APPLICANT: City of Topeka, Kansas

PROJECT LOCATION: In and adjacent to the Kansas River, Mile 87.0, Section 26, Township 11 South, Range 15 East, Shawnee County, Kansas.

ACTIVITY: Proposed improvements to existing Kansas River Weir, include the construction of north channel navigation chutes and fish passage structures, new bank protection, downstream energy dissipation structures and replacement of existing downstream boat ramp. In addition, the project would remove portions and/or remnants of existing jetties, rebar, riprap and other debris in the vicinity of the weir.

APPLICANT: City of Topeka, Kansas PROJECT LOCATION: In and adjacent to the Kansas River, Mile 87.0, Section 26, Township 11 South, Range 15 East, Shawnee County, Kansas. ACTIVITY: Proposed improvements to existing Kansas River Weir, include the construction of north channel navigation chutes and fish passage structures, new bank protection, downstream energy dissipation structures and replacement of existing downstream boat ramp. In addition, the project would remove portions and/or remnants of existing jetties, rebar, riprap and other debris in the vicinity of the weir.

PUBLIC NOTICE Permit No. NWK-0-2211 Issue Date: October 10, 2017 Expiration Date: October 31, 2017

US Army Corps of Engineers Kansas City District

21-Day Notice ______________________________________________________________________________ This public notice is issued jointly with the Kansas Department of Health and Environment. The Department of Health and Environment will use the comments to this notice in deciding whether to grant Section 401 water quality certification. Commenters are requested to furnish a copy of their comments to the Kansas Department of Health and Environment, Bureau of Water - Watershed Management Section, 1000 SW Jackson Street, Suite 420, Topeka, Kansas 666121367. APPLICANT: City of Topeka, Kansas 3245 NW Waterworks Drive Topeka, Kansas 66606 PROJECT LOCATION (As shown on the attached drawings): In and adjacent to the Kansas River, Mile 87.0, Section 26, Township 11 South, Range 15 East, Shawnee County, Kansas. USGS 1:24,000 QUAD: Topeka Latitude: 39.0727 --- Longitude: -95.7157 AUTHORITY: Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and Section 404 of the Clean Water Act (33 USC 1344). ACTIVITY (As shown on the attached drawings): Proposed improvements to existing Kansas River Weir, include the construction of north channel navigation chutes and fish passage structures, new bank protection, downstream energy dissipation structures and replacement of existing downstream boat ramp. In addition, the project would remove portions and/or remnants of existing jetties, rebar, riprap and other debris in the vicinity of the weir. Drawing sheet 2 of 6 provides a plan view of existing and proposed project elements. The original weir was authorized by Department of the Army permit on October 15, 1984. WETLANDS/AQUATIC HABITAT: The project would result in the excavation and discharge of dredged and fill material below the ordinary high water mark of the Kansas River. Approximately 2.3 acres and 375 linear feet of Kansas River bed and banks would be affected by the construction of the project. Permanent fills are limited to the new structure elements as shown on the attached drawings. No wetlands would be affected.

APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC RESOURCES: The project footprint was kept as small as possible to meet the project purpose to minimize disturbance to the Kansas River. By utilizing the existing weir for a portion of the cofferdams, the amount of temporary fill that will be placed for dewatering operations is greatly reduced. Access and staging will occur only in already disturbed areas. The existing downstream boat ramp that will be replaced will be used as an access road on the north bank, and the existing access road will be used on the south bank. Stormwater Best Management Practices and appropriate sediment and erosion controls will be utilized for the duration of construction. These could include but are not limited to turbidity curtains, silt fences, construction entrances with sediment control, and/or straw wattles. ADDITIONAL INFORMATION: Additional information about this application may be obtained by contacting Mr. Matt Mikulecky, U.S. Army Corps of Engineers, Kanopolis Satellite Office, 107 Riverside Drive, Marquette, Kansas 67464 at (816) 389-3027 or email: matthew.j.mikulecky@usace.army.mil. All comments to this public notice should be directed to the above address. STATE AUTHORIZATION: The applicant will contact the Kansas Department of Agriculture for permit requirements, if any, pursuant to Kansas Statutes Annotated 82a-301 to 305a. CULTURAL RESOURCES: Kansas City District will comply with the National Historic Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic Places and the Federal Register and no property listed in the Register or proposed for listing is located in the permit area. In addition, the project has been reviewed by the Kansas Historical Society, State Historic Preservation Officer (SHPO), and no adverse effects to historic properties have been identified (KSR & C No. 17-07-151). This is the extent of our knowledge about historic properties in the permit area at this time. However, we will evaluate input by the SHPO, Tribal Historic Preservation Officers (or Tribe designated representative) and the public in response to this public notice. ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this public notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of dredged or fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. This public notice serves as an application to the state in which the discharge site is located for certification of the discharge. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the state's opinion that the discharge will not violate applicable water quality standards.

