PERSONNEL, BARGE AND EQUIPMENT DOCK INSTALLATIONS FOURCHON TERMINAL, LAFOURCHE PARISH

NAME OF APPLICANT: CHEVRON PIPE LINE COMPANY, c/o T. Baker Smith, Attn: Jeffrey Hargis, Post Office Box 2266, Houma, Louisiana 70361 LOCATION OF WORK: California Canal and Pass Fourchon at the Fourchon Terminal, located in Section 24, Township 23 South, Range 22 East, Port Fourchon, Louisiana, (29.106077, -90.193469), in Lafourche Parish, as shown on the enclosed drawings, within Hydrologic Unit Code 08090301 East Central Louisiana Coastal. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to install and maintain a 6.5-ft wide by 70-ft long steel personnel boat dock and walkway in the California Canal (29.106077, -90.193469), and to install and maintain a 3.5-ft wide by 39-ft long steel barge dock walkway, and a 14-ft wide by 40-ft long steel loading ramp with timber and steel piles in Pass Fourchon (29.104880, -90.190625), all to ensure continuity of safe operations at Fourchon Terminal since a bridge along Louisiana Highway 3090 that serves as the only means of access to the site, will be removed by the Lafourche Parish Government. Three (3) 8-ft by 20-ft articulated concrete mats will be placed under the steel loading ramp for erosion control. A proposed winch mounted on a 30” steel piling will be installed on the existing gravel parking lot. All construction activities will be conducted from the water on barges. No dredging or wheel washing is required. The site is an industrial facility and there are no jurisdictional wetlands that will be impacted by this project.

JOINT PUBLIC NOTICE October 16, 2017 United States Army Corps of Engineers New Orleans District Attn: Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118

State of Louisiana Department of Environmental Quality Attn: Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

Project Manager: Dirreen Arnold (504) 862-2301 / fax: (504) 862-2574 dirreen.s.arnold@usace.army.mil Permit Application Number: MVN-2017-01238-CA

Project Manager: Elizabeth Hill (225) 219-3225 / fax: (225) 219-3156 WQC Application Number: WQC-171009-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act. PERSONNEL, BARGE AND EQUIPMENT DOCK INSTALLATIONS FOURCHON TERMINAL, LAFOURCHE PARISH NAME OF APPLICANT: CHEVRON PIPE LINE COMPANY, c/o T. Baker Smith, Attn: Jeffrey Hargis, Post Office Box 2266, Houma, Louisiana 70361 LOCATION OF WORK: California Canal and Pass Fourchon at the Fourchon Terminal, located in Section 24, Township 23 South, Range 22 East, Port Fourchon, Louisiana, (29.106077, -90.193469), in Lafourche Parish, as shown on the enclosed drawings, within Hydrologic Unit Code 08090301 East Central Louisiana Coastal. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to install and maintain a 6.5-ft wide by 70-ft long steel personnel boat dock and walkway in the California Canal (29.106077, -90.193469), and to install and maintain a 3.5-ft wide by 39-ft long steel barge dock walkway, and a 14-ft wide by 40-ft long steel loading ramp with timber and steel piles in Pass Fourchon (29.104880, -90.190625), all to ensure continuity of safe operations at Fourchon Terminal since a bridge along Louisiana Highway 3090 that serves as the only means of access to the site, will be removed by the Lafourche Parish Government. Three (3) 8-ft by 20-ft articulated concrete mats will be placed under the steel loading ramp for erosion control. A proposed winch mounted on a 30" steel piling will be installed on the existing gravel parking lot. All construction activities will be conducted from the water on barges. No dredging or wheel washing is required. The site is an industrial facility and there are no jurisdictional wetlands that will be impacted by this project.

-2-

The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be submitted so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be forwarded to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing, faxing, or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.

Corps of Engineers Permit Criteria

The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

-3-

The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, pre-historical, historical sites, or data. Issuance of this public notice solicits input from the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources. The New Orleans District has determined that the proposed project is located within waters known to be occupied by the endangered West Indian Manatee (Trichechus manatus) and determined with the inclusion of the Standard Manatee Conditions for In-Water Activities the proposed activity is not likely to adversely affect the species based on the Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may result in the destruction or alteration of 0.0 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

-4-

The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch

Enclosure

LAFOURCH PARISH, LOUISIANA 20 MILES SOUTH OF GOLDEN MEADOW

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY DRAWN BY: DATE:

SJK

APPROVED BY:

09/13/17

JOB NO:

DRAWING NAME:

2017.0812

170812P01-02.DWG

1

SHEET NO:

