The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army permit application from the City of Longmont, c/o CH2M Hill, Attn: Susan Hall, 9189 S. Jamaica Street, Englewood, CO 80111.

Summary The City of Longmont (City) is proposing improvements along the St. Vrain Creek to restore flood damaged riparian and wetland areas along the creek, repair and protect public and private infrastructure, increase flood resiliency, restore the greenway trail and appurtenant structures, and improve water quality. The project, as proposed, will permanently impact 0.33 acre of wetlands and 1.86 acres of St. Vrain Creek.

Location The project is located in Sections 9 and 10 within Township 2 North, Range 69 West in Boulder County, Colorado. The approximate projectcoordinates are latitude is 40.156081, longitude -105.113153.

Existing Conditions The project area is located within the South Platte River watershed of northeastern Colorado. St. Vrain Creek flows from west to east through the project area before forming a confluence with the South Platte River approximately 16 miles northeast of the project site. Land use within the project area is urbanized and the project site is surrounded by commercial and high density residential development.

PUBLIC NOTICE US Army Corps of Engineers Omaha District

Application No: NWO-2017-01796-DEN Project: Resilient St. Vrain- City Reach 2B Improvements Applicant: City of Longmont, CO Waterway: St. Vrain Creek Issue Date: October 6, 2017 Expiration Date: November 5, 2017

REPLY TO: U.S. Army Corps of Engineers Denver Regulatory Office 9307 South Wadsworth Blvd Littleton, CO 80128-6901 angelle.v.greer@usace.army.mil

30 DAY NOTICE

PUBLIC NOTICE FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army permit application from the City of Longmont, c/o CH2M Hill, Attn: Susan Hall, 9189 S. Jamaica Street, Englewood, CO 80111. Permits are issued under Section 404 of the Clean Water Act (Section 404) which regulates the placement of dredged or fill material in the nation's waters. Summary The City of Longmont (City) is proposing improvements along the St. Vrain Creek to restore flooddamaged riparian and wetland areas along the creek, repair and protect public and private infrastructure, increase flood resiliency, restore the greenway trail and appurtenant structures, and improve water quality. The project, as proposed, will permanently impact 0.33 acre of wetlands and 1.86 acres of St.Vrain Creek. Location The project is located in Sections 9 and 10 within Township 2 North and Range 69 West in Boulder County, Colorado. The approximate project center latitude is 40.156081 and the longitude is -105.113153. Existing Conditions The project area is located within the South Platte River watershed of northeastern Colorado. St. Vrain Creek flows from west to east through the project area before forming a confluence with the South Platte River approximately 16 miles northeast of the project site. Land use within the project area is urbanized and the project site is surrounded by commercial and high density residential development. 1 Project: Resilient St. Vrain- City Reach 2B Improvements Waterway: St. Vrain Creek, Boulder County, Colorado

Corps File No: NWO-2017-01796-DEN Applicant: City of Longmont

Purpose The basic project purpose is stream/wetland restoration and flood control. The overall project purpose is to restore flood-damaged riparian and wetland areas along the creek, repair and protect public and private infrastructure, increase flood resiliency, restore the greenway trail and appurtenant structures, and improve water quality. Description of work The project encompasses several components: channel reconstruction and tie-in, modular block retaining walls, the BNSF Railway bridge, a pedestrian bridge and trail improvements, stormwater outfalls, and a waterline replacement. Channel Reconstruction Channel reconstruction would include reshaping and realignment to accommodate 100-year flows through the project area and transition flows through a smooth curve from upstream to downstream of the BNSF. The total width of the regraded banks or benches, combined with the low-flow channel would be between 150 feet and 300 feet and would allow flows of up to 15,200 cubic feet per second (cfs) (100-year event) to be safely conveyed through the Project area. The channel would be lowered compared to the existing channel elevations by up to 3 feet with the following dimensions: · 35-foot channel bottom width; · 2.5 feet channel depth; and · 3:1 side slopes typically with flatter slopes on the inside bends. The 1,400 If of channel would be realigned to establish stream meanders incorporating geomorphic and natural channel design principals. Where bedrock is exposed, the new channel would be over-excavated and refilled with a cobble channel lining in the channel bottom for aquatic habitat. Topsoil and native fill would be placed on the overbank benches. Channel reshaping would also include the development of a riffle-pool sequence within the low-flow channel. Channel sinuosity ratio would increase to 1.05 over existing conditions. Existing banks would be replaced with tiered channel banks to connect higher flows and annual runoff to the overbank, and channel banks and overbank benches would be protected with bioengineering, soil riprap, wetland vegetation, and native vegetation, shrubs, and trees. The existing low-quality wetland and aquatic habitat would be replaced with new aquatic habitats in zones according to hydrological requirements and incorporating native species. The existing riparian buffer would also be replaced with native vegetation according to hydrologic zone and slope. For habitat variability, random boulders, boulder clusters, and woody debris would be placed within the channel and overbanks. Architectural modular block retaining walls would be installed along both banks of St. Vrain Creek for most of the Project reach for bank protection. At the upstream end of the Project, Type M soil riprap would be used to transition the wall grading to existing grade, and Type H void-filled riprap would be used to transition the channel bottom back to existing grade. Type M soil riprap would also be installed at the downstream end of the Project as a transition to the downstream reach. Modular Block Retaining Walls As discussed above, modular block retaining walls would be installed along both banks of St. Vrain Creek for most of the Project reach for upper bank and property protection. The modular block would be typically 2 Project: Resilient St. Vrain- City Reach 2B Improvements Waterway: St. Vrain Creek, Boulder County, Colorado

Corps File No: NWO-2017-01796-DEN Applicant: City of Longmont

constructed in multiple tiers, with each tier not exceeding approximately 5 feet in wall height. In some locations, typically where the modular block retaining walls tie in to existing infrastructure, the wall height would exceed 5 feet. The modular block retaining walls would include concrete pre-cast modular blocks that are 46-1/8 inches wide, 18 inches tall, and between 28 and 60 inches deep. Each wall tier would include a cap stone. The bottom of the walls would be installed within bedrock and set on a leveling pad. Behind the walls, gravel backfill (Number 57 or 67) and drainage pipes would be installed to prevent build-up of water behind the walls. Cast-in-place retaining walls may be used on BNSF property with the footprint approximately the same as the modular block wall. BNSF Railway Bridge The existing BNSF bridge would be removed and replaced with a longer span bridge structure across the realigned St. Vrain Creek to convey the 100-year flood flows. The proposed bridge structure would be constructed within the existing BNSF right-of-way, and the proposed south abutment would be at the approximate location of the existing north abutment. The new bridge would include up to four piers. The bridge piers and abutments may be founded on drilled shafts or socketed steel pile and Type M soil riprap would be installed around the piers to prevent scour. The existing BNSF bridge is a double-track bridge, but only carries one track. Through coordination with BNSF, a double-track bridge would be required to replace the existing bridge structure. A second main track would be constructed as part of this project for future use. Pedestrian Bridge and Trail Improvements Trail improvements would include approximately 1,250 If of concrete Greenway Trail along the north side of the realigned St. Vrain Creek, a new 185-foot pedestrian bridge across the widened and realigned St. Vrain Creek, and new concrete trail connections to the new pedestrian bridge. The concrete trail section would be 10 feet wide with a 3-foot wide crusher fines edge or a concrete rumble strip on the downhill side. The new pedestrian bridge would be installed approximately 150 feet upstream of the existing BNSF bridge, and upstream of the existing Dry Creek Outfall. Abutments for the pedestrian bridge would be concrete 24-inch drilled caissons with an abutment cap on either side of St. Vrain Creek. There would be no center piers for the pedestrian bridge. Stormwater Outfalls Three existing stormwater outfalls within the Project area would undergo improvements. The existing Price Road Outfall discharges storm flows from Price Road to St. Vrain Creek immediately upstream of the BNSF bridge on the north side of St. Vrain Creek. Improvements to the Price Road Outfall would include swale grading near Price Road, a new Colorado Department of Transportation Type C Drop Inlet, 18-inch reinforced concrete pipe through the retaining walls and beneath the Greenway Trail, and overbank swale grading to transition the storm flows into St. Vrain Creek. The overbank swale grading would include Type M soil riprap for erosion protection and bank stabilization. The existing Dry Creek Outfall is comprised of twin 10 by 10-foot box culverts draining the upper Dry Creek watershed on the south side of St. Vrain Creek. The outfall conduits would not be improved as part of the Project, but the creek would be realigned to the north away from the existing outfall. The existing wingwalls and a portion of the concrete apron would be removed or modified, and new retaining walls would extend from St. Vrain Creek to tie into the existing Dry Creek Outfall headwall. The Dry Creek

3 Project: Resilient St. Vrain- City Reach 2B Improvements Waterway: St. Vrain Creek, Boulder County, Colorado

Corps File No: NWO-2017-01796-DEN Applicant: City of Longmont

Outfall channel downstream of the box culvert would be graded to tie into the St. Vrain Creek channel, with Type M Soil Riprap to protect the confluence of Dry Creek with St. Vrain Creek. The Maintenance Access Outfall is an existing 36-inch reinforced concrete pipe discharging to St. Vrain Creek. The improvements to the Maintenance Access Outfall would include overbank grading to transition storm flows into St. Vrain Creek with Type M soil riprap for channel and bank stabilization. Waterline Replacement An existing waterline crossing approximately 100 feet downstream of the existing BNSF bridge would be abandoned in place and replaced with a new waterline crossing of the realigned and widened St. Vrain Creek channel. The new waterline would be installed within bedrock and concrete encased as it crosses beneath St. Vrain Creek. CR2B/CR 2A Channel Tie-in (Transition Area) A channel tie-in area (Transition Area) would be constructed between CR2B and CR2A, which is located immediately downstream of CR2B. The Transition Area is required because the CR2A project is scheduled to be constructed before CR2B and its upstream end must be graded into the existing channel. After construction of CR2A, the Transition Area would be reseeded with a wetland seed mix. A portion of the Transition Area mitigation wetland is expected to be permanently impacted from the construction of CR2B. Upon the completion of the CR2B construction, impacted wetland areas within the Transition Area would be planted with wetland species. Other Project Elements Other Project elements include demolition of two existing buildings located in uplands, reconstruction of adjacent parking areas and installation of fencing. Irrigation lines would be installed near the Greenway Trail and within the tiered walls. Prior to construction, demolition of two City-acquired buildings located in the upland is required for construction of the new channel. Temporary and permanent erosion control would be required during all phases of construction. The contractor would submit erosion control or stormwater pollution control construction drawings for approval as part of an application for obtaining a Stormwater Construction Activity Permit (SCAP) filed with the City prior to the start of construction activities. Installing and maintaining best management practices (BMPs) would be critical to controlling erosion and providing pollution control to minimize damage to the waterway, habitat, and aquatic life. Impacts and Mitigation Direct impacts to approximately 0.33 acre of wetlands and 1.86 acres of the St.Vrain Creek would occur upon project implementation. To compensate for unavoidable project-related wetland impacts, the City has elected to implement on-site, in-kind compensatory mitigation to replace lost wetland functions and improve riparian corridor connectivity within St. Vrain Creek. Compensatory mitigation would replace the impacted 0.33 acre of wetland along the channel bank. Establishment of the mitigation wetlands will be monitored annually during the summer by a qualified wetland scientist, for a period of 5 years following completion of project construction. In addition, the following mitigation measures will be employed during construction: · To prevent impacts to nesting migratory birds, woody vegetation will be cleared before the nesting season begins (March 15) or a preconstruction nest survey will occur no earlier than 1 week prior to clearing. If actively nesting species are observed, the United States Fish and Wildlife Service 4 Project: Resilient St. Vrain- City Reach 2B Improvements Waterway: St. Vrain Creek, Boulder County, Colorado

Corps File No: NWO-2017-01796-DEN Applicant: City of Longmont

·

· · · · ·

· ·

(USFWS) will be contacted for buffer restrictions. Buffers will be adhered to until the young have fledged. BMPs will be used during all phases of construction to reduce impacts from sedimentation and erosion, such as the use of berms, sediment control logs, inlet and outlet protection, concrete washout areas, check dams, erosion control blankets, stabilized staging area, vehicle tracking control, silt fences, surface roughening, and/or diversion channels (as appropriate). Erosion control will be checked regularly and repaired or replaced as needed. Devices will remain in place until vegetation is established, as needed. Disturbed areas will be sprayed with water to minimize dust and soil loss. The contractor will be required to wash construction vehicles and equipment prior to entry into the construction area to avoid transport and introduction of invasive terrestrial and aquatic organisms. The use of petrochemicals within 50 feet or on slopes leading to waters of the United States will be prohibited. No equipment staging or storage of construction materials will occur within 50 feet or on slopes leading to waters of the United States. Equipment will be refueled in level, designated containment areas, a minimum of 50 feet from waters of the United States. Before construction, noxious weed and watchlist species will be safely eradicated. Chemicals used to control noxious weeds within SO feet of waterways must be rated for use near water and reviewed by the City. Any salvaged wetland soils will be stored separately from upland soils. Stockpiled or other fill material will be stored in level upland areas and protected from erosion and weed establishment. If any pumps are used, fish screens will be installed to prevent entrainment. *********************

The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 Cherry Creek Drive South, Denver, Colorado 80222-1530, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. For further information, please contact the Colorado Water Quality Control Division, (303) 692-3500. In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not adversely affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against the reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, wetlands, fish and wildlife values, 5 Project: Resilient St. Vrain- City Reach 2B Improvements Waterway: St. Vrain Creek, Boulder County, Colorado

Corps File No: NWO-2017-01796-DEN Applicant: City of Longmont

flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). The Corps of Engineers is soliciting written comments from the public; Federal, state and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. Any agency or individual having an objection to the work should identify it as an objection with clear and specific reasons. All replies to the public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact Angelle Greer at (303) 979-4120 or by email at angelle.v.greer@usace.army.mil or visit the Denver Regulatory Office web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx The District Engineer will consider requests for holding a public hearing, for the purpose of gathering additional information. Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held. Requests for a public hearing should state specifically the reasons for holding a public hearing, and what additional information would be obtained. Should the District Engineer decide that additional information is required and a public hearing should be held, interested parties will be notified of the date, time and location. Comments received after the close of business on the expiration date of this public notice will not be considered.

6 Project: Resilient St. Vrain- City Reach 2B Improvements Waterway: St. Vrain Creek, Boulder County, Colorado

Corps File No: NWO-2017-01796-DEN Applicant: City of Longmont

COLORADO

··

Legend

-

Figure 1 Resi lient St. Vrain Project City Reach 28 Location Map

Cl City Reach 28 Limits of Construction 0 N

500

1,000 I

Feet

W 1653819_ LONGMONT_ STVRAIN\04_ GISIMAPFI LESIEXHIBITSICITY _ REACH_ EXHIBI TSICR214041WDRICR2B_ LO CAT ION_ MAP MX O JOUAN 6129120 17 2 51 ·32 PM

Resilient St. Vrain Project City Reach 28 Project Overview

Legend

.c:::::J - -1·

_

.!

City Reach 28 Limits of Construction

. . Retaining Wall

City Reach 28 Limits of Construction Transition Area

Water Line

Grading

E2Z]

Rock Work

~ Wetland

Water of the US

Sidewalk/Trail W\653819_ LONGlv1 0 NT_STVRAIN\04_G IS\lv1 APFIL ESIEXHIBITS\C ITY_REAC H_EX HI BITS\CR2\404\CR2B_V\/ETLANDS_WATERS_OVE RV IEV\/_lv1AP lv1X D JO UAN 8/18120 '17 2 34 54 Plv1

0 N

50

I

100 I

Feet

6

4

'

/

\.....

·...,.

·:I

l

\/

J

'· -J --/----·-

r-A

}---

- - J

-- I

- _(/

;(

\,-

_,

I I

~'\.

'·

/ ---...._../

I _,'

-----

on_

'

PRO l)'OSED --~_-,-.'. GRE,E NWA Y TRA.l,~L~/ _

\

CON~ECT

\'

)

6' HT. WOOD FENCE, SEE bWG LA-300 AND STD. LA-15

,/'

\

w

"z <>:

\'

\

I\

_J

I

<>: w

(/)

FOR WALL-PLANTINGTEQE:l'JD: SEE DWG LA-002

TO E ~ ISTING

\

/

.\

-

'\._

\., -,~ -·:.....

,

\,

i.

'" ,\ I

z

!

I

LEGEND

oo

,, '~,

---1.' .

LIMITS OF DISTURBANCE

B

Q C/J " I

~o

"'zt-w

ZONE J

0::

" :::> 0

\\ RETAININ G WALL; T'(P, "\, ,__' SEE CIVIL DWGS " FOR ALIGNMENT

! I

PROPOSED GREENWAY TRAIL

-- '

PROPOSED GREENWAY TREE

0 0

z

0

,,,,

',.._ __~

F 0 :::> 0:: t-

"'0z

'

0::

0

0

~

I

0

~ ~

w

PROPOSED EVERGREEN TREE

\\

PROPOSED RIPARIAN TREE

0

N

\

/

PROPOSED SHRUB (ALSO SEE LEGEND ON DWG LA-003)

¢0

PLANTING ZONES

)

ZONE A, MITIGATION WETLAND SOD ZONE B, MITIGATION SHALLOW EMERGENT PLUGS

111: I I' I

I

I

ZONE C, MITIGATION WETLAND SHRUBS & PLUGS

I

ZONED, STABILIZATION RIPARIAN SHRUBS

c

I'! 1. I I I .1: I !1

1-- --1 -- ------ -~

---

-

(/) <>: \;> <>: "

I

ZONE F, STABILIZATION UPLAND SEED

I

ZONE M, STABILIZATION RETA INING WALL SEED MIX

0 0

0 0

""5

"'('.)

~z mW

I-

[; 'I

:::> 0 0

>-

/ \

\

\

w w

(f)

\

w

6' HT\._CHAIN LINK FENCE_, ,. - -

_J

SEE LJWG LA-300 AND / ( STD,:DTL LA-12 '

w I (j)

CD N

I

~

0:::

ZONE K, STABILIZATION FLOODPLAIN SEED

lt:~<~I

0

(/) w _J

'1

ZONE H, STABILIZATION FLOODPLAIN SEED

ZONE L, STABILIZATION FLOODPLAIN SEED

~

r\

ZONE J, STABILIZATION GREENWAY TRAIL SEED

I

~

I I I

/

0

<>: w

0::

!~

ZONES

~ 0

r'.

w

CL('.) w <( 0 o -<( 0::

0

Q_

z

<( 0::

> t-

z

z ..--

U)l-W

ozo::: U) z ::s <( Iz <(CL w _J

2

<( (/)

:::> 0 0

ztw

:::;

FOR WALL-PLANTING--~ LEGEND, SEE DWG LA-002

Uj

0

w

0::

z

NOTES

D

0

1. REFER TO DWG LA-002 FOR PLANTING NOTES.

)

RETAINING WALL, TYP . SEE CIVIL DWGS FOR ALIGNMENT

N

C)

2. REFER TO DWG LA-003 FOR PLANT LIST AND QUANTITIES, AND SEED MIXES.

0

10

20

I 40

-~-~-~-~--~~--;}_~~~' SCALE IN FEET

I

60

(

i=

I

\ 3-EC~ · -~

"· --- _/

1-----..__----~o

\

1" = 20'

:::>

VERIFY SCALE

0::: U)f-

BAR IS ONE INC H ON OR IGINAL DRAWNG.

,I -

42" HT Clj._Al_IY·Llt:'[K- - CE, . SEE,EYYG:.i:A-::3'00 AND __5HJ.l)TL LA-12

0

,.

z

Q

DATE

JULY 2017

PROJ

653619

0

DWG

LA-101

cfi

L~~~~~~~~~----=:~~~~~~~~~~~~~~~~~~)WWG~~--rLOTDATE:SPLc;mATE~TTIME:SPl~w SHEET

SPWURL

SPWFATH

FILENAME: ANS l_D .DWG

PLOT DATE: SPLOTDATE

of

PLOT TIME: SPLOTTIME

O

5

LEGEND

I

-

1

----

LIMITS OF DISTURBANCE

I

II II

PROPOSED GREENWAY TRAIL

o

¢

t"

-,1

~·o 08

I-

-. \ ~, I

0

~I

lli (/)

PROPOSED RIPARIAN TREE

1=--------~ ZONE H, STABILIZATION

PROPOSED SHRUB (ALSO SEE LEGEND ON DWG LA-003)

ZONE B, MITIGATION SHALLOW EMERGENT PLUGS

::::;

I

-=-----_-.

FLOODPLAIN SEED

: · 1 IL ._ _·_ ,_

ZONE J, STABILIZATION GREENWAY TRAIL SEED

I ~'

<'~

ZONE M, STABILIZATION

'---~

ZON~J

N

:2:

NOTES

RETAINING WALL , TYP. ~EE CIVIL DWGS FOR ALIGNMENT

B

.

I

/'" \

/

I

Q)

1. REFER TO DWG LA-002 FOR PLANTING NOTES.

'

PEDESTRIAN SAFETY RAILl~G. SEE DWG LA-300 AND STD. i°TL 1000-666

-----

0

2. REFER TO DWG LA-003 FOR PLANT LIST, QUANTITIES AND SEED MIXES .

1020

60

40

I

SCALE IN FEET

~-"<---FOR WALL-PLANTING LEGEND,

' , SEE DWG LA-002

""

)

ZONE K, STABILIZATION FLOODPLAIN SEED

I RETAINING WALL SEED MIX

(_) <(

'\I

l/'..'.f//". : I ZONE L, STABILIZATION Y' /// FLOODPLAIN SEED

I

I-

ZONED, STABILIZATION RIPARIAN SHRUBS

r

ZONE F, STABILIZATION '------'- UPLAND SEED

ZONE A, MITIGATION WETLAND SOD

w z

I

PROPOSED EVERGREEN TREE

PLANTING ZONES

I

WETLAND SHRUBS & PLUGS

I.

PROPOSED GREENWAY TREE

~·l~ <.o,;.

. i , .) . '

I I ZONE C, MITIGATION,

)~.(/) ' r'

A

~

6

(')

0

I

' '

PR'OPOSED GREEONWAY TRAIL

"'-., "'-..

LIMITS OF----~ DISTURBANCE , TYP.

--

-- - - - - - - - - - - - -

'-BENCH ON PAD, w/ TRASH RECEPTACLE

(')

s0

/ I

' '

5

/

/

w w

(/)

/

--------------~ l

w

z

::::; I

(_)

I<(

:2:

CONCRETE SIDEWALK TO PEDESTRIAN BRIDGE

c

\

~

t;

g

<(

0

~

;;;u

UU

CONCRETE SIDEWALK TO PRICE ROAD

I

0 0

~8 ::;; 0 :'!) 5

~ "'l'J ~z

i';

w

"«"'w

IJJ

w

O>

al

N

I

u

'' 6' HT CHAIN LINK FENCE, SEE DWG LA-300 AND STD. DTL LA-12 I

RETAINING WALLS, TYP. SEE CIVIL DWGS . FOR ALIGNMENT

<(

""/' .·· /

/

w

D:'.

i':

u ,.'..

u

'

w

0 D:'.

""'

a.

z

~ D:'.

>

f-

z

~

/

_J

2: :::>

IJJ

f-

z

u

w

'/

0 0

::J

iii

FOR WALL-PLANTING LEGEND, . SEE DWG LA-002

D

w a... (,'.) <(ZN u-<( (/)I- w ozo::: (/) z ::5 <( Iz <(a... w

w

D:'.

z

0

)

i=

>---~----~u

2-TCH

:::>

1" = 20'

VERIFY SCALE

0:::

BAR IS ONE INCH ON

(/)I--

ORIGINAL DRAVV1NG.

0

PROJ

653819

Q U

LA-102

°#.

SHEET SPWPATH

FILENAME: ANSl_D.DWG

PLOT DATE: SPLOTDATE

z

JULY 20 17

DWG SP\NURL

,.

DATE

of

PLOT TIME: SPLOTTIME

~

6

5

LEGEND

----

Q)

LIMITS OF DISTURBANCE

(

0

) A

PROPOSED GREENWAY TREE

';.f:,.~t

PROPOSED EVERGREEN TREE

.tfJ""v..

0

PROPOSED RIPARIAN TREE

¢0

PROPOSED SHRUB (ALSO SEE LEGEND ON DWG LA-003)

10

20

40

60

~--

PROPOSED GREENWAY TRAIL

oo

, ~)

N

I

~;'

SCALE IN FEET

/

. i I

\

/

PLANTING ZONES

\I

ZONE A, MITIGATION WETLAND SOD

j

-

t-

_I/-

\

ZONE B, MITIGATION SHALLOW EMERGENT PLUGS

z

w

\

2 :::>

u 0 0

z

1 11

11 I

0

ZONE C, MITIGATION WETLAND SHRUBS & PLUGS /

/

B

{

,,_,

I

'I .

I: '. ~ : · I I~',, ~1

c

I

ZONE M, STABILIZATION RETAINING WALL SEED MIX

I

I ~

~

/

~I

/

'·:,-

... , \

' \, I

I

.)

,1

I

~

PROPOSED GREENWAY--TRAIL, CONNECT TO CITY REACH 2A

l

;

,

r

.·

I

I

I

.

/

FOR WALL' PLANTING LEGEND, SEE DWG GA-002 \ RETAINING WALLS, TYP . SEE CIVIL 'oWGS FOR ALIGl';JMENT

NOTES

/

1. REFER TO DWG LA-002 FOR PLANTING NOTES.

I·

CR4B/CR2A TRANSfTION·AREA \ .

2. REFER TO DWG LA-003 FOR PLANT LIST AND QUANTITIES, AND SEED

\

a

E

, .. _ J

//>.

.~--/

'

c

>\ (..- \ ·.

,__; (·.., ... I ·}

\

ZONE K, STABILIZATION FLOODPLAIN SEED

l/~ I

::.,__ .:-··

·I

ZONE J, STABILIZATION GREENWAY TRAIL SEED

ZONE L, STABILIZATION FLOODPLAIN SEED

z

0

u

I

- I\

ZONE H, STABILIZATION FLOODPLAIN SEED

)

-

~

ZONE F, STABILIZATION UPLAND SEED

!11!

\

.· (

ZONED, STABILIZATION RIPARIAN SHRUBS

' i )/ ) ,' .'

/

F u :::> 0: t

) \_.'

I \

-,

,--

,I

I

,_

'·-

_/

--. --'..,\, \

/I

,·: / _/

' F\ '

CITY

\ REACH_~

...__

I

~

0co

~

80

"u0

.

_/

/ 1,

m ~c .E- a U.J

.. '.

\

\ I

,

I

\ I

(

:s

§w

,

\

~

0

lll

iii

_,

/

-

.'

I

(.')

I

w

z

: /

-/-

.-

-

N

u

<".

\

~------

"'

m I

w

\

"'>-t-

\

/

·· J

(I

\ , \-

!-5

0 ,.'.. a.. C)

w

u

z (") u 1---w - z "'t- z<(a.. w

0

<(

a.

<(

z

w

_J

2:

<( (/)

::J

t-

z

()

:::;

0 0

w

ZONEJ--'---~

en w

"'

D

z

0

j::

)

I

1-------'-----~ u

::J 0::

1": 20'

VERIFY SCALE BAR IS ONE INC H ON ORIGINAL ORA'MNG. 0 ,.

DATE PROJ

JULY2017

DWG

LA-103

~

v

z

J

0

653819 ()

'

'<;;;;;;;-;;;;------------------------------;:-;;;-;-::::~:---------------------------------------------------~-----~-------~--~__J~S~HE~E~T---~o~f~_Jg SPWURL SPWPATH PLOT TIME: SPLOTTIME PLOT DATE: SPLOTDATE FILENAME: ANSl_D.DWG

2

6

5

MATCHLINE - SEE DWG LA-102

) A

w :;;

'I ~

<(

z_J

<(

w

(f)

ZONE El ZONE~'

l\

\

/ :..~-- RETAINING WALLS, .· \ TYR/ SEEGIVIL DWGS FOR ALIGNtylENT \ .. ,

>

6' HT. CHAIN LINK FENCE, \ SEE Lk-°'300 ANIS.STD. DrL. t'A-12

z Q :r: " ~ ~ 0

""

.

.

(f)

UJ "'

:;

i

\\

::J

g

""\,

.

.

z

0

ti::J ~

"'

z

0

0

0

~

I

·\/

!\

( \

'

' .· i CHA!N GA T'-'·-,,,,-\ ~'~..--~ i?ETWEEN,BOLLf>. ROS, . SEE DETAIL, LA::j5 \

\

/

\_,1 \

\

LIMITS OF DISTURBANCE

.....

111111111111~:r~N~~~~~~~~· PLUGS

PROPOSED GREENWAY TRAIL

,,,,41J1c,. ,

0

~'6 Oo D

)

LIMITS

')·\ 1. /> ZONE 0, STABILIZATION 1

°'

/ ·,

RIPARIAN SHRUBS

I··

/ /

jl 1jl 1lljll1 1 ZONE F, STABILIZATION .1 11. l 1 l,l l.1 . UPLAND SEED

PROPOSED SHRUB (ALSO SEE LEGEND ON DWG LA-003)

ZONE H, STABILIZATION "'-------'·I FLOODPLAIN SEED

~ -. - .)/

r.r--

}

OF_/-:,~ ,

,·

ZONE B, MITIGATION SHALLOW EMERGENT PLUGS

. f-, "'--.

·.

'.I

) -----+--

I

~-~

N

0

i

\

w

"'>-

I-

\.,

_ _ _ :_

' \.:- ~

-~ '

-- -~--

u UJ ..:. 0 CL(.'.)

o~..,,

.·

,.

~ \ , ; tlJ

w <( z

-

~

""'z > "' <(

00

w

I-

NOTES

::s

_J

I

I-

~

::J

/,

I

----

20

z

UJ

z w

(_)

0 0

u;

w

"'

z

0

f=

-(9

10

(/)

r

:::2: ::>

N

0

\_,

ozo::: z <( <(CL

(f)

I

!- ·

1. REFER TO DWG LA-002 FOR PLANTING NOTES. 2. REFER TO DWG LA-003 FOR PLANT LIST AND QUANTITIES, AND SEED MIXES.

z

(/)1--UJ

<(

2

/I

'

0 u-<(

0

"I\ - '· - --------- -- --su

'

I

ZONE M, STABILIZATION RETAINING WALL SEED MIX

ro

:r:

'·,

- ---.:\ -

I

f / 7 1ZONE L, STABILIZATION l_::L_ ~// ~/./~. FLOODPLAIN SEED

(- -

<(

: I ZONE J, STABILIZATION I~.--~. GREENWAYTRAILSEED 1 -~, ~ I ZONE K, STABILIZATION '\:~ FLOODPLAIN SEED

-

FiGR WALL-PLANTING ~EG END ; SEE ow~ LA-002

PLANTING ZONES ZONE A, MITIGATION WETLAND SOD

-~----=-~'":-~-==-=~~~o_:_-_

6' HT. CHAIN-LINK FENCE: . SEE L_A-3,00 Ati D STD. DTL. Lk 12

'::.1 ( \ .

\.

/

PROPOSED RIPARIAN TREE

( -of6'.s

DISTURBANCE, TYP /'

/

PROPOSED GREENWAY TREE PROPOSED EVERGREEN TREE

. ----- -

Z ONE C - --~

LEGEND

----

I

r'.

1-----'---- -- ____,U 1" ~20· ::> 40

0:::

VERIFYSCALE

60

BAR IS ONE INCH ON ORIGINAL DRAW NG.

I

0

SCALE IN FE ET

DATE PROJ DING

,.

r(/)

z

JULY2017 Q 653819 (_) LA-104 '

'---------------------------------------------------------------------------------------------------------------------_J,~ S H~E~E~T_ _ _ _ _of_ __,~ SPWURL SPWPATH

FILENAME: ANSl_D.DWG

PLOT DATE: SPLOTDATE

PLOT TIME: SPLOTTIME

3

-

6

4

ci

~

,I

---

)

t3

\

I I

"~ Cl

"'~ ~

j i'

A

"'

::; Q.

w

<{

z®

>

2<{ u _J

Q.

"

a>

"

0

"'

<{

>-

w

CJ

Cf)

z Q"'

Cf)

~ ~ UJ

::;

I

0

Cl'.

i3 g z

0

G

~

Cl'. 0

8

B

)

c

---~"'.-,,/--...,~

-

;<

-._

]-SCH

Rj:TAINING WALLS , T YP c,' s 'EE c 1v1L DwGs FOR .A LIGNMENT

LEGEND

1~

--

·--

,-

---- .. Z-ONE K --

/

CJ

/

------

-

_

. \.,_ \

___

\

. -

.

,-' --- · ~

:

/

-

___,,

~

0

PROPOSED EVERGREEN TREE

Cl'.

1·,

r

)

ZONED, STABILIZATION RIPARIAN SHRUBS

>-

111111111111111 ZONE F, STABILIZATION .1.11.1 1.11. UPLAND SEED

ZONE H, STABILIZATION -=1 FLOODPLAIN SEED

PROPOSED RIPARIAN TREE

~

~

NOTES 40

1. REFER TO DWG LA-002 FOR PLANTING NOTES.

60

I

SCALE IN FEET

2. REFER TO DWG LA-003 FOR PLANT LIST AND QUANTITIES, AND SEED MIXES.

I·

(

3Cl'.

u-

(f)l-W

<( Cl'.

ozo:: z::; <(

z

_J

z

> <(Cl. >-

ZONE A, MITIGATION WETLAND SOD ZONE B, MITIGATION SHALLOW EMERGENT PLUGS

l '\,~I

Cf)

0 0

w

Cl'.

z

0

f=

ZONE L, STABILIZATION FLOODPLAIN SEED

FILENAME: ANSl_D.DWG

::::> 0::

V ERIFY SCALE BAR IS ONE INCH ON

,.

DATE PROJ DWG

SPWPATH

u

ORIGINAL ORAV'v1NG. 0

I

PLOT DATE: SPLOTDATE

w

u

w

Ui

ZONE K, STABILIZATION FLOODPLAIN SEED

ZONE M, STABILIZATION RETAINING WALL SEED MIX

z

::::>

1" = 20'

l/~~I

Cf)

I-

::a:

<(

::J

SHEET SP\l\IUR L

,.'.. w (L(9 w <(ZLO

0

z>-

ZONE J, STABILIZATION GREENWAY TRAIL SEED

I:

u

PLANTING ZONES

,

20

<{

w

>-

PROPOSED GREENWAY TREE

PROPOSED SHRUB (ALSO SEE LEGEND ON DWG LA-003)

/

____ C) 10

PROPOSED GREENWAY TRAIL

I

\~~

N

0

ZONE C, MITIGATION,

-

D

)

I

0

111111111111 WETLAND SHRUBS & PLUGS

6' HT. CHAIN LINK FENCE, SEE LA-300 AND STD. DTL. LA-12

/ /--

N

LIMITS OF DISTURBANCE

ICf)

z 653819 u

JU LY 201 7

0

LA-105 0;:,,!i?.

of

PLOT TIME: SPLOTTIME

0

(!)

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits