SPECIAL PUBLIC NOTICE: On July 11, 2017, the St. Paul District U.S. Army Corps of Engineers Regulatory Branch (Corps) issued a public notice announcing its intent to develop several new regional general permits (RGPs). The proposed 2018 RGPs would replace most of the currently available RGPs authorized for use in the St. Paul District. The proposed 2018 RGPs would provide streamlined authorization for regulated minor activities in waters of the United States (US) including: beach creation and nourishment, beach raking, minor discharge of less than 400 square feet, construction of piers and docks, activities on previously filled navigable waters, transportation projects, utility projects, and construction of wildlife ponds. This public notice solicits public comment on the attached 2018 RGPs proposed for use in Minnesota, Wisconsin, and within the exterior boundaries of Federally-recognized American Indian reservations.
PROJECT DESCRIPTION AND PURPOSE: On July 11, 2017, the St. Paul District U.S. Army Corps of Engineers Regulatory Branch (Corps) issued a public notice announcing its intent to develop several new regional general permits (RGPs). The proposed 2018 RGPs would replace most of the currently available RGPs authorized for use in the St. Paul District. The proposed 2018 RGPs would provide streamlined authorization for regulated minor activities in waters of the United States (US) including: beach creation and nourishment, beach raking, minor discharge of less than 400 square feet, construction of piers and docks, activities on previously filled navigable waters, transportation projects, utility projects, and construction of wildlife ponds. This public notice solicits public comment on the attached 2018 RGPs proposed for use in Minnesota, Wisconsin, and within the exterior boundaries of Federally-recognized American Indian reservations.
Public Notice
ISSUED: 13 October 2017
EXPIRES: 12 November 2017
PROPOSED REGIONAL GENERAL PERMITS
A.
B.
C.
D.
Beach Creation & Nourishment
Beach Raking
Minor Discharges
Piers and Docks
E.
F.
G.
H.
Authorities:
Section 404 Clean Water Act,
Section 10 Rivers and Harbors Act
Previously Filled Navigable Waters
Transportation
Utilities
Wildlife Ponds
SUMMARY
On July 11, 2017, the St. Paul District U.S. Army Corps of Engineers Regulatory Branch (Corps)
issued a public notice announcing its intent to develop several new regional general permits (RGPs).
The proposed 2018 RGPs would replace most of the currently available RGPs authorized for use in
the St. Paul District. The proposed 2018 RGPs would provide streamlined authorization for regulated
minor activities in waters of the United States (US) including: beach creation and nourishment, beach
raking, minor discharge of less than 400 square feet, construction of piers and docks, activities on
previously filled navigable waters, transportation projects, utility projects, and construction of wildlife
ponds. This public notice solicits public comment on the attached 2018 RGPs proposed for use in
Minnesota, Wisconsin, and within the exterior boundaries of Federally-recognized American Indian
reservations.
JURISDICTION AND REGULATORY AUTHORITY
The proposed 2018 RGPs would authorize regulated work and structures in navigable waters subject
to Section 10 Rivers and Harbors Act of 1899 (Section 10), 33 U.S.C. 403, and regulated discharges
of dredged or fill material in waters of the US, including wetlands, pursuant to Section 404 of the
Clean Water Act (Section 404), 33 U.S.C. 1344.
BACKGROUND AND PURPOSE
General permits are used by the Corps to streamline review of activities determined to result in no
more than minimal adverse effects, individually and cumulatively. General permits include nationwide
permits (NWPs), programmatic general permits, and RGPs. On April 24, 2017, the Corps issued 42
NWPs for use in Minnesota, Wisconsin, and federally-recognized American Indian reservations in
both states. After issuance of the NWPs, the Corps revoked all RGP's that were made obsolete by
the NWPs. The Corps intends to replace the remaining RGPs with eight new 2018 RGPs. The
proposed 2018 RGPs will ensure continued general permit coverage in both states for activities not
covered by NWPs, will improve efficiency and consistency in project reviews, and will provide
appropriate and consistent protections for waters of the United States in Minnesota and Wisconsin.
Once the 2018 RGPs are issued, all existing RGPs will be revoked.
PROPOSED 2018 RGPs
The Corps is proposing that all 2018 RGPs be eligible for use in both Minnesota and Wisconsin and
within the exterior boundaries of all federally-recognized American Indian reservations in both states.
The full content of the proposed 2018 RGPs are attached to this Public Notice as Enclosures A
through H. A brief summary of each 2018 RGP and its applicable authorities are listed below.
A. Beach Creation and Nourishment: This RGP is proposed to authorize regulated activities
associated with the placement of sand or pea gravel for the creation of new recreational
beaches or nourishment of established beaches, including temporary impacts necessary to
complete beach creation and nourishment. This RGP may not be used to authorize the
installation of plant barriers or liners.
Public Notice, Proposed 2018 Regional General Permits
B. Beach Raking: This RGP is proposed to authorize regulated activities in waters of the US
associated with mechanical beach raking activities for the purpose of removing accumulated
debris below the ordinary high water mark of a beach, including but not limited to, dead aquatic
plants and shellfish, woody debris, and algae.
C. Minor Discharges: This RGP is proposed to authorize regulated activities associated with minor
permanent and temporary discharges of dredged or fill material in waters of the US for a single
and complete project. Discharges that would impound a tributary or lake, or are associated with
utility, transportation, or pier or dock projects are not authorized by this permit.
D. Piers and Docks: This RGP is proposed to authorize regulated activities associated with the
construction, installation, and modification of piers, docks, small rock cribs and ancillary
features. Temporary structures, fills, and work, including the use of temporary mats, necessary
to accomplish these activities are also authorized.
E. Previously Filled Navigable Waters: This RGP is proposed to authorize regulated activities in
navigable waters of the US previously converted to dry land (also referred to as "fast land") as
part of a previous authorization, provided the work does not affect the course, location, or
condition of the waterbody in such a manner as to impact its navigable capacity
F. Transportation: This RGP is proposed to authorize regulated activities associated with the minor
maintenance and modification of existing linear transportation projects, the construction of new
linear transportation projects, the construction or expansion of non-linear transportation projects,
and temporary discharges, including survey activities, needed to construct transportation
projects.
G. Utilities: This RGP is proposed to authorize regulated activities associated with the
construction, maintenance, and repair of utility lines and substations, utility survey activities,
access roads, and remediation of inadvertent returns of drilling fluid.
H. Wildlife Ponds: This RGP is proposed to authorize regulated activities required for the
construction of small ponds for wildlife habitat.
SINGLE AND COMPLETE PROJECTS
As part of the 2018 RGPs, the Corps is proposing to use the nationwide definitions of "single and complete
linear project" and "single and complete non-linear project." These definitions are based on regulations found
at 33 CFR Part 330.2, and are used nationally as part of the NWP program.
The "single and complete linear project" definition primarily applies to transportation and utility activities. A
linear project is a project constructed for the purpose of getting people, goods, or services from a point of origin
to a terminal point, which often involves multiple crossings of one or more waterbodies at separate and distant
locations. The term "single and complete project" is defined as that portion of the overall linear project
proposed or accomplished by one owner/developer or partnership or other association of owners/developers
that includes all crossings of a single water of the US (i.e., a single waterbody) at a specific location. For linear
projects crossing a single or multiple waterbodies several times at separate and distant locations, each
crossing is considered a single and complete project for purposes of general permit authorization. However,
individual channels in a braided stream or river, or individual arms of a large, irregularly shaped wetland or
lake, etc., are not separate waterbodies, and crossings of such features cannot be considered separately. The
definition of "single and complete linear project" does not include the term "independent utility" because each
crossing of waters of the US is needed for the single and complete linear project to fulfill its purpose of
transporting people, goods, and services from the point of origin to the terminal point.
Figure 1 on the following page depicts an example of how single and complete linear projects would be
determined for an overall project.
2
Public Notice, Proposed 2018 Regional General Permits
Figure 1
The Corps is not proposing any change to the definition of "single and complete non-linear project." Non-linear
single and complete projects are currently defined as the overall project proposed or accomplished by one
owner/developer or partnership or other association of owners/developers. A single and complete non-linear
project must have independent utility. Single and complete non-linear projects may not be "piecemealed" to
avoid the limits in an RGP authorization. A project is considered to have independent utility if it would be
constructed absent the construction of other projects in the project area. Portions of a multi-phase project that
depend upon other phases of the project do not have independent utility. Phases of a project that would be
constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
As part of the Corps RGP development process, permitting data was analyzed to ensure that the proposed
RGPs, including the application of the single and complete linear and non-linear project definitions, would
result in no more than minimal individual and cumulative adverse effects to waters of the US.
PRE-CONSTRUCTION NOTIFICATION
Where required by the terms of a proposed 2018 RGP, a permittee must notify the Corps by submitting a preconstruction notification (PCN) as early as possible, and may not begin work until written verification of RGP
coverage is obtained from the Corps. PCN requirements are fulfilled by completing and submitting the
Minnesota Joint Application Form, the Wisconsin Water Permits Application, or the Application for Department
of the Army Permit. Depending on the PCN requirement associated with the regulated activity, additional
information not requested on these forms may be required. As an alternative to these forms, a letter containing
all the required PCN information may also be submitted.
When a PCN is required, the content of the PCN must disclose any and all other nationwide permits,
programmatic general permits, RGPs, or individual permit(s) used or intended to be used to authorize any part
of the total linear and non-linear project (including all single and complete activities) and any related activity,
including other activities that require Section 10 and Section 404 authorization but do not require PCN.
3
Public Notice, Proposed 2018 Regional General Permits
Additional information on when PCN is required, and what is required to submit a complete PCN, is specific to
each RGP proposed; see Enclosures A through H for more information.
Projects that meet the terms and conditions of a proposed 2018 RGP and do not require submittal of a PCN
would be able to commence work after project proponents have carefully confirmed that the activity will be
conducted in compliance with all applicable terms and conditions of the specific RGP issued.
PROJECT-SPECIFIC EVALUATION PROCEDURES
When making minimal adverse environmental effects determinations, the Corps considers the direct and
indirect effects caused by the RGP activity. The Corps also considers site specific factors, such as the
environmental setting in the vicinity of the RGP activity, the type of resource that will be affected by the RGP
activity, the functions provided by the aquatic resources that will be affected by the RGP activity, the degree or
magnitude to which the aquatic resources perform those functions, the extent that aquatic resource functions
will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the adverse effects
(temporary or permanent), the importance of the aquatic resource functions to the region (e.g., watershed or
ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
COMPENSATORY MITIGATION
The current Corps compensatory mitigation policies for Minnesota and Wisconsin will remain in effect. Any
proposed changes to those mitigation policies will be appropriately coordinated with the public and published in
a separate public notice. Minnesota and Wisconsin mitigation policies can be viewed on the Corps website:
Minnesota:
http://www.mvp.usace.army.mil/Portals/57/docs/regulatory/Website%20Organization/Guidance%20for%20Miti
gation%20in%20Minnesota.pdf
Wisconsin:
http://www.mvp.usace.army.mil/Portals/57/docs/regulatory/Website%20Organization/Guidance%20for%20Miti
gation%20in%20Wisconsin.pdf
For proposed 2018 RGP activities which require PCN, the prospective permittee is required to submit a
mitigation proposal with the PCN. The Corps will consider any proposed compensatory mitigation or other
mitigation measures the applicant has included in the proposal in determining whether the net adverse
environmental effects of the proposed activity are no more than minimal. The compensatory mitigation
proposal may be either conceptual or detailed. If the Corps determines that the activity complies with the terms
and conditions of the RGP and that the adverse environmental effects are no more than minimal, after
considering mitigation, the Corps will notify the permittee and include any activity specific conditions in the
2018 RGP verification that the Corps deems necessary.
PUBLIC COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections concerning the
proposal within 30 days of the date of this notice. These statements should bear upon the suitability and
adequacy of the proposal and should, if appropriate, suggest any changes deemed desirable.
The Corps intends to use these comments to inform decisions regarding any final RGPs issued, including RGP
terms and conditions. As part of this comment period, the Corps is actively soliciting public comment regarding
the following aspects of the proposed 2018 RGPs:
1. Impact limits: The Corps believes the proposed impact limits within each RGP will ensure no more than
minimal effects, both cumulatively and individually. The Corps is soliciting comments to determine if the
proposed impact limits for loss and temporary impacts to waters of the US are appropriate.
2. Waivers: The Corps is considering whether to allow waivers to exceed certain RGP limits, and if so, which
RGP limits warrant a waiver process. If a waiver process is implemented, the Corps is inviting comment on
4
Public Notice, Proposed 2018 Regional General Permits
the information which should be provided with a PCN to inform Corps decisions. If the provision to issue
waivers of certain RGP limits is not pursued, individual permits would be required for proposed activities
with losses of waters of the US that exceed stated limits.
3. Transportation RGP category 1 (Minor Maintenance Linear Transportation): The Corps is soliciting
comments to determine if further clarification of this category is needed, and if the suite of projects shown
is appropriate for a category that would not require a PCN.
4. Transportation RGP category 2 (Modification - Linear Transportation): The Corps is soliciting comments on
the impact limits proposed in this category. As written, this category would allow up to 1 acre of loss to
waters of the US at each single and complete location for existing linear transportation projects. The 1 acre
limit per single and complete project would not be imposed on proposals where the overall project impacts
do not exceed 3 acres. See the attached Figure 1 for illustration on how two different projects could be
verified using category 2. This approach to the impact limits has been proposed to provide a streamlined
authorization for small overall linear transportation projects (no more than 3 acres) which often have a
larger impact at one single and complete location (e.g. bridge projects), as well as for projects that have
many small impacts (no more than 1 acre) spread out over longer distances (e.g. road widening projects).
Comments should be accompanied by data and other information supporting the commenter's views on these
questions as available.
WORK AUTHORIZED BY THE EXISTING REGIONAL GENERAL PERMITS
At the time the proposed 2018 RGPs are issued, the Corps plans to suspend and ultimately revoke all existing
RGPs to eliminate redundancy.
Activities authorized by the existing RGPs that have commenced construction, or are under contract to
commence construction, will remain authorized for up to 12 months after the date of original RGP expiration,
suspension, or revocation; whichever is sooner. Projects currently authorized by the existing RGPs which
have not begun work and are not under contract at the time of RGP suspension or expiration will require a new
review for verification under another general permit or individual permit.
FEDERALLY-LISTED THREATENED OR ENDANGERED SPECIES AND CRITICAL HABITAT
The proposed 2018 RGPs are being coordinated with the U.S. Fish and Wildlife Service. Any comments
concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be
considered in deciding whether to issue any or all of the proposed RGPs. Issuing any proposed 2018 RGP will
not affect the Corps responsibility to comply with Section 7 of the Endangered Species Act.
HISTORICAL/ARCHAEOLOGICAL
The National Park Service, interested Tribal Historic Preservation Offices, the State Archaeologists and the
Minnesota and Wisconsin State Historic Preservation Officers have been provided notification regarding the
Corps proposed action and have been invited to comment or consult as appropriate. Issuing the proposed
2018 RGPs will not affect the Corps responsibility to ensure that all Section 10 and Section 404 authorizations
do not impair treaty rights, including but not limited to reserved water rights and treaty fishing and hunting
rights, or adversely affect Indian lands or protected Tribal resources. Finally, issuing any proposed 2018 RGPs
will not affect the Corps responsibility to comply with Section 106 of the National Historic Preservation Act.
WATER QUALITY CERTIFICATION
The Wisconsin Department of Natural Resources (WDNR) and Minnesota Pollution Control Agency (MPCA) is
responsible for water quality certification pursuant to Section 401 of the Clean Water Act (Section 401) outside
the exterior boundaries of Federally-recognized American Indian reservations in Wisconsin and Minnesota,
respectively. The following Tribes are responsible for Section 401 within the exterior boundaries of their
reservations: Bad River Band of Lake Superior Chippewa, Lac du Flambeau Band of Lake Superior Chippewa,
Fond du Lac Band of Lake Superior Chippewa, Grand Portage Band of Chippewa, and Sokaogon Chippewa
Community. The United States Environmental Protection Agency (EPA) is responsible for Section 401 in all
5
Public Notice, Proposed 2018 Regional General Permits
other Federally-recognized American Indian reservations in Minnesota and Wisconsin. Valid Section 404
permits cannot be issued for any activity unless water quality certification for the activity is granted or waived
pursuant to Section 401. A copy of this notice has been provided to the named entities above, who will
evaluate this proposal for water quality certification. If a Section 401 authority does not provide water quality
certification for an RGP issued by the Corps, the Section 404 RGP authorization is not valid until project
proponents obtain a project-specific Section 401 water quality certification or waiver.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within 10 days of this notice, that a public hearing be held to consider this
proposal. Requests for public hearings shall state, in detail, the reasons for holding a public hearing. A
request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no
valid interest to be served.
PUBLIC INTEREST REVIEW
The decision to issue any or all of the proposed 2018 RGPs will be based on an evaluation of the probable
impact, including cumulative impacts, of the proposal on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which reasonably may
be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered, including the cumulative effects. Among
those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish
and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and,
in general, the needs and welfare of the people.
COASTAL MANAGEMENT PROGRAM CONSISTENCY CERTIFICATION
This notice has been sent to the Minnesota Department of Natural Resources' Costal Program and the
Wisconsin Department of Administration's Coastal Management Program.
ADDITIONAL INFORMATION
The Corps lead contacts for the proposed 2018 RGPs are Ms. Jill Bathke - Minnesota Policy Liaison, and Ms.
Rebecca Graser - Wisconsin Program Manager. If you have questions or comments about the proposed
RGPs, Ms. Bathke can be reached at (651) 290-5697 or at Jill.C.Bathke@usace.army.mil, and Ms. Graser
may be reached at (651) 290-5728 or at Rebecca.M.Graser@usace.army.mil.
Chad Konickson
Chief, Regulatory Branch
See Enclosures A-H and Figure 2
NOTICE TO EDITORS: This public notice is provided as background information and is not a request or
contract for publication.
6
Figure 2- Transportation RGP Category 2 Modification Examples
0.8 acre loss of wetland for a second
single and complete project
0.5 acre loss to wetland for a fifth
single and complete project
Example A:
road widening project
Road length = 15 miles
150 linear foot (0.1 acre) loss of tributary
for a third single and complete project
0.8 acre loss to wetland for a
forth single and complete project
Fits under category 2(a). Overall project loss= 3.1 acres. "The discharge cannot cause the loss of greater than 1.0 acre of waters of the US for each
single and complete project."
0.9 acre loss of wetland for a single and complete project
2.6 acre loss of wetland and 250 linear foot (0.03 acre) loss of tributary for a single and complete project
Example B:
bridge replacement and
road widening
Road length = 2 miles
0.1 acre loss to wetland for a second single and complete project
Fits under category 2(b). Overall project loss to waters of the US= 2.73 acres. "If the overall project (including all single and complete projects)
would result in the loss of 3.0 acres or less of waters of the US, including the area of tributary loss, the 1.0 acre limit at each single and complete
crossing does not apply."
2.6 acre loss of wetland and 250 linear foot (0.03 acre) loss of tributary for a single and complete project
Example C:
bridge replacement and
road widening
Road length = 2 mile
0.8 acre loss to wetland for a second single and complete project
Does NOT fit in category 2. Overall project loss to waters of the US= 3.43 acres. The overall project exceeds 3 acres of loss therefore no single and
complete project can exceed 1 acre of loss. Will need to be reviewed as an individual permit.
Regional General Permit Public Notice Enclosure A
DEPARTMENT OF THE ARMY
BEACH CREATION AND NOURISHMENT REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Beach Creation and Nourishment Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED January 2, 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Beach Creation and Nourishment Regional General Permit (RGP). All regulated activities
require an applicant to submit pre-construction notification and receive written St. Paul District Corps of Engineers
Regulatory Branch (Corps) verification prior to commencing work. In addition, some RGP authorizations may be subject to
project-specific special conditions that will be specified in the Corps verification letter. Refer to the appropriate sections
of this permit for a description of RGP procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the Corps verification letter confirming a project complies with the terms and conditions of
this RGP, the time limit for completing work authorized by the permit ends upon the expiration date of the RGP. Activities
authorized under this RGP that have commenced construction or are under contract to commence construction in
reliance upon this RGP, will remain authorized provided the activity is completed within 12 months of the date of the RGP
expiration, suspension, or revocation; whichever is sooner.
Some RGP authorizations are not valid until a project proponent obtains a Clean Water Act Section 401 water quality
certification or waiver from the appropriate water quality certifying agency. In addition, some RGP authorizations may be
subject to project-specific special conditions that will be specified in the Corps verification letter. This RGP does not obviate
the need for other necessary federal, state, tribal, or local authorizations or permits.
B. BEACH CREATION AND NOURISHMENT REGIONAL GENERAL PERMIT APPLICABILITY
The Beach Creation and Nourishment RGP applies to certain activities in waters of the United States (US), including
wetlands, as described below, in the States of Wisconsin and Minnesota, including within the exterior boundaries of
Indian Reservations.
1. Authorities: Section 404 of the Clean Water Act (33 U.S.C. 1344, Section 404) for discharges of dredged and fill
material into waters of the US, and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403, Section 10) for work
and structures that are located in, under, or over any navigable water of the US. Activities subject to Section 404 and
Section 10 authorization requirements are hereafter referred to as regulated activities.
2. Eligible Activities: Regulated activities associated with the placement of sand or pea gravel for the creation of new
recreational beaches or nourishment of established beaches, including temporary impacts necessary to complete beach
creation and nourishment. This RGP may not be used to authorize the installation of plant barriers or liners.
3. Activity Restrictions (the regulated activity must meet the following terms):
a) Regulated beach creation activities may not exceed 50 feet parallel to the shoreline and 50 feet perpendicular to
the shoreline.
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
b) Regulated beach nourishment activities may not result in the loss of more than 300 linear feet of a tributary at
any single and complete location, unless otherwise authorized via a waiver in a Corps verification letter.
c) Regulated beach nourishment activities may not exceed 0.50 acre at established beaches. A written request to
waive the 0.50 acre requirement may be submitted to the Corps for projects at public beaches. The Corps may
waive the 0.50 acre threshold for public beaches if the Corps determines that the activity will result in no more
than minimal adverse environmental effects.
d) Sand and pea gravel blanket discharges may not exceed 6 inches in depth.
e) Regulated activities may not occur in wetlands, unless the Corps waives this requirement by making a written
determination concluding that the regulated activity will result in no more than minimal adverse environmental
effects.
4. Pre-Construction Notification (PCN): All activities eligible for authorization by the Beach Creation and Nourishment RGP
require submittal of a PCN and written Corps verification of coverage prior to starting work. Please refer to Section E
below for additional information regarding PCN requirements.
C. BEACH CREATION AND NOURISHMENT REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for Beach Creation and Nourishment RGP authorization:
1. Regulated activities that would divert more than 10,000 gallons per day of surface or ground water into or out of
the Great Lakes Basin.
2. Regulated activities that may cause more than minimal adverse effects on tribal rights (including treaty rights),
protected tribal resources, or tribal lands.
3. Regulated activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general
permit.
4. Regulated activities that would occur in known fish spawning areas.
5. Regulated activities that would occur in a calcareous fen, unless the Wisconsin Department of Natural Resources
(WI DNR) has authorized the proposed regulated activity, or the Minnesota Department of Natural Resources
(MN DNR) has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
6. Regulated activities that would occur in a component of the National Wild and Scenic River System (St. Croix River
in Minnesota and Wisconsin and the Wolf River in Wisconsin), or in a river officially designated by Congress as a
"study river" for possible inclusion in the system while the river is in an official study status. This exclusion applies
unless the appropriate Federal agency with direct management responsibility for such river has determined in
writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
7. Regulated activities which are likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such
species. No regulated activity is authorized which "may affect" a listed species or critical habitat, unless ESA
Section 7 consultation addressing the effects of the proposed activity has been completed.
8. Regulated activities which may have the potential to cause effects to properties listed, or eligible for listing, in the
National Register of Historic Places, unless the requirements of Section 106 of the National Historic Preservation
Act (NHPA) have been satisfied.
9. Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because
they will alter or temporarily or permanently occupy or use a Corps federally authorized civil works project, unless
the appropriate Corps office issues the Section 408 permission to alter, occupy, or use the Corps federally
authorized civil works project.
10. Activities which would adversely affect public water supplies.
2
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
D. CALCULATING IMPACTS TO WATERS OF THE UNITED STATES
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see Definitions,
Section I).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single
and complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from
losses of waters of the US, and do not contribute to loss thresholds. Permanent adverse effects include filling,
flooding, excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse
effects to waters of the US include regulated activities that change a waterbody to dry land, increase the bottom
elevation of a waterbody (e.g. installation of riprap), or decrease the bottom elevation of a waterbody (e.g.
excavation of a sedge meadow wetland to shallow marsh), or change the use of a waterbody.
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the total amount of linear loss to waters of the US.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B, or in Pre-Construction Notification
Information, Section E.
3. Temporary impacts to waters of the US include the sum of all regulated impacts to waters of the US for a single
and complete project which are restored to pre-construction conditions after construction. Examples of
temporary impacts in waters of the US include the placement of timber matting, installation of coffer dams,
trenching and backfilling, and in many cases, mechanized land-clearing.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts must be added together to determine the total amount of
temporary linear impact.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B, or in Pre-Construction Notification
Information, Section E.
4. Losses and temporary impacts to waters of the US do not include activities that do not require Department of the
Army authorization, such as activities eligible for exemptions under section 404(f) of the Clean Water Act.
5. The measurements of loss and temporary impact to waters of the US are for determining whether a project may
qualify for the RGP, and are not reduced by compensatory mitigation.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
All Beach Creation and Nourishment RGP activities require PCN. The PCN must include all other nationwide permits,
programmatic general permits, RGPs, or individual permits used or intended to be used to authorize any part of the
overall project, including other regulated activities that require Corps authorization but do not require PCN.
Before starting regulated work, project proponents must obtain written Corps verification of Beach Creation and
Nourishment RGP coverage for all activities.
1. Timing of PCN: The prospective permittee must notify the Corps by submitting a PCN as early as possible. The Corps
will determine if the PCN is complete within 30 calendar days of the date of receipt and, if the PCN is determined to be
3
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
incomplete, notify the prospective permittee within that 30 day period to request the additional information necessary
to make the PCN complete. As a general rule, the Corps will request additional information necessary to make the PCN
complete only once. However, if the prospective permittee does not provide all of the requested information, then the
Corps will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not
commence until all of the requested information has been received by the Corps. The prospective permittee shall not
begin the activity until they are notified in writing by the Corps that the activity may proceed under the RGP with any
special conditions imposed by the Corps.
2. Form and Content of PCN: The PCN must be in writing and should utilize the Minnesota Joint Waters Wetlands
Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A letter
containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents.
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees).
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall project, including
activities that require Corps authorization but do not require PCN.
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss and temporary impact to
waters of the US expected to result from the proposed activity. Impacts to all waters of the US must be reported
in acres or square feet. In addition, tributary, pond, and lake impacts must also be reported in linear feet. A table
may be used to clearly and succinctly disclose this information (see Calculating Impacts to Water of the United
States, Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale bar
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
f. Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources shall be identified by type (e.g. wetland, tributary, lake, man-made ditch, pond, etc.) and impacts shall be
identified by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may
be required.
g. A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
h. If the proposed project would impact a calcareous fen, the PCN must include a copy of the WI DNR authorization for
the proposed regulated activity, or a copy of the approved MN DNR calcareous fen management plan specific to the
project.
i. If any federally-listed proposed, threatened or endangered species or proposed or designated critical habitat might
be affected or is in the vicinity of the activity, the PCN must include the name(s) of those endangered or threatened
species that might be affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. Federal applicants or applicants that have federal funding (or whose project
otherwise involves a lead federal agency) must provide documentation demonstrating compliance with Section 7 of
the Endangered Species Act.
j. If the activity might have the potential to cause effects to an historic property listed on, eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property
might have the potential to be affected by the proposed activity and include a vicinity map indicating the location of
the historic property. Federal applicants or applicants that have federal funding (or whose project otherwise involves
4
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
a lead federal agency) must provide documentation demonstrating compliance with Section 106 of the National
Historic Preservation Act.
k. If an activity is proposed in a component of the National Wild and Scenic River System (including the St. Croix River in
Minnesota and Wisconsin and the Wolf River in Wisconsin) or in a river officially designated by Congress as a "study
river" for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild
and Scenic River or the "study river."
l. The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
m. If a waiver from for a specific condition of the permit is proposed (e.g. for regulated activities within wetlands), the
PCN must include an explanation of the need for a waiver and why the applicant believes the impacts would result in
minimal individual and cumulative adverse environmental effects.
n. For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because it will alter or
temporarily or permanently occupy or use a Corps federally authorized civil works project, the PCN must include a
statement confirming if the project proponent has submitted a written request for Section 408 permission from the
Corps office having jurisdiction over the Corps civil works project.
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). Mitigation includes actions which may avoid, minimize, rectify, reduce,
or compensate for adverse environmental effects or activities which may otherwise be contrary to the public interest.
The Corps may require compensatory mitigation to ensure that the activity results in no more than minimal adverse
environmental effects, or will not be contrary to the public interest. In reviewing the PCN for the proposed activity, the
Corps will determine whether the activity authorized by the RGP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by
a specific RGP, the Corps should issue the RGP verification for that activity if it meets the terms and conditions of that
RGP, unless the Corps determines, after considering mitigation, that the proposed activity will result in more than minimal
individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity.
Project proponents may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation.
When developing a compensatory mitigation proposal, the project proponent must consider appropriate and practicable
options consistent with the framework at 33 CFR 332.3(b). Compensatory mitigation projects provided to offset losses of
aquatic resources must comply with the applicable provisions of the current Corps policies, guidelines, and 33 CFR part
332.
G. USE OF MULTIPLE GENERAL PERMITS (STACKING)
Single and complete non-linear projects may not be ``piecemealed'' to avoid the limits in a general permit (nationwide,
programmatic, or regional general permit) authorization. When general permit limits are exceeded, single and complete
projects may be eligible for review and authorization by an individual permit.
Unless otherwise indicated by a specific general permit or general permit category, the use of more than one general
permit (nationwide, programmatic, or regional general permit) for a single and complete project is prohibited, except when
5
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
the acreage or linear foot loss of waters of the US authorized by the general permits does not exceed the loss limit of the
general permit with the highest specified acreage limit.
H. GENERAL CONDITIONS
To qualify for Beach Creation and Nourishment RGP authorization, the prospective permittee must comply with the
following conditions, as applicable, in addition to all applicable Beach Creation and Nourishment RGP terms and
requirements and all project-specific conditions imposed by the Corps.
1. Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill shall be properly maintained, including
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
2. Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
3. Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
4. Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
5. Endangered Species:
a. No activity is authorized under this RGP which is likely to directly or indirectly jeopardize the continued existence
of a threatened or endangered species or a species proposed for such designation, as identified under the
Endangered Species Act (ESA), 50 CFR 402, or which will directly or indirectly destroy or adversely modify the
critical habitat of such species. No activity is authorized under the Beach Creation and Nourishment RGP which
"may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the
proposed activity has been completed, and a Corps RGP verification letter is issued. Direct effects are the
immediate effects on listed species and critical habitat caused by the RGP activity. Indirect effects are those
effects on listed species and critical habitat that are caused by the RGP activity and are later in time, but still are
reasonably certain to occur.
b. As a result of formal or informal consultation with the FWS the Corps may add species-specific permit condition
to the RGP verification.
c. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
6
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
6. Calcareous Fens: The permittee may not complete regulated activities in a calcareous fen, unless the Wisconsin
Department of Natural Resources has authorized the proposed regulated activity, or the Minnesota Department of
Natural Resources has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
7. Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with direct management
responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and
Scenic River designation or study status.
8. Historic Properties, Cultural Resources:
a. No activity which may affect historic properties listed or potentially eligible for listing on the National Register of
Historic Places is authorized until the Corps has complied with the requirements of Section 106 of the National
Historic Preservation Act. Federal project proponents should follow their own procedures for complying with the
requirements of Section 106 and provide documentation of compliance with those requirements.
b. Information on the location and existence of historic resources can be obtained from the State Historic
Preservation Office, Tribal Historic Preservation Offices, and the National Register of Historic Places.
c. Rock or fill material used for activities authorized by this permit must either be obtained from existing quarries or,
if a new borrow site is excavated to obtain fill material, the Corps must be notified prior to the use of the new site
to determine whether a cultural resources survey of the site is necessary.
9. Discovery of Previously Unknown Remains and Artifacts: If you discover any previously unknown historic, cultural or
archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately
notify the Corps of what you have found, and to the maximum extent practicable, avoid construction activities that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
10. Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described in this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized
civil works project, unless the appropriate Corps office issues Section 408 permission to alter, occupy, or use the
Corps civil works project (pursuant to 33 U.S.C. 408), and the Corps issues written a Beach Creation and Nourishment
RGP verification. Examples of federal projects include but are not limited to works that were built by the Corps and
are locally maintained (such as local flood control projects) or operated and maintained by the Corps (such as locks
and dams).
11. Restoration of Temporary Impacts: All temporary impacts in waters of the US, including discharges resulting from
side casting material excavated from trenching, that occur as a result of the regulated activity must be fully
contained with appropriate erosion control or containment methods, be restored to preconstruction contours and
elevations, and revegetated with native, non-invasive vegetation. A project proponent may request, in writing, a
waiver from this condition from the Corps. An acceptable reason for a waiver to this condition may include, but is
not limited to, the Corps allowing natural restoration of the site when the resulting grade and existing seed bank
are sufficient for the site to restore to pre-construction conditions. In temporarily excavated wetlands, the top 6
to 12 inches of the excavation should normally be backfilled with topsoil originating from the wetland. No
temporary excavation area, including, but not limited to trenches, may be constructed or backfilled in such a
manner as to drain waters of the United States (e.g., backfilling with extensive gravel layers, creating a french
drain effect).
12. Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and
limited to the smallest area and the shortest duration required to accomplish the project purpose. Unless otherwise
conditioned in a Corps RGP verification, temporary impacts: 1) are allowed to stay in place as long as specified in the
PCN; or 2) must be removed in their entirety in accordance with the plan described in the PCN.
7
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
13. Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) shall be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs shall be
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
14. Culverts and Crossings: Unless an RGP verification authorizes otherwise, replacement and installation of culverts or
crossings authorized by a RGP are to follow (or be restored to) the natural alignment and profile of the tributary. The
culverts or bridges must adequately pass low flow and bankfull events, bedload, sediment load, and provide siteappropriate fish and wildlife passage. Example design elements include recessing single culverts to accommodate
natural bankfull width and adjusting additional culvert inverts at an elevation higher than the bankfull elevation.
15. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
16. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
17. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003; or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
18. Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
19. Navigation: No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the US. The permittee understands and agrees
that, if future operations by the United States require the removal, relocation, or other alteration, of the structure
or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the United
States on account of any such removal or alteration.
20. Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
21. Access Roads: Access roads must be sized appropriately and must be constructed in such a way to minimize adverse
effects on waters of the US and elevations must be as near as practicable to pre-construction contours and elevations
(e.g., at grade corduroy roads or geotextile/gravel roads). All access roads constructed in waters of the US must be
properly bridged or culverted to maintain surface flows.
22. Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner by
submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
8
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
___________________________________
(Transferee)
___________________________________
(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
Overall project: The aggregate of all single and complete projects (linear and non-linear) proposed with regulated losses
and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
9
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
Single and complete linear project: A linear project is a project constructed for the purpose of getting people, goods, or
services from a point of origin to a terminal point, which often involves multiple crossings of one or more waterbodies at
separate and distant locations. The term "single and complete project" is defined as that portion of the overall linear
project proposed or accomplished by one owner/developer or partnership or other association of owners/developers that
includes all crossings of a single water of the US (i.e., a single waterbody) at a specific location. For linear projects crossing
a single or multiple waterbodies several times at separate and distant locations, each crossing is considered a single and
complete project for purposes of this general permit authorization. However, individual channels in a braided stream or
river, or individual arms of a large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of
such features cannot be considered separately. The definition of "single and complete linear project" does not include the
term "independent utility" because each crossing of waters of the US is needed for the single and complete linear project
to fulfill its purpose of transporting people, goods, and services from the point of origin to the terminal point.
Single and complete non-linear project: For non-linear projects, the term "single and complete project" is defined at 33
CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or partnership or other association
of owners/developers. A single and complete non-linear project must have independent utility. Single and complete nonlinear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a
multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project
that would be constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without
limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty,
artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel,
piling, aid to navigation, or any other manmade obstacle or obstruction.
Tribal lands: Any lands which are either: 1) held in trust by the United States for the benefit of any Indian tribe or
individual; or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For purposes of this RGP, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
Waiver: An approval from the Corps which allows an applicant to exceed the activity restrictions or conditions described
in an RGP. Waivers may only be considered when expressly indicated as available in an RGP and will only be granted once
the Corps has made a written determination that the RGP activity will result in only minimal individual and cumulative
adverse environmental effects. When a waiver is required, an applicant cannot start work until they have received a RGP
verification letter with waiver approval.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
10
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
J. FURTHER INFORMATION
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by
an RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a. This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b. This RGP does not grant any property rights or exclusive privileges;
c. This RGP does not authorize any injury to the property or rights of others; and
d. This RGP does not authorize interference with any existing or proposed federal project.
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; or
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a. The permittee fails to comply with the terms and conditions of this permit;
b. The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c. Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this Beach Creation and Nourishment RGP at any time the
circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, significant
new information surfaces which this office did not consider in reaching the original public interest decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation
procedures contained in 33 CFR 325.
11
St. Paul District Corps of Engineers, Regulatory Branch
Beach Creation and Nourishment Regional General Permit
K. CORPS DECISION
In reviewing the PCN for the proposed activity, the Corps will determine whether the activity authorized by the RGP will
result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public
interest. If a project proponent requests authorization by a specific RGP, the Corps should issue the RGP verification for
that activity if it meets the terms and conditions of that RGP, unless the Corps determines, after considering mitigation,
that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic
environment and other aspects of the public interest and exercises discretionary authority to require an individual permit
for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of
waters of the United States to determine whether they individually satisfy the terms and conditions of the RGPs, as well as
the cumulative effects caused by all of the crossings authorized by RGP.
If an applicant requests a waiver for any limit where waivers are indicated as available, the Corps will only grant the waiver
upon a written determination that the RGP activity will result in only minimal individual and cumulative adverse
environmental effects.
When making minimal adverse environmental effects determinations the Corps will consider the direct and indirect
effects caused by the RGP activity. The Corps will also consider the cumulative adverse environmental effects caused by
activities authorized by the RGP and whether those cumulative adverse environmental effects are no more than minimal.
The Corps will consider site specific factors, such as the environmental setting in the vicinity of the RGP activity, the type
of resource that will be affected by the RGP activity, the functions provided by the aquatic resources that will be affected
by the RGP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that
aquatic resource functions will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g.,
watershed or ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
The Corps will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in
the proposal to inform decisions regarding whether the net adverse environmental effects of the proposed activity are no
more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the Corps determines
that the activity complies with the terms and conditions of the RGP and that the adverse environmental effects are no
more than minimal, after considering mitigation, the Corps will notify the permittee and include any activity specific
conditions in the RGP verification the Corps deems necessary. Conditions for compensatory mitigation requirements must
comply with the appropriate provisions at 33 CFR 332.3(k). When compensatory mitigation is required, the Corps must
approve the final mitigation plan before the permittee commences work in waters of the United States, unless the Corps
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion
of the required compensatory mitigation. If the Corps determines that the adverse environmental effects of the proposed
activity are more than minimal, then the Corps will notify the applicant of next steps as described in 33 CFR 325.
12
Regional General Permit Public Notice Enclosure B
DEPARTMENT OF THE ARMY
BEACH RAKING REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Beach Raking Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED January 2, 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Beach Raking General Permit (RGP). Certain regulated activities require an applicant to submit
pre-construction notification and receive written St. Paul District Corps of Engineers Regulatory Branch (Corps) verification
prior to commencing work. In addition, some RGP authorizations may be subject to project-specific special conditions that
will be specified in the Corps verification letter. Refer to the appropriate sections of this permit for a description of RGP
procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the Corps verification letter confirming a project complies with the terms and conditions of
this RGP, the time limit for completing work authorized by the permit ends upon the expiration date of the RGP. Activities
authorized under this RGP that have commenced construction or are under contract to commence construction in
reliance upon this RGP, will remain authorized provided the activity is completed within 12 months of the date of the RGP
expiration, suspension, or revocation; whichever is sooner.
Some RGP authorizations are not valid until a project proponent obtains a Clean Water Act Section 401 water quality
certification or waiver from the appropriate water quality certifying agency. In addition, some RGP authorizations may be
subject to project-specific special conditions that will be specified in the Corps verification letter. This RGP does not obviate
the need for other necessary federal, state, tribal, or local authorizations or permits.
B. BEACH RAKING REGIONAL GENERAL PERMIT APPLICABILITY
The Beach Raking RGP applies to certain activities in waters of the United States (US), including wetlands, as described
below, in the States of Wisconsin and Minnesota, including within the exterior boundaries of Indian Reservations.
1. Authorities: The Beach Raking RGP regional general permit may be used to authorize activities pursuant to Section 404
of the Clean Water Act (33 U.S.C. 1344, Section 404) for discharges of dredged and fill material into waters of the US and
Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403, Section 10) for work and structures that are located in,
under, or over any navigable water of the US. Activities subject to Section 404 and Section 10 regulatory requirements
are hereafter referred to as regulated activities.
2. Eligible Activities: Regulated activities in waters of the US associated with mechanical beach raking activities for the
purpose of removing accumulated debris below the ordinary high water mark of a beach, including but not limited to,
dead aquatic plants and shellfish, woody debris, and algae.
3. Activity Restrictions:
a. Regulated beach raking activities in inundated portions of waters of the US are not authorized.
b. Removal of living vegetation and work in inundated portions of waters of the US are not authorized.
c. Regulated activities associated with mechanical beach raking may not exceed 2.0 acres below the plane of the
ordinary high water mark or the mean high water mark in waters of the US. The Corps may waive the 2.0 acre
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
threshold for public beaches by making a written determination concluding that the activity will result in no
more than minimal adverse environmental effects. An applicant may request, in writing, a waiver from the
District.
4. Pre-Construction Notification (PCN): No pre-construction notification is required unless triggered by the terms and
condition of this permit (See Section E. Pre-Construction Notification).
C. BEACH RAKING REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for Beach Raking RGP authorization:
1. Activities that would divert more than 10,000 gallons per day of surface or ground water into or out of the Great
Lakes Basin.
2. Activities that may cause more than minimal adverse effects on tribal rights (including treaty rights), protected
tribal resources, or tribal lands.
3. Activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general permit.
4. Activities that would occur in a calcareous fen, unless the Wisconsin Department of Natural Resources (WI DNR)
has authorized the proposed regulated activity, or the Minnesota Department of Natural Resources (MN DNR) has
approved a calcareous fen management plan specific to a project. A list of known Minnesota calcareous fens can
be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
5. Activities that would occur in the St. Croix River in Minnesota and Wisconsin, the Wolf River in Wisconsin, a
National Wild and Scenic River, or a river officially designated by Congress as a "study river" for possible inclusion
in the system while the river is in an official study status, unless the appropriate Federal agency with direct
management responsibility for such river, has determined in writing that the proposed activity will not adversely
affect the Wild and Scenic River designation or study status.
6. Any activity which is likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such
species. No activity is authorized under any RGP which "may affect" a listed species or critical habitat, unless ESA
Section 7 consultation addressing the effects of the proposed activity has been completed.
7. Any activity which may have the potential to cause effects to properties listed, or eligible for listing, in the
National Register of Historic Places, unless the requirements of Section 106 of the National Historic Preservation
Act (NHPA) have been satisfied.
8. Activities which require permission from the Corps pursuant to 33 U.S.C. 408 because they will alter or
temporarily or permanently occupy or use a Corps federally authorized Civil Works project, unless the appropriate
Corps office issues the section 408 permission to alter, occupy, or use the USACE project, AND the Corps issues
written RGP verification.
9. Activities which would adversely affect public water supplies.
D. CALCULATING LOSS OF WATERS OF THE UNITED STATES
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see Definitions,
Section I).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single and
complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from losses
of waters of the US and do not contribute to loss thresholds. Permanent adverse effects include filling, flooding,
excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse effects to
waters of the US include regulated activities that change a waterbody to dry land, increase the bottom elevation
2
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
of a waterbody (e.g. installation of riprap), decrease the bottom elevation of a waterbody (e.g. excavation of a
sedge meadow wetland to shallow marsh), or change the use of a waterbody.
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the overall amount of linear loss to waters of the US.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
3. Temporary impacts to waters of the US include the sum of all regulated impacts to waters of the US for a single
and complete project which are restored to preconstruction conditions after construction. Examples of
temporary impacts to waters of the US may include the placement of timber matting, installation of coffer dams,
trenching and backfilling, and in many cases, mechanized land-clearing.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts must be added together to determine the overall amount of
temporary linear impact.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
4. Losses and temporary impacts to waters of the US do not include:
a) Activities that do not require Department of the Army authorization, such as activities eligible for exemptions
under section 404(f) of the Clean Water Act.
b) Impacts to wetlands that are confined to the bed and banks of linear ditches provided the ditch is not located
in a wetland (see definition of linear ditch in Definitions, Section I).
5. The measurements of loss and temporary impact to waters of the US are for determining whether a project may
qualify for the RGP, and are not reduced by compensatory mitigation.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
Projects that meet the terms and conditions of the Beach Raking RGP and do not require submittal of a PCN, as outlined in
the table below, may commence work after project proponents have carefully confirmed that the activity will be conducted
in compliance with all applicable terms and conditions of the RGP.
For all activities which require PCN, project proponents must obtain written Corps verification of Beach Raking RGP coverage
before starting regulated work. For RGP activities that require PCN, the PCN must include all other nationwide permits,
programmatic general permits, RGPs, or individual permits used or intended to be used to authorize any part of the
overall linear and non-linear project (including all single and complete projects), including regulated activities that require
Corps authorization but do not require PCN.
Follow the table below to know if a PCN must be submitted and a written verification letter received prior to starting work.
WISCONSIN:
MINNESOTA:
PCN is required
1. The Apostle Islands National Lakeshore;
1. Wild rice waters identified in Minn. R.
2. Madeline Island;
7050.0470, subpart 1 (or as amended by the
for regulated
3. State-designated wild rice waters
Minnesota Pollution Control Agency);
activities
(https://data.glifwc.org/manoomin.harvest.i 2. Bog wetland plant communities; and
proposed in
nfo);
3. Fens.
3
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
these aquatic
resources 1:
4.
5.
6.
7.
8.
1.
PCN is required
for the
following
activities to
comply with other
federal laws:
2.
3.
4.
1.
Other activities
which
require PCN
include:
2.
3.
Coastal plain marshes;
Bog wetland plant communities;
Interdunal wetlands;
Great Lakes ridge and swale complexes;
Fens; and
9. Wetland sites designated by the
Ramsar Convention (as of the date of
publication, these include: the
Horicon Marsh, Upper Mississippi
River Floodplain wetlands, Kakagon
and Bad River Sloughs, Door County
Peninsula Coastal wetlands, and the
Chiwaukee Illinois Beach Lake Plain),
see https://rsis.ramsar.org/.
Regulated activities which may affect, or are in the vicinity of, any Federally-listed
threatened, endangered, or proposed threatened and endangered species, designated
critical habitat, or proposed critical habitat.
Regulated activities which might have the potential to cause effects to any historic
properties listed on, determined to be eligible for listing on, or potentially eligible for listing
on the National Register of Historic Places, including previously unidentified properties.
Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408
because it will alter or temporarily or permanently occupy or use a Corps federally
authorized civil works project.
Regulated activities in the National Wild and Scenic River System, including the St. Croix
River in Minnesota and Wisconsin and the Wolf River in Wisconsin or in a river officially
designated by Congress as a "study river" for possible inclusion in the system while the river
is in an official study status.
Areas of suspected sediment or soil contamination, including but not limited to Superfund
sites. Superfund sites in Minnesota or Wisconsin can be located by searching the EPA's
website: https://www.epa.gov/superfund/search-superfund-sites-where-you-live.
Bridges, structures, and sunken vessels more than 50 years old, unless already determined
ineligible for listing on National Register of Historic Places. Culverts that are constructed
using pre-cast concrete or corrugated metal are not subject to this PCN requirement.
All regulated activities which require a waiver to be eligible for authorization by the RGP.
Timing of PCN: Where required by the terms of this RGP, the prospective permittee must notify the Corps by submitting
a PCN as early as possible. The Corps will determine if the PCN is complete within 30 calendar days of the date of receipt
and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day period to request
the additional information necessary to make the PCN complete. As a general rule, the Corps will request additional
information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all
of the requested information, then the Corps will notify the prospective permittee that the PCN is still incomplete and
the PCN review process will not commence until all of the requested information has been received by the Corps. The
Additional information about the plant communities listed can be found at www.mvp.usace.army.mil/Missions/Regulatory.aspx,
the Wisconsin Department of Natural Resources' (WI DNR) website:
www.dnr.wi.gov/topic/EndangeredResources/Communities.asp?mode=group&Type=Wetland, or at the Minnesota Department of
Natural Resources' (MN DNR) Native Plant Community Classification's website: www.dnr.state.mn.us/npc/classification.html.
1
4
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
prospective permittee shall not begin the activity until they are notified in writing by the Corps that the activity may
proceed under the RGP with any special conditions imposed by the Corps.
Form and Content of PCN: The PCN must be in writing and should utilize the Minnesota Joint Waters Wetlands
Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A letter
containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents;
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees);
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall proposed project
including activities that require Corps authorization but do not require PCN.
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss of waters and temporary
impacts expected to result from the proposed activity. Impacts to all waters of the US must be reported in acres
or square feet. In addition, tributary, pond, and lake impacts must also be reported in linear feet. A table may be
used to clearly and succinctly disclose this information (see Calculating Impacts to Waters of the United States,
Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
f. Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources must be identified by type (e.g. wetland, tributary, lake, man-made ditch, pond, etc.) and impacts must be
identified by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may
be required.
g. A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
h. If the proposed project would impact a calcareous fen, the PCN must include a copy of the WI DNR authorization for
the proposed regulated activity, or a copy of the approved MN DNR calcareous fen management plan specific to the
project.
i. If any federally-listed proposed, threatened or endangered species or proposed or designated critical habitat might
be affected or is in the vicinity of the activity the PCN must include the name(s) of those endangered or threatened
species that might be affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. Federal applicants or applicants that have federal funding (or whose project
otherwise involves a lead federal agency) must provide documentation demonstrating compliance with Section 7 of
the Endangered Species Act.
j. If the activity might have the potential to cause effects to an historic property listed on, eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property
might have the potential to be affected by the proposed activity and include a vicinity map indicating the location of
the historic property. Federal applicants or applicants that have federal funding (or whose project otherwise involves
a lead federal agency) must provide documentation demonstrating compliance with section 106 of the National
Historic Preservation Act.
k. If an activity is proposed in a component of the National Wild and Scenic River System (including the St. Croix River in
Minnesota and Wisconsin and the Wolf River in Wisconsin) or in a river officially designated by Congress as a "study
river" for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild
and Scenic River or the "study river."
5
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
l. The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
m. If a waiver for a specific category or condition of the permit is proposed (e.g. for public beach raking), the PCN must
include an explanation of the need for a waiver and why the applicant believes the impacts would result in minimal
individual and cumulative adverse environmental effects.
n. For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because it will alter or
temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the
PCN must include a statement confirming if the project proponent has submitted a written request for Section 408
permission from the Corps office having jurisdiction over the Corps civil works project.
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). Mitigation includes actions which may avoid, minimize, rectify, reduce,
or compensate for adverse environmental effects or activities which may otherwise be contrary to the public interest.
The Corps may require compensatory mitigation to ensure that the activity results in no more than minimal adverse
environmental effects, or will not be contrary to the public interest. In reviewing the PCN for the proposed activity, the
Corps will determine whether the activity authorized by the RGP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by
a specific RGP, the Corps should issue the RGP verification for that activity if it meets the terms and conditions of that
RGP, unless the Corps determines, after considering mitigation, that the proposed activity will result in more than minimal
individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity.
Project proponents may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation.
When developing a compensatory mitigation proposal, the project proponent must consider appropriate and practicable
options consistent with the framework at 33 CFR 332.3(b). Compensatory mitigation projects provided to offset losses of
aquatic resources must comply with the applicable provisions of the current Corps policies, guidelines, and 33 CFR part
332.
G. USE OF MULTIPLE GENERAL PERMITS
Single and complete non-linear projects may not be ``piecemealed'' to avoid the limits in a general permit (nationwide,
programmatic, or regional general permit) authorization. When general permit limits are exceeded, single and complete
projects may be eligible for review and authorization by an individual permit.
Unless otherwise indicated by a specific general permit or general permit category, the use of more than one general
permit (nationwide, programmatic, or regional general permit) for a single and complete project is prohibited, except when
the acreage or linear foot loss of waters of the US authorized by the general permits does not exceed the loss limit of the
general permit with the highest specified acreage limit.
H. GENERAL CONDITIONS
6
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
To qualify for Beach Raking RGP authorization, the prospective permittee must comply with the following conditions, as
applicable, in addition to any category-specific requirements and project-specific conditions imposed by the Corps.
1.
2.
3.
4.
5.
6.
7.
Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill must be properly maintained, including
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
Endangered Species:
a. No activity is authorized under this RGP which is likely to directly or indirectly jeopardize the continued existence
of a threatened or endangered species or a species proposed for such designation, as identified under the
Endangered Species Act (ESA), 50 CFR 402, or which will directly or indirectly destroy or adversely modify the
critical habitat of such species. No activity is authorized under the RGP which "may affect" a listed species or
critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed,
and a Corps RGP verification letter is issued. Direct effects are the immediate effects on listed species and critical
habitat caused by the RGP activity. Indirect effects are those effects on listed species and critical habitat that are
caused by the RGP activity and are later in time, but still are reasonably certain to occur.
b. As a result of formal or informal consultation with the FWS the Corps may add species-specific permit condition
to the RGP verification.
c. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
Calcareous Fens: The permittee may not complete regulated activities in a calcareous fen, unless the Wisconsin
Department of Natural Resources has authorized the proposed regulated activity, or the Minnesota Department of
Natural Resources has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with direct management
responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and
Scenic River designation or study status.
7
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
Historic Properties, Cultural Resources:
a. No activity which may affect historic properties listed or potentially eligible for listing on the National Register of
Historic Places is authorized until the requirements of Section 106 of the National Historic Preservation Act have
been satisfied. Federal project proponents should follow their own procedures for complying with the
requirements of Section 106 and provide documentation of compliance with those requirements.
b. Information on the location and existence of historic resources can be obtained from the State Historic
Preservation Office, Tribal Historic Preservation Offices, and the National Register of Historic Places.
c. Rock or fill material used for activities authorized by this permit must either be obtained from existing quarries or,
if a new borrow site is excavated to obtain fill material, the Corps must be notified prior to the use of the new site
to determine whether a cultural resources survey of the site is necessary.
9. Discovery of Previously Unknown Remains and Artifacts: If any previously unknown historic, cultural or archeological
remains and artifacts are discovered while accomplishing the activity authorized by this permit, the Corps must
immediately be notified of the findings. To the maximum extent practicable, construction activities must avoided that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
10. Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized civil
works project, unless the appropriate Corps office issues a Section 408 permission to alter, occupy, or use the Corps
civil works project (pursuant to 33 U.S.C. 408) and the Corps issues written RGP verification. Examples of federal
projects include but are not limited to works that were built by the Corps and are locally maintained (such as local
flood control projects) or operated and maintained by the Corps (such as locks and dams).
11. Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) must be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs must be
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
12. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
13. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
14. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003, or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
15. Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
16. Navigation: No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the US. The permittee understands and agrees
that, if future operations by the United States require the removal, relocation, or other alteration, of the structure
or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said
8.
8
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the United
States on account of any such removal or alteration.
17. Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
18. Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner by
submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
_________________________________(Transferee)
___________________________________(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
9
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
Overall project: The aggregate of all single and complete projects (including both linear and non-linear regulated
activities) proposed by an applicant with regulated losses and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
Single and complete non-linear project: For non-linear projects, the term "single and complete project" is defined at 33
CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or partnership or other association
of owners/developers. A single and complete non-linear project must have independent utility. Single and complete nonlinear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a
multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project
that would be constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without
limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty,
artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel,
piling, aid to navigation, or any other manmade obstacle or obstruction.
Tribal lands: Any lands which is either: 1) held in trust by the United States for the benefit of any Indian tribe or individual;
or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For the purposes of this permit, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
Waiver: An approval from the Corps which allows an applicant to exceed the activity restrictions or conditions described
in an RGP. Waivers may only be considered when expressly indicated as available in an RGP and will only be granted once
the Corps has made a written determination that the RGP activity will result in only minimal individual and cumulative
adverse environmental effects. When a waiver is required, an applicant cannot start work until they have received a RGP
verification letter with waiver approval.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
J. FURTHER INFORMATION
10
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by
an RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a. This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b. This RGP does not grant any property rights or exclusive privileges;
c. This RGP does not authorize any injury to the property or rights of others; and
d. This RGP does not authorize interference with any existing or proposed federal project.
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; or
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a. The permittee fails to comply with the terms and conditions of this permit;
b. The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c. Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this RGP at any time the circumstances warrant. Circumstances
that could require a reevaluation include, but are not limited to, significant new information surfaces which this office
did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination
that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.
K. CORPS DECISION
In reviewing the PCN for the proposed activity, the Corps will determine whether the activity authorized by the RGP will
result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public
interest. If a project proponent requests authorization by a specific RGP, the Corps should issue the RGP verification for
that activity if it meets the terms and conditions of that RGP, unless the Corps determines, after considering mitigation,
that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic
11
St. Paul District Corps of Engineers, Regulatory Branch
Beach Raking Regional General Permit
environment and other aspects of the public interest and exercises discretionary authority to require an individual permit
for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of
waters of the United States to determine whether they individually satisfy the terms and conditions of the RGPs, as well as
the cumulative effects caused by all of the crossings authorized by RGP. If an applicant requests a waiver for any limit
where waivers are indicated as available, the Corps will only grant the waiver upon a written determination that the RGP
activity will result in only minimal individual and cumulative adverse environmental effects.
When making minimal adverse environmental effects determinations the Corps will consider the direct and indirect
effects caused by the RGP activity. The Corps will also consider the cumulative adverse environmental effects caused by
activities authorized by the RGP and whether those cumulative adverse environmental effects are no more than minimal.
The Corps will consider site specific factors, such as the environmental setting in the vicinity of the RGP activity, the type
of resource that will be affected by the RGP activity, the functions provided by the aquatic resources that will be affected
by the RGP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that
aquatic resource functions will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g.,
watershed or ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
The Corps will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in
the proposal to inform decisions regarding whether the net adverse environmental effects of the proposed activity are no
more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the Corps determines
that the activity complies with the terms and conditions of the RGP and that the adverse environmental effects are no
more than minimal, after considering mitigation, the Corps will notify the permittee and include any activity specific
conditions in the RGP verification the Corps deems necessary. Conditions for compensatory mitigation requirements must
comply with the appropriate provisions at 33 CFR 332.3(k). When compensatory mitigation is required, the Corps must
approve the final mitigation plan before the permittee commences work in waters of the United States, unless the Corps
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion
of the required compensatory mitigation. If the Corps determines that the adverse environmental effects of the proposed
activity are more than minimal, then the Corps will notify the applicant of next steps as described in 33 CFR 325.2.
12
Regional General Permit Public Notice Enclosure C
DEPARTMENT OF THE ARMY
MINOR DISCHARGES REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Minor Discharges Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED January 2, 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Minor Discharges General Permit (RGP). Refer to the appropriate sections of this permit for a
description of RGP procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the St. Paul District Corps of Engineers Regulatory Branch (Corps) verification letter
confirming a project complies with the terms and conditions of this RGP, the time limit for completing work authorized by
the permit ends upon the expiration date of the RGP. Activities authorized under this RGP that have commenced
construction or are under contract to commence construction in reliance upon this RGP, will remain authorized provided
the activity is completed within 12 months of the date of the RGP expiration, suspension, or revocation; whichever is
sooner.
No RGP authorizations is valid until a project proponent obtains a Clean Water Act Section 401 water quality certification or
waiver from the appropriate water quality certifying agency. In addition, some RGP authorizations may be subject to
project-specific special conditions that will be specified in the Corps verification letter. This RGP does not obviate the need
for other necessary federal, state, tribal, or local authorizations or permits.
B. MINOR DISCHARGES REGIONAL GENERAL PERMIT APPLICABILITY
The Minor Discharges RGP applies to certain activities in waters of the United States (US), including wetlands, as described
below, in the States of Wisconsin and Minnesota, including within the exterior boundaries of Indian Reservations.
1. Authority: The Minor Discharges RGP regional general permit may be used to authorize activities pursuant to Section
404 of the Clean Water Act (33 U.S.C. 1344, Section 404) for discharges of dredged and fill material into waters of the US.
Activities subject to Section 404 regulatory requirements are hereafter referred to as regulated activities.
2. Eligible Activities: Regulated activities associated with minor permanent and temporary discharges of dredged or fill
material in waters of the US for a single and complete project. Discharges that would impound a tributary or lake, or are
associated with utility, transportation, or pier or dock projects are not authorized by this permit.
3. Activity Restrictions:
a. The regulated discharge may not exceed 400 square feet of waters of the US. Losses of waters of the US and
temporary impacts to waters of the US contribute toward the 400 square foot threshold, see section D for
additional information.
b. All tributary channel modifications are limited to the minimum necessary and cannot exceed 300 linear feet. See
Section D. Calculating Impacts to Waters of the United States for additional information.
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
c. This category may not be used more than once by the permittee, property owner, or agent of a single permittee
or property owner in a manner that would cumulatively impact more than 400 square feet of waters of the US.
4. Pre-Construction Notification (PCN): No PCN is required prior to the start of work. Applicant must meet ALL the terms
and conditions of this permit.
C. MINOR DISCHARGES REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for 2018 Minor Discharges RGP authorization:
1. Activities that would divert more than 10,000 gallons per day of surface or ground water into or out of the Great
Lakes Basin.
2. Activities that may cause more than minimal adverse effects on tribal rights (including treaty rights), protected
tribal resources, or tribal lands.
3. Activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general permit.
4. Activities that would result in the loss of more than 300 linear feet of a tributary.
5. Activities that would occur in a calcareous fen.
6. Activities that would occur in a component of the National Wild and Scenic River System (St. Croix River in
Minnesota and Wisconsin or the Wolf River in Wisconsin), or in a river officially designated by Congress as a "study
river" for possible inclusion in the system while the river is in an official study status.
7. Any activity which is likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species.
8. Any activity which may have the potential to cause effects to properties listed, or eligible for listing, in the National
Register of Historic Places.
9. Activities which require permission from the Corps pursuant to 33 U.S.C. 408 because they will alter or
temporarily or permanently occupy or use a Corps federally authorized Civil Works project.
10. Activities that do not comply with applicable state dam safety criteria which have not been designed by
qualified persons.
11. Activities which would adversely affect public water supplies.
D. CALCULATING IMPACTS TO WATERS OF THE UNITED STATES
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see Definitions,
Section I).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single and
complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from losses
of waters of the US and do not contribute to loss thresholds. Permanent adverse effects include filling, flooding,
excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse effects to
waters of the US include regulated activities that change a waterbody to dry land, increase the bottom elevation
of a waterbody (e.g. installation of riprap), decrease the bottom elevation of a waterbody (e.g. excavation of a
sedge meadow wetland to shallow marsh), or change the use of a waterbody.
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the overall amount of linear loss to waters of the US.
2
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
3. Temporary impacts to waters of the US include the sum of all regulated impacts to waters of the US for a single
and complete project which are restored to preconstruction conditions after construction. Examples of
temporary impacts to waters of the US may include the placement of timber matting, installation of coffer dams,
trenching and backfilling, and in many cases, mechanized land-clearing.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts must be added together to determine the overall amount of
temporary linear impact.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
4. Losses and temporary impacts to waters of the US do not include:
a) Activities that do not require Department of the Army authorization, such as activities eligible for exemptions
under section 404(f) of the Clean Water Act.
b) Impacts to wetlands that are confined to the bed and banks of linear ditches provided the ditch is not located
in a wetland (see definition of linear ditch in Definitions, Section I).
5. The measurements of loss and temporary impact to waters of the US are for determining whether a project may
qualify for the RGP, and are not reduced by compensatory mitigation.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
No PCN is required prior to the start of work. The applicant must meet ALL the terms and conditions of this
permit.
Though a PCN is not required, an applicant may request a verification letter from the Corps to confirm the proposed work
would meet the terms and conditions of this permit. The PCN must be in writing and should utilize the Minnesota Joint
Waters Wetlands Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A
letter containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents;
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees);
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall proposed project
including activities that require Corps authorization but do not require PCN.
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss of waters and temporary
impacts expected to result from the proposed activity. Impacts to all waters of the US must be reported in acres
or square feet. In addition, tributary, pond, and lake impacts must also be reported in linear feet. A table may be
used to clearly and succinctly disclose this information (see Calculating Impacts to Waters of the United States,
Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale
3
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
f.
g.
h.
i.
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources must be identified by type (e.g. wetland, tributary, lake, man-made ditch, pond, etc.) and impacts must be
identified by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may
be required.
A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
If a waiver for a specific category or condition of the permit is proposed (e.g. duration of temporary impacts), the PCN
must include an explanation of the need for a waiver and why the applicant believes the impacts would result in
minimal individual and cumulative adverse environmental effects.
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site).
G. USE OF MULTIPLE RGP CATEGORIES (STACKING)
Activities authorized under the minor discharges RGP may not be combined or stacked with any other general permit
(nationwide, programmatic, or regional general permit) authorization. All regulated activities authorized by this permit
must be for one single and complete project that does not require an additional Corps permit(s).
H. GENERAL CONDITIONS
To qualify for minor discharges RGP authorization, the prospective permittee must comply with the following conditions,
as applicable, in addition to any category-specific requirements and project-specific conditions imposed by the Corps.
Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill must be properly maintained, including
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
2. Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
3. Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
1.
4
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
Endangered Species: No activity is authorized under this RGP which might affect a threatened or endangered species
or a species proposed for such designation, or critical habitat as identified under the Endangered Species Act (ESA), 50
CFR 402. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
Calcareous Fens: The permittee may not complete regulated activities in a calcareous fen, unless the Wisconsin
Department of Natural Resources has authorized the proposed regulated activity, or the Minnesota Department of
Natural Resources has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status.
Historic Properties, Cultural Resources: No activity which may affect historic properties listed or potentially eligible for
listing on the National Register of Historic Places is authorized. Rock or fill material used for activities authorized by
this permit must either be obtained from existing quarries or, if a new borrow site is excavated to obtain fill material,
the Corps must be notified prior to the use of the new site to determine whether a cultural resources survey of the
site is necessary.
Discovery of Previously Unknown Remains and Artifacts: If any previously unknown historic, cultural or archeological
remains and artifacts are discovered while accomplishing the activity authorized by this permit, the Corps must
immediately be notified of the findings. To the maximum extent practicable, construction activities must avoided that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized civil
works project.
Dam Safety: Regulated activities that may affect a dam must comply with applicable state dam safety criteria and be
designed by qualified persons.
Restoration of Temporary Impacts: All temporary impacts in waters of the US, including discharges resulting from side
casting material excavated from trenching, that occur as a result of the regulated activity must be fully contained with
appropriate erosion control or containment methods, be restored to preconstruction contours and elevations, and
revegetated with native, non-invasive vegetation. In temporarily excavated wetlands, the top 6 to 12 inches of the
excavation should normally be backfilled with topsoil originating from the wetland. No temporary excavation area,
including, but not limited to trenches, may be constructed or backfilled in such a manner as to drain waters of the
United States (e.g., backfilling with extensive gravel layers, creating a french drain effect).
Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and
limited to the smallest area and the shortest duration required to accomplish the project purpose. Temporary impacts
may not remain in place longer than 90 days between May 15 and November 15. Before those 90 days have elapsed
all temporary discharges must be removed in their entirety.
Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) must be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs must be
5
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
15. Culverts and Crossings: Replacement and installation of culverts or crossings authorized by a RGP are to follow (or be
restored to) the natural alignment and profile of the tributary. The culverts or bridges must adequately pass low flow
and bankfull events, bedload, sediment load, and provide site-appropriate fish and wildlife passage. Example design
elements include recessing single culverts to accommodate natural bankfull width and adjusting additional culvert
inverts at an elevation higher than the bankfull elevation.
16. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
17. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
18. Riprap: For RGP categories that allow for the use of riprap material for bank stabilization, only rock must be used
and it must be of a size sufficient to prevent its movement from the authorized alignment by natural forces under
normal or high flows.
19. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003, or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
20. Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
21. Navigation: No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the US. The permittee understands and agrees
that, if future operations by the United States require the removal, relocation, or other alteration, of the structure
or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the United
States on account of any such removal or alteration.
22. Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
23. Access Roads: Access roads must be sized appropriately and must be constructed in such a way to minimize
adverse effects on waters of the US and elevations must be as near as practicable to pre-construction contours
and elevations (e.g., at grade corduroy roads or geotextile/gravel roads). All access roads constructed in waters of
the US must be properly bridged or culverted to maintain surface flows.
24. Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner by
submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
6
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
_________________________________(Transferee)
___________________________________(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
Overall project: The aggregate of all single and complete projects (including both linear and non-linear regulated
activities) proposed by an applicant with regulated losses and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
7
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
Single and complete non-linear project: For non-linear projects, the term "single and complete project" is defined at 33
CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or partnership or other association
of owners/developers. A single and complete non-linear project must have independent utility. Single and complete nonlinear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a
multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project
that would be constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
Tribal lands: Any lands which is either: 1) held in trust by the United States for the benefit of any Indian tribe or individual;
or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For the purposes of this permit, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
J. FURTHER INFORMATION
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by
an RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a. This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b. This RGP does not grant any property rights or exclusive privileges;
c. This RGP does not authorize any injury to the property or rights of others; and
d. This RGP does not authorize interference with any existing or proposed federal project.
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; or
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a. The permittee fails to comply with the terms and conditions of this permit;
8
St. Paul District Corps of Engineers, Regulatory Branch
Minor Discharges Regional General Permit
b. The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c. Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this RGP at any time the circumstances warrant. Circumstances
that could require a reevaluation include, but are not limited to, significant new information surfaces which this office
did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination
that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.
9
Regional General Permit Public Notice Enclosure D
DEPARTMENT OF THE ARMY
PIERS AND DOCKS REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Piers and Docks Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED 02 January 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Piers and Docks General Permit (RGP). All regulated activities require an applicant to submit
pre-construction notification and receive written St. Paul District Corps of Engineers Regulatory Branch (Corps) verification
prior to commencing work. In addition, some RGP authorizations may be subject to project-specific special conditions that
will be specified in the Corps verification letter. Refer to the appropriate sections of this permit for a description of RGP
procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the Corps verification letter confirming a project complies with the terms and conditions of
this RGP, the time limit for completing work authorized by the permit ends upon the expiration date of the RGP. Activities
authorized under this RGP that have commenced construction or are under contract to commence construction in
reliance upon this RGP, will remain authorized provided the activity is completed within 12 months of the date of the RGP
expiration, suspension, or revocation; whichever is sooner.
Some RGP authorizations are not valid until a project proponent obtains a Clean Water Act Section 401 water quality
certification or waiver from the appropriate water quality certifying agency. In addition, some RGP authorizations may be
subject to project-specific special conditions that will be specified in the Corps verification letter. This RGP does not obviate
the need for other necessary federal, state, tribal, or local authorizations or permits.
B. PIERS AND DOCKS REGIONAL GENERAL PERMIT APPLICABILITY
The Piers and Docks RGP applies to certain activities in waters of the United States (US), including wetlands, as described
below, in the States of Wisconsin and Minnesota, including within the exterior boundaries of Indian Reservations.
1. Authorities: The Piers and Docks RGP regional general permit may be used to authorize activities pursuant to Section
404 of the Clean Water Act (33 U.S.C. 1344, Section 404) for discharges of dredged and fill material into waters of the US
and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403, Section 10) for work and structures that are located
in, under, or over any navigable water of the US. Activities subject to Section 404 and Section 10 regulatory requirements
are hereafter referred to as regulated activities.
2. Eligible Activities: Regulated activities associated with the construction, installation, and modification of piers, docks,
small rock cribs and ancillary features. Temporary structures, fills, and work, including the use of temporary mats,
necessary to accomplish these activities are also authorized.
3. Activity Restrictions:
a. Length: The pier or dock must only extend into the water from the shoreline out to the point where there is
adequate depth to accomplish the primary purpose of the pier or dock (e.g. for mooring a boat or using a boat
hoist or lift this is typically 3 feet in depth, fishing piers may require less depth).
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
b. Width: The width of the primary walkway (also referred to as the access dock) for a pier or dock may not exceed 6
feet for public piers and docks and 8 feet for public piers and docks.
c. Terminal sections of a pier or dock: (e.g. "L", "T", or "U" shaped pier section, boat shelter, boat hoist, or lift) may
not exceed 200 square feet, not including the area of the primary walkway.
d. Regulated activities associated with the construction, installation or modification of small rock cribs must be of
the minimum number and size and may not exceed 400 square feet. Rock cribs as pier or dock support must only
be used in waters where pilings are not a practicable alternative.
e. All structures and fills authorized by this category shall be designed, located, or operated in a manner which
would not impede public use of waterways.
f. No structures or fills authorized by this RGP may extend into a federal navigational channel or used to moor
vessels within a federal navigational channel.
g. All structures or fills authorized by this RGP must be designed to minimize disruption of flow and circulation
patterns and sediment transport.
4. Pre-Construction Notification (PCN): An applicant must submit pre-construction notification and receive written Corps
verification of Piers and Docks RGP coverage prior to starting work. See Section E. Pre-construction Notification (PCN)
Information for additional information.
C. PIERS AND DOCKS REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for Piers and Docks RGP authorization:
1. Regulated activities that would divert more than 10,000 gallons per day of surface or ground water into or out of
the Great Lakes Basin.
2. Regulated activities that may cause more than minimal adverse effects on tribal rights (including treaty rights),
protected tribal resources, or tribal lands.
3. Regulated activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general
permit.
4. Regulated activities that would cause the loss of more than 400 square feet of a tributary.
5. Regulated activities that would occur in a calcareous fen, unless the Wisconsin Department of Natural Resources
(WI DNR) has authorized the proposed regulated activity, or the Minnesota Department of Natural Resources
(MN DNR) has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
6. Regulated activities that would occur in a component of the National Wild and Scenic River System (St. Croix River
in Minnesota and Wisconsin or the Wolf River in Wisconsin), or in a river officially designated by Congress as a
"study river" for possible inclusion in the system while the river is in an official study status. This exclusion applies
unless the appropriate Federal agency with direct management responsibility for such river, has determined in
writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
7. Regulated activities which are likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species.
No regulated activity is authorized which "may affect" a listed species or critical habitat, unless ESA section 7
consultation addressing the effects of the proposed activity has been completed.
8. Regulated activities which may have the potential to cause effects to properties listed, or eligible for listing, in the
National Register of Historic Places, unless the requirements of Section 106 of the National Historic Preservation
Act (NHPA) have been satisfied.
9. Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because
they will alter or temporarily or permanently occupy or use a Corps federally authorized civil works project, unless
2
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
the appropriate Corps office issues the Section 408 permission to alter, occupy, or use Corps federally authorized
civil works project.
10. Regulated activities where applicants are unable to demonstrate that the structures comply with applicable
state dam safety criteria or have been designed by qualified persons.
11. Regulated activities which would adversely affect public water supplies.
D. CALCULATING LOSS OF WATERS OF THE UNITED STATES
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see Definitions,
Section I).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single and
complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from losses
of waters of the US and do not contribute to loss thresholds. Permanent adverse effects include filling, flooding,
excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse effects to
waters of the US include regulated activities that change a waterbody to dry land, increase the bottom elevation
of a waterbody (e.g. installation of riprap), decrease the bottom elevation of a waterbody (e.g. excavation of a
sedge meadow wetland to shallow marsh), or change the use of a waterbody.
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the overall amount of linear loss to waters of the US.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
3. Temporary impacts to waters of the US include the sum of all regulated impacts to waters of the US for a single
and complete project which are restored to preconstruction conditions after construction. Examples of
temporary impacts to waters of the US may include the placement of timber matting, installation of coffer dams,
trenching and backfilling, and in many cases, mechanized land-clearing.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts must be added together to determine the overall amount of
temporary linear impact.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
4. Losses and temporary impacts to waters of the US do not include: activities that do not require Department of the
Army authorization, such as activities eligible for exemptions under section 404(f) of the Clean Water Act.
5. The measurements of loss and temporary impact to waters of the US are for determining whether a project may
qualify for the RGP, and are not reduced by compensatory mitigation.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
Project proponents must obtain written Corps verification of Piers and Docks RGP coverage prior to starting work.
The PCN must include any and all other nationwide permits, programmatic general permits, regional general permits, or
individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity.
3
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
Timing of PCN: Where required by the terms of this RGP, the prospective permittee must notify the Corps by submitting
a PCN as early as possible. The Corps will determine if the PCN is complete within 30 calendar days of the date of receipt
and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day period to request
the additional information necessary to make the PCN complete. As a general rule, the Corps will request additional
information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all
of the requested information, then the Corps will notify the prospective permittee that the PCN is still incomplete and
the PCN review process will not commence until all of the requested information has been received by the Corps. The
prospective permittee shall not begin the activity until they are notified in writing by the Corps that the activity may
proceed under the RGP with any special conditions imposed by the Corps.
Form and Content of PCN: The PCN must be in writing and should utilize the Minnesota Joint Waters Wetlands
Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A letter
containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents;
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees);
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall proposed project
including activities that require Corps authorization but do not require PCN.
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss of waters and temporary
impacts expected to result from the proposed activity. Impacts to all waters of the US must be reported in acres
or square feet. In addition, tributary, pond, and lake impacts must also be reported in linear feet. A table may be
used to clearly and succinctly disclose this information (see Calculating Impacts to Waters of the United States,
Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
f. Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources must be identified by type (e.g. wetland, tributary, lake, man-made ditch, pond, etc.) and impacts must be
identified by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may
be required.
g. A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
h. If the proposed project would impact a calcareous fen, the PCN must include a copy of the WI DNR authorization for
the proposed regulated activity, or a copy of the approved MN DNR calcareous fen management plan specific to the
project.
i. If any federally-listed proposed, threatened or endangered species or proposed or designated critical habitat might
be affected or is in the vicinity of the activity the PCN must include the name(s) of those endangered or threatened
species that might be affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. Federal applicants or applicants that have federal funding (or whose project
otherwise involves a lead federal agency) must provide documentation demonstrating compliance with Section 7 of
the Endangered Species Act.
j. If the activity might have the potential to cause effects to an historic property listed on, eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property
might have the potential to be affected by the proposed activity and include a vicinity map indicating the location of
4
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
the historic property. Federal applicants or applicants that have federal funding (or whose project otherwise involves
a lead federal agency) must provide documentation demonstrating compliance with section 106 of the National
Historic Preservation Act.
k. If an activity is proposed in a component of the National Wild and Scenic River System (including the St. Croix River in
Minnesota and Wisconsin and the Wolf River in Wisconsin) or in a river officially designated by Congress as a "study
river" for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild
and Scenic River or the "study river."
l. The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
m. If a waiver for a specific category or condition of the permit is proposed (e.g. duration of temporary impacts), the PCN
must include an explanation of the need for a waiver and why the applicant believes the impacts would result in
minimal individual and cumulative adverse environmental effects.
n. For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because it will alter or
temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the
PCN must include a statement confirming if the project proponent has submitted a written request for Section 408
permission from the Corps office having jurisdiction over the Corps civil works project.
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). Mitigation includes actions which may avoid, minimize, rectify, reduce,
or compensate for adverse environmental effects or activities which may otherwise be contrary to the public interest.
The Corps may require compensatory mitigation to ensure that the activity results in no more than minimal adverse
environmental effects, or will not be contrary to the public interest. In reviewing the PCN for the proposed activity, the
Corps will determine whether the activity authorized by the RGP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by
a specific RGP, the Corps should issue the RGP verification for that activity if it meets the terms and conditions of that
RGP, unless the Corps determines, after considering mitigation, that the proposed activity will result in more than minimal
individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity.
Project proponents may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation.
When developing a compensatory mitigation proposal, the project proponent must consider appropriate and practicable
options consistent with the framework at 33 CFR 332.3(b). Compensatory mitigation projects provided to offset losses of
aquatic resources must comply with the applicable provisions of the current Corps policies, guidelines, and 33 CFR part
332.
G. USE OF MULTIPLE GENERAL PERMITS
Single and complete non-linear projects may not be ``piecemealed'' to avoid the limits in a general permit (nationwide,
programmatic, or regional general permit) authorization. When general permit limits are exceeded, single and complete
projects may be eligible for review and authorization by an individual permit.
Unless otherwise indicated by a specific general permit or general permit category, the use of more than one general
permit (nationwide, programmatic, or regional general permit) for a single and complete project is prohibited, except when
5
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
the acreage or linear foot loss of waters of the US authorized by the general permits does not exceed the loss limit of the
general permit with the highest specified acreage limit.
H. GENERAL CONDITIONS
To qualify for Piers and Docks RGP authorization, the prospective permittee must comply with the following conditions, as
applicable, in addition to any category-specific requirements and project-specific conditions imposed by the Corps.
1.
2.
3.
4.
5.
6.
Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill shall be properly maintained, including
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
Endangered Species:
a. No activity is authorized under this RGP which is likely to directly or indirectly jeopardize the continued existence
of a threatened or endangered species or a species proposed for such designation, as identified under the
Endangered Species Act (ESA), 50 CFR 402, or which will directly or indirectly destroy or adversely modify the
critical habitat of such species. No activity is authorized under this RGP which "may affect" a listed species or
critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed,
and a Corps RGP verification letter is issued. Direct effects are the immediate effects on listed species and critical
habitat caused by the RGP activity. Indirect effects are those effects on listed species and critical habitat that are
caused by the RGP activity and are later in time, but still are reasonably certain to occur.
b. As a result of formal or informal consultation with the FWS the Corps may add species-specific permit condition
to the RGP verification.
c. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
Calcareous Fens: The permittee may not complete regulated activities in a calcareous fen, unless the Wisconsin
Department of Natural Resources has authorized the proposed regulated activity, or the Minnesota Department of
Natural Resources has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
6
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
7.
8.
9.
10.
11.
12.
13.
Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with direct management
responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and
Scenic River designation or study status.
Historic Properties, Cultural Resources:
a. No activity which may affect historic properties listed or potentially eligible for listing on the National Register of
Historic Places is authorized until the Corps has complied with the requirements of Section 106 of the National
Historic Preservation Act. Federal project proponents should follow their own procedures for complying with the
requirements of Section 106 and provide documentation of compliance with those requirements.
b. Information on the location and existence of historic resources can be obtained from the State Historic
Preservation Office, Tribal Historic Preservation Offices, and the National Register of Historic Places.
c. Rock or fill material used for activities authorized by this permit must either be obtained from existing quarries or,
if a new borrow site is excavated to obtain fill material, the Corps must be notified prior to the use of the new site
to determine whether a cultural resources survey of the site is necessary.
Discovery of Previously Unknown Remains and Artifacts: If you discover any previously unknown historic, cultural or
archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately
notify the Corps of what you have found, and to the maximum extent practicable, avoid construction activities that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described in this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized
civil works project, unless the appropriate Corps office issues Section 408 permission to alter, occupy, or use the
Corps civil works project (pursuant to 33 U.S.C. 408), and the Corps issues written a RGP verification. Examples of
federal projects include but are not limited to works that were built by the Corps and are locally maintained (such as
local flood control projects) or operated and maintained by the Corps (such as locks and dams).
Dam Safety: Permittees are not authorized to begin regulated activities unless they are able to demonstrate that the
structures, when appropriate, comply with applicable state dam safety criteria or have been designed by qualified
persons. The Corps may require documentation that the design has been independently reviewed by similarly
qualified persons, and appropriate modifications are made to ensure safety.
Restoration of Temporary Impacts: All temporary impacts in waters of the US, including discharges resulting from side
casting material excavated from trenching, that occur as a result of the regulated activity must be fully contained with
appropriate erosion control or containment methods, be restored to preconstruction contours and elevations, and
revegetated with native, non-invasive vegetation. A project proponent may request, in writing, a waiver from this
condition from the Corps. An acceptable reason for a waiver to this condition may include, but is not limited to, the
Corps allowing natural restoration of the site when the resulting grade and existing seed bank are sufficient for the
site to restore to pre-construction conditions. In temporarily excavated wetlands, the top 6 to 12 inches of the
excavation should normally be backfilled with topsoil originating from the wetland. No temporary excavation area,
including, but not limited to trenches, may be constructed or backfilled in such a manner as to drain waters of the
United States (e.g., backfilling with extensive gravel layers, creating a french drain effect).
Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and
limited to the smallest area and the shortest duration required to accomplish the project purpose.
a. ACTIVITIES WITHOUT PCN REQUIREMENTS: Temporary impacts may not remain in place longer than 90 days
between May 15 and November 15. Before those 90 days have elapsed all temporary discharges must be
removed in their entirety. If the temporary impacts would remain in place for longer than 90 days between May
15 and November 15, a PCN is required and the activity is subject to the requirements and limitations described
in part B of this regional condition.
7
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
b. ACTIVITIES WITH PCN REQUIREMENTS:
The PCN must specify how long the temporary impact will remain and include a restoration plan showing how all
temporary fills and structures will be removed and the area restored to pre-project conditions. Unless otherwise
conditioned in a Corps RGP verification, temporary impacts: 1) are allowed to stay in place as long as specified in
the PCN; or 2) must be removed in their entirety in accordance with the plan described in the PCN.
14. Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) shall be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs shall be
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
15. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
16. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
17. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003; or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
18. Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
19. Navigation: No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the US. The permittee understands and agrees
that, if future operations by the United States require the removal, relocation, or other alteration, of the structure
or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the United
States on account of any such removal or alteration.
20. Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
21. Access Roads: Access roads must be sized appropriately and must be constructed in such a way to minimize adverse
effects on waters of the US and elevations must be as near as practicable to pre-construction contours and elevations
(e.g., at grade corduroy roads or geotextile/gravel roads). All access roads constructed in waters of the US must be
properly bridged or culverted to maintain surface flows.
22. Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner
by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
8
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
___________________________________
(Transferee)
___________________________________
(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
Overall project: The aggregate of all single and complete projects (including both linear and non-linear regulated
activities) proposed by an applicant with regulated losses and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
9
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
Single and complete non-linear project: For non-linear projects, the term "single and complete project" is defined at 33
CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or partnership or other association
of owners/developers. A single and complete non-linear project must have independent utility. Single and complete nonlinear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a
multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project
that would be constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without
limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty,
artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel,
piling, aid to navigation, or any other manmade obstacle or obstruction.
Tribal lands: Any lands which is either: 1) held in trust by the United States for the benefit of any Indian tribe or individual;
or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For the purposes of this permit, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
Waiver: An approval from the Corps which allows an applicant to exceed the activity restrictions or conditions described
in an RGP. Waivers may only be considered when expressly indicated as available in an RGP and will only be granted once
the Corps has made a written determination that the RGP activity will result in only minimal individual and cumulative
adverse environmental effects. When a waiver is required, an applicant cannot start work until they have received a RGP
verification letter with waiver approval.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
J. FURTHER INFORMATION
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by
an RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a. This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b. This RGP does not grant any property rights or exclusive privileges;
c. This RGP does not authorize any injury to the property or rights of others; and
d. This RGP does not authorize interference with any existing or proposed federal project.
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
10
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; or
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a. The permittee fails to comply with the terms and conditions of this permit;
b. The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c. Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this RGP at any time the circumstances warrant. Circumstances
that could require a reevaluation include, but are not limited to, significant new information surfaces which this office
did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination
that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.
K. CORPS DECISION
In reviewing the PCN for the proposed activity, the Corps will determine whether the activity authorized by the RGP will
result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public
interest. If a project proponent requests authorization by a specific RGP, the Corps should issue the RGP verification for
that activity if it meets the terms and conditions of that RGP, unless the Corps determines, after considering mitigation,
that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic
environment and other aspects of the public interest and exercises discretionary authority to require an individual permit
for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of
waters of the United States to determine whether they individually satisfy the terms and conditions of the RGPs, as well as
the cumulative effects caused by all of the crossings authorized by RGP. If an applicant requests a waiver for any limit
where waivers are indicated as available, the Corps will only grant the waiver upon a written determination that the RGP
activity will result in only minimal individual and cumulative adverse environmental effects.
When making minimal adverse environmental effects determinations the Corps will consider the direct and indirect
effects caused by the RGP activity. The Corps will also consider the cumulative adverse environmental effects caused by
activities authorized by the RGP and whether those cumulative adverse environmental effects are no more than minimal.
The Corps will consider site specific factors, such as the environmental setting in the vicinity of the RGP activity, the type
of resource that will be affected by the RGP activity, the functions provided by the aquatic resources that will be affected
by the RGP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that
11
St. Paul District Corps of Engineers, Regulatory Branch
Piers and Docks Regional General Permit
aquatic resource functions will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g.,
watershed or ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
The Corps will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in
the proposal to inform decisions regarding whether the net adverse environmental effects of the proposed activity are no
more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the Corps determines
that the activity complies with the terms and conditions of the RGP and that the adverse environmental effects are no
more than minimal, after considering mitigation, the Corps will notify the permittee and include any activity specific
conditions in the RGP verification the Corps deems necessary. Conditions for compensatory mitigation requirements must
comply with the appropriate provisions at 33 CFR 332.3(k). When compensatory mitigation is required, the Corps must
approve the final mitigation plan before the permittee commences work in waters of the United States, unless the Corps
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion
of the required compensatory mitigation. If the Corps determines that the adverse environmental effects of the proposed
activity are more than minimal, then the Corps will notify the applicant of next steps as described in 33 CFR 325.2.
12
Regional General Permit Public Notice Enclosure E
DEPARTMENT OF THE ARMY
PREVIOUSLY FILLED NAVIGABLE WATERS REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Previously Filled Navigable Waters Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED January 2, 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Previously Filled Navigable Waters Regional General Permit (RGP). All regulated activities
require an applicant to submit pre-construction notification and receive written St. Paul District Corps of Engineers
Regulatory Branch (Corps) verification prior to commencing work. In addition, some RGP authorizations may be subject to
project-specific special conditions that will be specified in the Corps verification letter. Refer to the appropriate sections
of this permit for a description of RGP procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the Corps verification letter confirming a project complies with the terms and conditions of
this RGP, the time limit for completing work authorized by the permit ends upon the expiration date of the RGP. Activities
authorized under this RGP that have commenced construction or are under contract to commence construction in
reliance upon this RGP, will remain authorized provided the activity is completed within 12 months of the date of the RGP
expiration, suspension, or revocation; whichever is sooner.
Some RGP authorizations may be subject to project-specific special conditions that will be specified in the Corps verification
letter. This RGP does not obviate the need for other necessary federal, state, tribal, or local authorizations or permits.
B. PREVIOUSLY FILLED NAVIGABLE WATERS REGIONAL GENERAL PERMIT APPLICABILITY
The Previously Filled Navigable Waters RGP applies to certain activities in navigable waters of the United States (US) as
described below, in the States of Wisconsin and Minnesota, including within the exterior boundaries of Indian
Reservations.
1. Authority: Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403, Section 10) for work and structures that are
located in, under, or over any navigable water of the US, hereafter referred to as regulated activities.
2. Eligible Activities: Regulated activities in navigable waters of the US previously converted to dry land (also referred to
as "fast land") as part of a previous authorization, provided the work does not affect the course, location, or condition of
the waterbody in such a manner as to impact its navigable capacity. This RGP may not be used to authorize any activity
which requires a Section 404 Clean Water Act (33 U.S.C. 1344) permit.
3. Activity Restrictions: the activities above must not exceed the following limits.
a. The work shall not extend or expand the previously authorized areal footprint of navigable waters of the US
converted to dry land.
b. Regulated work in waters of the US not previously converted to dry land are ineligible for authorization by this
RGP.
4. Pre-Construction Notification (PCN): All activities eligible for authorization by the Previously Filled Navigable Waters
RGP require submittal of a PCN and written Corps verification of coverage prior to starting work. Please refer to Section E
below for additional information regarding PCN requirements.
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
C. PREVIOUSLY FILLED NAVIGABLE WATERS REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for Previously Filled Land RGP authorization:
1. Regulated activities that would divert more than 10,000 gallons per day of surface or ground water into or out of
the Great Lakes Basin.
2. Regulated activities that may cause more than minimal adverse effects on tribal rights (including treaty rights),
protected tribal resources, or tribal lands.
3. Regulated activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general
permit.
4. Regulated activities that would occur in a component of the National Wild and Scenic River System (St. Croix River
in Minnesota and Wisconsin and the Wolf River in Wisconsin), or in a river officially designated by Congress as a
"study river" for possible inclusion in the system while the river is in an official study status. This exclusion applies
unless the appropriate Federal agency with direct management responsibility for such river has determined in
writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
5. Regulated activities which are likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such
species. No regulated activity is authorized which "may affect" a listed species or critical habitat, unless ESA
Section 7 consultation addressing the effects of the proposed activity has been completed.
6. Regulated activities which may have the potential to cause effects to properties listed, or eligible for listing, in the
National Register of Historic Places, unless the requirements of Section 106 of the National Historic Preservation
Act (NHPA) have been satisfied.
7. Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because
they will alter or temporarily or permanently occupy or use a Corps federally authorized civil works project, unless
the appropriate Corps office issues the Section 408 permission to alter, occupy, or use the Corps federally
authorized civil works project.
8. Regulated activities which would adversely affect public water supplies.
D. CALCULATING IMPACTS TO WATERS OF THE UNITED STATES
This section describes the impact calculations the Corps generally uses to verify that an RGP meets the stated restrictions
in Section B above. Components 2.b and 3.b below are applicable to the Previously Filled Navigable Waters RGP.
However, projects where the Previously Filled Navigable Waters RGP activity is one component of a larger project
requiring Corps authorization, project proponents may be required to submit a tabulation of more varied impacts than
required by the Previously Filled Navigable Waters RGP alone. See Section G below for more information regarding the
use of multiple general permits.
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see the Definitions
section I below).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single
and complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from
losses of waters of the US, and do not contribute to loss thresholds. Permanent adverse effects include filling,
flooding, excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse
effects to waters of the US include regulated activities that change a waterbody to dry land, increase the bottom
elevation of a waterbody, or decrease the bottom elevation of a waterbody (e.g. excavation of a sedge meadow
wetland to shallow marsh), or change the use of a waterbody.
2
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the total amount of linear loss to waters of the US.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability section B, or in Pre-Construction Notification
Information section E.
3. Temporary impacts to waters of the US include the sum of all regulated activities in jurisdictional waterbodies at a
single and complete location which are restored to pre-construction conditions. Examples of temporary impacts
in waters of the US include the placement of timber matting, temporary stockpiling of dredged material,
trenching and backfilling, and in many cases - mechanized land-clearing in waters of the US.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts are added together to determine the total amount of temporary
linear impact.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability section B, or in Pre-Construction Notification
Information section E.
4. Losses and temporary impacts to waters of the US do not include activities that do not require Department of the
Army authorization, such as activities eligible for exemptions under section 404(f) of the Clean Water Act.
5. The measurements of loss and temporary impact to waters of the US are threshold measurements to
jurisdictional waters for determining whether a project may qualify for an RGP. These measures are not a net
threshold that is calculated after considering compensatory mitigation that may be used to offset losses of
aquatic functions and services.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
All Previously Filled Navigable Waters RGP activities require PCN. The PCN must include all other nationwide permits,
programmatic general permits, RGPs, or individual permits used or intended to be used to authorize any part of the
overall project, including other regulated activities that require Corps authorization but do not require PCN.
Before starting regulated work, project proponents must obtain written Corps verification of Previously Filled
Navigable Waters RGP coverage for all activities.
1. Timing of PCN: The prospective permittee must notify the Corps by submitting a PCN as early as possible. The Corps
will determine if the PCN is complete within 30 calendar days of the date of receipt and, if the PCN is determined to be
incomplete, notify the prospective permittee within that 30 day period to request the additional information necessary
to make the PCN complete. As a general rule, the Corps will request additional information necessary to make the PCN
complete only once. However, if the prospective permittee does not provide all of the requested information, then the
Corps will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not
commence until all of the requested information has been received by the Corps. The prospective permittee shall not
begin the activity until they are notified in writing by the Corps that the activity may proceed under the RGP with any
special conditions imposed by the Corps.
3
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
2. Form and Content of PCN: The PCN must be in writing and should utilize the Minnesota Joint Waters Wetlands
Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A letter
containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents.
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees).
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall project, including
activities that require Corps authorization but do not require PCN.
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss and temporary impact to
waters of the US expected to result from the proposed activity. Impacts to all waters of the US must be reported
in acres or square feet. In addition, tributary, pond, and lake impacts must also be reported in linear feet. A table
may be used to clearly and succinctly disclose this information (see Calculating Impacts to Water of the United
States, Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale bar
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
f. Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources shall be identified by type (e.g. wetland, tributary, lake, man-made ditch, pond, etc.) and impacts shall be
identified by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may
be required.
g. A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
h. If any federally-listed proposed, threatened or endangered species or proposed or designated critical habitat might
be affected or is in the vicinity of the activity, the PCN must include the name(s) of those endangered or threatened
species that might be affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. Federal applicants or applicants that have federal funding (or whose project
otherwise involves a lead federal agency) must provide documentation demonstrating compliance with Section 7 of
the Endangered Species Act.
i. If the activity might have the potential to cause effects to an historic property listed on, eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property
might have the potential to be affected by the proposed activity and include a vicinity map indicating the location of
the historic property. Federal applicants or applicants that have federal funding (or whose project otherwise involves
a lead federal agency) must provide documentation demonstrating compliance with Section 106 of the National
Historic Preservation Act.
j. If an activity is proposed in a component of the National Wild and Scenic River System (including the St. Croix River in
Minnesota and Wisconsin and the Wolf River in Wisconsin) or in a river officially designated by Congress as a "study
river" for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild
and Scenic River or the "study river."
k. The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
l. If a waiver from for a specific condition of the permit is proposed (e.g. General Condition 12), the PCN must include
an explanation of the need for a waiver and why the applicant believes the impacts would result in minimal individual
and cumulative adverse environmental effects.
4
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
m. For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because it will alter or
temporarily or permanently occupy or use a Corps federally authorized civil works project, the PCN must include a
statement confirming if the project proponent has submitted a written request for Section 408 permission from the
Corps office having jurisdiction over the Corps civil works project.
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). Mitigation includes actions which may avoid, minimize, rectify, reduce,
or compensate for adverse environmental effects or activities which may otherwise be contrary to the public interest.
The Corps may require compensatory mitigation to ensure that the activity results in no more than minimal adverse
environmental effects, or will not be contrary to the public interest. In reviewing the PCN for the proposed activity, the
Corps will determine whether the activity authorized by the RGP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by
a specific RGP, the Corps should issue the RGP verification for that activity if it meets the terms and conditions of that
RGP, unless the Corps determines, after considering mitigation, that the proposed activity will result in more than minimal
individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity.
Project proponents may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation.
When developing a compensatory mitigation proposal, the project proponent must consider appropriate and practicable
options consistent with the framework at 33 CFR 332.3(b). Compensatory mitigation projects provided to offset losses of
aquatic resources must comply with the applicable provisions of the current Corps policies, guidelines, and 33 CFR part
332.
G. USE OF MULTIPLE GENERAL PERMITS (STACKING)
Single and complete non-linear projects may not be ``piecemealed'' to avoid the limits in a general permit (nationwide,
programmatic, or regional general permit) authorization. When general permit limits are exceeded, single and complete
projects may be eligible for review and authorization by an individual permit.
Unless otherwise indicated by a specific general permit or general permit category, the use of more than one general
permit (nationwide, programmatic, or regional general permit) for a single and complete project is prohibited, except
when the acreage or linear foot loss of waters of the US authorized by the general permit does not exceed the acreage
limit of the general permit with the highest specified acreage limit.
H. GENERAL CONDITIONS
To qualify for Previously Filled Land RGP authorization, the prospective permittee must comply with the following
conditions, as applicable, in addition to all applicable Previously Filled Navigable Waters RGP terms and requirements, and
all project-specific conditions imposed by the Corps.
1.
Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
5
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill shall be properly maintained, including
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
2.
3.
4.
5.
6.
7.
Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
Endangered Species:
a. No activity is authorized under this RGP which is likely to directly or indirectly jeopardize the continued existence
of a threatened or endangered species or a species proposed for such designation, as identified under the
Endangered Species Act (ESA), 50 CFR 402, or which will directly or indirectly destroy or adversely modify the
critical habitat of such species. No activity is authorized under the Previously Filled Navigable Waters RGP which
"may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the
proposed activity has been completed, and a Corps RGP verification letter is issued. Direct effects are the
immediate effects on listed species and critical habitat caused by the RGP activity. Indirect effects are those
effects on listed species and critical habitat that are caused by the RGP activity and are later in time, but still are
reasonably certain to occur.
b. As a result of formal or informal consultation with the FWS the Corps may add species-specific permit condition
to the RGP verification.
c. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with direct management
responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and
Scenic River designation or study status.
Historic Properties, Cultural Resources:
a. No activity which may affect historic properties listed or potentially eligible for listing on the National Register of
Historic Places is authorized until the Corps has complied with the requirements of Section 106 of the National
Historic Preservation Act. Federal project proponents should follow their own procedures for complying with the
requirements of Section 106 and provide documentation of compliance with those requirements.
b. Information on the location and existence of historic resources can be obtained from the State Historic
Preservation Office, Tribal Historic Preservation Offices, and the National Register of Historic Places.
6
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
c. Rock or fill material used for activities authorized by this permit must either be obtained from existing quarries or,
if a new borrow site is excavated to obtain fill material, the Corps must be notified prior to the use of the new site
to determine whether a cultural resources survey of the site is necessary.
8. Discovery of Previously Unknown Remains and Artifacts: If you discover any previously unknown historic, cultural or
archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately
notify the Corps of what you have found, and to the maximum extent practicable, avoid construction activities that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
9. Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described in this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized
civil works project, unless the appropriate Corps office issues Section 408 permission to alter, occupy, or use the
Corps civil works project (pursuant to 33 U.S.C. 408), and the Corps issues written a Previously Filled Navigable Waters
RGP verification. Examples of federal projects include but are not limited to works that were built by the Corps and
are locally maintained (such as local flood control projects) or operated and maintained by the Corps (such as locks
and dams).
10. Dam Safety: Permittees are not authorized to begin regulated activities unless they are able to demonstrate that the
structures, when appropriate, comply with applicable state dam safety criteria or have been designed by qualified
persons. The Corps may require documentation that the design has been independently reviewed by similarly
qualified persons, and appropriate modifications are made to ensure safety.
11. Restoration of Temporary Impacts: All temporary impacts in waters of the US, including discharges resulting from side
casting material excavated from trenching, that occur as a result of the regulated activity must be fully contained with
appropriate erosion control or containment methods, be restored to preconstruction contours and elevations, and
revegetated with native, non-invasive vegetation. A project proponent may request, in writing, a waiver from this
condition from the Corps. An acceptable reason for a waiver to this condition may include, but is not limited to, the
Corps allowing natural restoration of the site when the resulting grade and existing seed bank are sufficient for the
site to restore to pre-construction conditions. In temporarily excavated wetlands, the top 6 to 12 inches of the
excavation should normally be backfilled with topsoil originating from the wetland. No temporary excavation area,
including, but not limited to trenches, may be constructed or backfilled in such a manner as to drain waters of the
United States (e.g., backfilling with extensive gravel layers, creating a french drain effect).
12. Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and
limited to the smallest area and the shortest duration required to accomplish the project purpose. Unless otherwise
conditioned in a Corps RGP verification, temporary impacts: 1) are allowed to stay in place as long as specified in the
PCN; or 2) must be removed in their entirety in accordance with the plan described in the PCN.
13. Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) shall be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs shall be
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
14. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
15. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
7
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
16. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
17.
18.
19.
20.
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003; or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
Navigation: No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the US. The permittee understands and agrees
that, if future operations by the United States require the removal, relocation, or other alteration, of the structure
or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the United
States on account of any such removal or alteration.
Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner
by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
___________________________________
(Transferee)
___________________________________
(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
8
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
Overall project: The aggregate of all single and complete projects (linear and non-linear) proposed with regulated losses
and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
Single and complete linear project: A linear project is a project constructed for the purpose of getting people, goods, or
services from a point of origin to a terminal point, which often involves multiple crossings of one or more waterbodies at
separate and distant locations. The term "single and complete project" is defined as that portion of the overall linear
project proposed or accomplished by one owner/developer or partnership or other association of owners/developers that
includes all crossings of a single water of the US (i.e., a single waterbody) at a specific location. For linear projects crossing
a single or multiple waterbodies several times at separate and distant locations, each crossing is considered a single and
complete project for purposes of this general permit authorization. However, individual channels in a braided stream or
river, or individual arms of a large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of
such features cannot be considered separately. The definition of "single and complete linear project" does not include the
term "independent utility" because each crossing of waters of the US is needed for the single and complete linear project
to fulfill its purpose of transporting people, goods, and services from the point of origin to the terminal point.
Single and complete non-linear project: For non-linear projects, the term "single and complete project" is defined at 33
CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or partnership or other association
of owners/developers. A single and complete non-linear project must have independent utility. Single and complete nonlinear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a
multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project
9
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
that would be constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
Tribal lands: Any lands which are either: 1) held in trust by the United States for the benefit of any Indian tribe or
individual; or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For purposes of this RGP, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
Waiver: An approval from the Corps which allows an applicant to exceed the activity restrictions or conditions described
in an RGP. Waivers may only be considered when expressly indicated as available in an RGP and will only be granted once
the Corps has made a written determination that the RGP activity will result in only minimal individual and cumulative
adverse environmental effects. When a waiver is required, an applicant cannot start work until they have received a RGP
verification letter with waiver approval.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
J. FURTHER INFORMATION
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by a
RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a. This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b. This RGP does not grant any property rights or exclusive privileges;
c. This RGP does not authorize any injury to the property or rights of others; and
d. This RGP does not authorize interference with any existing or proposed federal project.
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; or
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a. The permittee fails to comply with the terms and conditions of this permit;
10
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
b. The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c. Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this Previously Filled Land RGP at any time the circumstances
warrant. Circumstances that could require a reevaluation include, but are not limited to, significant new information
surfaces which this office did not consider in reaching the original public interest decision. Such a reevaluation may
result in a determination that it is appropriate to use the suspension, modification, and revocation procedures
contained in 33 CFR 325.
K. CORPS DECISION
In reviewing the PCN for the proposed activity, the Corps will determine whether the activity authorized by the RGP will
result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public
interest. If a project proponent requests authorization by a specific RGP, the Corps should issue the RGP verification for
that activity if it meets the terms and conditions of that RGP, unless the Corps determines, after considering mitigation,
that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic
environment and other aspects of the public interest and exercises discretionary authority to require an individual permit
for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of
waters of the United States to determine whether they individually satisfy the terms and conditions of the RGPs, as well as
the cumulative effects caused by all of the crossings authorized by RGP.
If an applicant requests a waiver for any limit where waivers are indicated as available, the Corps will only grant the waiver
upon a written determination that the RGP activity will result in only minimal individual and cumulative adverse
environmental effects.
When making minimal adverse environmental effects determinations the Corps will consider the direct and indirect
effects caused by the RGP activity. The Corps will also consider the cumulative adverse environmental effects caused by
activities authorized by the RGP and whether those cumulative adverse environmental effects are no more than minimal.
The Corps will consider site specific factors, such as the environmental setting in the vicinity of the RGP activity, the type
of resource that will be affected by the RGP activity, the functions provided by the aquatic resources that will be affected
by the RGP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that
aquatic resource functions will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g.,
watershed or ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
The Corps will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in
the proposal to inform decisions regarding whether the net adverse environmental effects of the proposed activity are no
more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the Corps determines
11
St. Paul District Corps of Engineers, Regulatory Branch
Previously Filled Navigable Waters Regional General Permit
that the activity complies with the terms and conditions of the RGP and that the adverse environmental effects are no
more than minimal, after considering mitigation, the Corps will notify the permittee and include any activity specific
conditions in the RGP verification the Corps deems necessary. Conditions for compensatory mitigation requirements must
comply with the appropriate provisions at 33 CFR 332.3(k). When compensatory mitigation is required, the Corps must
approve the final mitigation plan before the permittee commences work in waters of the United States, unless the Corps
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion
of the required compensatory mitigation. If the Corps determines that the adverse environmental effects of the proposed
activity are more than minimal, then the Corps will notify the applicant of next steps as described in 33 CFR 325.
12
Regional General Permit Public Notice Enclosure F
DEPARTMENT OF THE ARMY
TRANSPORTATION REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Transportation Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED January 2, 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Transportation General Permit (RGP). Certain regulated activities require an applicant to
submit pre-construction notification and receive written St. Paul District Corps of Engineers Regulatory Branch (Corps)
verification prior to commencing work. In addition, some RGP authorizations may be subject to project-specific special
conditions that will be specified in the Corps verification letter. Refer to the appropriate sections of this permit for a
description of RGP procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the Corps verification letter confirming a project complies with the terms and conditions of
this RGP, the time limit for completing work authorized by the permit ends upon the expiration date of the RGP. Activities
authorized under this RGP that have commenced construction or are under contract to commence construction in
reliance upon this RGP, will remain authorized provided the activity is completed within 12 months of the date of the RGP
expiration, suspension, or revocation; whichever is sooner.
Some RGP authorizations are not valid until a project proponent obtains a Clean Water Act Section 401 water quality
certification or waiver from the appropriate water quality certifying agency. In addition, some RGP authorizations may be
subject to project-specific special conditions that will be specified in the Corps verification letter. This RGP does not obviate
the need for other necessary federal, state, tribal, or local authorizations or permits.
B. TRANSPORTATION REGIONAL GENERAL PERMIT APPLICABILITY
The Transportation Regional General Permit (RGP or permit) applies to certain transportation associated activities in
waters of the United States (US), including wetlands, as described in this permit, in the States of Wisconsin and
Minnesota, including within the exterior boundaries of Indian Reservations.
Authorities: The Transportation RGP may be used to authorize these activities pursuant to Section 404 of the Clean Water
Act (33 U.S.C. 1344, Section 404) for discharges of dredged and fill material into waters of the US and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. 403, Section 10) for work and structures that are located in, under, or over any
navigable water of the US. Activities subject to Section 404 and Section 10 regulatory requirements are hereafter
referred to as regulated activities.
CATEGORY 1: MINOR MAINTENANCE - LINEAR TRANSPORTATION
Eligible Activities: Regulated activities required for crossings of waters of the US associated with minor repairs,
rehabilitation, or replacement of a previously authorized 1 currently serviceable linear transportation project provided that
the structure or fill is not to be put to uses differing from those uses specified or contemplated in the original permit or
the most recently authorized modification. Activities associated with tributary channelization, slope widening, road
widening, new lanes or trails, or new stormwater ponds are NOT authorized by this category. Activities authorized by this
category include:
1
Previously authorized under 33 CFR 330.3 or by a Corps permit
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
(1) Minor deviations in a culvert or bridge configuration or filled area due to changes in materials, construction
techniques, requirements of other regulatory agencies, or current construction codes, site conditions, or
safety standard, including and limited to: the repair of a culverts, aprons or bridge piles, lining or cleaning of
pipes, culverts or bridges, extension of culverts without shoulder widening, upsizing of culverts or flumes,
maintenance of existing stream bank protection (not to expand original footprint), resetting or re-tying of
aprons and culverts, and apron placements 2, including the use of temporary discharges, necessary to conduct
those activities;
(2) Removal of previously authorized structures or fills, including temporary discharges necessary to conduct
those activities;
(3) Repair, rehabilitation, or replacement of structures or fills destroyed or damaged by storms, floods, fire or
other discrete events, provided the repair, rehabilitation, or replacement is commenced, or is under contract
to commence, within two years of the date of their destruction or damage, including temporary discharges
necessary to conduct those activities; and
(4) Removal of accumulated sediment and debris within the vicinity of bridges and culverted road crossings,
including temporary discharges necessary to conduct those activities.
Activity restrictions:
a) Removal of accumulated sediment and debris is limited to the minimum necessary to restore the waterway in the
vicinity of the structure to the approximate dimensions that existed when the structure was built and does not extend
farther than 200 feet in any direction from the structure.
b) All dredged or excavated materials is deposited and retained in an area that is not a water of the US.
c) All tributary channel modifications are limited to the minimum necessary for the repair, rehabilitation, or replacement
of the structure or fill. Modifications, including the removal of material from the tributary, must be immediately
adjacent to the structure or fill. All dredged or excavated material must be deposited and retained in an area that is
not a water of the US unless otherwise specifically approved by the Corps under separate authorization.
No PCN is required unless triggered by the terms and condition of this permit (See Section E. Pre-Construction Notification).
CATEGORY 2: MODIFICATION - LINEAR TRANSPORTATION
Eligible Activities: Regulated activities required for crossings of waters of the US associated with the expansion,
modification, improvement or minor realignments of an existing linear transportation project (e.g., roads, highways,
railways, trails, airport runways, and taxiways) the temporary structures, fills, and work, including the use of temporary
mats, necessary for those activities.
Activity restrictions:
a) Regulated activities cannot cause the loss of greater than 1.0 acre of waters of the US for each single and complete
project, including the area of tributary loss (see definition of single and complete linear project).
b) If the overall project (including all single and complete projects) would result in the loss of 3.0 acres or less of waters
of the US, including the area of tributary loss, the 1.0 acre limit at each single and complete crossing does not apply.
c) All tributary channel modifications, including bank stabilization, are limited to the minimum necessary to construct or
protect the linear transportation project and cannot exceed 300 linear feet 3 for each single and complete project,
unless the Corps waives the 300 linear foot limit by making a written determination concluding that the discharge will
2
The undertaking of these activities does not always result in a discharge or require a Corps permit. This RGP category authorizes the
repair, rehabilitation, or replacement of previously authorized structures or fills that do not qualify for the Clean Water Act section
404(f) exemption for maintenance.
3
When calculating loss of a tributary for a culvert replacement, the linear foot length of the existing culvert does not count toward the
300 linear foot limit. Rip-rap and other tributary impacts count towards the tributary modification limit. See Section D. Calculating
Impacts to Waters of the United States for more information.
2
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
result in no more than minimal adverse environmental effects. An applicant may request, in writing, a waiver from the
Corps.
An applicant must submit a PCN for the overall linear project proposed:
i. If a single and complete project exceeds 0.1 acre of loss of waters of the US;
ii. If the overall linear project (including all single and complete activities) exceeds 10,000 square feet of loss of waters of
the US;
iii. If the single and complete project exceeds 0.5 acres of temporary impact to waters of the US;
iv. If temporary impacts in waters of the US would remain in place longer than 90 days between May 15 and November
15;
v. If a waiver from the 300 linear foot limit tributary threshold is requested by an applicant;
vi. If triggered by the project's location or potential impacts as described in Section E. Pre-Construction Notification.
CATEGORY 3: NEW CONSTRUCTION - LINEAR TRANSPORTATION
Eligible Activities: Regulated activities required for crossings of waters of the US associated with the construction of a
linear transportation project (e.g., roads, highways, railways, trails, airport runways, and taxiways). Examples of eligible
activities include: discharges for the construction of: (1) new roads or major realignments of existing roadways; (2) new
railroad spurs or tracks; (3) new or detached frontage roads; (4) new airport runways; (5) new trails; (6) associated linear
infrastructure for those new construction projects, and (7) temporary structures, fills, and work, including the use of
temporary mats, necessary for activities 1-6.
Activity restrictions:
a) Regulated activities cannot cause the loss of greater than 0.5 acre of waters of the US for each single and complete
project, including the area of tributary loss (see definition of single and complete linear project).
b) All tributary channel modification, including bank stabilization, are limited to the minimum necessary to construct or
protect the linear transportation project and cannot exceed 300 linear feet for each single and complete project,
unless the Corps waives the 300 linear foot limit by making a written determination concluding that the discharge will
result in no more than minimal adverse environmental effects. An applicant may request, in writing, a waiver from the
Corps.
An applicant must submit a PCN for the overall linear project proposed:
i. If a single and complete project exceeds 400 square feet of loss of waters of the US; or
ii. If a single and complete project exceeds 0.5 acre of temporary impact to waters of the US; or
iii. If temporary impacts in waters of the US would remain in place longer than 90 days between May 15 and November
15;
iv. If a waiver from the 300 linear foot tributary limit is requested by an applicant; or
v. If triggered by the project's location or potential impacts as described in Section E. Pre-Construction Notification.
CATEGORY 4: NON- LINEAR TRANSPORTATION PROJECTS
Eligible Activities: Regulated activities in waters of the US associated with the construction or expansion of non-linear
features associated with transportation projects, including the use of temporary discharges necessary to conduct those
activities. Such projects may include: vehicle maintenance or storage buildings, weigh stations, rest-stops, parking lots,
train stations, aircraft hangars, and associated infrastructure, including storm water management facilities.
Activity restrictions:
a) Regulated activities cannot cause the loss of greater than 0.5 acre of waters of the US, including the area of tributary
loss (see definition of single and complete non-linear project).
b) The discharge must not cause the loss of greater than 300 linear feet of a tributary, unless the Corps waives the 300
linear foot limit by making a written determination concluding that the discharge will result in no more than minimal
3
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
adverse environmental effects (see definition of single and complete non-linear project). An applicant may request, in
writing, a waiver from the Corps.
An applicant must submit a PCN:
i. If the single and complete project exceeds 0.1 acre of loss of waters of the US;
ii. If the single and complete project exceeds 0.5 acre of temporary impact to waters of the US;
iii. If temporary impacts in waters of the US would remain in place longer than 90 days between May 15 and November
15;
iv. If a waiver from the 300 linear foot limit tributary threshold is requested by an applicant; or
v. If triggered by the project's location or potential impacts as described in Section E. Pre-Construction Notification.
CATEGORY 5: TRANSPORTATION SURVEYING
Eligible Activities: Regulated temporary activities in waters of the US associated with surveying activities, such as core
sampling, exploratory-type bore holes, exploratory trenching, soil surveys, sampling, sample plots or transects for wetland
delineations, historic resources surveys, and temporary access roads necessary to perform those activities. Regulated
activities for the recovery of historic resources and losses of waters of the US are not authorized.
Activity restrictions: Bore holes must be properly sealed following completion of survey activities.
An applicant must submit a PCN for the overall project proposed:
i. If the single and complete project exceeds 0.5 acre of temporary impact to waters of the US or
ii. If triggered by the project's location or potential impacts as described in Section E. Pre-Construction Notification.
C. TRANSPORTATION REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for Transportation RGP authorization:
1. Regulated activities that would divert more than 10,000 gallons per day of surface or ground water into or out of
the Great Lakes Basin.
2. Regulated activities that may cause more than minimal adverse effects on tribal rights (including treaty rights),
protected tribal resources, or tribal lands.
3. Regulated activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general
permit.
4. Regulated activities that would occur in a calcareous fen, unless the Wisconsin Department of Natural Resources
(WI DNR) has authorized the proposed regulated activity, or the Minnesota Department of Natural Resources
(MN DNR) has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
5. Regulated activities that would occur in a component of the National Wild and Scenic River System (St. Croix River
in Minnesota and Wisconsin or the Wolf River in Wisconsin), or in a river officially designated by Congress as a
"study river" for possible inclusion in the system while the river is in an official study status. This exclusion applies
unless the appropriate Federal agency with direct management responsibility for such river, has determined in
writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
6. Regulated activities which are likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species.
No regulated activity is authorized which "may affect" a listed species or critical habitat, unless ESA section 7
consultation addressing the effects of the proposed activity has been completed.
7. Regulated activities which may have the potential to cause effects to properties listed, or eligible for listing, in the
National Register of Historic Places, unless the requirements of Section 106 of the National Historic Preservation
Act (NHPA) have been satisfied.
4
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
8. Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because
they will alter or temporarily or permanently occupy or use a Corps federally authorized civil works project, unless
the appropriate Corps office issues the Section 408 permission to alter, occupy, or use Corps federally authorized
civil works project.
9. Regulated activities where applicants are unable to demonstrate that the structures comply with applicable
state dam safety criteria or have been designed by qualified persons.
10. Regulated activities which would adversely affect public water supplies.
D. CALCULATING IMPACTS TO WATERS OF THE UNITED STATES
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see Definitions,
Section I).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single and
complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from losses
of waters of the US and do not contribute to loss thresholds. Permanent adverse effects include filling, flooding,
excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse effects to
waters of the US include regulated activities that change a waterbody to dry land, increase the bottom elevation
of a waterbody (e.g. installation of riprap), decrease the bottom elevation of a waterbody (e.g. excavation of a
sedge meadow wetland to shallow marsh), or change the use of a waterbody.
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the overall amount of linear loss to waters of the US.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
3. Temporary impacts to waters of the US include the sum of all regulated impacts to waters of the US for a single
and complete project which are restored to preconstruction conditions after construction. Examples of
temporary impacts to waters of the US may include the placement of timber matting, installation of coffer dams,
trenching and backfilling, and in many cases, mechanized land-clearing.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts must be added together to determine the overall amount of
temporary linear impact.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B or in Pre-Construction Notification
Information, Section E.
4. Losses and temporary impacts to waters of the US do not include:
a) Activities that do not require Department of the Army authorization, such as activities eligible for exemptions
under section 404(f) of the Clean Water Act.
b) Impacts to wetlands that are confined to the bed and banks of linear ditches provided the ditch is not located
in a wetland (see definition of linear ditch in Definitions, Section I).
5. The measurements of loss and temporary impact to waters of the US are for determining whether a project may
qualify for the RGP, and are not reduced by compensatory mitigation.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
5
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
Projects that meet the terms and conditions of the Transportation RGP and do not require submittal of a PCN, as outlined
below, may commence work after project proponents have carefully confirmed that the activity will be conducted in
compliance with all applicable terms and conditions of the RGP.
For all activities which require PCN, project proponents must obtain written Corps verification of Transportation RGP
coverage before starting regulated work. For Transportation RGP activities that require PCN, the PCN must include all
other nationwide permits, programmatic general permits, RGPs, or individual permits used or intended to be used to
authorize any part of the overall linear and non-linear project (including all single and complete projects), including
regulated activities that require Corps authorization but do not require PCN.
If an activity does not specifically require a PCN (as described in each RGP category), follow the table below to know if a PCN
must be submitted and a written verification letter received prior to starting work.
WISCONSIN:
MINNESOTA:
PCN is required
1. The Apostle Islands National Lakeshore;
1. Wild rice waters identified in Minn. R.
2. Madeline Island;
7050.0470, subpart 1 (or as amended by the
for regulated
3. State-designated wild rice waters
Minnesota Pollution Control Agency);
activities
proposed in
(https://data.glifwc.org/manoomin.harvest.i 2. Bog wetland plant communities; and
these aquatic
nfo);
3. Fens.
resources 4:
4. Coastal plain marshes;
5. Bog wetland plant communities;
6. Interdunal wetlands;
7. Great Lakes ridge and swale complexes;
8. Fens; and
9. Wetland sites designated by the
Ramsar Convention (as of the date of
publication, these include: the
Horicon Marsh, Upper Mississippi
River Floodplain wetlands, Kakagon
and Bad River Sloughs, Door County
Peninsula Coastal wetlands, and the
Chiwaukee Illinois Beach Lake Plain),
see https://rsis.ramsar.org/.
1. Regulated activities which may affect, or are in the vicinity of, any Federally-listed
PCN is required
threatened, endangered, or proposed threatened and endangered species, designated
critical habitat, or proposed critical habitat.
for the
following
2. Regulated activities which might have the potential to cause effects to any historic
properties listed on, determined to be eligible for listing on, or potentially eligible for listing
activities to
comply with other
on the National Register of Historic Places, including previously unidentified properties.
federal laws:
3. Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408
because it will alter or temporarily or permanently occupy or use a Corps federally
authorized civil works project.
4. Regulated activities in the National Wild and Scenic River System, including the St. Croix
River in Minnesota and Wisconsin and the Wolf River in Wisconsin or in a river officially
Additional information about the plant communities listed can be found at www.mvp.usace.army.mil/Missions/Regulatory.aspx,
the Wisconsin Department of Natural Resources' (WI DNR) website:
www.dnr.wi.gov/topic/EndangeredResources/Communities.asp?mode=group&Type=Wetland, or at the Minnesota Department of
Natural Resources' (MN DNR) Native Plant Community Classification's website: www.dnr.state.mn.us/npc/classification.html.
4
6
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
Other activities
which
require PCN
include:
1.
2.
3.
4.
designated by Congress as a "study river" for possible inclusion in the system while the river
is in an official study status.
Areas of suspected sediment or soil contamination, including but not limited to Superfund
sites. Superfund sites in Minnesota or Wisconsin can be located by searching the EPA's
website: https://www.epa.gov/superfund/search-superfund-sites-where-you-live.
Bridges, structures, and sunken vessels more than 50 years old, unless already determined
ineligible for listing on National Register of Historic Places. Culverts that are constructed
using pre-cast concrete or corrugated metal are not subject to this PCN requirement.
Temporary impacts remaining in place for longer than 90 days between May 15 and
November 15.
All regulated activities which require a waiver to be eligible for authorization by the RGP.
Timing of PCN: Where required by the terms of this RGP, the prospective permittee must notify the Corps by submitting
a PCN as early as possible. The Corps will determine if the PCN is complete within 30 calendar days of the date of receipt
and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day period to request
the additional information necessary to make the PCN complete. As a general rule, the Corps will request additional
information necessary to make the PCN complete only once. However, if the prospective permittee does not provide all
of the requested information, then the Corps will notify the prospective permittee that the PCN is still incomplete and
the PCN review process will not commence until all of the requested information has been received by the Corps. The
prospective permittee shall not begin the activity until they are notified in writing by the Corps that the activity may
proceed under the RGP with any special conditions imposed by the Corps.
Form and Content of PCN: The PCN must be in writing and should utilize the Minnesota Joint Waters Wetlands
Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A letter
containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents;
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees);
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall proposed project
including activities that require Corps authorization but do not require PCN.
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss of waters and temporary
impacts expected to result from the proposed activity. Impacts to all waters of the US must be reported in acres
or square feet. In addition, tributary, pond, and lake impacts must also be reported in linear feet. A table may be
used to clearly and succinctly disclose this information (see Calculating Impacts to Waters of the United States,
Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
f. Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources must be identified by type (e.g. wetland, tributary, lake, man-made ditch, pond, etc.) and impacts must be
identified by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may
be required.
g. A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
7
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
h. If the proposed project would impact a calcareous fen, the PCN must include a copy of the WI DNR authorization for
the proposed regulated activity, or a copy of the approved MN DNR calcareous fen management plan specific to the
project.
i. If any federally-listed proposed, threatened or endangered species or proposed or designated critical habitat might
be affected or is in the vicinity of the activity the PCN must include the name(s) of those endangered or threatened
species that might be affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. Federal applicants or applicants that have federal funding (or whose project
otherwise involves a lead federal agency) must provide documentation demonstrating compliance with Section 7 of
the Endangered Species Act.
j. If the activity might have the potential to cause effects to an historic property listed on, eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property
might have the potential to be affected by the proposed activity and include a vicinity map indicating the location of
the historic property. Federal applicants or applicants that have federal funding (or whose project otherwise involves
a lead federal agency) must provide documentation demonstrating compliance with section 106 of the National
Historic Preservation Act.
k. If an activity is proposed in a component of the National Wild and Scenic River System (including the St. Croix River in
Minnesota and Wisconsin and the Wolf River in Wisconsin) or in a river officially designated by Congress as a "study
river" for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild
and Scenic River or the "study river."
l. The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
m. If a waiver for a specific category or condition of the permit is proposed (e.g. from a linear tributary impact limit or
duration of temporary impact), the PCN must include an explanation of the need for a waiver and why the applicant
believes the impacts would result in minimal individual and cumulative adverse environmental effects.
n. For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because it will alter or
temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the
PCN must include a statement confirming if the project proponent has submitted a written request for Section 408
permission from the Corps office having jurisdiction over the Corps civil works project.
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). Mitigation includes actions which may avoid, minimize, rectify, reduce,
or compensate for adverse environmental effects or activities which may otherwise be contrary to the public interest.
The Corps may require compensatory mitigation to ensure that the activity results in no more than minimal adverse
environmental effects, or will not be contrary to the public interest. In reviewing the PCN for the proposed activity, the
Corps will determine whether the activity authorized by the RGP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by
a specific RGP, the Corps should issue the RGP verification for that activity if it meets the terms and conditions of that
RGP, unless the Corps determines, after considering mitigation, that the proposed activity will result in more than minimal
individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity.
Project proponents may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation.
When developing a compensatory mitigation proposal, the project proponent must consider appropriate and practicable
8
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
options consistent with the framework at 33 CFR 332.3(b). Compensatory mitigation projects provided to offset losses of
aquatic resources must comply with the applicable provisions of the current Corps policies, guidelines, and 33 CFR part
332.
G.USE OF MULTIPLE RGP CATEGORIES (STACKING)
Single and complete non-linear projects may not be ``piecemealed'' to avoid the limits in a general permit (nationwide,
programmatic, or regional general permit) authorization. When general permit limits are exceeded, single and complete
projects may be eligible for review and authorization by an individual permit.
Unless otherwise indicated by a specific general permit or general permit category, the use of more than one general
permit (nationwide, programmatic, or regional general permit) for a single and complete project is prohibited, except when
the acreage or linear foot loss of waters of the US authorized by the general permits do not exceed the loss limit of the
general permit with the highest specified acreage limit.
Category 4, Non-linear Transportation projects, can be used multiple times with other categories in this general permit
but the sum of loss of waters of the US for each single and complete non-linear project may not exceed the loss impact
limit for waters of the US of category 4 for the overall linear project. For example, two category 4 activities (a 0.25 acre
stormwater pond and a 0.25 acre train station in waters of the US) may be authorized for a new light-rail authorized
under category 1 if the sum of loss of waters of the US for the stormwater pond and train station does not exceed 0.5
acre.
H. GENERAL CONDITIONS
To qualify for regional general permit (RGP) authorization, the prospective permittee must comply with the following
conditions, as applicable, in addition to any category-specific requirements and project-specific conditions imposed by the
Corps.
1. Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill must be properly maintained, including
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
2. Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
3. Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
4. Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
9
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
5.
6.
7.
8.
9.
10.
11.
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
Endangered Species:
a. No activity is authorized under this RGP which is likely to directly or indirectly jeopardize the continued existence
of a threatened or endangered species or a species proposed for such designation, as identified under the
Endangered Species Act (ESA), 50 CFR 402, or which will directly or indirectly destroy or adversely modify the
critical habitat of such species. No activity is authorized under the RGP which "may affect" a listed species or
critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed,
and a Corps RGP verification letter is issued. Direct effects are the immediate effects on listed species and critical
habitat caused by the RGP activity. Indirect effects are those effects on listed species and critical habitat that are
caused by the RGP activity and are later in time, but still are reasonably certain to occur.
b. As a result of formal or informal consultation with the FWS the Corps may add species-specific permit condition
to the RGP verification.
c. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
Calcareous Fens: The permittee may not complete regulated activities in a calcareous fen, unless the Wisconsin
Department of Natural Resources has authorized the proposed regulated activity, or the Minnesota Department of
Natural Resources has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with direct management
responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and
Scenic River designation or study status.
Historic Properties, Cultural Resources:
a. No activity which may affect historic properties listed or potentially eligible for listing on the National Register of
Historic Places is authorized until the requirements of Section 106 of the National Historic Preservation Act have
been satisfied. Federal project proponents should follow their own procedures for complying with the
requirements of Section 106 and provide documentation of compliance with those requirements.
b. Information on the location and existence of historic resources can be obtained from the State Historic
Preservation Office, Tribal Historic Preservation Offices, and the National Register of Historic Places.
c. Rock or fill material used for activities authorized by this permit must either be obtained from existing quarries or,
if a new borrow site is excavated to obtain fill material, the Corps must be notified prior to the use of the new site
to determine whether a cultural resources survey of the site is necessary.
Discovery of Previously Unknown Remains and Artifacts: If any previously unknown historic, cultural or archeological
remains and artifacts are discovered while accomplishing the activity authorized by this permit, the Corps must
immediately be notified of the findings. To the maximum extent practicable, construction activities must avoided that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized civil
works project, unless the appropriate Corps office issues a Section 408 permission to alter, occupy, or use the Corps
civil works project (pursuant to 33 U.S.C. 408) and the Corps issues written RGP verification. Examples of federal
projects include but are not limited to works that were built by the Corps and are locally maintained (such as local
flood control projects) or operated and maintained by the Corps (such as locks and dams).
Dam Safety: Permittees are not authorized to begin regulated activities unless they are able to demonstrate that the
structures, when appropriate, comply with applicable state dam safety criteria or have been designed by qualified
10
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
persons. The Corps may require documentation that the design has been independently reviewed by similarly
qualified persons, and appropriate modifications are made to ensure safety.
12. Restoration of Temporary Impacts: All temporary impacts in waters of the US, including discharges resulting from side
casting material excavated from trenching, that occur as a result of the regulated activity must be fully contained with
appropriate erosion control or containment methods, be restored to preconstruction contours and elevations, and
revegetated with native, non-invasive vegetation. A project proponent may request, in writing, a waiver from this
condition from the Corps. An acceptable reason for a waiver to this condition may include, but is not limited to, the
Corps allowing natural restoration of the site when the resulting grade and existing seed bank are sufficient for the
site to restore to pre-construction conditions. In temporarily excavated wetlands, the top 6 to 12 inches of the
excavation should normally be backfilled with topsoil originating from the wetland. No temporary excavation area,
including, but not limited to trenches, may be constructed or backfilled in such a manner as to drain waters of the
United States (e.g., backfilling with extensive gravel layers, creating a french drain effect).
13. Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and
limited to the smallest area and the shortest duration required to accomplish the project purpose.
a. ACTIVITIES WITHOUT PCN REQUIREMENTS: Temporary impacts may not remain in place longer than 90 days
between May 15 and November 15. Before those 90 days have elapsed all temporary discharges must be
removed in their entirety. If the temporary impacts would remain in place for longer than 90 days between May
15 and November 15, a PCN is required and the activity is subject to the requirements and limitations described
in part B of this regional condition.
b. ACTIVITIES WITH PCN REQUIREMENTS:
The PCN must specify how long the temporary impact will remain and include a restoration plan showing how all
temporary fills and structures will be removed and the area restored to pre-project conditions. Unless otherwise
conditioned in a Corps RGP verification, temporary impacts: 1) are allowed to stay in place as long as specified in
the PCN; or 2) must be removed in their entirety in accordance with the plan described in the PCN.
14. Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) must be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs must be
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
15. Culverts and Crossings: Unless an RGP verification authorizes otherwise, replacement and installation of culverts or
crossings authorized by a RGP are to follow (or be restored to) the natural alignment and profile of the tributary. The
culverts or bridges must adequately pass low flow and bankfull events, bedload, sediment load, and provide siteappropriate fish and wildlife passage. Example design elements include recessing single culverts to accommodate
natural bankfull width and adjusting additional culvert inverts at an elevation higher than the bankfull elevation.
16. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
17. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
18. Riprap: For RGP categories that allow for the use of riprap material for bank stabilization, only rock must be used
and it must be of a size sufficient to prevent its movement from the authorized alignment by natural forces under
normal or high flows. A project proponent may request from the Corps, in writing, a waiver to use alternative
riprap materials.
19. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
11
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
20.
21.
22.
23.
24.
25.
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003, or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
Navigation: No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the US. The permittee understands and agrees
that, if future operations by the United States require the removal, relocation, or other alteration, of the structure
or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the United
States on account of any such removal or alteration.
Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
Access Roads: Access roads must be sized appropriately and must be constructed in such a way to minimize
adverse effects on waters of the US and elevations must be as near as practicable to pre-construction contours
and elevations (e.g., at grade corduroy roads or geotextile/gravel roads). All access roads constructed in waters of
the US must be properly bridged or culverted to maintain surface flows.
Tributary Modifications. When stream channelization is performed with the construction of a road crossing, both
activities should be considered as a single and complete project, which may be authorized by another form of
authorization. The Corps does not consider installation of a culvert in a stream bed as stream channelization as long
as those activities are conducted in accordance with the terms of the categories described in this permit. Unless the
general permit verification authorizes otherwise, replacement and installation of culverts or crossings authorized are
to follow (or be restored to) the natural alignment and profile of the tributary, see General Condition 13. Culverts and
Crossings.
Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner by
submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
_________________________________(Transferee)
___________________________________(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
12
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
Exploratory trenching: temporary excavation of the upper soil profile to expose bedrock or substrate for the purpose of
mapping or sampling the exposed material.
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Linear Ditch: A defined channel constructed adjacent to a linear transportation facility (e.g., roads, highways, railways,
trails, airport runways, and taxiways, etc.) to convey runoff from the linear facilities and from areas which drain toward
the linear facilities. The term linear ditch does not include natural tributaries, relocated natural tributaries, or modified
natural tributaries.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
Overall project: The aggregate of all single and complete projects (including both linear and non-linear regulated
activities) proposed by an applicant with regulated losses and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
Single and complete linear project (categories 1-3 and temporary access roads fills): A linear project is a project
constructed for the purpose of getting people, goods, or services from a point of origin to a terminal point, which often
involves multiple crossings of one or more waterbodies at separate and distant locations. The term "single and complete
project" is defined as that portion of the overall linear project proposed or accomplished by one owner/developer or
partnership or other association of owners/developers that includes all crossings of a single water of the US (i.e., a single
waterbody) at a specific location. For linear projects crossing a single or multiple waterbodies several times at separate
and distant locations, each crossing is considered a single and complete project for purposes of this general permit
authorization. However, individual channels in a braided stream or river, or individual arms of a large, irregularly shaped
wetland or lake, etc., are not separate waterbodies, and crossings of such features cannot be considered separately. The
13
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
definition of "single and complete linear project" does not include the term "independent utility" because each crossing
of waters of the US is needed for the single and complete linear project to fulfill its purpose of transporting people, goods,
and services from the point of origin to the terminal point.
Single and complete non-linear project (categories 4 and 5): For non-linear projects, the term "single and complete
project" is defined at 33 CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or
partnership or other association of owners/developers. A single and complete non-linear project must have independent
utility. Single and complete non-linear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A
project is considered to have independent utility if it would be constructed absent the construction of other projects in
the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Stormwater management facilities: Stormwater management facilities are those facilities including, but not limited to,
stormwater retention and detention ponds and best management practices, which retain water for a period of time to
control runoff or improve the quality (i.e., by reducing the concentration of nutrients, sediments, hazardous substances
and other pollutants) of stormwater runoff.
Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without
limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty,
artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel,
piling, aid to navigation, or any other manmade obstacle or obstruction.
Tribal lands: Any lands which is either: 1) held in trust by the United States for the benefit of any Indian tribe or individual;
or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For the purposes of this permit, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
Waiver: An approval from the Corps which allows an applicant to exceed the activity restrictions or conditions described
in an RGP. Waivers may only be considered when expressly indicated as available in an RGP and will only be granted once
the Corps has made a written determination that the RGP activity will result in only minimal individual and cumulative
adverse environmental effects. When a waiver is required, an applicant cannot start work until they have received a RGP
verification letter with waiver approval.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
J. FURTHER INFORMATION
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by
an RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a) This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b) This RGP does not grant any property rights or exclusive privileges;
c) This RGP does not authorize any injury to the property or rights of others; and
d) This RGP does not authorize interference with any existing or proposed federal project.
14
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a) Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
b) Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c) Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d) Design or construction deficiencies associated with the permitted work; or
e) Damage claims associated with any future modification, suspension, or revocation of this permit.
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a) The permittee fails to comply with the terms and conditions of this permit;
b) The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c) Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this RGP at any time the circumstances warrant. Circumstances
that could require a reevaluation include, but are not limited to, significant new information surfaces which this office
did not consider in reaching the original public interest decision. Such a reevaluation may result in a determination
that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.
K. CORPS DECISION
In reviewing the PCN for the proposed activity, the Corps will determine whether the activity authorized by the RGP will
result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public
interest. If a project proponent requests authorization by a specific RGP, the Corps should issue the RGP verification for
that activity if it meets the terms and conditions of that RGP, unless the Corps determines, after considering mitigation,
that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic
environment and other aspects of the public interest and exercises discretionary authority to require an individual permit
for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of
waters of the United States to determine whether they individually satisfy the terms and conditions of the RGPs, as well as
the cumulative effects caused by all of the crossings authorized by RGP. If an applicant requests a waiver for any limit
where waivers are indicated as available, the Corps will only grant the waiver upon a written determination that the RGP
activity will result in only minimal individual and cumulative adverse environmental effects.
When making minimal adverse environmental effects determinations the Corps will consider the direct and indirect
effects caused by the RGP activity. The Corps will also consider the cumulative adverse environmental effects caused by
activities authorized by the RGP and whether those cumulative adverse environmental effects are no more than minimal.
15
St. Paul District Corps of Engineers, Regulatory Branch
Transportation Regional General Permit
The Corps will consider site specific factors, such as the environmental setting in the vicinity of the RGP activity, the type
of resource that will be affected by the RGP activity, the functions provided by the aquatic resources that will be affected
by the RGP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that
aquatic resource functions will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g.,
watershed or ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
The Corps will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in
the proposal to inform decisions regarding whether the net adverse environmental effects of the proposed activity are no
more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the Corps determines
that the activity complies with the terms and conditions of the RGP and that the adverse environmental effects are no
more than minimal, after considering mitigation, the Corps will notify the permittee and include any activity specific
conditions in the RGP verification the Corps deems necessary. Conditions for compensatory mitigation requirements must
comply with the appropriate provisions at 33 CFR 332.3(k). When compensatory mitigation is required, the Corps must
approve the final mitigation plan before the permittee commences work in waters of the United States, unless the Corps
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion
of the required compensatory mitigation. If the Corps determines that the adverse environmental effects of the proposed
activity are more than minimal, then the Corps will notify the applicant of next steps as described in 33 CFR 325.2.
16
Regional General Permit Public Notice Enclosure G
DEPARTMENT OF THE ARMY
UTILITY REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Utility Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED January 2, 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Utility Regional General Permit (RGP). Certain activities require an applicant to submit preconstruction notification and receive written St. Paul District Corps of Engineers Regulatory Branch (Corps) verification
prior to commencing work. In addition, some RGP authorizations may be subject to project-specific special conditions that
will be specified in the Corps verification letter. Refer to the appropriate sections of this permit for a description of RGP
procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the Corps verification letter confirming a project complies with the terms and conditions of
this RGP, the time limit for completing work authorized by the permit ends upon the expiration date of the RGP. Activities
authorized under this RGP that have commenced construction or are under contract to commence construction in
reliance upon this RGP, will remain authorized provided the activity is completed within 12 months of the date of the RGP
expiration, suspension, or revocation; whichever is sooner.
Some RGP authorizations are not valid until a project proponent obtains a Clean Water Act Section 401 water quality
certification or waiver from the appropriate water quality certifying agency. In addition, some RGP authorizations may be
subject to project-specific special conditions that will be specified in the Corps verification letter. This RGP does not obviate
the need for other necessary federal, state, tribal, or local authorizations or permits.
B. UTILITY REGIONAL GENERAL PERMIT APPLICABILITY
The Utility RGP applies to certain activities in waters of the United States (US), including wetlands, as described below, in
the States of Wisconsin and Minnesota, including within the exterior boundaries of Indian Reservations.
1. Authorities: Section 404 of the Clean Water Act (33 U.S.C. 1344, Section 404) for discharges of dredged and fill material
into waters of the US, and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403, Section 10) for work and
structures that are located in, under, or over any navigable water of the US. Activities subject to Section 404 and Section
10 authorization requirements are hereafter referred to as regulated activities.
2. Eligible Activities: Regulated activities associated with the four items listed below are eligible for authorization using
the Utility RGP. The Utility RGP may be used to authorize losses and temporary impacts in waters of the US necessary to
accomplish the activities listed below.
a. Utility Lines: Regulated activities for single and complete linear projects to construct, maintain, or repair utility
lines, including foundations for overhead utility line towers, poles, and anchors. This includes utility lines strung
above, and routed in and under, Section 10 waters.
b. Utility Survey Activities: Temporary regulated activities for non-linear single and complete survey projects. Survey
activities include core sampling, exploratory-type bore holes, exploratory trenching, soil surveys, sampling,
sample plots or transects for wetland delineations, and historic resources surveys. Regulated activities for the
recovery of historic resources, and losses of waters of the US are not authorized.
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
c. Substation Facilities: Regulated activities for single and complete non-linear projects required to construct,
maintain, or expand substation facilities.
d. Access Roads: Regulated activities for single and complete linear projects to construct permanent and temporary
access roads necessary for the construction, repair, and maintenance of utility lines and substations, and to
provide access to utility survey locations.
e. Remediation of Inadvertent Returns of Drilling Fluid: Regulated activities necessary for the remediation of
inadvertent returns of drilling fluids through sub-soil fissures or fractures that might occur during horizontal
directional drilling (HDD) activities conducted for the purpose of installing or replacing utility lines. These
remediation activities must be done as soon as practicable to restore the affected waterbody. The Corps may add
special conditions to RGP verifications to require a remediation plan for addressing inadvertent returns of drilling
fluids to waters of the US during HDD activities conducted for installing or replacing utility lines.
3. Activity restrictions: Eligible activities above must not exceed either of the following two limits.
a. Regulated activities for each single and complete project cannot cause the loss of greater than 0.5 acre of waters
of the US. Where a single and complete project would result in losses to more than one aquatic resource type
(e.g. wetland and tributary), this restriction is calculated as the sum for all losses to aquatic resources.
b. Regulated activities may not cause the loss of more than 300 linear feet of tributary for any single and complete
project, unless the Corps waives the 300 linear foot limit by making a written determination concluding that the
discharge will result in no more than minimal adverse environmental effects. An applicant may request, in writing,
a waiver from the Corps. For purposes of this restriction, tributaries do not include linear ditches (see definition
for both terms in the Definitions section below). Tributary losses contribute to activity restriction a. above.
4. Pre-Construction Notification (PCN): Some activities eligible for Utility RGP authorization require a PCN to the Corps.
Please refer to Section E below for additional information regarding PCN requirements.
NOTE: Pipes and pipelines used to transport gaseous, liquid, liquescent, or slurry substances over navigable waters of the
US are considered bridges, and may require a permit from the U.S. Coast Guard pursuant to Section 9 of the Rivers and
Harbors Act of 1899. Discharges of dredged and fill material into waters of the US associated with such pipes and
pipelines requires Section 404 authorization.
C. UTILITY REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for Utility RGP authorization:
1. Regulated activities that would divert more than 10,000 gallons per day of surface or ground water into or out of
the Great Lakes Basin.
2. Regulated activities that may cause more than minimal adverse effects on tribal rights (including treaty rights),
protected tribal resources, or tribal lands.
3. Regulated activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general
permit.
4. Regulated activities that would occur in a calcareous fen, unless the Wisconsin Department of Natural Resources
(WI DNR) has authorized the proposed regulated activity, or the Minnesota Department of Natural Resources
(MN DNR) has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
5. Regulated activities that would occur in a component of the National Wild and Scenic River System (St. Croix River
in Minnesota and Wisconsin and the Wolf River in Wisconsin), or in a river officially designated by Congress as a
"study river" for possible inclusion in the system while the river is in an official study status. This exclusion applies
2
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
6.
7.
8.
9.
10.
11.
unless the appropriate Federal agency with direct management responsibility for such river has determined in
writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
Regulated activities which are likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such
species. No regulated activity is authorized which "may affect" a listed species or critical habitat, unless ESA
Section 7 consultation addressing the effects of the proposed activity has been completed.
Regulated activities which may have the potential to cause effects to properties listed, or eligible for listing, in the
National Register of Historic Places, unless the requirements of Section 106 of the National Historic Preservation
Act (NHPA) have been satisfied.
Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because
they will alter or temporarily or permanently occupy or use a Corps federally authorized civil works project, unless
the appropriate Corps office issues the Section 408 permission to alter, occupy, or use the Corps federally
authorized civil works project.
Regulated activities where applicants are unable to demonstrate that the structures, when appropriate, comply
with applicable state dam safety criteria or have been designed by qualified persons.
Regulated activities which would adversely affect public water supplies.
Regulated activities, except access roads and temporary crossings required for utility line construction, repair, or
maintenance, which would enclose any portion of a non-wetland water of the US.
D. CALCULATING IMPACTS TO WATERS OF THE UNITED STATES
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see Definitions,
Section I).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single
and complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from
losses of waters of the US, and do not contribute to loss thresholds. Permanent adverse effects include filling,
flooding, excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse
effects to waters of the US include regulated activities that change a waterbody to dry land, increase the bottom
elevation of a waterbody (e.g. installation of riprap), or decrease the bottom elevation of a waterbody (e.g.
excavation of a sedge meadow wetland to shallow marsh), or change the use of a waterbody.
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the total amount of linear loss to waters of the US.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B, or in Pre-Construction Notification
Information, Section E.
3. Temporary impacts to waters of the US include the sum of all regulated impacts to waters of the US for a single
and complete project which are restored to pre-construction conditions after construction. Examples of
temporary impacts in waters of the US include the placement of timber matting, installation of coffer dams,
trenching and backfilling, and in many cases, mechanized land-clearing.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts must be added together to determine the total amount of
temporary linear impact.
3
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability, Section B, or in Pre-Construction Notification
Information, Section E.
4. Losses and temporary impacts to waters of the US do not include:
a) Activities that do not require Department of the Army authorization, such as activities eligible for exemptions
under section 404(f) of the Clean Water Act.
b) Impacts to wetlands that are confined to the bed and banks of linear ditches provided the ditch is not located
in a wetland (see definition of linear ditch in Definitions, Section I).
5. The measurements of loss and temporary impact to waters of the US are for determining whether a project may
qualify for the RGP, and are not reduced by compensatory mitigation.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
Projects that meet the terms and conditions of the Utility RGP and do not require submittal of a PCN, as outlined below,
may commence work after project proponents have carefully confirmed that the activity will be conducted in compliance
with all applicable terms and conditions of the Utility RGP.
Before starting regulated work, project proponents must obtain written Corps verification of Utility RGP coverage for
all activities which require PCN. For Utility RGP activities that require PCN, the PCN must include all other nationwide
permits, programmatic general permits, RGPs, or individual permits used or intended to be used to authorize any part of
the overall project (including all single and complete projects), including other regulated activities that require DA
authorization but do not require PCN.
1. When PCN is required: A PCN is required for the locations, impact thresholds, and activities listed below.
PCN is required for
regulated activities
proposed in these
Aquatic Resources1:
PCN is required for the
following activities to
WISCONSIN:
MINNESOTA:
1. Section 10 waters;
1. Section 10 waters;
2. The Apostle Islands National Lakeshore;
2. Wild rice waters
3. Madeline Island;
identified in Minn. R.
4. State-designated wild rice waters
7050.0470, subpart 1
(https://data.glifwc.org/manoomin.harvest.info);
(or as amended by the
5. Coastal plain marshes;
Minnesota Pollution
6. Bog wetland plant communities;
Control Agency);
7. Interdunal wetlands;
3. Bog wetland plant
8. Great Lakes ridge and swale complexes;
communities; and
9. Fens; and
4. Fens.
10. Wetland sites designated by the Ramsar Convention (as of the
date of publication, these include: the Horicon Marsh, Upper
Mississippi River Floodplain wetlands, Kakagon and Bad River
Sloughs, Door County Peninsula Coastal wetlands, and the
Chiwaukee Illinois Beach Lake Plain), see
https://rsis.ramsar.org/.
1. Regulated activities which may affect, or are in the vicinity of, any Federally-listed threatened,
endangered, or proposed threatened and endangered species, designated critical habitat, or
proposed critical habitat.
1
Additional information about the plant communities listed can be found at www.mvp.usace.army.mil/Missions/Regulatory.aspx,
the Wisconsin Department of Natural Resources' (WI DNR) website:
www.dnr.wi.gov/topic/EndangeredResources/Communities.asp?mode=group&Type=Wetland, or at the Minnesota Department of
Natural Resources' (MN DNR) Native Plant Community Classification's website: www.dnr.state.mn.us/npc/classification.html.
4
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
comply with other
federal laws:
2.
3.
4.
1.
PCN is required for the
following Utility RGP
regulated activities:
2.
3.
4.
5.
1.
Other activities which
require PCN include:
2.
3.
4.
Regulated activities which might have the potential to cause effects to any historic properties
listed on, determined to be eligible for listing on, or potentially eligible for listing on the National
Register of Historic Places, including previously unidentified properties.
Regulated activities which require permission from the Corps pursuant to 33 U.S.C. 408 because
it will alter or temporarily or permanently occupy or use a Corps federally authorized civil works
project.
Regulated activities proposed in the National Wild and Scenic River System, including the St.
Croix River in Minnesota and Wisconsin and the Wolf River in Wisconsin, or a river officially
designated by Congress as a "study river" for possible inclusion in the system while the river is in
an official study status.
All single and complete regulated activities in non-tributary waters of the US, excluding
overhead lines, which exceed 500 linear feet.
All single and complete projects where the regulated activity would result in the loss of
greater than 0.1 acre of waters of the US.
All single and complete projects where the temporary impacts are proposed to impact 0.5
acre or greater of waters of the US, including wetlands.
Mechanized land-clearing which results in the conversion of wooded, including both shrub and
forested, wetlands to herbaceous communities.
Utility lines, excluding overhead lines, installed via trenching within a water of the United States,
where the utility line runs parallel to or along a tributary contiguous with the water of the US
trenched. Linear ditches (see Definitions, Section I) are not subject to this PCN requirement.
Areas of suspected sediment or soil contamination, including but not limited to Superfund sites.
Superfund sites in Minnesota or Wisconsin can be located by searching the EPA's website:
https://www.epa.gov/superfund/search-superfund-sites-where-you-live.
Bridges, structures, and sunken vessels more than 50 years old, unless already determined
ineligible for listing on National Register of Historic Places. Culverts that are constructed using
pre-cast concrete or corrugated metal are not subject to this PCN requirement.
Temporary impacts remaining in place for longer than 90 days between May 15 and November
15.
All regulated activities which require a waiver to be eligible for authorization by the Utility RGP.
2. Timing of PCN: Where required by the terms of this RGP, the prospective permittee must notify the Corps by
submitting a PCN as early as possible. The Corps will determine if the PCN is complete within 30 calendar days of the
date of receipt and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day
period to request the additional information necessary to make the PCN complete. As a general rule, the Corps will
request additional information necessary to make the PCN complete only once. However, if the prospective permittee
does not provide all of the requested information, then the Corps will notify the prospective permittee that the PCN is
still incomplete and the PCN review process will not commence until all of the requested information has been received
by the Corps. The prospective permittee shall not begin the activity until they are notified in writing by the Corps that
the activity may proceed under the RGP with any special conditions imposed by the Corps.
3. Form and Content of PCN: The PCN must be in writing and should utilize the Minnesota Joint Waters Wetlands
Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A letter
containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents.
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees).
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall project, including
activities that require Corps authorization but do not require PCN.
5
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss and temporary impact to
waters of the US expected to result from the proposed activity. For the Utility RGP, all PCNs must additionally
report conversions of wooded (shrub and forested) communities in waters of the US. Conversion reporting in
waters of the US must distinguish permanent conversion from areas proposed to regenerate, and must clarify
which conversions proposed would, and would not, incorporate a regulated activity in waters of the US. Impacts
to all waters of the US must be reported in acres or square feet. In addition, tributary, pond, and lake impacts
must also be reported in linear feet. A table may be used to clearly and succinctly disclose this information (see
Calculating Impacts to Water of the United States, Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale bar
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
f. Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources shall be identified by type (e.g. wetland, tributary, lake, man-made ditch, pond, etc.) and impacts shall be
identified by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may
be required.
g. A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
h. If the proposed project would impact a calcareous fen, the PCN must include a copy of the WI DNR authorization for
the proposed regulated activity, or a copy of the approved MN DNR calcareous fen management plan specific to the
project.
i. If any federally-listed proposed, threatened or endangered species or proposed or designated critical habitat might
be affected or is in the vicinity of the activity, the PCN must include the name(s) of those endangered or threatened
species that might be affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. Federal applicants or applicants that have federal funding (or whose project
otherwise involves a lead federal agency) must provide documentation demonstrating compliance with Section 7 of
the Endangered Species Act.
j. If the activity might have the potential to cause effects to an historic property listed on, eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property
might have the potential to be affected by the proposed activity and include a vicinity map indicating the location of
the historic property. Federal applicants or applicants that have federal funding (or whose project otherwise involves
a lead federal agency) must provide documentation demonstrating compliance with Section 106 of the National
Historic Preservation Act.
k. If an activity is proposed in a component of the National Wild and Scenic River System (including the St. Croix River in
Minnesota and Wisconsin and the Wolf River in Wisconsin) or in a river officially designated by Congress as a "study
river" for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild
and Scenic River or the "study river."
l. The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
m. If a waiver from for a specific condition of the permit is proposed (e.g. for length of time temporary impacts would
remain in place), the PCN must include an explanation of the need for a waiver and why the applicant believes the
impacts would result in minimal individual and cumulative adverse environmental effects.
n. For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 (Section 408) because it will alter or
temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the
PCN must include a statement confirming if the project proponent has submitted a written request for Section 408
permission from the Corps office having jurisdiction over the Corps civil works project.
6
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). Mitigation includes actions which may avoid, minimize, rectify, reduce,
or compensate for adverse environmental effects or activities which may otherwise be contrary to the public interest.
The Corps may require compensatory mitigation to ensure that the activity results in no more than minimal adverse
environmental effects, or will not be contrary to the public interest. In reviewing the PCN for the proposed activity, the
Corps will determine whether the activity authorized by the RGP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by
a specific RGP, the Corps should issue the RGP verification for that activity if it meets the terms and conditions of that
RGP, unless the Corps determines, after considering mitigation, that the proposed activity will result in more than minimal
individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity.
Project proponents may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation.
When developing a compensatory mitigation proposal, the project proponent must consider appropriate and practicable
options consistent with the framework at 33 CFR 332.3(b). Compensatory mitigation projects provided to offset losses of
aquatic resources must comply with the applicable provisions of the current Corps policies, guidelines, and 33 CFR part
332.
G. USE OF MULTIPLE GENERAL PERMITS (STACKING)
Single and complete non-linear projects may not be ``piecemealed'' to avoid the limits in a general permit (nationwide,
programmatic, or regional general permit) authorization. When general permit limits are exceeded, single and complete
projects may be eligible for review and authorization by an individual permit.
Unless otherwise indicated by a specific general permit or general permit category, the use of more than one general
permit (nationwide, programmatic, or regional general permit) for a single and complete project is prohibited, except when
the acreage or linear foot loss of waters of the US authorized by the general permits does not exceed the loss limit of the
general permit with the highest specified acreage limit.
H. GENERAL CONDITIONS
To qualify for Utility regional general permit (RGP) authorization, the prospective permittee must comply with the
following conditions, as applicable, in addition to any Utility RGP terms and project-specific conditions imposed by the
Corps.
1.
Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill shall be properly maintained, including
7
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
2.
3.
4.
5.
6.
7.
8.
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
Endangered Species:
a. No activity is authorized under this RGP which is likely to directly or indirectly jeopardize the continued existence
of a threatened or endangered species or a species proposed for such designation, as identified under the
Endangered Species Act (ESA), 50 CFR 402, or which will directly or indirectly destroy or adversely modify the
critical habitat of such species. No activity is authorized under the Utility RGP which "may affect" a listed species
or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been
completed, and a Corps RGP verification letter is issued. Direct effects are the immediate effects on listed species
and critical habitat caused by the RGP activity. Indirect effects are those effects on listed species and critical
habitat that are caused by the RGP activity and are later in time, but still are reasonably certain to occur.
b. As a result of formal or informal consultation with the FWS the Corps may add species-specific permit condition
to the RGP verification.
c. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
Calcareous Fens: The permittee may not complete regulated activities in a calcareous fen, unless the Wisconsin
Department of Natural Resources has authorized the proposed regulated activity, or the Minnesota Department of
Natural Resources has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with direct management
responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and
Scenic River designation or study status.
Historic Properties, Cultural Resources:
a. No activity which may affect historic properties listed or potentially eligible for listing on the National Register of
Historic Places is authorized until the Corps has complied with the requirements of Section 106 of the National
Historic Preservation Act. Federal project proponents should follow their own procedures for complying with the
requirements of Section 106 and provide documentation of compliance with those requirements.
b. Information on the location and existence of historic resources can be obtained from the State Historic
Preservation Office, Tribal Historic Preservation Offices, and the National Register of Historic Places.
c. Rock or fill material used for activities authorized by this permit must either be obtained from existing quarries or,
if a new borrow site is excavated to obtain fill material, the Corps must be notified prior to the use of the new site
to determine whether a cultural resources survey of the site is necessary.
8
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
9.
10.
11.
12.
13.
14.
15.
Discovery of Previously Unknown Remains and Artifacts: If you discover any previously unknown historic, cultural or
archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately
notify the Corps of what you have found, and to the maximum extent practicable, avoid construction activities that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described in this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized
civil works project, unless the appropriate Corps office issues Section 408 permission to alter, occupy, or use the
Corps civil works project (pursuant to 33 U.S.C. 408), and the Corps issues written a Utility RGP verification. Examples
of federal projects include but are not limited to works that were built by the Corps and are locally maintained (such
as local flood control projects) or operated and maintained by the Corps (such as locks and dams).
Dam Safety: Permittees are not authorized to begin regulated activities unless they are able to demonstrate that the
structures, when appropriate, comply with applicable state dam safety criteria or have been designed by qualified
persons. The Corps may require documentation that the design has been independently reviewed by similarly
qualified persons, and appropriate modifications are made to ensure safety.
Restoration of Temporary Impacts: All temporary impacts in waters of the US, including discharges resulting from side
casting material excavated from trenching, that occur as a result of the regulated activity must be fully contained with
appropriate erosion control or containment methods, be restored to preconstruction contours and elevations, and
revegetated with native, non-invasive vegetation. A project proponent may request, in writing, a waiver from this
condition from the Corps. An acceptable reason for a waiver to this condition may include, but is not limited to, the
Corps allowing natural restoration of the site when the resulting grade and existing seed bank are sufficient for the
site to restore to pre-construction conditions. In temporarily excavated wetlands, the top 6 to 12 inches of the
excavation should normally be backfilled with topsoil originating from the wetland. No temporary excavation area,
including, but not limited to trenches, may be constructed or backfilled in such a manner as to drain waters of the
United States (e.g., backfilling with extensive gravel layers, creating a french drain effect).
Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and
limited to the smallest area and the shortest duration required to accomplish the project purpose.
a. ACTIVITIES WITHOUT PCN REQUIREMENTS: Temporary impacts may not remain in place longer than 90 days
between May 15 and November 15. Before those 90 days have elapsed all temporary discharges must be
removed in their entirety. If the temporary impacts would remain in place for longer than 90 days between May
15 and November 15, a PCN is required and the activity is subject to the requirements and limitations described
in part B of this regional condition.
b. ACTIVITIES WITH PCN REQUIREMENTS:
The PCN must specify how long the temporary impact will remain and include a restoration plan showing how all
temporary fills and structures will be removed and the area restored to pre-project conditions. Unless otherwise
conditioned in a Corps RGP verification, temporary impacts: 1) are allowed to stay in place as long as specified in
the PCN; or 2) must be removed in their entirety in accordance with the plan described in the PCN.
Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) shall be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs shall be
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
Culverts and Crossings: Unless an RGP verification authorizes otherwise, replacement and installation of culverts or
crossings authorized by a RGP are to follow (or be restored to) the natural alignment and profile of the tributary. The
culverts or bridges must adequately pass low flow and bankfull events, bedload, sediment load, and provide site9
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
appropriate fish and wildlife passage. Example design elements include recessing single culverts to accommodate
natural bankfull width and adjusting additional culvert inverts at an elevation higher than the bankfull elevation.
16. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
17. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
18. Riprap: For RGP categories that allow for the use of riprap material for bank stabilization, only rock shall be used
and it must be of a size sufficient to prevent its movement from the authorized alignment by natural forces under
normal or high flows. A project proponent may request from the Corps, in writing, a waiver to use alternative
riprap materials.
19. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003; or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
20. Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
21. Navigation: No activity may cause more than a minimal adverse effect on navigation. Any safety lights and signals
prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the
permittee's expense on authorized facilities in navigable waters of the US. The permittee understands and agrees
that, if future operations by the United States require the removal, relocation, or other alteration, of the structure
or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said
structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the
permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or
obstructions caused thereby, without expense to the United States. No claim shall be made against the United
States on account of any such removal or alteration.
22. Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
23. Access Roads: Access roads must be sized appropriately and must be constructed in such a way to minimize adverse
effects on waters of the US and elevations must be as near as practicable to pre-construction contours and elevations
(e.g., at grade corduroy roads or geotextile/gravel roads). All access roads constructed in waters of the US must be
properly bridged or culverted to maintain surface flows.
24. Minimum Clearances for Aerial Lines over Navigable Waters: The minimum clearance* for an aerial electrical power
transmission line is based on the low point of the line under conditions that produce the greatest sag, taking into
consideration temperature, load, wind, length or span and the type of supports. The minimum clearance for an
aerial electrical power transmission line crossing navigable waters of the United States, where there is an
established bridge clearance established by the U.S. Coast Guard, shall be governed by the system voltage, as
indicated below:
Nominal System Voltage, in kilovolts
115 and below
138
161
230
350
Minimum Clearance Above Bridge (as established by the U.S. Coast Guard)
20 feet
22
24
26
30
10
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
500
700
750 to 765
35
42
45
*NOTE: Minimum clearance is the distance measured between the lowest point of a stationary bridge, including
any infrastructure attached to underside of the bridge, and the ordinary high water mark of the navigable waters of
the United States beneath the bridge.
25. Minimum Depths for Utility Lines under Federally-Maintained Channels: Unless otherwise conditioned in a Corps
Utility RGP verification letter, all utility line crossings of federally-maintained channels (i.e., the Mississippi River) will
be buried at least six (6) feet below the allowable over depth of the authorized channel, including all side slopes.
26. Overhead Utility Line Foundations: Foundations proposed for overhead utility lines must be the minimum size
necessary and separate footings for each tower leg (rather than a large single pad) must be used where
practicable.
27. Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner
by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
___________________________________
(Transferee)
___________________________________
(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
Exploratory Trenching: Temporary excavation of the upper soil profile to expose bedrock or substrate, for the purpose of
mapping or sampling the exposed material.
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
11
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Linear Ditch: A defined channel constructed adjacent to a linear transportation facility (e.g., roads, highways, railways,
trails, airport runways, and taxiways, etc.) to convey runoff from the linear facilities and from areas which drain toward
the linear facilities. The term linear ditch does not include natural tributaries, relocated natural tributaries, or modified
natural tributaries.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
Overall project: The aggregate of all single and complete projects (linear and non-linear) proposed with regulated losses
and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
Single and complete linear project: A linear project is a project constructed for the purpose of getting people, goods, or
services from a point of origin to a terminal point, which often involves multiple crossings of one or more waterbodies at
separate and distant locations. The term "single and complete project" is defined as that portion of the overall linear
project proposed or accomplished by one owner/developer or partnership or other association of owners/developers that
includes all crossings of a single water of the US (i.e., a single waterbody) at a specific location. For linear projects crossing
a single or multiple waterbodies several times at separate and distant locations, each crossing is considered a single and
complete project for purposes of this general permit authorization. However, individual channels in a braided stream or
river, or individual arms of a large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of
such features cannot be considered separately. The definition of "single and complete linear project" does not include the
term "independent utility" because each crossing of waters of the US is needed for the single and complete linear project
to fulfill its purpose of transporting people, goods, and services from the point of origin to the terminal point.
Single and complete non-linear project: For non-linear projects, the term "single and complete project" is defined at 33
CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or partnership or other association
of owners/developers. A single and complete non-linear project must have independent utility. Single and complete nonlinear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a
multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project
that would be constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without
limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty,
12
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel,
piling, aid to navigation, or any other manmade obstacle or obstruction.
Tribal lands: Any lands which are either: 1) held in trust by the United States for the benefit of any Indian tribe or
individual; or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For purposes of this RGP, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
Utility Line: Any pipe or pipeline for the transportation of any gaseous, liquid, liquescent, or slurry substance, for any
purpose not excluded herein, and any cable, line, or wire for the transmission of electrical energy, telephone, and
telegraph messages, and internet, radio, and television communication. The term utility line does not include activities
that drain a water of the United States, such as drainage tile or French drains. The term also excludes pipes and culverts
for residential, commercial, industrial, agricultural, recreational, or other developments associated with driveways,
roadways, lots, and storm water ponds.
Waiver: An approval from the Corps which allows an applicant to exceed the activity restrictions or conditions described
in an RGP. Waivers may only be considered when expressly indicated as available in an RGP and will only be granted once
the Corps has made a written determination that the RGP activity will result in only minimal individual and cumulative
adverse environmental effects. When a waiver is required, an applicant cannot start work until they have received a RGP
verification letter with waiver approval.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
J. FURTHER INFORMATION
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by
an RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a) This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b) This RGP does not grant any property rights or exclusive privileges;
c) This RGP does not authorize any injury to the property or rights of others; and
d) This RGP does not authorize interference with any existing or proposed federal project.
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a) Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
b) Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c) Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d) Design or construction deficiencies associated with the permitted work; or
e) Damage claims associated with any future modification, suspension, or revocation of this permit.
13
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a) The permittee fails to comply with the terms and conditions of this permit;
b) The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c) Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this Utility RGP at any time the circumstances warrant.
Circumstances that could require a reevaluation include, but are not limited to, significant new information surfaces
which this office did not consider in reaching the original public interest decision. Such a reevaluation may result in a
determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33
CFR 325.
K. CORPS DECISION
In reviewing the PCN for the proposed activity, the Corps will determine whether the activity authorized by the RGP will
result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public
interest. If a project proponent requests authorization by a specific RGP, the Corps should issue the RGP verification for
that activity if it meets the terms and conditions of that RGP, unless the Corps determines, after considering mitigation,
that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic
environment and other aspects of the public interest and exercises discretionary authority to require an individual permit
for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of
waters of the United States to determine whether they individually satisfy the terms and conditions of the RGPs, as well as
the cumulative effects caused by all of the crossings authorized by RGP.
If an applicant requests a waiver for any limit where waivers are indicated as available, the Corps will only grant the waiver
upon a written determination that the RGP activity will result in only minimal individual and cumulative adverse
environmental effects.
When making minimal adverse environmental effects determinations the Corps will consider the direct and indirect
effects caused by the RGP activity. The Corps will also consider the cumulative adverse environmental effects caused by
activities authorized by the RGP and whether those cumulative adverse environmental effects are no more than minimal.
The Corps will consider site specific factors, such as the environmental setting in the vicinity of the RGP activity, the type
of resource that will be affected by the RGP activity, the functions provided by the aquatic resources that will be affected
by the RGP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that
aquatic resource functions will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g.,
14
St. Paul District Corps of Engineers, Regulatory Branch
Utility Regional General Permit
watershed or ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
The Corps will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in
the proposal to inform decisions regarding whether the net adverse environmental effects of the proposed activity are no
more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the Corps determines
that the activity complies with the terms and conditions of the RGP and that the adverse environmental effects are no
more than minimal, after considering mitigation, the Corps will notify the permittee and include any activity specific
conditions in the RGP verification the Corps deems necessary. Conditions for compensatory mitigation requirements must
comply with the appropriate provisions at 33 CFR 332.3(k). When compensatory mitigation is required, the Corps must
approve the final mitigation plan before the permittee commences work in waters of the United States, unless the Corps
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion
of the required compensatory mitigation. If the Corps determines that the adverse environmental effects of the proposed
activity are more than minimal, then the Corps will notify the applicant of next steps as described in 33 CFR 325.
15
Regional General Permit Public Notice Enclosure H
DEPARTMENT OF THE ARMY
WILDLIFE PONDS REGIONAL GENERAL PERMIT
PERMITTEE: The General Public in Wisconsin and Minnesota
PERMIT: DRAFT Wildlife Ponds Regional General Permit
ISSUING OFFICE: St. Paul District U.S. Army Corps of Engineers
ISSUANCE DATE: PROPOSED January 2, 2018
EXPIRATION DATE: five years after issuance
A. AUTHORIZATION
The general public in the States of Wisconsin and Minnesota are authorized to perform work in accordance with the
terms and conditions of the Wildlife Ponds Regional General Permit (RGP). All regulated activities require an applicant to
submit pre-construction notification and receive written St. Paul District Corps of Engineers Regulatory Branch (Corps)
verification prior to commencing work. In addition, some RGP authorizations may be subject to project-specific special
conditions that will be specified in the Corps verification letter. Refer to the appropriate sections of this permit for a
description of RGP procedures, eligible activities, conditions, exclusions and application instructions.
Unless otherwise specified in the Corps verification letter confirming a project complies with the terms and conditions of
this RGP, the time limit for completing work authorized by the permit ends upon the expiration date of the RGP. Activities
authorized under this RGP that have commenced construction or are under contract to commence construction in
reliance upon this RGP, will remain authorized provided the activity is completed within 12 months of the date of the RGP
expiration, suspension, or revocation; whichever is sooner.
No RGP authorization is valid until a project proponent obtains a Clean Water Act Section 401 water quality certification or
waiver from the appropriate water quality certifying agency. In addition, some RGP authorizations may be subject to
project-specific special conditions that will be specified in the Corps verification letter. This RGP does not obviate the need
for other necessary federal, state, tribal, or local authorizations or permits.
B. WILDLIFE PONDS REGIONAL GENERAL PERMIT APPLICABILITY
The Wildlife Ponds RGP applies to certain activities in waters of the United States (US), including wetlands, as described
below, in the States of Wisconsin and Minnesota, including within the exterior boundaries of Indian Reservations.
1. Regulatory Authority: Section 404 of the Clean Water Act (33 U.S.C. 1344, Section 404) for discharges of dredged and
fill material into waters of the US (referred to as regulated activities).
2. Eligible Activities: Regulated activities, including losses and temporary impacts (see Section D, Calculating Impacts to
Waters of the US), required for the construction of small ponds for wildlife habitat.
3. Activity Restrictions (the regulated activity must meet the following terms):
a) This RGP may be used to authorize more than one wildlife pond, so long as each pond authorized does not cause
the loss of greater than 0.50 acre of waters of the US, and the overall project does not cause the loss of more
than 1.0 acre of waters of the US. Each pond authorized is considered a single and complete project.
b) Wildlife ponds must be constructed with irregular shorelines, shallow side slopes (8H:1V or flatter), and
dominated by water depths of 4 feet or less, but not deeper than 6 feet.
c) Upon completion of pond construction, all dredged material must be placed at an upland location.
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
d) This RGP does not authorize the creation of nesting islands or pond liners, and does not authorize construction of
aquaculture or swimming ponds.
e) This RGP may not be used to authorize tributary loss, including, but not limited to, the construction of "online"
ponds in waters of the US.
4. Pre-Construction Notification (PCN): All activities eligible for authorization by the Wildlife Ponds RGP require submittal
of a PCN and written Corps verification of coverage prior to starting work. Please refer to Section E below for
additional information regarding PCN requirements.
C. WILDLIFE PONDS REGIONAL GENERAL PERMIT EXCLUSIONS
The following activities are INELIGIBLE for Wildlife Ponds RGP authorization:
1. Regulated activities that would require authorization from the Corps pursuant to Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403).
2. Regulated activities that may cause more than minimal adverse effects on tribal rights (including treaty rights),
protected tribal resources, or tribal lands.
3. Regulated activities eligible for authorization under a valid Corps Special Area Management plan (SAMP) general
permit.
4. Regulated activities that would result in the loss of a tributary at any single and complete location.
5. Regulated activities that would occur in a calcareous fen, unless the Wisconsin Department of Natural Resources
(WI DNR) has authorized the proposed regulated activity, or the Minnesota Department of Natural Resources
(MN DNR) has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
6. Regulated activities which are likely to directly or indirectly jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such
species. No regulated activity is authorized under any RGP which "may affect" a listed species or critical habitat,
unless ESA Section 7 consultation addressing the effects of the proposed activity has been completed.
7. Regulated activities which may have the potential to cause effects to properties listed, or eligible for listing, in the
National Register of Historic Places, unless the requirements of Section 106 of the National Historic Preservation
Act (NHPA) have been satisfied.
D. CALCULATING IMPACTS TO WATERS OF THE UNITED STATES
This section describes the impact calculations the Corps generally uses to verify that an RGP meets the stated restrictions
in Section B above. Some components described in this section may not be applicable to the Wildlife Ponds RGP.
However, projects where Wildlife Ponds RGP activities are one component of a larger project requiring Corps
authorization may require a tabulation of more varied impacts than required by the Wildlife Ponds RGP alone. See
Section G below for more information regarding the use of multiple general permits.
1. Waters of the US may include waterbodies such as streams, rivers, lakes, ponds, and wetlands (see the Definitions
section I below).
2. Loss of waters of the US is the sum of all permanently adversely affected jurisdictional waterbodies for a single
and complete project. Temporary impacts to waters of the US, discussed below, are calculated separately from
losses of waters of the US, and do not contribute to loss thresholds. Permanent adverse effects include filling,
2
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
flooding, excavation, or drainage in waters of the US as a result of the regulated activity. Permanent adverse
effects to waters of the US include regulated activities that change a waterbody to dry land, increase the bottom
elevation of a waterbody, or decrease the bottom elevation of a waterbody (e.g. excavation of a sedge meadow
wetland to shallow marsh), or change the use of a waterbody.
a) Losses of wetland must be reported in either acres or square feet, as appropriate.
b) Losses of tributaries, ponds, and lakes must be reported in acres or square feet and linear feet below the
plane of the ordinary high water mark. If regulated activities are proposed along opposite banks (e.g. bank
stabilization along both banks of a tributary) or at multiple locations (e.g. construction of bridge abutments
and piers), they are added together to determine the total amount of linear loss to waters of the US.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability section B, or in Pre-Construction Notification
Information section E.
3. Temporary impacts to waters of the US include the sum of all regulated activities in jurisdictional waterbodies at a
single and complete location which are restored to pre-construction conditions. Examples of temporary impacts
in waters of the US include the placement of timber matting, temporary stockpiling of dredged material,
trenching and backfilling, and in many cases - mechanized land-clearing in waters of the US.
a) Temporary impacts to wetlands must be reported in either acres or square feet, as appropriate.
b) Temporary impacts to tributaries, ponds, and lakes must be reported in acres or square feet and linear feet
below the plane of the ordinary high water mark. If regulated activities are proposed along opposite banks or
at multiple locations, temporary impacts are added together to determine the total amount of temporary
linear impact.
c) Additional measurements for waterbodies may be required. If required, these measurements will be
specified in the Regional General Permit Applicability section B, or in Pre-Construction Notification
Information section E.
4. Losses and temporary impacts to waters of the US do not include activities that do not require Department of the
Army authorization, such as activities eligible for exemptions under section 404(f) of the Clean Water Act.
5. The measurements of loss and temporary impact to waters of the US are threshold measurements to
jurisdictional waters for determining whether a project may qualify for an RGP. These measures are not a net
threshold that is calculated after considering compensatory mitigation that may be used to offset losses of
aquatic functions and services.
E. PRE-CONSTRUCTION NOTIFICATION (PCN) INFORMATION
All Wildlife Ponds RGP activities require PCN. The PCN must include all other nationwide permits, programmatic general
permits, RGPs, or individual permits used or intended to be used to authorize any part of the overall project, including
other regulated activities that require Corps authorization but do not require PCN.
Before starting regulated work, project proponents must obtain written Corps verification of Wildlife Ponds RGP
coverage for all activities.
1. Timing of PCN: The prospective permittee must notify the Corps by submitting a PCN as early as possible. The Corps
will determine if the PCN is complete within 30 calendar days of the date of receipt and, if the PCN is determined to be
incomplete, notify the prospective permittee within that 30 day period to request the additional information necessary
to make the PCN complete. As a general rule, the Corps will request additional information necessary to make the PCN
complete only once. However, if the prospective permittee does not provide all of the requested information, then the
Corps will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not
commence until all of the requested information has been received by the Corps. The prospective permittee shall not
3
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
begin the activity until they are notified in writing by the Corps that the activity may proceed under the RGP with any
special conditions imposed by the Corps.
2. Form and Content of PCN: The PCN must be in writing and should utilize the Minnesota Joint Waters Wetlands
Application, WI DNR application or the Corps standard individual permit application Form ENG 4345. A letter
containing the required information may also be used. A complete PCN must include:
a. Contact information including the name, mailing address, email address, and telephone numbers of the prospective
permittee and any third party agents.
b. Location of the proposed activity (i.e. section-township-range and latitude and longitude in decimal degrees).
c. A description of the proposed activity and its purpose; a description of any avoidance and minimization mitigation
measures intended to reduce the adverse environmental effects caused by the proposed activity; and any and all
other general or individual permits used or intended to be used to authorize any part of the overall project, including
activities that require Corps authorization but do not require PCN.
d. A tabulation of all impacts to waters of the US, including the anticipated amount of loss and temporary impact to
waters of the US expected to result from the proposed activity. Impacts to all waters of the US must be reported
in acres or square feet. In addition, pond and lake impacts must also be reported in linear feet (see Calculating
Impacts to Water of the United States, Section D).
e. Sketches, maps, drawings and plans must be provided to show that the activity complies with the terms of the RGP.
Sketches should contain sufficient detail to provide an illustrative description of the proposed activity. Large and smallscale maps must be provided to show the project site location. Drawings and plans should be to scale, with scale bar
included, and depict all identified aquatic resources and aquatic resource impact areas, including plan-view drawings
on a recent aerial photograph, and cross-section and profile drawings where appropriate.
f. Identification of all aquatic resources on the project site and the acreage of each aquatic resource present. Aquatic
resources shall be identified by type (e.g. wetland, lake, man-made ditch, pond, etc.) and impacts shall be identified
by type (e.g. fill, excavation, etc.) and permanence (permanent or temporary). A wetland delineation may be required.
g. A statement describing how compensatory mitigation requirements will be satisfied, or an explanation why
compensatory mitigation should not be required. See Mitigation, Section F for more information.
h. If the proposed project would impact a calcareous fen, the PCN must include a copy of the WI DNR authorization for
the proposed regulated activity, or a copy of the approved MN DNR calcareous fen management plan specific to the
project.
i. If any federally-listed proposed, threatened or endangered species or proposed or designated critical habitat might
be affected or is in the vicinity of the activity, the PCN must include the name(s) of those endangered or threatened
species that might be affected by the proposed activity or that utilize the designated critical habitat that might be
affected by the proposed activity. Federal applicants or applicants that have federal funding (or whose project
otherwise involves a lead federal agency) must provide documentation demonstrating compliance with Section 7 of
the Endangered Species Act.
j. If the activity might have the potential to cause effects to an historic property listed on, eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property
might have the potential to be affected by the proposed activity and include a vicinity map indicating the location of
the historic property. Federal applicants or applicants that have federal funding (or whose project otherwise involves
a lead federal agency) must provide documentation demonstrating compliance with Section 106 of the National
Historic Preservation Act.
k. The PCN must specify how long temporary impacts and structures will remain in place and include a restoration plan
showing how all temporary fills and structures will be removed and the area restored to pre-project conditions.
l. If a waiver from for a specific condition of the permit is proposed (General Condition 12), the PCN must include an
explanation of the need for a waiver and why the applicant believes the impacts would result in minimal individual
and cumulative adverse environmental effects.
4
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
F. MITIGATION
In accordance with the Federal Mitigation Rule (33 CFR part 332), the Section 404(b)(1) guidelines (40 CFR part 230), and
current Corps policies and guidelines for compensatory mitigation, regulated activities must be designed and constructed
to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site). Mitigation includes actions which may avoid, minimize, rectify, reduce,
or compensate for adverse environmental effects or activities which may otherwise be contrary to the public interest.
The Corps may require compensatory mitigation to ensure that the activity results in no more than minimal adverse
environmental effects, or will not be contrary to the public interest. In reviewing the PCN for the proposed activity, the
Corps will determine whether the activity authorized by the RGP will result in more than minimal individual or cumulative
adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by
a specific RGP, the Corps should issue the RGP verification for that activity if it meets the terms and conditions of that
RGP, unless the Corps determines, after considering mitigation, that the proposed activity will result in more than minimal
individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and
exercises discretionary authority to require an individual permit for the proposed activity.
Project proponents may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation.
When developing a compensatory mitigation proposal, the project proponent must consider appropriate and practicable
options consistent with the framework at 33 CFR 332.3(b). Compensatory mitigation projects provided to offset losses of
aquatic resources must comply with the applicable provisions of the current Corps policies, guidelines, and 33 CFR part
332.
G. USE OF MULTIPLE GENERAL PERMITS (STACKING)
Single and complete non-linear projects may not be ``piecemealed'' to avoid the limits in a general permit (nationwide,
programmatic, or regional general permit) authorization. When general permit limits are exceeded, single and complete
projects may be eligible for review and authorization by an individual permit.
Unless otherwise indicated by a specific general permit or general permit category, the use of more than one general
permit (nationwide, programmatic, or regional general permit) for a single and complete project is prohibited, except
when the acreage or linear foot loss of waters of the US authorized by the general permit does not exceed the acreage
limit of the general permit with the highest specified acreage limit.
H. GENERAL CONDITIONS
To qualify for Wildlife Ponds RGP authorization, the prospective permittee must comply with the following conditions, as
applicable, in addition to all applicable Wildlife Ponds RGP terms and requirements and all project-specific conditions
imposed by the Corps.
1.
Compliance: The permittee is responsible for ensuring that whomever performs, supervises or oversees any
portion of the physical work associated with the construction of the project has a copy of and is familiar with all
the terms and conditions of the RGP and any special (permit-specific) conditions included in any written
verification letter from the Corps. The activity must also comply with any special conditions added by the state,
Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination. The permittee is ultimately responsible for ensuring compliance with
all the terms and conditions of the RGP. Any authorized structure or fill shall be properly maintained, including
5
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
2.
3.
4.
5.
6.
7.
8.
maintenance to ensure public safety and compliance with applicable RGP general conditions, as well as any activityspecific conditions added by the Corps to an RGP authorization.
Compliance Certification: Each permittee who receives an RGP verification letter from the Corps must provide a signed
certification documenting completion of the authorized activity and implementation of any required compensatory
mitigation. The Corps will provide the permittee the certification document with the RGP verification letter. The
completed certification document must be submitted to the Corps within 30 days of completion of the authorized
activity or the implementation of any required compensatory mitigation, whichever occurs later.
Site Inspection: The permittee shall allow representatives from the Corps to inspect the proposed project site and the
authorized activity to ensure that it is being, or has been, constructed and maintained in accordance with the RGP
authorization.
Migratory Birds and Bald and Golden Eagles: The permittee is responsible for ensuring their action complies with the
Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting
appropriate local office of the U.S. Fish and Wildlife Service (FWS) to determine applicable measures to reduce
impacts to migratory birds or eagles, including whether "incidental take" permits are necessary and available under
the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. Activities in waters of
the US that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
Endangered Species:
a. No activity is authorized under this RGP which is likely to directly or indirectly jeopardize the continued existence
of a threatened or endangered species or a species proposed for such designation, as identified under the
Endangered Species Act (ESA), 50 CFR 402, or which will directly or indirectly destroy or adversely modify the
critical habitat of such species. No activity is authorized under the Wildlife Ponds RGP which "may affect" a listed
species or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been
completed, and a Corps RGP verification letter is issued. Direct effects are the immediate effects on listed species
and critical habitat caused by the RGP activity. Indirect effects are those effects on listed species and critical
habitat that are caused by the RGP activity and are later in time, but still are reasonably certain to occur.
b. As a result of formal or informal consultation with the FWS the Corps may add species-specific permit condition
to the RGP verification.
c. Information on the location of threatened and endangered species and their critical habitat can be obtained
directly from the offices of the FWS on their web page at www.fws.gov/ipac.
Calcareous Fens: The permittee may not complete regulated activities in a calcareous fen, unless the Wisconsin
Department of Natural Resources has authorized the proposed regulated activity, or the Minnesota Department of
Natural Resources has approved a calcareous fen management plan specific to the project. A list of known Minnesota
calcareous fens can be found at: http://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf.
Wild and Scenic Rivers: The permittee may not complete regulated activities in a component of the National Wild and
Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the
system while the river is in an official study status, unless the appropriate Federal agency with direct management
responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and
Scenic River designation or study status.
Historic Properties, Cultural Resources:
a. No activity which may affect historic properties listed or potentially eligible for listing on the National Register of
Historic Places is authorized until the Corps has complied with the requirements of Section 106 of the National
Historic Preservation Act. Federal project proponents should follow their own procedures for complying with the
requirements of Section 106 and provide documentation of compliance with those requirements.
b. Information on the location and existence of historic resources can be obtained from the State Historic
Preservation Office, Tribal Historic Preservation Offices, and the National Register of Historic Places.
c. Rock or fill material used for activities authorized by this permit must either be obtained from existing quarries or,
if a new borrow site is excavated to obtain fill material, the Corps must be notified prior to the use of the new site
to determine whether a cultural resources survey of the site is necessary.
6
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
Discovery of Previously Unknown Remains and Artifacts: If you discover any previously unknown historic, cultural or
archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately
notify the Corps of what you have found, and to the maximum extent practicable, avoid construction activities that
may affect the remains and artifacts until the required coordination has been completed. The Corps will initiate the
Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if
the site is eligible for listing in the National Register of Historic Places.
10. Federally Authorized Corps Civil Works projects: A permittee is not authorized to begin any regulated activities
described in this RGP if activities will alter or temporarily or permanently occupy or use a Corps federally authorized
civil works project, unless the appropriate Corps office issues Section 408 permission to alter, occupy, or use the
Corps civil works project (pursuant to 33 U.S.C. 408), and the Corps issues written a Wildlife Ponds RGP verification.
Examples of federal projects include but are not limited to works that were built by the Corps and are locally
maintained (such as local flood control projects) or operated and maintained by the Corps (such as locks and dams).
11. Dam Safety: Permittees are not authorized to begin regulated activities unless they are able to demonstrate that the
structures, when appropriate, comply with applicable state dam safety criteria or have been designed by qualified
persons. The Corps may require documentation that the design has been independently reviewed by similarly
qualified persons, and appropriate modifications are made to ensure safety.
12. Restoration of Temporary Impacts: All temporary impacts in waters of the US, including discharges resulting from side
casting material excavated from trenching, that occur as a result of the regulated activity must be fully contained with
appropriate erosion control or containment methods, be restored to preconstruction contours and elevations, and
revegetated with native, non-invasive vegetation. A project proponent may request, in writing, a waiver from this
condition from the Corps. An acceptable reason for a waiver to this condition may include, but is not limited to, the
Corps allowing natural restoration of the site when the resulting grade and existing seed bank are sufficient for the
site to restore to pre-construction conditions. In temporarily excavated wetlands, the top 6 to 12 inches of the
excavation should normally be backfilled with topsoil originating from the wetland. No temporary excavation area,
including, but not limited to trenches, may be constructed or backfilled in such a manner as to drain waters of the
United States (e.g., backfilling with extensive gravel layers, creating a french drain effect).
13. Duration of Temporary Impacts: Temporary impacts in waters of the U.S., including wetlands, must be avoided and
limited to the smallest area and the shortest duration required to accomplish the project purpose. Unless otherwise
conditioned in a Corps RGP verification, temporary impacts: 1) are allowed to stay in place as long as specified in the
PCN; or 2) must be removed in their entirety in accordance with the plan described in the PCN.
14. Best Management Practices: To minimize adverse effects from soil loss and sediment transport that may occur as a
result of the authorized work, appropriate best management practices (BMPs) shall be maintained and remain in
place until the affected area is stabilized with vegetation or ground cover. Heavy equipment working in wetlands or
mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. BMPs shall be
inspected and property maintained following storm events to ensure they are operational. All exposed slopes and
stream banks must be stabilized within 24 hours after completion of all tributary crossings.
15. Aquatic Life Movements: No regulated activity may substantially disrupt the necessary life cycle movements of
those species of aquatic life indigenous to the waterbody, including those species that normally migrate through
the area, unless the activity's primary purpose is to impound water.
16. Spawning Areas: Activities in spawning areas during spawning seasons must be avoided to the maximum extent
practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering
by substantial sedimentation) of a designated or known spawning area are not authorized.
17. Pollutant or Hazardous Waste Spills: If a spill of any potential pollutant or hazardous waste occurs, it is the
responsibility of the permittee to immediately notify the National Response Center at 1-800-424-8802 or
www.nrc.uscg.mil AND
IN WISCONSIN: the WI DNR Spills Team at 1-800-943-0003; or
IN MINNESOTA: the Minnesota State Duty Officer at 1-800-422-0798.
9.
7
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
18.
19.
20.
21.
The permittee is responsible for removing such pollutants and hazardous materials and for minimizing any
contamination resulting from a spill in accordance with state and federal laws.
Clean Construction Equipment: All construction equipment must be clean prior to entering and before leaving the
work site in order to prevent the spread of invasive species.
Fills Within 100-Year Floodplains: The activity must comply with applicable FEMA-approved state or local floodplain
management requirements.
Access Roads: Access roads must be sized appropriately and must be constructed in such a way to minimize adverse
effects on waters of the US and elevations must be as near as practicable to pre-construction contours and
elevations (e.g., at grade corduroy roads or geotextile/gravel roads). All access roads constructed in waters of the
US must be properly bridged or culverted to maintain surface flows.
Transfer of Regional General Permit Verifications: If the permittee sells the property associated with a regional
general permit verification, the permittee may transfer the regional general permit verification to the new owner
by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the regional general
permit verification must be attached to the letter, and the letter must contain the following statement and
signature "When the structures or work authorized by this regional general permit are still in existence at the time
the property is transferred, the terms and conditions of this regional general permit, including any special
conditions, will continue to be binding on the new owner(s) of the property. To validate the transfer of this regional
general permit and the associated liabilities associated with compliance with its terms and conditions, have the
transferee sign and date below."
___________________________________
(Transferee)
___________________________________
(Date)
I. DEFINITIONS
Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse
environmental effects on surface water quality resulting from development. BMPs are categorized as structural or nonstructural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement,
and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse
impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.
Direct effects: Effects that are caused by the activity and occur at the same time and place.
Discharge: The term discharge of dredged material is defined at 33 CFR 323.2(d) and the term discharge of fill material is
defined at 33 CFR 332.2(f).
Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object
included in, or eligible for inclusion in, the National Register of Historic Places maintained by the Secretary of the Interior.
This term includes artifacts, records, and remains that are related to and located within such properties. The term
includes properties of traditional religious and cultural importance to an Indian tribe and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-linear project in the Corps Regulatory
Program. A project is considered to have independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have
independent utility. Phases of a project that would be constructed even if the other phases were not built can be
considered as separate single and complete projects with independent utility.
8
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still
reasonably foreseeable.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR
part 329.
Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and
indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding
areas.
Overall project: The aggregate of all single and complete projects (linear and non-linear) proposed with regulated losses
and temporary impacts to waters of the US.
Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in
light of overall project purposes.
Pre-construction notification (PCN): A request submitted by the project proponent to the Corps for confirmation that a
particular activity is verified by a general permit. The request may be a permit application, letter, or similar document that
includes information about the proposed work and its anticipated environmental effects. Pre-construction notification
may be required by the terms and conditions of this regional general permit. A pre-construction notification may be
voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants
verification that the activity is authorized by general permit.
Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural
importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes,
judicial decisions, or executive orders, including tribal trust resources.
Single and complete linear project: A linear project is a project constructed for the purpose of getting people, goods, or
services from a point of origin to a terminal point, which often involves multiple crossings of one or more waterbodies at
separate and distant locations. The term "single and complete project" is defined as that portion of the overall linear
project proposed or accomplished by one owner/developer or partnership or other association of owners/developers that
includes all crossings of a single water of the US (i.e., a single waterbody) at a specific location. For linear projects crossing
a single or multiple waterbodies several times at separate and distant locations, each crossing is considered a single and
complete project for purposes of this general permit authorization. However, individual channels in a braided stream or
river, or individual arms of a large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of
such features cannot be considered separately. The definition of "single and complete linear project" does not include the
term "independent utility" because each crossing of waters of the US is needed for the single and complete linear project
to fulfill its purpose of transporting people, goods, and services from the point of origin to the terminal point.
Single and complete non-linear project: For non-linear projects, the term "single and complete project" is defined at 33
CFR 330.2(i) as the overall project proposed or accomplished by one owner/developer or partnership or other association
of owners/developers. A single and complete non-linear project must have independent utility. Single and complete nonlinear projects may not be "piecemealed" to avoid the limits in an RGP authorization. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a
multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project
that would be constructed even if the other phases were not built can be considered as separate single and complete
projects with independent utility.
Tribal lands: Any lands which are either: 1) held in trust by the United States for the benefit of any Indian tribe or
individual; or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished
aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable
remedies.
Tributary: For purposes of this RGP, a water that contributes flow, either directly or through another water to a
traditionally navigable water or interstate water (including wetlands) and that is characterized by the presence of the
physical indicators of bed and banks and ordinary high water mark. A tributary can be a natural, man-altered, or manmade water and includes waters such as rivers, streams, canals, and ditches.
9
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
Waiver: An approval from the Corps which allows an applicant to exceed the activity restrictions or conditions described
in an RGP. Waivers may only be considered when expressly indicated as available in an RGP and will only be granted once
the Corps has made a written determination that the RGP activity will result in only minimal individual and cumulative
adverse environmental effects. When a waiver is required, an applicant cannot start work until they have received a RGP
verification letter with waiver approval.
Waterbody: For purposes of this RGP, a waterbody is a jurisdictional water of the United States. Examples of
"waterbodies" include streams, rivers, lakes, ponds, and wetlands.
J. FURTHER INFORMATION
1. Congressional authorities: The permittee has been authorized to undertake the activity described above pursuant to
Section 404 of the Clean Water Act (33 U.S.C 1344).
2. The Corps retains discretionary authority to require an individual permit for any activity eligible for authorization by a
RGP based on concern for the aquatic environment or for any other factor of the public interest.
3. Limits of this authorization:
a. This RGP does not obviate the need to obtain other federal, state, or local authorizations required by law;
b. This RGP does not grant any property rights or exclusive privileges;
c. This RGP does not authorize any injury to the property or rights of others; and
d. This RGP does not authorize interference with any existing or proposed federal project.
4. Limits of federal liability: In issuing this permit, the Federal Government does not assume any liability for the
following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from
natural causes;
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity
authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; or
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
5. Reliance on permittee's data: The determination of this office that an activity is not contrary to the public interest will
be made in reliance on the information provided by the project proponent.
6. Re-evaluation of decision: This office may reevaluate its decision for an individual verification under this general
permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a. The permittee fails to comply with the terms and conditions of this permit;
b. The information provided by the permittee in support of the pre-construction notification proves to have been
false, incomplete, or inaccurate (See 4 above); or
c. Significant new information surfaces which this office did not consider in reaching the original decision. Such a
reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring the permittee to comply with the terms and conditions of their permit and for the initiation of legal
action where appropriate. The permittee will be required to pay for any corrective measures ordered by this
office, and if the permittee fails to comply with such directive, this office may in certain situations (such as those
specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill the permittee
for the cost.
7. This office may also reevaluate its decision to issue this Wildlife Ponds RGP at any time the circumstances warrant.
Circumstances that could require a reevaluation include, but are not limited to, significant new information surfaces
10
St. Paul District Corps of Engineers, Regulatory Branch
Wildlife Ponds Regional General Permit
which this office did not consider in reaching the original public interest decision. Such a reevaluation may result in a
determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33
CFR 325.
K. CORPS DECISION
In reviewing the PCN for the proposed activity, the Corps will determine whether the activity authorized by the RGP will
result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public
interest. If a project proponent requests authorization by a specific RGP, the Corps should issue the RGP verification for
that activity if it meets the terms and conditions of that RGP, unless the Corps determines, after considering mitigation,
that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic
environment and other aspects of the public interest and exercises discretionary authority to require an individual permit
for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of
waters of the United States to determine whether they individually satisfy the terms and conditions of the RGPs, as well as
the cumulative effects caused by all of the crossings authorized by RGP.
If an applicant requests a waiver for any limit where waivers are indicated as available, the Corps will only grant the waiver
upon a written determination that the RGP activity will result in only minimal individual and cumulative adverse
environmental effects.
When making minimal adverse environmental effects determinations the Corps will consider the direct and indirect
effects caused by the RGP activity. The Corps will also consider the cumulative adverse environmental effects caused by
activities authorized by the RGP and whether those cumulative adverse environmental effects are no more than minimal.
The Corps will consider site specific factors, such as the environmental setting in the vicinity of the RGP activity, the type
of resource that will be affected by the RGP activity, the functions provided by the aquatic resources that will be affected
by the RGP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that
aquatic resource functions will be lost as a result of the RGP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g.,
watershed or ecoregion), and mitigation required by the Corps. The Corps may add case-specific special conditions to the
RGP authorization to address site-specific environmental concerns.
The Corps will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in
the proposal to inform decisions regarding whether the net adverse environmental effects of the proposed activity are no
more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the Corps determines
that the activity complies with the terms and conditions of the RGP and that the adverse environmental effects are no
more than minimal, after considering mitigation, the Corps will notify the permittee and include any activity specific
conditions in the RGP verification the Corps deems necessary. Conditions for compensatory mitigation requirements must
comply with the appropriate provisions at 33 CFR 332.3(k). When compensatory mitigation is required, the Corps must
approve the final mitigation plan before the permittee commences work in waters of the United States, unless the Corps
determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion
of the required compensatory mitigation. If the Corps determines that the adverse environmental effects of the proposed
activity are more than minimal, then the Corps will notify the applicant of next steps as described in 33 CFR 325.
11