~fr===========M=A=T=C=H=l=IN=E==K~=============================================;=S~E~ES=H~EE~T=1=FO~R~L~EG~E~ND~
_J
Figure 3 (COE PN)
LEVEE - MIDWAY
c
SOOkV TRANSMISSION LINE
-~
PHASE 3.3
6
Sheet 6 of 8
Transmission Structure Locations and Access Roads,
Phase 3.3 (County Line to Levee Substation)
Source:
FOOT
Aerials,
2015;WPE
Consultin , Inc.,
2017.
·
FPL
MATCHLINE M
MATCHLINE N
E
.....
0
N
CV
(/)
~
"O
".....I
N
I
O>
I
I')
(!)
CL
I
a_
z
MATCHLINE P
w
0
8
I')
ri
MATCHLINE 0
100 200
SCALE: 1" =
400
400'
SEESHEET1FORLEGEND
~>;===================::;:=============================================:;============~
Figure 3 (COE PN)
Sheet 7 of 8
_J
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
-~
PHASE 3.3
c
6
Transmission Structure Locations and Access Roads,
Phase 3.3 (County Line to Levee Substation)
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
E
""
,..._
0
a
w
N
z
,..:
N
::J
I
()
CV
(/)
!;(
~
~
"O
"I
,..._
N
I
O>
I
I')
(!)
CL
I
z
0
a_
w
100 200
SCALE: 1"
0
(.)
=
400
400'
SEESHEET1 FORLEGEND
I')
ri
a_
:::;
_J
~
c
"i
0
6
Figure 3 (COE PN)
LEVEE - MIDWAY
500kV TRANSM ISSION LINE
PHASE 3.3
Sheet 8 of 8
Transmission Structure Locations and Access Roads
'
Phase 3.3 (County Line to Levee Substation)
Source: FOOT Aerials, 2015; WPE Consultin , Inc., 2017.
·
FPL
PHASE
3.1
WETLAND
AREA "84"
PHASE
WETLAND
AREA
3.2
"85"
WETLAND
AREA
"D1 "
~
0
4
2
SCALE: 1· = 4 Miles
E
"'o;
,.._
5N
"
N
PHASE
3.3
WETLAND
AREA
"D2"
LEGEND
"
t/l
B-6
Wetland
574
Structure and Number
J:
"O
Proposed Finger Pad
"
,.._I
Wetland Line
N
I
"'
,,.,1
.
~
"iz
"'"'"'"'"'"'
a.
8
Construction Path
Clear 20' Path Through
vegetation (Unless Otherwise
noted)
Existing pads
..;-
~· ~==========~~~~~~~~~~~~===::=~=:==~=r==~~==~
~-
LEVEE - MIDWAY
·~ 500kV TRANSMISSION LINE
~
PHASE 3.4
Figure 3 (COE PN)
Sheet 1 of 1 1
~ta
"
Index Sheet_ Transmission Structure Locations
. ·
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
Source: FDOT H' hwa Ma ; WPE Consultin , Inc., 2017.
0
100
200
SCALE: 1"
400
= 400'
SEE SHEET 1FOR LEGEND
0
G:I
z
Q_
w
~_., ~=::=::=::=::=::=::=::=::~~Fi:g:ur:e~3~(C~O~E~P~N~)=::=::=::=::=::=::~S~h=e=e~t2~of~1~1~~-~
.~;;:=====~
. . ..
c
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
~ll:========================~Sou~rce~:F~oogr~A~e~~·1~,s~Bro=w=aro~C~oo=n~,~~~15~;Wi~P~E~Coo~~su~ltin~,=m~~.:~:11=·==============================~
en
~~fi~l2rJR~t~;.;.,;,.r:-.
~
~ r,~r,t~~~J
~
I
I
0
c
~
0
~ 1-~~~~~~~-'"11i-~~---1-~~~~~-=~~~~~---.,.~~~~+-~~~~~~---:--~~~--1 ~
E
,..,
N
.n
"5
N
,..:
N
.,
Vl
l:
"O
,..:
I
400
"I
N
"',..,I
SCAL E: 1· = 400'
SEE SHEET 1 FOR LEGEND
0
G:I
z
Q_
w
0
u
~~======================:;::===========================================:;:=============~
Figure 3 (COE PN)
Sheet 3 of 11
Q_
3
·~
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation )
Source: FOOTAerials, Broward Coun , 2015; WPE Ccnsuftin , Inc., 2017.
·
FPL
D·l.!::========================::!::::::====================:::::::=======================:::::::==============~
E
,..,
N
.n
"5
N
,..:
N
.,
Vl
u_
w
z
::J
l:
"O
,..:
I
"I
N
I
(.)
~
:::2:
400
"',..,I
SCALE: 1· = 400'
SEE SHEET 1 FOR LEGEND
0
G::
I
z
Q_
w
0
u
v
,,;
Q_
:::;:
_J
;,;
l;:
c
·~
~
D
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Figure 3 (COE PN)
Sheet 4 of 11
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
Source: FOOT Aerials, Broward Coun , 2015; WPE Ccnsuftin , Inc., 2017.
·
FPL
-
..
- .·
--
E
I")
N
.n
"5
N
,..:
N
.,
Vl
l:
"O
,..:
I
0
"I
100
200
400
N
"'I
SCALE: 1· = 400'
I")
SEE SHEET 1 FOR LEGEND
0
G:I
z
Q_
w
0
u
~~:§:====================:;::===========================================:;:=============~
Figure 3 (COE PN)
Sheet 5 of 11
Q_
3
·~
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation )
Source: FOOT Aerials, Broward Coun , 2015; WPE Ccnsuftin , Inc., 2017.
·
FPL
D·l.!::========================::!::::::====================:::::::=======================:::::::==============~
E
N
N
.n
"5
N
".
N
"
Vl
;,,
'O
,...:
I
0
"I
N
1()()
200
400
SCALE: 1· = 400'
(])
SEE SHEET 1FOR LEGEND
I
I")
0
G:I
z
0..
w
0
~~,_.· ~:=:=:=:=:=:=:=:=:=~§Fi:g:ur:e~3~(C~O~E§=§P~N~):=:=:=~~~~S~h~e=e~t6~of~1~1~:=-~
.~;;.:====;
....
~
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
]lb==================:::::d~S~oo~~g:F~DO~TA~ena~·~~.Browa
~;roc~ou~n~.~~1~~WP;E~Coo:su:m!·=~~.,2=01=~=========================:::J
c
E
N
N
.n
"5
N
,..:
N
Q)
Vl
l:
'O
,..:
I
0
"I
100
200
400
N
"'I
SCALE: 1· = 400'
SEE SHEET 1 FOR LEGEND
I")
0
G:I
z
Q_
w
0
~_.,Jk=::=::=::=::~~~~~~Fi:g:ur:e~3~(C~O~E~P~N~)=::=::=::~~~~S~h~e=e~t7;=:of~1~1~=::-~
.~;~=::=::11
...
c
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
~lb==================d:Sou~=~:F~OO~TA~ena~·~~.B~ro=waro~C~oo~n~.~~15~;~;~ECcn:::sw~M~,m~~.=~=17:.==========:::::::!:::==========~
E
"5
N
,..:
N
Q)
Vl
l:
'O
,..:
I
0
"I
100
200
400
N
"'I
SCALE: 1· = 400'
SEE SHEET 1 FOR LEGEND
I")
0
G:I
z
Q_
w
0
~_.,Jk=::=::=::=::~~~~~~Fi:g:ur:e~3~(C~O~E~P~N~)=::=::=::~~~~S~h~e=e~t~8:of~1~1~=::-~
.~;~=::=::11
...
c
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
~lb==================d:Sou~=~:F~OO~T~Aena~·~~.B~ro=waro~C~oo~n~.~~15~;~;~ECcn:::sw~M~,m~~.=~=17:.==========:::::::!:::==========~
E
"5
N
,..:
N
Q)
Vl
l:
'O
,..:
I
0
"I
100
200
400
N
"'I
SCALE: 1· = 400'
SEE SHEET 1 FOR LEGEND
I")
0
G:I
z
Q_
w
0
~_.,Jk=::=::=::=::~~~~~~Fi:g:ur:e~3~(C~O~E~P~N~)=::=::=::=::=::=::~S~h~e=e~t9~of~1~1~=::-~
.~;~=::=::11
...
c
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
~lb==================d:Sou~=~:F~OO~T~Aena~·~~.B~ro=waro~C~oo~n~.~~15~;~;~ECcn:::sw~M~,m~~.=~=17:.==========:::::::!:::==========~
E
"5
N
,..:
N
Q)
Vl
0
100
200
400
SCALE: 1· = 400'
SEE SHEET 1 FOR LEGEND
l:
'O
,..:
I
"I
N
"'I
I")
0
G:I
z
Q_
w
0
~_.,Jk=::=::=::=::=::=::=::=::=::~Fi:g:ur:e~3~(C~O~E~P~N~)=::=::=::=::=::=::S~h~e~e~t~10~of~1~1~=::-~
.~;~=::=::11
...
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
~lb==================:::::d~Sou~=g:F~OO~TA~ena~·~~.B~ro=~;roc~oo~n~.~~1~~~;E~Ccn=su:~!·:mc~. ~=1=~========================~
c
CONSERVATION
SUBSTATION
..
.....t1.
r
I
..
E
"5
N
,..:
N
Q)
Vl
l:
'O
,..:
I
"I
N
°'1
I")
0
G:I
z
Q_
w
~_., ~=::!!~~~~~~!!!Fi!g~ur~e~3~(C~O~E~P~N~)~M:~~~~S~h~e=e~t~1~1~of~1~1~~-~
.~~~~==~
...
LEVEE - MIDWAY
SOOkV TRANSMISSION LINE
PHASE 3.4
Transmission Structure Locations
and Access Roads-Phase 3.4
(US Hwy 27 to Conservation Substation)
FPL
~U:====================:J~Sou~=~:F~DO~TA~ena~·1~s,~Bro=~~ro~C~oon~.~~15~;WP~E~Ccn=s~~~n~,m~~.:~:11=·==========================~
c