JMH

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET SCALE: 1" = 4 Miles

4 Miles

2 Miles

0

PROJECT VICINITY CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA REV. NO:

4 Miles

00

REV. DATE:

REVISION DESCRIPTION: --

--/--/--

REV. BY:

---

LAFOURCH PARISH, LOUISIANA SECTION 24, T23S-R22E

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY DRAWN BY: DATE:

SJK

APPROVED BY:

09/13/17

JOB NO:

DRAWING NAME:

JMH

2017.0812

170812P01-02.DWG

2

SHEET NO:

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET SCALE: 1" = 2000'

2000'

1000'

0'

PROJECT VICINITY CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA REV. NO:

2000'

00

REV. DATE:

REVISION DESCRIPTION: --

--/--/--

REV. BY:

---

+10'

8.2'

F SS PA OU

HW

Y

H RC

30

90

ON 8.3'

MARSH

8.1'

MARSH

9.2' 6.9'

CALIFORNIA CANAL

10.7'

10.9'

10.1'

7.3'

5.2'

SITE OF BOAT DOCK (PERSONNEL)

8.1' 8.8'

CHEVRON FOURCHON TERMINAL

7.3'

SITE OF EQUIPMENT DOCK/RAMP THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY DRAWN BY: DATE:

SJK

APPROVED BY:

09/13/17

JOB NO:

DRAWING NAME:

2017.0812

170812P01-02.DWG

3

SHEET NO:

JMH

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET SCALE: 1" = 300'

300'

150'

0'

ACCESS CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA REV. NO:

300'

00

REV. DATE:

REVISION DESCRIPTION: --

--/--/--

REV. BY:

---

APPROXIMATELY 195± FROM END OF DOCK TO OPPOSITE BANKLINE

CALIFORNIA CANAL 270'

TEMPORARY WORKSPACE

END PROPOSED DOCK I AL

X = 3,644,864' Y = 222,298' LAT = 29° 6' 22.59" LONG = 90° 11' 36.49"

M GN T EN

POSSIBLE VESSEL LOCATIONS FOR CONSTRUCTION

NAD 83 NAD 83

M AY RY

VA

180'

225'

CITY OF NEW ORLEANS SWD # 1

120' x 38' CRANE BARGE

PROPOSED BOAT DOCK WALKWAY

WELL W

50' x 18' TUG

ALKWA Y

130' x 30' DECK BARGE

EXISTING BULKHEAD EXIST. BUILDING

BEGIN PROPOSED DOCK X = 3,644,864' Y = 222,227' LAT = 29° 6' 21.88" LONG = 90° 11' 36.49"

NAD 83 NAD 83

SEE PAGE 6 PERSONNEL DOCK CROSS SECTION

EXISTING CHEVRON FOURCHON TERMINAL THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY DRAWN BY: DATE:

SJK

APPROVED BY:

09/13/17

JOB NO:

DRAWING NAME:

2017.0812

170812P01-02.DWG

4

SHEET NO:

JMH

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET SCALE: 1" = 50'

50'

25'

0'

BOAT DOCK (PERSONNEL) WORKSPACE CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA REV. NO:

50'

00

REV. DATE:

REVISION DESCRIPTION: --

--/--/--

REV. BY:

---

IMPACTS: 12" TIMBER PILES: 6 TO BE INSTALLED IN WATER:

QTY. 6 6 sqft.

0 CUBIC YARDS OF MATERIAL REMOVED

PASS FOURCHON

NG TI IS EX

5± 18 K LY OC LINE E D AT F NK IM D O BA OX EN TE R P M SI AP RO PO F OP TO

CK

RO

END PROPOSED DOCK

100'

NK

BA

X = 3,645,808' Y = 221,825' LAT = 29° 6' 17.81" LONG = 90° 11' 25.90"

NAD 83 NAD 83

PROPOSED BARGE DOCK & WALKWAY ' 18 'x G 50 TU

PROPOSED PILE CLUSTER

0' E x3 G 0' AR 13 K B C DE

8' E x 3 RG 0' BA 12 E N

A CR

SEE PAGE 6 EQUIPMENT DOCK CROSS SECTION

225'

POSSIBLE VESSEL LOCATION

BEGIN PROPOSED DOCK X = 3,645,777' Y = 221,801' LAT = 29° 6' 17.57" LONG = 90° 11' 26.25"

NAD 83

E

AC

NAD 83

P KS

PROPOSED PILE CLUSTER

OR

RY

EXISTING PARKING

W

RA

M

TE

PO

110'

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY DRAWN BY: DATE:

SJK

APPROVED BY:

09/13/17

JOB NO:

DRAWING NAME:

2017.0812

170812P01-02.DWG

5

SHEET NO:

JMH

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET SCALE: 1" = 50'

50'

25'

0'

EQUIPMENT DOCK/RAMP WORKSPACE CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA REV. NO:

50'

00

REV. DATE:

REVISION DESCRIPTION: --

--/--/--

REV. BY:

---

CROSS SECTION "PERSONNEL DOCK " LOOKING EAST 20' 15'

20'

12.00' 15'

M.H.W. = 1.5'

10'

M.L.W. = 0.0'

5'

5' NATURAL GROUND

0'

NAVD88

10' NAVD88

PROPOSED CRANE BARGE PLACEMENT 38' WIDE

PROPOSED DECK BARGE PLACEMENT 30' WIDE

0'

5' DRAFT

5' DRAFT -5'

-5' NATURAL BOTTOM

-10'

-10' EXISTING SHEET PILE BULKHEAD

-15'

-15'

CROSS SECTION "EQUIPMENT DOCK" LOOKING NORTHWEST 20'

20'

10'

15'

PROPOSED DECK BARGE PLACEMENT 30' WIDE

15'

NAVD88

10'

M.H.W. = 1.5' M.L.W. = 0.0'

5'

5' NATURAL GROUND

0'

0'

5' DRAFT

5' DRAFT

-5' P:\Y-2017\2017.0812\DWG\PERMIT\170812P04-11.DWG

10'

-5' NATURAL BOTTOM

-10' -15'

-15'

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY SCALE: 1" = 20'

DRAWN BY: DATE:

20'

10'

0'

20'

SJK 09/13/17

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

00

REV. DATE:

--/--/--

REV. BY:

---

JMH

2017.0812

170812P01-02.DWG

6

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET REV. NO:

-10'

REVISION DESCRIPTION: --

EQUIPMENT ACCESS PROFILE CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA

NAVD88

PROPOSED CRANE BARGE PLACEMENT 38' WIDE

CALIFORNIA CANAL

20'± PROPOSED TIMBER BRACING

20'±

17'±

12'±

PROPOSED STEEL WALKWAY & CABLE TRAY SUPPORTS

PROPOSED STEEL WALKWAY

TIE INTO EXISTING STAIRCASE PROPOSED STAIRS

10'± 6.5'± 10'±

10'±

10'±

10'±

PROPOSED TIMBER BRACING PROPOSED 12" DIA. PILE LOCATIONS

PROPOSED 12" DIA. PILE LOCATIONS

PROPOSED 12" DIA. PILE LOCATIONS

P:\Y-2017\2017.0812\DWG\PERMIT\170812P04-11.DWG

42'± GRAVEL

IMPACTS: EXISTING BULKHEAD

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY SCALE: 1" = 10'

DRAWN BY: DATE:

10'

5'

0'

10'

SJK 09/13/17

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

2017.0812

170812P01-02.DWG

7

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET REV. NO:

00

REV. DATE:

--/--/--

REV. BY:

---

JMH

REVISION DESCRIPTION: --

12" TIMBER PILES: QTY. 12 8 TO BE INSTALLED IN WATER: 8 sqft. 4 TO BE INSTALLED ON LAND: 4 sqft. 0 CUBIC YARDS OF MATERIAL REMOVED

BOAT DOCK (PERSONNEL) DETAIL CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA

PROPOSED DOCK INSTALLATION LOOKING EAST 20'

20' 40'± PROPOSED BARGE DOCK

TIE INTO EXISTING PLATFORM

30'± PROPOSED WALKWAY

15'

15' PROPOSED STEEL DECK AND HANDRAIL

PROPOSED TIMBER BRACING

10'

PROPOSED STAIRS

10'

5'

5' NATURAL GROUND M.H.W. = 1.5'

M.L.W. = 0.0'

0'

0'

NATURAL BOTTOM

-5'

-5'

EXISTING SHEET PILE BULKHEAD

-10'

-10'

P:\Y-2017\2017.0812\DWG\PERMIT\170812P04-11.DWG

-15'

-15' PROPOSED 12" DIA. PILE LOCATIONS

PROPOSED 12" DIA. PILE LOCATIONS

PROPOSED 12" DIA. PILE LOCATIONS

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY SCALE: 1" = 10'

DRAWN BY: DATE:

10'

5'

0'

10'

SJK 09/13/17

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

2017.0812

170812P01-02.DWG

8

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET REV. NO:

00

REV. DATE:

--/--/--

REV. BY:

---

JMH

REVISION DESCRIPTION: --

BOAT DOCK (PERSONNEL) PROFILE CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA

39'± PROPOSED BARGE DOCK PROPOSED 12" DIA. WOODEN PILES

PROPOSED 12" DIA. WOODEN PILES

PROPOSED STEEL WALKWAY

PROPOSED TIMBER BRACING

PROPOSED WOODEN PILE CLUSTER

GRAVEL PROPOSED 12" DIA. WOODEN PILES

3.5'± 10'±

10'±

10'±

7'± PROPOSED 16" STEEL PILE

PROPOSED 12" STEEL PILE

PASS FOURCHON 20'±

14'±

PROPOSED WINCH MOUNTED ON SINGLE 30" STEEL PILING

PROPOSED WOODEN PILE CLUSTER PROPOSED 12" STEEL PILE

24'± PROPOSED 16" STEEL PILE

IMPACTS: 12" TIMBER PILES: QTY. 16 16 TO BE INSTALLED IN WATER:

16 sqft.

16" STEEL PILES: QTY. 2 2 TO BE INSTALLED IN WATER:

3 sqft.

24" STEEL PILES: QTY. 2 2 TO BE INSTALLED IN WATER:

6 sqft.

30" STEEL PILES: QTY. 1 1 TO BE INSTALLED ON LAND :

5 sqft

40'± STEEL LOADING RAMP EXISTING ROCK BANK

P:\Y-2017\2017.0812\DWG\PERMIT\170812P04-11.DWG

PROPOSED MATTING THREE 8' X 20' ARTICULATED CONCRETE MATS

EXISTING PARKING

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY SCALE: 1" = 10'

DRAWN BY: DATE:

10'

5'

0 CUBIC YARDS OF MATERIAL REMOVED

0'

10'

SJK 09/13/17

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

2017.0812

170812P01-02.DWG

9

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET REV. NO:

00

REV. DATE:

--/--/--

REV. BY:

---

JMH

REVISION DESCRIPTION: --

EQUIPMENT DOCK/RAMP DETAIL CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA

PROPOSED DOCK INSTALLATION LOOKING NORTHWEST 20'

20' PROPOSED PILE MOUNTED LIFT GATE SUPPORTS

15'

15'

PROPOSED WINCH MOUNTED ON SINGLE 30" STEEL PILING

10'

39'± PROPOSED BARGE DOCK

10'

PROPOSED PILE MOUNTED LIFT GATE SUPPORTS

PROPOSED STEEL DECK AND HANDRAIL

5'

5' NATURAL GROUND

M.H.W. = 1.5' M.L.W. = 0.0'

0'

-5'

0'

-5' NATURAL BOTTOM

PROPOSED MATTING

-10'

-10'

P:\Y-2017\2017.0812\DWG\PERMIT\170812P04-11.DWG

-15'

-15'

IMPACTS:

PROPOSED 12" DIA. PILE LOCATIONS

8' X 20' CONCRETE MATS: QTY. 3 3 TO BE INSTALLED IN WATER: 480 sqft.

PROPOSED 12" DIA. PILE LOCATIONS

0 CUBIC YARDS OF MATERIAL REMOVED

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY SCALE: 1" = 10'

DRAWN BY: DATE:

10'

5'

0'

10'

SJK 09/13/17

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

2017.0812

170812P01-02.DWG

10

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET REV. NO:

00

REV. DATE:

--/--/--

REV. BY:

---

JMH

REVISION DESCRIPTION: --

EQUIPMENT DOCK/RAMP PROFILE CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA

PROPOSED MAT INSTALLATION

PROPOSED MAT INSTALLATION

OBLIQUE VIEW

LOOKING NORTHWEST

EXISTING GRAVEL PARKING LOT

A

RE

A ING

A

MIN

E

G TIN XIS

AP

G

EX

TER

IN IST

-R RIP

EXISTING RIP-RAP EROSION CONTROL P200600037

7

003

RK

A LP

L

O TR

06 P20

ON

OS

ER

C ION

M.L.W. = 0.0' PROPOSED MATTING 8'x20'x4.5", QTY:3

EDGE TO BE HAND JETTED

8' CABLE TIES

WATER BOTTOM 8'

8'

8'

8'

EDGE TO BE HAND JETTED 20'

EDGE TO BE HAND JETTED 8'

EXISTING RIP-RAP WILL BE REGRADED TO ALLOW FOR MAT PLACEMENT WITH EDGES EMBEDDED IN THE BOTTOM 1.0' EDGE BURIAL WILL TAKE PLACE BY HAND JETTING. 8'X20' MATS, QTY: 3 68' LINEAR FEET OF MAT EDGES TO BE JETTED 68' OF MATS X 1/2' WIDE X 1'BURIEL DEPTH = 34 CUBIC FT (1.26 CU.YDS.) OF JETTING 68' OF MATS X 1/2' WIDE = 34 SQFT (0.0007 ACRES) OF JETTING

9/25/2017 - P:\Y-2017\2017.0812\DWG\PERMIT\170812P04-11.DWG

TYPICAL MAT IDENTIFICATION TAG CHEVRON PIPE LINE COMPANY 100 NORTHPARK BLVD COVINGTON, LA 70433 CUP # P20170913 MAT NO. 1 OF 3

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY SCALE: 1" = 20'

DRAWN BY: DATE:

20'

10'

0'

20'

SJK 09/13/17

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

170812P01-02.DWG

11

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET REV. NO:

00

REV. DATE:

--/--/--

REV. BY:

---

JMH

2017.0812

REVISION DESCRIPTION: --

MATTING DETAIL CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA

TYPICAL SHALLOW DRAFT TUG, BARGE, AND CRANE

600HP SHALLOW DRAFT TUG

120'x38' CRANE BARGE

5' DRAFT

5' DRAFT

120'±

50'±

CALCULATIONS:

EQUIPMENT LIST:

600 HP TUG 50' X 18' X 5' DRAFT 38' X 120' X 5' DRAFT CRANE/QUARTERS BARGE 30' X 130' X 3'-5' DRAFT DECK BARGE ALUMINUM WORK SKIFF

APPROXIMATELY 9 SQUARE FEET OF THE FOURCHON TERMINAL GROUNDS MAY BEAFFECTED BY PILINGS USED IN THE PROPOSED DOCK CONSTRUCTION APPROXIMATELY 33 SQUARE FEET OF WATER BOTTOMS MAY BE AFFECTED BY PILINGS USEDIN THE PROPOSED DOCK CONSTRUCTION. APPROXIMATELY 480 SQ FT (0.01 ACRES) MAY BE AFFECTED BY THE PLACEMENT OF 4.5"ARTICULATED CONCRETE MATTING FOR EROSION CONTROL (6.67 CUBIC YARDS). APPROXIMATELY 34 SQFT. (0.0007 ACRES) MAY BE AFFECTED BY HAND JETTING APPROXIMATELY 1.26 CU. YDS. OF NATIVE MATERIAL MAY BE DISPLACED BY HAND JETTING

NO DREDGING OR WHEEL WASHING IS ANTICIPATED

NOTES: AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE WRITTEN ON THEM THE DATE OF COMPLETION OF SAID ACTIVITIES AND SHALL BE SUBMITTED TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, OFFICE OF COASTAL MANAGEMENT, P. O. BOX 44487, BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS FOLLOWING PROJECT COMPLETION. ALL STRUCTURES BUILT UNDER THE AUTHORIZATION AND CONDITIONS OF THIS PERMIT SHALL BE REMOVED FROM THE SITE WITHIN 120 DAYS OF ABANDONMENT OF THE FACILITIES FOR THE HEREIN PERMITTED USE, OR WHEN THESE STRUCTURES FALL INTO A STATE OF DISREPAIR SUCH THAT THEY CAN NO LONGER FUNCTION AS INTENDED. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE PERMIT, SHOULD ONE BE REQUIRED, FOR SUCH REMOVAL ACTIVITIES. STRUCTURES MUST ALSO BE MARKED/LIGHTED IN ACCORDANCE WITH U. S. COAST GUARD REGULATIONS. IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY.

THESE DRAWING ARE TO BE USED FOR THE ACQUISITION OF REGULATORY PERMITS ONLY DRAWN BY: DATE:

SJK 09/13/17

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

JMH

2017.0812

170812P01-02.DWG

12

OF

12

PROJECTION: LA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

EQUIPMENT/NOTES CHEVRON PIPE LINE COMPANY PROPOSED INSTALLATION OF A PERSONNEL DOCK & EQUIPMENT DOCK FOURCHON TERMINAL SECTION 24, T23S-R22E LAFOURCHE PARISH, LOUISIANA REV. NO:

00

REV. DATE:

REVISION DESCRIPTION: --

--/--/--

REV. BY:

---

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas