Broward County. City of Deerfield Beach. Deerfield Beach. FL. PROJECT PURPOSE: Basic: The basic project purpose is the deployment of an artificial reef for recreational use. Overall: The overall project purpose is deployment of an artificial reef for recreational use within the nearshore tidal waters of the Atlantic Ocean offshore of Broward County, Florida
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: City of Deerfield Beach
Attn: Burgess Hanson
150 NE 2nd Ave.
Deerfield Beach, FL 33441
WATERWAY AND LOCATION: The project is located in the Atlantic Ocean, approximately 397 linear feet offshore of The City of Deerfield Beach, Broward County, near FDEP monument R-4.
Latitude and Longitude:
Location
Latitude (North)
Longitude (West)
NE Corner
26.31383°
-80.07386°
SE Corner
26.31182°
-80.07414°
SW Corner
26.31185°
-80.07443°
NW Corner
26.31385°
-80.07416°
Directions to the site are as follows: Exit I-95 to East Hillsboro Blvd., and then head East to South Ocean Way (approximately 2.4 miles). This site is only accessible by boat offshore of the shoreline of Broward County in the Atlantic Ocean at the above latitude and longitudes.
PROJECT PURPOSE:
Basic: The basic project purpose is the deployment of an artificial reef for recreational use.
Overall: The overall project purpose is deployment of an artificial reef for recreational use within the nearshore tidal waters of the Atlantic Ocean offshore of Broward County, Florida.
EXISTING CONDITIONS: The site is composed of firm sandy bottom with high-density substrate that will support artificial reef materials. Water depths within the deployment area range from -4 to -8 feet Mean Low Water. The description of the benthic habitat is unconsolidated sand substrate. Adjacent hardbottom resources are located over 200 meters from the shoreline in depths of approximately 3-4 m. The hardbottom is ephemeral and dominated by macroalgae and turf algae when exposed and supports small stony corals, octocorals and other benthic invertebrates. The shoreline is influenced by longshore and cross-shore waves and currents.
PROPOSED WORK: The applicant proposes to deploy approximately 972 cubic yards of suitable artificial reef material within a 1.72 acre area that has a water depth of -4 to
-8 feet of water. The artificial reef will maintain a minimum clearance of 1-foot from the top of the reef profile relative to Mean Low Water. The artificial reef will consist of three (3) clusters of riprap boulders, each cluster measuring 50-feet by 50-feet. The total boulder placement area is 0.17 acres. Each cluster will consist of one layer of riprap boulders measuring 3-4 feet in diameter. The north and south limits of the reef will be marked by anchored buoys with two additional buoys installed between each cluster (total of 4).
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The deployment of artificial reef material will be sited over sandy, unconsolidated benthic habitat only. A 50-foot buffer will be maintained between the deployments and adjacent resources. The boulders will be placed in a controlled manner by crane on the seabed to minimize suspended sediment. All work will take place during daylight hours. The riprap boulders will be limestone sourced from an upland stockpile in the City of Deerfield Beach or a local quarry. The boulders will be cleaned and transported to the project site via floating barge and placed with a crane to minimize turbidity. The buoy anchors will be either screwed into the sand or drilled into the limestone substrate and secured with epoxy. The City may install each boulder cluster using a phased approach as available rock stockpile and funds become available during the life of the permit. The artificial reef is proposed to be sited a minimum of 286.9 feet offshore and a maximum of 397.5 feet offshore to avoid impacts to submerged resources. The total project area is 1.72 acres.
COMPENSATORY MITIGATION: The applicant has provided the following explanation as to why compensatory mitigation should not be required: No impacts to submerged aquatic vegetation are proposed or anticipated therefore no compensatory mitigation is proposed.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the endangered West Indian manatee (Trichechus manatus) and would not adversely modify its designated critical habitat. The U.S. Fish and Wildlife Service’s has given concurrence with this determination pursuant to Section 7 of the Endangered Species Act and no further consultation is required.
The Corps has determined the proposed project may affect, but is not likely to adversely affect the endangered and threatened swimming sea turtles (Chelonia mydas, Eretmochelys imbricata, Lepidochelys kempii, Dermochelys coriacea, Caretta caretta), the endangered smalltooth sawfish (Pristis pectinata) and the swimming sea turtle, Loggerhead designated nearshore reproductive critical habitat. The Corps will request National Marine Fisheries Service's concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 0.17 acres of the benthic substrate from the direct placement of deployed material. The benthic substrate consists of unvegetated sand habitat utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Division. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Regulatory Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated aquatic resources. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Regulatory Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, by electronic mail at Linda.C.Knoeck@usace.army.mil, by fax at (561)626-6971, or by telephone at (561)472-3531.
IMPACT ON NATURAL RESOURCES: Preliminary review of this application indicates that an Environmental Impact Statement will not be required. Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Service, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. By means of this notice, we are soliciting comments on the potential effects of the project on threatened or endangered species or their habitat.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act and the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FL 33410
REPLY TO
ATTENTION OF
OCTOBER 16, 2017
Regulatory Division
South Permits Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application Number SAJ-2017-02343(SP-LCK)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: City of Deerfield Beach
Attn: Burgess Hanson
150 NE 2nd Ave.
Deerfield Beach, FL 33441
WATERWAY AND LOCATION: The project is located in the Atlantic Ocean,
approximately 397 linear feet offshore of The City of Deerfield Beach, Broward County,
near FDEP monument R-4.
Latitude and Longitude:
Location
NE Corner
SE Corner
SW Corner
NW Corner
Latitude (North)
26.31383°
26.31182°
26.31185°
26.31385°
Longitude (West)
-80.07386°
-80.07414°
-80.07443°
-80.07416°
Directions to the site are as follows: Exit I-95 to East Hillsboro Blvd., and then head East
to South Ocean Way (approximately 2.4 miles). This site is only accessible by boat
offshore of the shoreline of Broward County in the Atlantic Ocean at the above latitude
and longitudes.
PROJECT PURPOSE:
Basic: The basic project purpose is the deployment of an artificial reef for recreational
use.
Overall: The overall project purpose is deployment of an artificial reef for recreational
use within the nearshore tidal waters of the Atlantic Ocean offshore of Broward County,
Florida.
EXISTING CONDITIONS: The site is composed of firm sandy bottom with high-density
substrate that will support artificial reef materials. Water depths within the deployment
area range from -4 to -8 feet Mean Low Water. The description of the benthic habitat is
unconsolidated sand substrate. Adjacent hardbottom resources are located over 200
meters from the shoreline in depths of approximately 3-4 m. The hardbottom is
ephemeral and dominated by macroalgae and turf algae when exposed and supports
small stony corals, octocorals and other benthic invertebrates. The shoreline is
influenced by longshore and cross-shore waves and currents.
PROPOSED WORK: The applicant proposes to deploy approximately 972 cubic yards
of suitable artificial reef material within a 1.72 acre area that has a water depth of -4 to
-8 feet of water. The artificial reef will maintain a minimum clearance of 1-foot from the
top of the reef profile relative to Mean Low Water. The artificial reef will consist of three
(3) clusters of riprap boulders, each cluster measuring 50-feet by 50-feet. The total
boulder placement area is 0.17 acres. Each cluster will consist of one layer of riprap
boulders measuring 3-4 feet in diameter. The north and south limits of the reef will be
marked by anchored buoys with two additional buoys installed between each cluster
(total of 4).
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: The deployment of artificial reef material will be sited over sandy,
unconsolidated benthic habitat only. A 50-foot buffer will be maintained between the
deployments and adjacent resources. The boulders will be placed in a controlled
manner by crane on the seabed to minimize suspended sediment. All work will take
place during daylight hours. The riprap boulders will be limestone sourced from an
upland stockpile in the City of Deerfield Beach or a local quarry. The boulders will be
cleaned and transported to the project site via floating barge and placed with a crane to
minimize turbidity. The buoy anchors will be either screwed into the sand or drilled into
the limestone substrate and secured with epoxy. The City may install each boulder
cluster using a phased approach as available rock stockpile and funds become
available during the life of the permit. The artificial reef is proposed to be sited a
minimum of 286.9 feet offshore and a maximum of 397.5 feet offshore to avoid impacts
to submerged resources. The total project area is 1.72 acres.
COMPENSATORY MITIGATION: The applicant has provided the following explanation
as to why compensatory mitigation should not be required: No impacts to submerged
aquatic vegetation are proposed or anticipated therefore no compensatory mitigation is
proposed.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
2
ENDANGERED SPECIES: The Corps has determined the proposed project may affect,
but is not likely to adversely affect the endangered West Indian manatee (Trichechus
manatus) and would not adversely modify its designated critical habitat. The U.S. Fish
and Wildlife Service's has given concurrence with this determination pursuant to Section
7 of the Endangered Species Act and no further consultation is required.
The Corps has determined the proposed project may affect, but is not likely to
adversely affect the endangered and threatened swimming sea turtles (Chelonia mydas,
Eretmochelys imbricata, Lepidochelys kempii, Dermochelys coriacea, Caretta caretta),
the endangered smalltooth sawfish (Pristis pectinata) and the swimming sea turtle,
Loggerhead designated constricted migratory critical habitat. The Corps will request
National Marine Fisheries Service's concurrence with these determinations pursuant to
Section 7 of the Endangered Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
0.17 acres of the benthic substrate from the direct placement of deployed material. The
benthic substrate consists of unvegetated sand habitat utilized by various life stages of
penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and
snapper/grouper complex. Our initial determination is that the proposed action would
not have a substantial adverse impact on EFH or Federally managed fisheries in the
South Atlantic Division. Our final determination relative to project impacts and the need
for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance with
laws and regulation governing the regulatory program. The jurisdictional line has been
verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Palm Beach
Gardens Regulatory Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach
Gardens, FL 33410, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated aquatic resources. This is based on an analysis of the applicant's
avoidance and minimization efforts for the project, as well as the compensatory
mitigation proposed.
3
QUESTIONS concerning this application should be directed to the project manager, Ms.
Linda C. Knoeck, in writing at the Palm Beach Gardens Regulatory Permits Section,
4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, by electronic mail at
Linda.C.Knoeck@usace.army.mil, by fax at (561)626-6971, or by telephone at
(561)472-3531.
IMPACT ON NATURAL RESOURCES: Preliminary review of this application indicates
that an Environmental Impact Statement will not be required. Coordination with U.S.
Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine
Fisheries Service, and other Federal, State, and local agencies, environmental groups,
and concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area. By means of this notice, we are soliciting comments on the
potential effects of the project on threatened or endangered species or their habitat.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act and the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this decision, comments
are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act.
comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
4
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
CITY OF DEERFIELD BEACH
ARTIFICIAL REEF PROJECT
BROWARD COUNTY, FLORIDA
N.T.S.
ATLANTIC
OCEAN
GULF
OF
MEXICO
BOCA RATON
IAMI
-D-EE-RFlELD BEACH
·'1
iI:
u
I
MIAMI-DADE COUNTY
MIAMI
PROJECT LIMITS
SHEET INDEX
NO.
TITLE
GK
OATE
BY
1 - - - - + - - - + - - - - - - - - - - r - O M M NO.
631219971
HEET:
EAST HILLSBORO BLVD
N 721000
SE 1ST ST
N 720500
R-4
SE 2ND ST
NOTES:
1.
3.
1'.l 4.
~
8l 5.
~
"'~
COORDINATES ARE IN FEET BASED ON
FLORIDA STATE PLANE COORDINATE
SYSTEM, EAST ZONE, NORTH AMERICAN
DATUM 1983, 1990 ADJUSTMENT
(NAD83/90).
ELEVATIONS ARE IN FEET REFERENCED
TO NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD88).
SURVEY PERFORMED BY SEA
DIVERSIFIED, INC. OFFSHORE 8/11 /16.
ONSHORE 8/17 /16.
DATE OF AERIAL PHOTOGRAPHY:
JANUARY 6, 2017.
HARDBOTTOM SURVEY BY PINNACLE
ECOLOGICAL, INC. AUGUST-SEPTEMBER
2016.
E
Q)
~ LEGEND:
J
1ii
............__, 2016 HARDBOTTOM
- ··-
··-
~
1
~
i - -.__
INFORM ~1.J'l~Ni ~ pe~es 1p~ L y
4 _,,--
Q)
~
Si
2017 MEAN HIGH WATER LINE
BASED ON TOPOGRAPHIC
SURVEY DA~!\ 1 ~ti.Q~!>J f OR
DEP.,~.-t'i'i~S
S~I~~ P11_QBE.~9~ATl 6t;J* ~
AJ'f D D ~ PTH ~~tETr
~ ·1·-··---1 P~o.lfP._k ED
RECRf ATIONAL
: .N
j er :---+---'------+-
~ - - - - - - - ' Af()\ij!f l~L REEF PROJECT:'AQftA:
EAST HILLSBORO BLVD
N 721000
SE 1ST ST
N 720500
PROPOSED
NORTH/SO
ROCK CLU
LOCATION
WITHIN PR
R-4
SE 2ND ST
720000
2016 HARDBOTTOM
~
i
2017 MEAN HIGH WATER LINE
BASED ON TOPOGRAPHIC
:E
SURVEY DATA SHOWN FOR
~
INFORMATION PURPOSES ON L ~
-4 ___.,-r--
DEPTH CONTOUR
·-------1 PROPOSED
1__:_ ____ , ~~~~ICIAL
·
RECREATIONAL
REEF PROJECT
z
Ill
DAlE:
P:\Brcwanf\Deerf!afd Beacl'l\631219971 · Derutiafd Beach Artiflc;lal Reel\Cad\Pennlts\631219971P CS PV.dWQ . Jul 27. :1011.
'-(
~
0
lak
'TIZ
Oo
:::a -I
.
14
THE GREATEST DIMENSION
OF EACH BOULDER TO BE
PARALLEL TO THE EXISTING
BOTTOM
* ;:j
:: 1 >
'
~, =>~
[TJ
~ {{\~
!'z.>
-.J
N
CD
-.J
Ol
-
.
-
0
0
0
00 0
000
m
00 00oo+o
0 0
88 88
OJ
, .
;
!
A'
0
-...J
Ol
,....
.!
50'±
j .
oog
oog or
/
ROCKS TO BE
N
FLATTEST SURFACE TO
BE PLACED FACE DOWN
0
)>
P~I~ j
OA
0
.
50
o
BffiB
CLUSTERED FORMAT WITH
VARIABLE SPACING TO BE
DETERMINED
~
BOULDER PLACEMENT ORIENTATION
ARTIFICIAL REEF PLAN VIEW DETAIL (IYP.)
SCALE: N.T.S.
SCALE: N. T.S.
NOTES:
1.
2.
3.
4.
5.
6.
THE CONTRACTOR SHALL NOT WORK OR ANCHOR WITHIN 50 FEET OF ANY EXISTING HARDBOTTOM.
ALL BOULDERS SHALL BE PLACED IN A SINGLE LAYER AS CLOSE TOGETHER AS PRACTICAL. DO NOT STACK BOULDERS.
BOULDERS SHOULD BE PLACED WITH THE LONGEST DIMENSION OF EACH BOULDER PARALLEL TO THE BOTTOM.
PLACE THE FLATTEST OF THE TWO AVAILABLE SURFACES OF EACH BOULDER (SEE NOTE NO. 3) FACE DOWN.
PLAN VIEW AND CROSS-SECTION DETAIL PROVIDED FOR ILLUSTRATION OF INTENT OF SPECIFICATION, SOME VARIATION
WITHIN ALLOWABLE TOLERANCES IS EXPECTED.
PROPOSED BOULDER SIZES BASED ON GEOTECHNICAL TESTING PERFORMED BY GFA INTERNATIONAL, INC. 2/16/17.
~J::B&I ENVIRONMENTAL & INFRASTRUCTURE, I.NC. I TTTl£:
r.11
.....i
±
ZAii N.W. BOCA RATON BOULEVAAO
BOCA RATON; FLORIDA SS431
1 ..-.c&cc>m
PH. (5&1) 3111 .. 102
F/U (5611 3111-8116
c .0-11. FL. 119317
CITY OF DEERFIELD BEACH
ARTIFICIAL REEF PROJECT
PROPOSED CONDITIONS SECTIONS
P'\Broward\Deerfield Beach\631219971 · Ooorlield Beach Arlil ciat Reef\Cad\Permlls\S12 19971P CS PV.
'lZ
Oo
:::0 -i
:::0 ,,
,.,,~ 1 \i ii/1 1 .
'(V'
·
I It/
~~'~
~~
G')
0
I
~ "~~ , .
f'T1
-I
"O
-
~
rA4
~
r;:;.- o·V>
VJ ~
:::0
-- .._
· ;;>!
-
;..... -
.'///........
······· *
··..·/.c
·.·r,,,... ,,
z
p
:..c
~··
. _.
~
~
·.;. ~('] "'_..
.../ .....
--r N
· ...ti
~ :_"f- :.~~
~
~ _.
·."Z-
(") .
rr. : :-u
Z
·
::
SPACING BETWEEN
CLUSTERS VARIES
--
~ J#/r;=-6.2'
= MINIMUM ELEVATION
~ ~(\~ ·~
./~ : AT LANDWARD EDGE OF REEF
N
,, {.:). ··
· · ">) ~
~
"<,p.
O'iV\f. ... ·.·.. ..
en
-<
,,,
*° \;,, ,
R
!/
..
,,........
0
~
z<
-2
-_I
1' MINIMUM
CLEARANCE
t~OU~)
3' MINIMUM
~
fTI
a~
I~
-
(TYP.)
r
~
......... -6
<
_::~19 · J'IAVQ__ -
SEA FLOOR ELEVATION
(VARIES)
w -4
w
I-
CJ
DIA._ --¥-MLW.::
4' MAXIMUM
BOULDER DIA.
-8
- ..,)
-5
-10
0
5
DISTANCE FROM CENTER COORDINATE (FEET)
SAND----~
(THICKNESS VARIES)
HARD SUBSTRATE
(ELEVATION VARIES)
-10.0' = MAXIMUM ELEVATION
AT SEAWARD EDGE OF REEF
TYFICAL REEF CROSS
N. T.S.
SECTION A A'
z
~rB&I ENVIRONMENTAL & INFRASTRUCTURE, INC.
U1
r.1
2'81 N.W. BOCA RATON BOULEVARD
BOCA RATON, FLORIDA 33·31
..-.CBI.com
PH. (S61J J!tl-8102
F.t.)( j561)3!tl-9116
C.O.A. FL "9317
nnE:
CITY OF DEERFIELD BEACH
ARTIFICIAL REEF PROJECT
PROPOSED CONDITIONS SECTIONS
REGULA TORY BUOY
DIAMETER
OVERALL HEIGHT
EXPOSURE W/O TACKLE
DRAFT
NET WEIGHT
FOAM PER MIL-P-21929
AMENDMENT 1, EXCEPT
FIRE RESISTANCE
80"
9"
80"
45"
36"
77#
LINE SECURED TO
BUOY BY FACTORY SPLICE
3 FEET OF PLIOVIC
HOSE
PORTION OF BUOY BELOW
WATERLINE SHALL BE
TREATED WITH INOX
LAN OX MX14 LUBRICANT
LINE SECURED TO - -SHACKLE WITH
SELF-TIGHTENING KNOT
CHAFING GEAR
ATTACHED WITH
HEAVY DUTY TIES
SEABED
SCREW ANCHOR TO BE INSTALLED
IN SAND OR DRILLED INTO ROCK
WITH EPOXY
DEPTH TO BE
DETERMINED
.c