You can copy from here when filling out the rest of the page.
PROPOSED PRODUCTION BARGES AND FLOWLINES IN IBERVILLE PARISH
NAME OF APPLICANT: Interstate Explorations, LLC, c/o C.H. Fenstermaker & Associates, L.L.C., Attn: Chad Soileau, 5005 Riverway Dr., Suite 300, Houston, Texas 77056
LOCATION OF WORK: Near Bayou Sorrel, Section 25, 98, 99, and 100, T10S-R10E, approximately 1.8 miles southwest of Bayou Sorrel, Louisiana, in Iberville Parish, within the Atchafalaya Basin in hydrologic unit (HUC 08080101), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, excavate, directionally bore, jet, and deposit fill for the installation of two production barges, a meter platform, rock pad, two 4” flowlines, and four 3” flowlines to produce the Five Star No.1 Well. Approximately 254 cubic yards of native material, will be excavated and re-deposited and approximately 2,853 cubic yards of rock will be deposited to complete the project.
A preliminary analysis has determined that the proposed project would temporarily impact approximately 0.22 acre of herbaceous emergent wetlands, permanently convert 0.13 acre of forested wetlands to herbaceous emergent wetlands and temporarily impacts approximately 0.15 acre of “other waters of the US”.
The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit safe installation of the infrastructure for this project and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
October 16, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 701118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1301
Project Manager
Neil T. Gauthier
Neil.T.Gauthier@usace.army.mil
MVN 2013-03027-CM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 171013-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
PROPOSED PRODUCTION BARGES AND FLOWLINES IN IBERVILLE PARISH
NAME OF APPLICANT: Interstate Explorations, LLC, c/o C.H. Fenstermaker &
Associates, L.L.C., Attn: Chad Soileau, 5005 Riverway Dr., Suite 300, Houston, Texas
77056.
LOCATION OF WORK: Near Bayou Sorrel, Section 25, 98, 99, and 100, T10S-R10E,
approximately 1.8 miles southwest of Bayou Sorrel, Louisiana, in Iberville Parish, within
the Atchafalaya Basin in hydrologic unit (HUC 08080101), as shown on the attached
drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to clear, excavate, directionally bore, jet, and deposit fill for the installation of
two production barges, a meter platform, rock pad, two 4" flowlines, and four 3" flowlines to
produce the Five Star No.1 Well. Approximately 254 cubic yards of native material, will be
excavated and re-deposited and approximately 2,853 cubic yards of rock will be deposited
to complete the project.
A Preliminary analysis has determined that the proposed project would temporarily impact
approximately 0.22 acre of herbaceous emergent wetlands, permanently convert 0.13 acre
of forested wetlands to herbaceous emergent wetlands and temporarily impacts
approximately 0.15 acre of "other waters of the US".
2
The applicant stated that they have designed the project to avoid and minimize direct and
secondary adverse impacts to the maximum extent practicable. Any further reduction
would limit safe installation of the infrastructure for this project and, therefore deem the
project impracticable. As compensation for unavoidable wetland impacts, the applicant
proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located
in the watershed.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
3
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and State
Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Interior. Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that the proposed
activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
4
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures
Sec.11
Sec.26
SEE
SHEET 3
15 16
14
13 10
1211 9
P.O.E.
Proposed 4" Flowline @
Interstate Explorations LLCProposed Production Barge
(NAD83)
LAT. 30°10'26.1"
LONG. 91°24'21.9"
R 10 E
SEE SHEET 2
INSET C
Proposed Flowline
Bore Back
String On Floats
T
10
S
Sec.
25
X=
Y=
X=
Y=
1
2
NAD27
1,979,942
541,680
1,979,942
541,599
X=
Y=
X=
Y=
NAD 83
3,260,741
602,388
3,260,741
602,307
Lat.
Long.
Lat.
Long.
NAD83
30° 09' 23.2"
91° 23' 48.9"
30° 09' 22.4"
91° 23' 48.9"
VICINITY MAP
PROPOSED 4" FLOWLINE TO BE LAID ON HEATER PLATFORM
4
NOT TO SCALE
Sec.101
NAD 83
NAD83
NAD27
X= 1,979,942 X= 3,260,741 Lat.
30° 09' 22.4"
541,599 Y=
602,307 Long.
Y=
91° 23' 48.9"
X= 1,979,920 X= 3,260,719 Lat.
30° 09' 22.3"
541,595 Y=
602,303 Long.
Y=
91° 23' 49.1"
PROPOSED 4" FLOWLINE TO BE JETTED (±38')
STATION
3
Digitized Pipelines
Slip Area For
Proposed Bore Exit
(NAD83)
LAT. 30°09'51.4"
LONG. 91°24'01.8"
Sec.
100
Sec.97
6
SEE SHEET 2
INSET B
8
NAD27
Sec.103
STATION
5
Approximately 1.8 Miles Westerly
from BAYOU SORREL, LA.
AREA OF
PROPOSED
WORK
P.O.B. PROPOSED 4" FLOWLINE TO BE LAID ON WALKWAY (±80')
STATION
R 11 E
NAD 83
NAD83
X= 1,979,920 X= 3,260,719 Lat.
30° 09' 22.3"
541,595 Y=
602,303 Long.
Y=
91° 23' 49.1"
X= 1,979,886 X= 3,260,685 Lat.
30° 09' 22.2"
541,578 Y=
602,286 Long.
Y=
91° 23' 49.5"
PROPOSED 4" FLOWLINE TO BE BORED (±6918')
Sec.11
PROPOSED FLOWLINE
TO BE BORED
(±6918')
STATION
NAD27
NAD 83
NAD83
X= 1,979,886 X= 3,260,685 Lat.
30° 09' 22.2"
7
541,578 Y=
602,286 Long.
Y=
91° 23' 49.5"
Lat.
1,978,811
3,259,610
X=
X=
30° 09' 51.4"
8
544,535 Y=
605,243 Long.
Y=
91° 24' 01.8"
Lat.
1,977,004
3,257,803
30° 10' 24.2"
X=
X=
9
547,846 Y=
608,554 Long.
91° 24' 22.4"
Y=
PROPOSED 4" FLOWLINE TO BE LAID ON PIPE RACK (±317')
11
12
13
14
15
16
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
NAD27
1,977,004
547,846
1,976,999
547,846
1,976,999
547,868
1,976,926
547,975
1,977,013
548,046
1,977,038
548,052
1,977,051
548,034
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
NAD 83
3,257,803
608,554
3,257,798
608,554
3,257,798
608,576
3,257,725
608,683
3,257,812
608,754
3,257,837
608,760
3,257,850
608,742
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
NAD83
30° 10' 24.2"
91° 24' 22.4"
30° 10' 24.2"
91° 24' 22.4"
30° 10' 24.4"
91° 24' 22.4"
30° 10' 25.5"
91° 24' 23.3"
30° 10' 26.2"
91° 24' 22.3"
30° 10' 26.2"
91° 24' 22.0"
30° 10' 26.1"
91° 24' 21.9"
Proposed Flowline Bore
Back String On Floats
1
7 23
65 4
SEE SHEET 2
INSET A
Sec.99
Sec.98
1000'
0
500'
1000'
Scale: 1" = 1000'
08/18/2017
NAD 27 LOUISIANA SOUTH ZONE
104
10
T10S-R10E
T10S-R11E
STATION
P.O.B.
Proposed 4" Flowline @
Interstate Explorations LLCFive Star No.1 Well
(NAD83)
LAT. 30°09'23.2"
LONG. 91°23'48.9"
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
INTERSTATE EXPLORATIONS LLC
PROPOSED PRODUCTION BARGES, FLOWLINES & STRUCTURES
Sections 25,98,99 &100, T10S-R10E
IBERVILLE PARISH, LOUISIANA
DRAWN BY: SC
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 08/14/2017
SHEET 1 OF 7
SHEETS
FILENAME: T:\2015\2151678\DWG\SURVEYDETAIL\PERMIT PLANS_FLOWLINES.dwg
Proposed
Walkway
3'x80'
Proposed
4" Flowline
To Be Bored
1
P.O.B.
4" Flowline
@ Five Star
No. 1 Well
(MVN-2013-02775-CM)
2
4
15
16
13
Proposed
40'x50'
Heater Platform
Substation
Proposed
4" Flowline
To Be Jetted
Proposed
Pipe Rack
(±1435')
Proposed Temporary
Barge With Bore Equipment
(NAD83)
LAT. 30°10'22"
LONG. 91°23'49"
INSET A
1"=100'
P.O.E.
4" Flowline
Proposed
Boat Dock
8'x8'
3
Proposed
Bore Entry
4" Flowline
14
Proposed
Back String
On Floats
Proposed 4" Flowline
To Be Laid On
Pipe Rack
(±317')
INSET B
1"=100'
12
Proposed
Bore Entry
10'x10'x5'
10
11
INSET C
1"=60'
9
Proposed 4" Flowline
To Be Bored
(±6918')
PROPOSED 1-3" SWD & 3-3" FLOWLINES (SEE SHEET 3)
STATION
Proposed
Bore Exit
Proposed Temporary
Barge With Bore Equipment
(NAD83)
LAT. 30°09'52"
LONG. 91°24'02"
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
1
2
4
Proposed 4" Flowline
To Be Bored
(±6918')
3
4
5
Proposed
Back String
On Floats
6
7
8
9
PROPOSED 1-4" FLOWLINE (SEE SHEET 3)
STATION
2
3
4
1,976,999
548,025
1,977,001
548,148
1,977,003
548,315
1,977,004
548,376
X=
Y=
X=
Y=
X=
Y=
X=
Y=
NAD 83
X=
Y=
X=
Y=
X=
Y=
X=
Y=
3,257,797
608,733
3,257,799
608,857
3,257,802
609,023
3,257,803
609,084
10
NAD83
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
11
30° 10' 26.0"
91° 24' 22.5"
30° 10' 27.2"
91° 24' 22.4"
30° 10' 28.8"
91° 24' 22.4"
30° 10' 29.4"
91° 24' 22.4"
12
13
14
200'
0
100'
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
X=
Y=
NAD 83
3,256,781
608,471
3,256,886
608,476
3,256,956
608,473
3,257,012
608,459
3,257,084
608,420
3,257,092
608,368
3,257,143
608,367
3,257,650
608,483
3,257,796
608,530
3,257,796
608,576
3,257,723
608,683
3,257,811
608,756
3,257,838
608,762
3,257,851
608,744
NAD83
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
Lat.
Long.
30° 10' 23.4"
91° 24' 34.0"
30° 10' 23.4"
91° 24' 32.8"
30° 10' 23.4"
91° 24' 32.0"
30° 10' 23.2"
91° 24' 31.4"
30° 10' 22.9"
91° 24' 30.6"
30° 10' 22.3"
91° 24' 30.5"
30° 10' 22.3"
91° 24' 29.9"
30° 10' 23.5"
91° 24' 24.1"
30° 10' 23.9"
91° 24' 22.5"
30° 10' 24.4"
91° 24' 22.5"
30° 10' 25.5"
91° 24' 23.3"
30° 10' 26.2"
91° 24' 22.3"
30° 10' 26.2"
91° 24' 22.0"
30° 10' 26.1"
91° 24' 21.8"
200'
Scale: 1" = 200'
NAD 27 LOUISIANA SOUTH ZONE
1
NAD27
NAD27
1,975,982
547,762
1,976,087
547,767
1,976,157
547,765
1,976,213
547,751
1,976,285
547,712
1,976,293
547,659
1,976,344
547,659
1,976,851
547,775
1,976,997
547,822
1,976,997
547,868
1,976,924
547,975
1,977,012
548,047
1,977,040
548,053
1,977,052
548,035
08/18/2017
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
INTERSTATE EXPLORATIONS LLC
PROPOSED PRODUCTION BARGES, FLOWLINES & STRUCTURES
Sections 25,98,99 & 100, T10S-R10E
IBERVILLE PARISH, LOUISIANA
DRAWN BY: SC
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 08/14/2017
SHEET 2 OF 7
SHEETS
FILENAME: T:\2015\2151678\DWG\SURVEYDETAIL\PERMIT PLANS_FLOWLINES.dwg
Digitized Pipelines
Proposed Pile Clusters
Sec.25
Enlink Pipeline Tap-In
Point 6' CV_8.5' H2O
Enterprise Pipeline
Enlink Pipeline
Tied-In Ve
g
2
1
3
SEE INSET A
P.O.E.
Proposed 1-3" SWD &
3-3" Flowlines @
Proposed Production Barge
(NAD83)
13
1 -2.7' 14
11
-4.2'
10
-6.2'
9
Proposed Bore Entry
8 -7.2'
5
4
Tied-In Veg Line
2
12
" SWD
ED 1-3 ES
S
O
P
LIN
PRO
FLOW
& 3-3" LAID ON
E
TO B PIPE RACK
OSED
PROP (±1432')
Line
Proposed Bore Entry
(NAD83)
LAT. 30°10'28.8"
LONG. 91°24'22.4"
3
PROPOSED FLOWLINE
TO BE BORED
(±290')
P.O.B. Bore Exit
4" Flowline @
Proposed Production Barge
(NAD83)
LAT. 30°10'26.0"
LONG. 91°24'22.5"
SEE INSET B
4
PROPOSED FLOWLINE
TO BE JETTED
(±61')
Shell Pipeline
P.O.B.
Proposed 1-3" SWD &
3-3" Flowlines @
Previously Permitted 50'x50'
Production Platform
(MVN-2013-03032-CM)
(NAD83)
P.O.E.
4" Flowline @
Proposed Meter Platform
(15'x30')
(NAD83)
LAT. 30°10'29.4"
LONG. 91°24'22.4"
SEE SHEET 4
-7.2'
7
Proposed Back String
On Floats
6
-8.5'
-6.2'
© 2017 Microsoft Corporation
Proposed Pipe Rack
3'x1432'
Proposed 1-3"
SWD Flowline &
3-3" Flowlines
To Be Laid On
Pipe Rack
P.O.E. Tie-In Point
P.O.E.
1-3" SWD &
3-3" Flowlines
13
4
Enlink Pipeline
Proposed
10'x10'x7'
Excavation For
Tie-In
Proposed
Rock Pad
70'x220'
12
14
Proposed
Jetting
Proposed
15'x30' Meter
Platform
op
Pr
nB
tio
uc
od '
Pr 200
ed 'x
os 50
e
arg
nB
tio
uc
od '
Pr 200
ed 50'x
e
arg
INSET A:
1"=60'
os
op
Pr
Proposed
Pile Clusters
11
Proposed
Bore Entry
INSET B:
1"=60'
3
Proposed 10'x10'x5'
Temp. Work Space
Proposed Bore
Shell Pipeline
200'
0
100'
200'
NAD 27 LOUISIANA SOUTH ZONE
Scale: 1" = 200'
08/18/2017
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
INTERSTATE EXPLORATIONS LLC
PROPOSED PRODUCTION BARGES, FLOWLINES & STRUCTURES
Sections 25,98,99 & 100, T10S-R10E
IBERVILLE PARISH, LOUISIANA
DRAWN BY: SC
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 08/14/2017
SHEET 3 OF 7
SHEETS
FILENAME: T:\2015\2151678\DWG\SURVEYDETAIL\PERMIT PLANS_FLOWLINES.dwg
Enterprise Pipeline
Digitized Pipelines
150'
Proposed Temp.
Spoil Placement
(±10'x±30)
Proposed 15'x30'
Meter Platform
PROPOSED FLOWLINE
TO BE JETTED
(±61')
150'
Enlink Pipeline
Proposed Bore Exit
(10'X10'X5')
Shell Pipeline
Sec.25
Proposed Temp.
Workspace For
Marsh Buggy Access
236'
PROPOSED FLOWLINE
TO BE BORED
(±290')
Temporary Work Area
Emergent Wetlands
Wetlands To Be Deforested
40'
MHWL +5.8' NAVD 88
MLWL +4.1' NAVD 88
P.O.B.
Proposed 1-4" Flowline @ Proposed
Production Barge
P.O.E.
Proposed 1-4" Flowline @ Proposed
Meter Platform (15'x30')
Emergent Wetlands
Deforested Area For Marsh Buggy Access
Top of Water
9.8' NAVD 88
on 06/19/17
Temporary
spoil stockpiled
to be used
as backfill
Proposed
3-Pile Cluster
Slip
Existing
Shell Pipeline
Proposed
10'
220' x 70' x 3'
Proposed
Jetting
(±61')
Proposed Bored (±290')
3' Min.
Rock Pad
Existing
Enterprise
Proposed
Pipeline
10' x 10' x 7'
Existing
To Be
Enlink Pipeline
Excavated Proposed Tie-In
For Tie-in
Point
TYPICAL PROFILE OF PROPOSED 4" FLOWLINE
No Scale
200'
6'
0.0' NAVD 88
5'
3' Min.
Proposed
10' x 10' x 5'
Bore Entry
To Be
Excavated
0
100'
200'
Scale: 1" = 200'
NAD 27 LOUISIANA SOUTH ZONE
08/18/2017
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
INTERSTATE EXPLORATIONS LLC
PROPOSED PRODUCTION BARGES, FLOWLINES & STRUCTURES
Sections 25,98,99 & 100, T10S-R10E
IBERVILLE PARISH, LOUISIANA
DRAWN BY: SC
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 08/14/2017
SHEET 4 OF 7
SHEETS
FILENAME: T:\2015\2151678\DWG\SURVEYDETAIL\PERMIT PLANS_FLOWLINES.dwg
MHWL +5.8' NAVD 88
MLWL +4.1' NAVD 88
Proposed 40' x 50'
Heater Platform
Temporary spoil
Proposed
Substation
stockpiled to be used
10' x 10' x 5'
as backfill
Bore Entry Site
To Be Excavated
Top of Water
9.8' NAVD 88
on 06/19/17
Temporary spoil
stockpiled to be used
as backfill
0.0' NAVD 88
Slip
Proposed
10' x 10' x 5'
Bore Exit Site
To Be Excavated
Slip
5'
Proposed 4" Flowline
To Be Bored
5'
6'
P.O.B. (MVN-2013-02775-CM)
Proposed 1-4" Flowline @
Interstate Explorations LLCFive Star Royalty Partners
Proposed
No. 1 Well
1-4" Flowline
Proposed
Walkway
10'
Proposed 4" Flowline
To Be Jetted
10'
Proposed
4" Flowline
To Be Bored
TYPICAL PROFILE OF PROPOSED 4" FLOWLINE
No Scale
Temporary spoil
stockpiled to be used
Proposed
as backfill
Top of Water
10' x 10' x 5'
9.8' NAVD 88
Bore Entry Site
on 06/19/17
To Be Excavated
Proposed 4" Flowline
To Be Laid
On Proposed Pipe Rack
P.O.E.
Proposed 4" Flowline @
Proposed Production Barge
Swamp
Surface
0.0' NAVD 88
Proposed 4" Flowline
To Be Bored
P.O.B.
Proposed 1-3" SWD &
3-3" Flowlines @
Previously Permitted 50'x50
Production Platform
(MVN-2013-03032-CM)
Slip
5'
Slip
Proposed
3-Pile Cluster
10'
Proposed
220' x 70' x 3'
Rock Pad
TYPICAL PROFILE OF PROPOSED 4" FLOWLINE
No Scale
P.O.E.
Proposed 1-3" SWD &
3-3" Flowlines @ Proposed Production Barge
Proposed Flowlines
To Be Placed
On Pipe Rack
Top of Water
9.8' NAVD 88
on 06/19/17
Existing
Spoil
0.0' NAVD 88
Slip
TYPICAL PROFILE OF PROPOSED STRUCTURES & 1-3" SWD & 3-3" FLOWLINES
Proposed
3-Pile Cluster
No Scale
08/18/2017
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
INTERSTATE EXPLORATIONS LLC
PROPOSED PRODUCTION BARGES, FLOWLINES & STRUCTURES
Sections 25,98,99 & 100, T10S-R10E
IBERVILLE PARISH, LOUISIANA
DRAWN BY: SC
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 08/14/2017
SHEET 5 OF 7
SHEETS
FILENAME: T:\2015\2151678\DWG\SURVEYDETAIL\PERMIT PLANS_FLOWLINES.dwg
3'
0.0' NAVD 88
Existing Canal
Guard Rail
20'
Varies
3' Min.
Existing
Mudline
10'
3" x 8" Decking
Proposed 1- 4"
Flowline
3" x 12" Stringers
Heater
8" x 10" Caps
5'
Proposed
4" Flowline
PLAN VIEW
2'
3'
0.0' NAVD 88
Stack
Existing
Slip
TYPICAL JETTING
CANAL INSTALLATION
6'
Mudline
No Scale
Timber Pilings
0.0' NAVD 88
2'
Proposed
Flowlines
TYPICAL WALKWAY
No Scale
6.0'
15'
Mudline
ELEVATION
3'
0.0' NAVD 88
0.3'-2.8'
30'
TYPICAL HEATER PLATFORM
Canal
No Scale
Mudline
Timber Pilings
TYPICAL PIPERACK
No Scale
PLAN VIEW
7" Precast
Wooden
Deck
150' Temporary Work Area
5'
3'
15'
140'
2'
Wooden Pile
12" x12"
Temporary Work
Space
2'
16" Wooden
Pile Cap
Mudline
3' Min.
Temporary spoil
stockpiled and
utilized as backfill
2'
Proposed 1-4" Flowline
To Be Jetted
ELEVATION
TYPICAL R.O.W.
TYPICAL METER PLATFORM
No Scale
No Scale
08/18/2017
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
INTERSTATE EXPLORATIONS LLC
PROPOSED PRODUCTION BARGES, FLOWLINES & STRUCTURES
Sections 25,98,99 & 100, T10S-R10E
IBERVILLE PARISH, LOUISIANA
DRAWN BY: SC
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 08/14/2017
SHEET 6 OF 7
SHEETS
FILENAME: T:\2015\2151678\DWG\SURVEYDETAIL\PERMIT PLANS_FLOWLINES.dwg
TEMPORARY IMPACTS TO WATER BOTTOMS BY JETTING . . . . . . . . . . . . . . . . . . . . . . . . . .129 CU. YDS.
TEMPORARY IMPACTS TO WATER BOTTOMS BY EXCAVATION . . . . . . . . . . . . . . . . . . . . . .100 CU. YDS.
TEMPORARY IMPACTS TO EMERGENT WETLANDS FOR TEMPORARY WORKSPACE . . . . 0.22 ACRES
TEMPORARY IMPACTS TO EMERGENT WETLANDS BY EXCAVATION . . . . . . . . . . . . . . . . . .19 CU. YDS.
TEMPORARY IMPACTS TO EMERGENT WETLANDS BY JETTING . . . . . . . . . . . . . . . . . . . . . 5.6 CU.YDS.
WETLANDS TO BE DEFORESTED FOR MARSH BUGGY ACCESS . . . . . . . . . . . . . . . . . . . . . .0.13 ACRES
FILL REQUIRED FOR ROCK PAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2852 CU.YDS.
TEMPORARY IMPACTS TO WATER BOTTOMS BY JETTING & EXCAVATION . . . . . . . . . . . . .0.15 ACRES
Temporary spoil
stockpiled to be
used as backfill
4'
40' Wetland To Be Deforested For Marsh Buggy Access
Area To Be
Excavated
10'
18'
10'
Proposed
4" Flowline
to be Bored
TYPICAL R.O.W.
No Scale
18'
PLAN VIEW
0.0' NAVD 88
0.0' NAVD 88
Temporary spoil
stockpiled to be
used as backfill
4.2'
4'
Mudline
5'
1'
3 PILE CLUSTER
No Scale
Area To Be
Excavated
10'
ELEVATION
TYPICAL BORE SITE
Proposed
4" Flowline to be
Bored
No Scale
NOTES:
1. All structures, facilities, well and pipelines/flowlines occurring in open water
areas or in oilfield canals or slips shall be removed within 120 days of
abandonment of the facilities for the herein permitted use unless prior written
approval to leave such structures in place is received from the U.S. Army Corps
of Engineers.
2. In order to ensure the safety of all parties, the permittee shall contact the
Louisiana ONE CALL System (1-800-272-3020), a minimum of 48 hours prior to
the commencement of any excavation (Digging, Dredging, Jetting, etc.) or
demolition activity.
3. Structures will also be marked/lighted in accordance with U.S. Coast Guard
regulations.
08/18/2017
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
INTERSTATE EXPLORATIONS LLC
PROPOSED PRODUCTION BARGES, FLOWLINES & STRUCTURES
Sections 25,98,99, & 100, T10S-R10E
IBERVILLE PARISH, LOUISIANA
DRAWN BY: SC
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 08/14/2017
SHEET 7 OF 7
SHEETS
FILENAME: T:\2015\2151678\DWG\SURVEYDETAIL\PERMIT PLANS_FLOWLINES.dwg