Palm Beach County. Town of Palm Beach. Palm Beach. FL. PROJECT PURPOSE: Basic: The basic project purpose is improved water access and habitat creation. Overall: The overall project purpose is to improve water access within existing access channels along the Town of Palm Beach and provide increased habitat within the Lake Worth Lagoon.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Town of Palm Beach
c/o Thomas Bradford
360 South County Road
Palm Beach, Florida 33480
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Lake Worth Lagoon. The project site is located within existing access channels adjacent to the Town of Palm Beach.
The north access channel is located within the Lake Worth Lagoon, Class III Waters, in Palm Beach (Sections 26 and 35, Township 43 South, Range 43 East), in Palm Beach County between Latitude 26.688552°, Longitude -80.044198° and Latitude 26.676045°, Longitude -80.040157°.
The central access channel is located within the Lake Worth Lagoon, Class III Waters, in Palm Beach (Sections 26 and 35, Township 43 South, Range 43 East), in Palm Beach County between Latitude 26.674846°, Longitude -80.039884° and Latitude 26.670300°, Longitude -80.038879°.
The south access channel is located within the Lake Worth Lagoon, Class III Waters, in Palm Beach (Sections 2 and 11, Township 44 South, Range 43 East), in Palm Beach County between Latitude 26.661793°, Longitude -80.039092° and Latitude 26.648011°, Longitude -80.039004°.
The disposal site will occur at an existing dredge hole just north at the junction of the C-51 Canal and the Lake Worth Lagoon with center coordinates at Latitude 26.648070°, Longitude -80.044560°.
Directions to the site are as follows: The proposed project is located east of the Town of Palm Beach within the Lake Worth Lagoon. Access to the site is by boat only.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 26.660331°°
Longitude: -80.039761°°
PROJECT PURPOSE:
Basic: The basic project purpose is improved water access and habitat creation.
Overall: The overall project purpose is to improve water access within existing access channels along the Town of Palm Beach and provide increased habitat within the Lake Worth Lagoon.
EXISTING CONDITIONS: The proposed dredging and filling activities is located within the Lake Worth Lagoon. The existing conditions within these areas consist of silty muck substrate with intermittent sandy substrates. A seagrass survey was conducted in June 2014 and April 2017. No resources were found within the proposed dredge footprint.
North Access Channel: Sediments were generally silty to depths greater than 6 inches. One section of sandy material was encountered near a residential dock currently undergoing construction rehabilitation. No seagrasses, macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent to any of the proposed dredging areas of North Application Section.
Central Access Channel: The Central Application Section generally consists of two segments. Segment one is aligned east-to-west, with the dredging template beginning approximately 450 feet east of the Atlantic Intracoastal Waterway (AICW) and covering approximately 1,650 linear feet travelling east. Segment 2 is generally aligned north-to-south, is approximately 1,400 feet in length, travelling north from the end of Segment 1 and terminating approximately 350 south of the Southern Boulevard Bridge. At the eastern end of Segment 1, sediments were sandy and shelly with silt. No seagrasses, macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent to any of the proposed dredging areas. Sediment transitioned to silty/mucky within 75 feet of where the existing channel traverses red mangrove lined shorelines, approximately STA 81+00 to STA 90+00. The sediment encountered in this section were mucky, silty sediments, greater than 6 inches in thickness. Caulerpa verticillata was noted among the rocks along the red mangrove shoreline, outside of the proposed dredging template and buffer. No seagrasses, macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent to any of the proposed dredging areas in the red mangrove region. A small section of the dredging template extends west of the red mangrove section and east of the AICW. While this section is no closer than 450 feet to the AICW, the bathymetry drops and the sediments become less mucky and more sandy/shelly. No seagrasses, macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent to this section of the proposed dredging areas. The presence of a variable-depth layer of unconsolidated bottom substrate (muck) in nearly all of the assessment areas makes conditions unsuitable for the establishment and continued existence of seagrass and rooted macroalgae.
South Access Channel: The South Application Section generally consists of two segments. Segment one is aligned east to west, with the dredging template beginning approximately 220 feet east of the AICW and covering approximately 1,250 linear feet travelling east. Segment 2 is generally aligned north-to-south, is approximately 4,950 feet in length. Individual specimens of Halophila decipiens were encountered adjacent to the proposed dredge template and buffer in the northern extents of the South Application Section. In total 0.007 acres of Halophila decipiens were observed, comprised of 13 individual plants and one approximately 20 foot long by 10 foot wide patch. Sediments encountered in this regions were generally silty with some shell, with silt thicknesses of greater than 6 inches. Beyond the above listed Halophila decipiens, no other seagrasses, macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent to this section of the proposed dredging areas. Progressing south from the above listed section, sediments generally became less shelly and more silty/mucky. No further seagrass, macroalgae, oysters, sponges, corals or other marine life were observed along or adjacent to the proposed dredge template and buffer within the South Application Section. The southern end of the proposed South Application Section consisted of waist-deep muck sediments. The region where segment 1 and segment 2 intersect, approximately STA 15+00, exhibited shelly substrate and slightly deeper bathymetry, however, no seagrass, macroalgae, oysters, sponges, corals or other marine life were observed along or adjacent to the proposed dredge template and buffer in this area. Where the existing channel traverses red mangrove lined shorelines, approximately STA 13+50 to STA 04+00, the sediments encountered in this section were mucky, silty sediments, greater than 6 inches in thickness and no seagrasses, macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent to any of the proposed dredging areas this region. A small section of the dredging template extends west of the red mangrove section and east of the AICW. While this section is no closer than 220 feet to the Intracoastal Waterway, the bathymetry abruptly drops and the sediments become less mucky and more sandy/shelly. No seagrasses, macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent to this section of the proposed dredging areas.
Dredge Material: A subsequent sediment analysis was performed within the proposed dredge footprints. This sediment analysis consisted of the collection of six (6) vibracore sediment samples. These samples were collected to characterization depth in conformance with the guidance of the EPA/USACE Evaluation of Dredged Material Proposed for Discharge in Waters of the U.S. – Testing Manual, also known as the Inland Testing Manual. The physical analysis of the collected cores indicates an average D50 grain size of 0.49mm and an average silt content of 5.1 %. The samples were chemically tested for 18 PAHs, 13 metals, and nutrients. One single analyte from one sample required Tier II elutriate testing. The Tier II elutriate testing demonstrated no exceedances. Therefore, the sediment is considered suitable for in water disposal within the proposed disposal location of Tarpon Cove.
Dredge Hole: The 15.9 acre dredge hole is located west of the AICW within the Lake Worth Lagoon. Depths within the dredge hole range from 12-14 feet. Substrate consists of a thick layer of organic muck within the dredge hole. No seagrass or other submerged resources exist in the dredge hole, with benthic resource surveys conducted in May 2016 and June 2017. A joint inspection for field verification of existing conditions was conducted with FDEP staff on June 16, 2017.
PROPOSED WORK: The applicant seeks authorization to dredge approximately 57,000 cubic yards from within three existing access channels (referred to as North, Central, and South access channel) to a depth of -5.0 feet Mean Low Water. The excavated materials will be placed within an existing dredge hole known as Tarpon Cove and capped with clean sandy material. Dredging and disposal will be done by barge mounted mechanical dredge.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
The project as proposed will not impact any submerged aquatic vegetation therefore no further avoidance and minimization was provided. Due to the type of sediments being dredged; the applicant has chosen to dispose the material within an existing dredge hole that contains the same mixed mucky, silt, sandy makeup. The previous proposal that was noticed included the disposal at Bonefish Cove, however the applicant revised the plan to avoid utilizing that site due to the potential of impacting nearshore resources adjacent to the restoration site.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
The project as proposed does not provide a loss of waters or special aquatic site therefore no compensatory mitigation has been provided.
CULTURAL RESOURCES: The Corps has determined the activity is of such limited scope there is little likelihood of impact upon a historic property; therefore, the proposed project would have “No Potential to Cause Effect”.
ENDANGERED SPECIES:
Dredge Activity:
The Corps has determined the proposed dredging may affect, but is not likely to adversely affect the swimming sea turtles: [green sea turtle (Chelonia mydas), Kemp’s Ridley sea turtle (Lepidochelys kempii), and Loggerhead sea turtle (Caretta caretta)]; and smalltooth sawfish (Pristis pectinata). Work will occur in waters accessible to the swimming sea turtles and smalltooth sawfish. Smalltooth sawfish and swimming sea turtles may be affected by being unable to use an area for forage or refuge habitat due to potential avoidance of construction activities. These effects will be insignificant due to the limited time it will take to complete the action. Because these species are motile and likely to leave the area during construction, the risk of injury from this type of construction activity is insignificant. The Corps will request National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act.
The Corps has determined the proposed dredging may affect, but is not likely to adversely affect the West Indian Manatee (Trichechus manatus). Use of The Corps of Engineers, Jacksonville District and the State of Florida Effect Determination Key for the Manatee in Florida (Manatee Key) dated 25 April 2013 results in a path of A-B-C-G-N-O-P (paragraph 4). Provided the applicant adheres to the standard manatee construction conditions during the in-water work, the key results in a may affect, not likely to adversely affect determination. For proposed in-water activities analyzed with the West Indian Manatee in which the Corps reaches a may affect, not likely to adversely affect determination with respect to the manatee, the FWS concurs with the Corps determination in accordance with 50 CFR 402.14(b) 1; and, no further consultation with the FWS is required.
Dredge Disposal Activity:
The Corps has determined the proposed disposal of dredge material within the dredge hole may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's Ridley (Lepidochelys kempii), the threatened smalltooth sawfish (Pristis pectinata), and the threatened Johnson’s seagrass (Halophila johnsonii), and would not adversely modify their designated critical habitat. The Corps requested National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by letter dated September 2, 2017. By letter dated October 4, 2017, National Marine Fisheries Service provided concurrence to this determination.
The Corps has determined the proposed disposal of dredge material within the dredge hole “May Affect” determination: path A>B(2). However, the Corps has determined the proposal may affect but is not likely to adversely affect the threatened West Indian Manatee, and would not adversely modify its designated critical habitat (DCH) because the overall project will have a beneficial effect on the manatee through the restoration and enhancement activities. A manatee biological evaluation was provided that stated the disposal of dredge material included in the overall Tarpon Cove project is consistent with the Palm Beach County Manatee Protection Plan. All material will be constructed with lagoon compatible material. Materials will be transported to the project area via barge. Drafts of construction barges will vary between 3-5’ depending on the load of material. Turbidity curtains will be deployed as necessary to prevent sediment plumes from exceeding standards. Curtains will surround the ongoing work footprint in the smallest footprint possible to minimize potential impacts to local navigation. The contractor will monitor turbidity levels during filling activities. Additional minimization measures include the applicant adhering to the standard manatee conditions for in-water work. The Corps requested U.S. Fish and Wildlife concurrence with this determination pursuant to Section 7 of the Endangered Species Act by separate letter.
The Corps has determined the proposal would have no effect on any other listed threatened or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 14.12 (7.06 acres for the dredging and 7.06 acres for the disposal site) acres of silty organic matter along the bottom substrate utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410 within 15 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Samantha L. Rice, in writing at the Palm Beach Gardens Permits Section, Suite 500, Palm Beach Gardens, FL 33410; by electronic mail at Samantha.L.Rice@usace.army.mil; by facsimile transmission at (561)626-6971; or, by telephone at (561)472-3536.
ADDITIONAL INFORMATION: After reviewing all available information pertaining to the completed work, the Department of the Army has not recommended legal action at this time. Final determination regarding legal action will be made after review of the project through the permit procedure.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FLORIDA 33410
REPLY TO
ATTENTION OF
October 16, 2017
Regulatory Division
South Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2013-01640(SP-SLR)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Town of Palm Beach
c/o Thomas Bradford
360 South County Road
Palm Beach, Florida 33480
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with Lake Worth Lagoon. The project site is located within existing access
channels adjacent to the Town of Palm Beach.
The north access channel is located within the Lake Worth Lagoon, Class III Waters, in
Palm Beach (Sections 26 and 35, Township 43 South, Range 43 East), in Palm Beach
County between Latitude 26.688552°, Longitude -80.044198° and Latitude
26.676045°, Longitude -80.040157°.
The central access channel is located within the Lake Worth Lagoon, Class III Waters,
in Palm Beach (Sections 26 and 35, Township 43 South, Range 43 East), in Palm
Beach County between Latitude 26.674846°, Longitude -80.039884° and Latitude
26.670300°, Longitude -80.038879°.
The south access channel is located within the Lake Worth Lagoon, Class III Waters, in
Palm Beach (Sections 2 and 11, Township 44 South, Range 43 East), in Palm Beach
County between Latitude 26.661793°, Longitude -80.039092° and Latitude
26.648011°, Longitude -80.039004°.
The disposal site will occur at an existing dredge hole just north at the junction of the C51 Canal and the Lake Worth Lagoon with center coordinates at Latitude 26.648070°,
Longitude -80.044560°.
Directions to the site are as follows: The proposed project is located east of the Town
of Palm Beach within the Lake Worth Lagoon. Access to the site is by boat only.
APPROXIMATE CENTRAL COORDINATES: Latitude 26.660331°°
Longitude -80.039761°°
PROJECT PURPOSE:
Basic: The basic project purpose is improved water access and habitat creation.
Overall: The overall project purpose is to improve water access within existing access
channels along the Town of Palm Beach and provide increased habitat within the Lake
Worth Lagoon.
EXISTING CONDITIONS: The proposed dredging and filling activities is located within
the Lake Worth Lagoon. The existing conditions within these areas consist of silty muck
substrate with intermittent sandy substrates. A seagrass survey was conducted in June
2014 and April 2017. No resources were found within the proposed dredge footprint.
North Access Channel: Sediments were generally silty to depths greater than 6 inches.
One section of sandy material was encountered near a residential dock currently
undergoing construction rehabilitation. No seagrasses, macroalgae, oysters, sponges,
corals or other marine life were observed in or adjacent to any of the proposed dredging
areas of North Application Section.
Central Access Channel: The Central Application Section generally consists of two
segments. Segment one is aligned east-to-west, with the dredging template beginning
approximately 450 feet east of the Atlantic Intracoastal Waterway (AICW) and covering
approximately 1,650 linear feet travelling east. Segment 2 is generally aligned north-tosouth, is approximately 1,400 feet in length, travelling north from the end of Segment 1
and terminating approximately 350 south of the Southern Boulevard Bridge. At the
eastern end of Segment 1, sediments were sandy and shelly with silt. No seagrasses,
macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent
to any of the proposed dredging areas. Sediment transitioned to silty/mucky within 75
feet of where the existing channel traverses red mangrove lined shorelines,
approximately STA 81+00 to STA 90+00. The sediment encountered in this section
were mucky, silty sediments, greater than 6 inches in thickness. Caulerpa verticillata
was noted among the rocks along the red mangrove shoreline, outside of the proposed
dredging template and buffer. No seagrasses, macroalgae, oysters, sponges, corals or
other marine life were observed in or adjacent to any of the proposed dredging areas in
the red mangrove region. A small section of the dredging template extends west of the
red mangrove section and east of the AICW. While this section is no closer than 450
feet to the AICW, the bathymetry drops and the sediments become less mucky and
more sandy/shelly. No seagrasses, macroalgae, oysters, sponges, corals or other
marine life were observed in or adjacent to this section of the proposed dredging areas.
The presence of a variable-depth layer of unconsolidated bottom substrate (muck) in
nearly all of the assessment areas makes conditions unsuitable for the establishment
and continued existence of seagrass and rooted macroalgae.
2
South Access Channel: The South Application Section generally consists of two
segments. Segment one is aligned east to west, with the dredging template beginning
approximately 220 feet east of the AICW and covering approximately 1,250 linear feet
travelling east. Segment 2 is generally aligned north-to-south, is approximately 4,950
feet in length. Individual specimens of Halophila decipiens were encountered adjacent
to the proposed dredge template and buffer in the northern extents of the South
Application Section. In total 0.007 acres of Halophila decipiens were observed,
comprised of 13 individual plants and one approximately 20 foot long by 10 foot wide
patch. Sediments encountered in this regions were generally silty with some shell, with
silt thicknesses of greater than 6 inches. Beyond the above listed Halophila decipiens,
no other seagrasses, macroalgae, oysters, sponges, corals or other marine life were
observed in or adjacent to this section of the proposed dredging areas. Progressing
south from the above listed section, sediments generally became less shelly and more
silty/mucky. No further seagrass, macroalgae, oysters, sponges, corals or other marine
life were observed along or adjacent to the proposed dredge template and buffer within
the South Application Section. The southern end of the proposed South Application
Section consisted of waist-deep muck sediments. The region where segment 1 and
segment 2 intersect, approximately STA 15+00, exhibited shelly substrate and slightly
deeper bathymetry, however, no seagrass, macroalgae, oysters, sponges, corals or
other marine life were observed along or adjacent to the proposed dredge template and
buffer in this area. Where the existing channel traverses red mangrove lined shorelines,
approximately STA 13+50 to STA 04+00, the sediments encountered in this section
were mucky, silty sediments, greater than 6 inches in thickness and no seagrasses,
macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent
to any of the proposed dredging areas this region. A small section of the dredging
template extends west of the red mangrove section and east of the AICW. While this
section is no closer than 220 feet to the Intracoastal Waterway, the bathymetry abruptly
drops and the sediments become less mucky and more sandy/shelly. No seagrasses,
macroalgae, oysters, sponges, corals or other marine life were observed in or adjacent
to this section of the proposed dredging areas.
Dredge Material: A subsequent sediment analysis was performed within the proposed
dredge footprints. This sediment analysis consisted of the collection of six (6) vibracore
sediment samples. These samples were collected to characterization depth in
conformance with the guidance of the EPA/USACE Evaluation of Dredged Material
Proposed for Discharge in Waters of the U.S. Testing Manual, also known as the
Inland Testing Manual. The physical analysis of the collected cores indicates an
average D50 grain size of 0.49mm and an average silt content of 5.1 %. The samples
were chemically tested for 18 PAHs, 13 metals, and nutrients. One single analyte from
one sample required Tier II elutriate testing. The Tier II elutriate testing demonstrated no
exceedances. Therefore, the sediment is considered suitable for in water disposal within
the proposed disposal location of Tarpon Cove.
Dredge Hole: The 15.9 acre dredge hole is located west of the AICW within the Lake
Worth Lagoon. Depths within the dredge hole range from 12-14 feet. Substrate consists
of a thick layer of organic muck within the dredge hole. No seagrass or other
3
submerged resources exist in the dredge hole, with benthic resource surveys conducted
in May 2016 and June 2017. A joint inspection for field verification of existing
conditions was conducted with FDEP staff on June 16, 2017.
PROPOSED WORK: The applicant seeks authorization to dredge approximately
57,000 cubic yards from within three existing access channels (referred to as North,
Central, and South access channel) to a depth of -5.0 feet Mean Low Water. The
excavated materials will be placed within an existing dredge hole known as Tarpon
Cove and capped with clean sandy material. Dredging and disposal will be done by
barge mounted mechanical dredge.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
The project as proposed will not impact any submerged aquatic vegetation therefore no
further avoidance and minimization was provided. Due to the type of sediments being
dredged; the applicant has chosen to dispose the material within an existing dredge
hole that contains the same mixed mucky, silt, sandy makeup. The previous proposal
that was noticed included the disposal at Bonefish Cove, however the applicant revised
the plan to avoid utilizing that site due to the potential of impacting nearshore resources
adjacent to the restoration site.
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
The project as proposed does not provide a loss of waters or special aquatic site
therefore no compensatory mitigation has been provided.
CULTURAL RESOURCES: The Corps has determined the activity is of such limited
scope there is little likelihood of impact upon a historic property; therefore, the proposed
project would have "No Potential to Cause Effect".
ENDANGERED SPECIES:
Dredge Activity:
The Corps has determined the proposed dredging may affect, but is not likely to
adversely affect the swimming sea turtles: [green sea turtle (Chelonia mydas), Kemp's
Ridley sea turtle (Lepidochelys kempii), and Loggerhead sea turtle (Caretta caretta)];
and smalltooth sawfish (Pristis pectinata). Work will occur in waters accessible to the
swimming sea turtles and smalltooth sawfish. Smalltooth sawfish and swimming sea
turtles may be affected by being unable to use an area for forage or refuge habitat due
to potential avoidance of construction activities. These effects will be insignificant due to
the limited time it will take to complete the action. Because these species are motile and
likely to leave the area during construction, the risk of injury from this type of
4
construction activity is insignificant. The Corps will request National Marine Fisheries
Service concurrence with this determination pursuant to Section 7 of the Endangered
Species Act.
The Corps has determined the proposed dredging may affect, but is not likely to
adversely affect the West Indian Manatee (Trichechus manatus). Use of The Corps of
Engineers, Jacksonville District and the State of Florida Effect Determination Key for the
Manatee in Florida (Manatee Key) dated 25 April 2013 results in a path of A-B-C-G-NO-P (paragraph 4). Provided the applicant adheres to the standard manatee
construction conditions during the in-water work, the key results in a may affect, not
likely to adversely affect determination. For proposed in-water activities analyzed with
the West Indian Manatee in which the Corps reaches a may affect, not likely to
adversely affect determination with respect to the manatee, the FWS concurs with the
Corps determination in accordance with 50 CFR 402.14(b) 1; and, no further
consultation with the FWS is required.
Dredge Disposal Activity:
The Corps has determined the proposed disposal of dredge material within the dredge
hole may affect, but is not likely to adversely affect the threatened and endangered
swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas),
leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), and Kemp's
Ridley (Lepidochelys kempii), the threatened smalltooth sawfish (Pristis pectinata), and
the threatened Johnson's seagrass (Halophila johnsonii), and would not adversely
modify their designated critical habitat. The Corps requested National Marine Fisheries
Service concurrence with these determinations pursuant to Section 7 of the Endangered
Species Act by letter dated September 2, 2017. By letter dated October 4, 2017,
National Marine Fisheries Service provided concurrence to this determination.
The Corps has determined the proposed disposal of dredge material within the dredge
hole "May Affect" determination: path A>B(2). However, the Corps has determined the
proposal may affect but is not likely to adversely affect the threatened West Indian
Manatee, and would not adversely modify its designated critical habitat (DCH) because
the overall project will have a beneficial effect on the manatee through the restoration
and enhancement activities. A manatee biological evaluation was provided that stated
the disposal of dredge material included in the overall Tarpon Cove project is consistent
with the Palm Beach County Manatee Protection Plan. All material will be constructed
with lagoon compatible material. Materials will be transported to the project area via
barge. Drafts of construction barges will vary between 3-5' depending on the load of
material. Turbidity curtains will be deployed as necessary to prevent sediment plumes
from exceeding standards. Curtains will surround the ongoing work footprint in the
smallest footprint possible to minimize potential impacts to local navigation. The
contractor will monitor turbidity levels during filling activities. Additional minimization
measures include the applicant adhering to the standard manatee conditions for inwater work. The Corps requested U.S. Fish and Wildlife concurrence with this
determination pursuant to Section 7 of the Endangered Species Act by separate letter.
5
The Corps has determined the proposal would have no effect on any other listed
threatened or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
14.12 (7.06 acres for the dredging and 7.06 acres for the disposal site) acres of silty
organic matter along the bottom substrate utilized by various life stages of penaeid
shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and
snapper/grouper complex. Our initial determination is that the proposed action would
not have a substantial adverse impact on EFH or Federally managed fisheries in the
South Atlantic Region. Our final determination relative to project impacts and the need
for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Palm Beach
Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL
33410 within 15 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Samantha L. Rice, in writing at the Palm Beach Gardens Permits Section, Suite 500,
Palm Beach Gardens, FL 33410; by electronic mail at
Samantha.L.Rice@usace.army.mil; by facsimile transmission at (561)626-6971; or, by
telephone at (561)472-3536.
ADDITIONAL INFORMATION: After reviewing all available information pertaining to the
completed work, the Department of the Army has not recommended legal action at this
time. Final determination regarding legal action will be made after review of the project
through the permit procedure.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
6
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
7
NOTE: 1. BATHYMETAIC SURVliY PIERFORMED BY APPLIED TECHNOLOGY AND MANAGEMENT; DATED SDTeMB.ER 201;,,
BATHYM!TRIC SURVl!Y R!LATIVE TO NAD83 FLORIDA STATE PLANE, EAST ZONE, US FEET
2. AERIAL PHOTOGRAPHY DATSD JULY 2013.
3. SEAGRASS SURVEY CONDUCTED JUNE 12 & 13, 2014.
1i1
I
40+00
~
~
~
~
i
SOUTH WATERWAY
§
Secondary Cut
~
~
~
Main Channel
Segment
6 .0'
5.0'
5.0'
4.0'
S1
1639
4.0'
3.0'
w
S2
5479
3.0'
2.0'
S3
1684
2.0'
1.0'
1.0'
0.0'
~
11
S4
4184
Total
8927
00
22+00
32+00
20+0
Cut Thickness
Minimum Maximum
Thickness Thickness
~
11
~
3
SEP. 2013 SURVEY
CONTOUR LINES (TYP)
Volume (cy)
~
i
3& 00
SEAGl'fASS FOUND IN
THIS AREA (0.007ac)
REFER TO FIGURE 4
~
~
38+00
Co lor
··
·
Segment
Length (ft)
Volume (cy)
S1
1120
5688
S2
1880
7611
S3
500
1392
S4
1680
9062
D
D
D
SS
1445
4343
Total
6625
28096
?<
INfrMC©ASThlL
~
WATEl!{WAY
~
ii'
~
~
I
I
~
o;
"'
~
-
-
--
-
: 1. BA
PIEAFORMED BY APPL.ll!iD TECHNOLOGY AND MANA<3EM!NT; DAtEilll smlMBlm 2013.
THYMETftlC SURVEY. RllLATIVE TO NA083 FLORIDA STATE PLANE, EAST ZONE, US FEET
2. AERIAL PHOTOGRAPHY DA'l!ED JULY. 2013.
G
SURVEY C N CTE JU
1 & 13 2014.
-
lL:;;;;;;;;;;;;;;;:;:;::~=:;;;::;~;::;;;~::;:::;;;;;:::~~;;;;;;;;;;;;;;;;;;~~;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;~;;:;;==~l=·;. ;;;;;;;;~:=.1
.
~
&
i
'3
ATM
-
2047 Vista Parkway, Suite 201
West Palm Beach, FL 33411
(561) 659-0041
Certificate of Authorization #4669
;
6of 12
South Waterway - Plan View
JOB NUMBER: 17-3058
Lake Worth Lagoon Waterways
Town of Palm Beach, Florida
ISSUE DATE: 10-12-2017
FOR PERMITIING PURPOSES ONLY
NOT FOR CONSTRUCTION
·'
. ;. .. ~
~
.
,. ~.
~
-,b
~
~x ·:~
M~h,eal .G Jenkins Ph. D., P.~.
Profes_siaQ~I E r;g ir ~'. ...., , -, ~ /
Florida License Number 58072 , ·
,.,
j /'·
/J/
· ,,
. r,.'-1
NOTE: 1. BATH¥MllTRIC SUJ\Vl!Y PERFQRMliD BY APPLIED TECHNOLOGY AND MANAGEM~NT; DATED SEPTEMBER 2013.
SA>THY4VllTRIC SURVEY RElATIVli TO NAD83 FLORIDA STATE PLANE, EAST ZONE, US FEET
2: AllRIAL PHOTOGRAPHY DA:i'liiO Jl:Jl!Y 2013.
3. S!'AGRASS SURVEY CONDUCTED JUNE 12 & 13, 2014.
~I
ti · N-llllilE:
t
~I
I
'
Scale in
~I
I
SEGMENTS4
1620' +/-
Cut Thickness
SOUTH MAIN WATERWAY
I
!
..
8
it
Segment
Length (fl)
Volume (cy)
S1
1120
5688
6.0'
5.0'
S2
1880
7611
5.0'
4.0'
4.0'
3.0'
3.0'
2.0'
2.0'
1.0'
S3
500
1392
S4
1680
9062
S5
1445
4343
Total
6625
28096
WATERWAY
i
Main Channel
Segment
Volume (cy)
S1
1639
S2
5479
S3
1684
S4
4184
Total
8927
~
-
-
2047 Vista Parkway, sune 201
west Palm Beach, FL 33411
cse1)ss9-0041
··
·
Secondary Cut
8
8
".<·
Color
SOUTH WATERWAY
PROPOSED 40'.
WIClf M'AfN·
Minimum Maximum
Thickness Thickness
-
Lake Worth Lagoon Waterways
Town of Palm Beach, Florida
#
ISSUE DATE: 10-12-2011
"
,4
· _,,
l'y1icheal G. Jenk)Q", f~-: Q_,, P.l;i.i-,__ , /
Pro essioiial Engineer
' ,
I /
F.ioricia.uC::ns~N'~~tfe'r'ssb? ·- , / _.
&
'
g
FoRPERM1rnNGPURPos EsoNLY
~ L:iiiii;;;;;;;;C~e~rtifi~·~~te~of~A~uth~on~za~lio~n~~~56~9;;;;;;;;;;:.&::o;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:.&.:;;;;;;;;;;;N~O~T~FO~R~C~ON~S~TR~UC~T~IO~N;;;;;;;;;;:.&::;;;;;;;;;;;;;;;~~,;;;;;j-~·~·;;;;w~·;;;;;;;;~
- ~<~~~
· ;;;;;;;;.:,m
4J,
-~'
'"':J 10'lf·\ ;,I
(
l
4
,it\
'1Jtlfltll' 1'
1-,f·'"
~
NOTE:
DISPOSAL TO
OCCUR WITHIN
DREDGE HOLE. POST
PLACEMENT DEPTH
WILL BE DEEPER THAN
-10FT NAVD88
,:
...
2041 Vista Par11way, sun· 201
West Palm Beach, FL 33411
IQ
(561)659-0041
9of 12
Disposal Location Bathymetry
Plan View - Section 2
JOB NUMBER: 17-3058
Lake Worth Lagoon Waterways
Town of Palm Beach, Florida
FORPERMITTINGPURPosEsoNLv
ISSUE DATE: 10-12-2017
~ l,:;;m;mCmertmifim~mtemofmAmulmhomrizmatmionmMm6m6m9;;;;;:,,l.:;;;;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;m;;;;;;!,L:;;;m;mNOmTmFmOmRmCOmNmSmTRmUmCmTIOmN;m;;;;;;JL!;;;;m;..;~;;iiiiii;;i;i;;:iiliiiiiiliiiiiiiiii~;;;;:;5ti;;;~
"'JS,-0 10
1' AL t-'..-·
t
:1 ~ 1 t,,,,.,t~· ··
DREDGE HOLE TO BE
FILLED TO EL= -10.0
(15.9 AC)104 ,000 CY
Capacity
2041 Vista Parkway, sutte 201
ffi
West~~~)0::9".1:i·~~ 33411
Certificate of Authorization #4669
Lake Worth Lagoon Waterways
Town of Palm Beach, Florida
ISSUE DATE: 10-12-2011
FORPERMtTIINGPURPOSESONLY
NOT FOR CONSTRUCTION
~i;h~iJl~';Jenkir\]#i-~f~P.EP F / /
f'ro.fe ss ignal;;ngi9e7r ( p 1\)"" .' /~;
Florida Llfdense t'lumbe 58072 · ' · ·\' ·-
a 1.:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;i;;;;;;;;;;1.:.;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;!JL:..iiiiiiiiiiiiii0i~.;;;;;;;~;;.~L!;;;;;;;;;;;;·-~
,,~/~
,· ~·~·;:;;:;;;;;;;;;;:;~·~·-.~
1,;i;;;;;;;!.I
"·l,
~,J/fJ,J;\\ . .
v· .
. '/1'1 11 " 1 \\'.
/ 2 3 5 ' SElBACK FROM
BUU10
I
fT1
I
r
fT1
<
)>
-i
0
-
0
,_ _
.,
"\
z
....-._
fT1
fT1
-i
I
z
<
0
)>
..........
I
-
Ji.w...t:L.==-US _ _ _ _ I
1
~-----
JlfiL~.32
I
\
I
I
\
\
-10
\
y~wr
EXISTING
/,.-.J
_, k _
~-
V7
GAAD:s.
FllL DREDGE HOl.E TO EL=-10-204--+-_..--+---4--+---<>--_..-'--'--->---1---1---1
1+00
2+00
3+00
o+oo
PROFILE (100 FOOT STATIONS)
©CROSS SECTION OF DREDGE HOLE
SCALE: SHOWN
(100'H=10'V)
~
~
'TM
A
tl
2047VistaPar1Cross Section of Dredge Hole
Section 1-6 - Profile View
Lake Worth Lagoon Waterways
11 of 12
JosNuMBER
ISSUE DATE: 10-12-2017
./i_L! :o,p
!
17-3ose
·
,,
'. ·' /
\/'
'
1
1.lIC'h; afG
' P D'i:I~
, "J ~n k'. inr IPh
ll' ,,.. r·,,...
Prof8s_sional Enginee r
West Palm Beach, FL 33411
\P
'' \.
/
;
/
.
1
'
1.£:
1
/ {/
~u L:..;;;;;;;;;;;;;;;;;;;;;(~-1-)6-59-·0-04-1;;;;;;;;;;;;;;;;;;;;;;;:.&.:.;;;;;;;;;;;;;;;_T_o_w;;;;;;;n_o_f_P;;;;;;;a-lm;;;;;;;_B_e_a_c_h_._F_l_o_r_id-a;;;;;;;;;;;;;;;;;;;;;.:.l~F-O-R-PE-R-Ml_TT_IN·G·P-UR·P-OS_E_S_ON_L_Y;,a.:~F·l~o·r3-~a,J.·~j,'.~J-_·n··s~e:.iN.~~h-mb_.~_c,s;;s.·.cfr..~~··~~··~'_.~·~·.j/;;;;;;:J
.2
Certifica le of Authorization #4669
NOT FOR CONSTRUCTION
7 ~ ...
.
'u
) ... , \I
'1,
..,..~ v
-.....:. -
'~"" ~-
'I,
I(!,
,JdJ _.
·1:11
I\
234' SET BACK FROM
BULKHEAD LINE
f'T1
r
f'T1
<
)>
0
-l
0
~
z
.,
,......_
f'T1
f'T1
..... .....
-l
I
z
)>
<
0
-10
,,,,,.---
-...I
-...
-..__;
-20-t-~-t--~+---!t-----t~-+~-+-~-t-~-t--~+---!t-----t~-+~-+-~-t-~-t-----t
o+oo
1+00
EB
2+00
3+00
4+00
PROFILE (100 FOOT STATIONS)
CROSS SECTION OF DREDGE HOLE
SCALE: SHOWN
(1 OO'H=1 O'V)
ATM
,
Cross Section of Dredge Hole
Section 1-7 - Profile View
12of 12
JOB NUMBER: 17-3058
~
2047 Vista Parkway, Suite 201
West Palm Beach , FL 334 11
(561) 659-0041
Certificate or Authorization #4669
Lake Worth Lagoon Waterways
Town of Palm Beach, Florida
ISSUE DATE : 10-12-2017
FOR PERMITIING PURPOSES ON LY
NOT FOR CONSTRUCTION
f
~
/l ie(· jJ ~J,
./ .-;
" ·,ri
oecrr'r
,, ~{
·.-
.
I
P.l.r.
M1ch eaJ G. J e QL<1~ ~ P/1 '.D., ' · .
c '.
'
. .
I'
I.; ,
1
r '('·
Pfqtesslopa) Engineer
I
Florida·Lic~~~tN'um~J? 5ao72r · /
,__-,/- '>
,
' J
. u<,
""
'
.v ,O'J''\
I / \ _, \,'...
I
_.',.,
't~,l,JJl1' ~ !.~·
,~
.. .
( /1.1
.. .,.·.
~
·j.:
(I ·
Lake Worth Lagoon Waterways
Town of Palm Beach, Florida
North Waterway
NOTE: INFORMATION REGARDING TARPON COVE PROVIDED BY
PALM BEACH COUNTY - DEPARTMENT OF ENVIRONMENTAL
RESOURCES MANAGEMENT (PBC-ERM)
I
STATE OF FLORIDA
I
I
\
I
\ I
I
PROJECT
AREA
:\\
i
,I
AT\ANTIC
OCEAN
f"'.
\
N1S
Tarpon Cove
Restoration Project
--
~
~~
'TM
A
./"\.
'·
..
Location Map
f
JOB NUMBER: 17-3058
IS SUE DATE: 10-12-2017
r ~\.). ,x.ot~ ;
J'
10 12
- ;
) J_
/
:~
\
·:
ATM
Location Map
Disposal Location
2of12
JOB NUMBER: 17-3058
.··
-~-o . 2 9 '
NAVDBB
0.00' NAVDBB
PERMIT MOIDlllFICATION
CIH~N NELAD
1nnONAREA
NORTH MAIN WATERWAY
Segment
Length (ft)
Volume (cy)
Extension
1802
3500
INrfRACOASTAL
WA"F'i.RWAY
ATM
-
2047 Vista Parkway, Suite 20 1
West Palm Beach, FL 3341 1
(56 1) 659-0041
Certificate of Authorizalion #4669
3of1 2
North Waterway - Plan View
Channel Extension
Lake Worth Lagoon Waterways
Town of Palm Beach, Florida
..
'I\:.:, (
. :·
JOB NUMBER: 17-3058
ISSUE DATE: 10-12-201 7
FOR PERM ITIING PURPOSES ON LY
NOT FOR CONSTRUCTION
~-
.
/
'CJ .
·''
6aCf( '/,
.
, ·
~ ·, I;~
' 'G. Jenki~sl~~:(Q:
-~ P.'·~ff
t;licheal
.r
'7
P rofession~I En g'iri~er
Florida'~icense
<:'· '1,
· /'
NGrrib~r sed7i ... ,,. · ! ...,-'
J,
. ,,
. . . ..
- ., ·.
r
'·J ·) ;' Q ' I i . \ ~ /
~ .'! FI 'f' t I ,
t
r ,.·" ·
I
z
:r
~
~
~
Segment
~
~
~
iq.
A_
'TM
./"\.
Central Waterway - Plan v;ew
'~"
JOB NUMBER: 17-3058
<;/ f:.~- .· ~.·-~ ,1?~(
~'
. G ' ;. )
·
b .:J i,...--.---