PUBLIC INTEREST REVIEW: The decision to issue a permit will be based on an evaluation of the probable impact including the cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, esthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs and, in general, the needs and welfare of the people. The evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency under authority of Section 404(b) of the Clean Water Act (33 USC 1344). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COMMENTS: This notice is provided to outline details of the above-described activity so this District may consider all pertinent comments prior to determining if issuance of a permit would be in the public interest. Any interested party is invited to submit to this office written facts or objections relative to the activity on or before the public notice expiration date. Comments both favorable and unfavorable will be accepted and made a part of the record and will receive full consideration in determining whether it would be in the public interest to issue the Department of the Army permit. Copies of all comments, including names and addresses of commenters, may be provided to the applicant. Comments should be mailed to the address shown on page 2 of this public notice. PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this public notice, that a public hearing be held to consider this application. Such requests shall state, with particularity, the reasons for holding a public hearing.

LOCATION MAP

PROPOSED PROJECT

TOPEKA

PERMIT NO. NWK-0-2211 CITY OF TOPEKA, KANSAS KANSAS RIVER WEIR IMPROVEMENTS KANSAS RIVER MILE 87.0 SHAWNEE COUNTY, KANSAS SHEET 1 OF 6 10 OCTOBER 2017

PLAN VIEW EXISTING & PROPOSED

RECREATION ENGINEERING AND PLANNING 485 ARAPAHOE AVE. BOULDER | CO | 80302 WWW.BOATERPARKS.COM

PHASE 1 STAGING AREA REMOVE EXISTING CONCRETE BOAT RAMP PROTECT EXISTING CONCRETE BOAT RAMP

PROTECT EXISTING MATURE TREES AND VEGETATION

PHASE 1 COFFERDAM

BEGIN WEIR DEMOLITION AT EXISTING EXPANSION JOINT

CITY OF TOPEKA OFFICE OF UTILITIES AND TRANSPORTATION 3245 NW WATERWORKS DR TOPEKA, KS 66606

REMOVE 40 FT SECTION OF UPPER JETTY

REMOVE CONCRETE WEIR CAP AND SAW CUT SHEETPILE TO ELEV 854

PROJECT OWNER:

REMOVE REMNANTS OF LOWER JETTY (CONCRETE, REBAR, RIPRAP, ETC.)

DRAFT

REMOVE EXISTING CONCRETE, REBAR, RIPRAP AND OTHER DEBRIS FROM WORK AREA

PHASE 1 COFFERDAM

PHASE 2 COFFERDAM

SITE PLAN OVERVIEW

PERMIT NO. NWK-0-2211 CITY OF TOPEKA, KANSAS KANSAS RIVER WEIR IMPROVEMENTS KANSAS RIVER MILE 87.0 SHAWNEE COUNTY, KANSAS SHEET 2 OF 6 10 OCTOBER 2017

0

STAGING, ACCESS, & DEMO

REVISIONS:

SCALE BAR 1"=100' 100

PRELIMINARY - NOT FOR CONSTRUCTION

PHASE 2 STAGING AREA

TOPEKA, KANSAS

EXISTING ACCESS ROAD

KANSAS RIVER

EXISTING DIRECTIONAL JETTIES

KANSAS RIVER WEIR IMPROVEMENTS

PHASE 2 COFFERDAM

100

NOTES: 1. REMOVE ALL LOOSE CONCRETE, REBAR, AND DEBRIS FROM PROJECT AREA 2. PROTECT EXISTING TREES AND MATURE VEGETATION UNLESS DIRECTED BY ENGINEER 3. CONSTRUCTION PHASING IS CONCEPTUAL ONLY. ACTUAL PHASING TO BE DETERMINED BY QUALIFIED CONTRACTOR

NO.

DATE

DESIGNED:

GL

CHECKED:

XX

PLOT DATE:

DRAFTED:

ML, RG

09/20/2017

DRAWING NO.

G-02 SHEET 10 OF 15

NORTH CHANNEL PLAN & PROFILE

NEW VEGETATED AREA

NEW CONCRETE TRAIL WITH STONE STEPS NEW CONCRETE SIDEWALK

RECREATION ENGINEERING AND PLANNING 485 ARAPAHOE AVE. BOULDER | CO | 80302 WWW.BOATERPARKS.COM

OHWM

RA MP

NEW CONCRETE BOAT RAMP

NEW CONCRETE RIVERSIDE TRAIL

5+00 CHUTE 2 EXIT

0+00

<

<

<

CHUTE 2 CREST

<

CHUTE 1 CREST

<

<

<

TAILOUT MATTRESS

C-07 C-08

C-06

C-05

PERMIT NO. NWK-0-2211 CITY OF TOPEKA, KANSAS KANSAS RIVER WEIR IMPROVEMENTS KANSAS RIVER MILE 87.0 SHAWNEE COUNTY, KANSAS SHEET 3 OF 6 10 OCTOBER 2017

SCALE BAR 1"=30'

NORTH CHANNEL PLAN

30

0

ELEV 862.5

ELEV 862.1

ELEV 861.8

North Ch Thalweg

ELEV 863.8

ELEV 863.8

865

Elevation

NOTES: 1. EXISTING ELEVATIONS ARE APPROXIMATE. RIVER BED CONSISTS OF SAND THAT MAY HAVE CHANGED SINCE SURVEY

30

EXISTING GRADE

860

KANSAS RIVER WEIR IMPROVEMENTS

6+00

SHEET PILE DIVIDER

STA: 1+00 CHUTE 1 ELEV: 858.0 STA: 1+30 ELEV: 857.0

STA: 2+10 ELEV: 857.0

PROPOSED GRADE

REVISIONS:

ELEV 858.8

CHUTE 2 STA: 2+40 ELEV: 856.0

STA: 3+20 ELEV: 856.0

855

NO.

STA: 3+50 ELEV: 855.0

ELEV 853.2

STA: 4+30 ELEV: 855.0

STA: 4+70 ELEV: 854.0 DESIGNED:

GL

CHECKED:

XX

0+25

0+50

0+75

NORTH CHANNEL THALWEG PROFILE SCALE:

DRAFTED:

ML, RG

09/20/2017

DRAWING NO.

850

0+00

DATE

TAILOUT MATTRESS

CHUTE 3

PLOT DATE:

848

NORTH CHANNEL PLAN & PROFILE

<

<

PRELIMINARY - NOT FOR CONSTRUCTION

<

CITY OF TOPEKA OFFICE OF UTILITIES AND TRANSPORTATION 3245 NW WATERWORKS DR TOPEKA, KS 66606

<

CHUTE 3 CREST

<

<

TOPEKA, KANSAS

<

CHUTE 3 EXIT

<

<

<

<

<

<

PROJECT OWNER:

1+00 <

<

<

<

< < < <

<

<

<

<

2+00

5+20 <

< < < <

< <

<

<

3+00

7+00

CHUTE 1 EXIT

<

4+00

DRAFT

7+50

EX

IST

EXISTING TREES AND VEGETATION

KANSAS RIVER

I NG

BO

AT

NEW BEACH AREA

H: 1"=20' V: 1"=4'

1+00

1+25

1+50

1+75

2+00

2+25

2+50

2+75

3+00

3+25

3+50

3+75

4+00

4+25

4+50

4+75

5+00

VERTICAL EXAGGERATION = 5X

5+20

C-04 SHEET 12 OF 15

SOUTH CHANNEL PLAN & PROFILE GROUTED BOULDER DIVIDER WALL MIN 1FT ABOVE SLAB 865

0 3+0

S CREST

<

70FT

<

FIRST ENERGY DISSIPATION STEP

<

860

<

RIPRAP

<

<

<

<

2+0

GROUTED BOULDER DIVIDER WALL

0

<

<

<

855

<

COMPACTED NATIVE ALLUVIUM

STEP DOWN WITH GROUTED BOULDER TERRACING TO CONNECT CHUTE TO STEPS

850

<

CHUTE INVERT MATCH WEIR CREST ELEV 857.8 ELEV 857.0

MATCH WEIR CREST ELEV 857.8

<

GROUTED BOULDER TERRACING, TYP TO EXISTING GROUND

<

<

845

<

<

-50

<

<

<

1+00

<

<

<

<

<

<

<

<

<

<

<

-45

-40

-35

-30

-25

-20

-15

-10

-5

5

0

15

10

20

25

30

35

40

45

50

OFFSET FROM WEIR CL, STA: 1+00

<

<

SCALE:

DRAFT

SOUTH CHANNEL CHUTE CREST SECTION H: 1"=8' V: 1"=8'

OHWM GROUTED BOULDER TERRACING

S EXIT

20

0

855

1

20

CHUTE INVERT ELEV 854.0

ELEV 854.8

1

STONE RIPRAP

850

SCALE BAR 1"=20'

SOUTH CHANNEL PLAN

GROUTED BOULDER DIVIDER WALL MIN 1FT ABOVE SLAB SURFACE

GROUTED BOULDER TERRACING, TYP TO EXISTING GROUND

ELEV 854.8

40FT

STRUCTURAL FILL

CLEAN ANGULAR 3-8" COBBLE NATIVE ALLUVIUM

845 -50

-45

-40

-35

-30

-25

-20

-15

-10

-5

5

0

10

15

20

25

30

35

40

45

PROJECT OWNER:

0+00

ELEVATION

860

CITY OF TOPEKA OFFICE OF UTILITIES AND TRANSPORTATION 3245 NW WATERWORKS DR TOPEKA, KS 66606

865

50

H: 1"=8' V: 1"=8'

SOUTH CHANNEL CHUTE PROFILE

860 859

NOTES: 1. STRUCTURAL FILL DEFINED AS GRANULAR FILL COMPACTED IN MAX 2FT LIFTS. EXCAVATED ALLUVIUM MAY BE USED IF SUFFICIENTLY DRIED AND APPROVED BY ENGINEER 2. ALL SHEET PILE TO BE CAPPED

FLOW

858

SURFACE DISHED 10" FOR LENGTH OF CHUTE

10"

857

EXISTING WEIR

856

ELEVATION

855 854

CONCRETE SLAB 1FT THICK

EXISTING GROUND SURFACE PROFILE

33:1

ELEV 854.0

CLEAN, ANGULAR 3"-8" COBBLE, 18" THICK

1 STONE RIPRAP

1

853

TOPEKA, KANSAS

SCALE:

KANSAS RIVER

SOUTH CHANNEL CHUTE EXIT SECTION

KANSAS RIVER WEIR IMPROVEMENTS

OFFSET FROM WEIR CL, STA: 2+00

STRUCTURAL FILL

SOUTH CH PLAN, PROFILE, & SECTIONS

0+00

<

SOUTH CHANNEL CHUTE

PRELIMINARY - NOT FOR CONSTRUCTION

1+00

EST S CR

EXISTING WEIR

ELEVATION

<

RECREATION ENGINEERING AND PLANNING 485 ARAPAHOE AVE. BOULDER | CO | 80302 WWW.BOATERPARKS.COM

XIT SE

GROUTED BOULDER ENERGY DISSIPATION STEPS

852 851

REVISIONS:

SLOPE 10:1 TO MATCH EXISTING GRADE

850 849

NO.

NATIVE ALLUVIUM

848

NATIVE ALLUVIUM

847

0+30

0+35

0+40

0+45

0+50

0+55

0+60

0+65

0+70

0+75

0+80

0+85

0+90

0+95

1+00

1+05

1+10

1+15

1+20

1+25

1+30

1+35

1+40

1+45

1+50

1+55

1+60

1+65

1+70

1+75

1+80

1+85

1+90

1+95

2+00

2+05

2+10

2+15

2+20

2+25

2+30

2+35

2+40

2+45

VERTICAL EXAGGERATION = 5X

SOUTH CHANNEL THALWEG PROFILE SCALE:

DESIGNED:

GL

CHECKED:

XX

PLOT DATE:

846 845

DATE

H: 1"=10' V: 1"=2'

2+50

PERMIT NO. NWK-0-2211 CITY OF TOPEKA, KANSAS KANSAS RIVER WEIR IMPROVEMENTS KANSAS RIVER MILE 87.0 SHAWNEE COUNTY, KANSAS SHEET 4 OF 6 10 OCTOBER 2017

DRAFTED:

ML, RG

09/20/2017

DRAWING NO.

C-02 SHEET 5 OF 15

6+75

ENERGY DISSIPATION STEPS 4:1

STEPS SECTION 1' STEP HEIGHT, TYP

MIN 10" OVERLAP OF WEIR CAP OVER FIRST STEP

855 850

STONE RIPRAP

-20

-15

-10

-5

0

5

10

15

20

25

30

35

40

50

55

65

60

70

SHEET PILE TO BEDROCK (REFUSAL) 3-8" COBBLE, ANGULAR 1.5FT THICK

ENERGY DISSIPATION STEPS SECTION H: 1"=8' V: 1"=8'

4:1

RAMP SECTION

FLOW

865

4

MIN 10" OVERLAP OF WEIR CAP OVER FIRST STEP

1

850 845 4:1

-25

-30

-20

-15

-10

-5

0

5

ENERGY DISSIPATION RAMP SECTION

15

20

25

30

35

40

45

50

55

60

RIPRAP AT 1H:1V BELOW ELEV 854.0

65

70

75

NATIVE ALLUVIUM

80

85

90

95

100

OFFSET FROM WEIR CL, STA: 3+00

H: 1"=8' V: 1"=8'

3+00

SCALE:

10

1

RAMP SECTION

2+25

NOTES: 1. STRUCTURAL FILL DEFINED AS GRANULAR FILL COMPACTED IN MAX 2FT LIFTS. EXCAVATED ALLUVIUM MAY BE USED IF SUFFICIENTLY DRIED AND APPROVED BY ENGINEER 2. ALL SHEET PILE TO BE CAPPED 3. APPROXIMATE BEDROCK ELEV: 835.0 4. ALL ROCK TO BE CLEAN AND SWEPT AFTER GROUTING

STEPS SECTION

REVISIONS: NO.

SHEET PILE

1+50

ENERGY DISS. PLAN & SECTIONS

STRUCTURAL FILL

TOPEKA, KANSAS

1

EXISTING WEIR

PRELIMINARY - NOT FOR CONSTRUCTION

ELEV 854.0

855

KANSAS RIVER

3+75

ELEVATION

860

RIPRAP AT 4H:1V, MIN 3FT THICK. SET AS DIRECTED BY ENGINEER IN FIELD

CITY OF TOPEKA OFFICE OF UTILITIES AND TRANSPORTATION 3245 NW WATERWORKS DR TOPEKA, KS 66606

SCALE:

45

DRAFT

-25

-30

OFFSET FROM WEIR CL, STA: 2+00

4+50

1

NATIVE ALLUVIUM

845

5+25

1

STUCTURAL FILL

EXISTING WEIR

4:1

ENERGY DISSIPATION RAMP

ELEV 854.0

PROJECT OWNER:

ELEVATION

4', TYP

2'X2'X4' STEPPED, FLAT, QUARRIED STONE WITH GROUT HELD BACK A MINIMUM OF 6"-8". SET AS DIRECTED BY ENGINEER IN FIELD

KANSAS RIVER WEIR IMPROVEMENTS

6+00

FLOW 860

RECREATION ENGINEERING AND PLANNING 485 ARAPAHOE AVE. BOULDER | CO | 80302 WWW.BOATERPARKS.COM

865

ENERGY DISSIPATION STEPS

PERMIT NO. NWK-0-2211 CITY OF TOPEKA, KANSAS KANSAS RIVER WEIR IMPROVEMENTS KANSAS RIVER MILE 87.0 SHAWNEE COUNTY, KANSAS SHEET 5 OF 6 10 OCTOBER 2017

SCALE BAR 1"=30'

ENERGY DISSIPATION STEPS AND RAMP PLAN

30

0

30

DATE

DESIGNED:

GL

CHECKED:

XX

PLOT DATE:

DRAFTED:

ML, RG

09/20/2017

DRAWING NO.

C-03 SHEET 6 OF 15

TYPICAL FISH PASSAGE STRUCTURE

BOAT PASSAGE CHUTE

RECREATION ENGINEERING AND PLANNING 485 ARAPAHOE AVE. BOULDER | CO | 80302 WWW.BOATERPARKS.COM

DOWNSTREAM FISHWAY ELEVATIONS MATCH STRUCTURE EXIT ELEVATIONS

FLOW BULBOUS BOULDER STRUCTURE TOE ANCHORING AND TRANSITION TO POOL

DRAFT

DIVIDER TO CONSIST OF LARGE NATURAL BOULDERS, 6FT MIN DIA.

VELOCITY REFUGE ZONES

FLOW

3.

BOULDERS OFFSET TO PROVIDE VELOCITY REFUGE ZONES. BOULDERS (NUMBERED 1., 2., 3. ETC.) DO NOT EXTEND ACROSS FISHWAY INVERT WATER SURFACE VARIES

2.

3"-6" WASHED COBBLE, VTC ROCK OR SIMILAR SHEETPILE TO BEDROCK UPSTREAM OF FISHWAY AT CHUTE 1. NATURAL ROCK TRANSITION TO POOL AT CHUTES 2 & 3 NATIVE ALLUVIUM

1. 12" - 18" WASHED COBBLE

NOTES: 1. FISH PASSAGE CHANNEL BED TO REMAIN UNGROUTED 2. MIN FISH PASSAGE CHANNEL LENGTH 50FT

DOWNSTREAM FISHWAY INVERT ELEV MATCH STRUCTURE EXIT INVERT ELEV BULBOUS BOULDER STRUCTURE TOE ANCHORING AND TRANSITION TO POOL

POOL ARMORING FOR SCOUR PROTECTION

FISHWAY DETAILS

CONSTANT INVERT SLOPE 2% NO VERTICAL DROPS

PRELIMINARY - NOT FOR CONSTRUCTION

UPSTREAM FISHWAY INVERT ELEV MATCH STRUCTURE CREST INVERT ELEV

TOPEKA, KANSAS

TYPICAL FISH PASSAGE CHANNEL, PLAN VIEW

KANSAS RIVER

BOULDERS OFFSET TO PROVIDE VELOCITY REFUGE ZONES. BOULDERS DO NO EXTEND ACROSS FISHWAY INVERT 2FT MIN DIA

VELOCITY REFUGE ZONES

KANSAS RIVER WEIR IMPROVEMENTS

SHEETPILE WALL

PROJECT OWNER:

INTERSTITIAL VELOCITY BARRIER MID-DROP POOLS FOR UPSTREAM MIGRATION. 12"-18" WASHED COBBLE

CITY OF TOPEKA OFFICE OF UTILITIES AND TRANSPORTATION 3245 NW WATERWORKS DR TOPEKA, KS 66606

CONSTANT INVERT SLOPE 2% NO VERTICAL DROPS

REVISIONS: NO.

TYPICAL STRUCTURE PROFILE, ALONG FISHWAY INVERT

DESIGNED:

GL

CHECKED:

XX

PLOT DATE:

PERMIT NO. NWK-0-2211 CITY OF TOPEKA, KANSAS KANSAS RIVER WEIR IMPROVEMENTS KANSAS RIVER MILE 87.0 SHAWNEE COUNTY, KANSAS SHEET 6 OF 6 10 OCTOBER 2017

DATE

DRAFTED:

ML, RG

09/20/2017

DRAWING NO.

C-09 SHEET 17 OF 15

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas