Application for Permit Ina and Silverbell Gateway Project

PUBLIC NOTICE _________________________________________________________________________________________

U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT

BUILDING STRONG®

APPLICATION FOR PERMIT Ina and Silverbell Gateway Project

Public Notice/Application No.: SPL-2016-00852-MWL Project: Ina Road and Silverbell Gateway Project Comment Period: October 18, 2017 through November 17, 2017 Project Manager: Michael Langley; (602) 230-6953; Michael.W.Langley@usace.army.mil Applicant Douglas Kennedy Prestwick Properties, LLC 2965 N Calle Ladera Tucson, Arizona 85715

Contact Rion Bowers Bowers Environmental Consulting, LLC 2164 N Jacana Loop Tucson, Arizona 85745

Location The proposed project is located northeast of Ina Road and Silverbell Road in the Town of Marana, Pima County, Arizona (at: Lat. 32.3424, Long.-111.0900) (Figure 1) Activity To permanently discharge fill material into 0.88 acres of non-wetland waters of the United States (WOUS) for construction of residential development including utilities, roads, flood control facilities and residential housing units (Ina and Silverbell Gateway Project). The proposed project would support 315 multi-family residential units. (See attached Figures 1-4) For more information see Additional Information, page 4 of this notice.

Interested parties are hereby notified an application has been received for a Department of the Army permit for the activity described herein and shown on the attached drawing(s). We invite you to review today's public notice and provide views on the proposed work. By providing substantive, sitespecific comments to the Corps Regulatory Division, you provide information that supports the Corps' decision-making process. All comments received during the comment period become part of the record and will be considered in the decision. This permit will be issued, issued with special conditions, or denied under Section 404 of the Clean Water Act. Comments should be mailed to: DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS REGULATORY DIVISION ATTN: Michael Langley 3636 N. Central Ave, Suite 900 Phoenix, AZ 85012-1939

Alternatively, comments can be sent electronically to: Michael.W.Langley@usace.army.mil The mission of the U.S. Army Corps of Engineers Regulatory Program is to protect the Nation's aquatic resources, while allowing reasonable development through fair, flexible and balanced permit decisions. The Corps evaluates permit applications for essentially all construction activities that occur in the Nation's waters, including wetlands. The Regulatory Program in the Los Angeles District is executed to protect aquatic resources by developing and implementing short- and long-term initiatives to improve regulatory products, processes, program transparency, and customer feedback considering current staffing levels and historical funding trends. Corps permits are necessary for any work, including construction and dredging, in the Nation's navigable water and their tributary waters. The Corps balances the reasonably foreseeable benefits and detriments of proposed projects, and makes permit decisions that recognize the essential values of the Nation's aquatic ecosystems to the general public, as well as the property rights of private citizens who want to use their land. The Corps strives to make its permit decisions in a timely manner that minimizes impacts to the regulated public. During the permit process, the Corps considers the views of other Federal, state and local agencies, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States. The permit review process serves to first avoid and then minimize adverse effects of projects on aquatic resources to the maximum practicable extent. Any remaining unavoidable adverse impacts to the aquatic environment are offset by compensatory mitigation requirements, which may include restoration, enhancement, establishment, and/or preservation of aquatic ecosystem system functions and services. Evaluation Factors The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof. Factors that will be considered include conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food production and, in general, the needs and welfare of the people. In addition, if the proposal would discharge dredged or fill material, the evaluation of the activity will include application of the EPA Guidelines (40 CFR Part 230) as required by Section 404 (b)(1) of the Clean Water Act. The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments 2

are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Preliminary Review of Selected Factors EIS Determination- A preliminary determination has been made an environmental impact statement is not required for the proposed work. Water Quality-.The applicant is required to obtain water quality certification, under Section 401 of the Clean Water Act, from the Arizona Department of Environmental Quality. Section 401 requires any applicant for an individual Section 404 permit provide proof of water quality certification to the Corps of Engineers prior to permit issuance. Coastal Zone Management-.Not applicable within the State of Arizona. Essential Fish Habitat- No Essential Fish Habitat (EFH), as defined by the Magnuson-Stevens Fishery Conservation and Management Act, occurs within the project area and no EFH is affected by the proposed project. Cultural Resources- The project site has been surveyed for the presence of cultural resources. Four sites have been identified that are potentially eligible for inclusion in the National Register of Historic Places. Endangered Species- Preliminary determinations indicate the proposed activity would not affect federally-listed endangered or threatened species, or their critical habitat. Therefore, formal consultation under Section 7 of the Endangered Species Act does not appear to be required at this time. Public Hearing- Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. Proposed Activity for Which a Permit is Required Basic Project Purpose- The basic project purpose comprises the fundamental, essential, or irreducible purpose of the proposed project, and is used by the Corps to determine whether the applicant's project is water dependent (i.e., requires access or proximity to or siting within the special aquatic site to fulfill its basic purpose). Because no fills are proposed within special aquatic sites, identification of the basic project purpose is not necessary. The basic project purpose for the proposed project is to provide residential housing. The project is not water dependent. Overall Project Purpose- The overall project purpose serves as the basis for the Corps' 404(b)(1) alternatives analysis and is determined by further defining the basic project purpose in a manner that more specifically describes the applicant's goals for the project, and which allows a reasonable range of alternatives to be analyzed. The overall project purpose, as stated by the applicant, is to construct a multi-family residential development that could support approximately 315 residential units that meets the objectives of the Town of Marana's Silverbell Gateway Specific Plan. These objectives include: (1) Minimizing flood damage exposure to the proposed project and associated public utilities; (2) route all on-site and off-site runoff through the project area in a manner that will not adversely impact adjacent and downstream properties; (3) manage on-site floodplains such that the 500-feet3

500-year event building erosion hazard setbacks are eliminated from the project area; and, (4) manage on-site floodplains such that the project area is anticipated to be removed from the FEMA Zone A special Flood Hazard Area. Additional Project Information Baseline information- The proposed project consists of approximately 18.9 acres of undeveloped land that is located between Silverbell Road on the west and a levee along the Santa Cruz River on the east (project area). A large stormwater drainage channel and culvert that discharges into the Santa Cruz River abuts the northern boundary and an earthen levee borders the southern boundary of the site. The project area is bisected by two braids of Yuma Mine Wash that flow through large box culverts under Silverbell Road before discharging into the Santa Cruz River. Yuma Mine Wash is an ephemeral drainage that flows across the site in wide eroding channels, and then is diverted to a culvert under a levee where it discharges into the Santa Cruz River located east of the project area. The project site contains a total of 1.11 acres of WOUS. Project description- The proposed project consists of new multi-family residential housing, and related infrastructure that is consistent with the Town of Marana's Silverbell Gateway Specific Plan adopted by the Town of Marana in 2014. Project development would include the following activities: drainage improvements such as channelizing Yuma Mine Wash, cut and fill mass grading, pad fill and grading, foundation work, construction of driveways and access roads, installation of wet and dry utilities, vertical construction of apartment buildings, and landscaping. The development footprint would cover approximately 18.9 acres (Figure 2). In order for the project to be consistent with the specific plan and economically viable, Yuma Mine Wash would be altered to alleviate flooding and create a larger cohesive building site. Approximately 0.88 acre of WOUS would be filled to develop the proposed project. Approximately 0.23 acre of WOUS would be avoided. The two braids of Yuma Mine Wash would be diverted into concrete-lined stormwater channels that would be designed to convey runoff from a 100-year storm event. One channel would capture and carry stormwater north along the east side of Silverbell Road then turn east along the northern property boundary and discharge into the existing culvert under the levee located on the west bank of the Santa Cruz River. The other channel would convey stormwater along the southern boundary of the site, discharge into the natural channel along the levee which flows into the same culvert under the west bank of the Santa Cruz River (Figures 3 and 4). Proposed Mitigation­ The proposed mitigation may change as a result of comments received in response to this public notice, the applicant's response to those comments, and/or the need for the project to comply with the 404(b)(1) Guidelines. In consideration of the above, the proposed mitigation sequence (avoidance/minimization/compensation) as applied to the proposed project is summarized below:

Avoidance: Approximately 0.23 acre of WOUS of the 1.11 total acres on the project site would be avoided. Minimization: Impacts to WOUS have been minimized to the degree possible; the culverts constructed under Silverbell Road to manage incoming runoff and the locations of the washes on-site limit development options.

4

Compensation: The applicant has proposed a permittee-responsible mitigation plan consisting of preservation of ephemeral streams and riparian/upland buffers on property adjacent to the project site. The plan is currently under review by the Corps. Proposed Special Conditions To be developed.

For additional information please call Michael Langley of my staff at (602) 230-6953 or via e-mail at Michael.W.Langley@usace.army.mil. This public notice is issued by the Chief, Regulatory Division.

Regulatory Program Goals: · To provide strong protection of the nation's aquatic environment, including wetlands. · To ensure the Corps provides the regulated public with fair and reasonable decisions. · To enhance the efficiency of the Corps' administration of its regulatory program.

__________________________________________________________ DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS 3636 N. Central Ave, Suite 900 Phoenix, AZ 85012-1939

WWW.SPL.USACE.ARMY.MIL/MISSIONS/REGULATORY

5

ARIZONA

REGIONAL AREA

(1 inch = 10 miles)

Pinal County FLAGSTAFF

PHOENIX YUMA TUCSON

Pima County

Project Location

Legend Project Area

Figure 1. Vicinity map (DRAFT).

¹

0

1,000

0

300

T12S, R12E, Section 35 Pima County, Arizona Jaynes, Ariz. USGS 7.5' Quadrangle Data Source: Esri ArcGIS Image Source: USA Topo Coordinate System: NAD83 UTM Z12N 2,000 Feet 600 Meters

Path: M:\Jobs\1900's\1968.01\ENV\404b1_Alts_Analysis_InaSilverbellGateway\MXD\Figures\04_Alt_A.mxd

Date: 9/15/2017

Sa

m Yu

a

M

in

e

as W

nt

a

Cr uz

Ri ve

r(

Ef f lu

en t

Do

mi na

User: towens

ted )

h

Legend Available Footprint For Development Avoided Waters of the U.S. (0.23 acres) Previously Impacted Waters of the U.S. (0.46 acres) Impacted Potential Waters of the U.S. (0.88 acres)

Potential Waters of the U.S. T12S, R12E, Portion of Section 35, Pima County, Arizona, Image Source: Pima County Pictometry, 2016 Engineering Data Provided by Rick Engineering 8/15/2017

0

WestLand Resources

0

100

PRESTWICK PROPERTIES, LLC INA AND SILVERBELL GATEWAY PROJECT

200 Feet 50

100 Meters

±

PROPOSED ACTION

2 1 7 0

21 70

O S 2 .1

21 65

21 60

216 0

75 21

O S 2 .2

2175

2 1 6 0

5 216

5 6 1 2

60 21

21 60

21 40

21 65

21 65

2 1 6 5

21 55 2160

2 1 5 0

3

RCB CULVERT

2175

2175

2180

2170

2170

5 217

70 21

2165

2175

2170

0 217

2160

70 21 2170

2170

2 1 1 0

2 1 50

216 5

2170

2170

20 21

21 65

2 1 2 5

2 1 5 5

21 20

2165

2 1 5 0

2170

0 7 21

2170

2170

2160 2165

2155

0 215

2 1 4 5

2170

0'

2165

0 6 1 2

150'

2170

2 1 5 5

2170

70 21

300'

2160

T T

2175

2175

EXHIBIT III.G.1

Q100* (cfs)

1,100 49 49 10 700

50

N/A N/A 6.7 6.3 2.3 195 3.4

OS-2.2 OS-2.3 OS-3 OS-4 OS-5 OS-6

OS-7

21 65

2150

1,600

N/A

OS-2 OS-2.1

500-YEAR FLOW

2155

60 21 65 21

DATE:

80 3 150 N/A 520

1 2 3 3b 4

-7 OS

5/19/2014

0 215

50 21

2150

2160

50 21

70 21

60 5 21 216

0 5 1 2 70 21 60 21 5 216

0 7 1 2

60 21 65 21

0 5 1 2

2130 2135

2140

0 6 1 2

0 1 1 2

2115

0 7 1 2

70 21

75 21

5 7 1 2

75 21

2165

65 21

2165

70 21

80 21

0 8 1 2

04-AUG-2017

PAGE 1

**Cumulative discharge

OF1

520

1,750

150

700

190

Q100** (cfs)

*Local discharge, assumes conservative developed runoff rate of 10 cfs/ac

Q100* (cfs)

Concentration Point

DEVELOPED ON-SITE PEAK DISCHARGES

** At Cortaro Road

* Source varies, see report

5,603 2,400

2855

OS-1

Santa Cruz River 80,000**

Watershed Area (acres)

BE RAISED TO CONTAIN

BANK PROTECTION TO

EFFECTIVE FEMA SFHA

WATERSHED BOUNDARY

PROPOSED FLOW DIRECTION

HYDRAULIC CROSS-SECTION

CONCENTRATION POINT

WATERSHED

OFF-SITE PEAKDISCHARGES Concentration Point

1

CP-1

1

LEGEND

INA & SILVERBELL SPECIFIC PLAN

POST-DEVELOPMENT HYDROLOGY

APPROXIMATELY 2500LF

50 21

F:\4094_Ina_Silverbell\Hydro\4094drpr_exb01.dgn

2145

2135

0 212 2125

2 1 6 0

2 1 5 5

60 21

INA ROAD

2170

2165

21 65

21 55 21 60

212 0 21 25 21 30 21 35 21 40

21 45 21 50

21 15

2 1 2 4 1 0 3 2 5 1 3 2 1 0 2 2 5 1 2 0

214 5

55 21

2185

5

2170

216 5

21 65

2115

2155

21 45

O S -1

SCALE: 1" = 300' CONTOUR INTERVAL: 1'

55 21

2185

2175

21 65

214 5

25 21 30 21 35 21 0 214 5 4 21 50 21 55 1 0 2 6 1 2

2185

70 21

2

65 21

-5 OS

5 7 1 2

70 21

21 80

5 6 1 2

CHANNEL

0 6 1 2

WEST PARCEL

2165

EXISTING

2160

EAST PARCEL

21 60

21 45

21 50

2130

5 7 1 2

60 21

CHANNEL

21 60

21 55

21 50

21 45

2145

2120

21 80

-3 OS

1

2165

-1 CP

60 21

PROPOSED

4

2 1 6 0

21 45

0 2 1 2

4

60 21

2 21 145 50

5 1 1 2

5 217

2165

2170

CHANNEL

PROPOSED

3

CHANNEL

21 55

21 55

2110

PROPOSED CHANNELS

2175

2170

215 5

PROPOSED

2

2155

21 40

2115

2175

2175

2 1 5 5

21 55

21 40

21 45 21 50

THROUGH BANK PROTECTION

PROPOSED RCB CULVERT

15 21

4 OS-

2175

5 6 1 2

0 6 1 2

2155

21 21 55 55

2 1 4 0

2160

2175

5 7 1 2

70 21

0 7 1 2

2175

21 70

3 . OS2

21 70

0 6 1 2

21 50

2 1 5 0

2 1 4 0

BANK PROTECTION AND TOE-DOWNS.

0 1 1 2 5 1 1 2 20 1 2 5 2 1 2

2175

21 60

CHANNEL

FLOW AND ON-SITE CHANNELS CONSTRUCTED WITH

21 60

WITHIN SANTA CRUZ RIVER

2125

2 21 14 40 0

BANK PROTECTION RAISED TO CONTAIN 500-YEAR

2135

CONTAINS 500-YEAR FLOW

21 15

2 1 4 5

2 1 5 0

C P -3

PROPOSED

CHANNEL

60 21 60 21

PROPOSED

2 1 5 0

CP-4

1

21 65

D A

E IN PROPOSED CULVERT M H EXTENTION & CURVED A S M A TRANSITION TO CHANNEL U W Y

O S 2

2165 2165

21 55

21 15

21 45

2110

21 50

2160

UNDER PROPOSED CONDITION ASSUMING SANTA CRUZ

21 20

EXISTING BANK PROTECTION

2160

SITE NOT IMPACTED BY EROSION HAZARD SETBACKS

2165

C 3 P b

2 1 6 0

NOTE:

2155

EXISTING 3-12'x12' RCBC

2160

2 1 5 0

5 5 0 1 2 15 0 2 4 5 1 3 2 1 0 2 3 1 2

2175

2165

21 65

5 7 1 2

O R 2165

5 7 1 2

5 7 1 2

0 215

c 2017 Ri ck Engi neer i ng Company

0 7 1 2

2165

0 7 1 2 2165

0 7 21 21 15

0 7 1 2

L EL B R VE L SI 210 5

0 7 1 2 210 5

0 7 1 2 60 21

21 75

60 21

21 70

2165

2165

2160 2155

OS6

60 21

21 20

0 7 1 2

70 21

70 21 5 216

CP -2

70 5 21 16 2 2145

2155 0 5 1 2

2 1 6 0 215 5

60 21

2 1 5 0

2165

0 215 21 70

0 6 1 2

50 21 2160

60 21

2160 2165

5 215

5 5 0 6 1 0 1 2 4 2 1 2 70 21 65 21

2170

55 21

50 21 2155

2170 2165

0 5 1 2

2160

65 21

0 5 1 2

2150

5 5 1 2

A T N A S 2150

0 5 1 2

Z U R C 2150

2160

0 4 1 5 2 4 1 2

5 4 1 2

R E V I R 2160

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas