The applicant proposes to discharge approximately 60,387 cubic yards of fill material to construct a permanent replacement dam and berm along 21,648 linear feet of the north and west shores of Buckeye Lake in order to bring the dam into compliance with current State of Ohio regulations and dam safety standards as part of the Phase II of the Buckeye Lake Dam Rehabilitation Project.

TO WHOM IT MAY CONCERN: The intent of this Public Notice is to provide an opportunity for the public to express their views on proposed adverse effects to historic properties associated with the Buckeye Lake dam rehabilitation activities. APPLICANT: Ohio Department of Natural Resources (ODNR) 2045 Morse Road, Building E-3 Columbus, Ohio 43229

LOCATION: As depicted on the attached Project Location Map (Sheet 1), the proposed project is located along the west and north banks of the earthen embankment dam structure of Buckeye Lake, which extends from Liebs Island to Crane Lake in Walnut Township, Fairfield County and Union Township, Licking County, Ohio (39.905223° N, -82.528775° W).

DESCRIPTION OF PROPOSED WORK: The applicant proposes to discharge approximately 60,387 cubic yards of fill material to construct a permanent replacement dam and berm along 21,648 linear feet of the north and west shores of Buckeye Lake in order to bring the dam into compliance with current State of Ohio regulations and dam safety standards as part of the Phase II of the Buckeye Lake Dam Rehabilitation Project. Fill material would consist of impervious berm material, rip-rap, steel sheet piling, and concrete, as well as placement of fill material for temporary access during construction. Typical design for the replacement dam would consist of rip-rap underlain with geotextile material discharged along the upstream face of the dam in order to armor the shoreline and protect it from wave action and ice scour. Turf would be established in the corridor between the existing soil mix cutoff wall and the rip-rap shoreline.

Areas that deviate from the typical design for the replacement dam and/or include additional proposed work are the Sellers Auxiliary Spillway, Sellers Point, AMIL Gate Spillway, Watkins Island, Crane Lake, and Mud Island. Portions of the existing embankment stability berm may be removed in the previously mentioned areas in favor of steel sheet piling.

Liebs Island would continue to be used as a laydown and staging area for equipment and materials during construction. In addition, 14 turnarounds would be constructed to provide access and allow for the movement of equipment during construction. Three of the 14 constructed turnaround areas would remain following construction to enhance public access and recreational opportunities along the lake front, while the 11 remaining turnarounds would be removed.

The majority of the fill material discharged as part of the interim risk reduction measures (IRRM) implemented during Phase I of the overall project would remain in place. A total of 429,126 cubic yards of fill material would be permanently discharged into Buckeye Lake as a result of the overall Buckeye Lake Dam Rehabilitation project (Phase I-complete and Phase II-proposed).

Plans of the work are attached to this notice (See Sheet 2: Key Plan Drawing and Sheet 3: Typical Cross Sections).

As part of the mitigation proposal for the proposed project, in addition to the construction of 10.94 acres of fish habitat enhancement areas within Buckeye Lake, approximately 1,176 linear feet along the banks of the Kirkersville Feeder Canal would be stabilized and rock check dams installed to assist in the reduction of sediment and overall improvement in water quality. The portion of the Kirkersville Feeder Canal proposed to be stabilized is located downstream of the Millersport Water Treatment Plant to just upstream of the canal’s confluence with Buckeye Lake.

The Corps was determined to be the lead federal agency for this undertaking, as the only federal action in association with this proposal is the requirement to obtain authorization under Section 404 of the Clean Water Act for the discharge of dredged and/or fill material into waters of the United States. The proposal is under review for possible authorization under an individual standard permit pursuant to Section 404 of the Clean Water Act.

The Corps is mandated by the National Historic Preservation Act (NHPA) to ensure no federal undertaking, including a Corps permit action, which may affect historic resources, is commenced before the impacts of such action are considered and the Advisory Council on Historic Preservation and the State Historic Preservation Office (SHPO) are provided an opportunity to comment as required by the NHPA, 36 CFR 800, and 33 CFR 325, Appendix C.

Based on coordination with the Ohio SHPO, it has been determined that Buckeye Lake and its associated dam are significant for their association with the Ohio and Erie Canal, as the reservoir was constructed as a water supply for the canal and is considered eligible for inclusion on the National Register of Historic Places (NRHP).

The proposed Buckeye Lake dam rehabilitation activities would occur within the proposed NRHP boundary of the Ohio and Erie Canal and would directly affect, through alterations and additions, the Buckeye Lake dam, which is a contributing element of the Ohio and Erie Canal. The historic integrity of the dam would be diminished by the widening of the existing earthen embankment.

The Kirkersville Feeder Canal was constructed to supplement the water supply to Buckeye Lake and is proposed to be stabilized as part of the proposed project mitigation. The historic integrity of the feeder canal would be diminished by the alteration and stabilization of the channel.

The remains of the canal-era barge, the Black Diamond, were discovered during preparations for the IRRM in February 2016. The shipwreck represents one of the few shipwreck sites in Ohio outside of Lake Erie and is one of the few canal-era shipwrecks. The historic integrity of the shipwreck would be diminished by the removal and relocation of the property from its historic location.

Based on the above, we have been determined the proposed undertaking would have an adverse effect on the Ohio and Erie Canal, the Buckeye Lake Dam, the Black Diamond shipwreck, and the Kirkersville Feeder Canal. This Public Notice serves to solicit public input on potential mitigation activities to resolve the adverse effects on the aforementioned historic properties.

PUBLIC INTEREST: The Corps is soliciting comments from the public, Federal, state and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the proposed adverse effect on historic properties. Should you wish to express your views on the undertaking’s effects on historic properties, or provide comments, objections or mitigation proposals associated with the proposed undertaking, please forward this information to our office prior to the close of the comment period for this Public Notice.

CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. Persons wishing to submit comments or objections concerning this proposal should write:

United States Army Corps of Engineers ATTN: CELRH-RD-N (Public Notice No. LRH-2013-257) 502 8th Street Huntington, West Virginia 25701-2070

Please note, the names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. If you have any questions concerning this public notice, please contact Nicole Marisavljevic at the above address, by telephone at (330) 365-4273, or via email at nicole.marisavljevic@usace.army.mil.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas