PUBLIC NOTICE: The sponsor has proposed to develop the Jaycox Wetland Bank. The proposed bank site is approximately 48.37 acres in size.
PROJECT DESCRIPTION AND PURPOSE:The sponsor has proposed to develop the Jaycox Wetland Bank. The proposed bank site is approximately 48.37 acres in size. The bank service area is within the Lower Red River of the North Basin in Minnesota (Bank Service Area 3).
Public Notice
SPONSOR:
Larry Jaycox
REFER TO: 2010-00340-WAB
ISSUED: October 4, 2017
EXPIRES: November 3, 2017
SECTION: 404 - Clean Water Act
1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL
2. SPECIFIC INFORMATION
SPONSOR'S ADDRESS:
Larry Jaycox
35484 560th Ave
Warroad, Minnesota 56763
PROJECT LOCATION: The project site is located in the SE ¼ of Section 30, Township 155 North,
Range 37 West, Beltrami County, Minnesota, as shown in the enclosed figures labeled MVP-201000340-WAB Page 1 of 6 through Page 6 of 6. The approximate coordinates are Latitude 48.2143 and
Longitude -95.449207.
BANK SERVICE AREA: The bank service area is within the Lower Red River of the North Basin in
Minnesota (Bank Service Area 3).
DESCRIPTION OF PROJECT: The sponsor has proposed to develop the Jaycox Wetland Bank.
The proposed bank site is approximately 48.37 acres in size.
NEED AND OBJECTIVE OF PROJECT: The goal of the project was to restore approximately 48.37
acres of drained and farmed wetland on approximately 160 acres of land owned by Larry and Ronda
Jaycox in Hamre Township of Beltrami County, Minnesota. The project intended to restore
agricultural-use land to sustainable, pre-settlement Wetland Type 2/7 sedge meadow/forested
wetland communities that would replace functions and values of similar wetlands lost by construction
and development projects.
OPERATION AND MANAGEMENT: The sponsor proposed to restore 48.37 acres of drained farmed
wetland to sedge meadow/forested type wetland through the restoration of the site's natural
hydrology, eradication of invasive and non-native plant species, and restoration of native woody
vegetation and herbaceous species. There were three distinct drainage ditches within the project area
that were each disabled through the construction of ditch plugs, which eliminated the drainage and
allowed the restoration of hydrology within the wetland bank area. A natural ground vegetated spillway
provides stable passage of design flows at each ditch plug. Suitable fill material was obtained onsite
to construct the ditch plugs. The restoration/re-establishment design followed the Natural Resources
Conservation Service Practice Standard 657 "Wetland Restoration" in the Field Office Technical
Guide criteria.
The restoration began with the treating of reed canary grass using glyphosate herbicide (Rodeo) after
the agricultural crop harvest in the fall of 2011. After construction of the ditch plugs, disturbed soil was
seeded with BWSR Woodland Edge seed mix that was modified for use on the site as an invasive
weed competitor. The remaining portion of the site was broadcast seeded and no-till drill seeded with
typical Aspen Parklands mix to allow grass and forbes specie regeneration. During the second year of
Regulatory Branch (File No. MVP-2010-00340-WAB)
ground cover growth, it was planned to introduce trees and shrubs appropriate for the landscape
subsection.
Long term management included annual monitoring during the 5-year vegetation establishment period
and invasive species control as needed, including herbicide use and mowing. Off-site reed canary
grass control began in 2010 treating surrounding areas that could affect the bank site.
OWNERSHIP AND LONG-TERM MANAGEMENT: The established bank site would be managed by
the sponsor or their successors in property ownership. The site would be adaptively managed for
development of herbaceous communities dominated by native species common to the bank area.
Credit sales would be tracked by sponsor and reported to the state as required by state law. The
reported credit releases and sales would be tracked on both Corps and state databases using ledger
data supplied by the state. Long-term management of the property would be the responsibility of
sponsor until all released credits have been debited. After all credits are debited, long-term
management obligations would fall to the landowner under state law. Additional protections and
management limitations would be spelled out in both a conservation easement and in an approved
bank plan.
ECOLOGICAL SUITABILITY: The soil types within the project area include Smiley loam and smiley
muck, which are both poorly drained soils with high organic matter content, and Games loam, which is
a moderately well drained soil. Land use within the watershed consists of croplands and established
forest. The bank site is at the edge of large expanses of undeveloped forested wetlands to the south
and mixed forest and scattered farmland to the north. The site contains flat topography with slopes
generally less than 1 percent. The areas surrounding the project area are identified on the National
Wetland Inventory as palustrine forested wetlands.
HYDROLOGY: The project area had three distinct drainage areas. The drainage area associated with
Ditch Plug 1 is approximately 24.2 acres, the area associated with Ditch Plug 2 approximately 8.2
acres, and the area associated with Ditch Plug 3 approximately 18.1 acres. Wetland characteristics
have been achieved in all three areas through the disabling of the drainage ditches. The project was
not anticipated to have any upstream impacts affecting adjacent properties. The topography to the
east increases in elevation, preventing flooding impacts to the building site owned by the bank
sponsor. Existing ditches to the north and northwest will continue to receive runoff from the bank site.
An east-west aligned ditch located south of the bank site, on property owned by the bank sponsor,
was disabled by plugging with soil obtained from the adjacent berm. Downstream impacts were
expected to be negligible, as each area discharges into the existing ditch immediately downstream
from each ditch plug, which empty into a large drainage ditch 300 feet to the north.
CURRENT LAND USES: The bank sponsor owns approximately 160 acres of land. The mitigation
bank is located within the northern half of the land, which was previously farmed. The majority of the
southern half is composed of forested wetland, with approximately 6.5 acres of Conservation Reserve
Program planted to trees (enrollment ended in 2012), 8.3 acres of forage and wildlife food plot,
approximately 1 acre abandoned building site, and a 40-foot utility easement on the south side. Land
use to the east, south, and southwest are undeveloped forest, with scattered blocks of farmed
agricultural land to the north, northeast, and northwest.
COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the
following members of the Interagency Review Team (IRT) and other resource agencies: U.S.
Environmental Protection Agency, Board of Water and Soil Resources, U.S. Fish and Wildlife Service,
Beltrami County
Page 2 of 4
Regulatory Branch (File No. MVP-2010-00340-WAB)
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR
CRITICAL HABITAT
Beltrami County is within the known historic range for the following Federally-listed species:
Canada Lynx, threatened, Gray Wolf, threatened, both found in northern forests of Minnesota, and the
Northern-long eared bat, threatened, found in caves and mines, wooded areas in autumn, and upland
forests during spring and summer.
No species were identified by the applicant or known to exist within the permit area. As the project
area was initially composed of row-cropped farmland, it did not present appropriate habitat for the
listed species. This notice is being coordinated with the U.S. Fish and Wildlife Service. Any comments
it may have concerning Federally-listed threatened or endangered wildlife, plants, or their critical
habitat will be considered in our final assessment of the described work.
4. JURISDICTION
This application is being reviewed in accordance with the practices for documenting Corps jurisdiction
under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act
identified in Regulatory Guidance Letter 08-02.
5. HISTORICAL/ARCHAEOLOGICAL
The latest version of the National Register of Historic Places, as well as the Corps Cultural Resources
GIS layer, have been consulted and no listed properties (known to be eligible for inclusion, or included
in the Register) are located in the project area. The Corps has also considered the potential effects of
the project on any properties that have yet to be identified. Any adverse effects on historic properties
will be resolved prior to the Corps authorization of the work in connection with this project.
6.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, in detail, the
reasons for holding a public hearing. A request may be denied if substantive reasons for holding a
hearing are not provided or if there is otherwise no valid interest to be served.
7.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within 30
days of the date of this notice. These statements should bear upon the suitability of the location and
the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable.
Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by
the Sponsor is available to the public for review upon request.
Replies may be addressed to:
Regulatory Branch
St. Paul District Corps of Engineers
180 Fifth Street East, Suite 700
St. Paul, MN 55101-1678
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call William Baer at the Bemidji office of the
Corps, telephone number 651-290-5388.
Page 3 of 4
Regulatory Branch (File No. MVP-2010-00340-WAB)
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in
the New Registration Box.
Chad Konickson,
Chief, Regulatory Branch
Enclosures:
MVP-2010-00340-WAB Page 1 of 6 through 6 of 6
Page 4 of 4
MVP-2010-00340-WAB Page 1 of 6
N
© 2017 Google
© 2017 Google
10 mi
MVP-2010-00340-WAB Page 2 of 6
N
© 2017 Google
© 2017 Google
4000 ft
MVP-2010-00340-WAB Page 3 of 6
MVP-2010-00340-WAB Page 4 of 6
MVP-2010-00340-WAB Page 5 of 6
MVP-2010-00340-WAB Page 6 of 6
LARRY JAYCOX Wetland Bank Monitoring 2012
AS-BUILT DRAWING
Page 4 of 16