INSTALL AND MAINTAIN TWENTY-SIX 350’ BREAKWATERS IN CAMINADA BAY IN JEFFERSON PARISH
NAME OF APPLICANT: Grand Isle Independent Levee District c/o GIS Engineering, LLC, Mohan Menon, 450 Laurel Street, Suite 1500, Baton Rouge, Louisiana 70801.
LOCATION OF WORK: Section 25, Township 23 South, Range 21 East, in Grand Isle, Louisiana, in Jefferson Parish, as shown on the attached drawings.
HUC: 08090301: Lower Mississippi Region
Latitude: 29.218333 Longitude: -90.019639
CHARACTER OF WORK: To dredge approximately 32,100 cubic yards of waterbottoms for access to deposit approximately 70,400 cubic yards of rock and excavated material to create twenty-six 350’ segmented rock dike breakwaters in Caminada Bay, in Grand Isle, Louisiana. The applicant contends jurisdictional wetlands will not be impacted, as such compensatory mitigation is not anticipated at this time.
JOINT PUBLIC NOTICE
October 10, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2259
Project Manager
Scott N. Kennedy
scott.n.kennedy@usace.army.mil
Permit Application Number
MVN 2017-00711 EMM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 1701005-03
Interested parties are hereby notified that a permit application has been received by the New Orleans
District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of
March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816;
33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act.
INSTALL AND MAINTAIN TWENTY-SIX 350' BREAKWATERS
IN CAMINADA BAY IN JEFFERSON PARISH
NAME OF APPLICANT: Grand Isle Independent Levee District c/o GIS Engineering, LLC, Mohan
Menon, 450 Laurel Street, Suite 1500, Baton Rouge, Louisiana 70801.
LOCATION OF WORK: Section 25, Township 23 South, Range 21 East, in Grand Isle, Louisiana, in
Jefferson Parish, as shown on the attached drawings.
HUC: 08090301: Lower Mississippi Region
Latitude: 29.218333 Longitude: -90.019639
CHARACTER OF WORK: To dredge approximately 32,100 cubic yards of waterbottoms for access to
deposit approximately 70,400 cubic yards of rock and excavated material to create twenty-six 350'
segmented rock dike breakwaters in Caminada Bay, in Grand Isle, Louisiana. The applicant contends
jurisdictional wetlands will not be impacted, as such compensatory mitigation is not anticipated at this
time.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating reasons
thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must
be mailed so as to be received before or by the last day of the comment period. Letters concerning the
Corps of Engineers permit application must reference the applicant's name and the Permit Application
-2Number, and be mailed to the Corps of Engineers at the address above, ATTENTION:
REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference
the applicant's name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above. Individuals or parties may request an extension of time in
which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager
listed above. Any request must be specific and substantively supportive of the requested extension, and
received by this office prior to the end of the initial comment period. The Section Chief will review the
request and the requestor will be promptly notified of the decision to grant or deny the request. If granted,
the time extension will be continuous to the initial comment period and, inclusive of the initial comment
period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which reasonably
may be expected to accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and,
in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of
Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant
to the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or destroy
presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of the public
notice solicits input from the State Archeologist and State Historic Preservation Office regarding potential
impacts to cultural resources.
The New Orleans District has determined that the proposed work would neither affect any species
or critical habitat listed as endangered by the U.S. Department of Commerce.
-3The New Orleans District has determined that the proposed work would neither affect any species,
nor habitat designated as critical to the survival of species, listed as endangered by the U.S. Department of
Commerce.
In addition, the construction area is known to be utilized by the West Indian manatee (Trichechus
manatus). The West Indian manatee is listed as endangered by the U.S. Department of Interior. Our
initial finding is that the proposed work is "not likely to adversely affect" the West Indian manatee.
Concurrence has been received from the U.S. Fish and Wildlife Service per the Standard Local Operating
Procedure for Endangered Species in Louisiana, dated October 22, 2014. If authorized, "The Standard
Manatee Conditions for In-Water Activities" will be made part of the permit's special conditions.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of up to 23.3 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact
on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate water quality standards will be required from the Department of Environmental Quality,
Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The
Department of the Army permit will not be issued unless the applicant received approval or a waiver of
the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael Farabee
Chief, Eastern Evaluation Section
Enclosures
N
10,000
0'
10,000
20,000
30,000
PROJECT VICINITY
LAT: 29° 13' 37.68"
LONG: -90° 00' 50.94"
ACCESS VIA CAMINADA PASS
ACCESS VIA BAYOU RIGOUD
REVISIONS
XXX
May 31, 2017
SP
Plot Date
MAC
Checked by
MAC, JJS
Checked by
Drawn by
Designed by
XXXXXX
MAY 2017
Date
Date
Description
Project number
No.
- TEMPORARY DISPOSAL AREA
- TEMPORARY ACCESS CHANNEL
LEGEND
PROPOSED ADDITIONAL
±200' BREAKWATER
TEMPORARY ACCESS CHANNEL
TEMPORARY DISPOSAL AREA
APPROX. 1921
PROPERTY LINE
1000'
B01
B04
0'
B07 B08
1000'
GULF OF MEXICO
B02
B03
B05 B06
B10
2000'
B09
B22 B23
B24 B25
B26
PROPOSED ~350'
BREAKWATERS (TYP.)
B17
B15 B16
B18 B19
B20 B21
GRAND ISLE
B13 B14
TEMPORARY DISPOSAL AREA
3000'
B11 B12
TEMPORARY ACCESS CHANNEL
EXISTING BREAKWATERS
(TYP.)
CHEVRON
PIPELINE
CAMINADA BAY
BAYOU RIGOUD
REVISIONS
Plot Date
Checked by
Checked by
Drawn by
Designed by
May 31, 2017
SP
MAC
MAC, JJS
XXX
XXXXXX
MAY 2017
Date
Date
Description
Project number
No.
PROPOSED ADDITIONAL
~200' BREAKWATER
//
- TEMPORARY DISPOSAL AREA (756')
- TEMPORARY ACCESS CHANNEL (883')
LEGEND
PA
SS
C
A
M
IN
AD
A
LAT: 29° 12' 25.65"
LONG: -90° 02' 28.66"
//
CHEVRON PIPELINE
//
//
500'
//
//
0'
500'
//
1000'
1500'
GRAND ISLE
EXISTING PERMITTED BREAKWATERS
(P20100820 & MVN 1999-2987 EFF)
ENLARGED PLAN VIEW
APPROX. 1921 PROPERTY LINE
//
GULF OF MEXICO
N
REVISIONS
Plot Date
Checked by
Checked by
Drawn by
Designed by
May 31, 2017
SP
MAC
MAC, JJS
XXX
XXXXXX
MAY 2017
Date
Date
Description
Project number
No.
- TEMPORARY DISPOSAL AREA (5,721')
- TEMPORARY ACCESS CHANNEL (5,692')
LEGEND
EXISTING BREAKWATERS
300'
APPROX. 1921 PROPERTY LINE
CHEVRON PIPELINE
CAMINADA BAY
0'
300'
600'
ENLARGED PLAN VIEW
GRAND ISLE
900'
TEMPORARY DISPOSAL AREA
PROPOSED ~350' BREAKWATERS
SHIFT ALIGNMENT DUE TO PIPELINE
TEMPORARY ACCESS CHANNEL
REVISIONS
Plot Date
Checked by
Checked by
Drawn by
Designed by
June 7, 2017
SP
MAC
MAC, JJS
XXX
XXXXXX
MAY 2017
Date
Date
Description
Project number
No.
- TEMPORARY DISPOSAL AREA (5,721')
GRAND ISLE
PROPOSED ~350' BREAKWATERS
- TEMPORARY ACCESS CHANNEL (5,692')
LEGEND
TEMPORARY DISPOSAL AREA
TEMPORARY ACCESS CHANNEL
CAMINADA BAY
300'
0'
300'
600'
ENLARGED PLAN VIEW
APPROX. 1921 PROPERTY LINE
SHIFT ALIGNMENT DUE TO PIPELINE
900'
CHEVRON PIPELINE
EXISTING BREAKWATERS
BAYOU
RIGOU
D
REVISIONS
Plot Date
Checked by
Checked by
Drawn by
Designed by
June 7, 2017
SP
MAC
MAC, JJS
XXX
XXXXXX
MAY 2017
Date
Date
Description
Project number
No.
0
0
0
0'
10'
20'
30'
0'
10'
20'
30'
10'
0'
10'
20'
30'
TYPICAL SECTION - TEMPORARY ACCESS CHANNEL @ 200' BREAKWATER DIKE
10'
TYPICAL PROFILE - 200' BREAKWATER DIKE
10'
TYPICAL SECTION - 200' BREAKWATER DIKE
0
0
0
REVISIONS
Description
Date
06
June 7, 2017
SP
Plot Date
MAC
Checked by
MAC, JJS
Checked by
Drawn by
XXX
Date
Designed by
XXXXXX
MAY 2017
Project number
TYPICAL SECTIONS
200' BREAKWATER
DIKE
No.
0
0
0
0'
10'
20'
30'
0'
10'
20'
30'
10'
0'
10'
20'
30'
TYPICAL SECTION - TEMPORARY ACCESS CHANNEL @ 350' BREAKWATER DIKE
10'
TYPICAL PROFILE - 350' BREAKWATER DIKE
10'
TYPICAL SECTION - 350' BREAKWATER DIKE
0
0
0
REVISIONS
Description
Date
07
June 7, 2017
SP
Plot Date
MAC
Checked by
MAC, JJS
Checked by
Drawn by
XXX
Date
Designed by
XXXXXX
MAY 2017
Project number
TYPICAL SECTIONS
350' BREAKWATER
DIKE
No.