APPLICANT: City of Topeka, Kansas
PROJECT LOCATION: In and adjacent to the Kansas River, Mile 87.0, Section 26, Township 11 South, Range 15 East, Shawnee County, Kansas.
ACTIVITY: Proposed improvements to existing Kansas River Weir, include the construction of north channel navigation chutes and fish passage structures, new bank protection, downstream energy dissipation structures and replacement of existing downstream boat ramp. In addition, the project would remove portions and/or remnants of existing jetties, rebar, riprap and other debris in the vicinity of the weir.
APPLICANT: City of Topeka, Kansas
PROJECT LOCATION: In and adjacent to the Kansas River, Mile 87.0, Section 26, Township 11 South, Range 15 East, Shawnee County, Kansas.
ACTIVITY: Proposed improvements to existing Kansas River Weir, include the construction of north channel navigation chutes and fish passage structures, new bank protection, downstream energy dissipation structures and replacement of existing downstream boat ramp. In addition, the project would remove portions and/or remnants of existing jetties, rebar, riprap and other debris in the vicinity of the weir.
PUBLIC NOTICE
Permit No. NWK-0-2211
Issue Date: October 10, 2017
Expiration Date: October 31, 2017
US Army Corps
of Engineers
Kansas City District
21-Day Notice
______________________________________________________________________________
This public notice is issued jointly with the Kansas Department of Health and Environment. The
Department of Health and Environment will use the comments to this notice in deciding whether
to grant Section 401 water quality certification. Commenters are requested to furnish a copy of
their comments to the Kansas Department of Health and Environment, Bureau of Water - Watershed Management Section, 1000 SW Jackson Street, Suite 420, Topeka, Kansas 666121367.
APPLICANT: City of Topeka, Kansas
3245 NW Waterworks Drive
Topeka, Kansas 66606
PROJECT LOCATION (As shown on the attached drawings): In and adjacent to the Kansas
River, Mile 87.0, Section 26, Township 11 South, Range 15 East, Shawnee County, Kansas.
USGS 1:24,000 QUAD: Topeka
Latitude: 39.0727 --- Longitude: -95.7157
AUTHORITY: Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and Section
404 of the Clean Water Act (33 USC 1344).
ACTIVITY (As shown on the attached drawings): Proposed improvements to existing Kansas
River Weir, include the construction of north channel navigation chutes and fish passage
structures, new bank protection, downstream energy dissipation structures and replacement of
existing downstream boat ramp. In addition, the project would remove portions and/or remnants
of existing jetties, rebar, riprap and other debris in the vicinity of the weir. Drawing sheet 2 of 6
provides a plan view of existing and proposed project elements. The original weir was
authorized by Department of the Army permit on October 15, 1984.
WETLANDS/AQUATIC HABITAT: The project would result in the excavation and
discharge of dredged and fill material below the ordinary high water mark of the Kansas River.
Approximately 2.3 acres and 375 linear feet of Kansas River bed and banks would be affected
by the construction of the project. Permanent fills are limited to the new structure elements as
shown on the attached drawings. No wetlands would be affected.
APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND
COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC
RESOURCES: The project footprint was kept as small as possible to meet the project purpose
to minimize disturbance to the Kansas River. By utilizing the existing weir for a portion of the
cofferdams, the amount of temporary fill that will be placed for dewatering operations is greatly
reduced. Access and staging will occur only in already disturbed areas. The existing downstream
boat ramp that will be replaced will be used as an access road on the north bank, and the existing
access road will be used on the south bank. Stormwater Best Management Practices and
appropriate sediment and erosion controls will be utilized for the duration of construction. These
could include but are not limited to turbidity curtains, silt fences, construction entrances with
sediment control, and/or straw wattles.
ADDITIONAL INFORMATION: Additional information about this application may be
obtained by contacting Mr. Matt Mikulecky, U.S. Army Corps of Engineers, Kanopolis
Satellite Office, 107 Riverside Drive, Marquette, Kansas 67464 at (816) 389-3027 or email:
matthew.j.mikulecky@usace.army.mil. All comments to this public notice should be directed
to the above address.
STATE AUTHORIZATION: The applicant will contact the Kansas Department of Agriculture
for permit requirements, if any, pursuant to Kansas Statutes Annotated 82a-301 to 305a.
CULTURAL RESOURCES: Kansas City District will comply with the National Historic
Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic
Places and the Federal Register and no property listed in the Register or proposed for listing is
located in the permit area. In addition, the project has been reviewed by the Kansas Historical
Society, State Historic Preservation Officer (SHPO), and no adverse effects to historic properties
have been identified (KSR & C No. 17-07-151). This is the extent of our knowledge about
historic properties in the permit area at this time. However, we will evaluate input by the SHPO,
Tribal Historic Preservation Officers (or Tribe designated representative) and the public in
response to this public notice.
ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary
determination has been made that the described work will not affect species designated as
threatened or endangered or adversely affect critical habitat. In order to complete our evaluation
of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other
interested agencies and individuals.
FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988,
Floodplain Management, which discourages direct or indirect support of floodplain development
whenever there is a practicable alternative. By this public notice, comments are requested from
individuals and agencies that believe the described work will adversely impact the floodplain.
WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341)
requires that all discharges of dredged or fill material must be certified by the appropriate state
agency as complying with applicable effluent limitations and water quality standards. This
public notice serves as an application to the state in which the discharge site is located for
certification of the discharge. The discharge must be certified before a Department of the Army
permit can be issued. Certification, if issued, expresses the state's opinion that the discharge will
not violate applicable water quality standards.
PUBLIC INTEREST REVIEW: The decision to issue a permit will be based on an evaluation
of the probable impact including the cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization of
important resources. The benefits which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors which may
be relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, esthetics, general environmental concerns, wetlands, cultural
values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs and, in general, the needs and welfare of the
people. The evaluation of the impact of the activity on the public interest will include
application of the guidelines promulgated by the Administrator, Environmental Protection
Agency under authority of Section 404(b) of the Clean Water Act (33 USC 1344). The Corps of
Engineers is soliciting comments from the public; Federal, state, and local agencies and officials;
Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this
proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are used in preparation of an Environmental Assessment and/or an Environmental
Impact Statement pursuant to the National Environmental Policy Act. Comments are also used
to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
COMMENTS: This notice is provided to outline details of the above-described activity so this
District may consider all pertinent comments prior to determining if issuance of a permit would
be in the public interest. Any interested party is invited to submit to this office written facts or
objections relative to the activity on or before the public notice expiration date. Comments both
favorable and unfavorable will be accepted and made a part of the record and will receive full
consideration in determining whether it would be in the public interest to issue the Department of
the Army permit. Copies of all comments, including names and addresses of commenters, may
be provided to the applicant. Comments should be mailed to the address shown on page 2 of this
public notice.
PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this
public notice, that a public hearing be held to consider this application. Such requests shall state,
with particularity, the reasons for holding a public hearing.
LOCATION MAP
PROPOSED
PROJECT
TOPEKA
PERMIT NO. NWK-0-2211
CITY OF TOPEKA, KANSAS
KANSAS RIVER WEIR IMPROVEMENTS
KANSAS RIVER MILE 87.0
SHAWNEE COUNTY, KANSAS
SHEET 1 OF 6
10 OCTOBER 2017
PLAN VIEW EXISTING & PROPOSED
RECREATION ENGINEERING
AND PLANNING
485 ARAPAHOE AVE.
BOULDER | CO | 80302
WWW.BOATERPARKS.COM
PHASE 1
STAGING AREA
REMOVE EXISTING
CONCRETE BOAT RAMP
PROTECT EXISTING
CONCRETE BOAT RAMP
PROTECT EXISTING MATURE
TREES AND VEGETATION
PHASE 1 COFFERDAM
BEGIN WEIR DEMOLITION AT
EXISTING EXPANSION JOINT
CITY OF TOPEKA
OFFICE OF UTILITIES
AND TRANSPORTATION
3245 NW WATERWORKS DR
TOPEKA, KS 66606
REMOVE 40 FT SECTION
OF UPPER JETTY
REMOVE CONCRETE WEIR
CAP AND SAW CUT
SHEETPILE TO ELEV 854
PROJECT OWNER:
REMOVE REMNANTS OF
LOWER JETTY (CONCRETE,
REBAR, RIPRAP, ETC.)
DRAFT
REMOVE EXISTING CONCRETE, REBAR, RIPRAP
AND OTHER DEBRIS FROM WORK AREA
PHASE 1 COFFERDAM
PHASE 2 COFFERDAM
SITE PLAN OVERVIEW
PERMIT NO. NWK-0-2211
CITY OF TOPEKA, KANSAS
KANSAS RIVER WEIR IMPROVEMENTS
KANSAS RIVER MILE 87.0
SHAWNEE COUNTY, KANSAS
SHEET 2 OF 6
10 OCTOBER 2017
0
STAGING, ACCESS, & DEMO
REVISIONS:
SCALE BAR 1"=100'
100
PRELIMINARY - NOT FOR CONSTRUCTION
PHASE 2
STAGING AREA
TOPEKA, KANSAS
EXISTING ACCESS ROAD
KANSAS RIVER
EXISTING DIRECTIONAL
JETTIES
KANSAS RIVER WEIR IMPROVEMENTS
PHASE 2 COFFERDAM
100
NOTES:
1. REMOVE ALL LOOSE CONCRETE, REBAR, AND DEBRIS FROM PROJECT AREA
2. PROTECT EXISTING TREES AND MATURE VEGETATION UNLESS DIRECTED BY
ENGINEER
3. CONSTRUCTION PHASING IS CONCEPTUAL ONLY. ACTUAL PHASING TO BE
DETERMINED BY QUALIFIED CONTRACTOR
NO.
DATE
DESIGNED:
GL
CHECKED:
XX
PLOT DATE:
DRAFTED:
ML, RG
09/20/2017
DRAWING NO.
G-02
SHEET 10 OF 15
NORTH CHANNEL PLAN & PROFILE
NEW VEGETATED
AREA
NEW CONCRETE TRAIL
WITH STONE STEPS
NEW CONCRETE
SIDEWALK
RECREATION ENGINEERING
AND PLANNING
485 ARAPAHOE AVE.
BOULDER | CO | 80302
WWW.BOATERPARKS.COM
OHWM
RA
MP
NEW CONCRETE
BOAT RAMP
NEW CONCRETE
RIVERSIDE TRAIL
5+00
CHUTE 2
EXIT
0+00
<
<
<
CHUTE 2
CREST
<
CHUTE 1
CREST
<
<
<
TAILOUT
MATTRESS
C-07
C-08
C-06
C-05
PERMIT NO. NWK-0-2211
CITY OF TOPEKA, KANSAS
KANSAS RIVER WEIR IMPROVEMENTS
KANSAS RIVER MILE 87.0
SHAWNEE COUNTY, KANSAS
SHEET 3 OF 6
10 OCTOBER 2017
SCALE BAR 1"=30'
NORTH CHANNEL PLAN
30
0
ELEV 862.5
ELEV 862.1
ELEV 861.8
North Ch Thalweg
ELEV 863.8
ELEV 863.8
865
Elevation
NOTES:
1. EXISTING ELEVATIONS ARE APPROXIMATE. RIVER BED CONSISTS OF SAND THAT MAY HAVE CHANGED
SINCE SURVEY
30
EXISTING GRADE
860
KANSAS RIVER WEIR IMPROVEMENTS
6+00
SHEET PILE
DIVIDER
STA: 1+00 CHUTE 1
ELEV: 858.0
STA: 1+30
ELEV: 857.0
STA: 2+10
ELEV: 857.0
PROPOSED GRADE
REVISIONS:
ELEV 858.8
CHUTE 2
STA: 2+40
ELEV: 856.0
STA: 3+20
ELEV: 856.0
855
NO.
STA: 3+50
ELEV: 855.0
ELEV 853.2
STA: 4+30
ELEV: 855.0
STA: 4+70
ELEV: 854.0
DESIGNED:
GL
CHECKED:
XX
0+25
0+50
0+75
NORTH CHANNEL THALWEG PROFILE
SCALE:
DRAFTED:
ML, RG
09/20/2017
DRAWING NO.
850
0+00
DATE
TAILOUT MATTRESS
CHUTE 3
PLOT DATE:
848
NORTH CHANNEL PLAN & PROFILE
<
<
PRELIMINARY - NOT FOR CONSTRUCTION
<
CITY OF TOPEKA
OFFICE OF UTILITIES
AND TRANSPORTATION
3245 NW WATERWORKS DR
TOPEKA, KS 66606
<
CHUTE 3
CREST
<
<
TOPEKA, KANSAS
<
CHUTE 3
EXIT
<
<
<
<
<
<
PROJECT OWNER:
1+00
<
<
<
<
<
<
<
<
<
<
<
<
2+00
5+20
<
<
<
<
<
<
<
<
<
3+00
7+00
CHUTE 1
EXIT
<
4+00
DRAFT
7+50
EX
IST
EXISTING TREES AND
VEGETATION
KANSAS RIVER
I NG
BO
AT
NEW BEACH
AREA
H: 1"=20' V: 1"=4'
1+00
1+25
1+50
1+75
2+00
2+25
2+50
2+75
3+00
3+25
3+50
3+75
4+00
4+25
4+50
4+75
5+00
VERTICAL EXAGGERATION = 5X
5+20
C-04
SHEET 12 OF 15
SOUTH CHANNEL PLAN & PROFILE
GROUTED BOULDER
DIVIDER WALL MIN 1FT
ABOVE SLAB
865
0
3+0
S CREST
<
70FT
<
FIRST ENERGY
DISSIPATION STEP
<
860
<
RIPRAP
<
<
<
<
2+0
GROUTED BOULDER
DIVIDER WALL
0
<
<
<
855
<
COMPACTED NATIVE ALLUVIUM
STEP DOWN WITH GROUTED
BOULDER TERRACING TO
CONNECT CHUTE TO STEPS
850
<
CHUTE INVERT MATCH WEIR CREST
ELEV 857.8
ELEV 857.0
MATCH WEIR CREST
ELEV 857.8
<
GROUTED BOULDER
TERRACING, TYP
TO EXISTING GROUND
<
<
845
<
<
-50
<
<
<
1+00
<
<
<
<
<
<
<
<
<
<
<
-45
-40
-35
-30
-25
-20
-15
-10
-5
5
0
15
10
20
25
30
35
40
45
50
OFFSET FROM WEIR CL, STA: 1+00
<
<
SCALE:
DRAFT
SOUTH CHANNEL CHUTE CREST SECTION
H: 1"=8' V: 1"=8'
OHWM
GROUTED BOULDER
TERRACING
S EXIT
20
0
855
1
20
CHUTE INVERT
ELEV 854.0
ELEV 854.8
1
STONE RIPRAP
850
SCALE BAR 1"=20'
SOUTH CHANNEL PLAN
GROUTED BOULDER
DIVIDER WALL MIN 1FT
ABOVE SLAB SURFACE
GROUTED BOULDER
TERRACING, TYP
TO EXISTING GROUND
ELEV 854.8
40FT
STRUCTURAL FILL
CLEAN ANGULAR
3-8" COBBLE
NATIVE ALLUVIUM
845
-50
-45
-40
-35
-30
-25
-20
-15
-10
-5
5
0
10
15
20
25
30
35
40
45
PROJECT OWNER:
0+00
ELEVATION
860
CITY OF TOPEKA
OFFICE OF UTILITIES
AND TRANSPORTATION
3245 NW WATERWORKS DR
TOPEKA, KS 66606
865
50
H: 1"=8' V: 1"=8'
SOUTH CHANNEL CHUTE PROFILE
860
859
NOTES:
1. STRUCTURAL FILL DEFINED AS GRANULAR FILL
COMPACTED IN MAX 2FT LIFTS. EXCAVATED ALLUVIUM
MAY BE USED IF SUFFICIENTLY DRIED AND APPROVED
BY ENGINEER
2. ALL SHEET PILE TO BE CAPPED
FLOW
858
SURFACE DISHED 10"
FOR LENGTH OF CHUTE
10"
857
EXISTING WEIR
856
ELEVATION
855
854
CONCRETE SLAB
1FT THICK
EXISTING GROUND
SURFACE PROFILE
33:1
ELEV 854.0
CLEAN, ANGULAR
3"-8" COBBLE, 18" THICK
1
STONE RIPRAP
1
853
TOPEKA, KANSAS
SCALE:
KANSAS RIVER
SOUTH CHANNEL CHUTE EXIT SECTION
KANSAS RIVER WEIR IMPROVEMENTS
OFFSET FROM WEIR CL, STA: 2+00
STRUCTURAL FILL
SOUTH CH PLAN, PROFILE, & SECTIONS
0+00
<
SOUTH CHANNEL
CHUTE
PRELIMINARY - NOT FOR CONSTRUCTION
1+00
EST
S CR
EXISTING WEIR
ELEVATION
<
RECREATION ENGINEERING
AND PLANNING
485 ARAPAHOE AVE.
BOULDER | CO | 80302
WWW.BOATERPARKS.COM
XIT
SE
GROUTED BOULDER ENERGY
DISSIPATION STEPS
852
851
REVISIONS:
SLOPE 10:1 TO
MATCH EXISTING
GRADE
850
849
NO.
NATIVE ALLUVIUM
848
NATIVE ALLUVIUM
847
0+30
0+35
0+40
0+45
0+50
0+55
0+60
0+65
0+70
0+75
0+80
0+85
0+90
0+95
1+00
1+05
1+10
1+15
1+20
1+25
1+30
1+35
1+40
1+45
1+50
1+55
1+60
1+65
1+70
1+75
1+80
1+85
1+90
1+95
2+00
2+05
2+10
2+15
2+20
2+25
2+30
2+35
2+40
2+45
VERTICAL EXAGGERATION = 5X
SOUTH CHANNEL THALWEG PROFILE
SCALE:
DESIGNED:
GL
CHECKED:
XX
PLOT DATE:
846
845
DATE
H: 1"=10' V: 1"=2'
2+50
PERMIT NO. NWK-0-2211
CITY OF TOPEKA, KANSAS
KANSAS RIVER WEIR IMPROVEMENTS
KANSAS RIVER MILE 87.0
SHAWNEE COUNTY, KANSAS
SHEET 4 OF 6
10 OCTOBER 2017
DRAFTED:
ML, RG
09/20/2017
DRAWING NO.
C-02
SHEET 5 OF 15
6+75
ENERGY DISSIPATION STEPS
4:1
STEPS SECTION
1' STEP HEIGHT, TYP
MIN 10" OVERLAP OF WEIR
CAP OVER FIRST STEP
855
850
STONE RIPRAP
-20
-15
-10
-5
0
5
10
15
20
25
30
35
40
50
55
65
60
70
SHEET PILE TO
BEDROCK (REFUSAL)
3-8" COBBLE, ANGULAR
1.5FT THICK
ENERGY DISSIPATION STEPS SECTION
H: 1"=8' V: 1"=8'
4:1
RAMP SECTION
FLOW
865
4
MIN 10" OVERLAP OF WEIR
CAP OVER FIRST STEP
1
850
845
4:1
-25
-30
-20
-15
-10
-5
0
5
ENERGY DISSIPATION RAMP SECTION
15
20
25
30
35
40
45
50
55
60
RIPRAP AT 1H:1V
BELOW ELEV 854.0
65
70
75
NATIVE ALLUVIUM
80
85
90
95
100
OFFSET FROM WEIR CL, STA: 3+00
H: 1"=8' V: 1"=8'
3+00
SCALE:
10
1
RAMP SECTION
2+25
NOTES:
1. STRUCTURAL FILL DEFINED AS GRANULAR FILL COMPACTED IN MAX 2FT LIFTS. EXCAVATED ALLUVIUM MAY BE USED IF
SUFFICIENTLY DRIED AND APPROVED BY ENGINEER
2. ALL SHEET PILE TO BE CAPPED
3. APPROXIMATE BEDROCK ELEV: 835.0
4. ALL ROCK TO BE CLEAN AND SWEPT AFTER GROUTING
STEPS SECTION
REVISIONS:
NO.
SHEET PILE
1+50
ENERGY DISS. PLAN & SECTIONS
STRUCTURAL
FILL
TOPEKA, KANSAS
1
EXISTING WEIR
PRELIMINARY - NOT FOR CONSTRUCTION
ELEV 854.0
855
KANSAS RIVER
3+75
ELEVATION
860
RIPRAP AT 4H:1V, MIN 3FT THICK. SET AS
DIRECTED BY ENGINEER IN FIELD
CITY OF TOPEKA
OFFICE OF UTILITIES
AND TRANSPORTATION
3245 NW WATERWORKS DR
TOPEKA, KS 66606
SCALE:
45
DRAFT
-25
-30
OFFSET FROM WEIR CL, STA: 2+00
4+50
1
NATIVE ALLUVIUM
845
5+25
1
STUCTURAL FILL
EXISTING WEIR
4:1
ENERGY DISSIPATION
RAMP
ELEV 854.0
PROJECT OWNER:
ELEVATION
4', TYP
2'X2'X4' STEPPED, FLAT, QUARRIED STONE WITH
GROUT HELD BACK A MINIMUM OF 6"-8". SET AS
DIRECTED BY ENGINEER IN FIELD
KANSAS RIVER WEIR IMPROVEMENTS
6+00
FLOW
860
RECREATION ENGINEERING
AND PLANNING
485 ARAPAHOE AVE.
BOULDER | CO | 80302
WWW.BOATERPARKS.COM
865
ENERGY DISSIPATION
STEPS
PERMIT NO. NWK-0-2211
CITY OF TOPEKA, KANSAS
KANSAS RIVER WEIR IMPROVEMENTS
KANSAS RIVER MILE 87.0
SHAWNEE COUNTY, KANSAS
SHEET 5 OF 6
10 OCTOBER 2017
SCALE BAR 1"=30'
ENERGY DISSIPATION STEPS AND RAMP PLAN
30
0
30
DATE
DESIGNED:
GL
CHECKED:
XX
PLOT DATE:
DRAFTED:
ML, RG
09/20/2017
DRAWING NO.
C-03
SHEET 6 OF 15
TYPICAL FISH PASSAGE STRUCTURE
BOAT PASSAGE CHUTE
RECREATION ENGINEERING
AND PLANNING
485 ARAPAHOE AVE.
BOULDER | CO | 80302
WWW.BOATERPARKS.COM
DOWNSTREAM FISHWAY ELEVATIONS
MATCH STRUCTURE EXIT ELEVATIONS
FLOW
BULBOUS BOULDER
STRUCTURE TOE ANCHORING
AND TRANSITION TO POOL
DRAFT
DIVIDER TO CONSIST OF LARGE
NATURAL BOULDERS, 6FT MIN DIA.
VELOCITY REFUGE ZONES
FLOW
3.
BOULDERS OFFSET TO PROVIDE VELOCITY REFUGE
ZONES. BOULDERS (NUMBERED 1., 2., 3. ETC.) DO NOT
EXTEND ACROSS FISHWAY INVERT
WATER SURFACE VARIES
2.
3"-6" WASHED COBBLE,
VTC ROCK OR SIMILAR
SHEETPILE TO BEDROCK UPSTREAM
OF FISHWAY AT CHUTE 1. NATURAL
ROCK TRANSITION TO POOL AT
CHUTES 2 & 3
NATIVE ALLUVIUM
1.
12" - 18" WASHED COBBLE
NOTES:
1. FISH PASSAGE CHANNEL BED TO REMAIN UNGROUTED
2. MIN FISH PASSAGE CHANNEL LENGTH 50FT
DOWNSTREAM FISHWAY INVERT ELEV
MATCH STRUCTURE EXIT INVERT ELEV
BULBOUS BOULDER
STRUCTURE TOE ANCHORING
AND TRANSITION TO POOL
POOL ARMORING FOR
SCOUR PROTECTION
FISHWAY DETAILS
CONSTANT INVERT SLOPE 2%
NO VERTICAL DROPS
PRELIMINARY - NOT FOR CONSTRUCTION
UPSTREAM FISHWAY INVERT ELEV MATCH
STRUCTURE CREST INVERT ELEV
TOPEKA, KANSAS
TYPICAL FISH PASSAGE CHANNEL, PLAN VIEW
KANSAS RIVER
BOULDERS OFFSET TO PROVIDE VELOCITY REFUGE ZONES.
BOULDERS DO NO EXTEND ACROSS FISHWAY INVERT
2FT MIN DIA
VELOCITY REFUGE ZONES
KANSAS RIVER WEIR IMPROVEMENTS
SHEETPILE WALL
PROJECT OWNER:
INTERSTITIAL VELOCITY BARRIER MID-DROP
POOLS FOR UPSTREAM MIGRATION.
12"-18" WASHED COBBLE
CITY OF TOPEKA
OFFICE OF UTILITIES
AND TRANSPORTATION
3245 NW WATERWORKS DR
TOPEKA, KS 66606
CONSTANT INVERT SLOPE 2%
NO VERTICAL DROPS
REVISIONS:
NO.
TYPICAL STRUCTURE PROFILE, ALONG FISHWAY INVERT
DESIGNED:
GL
CHECKED:
XX
PLOT DATE:
PERMIT NO. NWK-0-2211
CITY OF TOPEKA, KANSAS
KANSAS RIVER WEIR IMPROVEMENTS
KANSAS RIVER MILE 87.0
SHAWNEE COUNTY, KANSAS
SHEET 6 OF 6
10 OCTOBER 2017
DATE
DRAFTED:
ML, RG
09/20/2017
DRAWING NO.
C-09
SHEET 17 OF 15