SPECIAL PUBLIC NOTICE: This public notice announces the St. Paul District Corps of Engineers Regulatory Branch (Corps) proposed modification of regional general permit (RGP) RGP-003-WI. This modification has been proposed to address the duration of authorization after RGP-003-WI expires

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

SPECIAL PUBLIC NOTICE: This public notice announces the St. Paul District Corps of Engineers Regulatory Branch (Corps) proposed modification of regional general permit (RGP) RGP-003-WI. This modification has been proposed to address the duration of authorization after RGP-003-WI expires, and extend the expiration date of GP-003-WI from December 31, 2017 through January 8, 2018.

PROJECT DESCRIPTION AND PURPOSE: This public notice announces the St. Paul District Corps of Engineers Regulatory Branch (Corps) proposed modification of regional general permit (RGP) RGP-003-WI. This modification has been proposed to address the duration of authorization after RGP-003-WI expires, and extend the expiration date of GP-003-WI from December 31, 2017 through January 8, 2018.

PROPOSED MODIFICATION OF REGIONAL GENERAL PERMIT GP-003-WI REFER TO: 2012-01422-DJM

Public Notice ISSUED: October 18, 2017 EXPIRES: November 17, 2018 Section 404, Clean Water Act Section 10, Rivers and Harbors Act

1. PROPOSED ACTION: This public notice announces the St. Paul District Corps of Engineers Regulatory Branch (Corps) proposed modification of regional general permit (RGP) RGP-003-WI. This modification has been proposed to address the duration of authorization after RGP-003-WI expires, and extend the expiration date of GP003-WI from December 31, 2017 through January 8, 2018. General Condition 2 (Duration of Authorization) of RGP-003-WI is proposed to be modified to allow all activities authorized that have commenced construction, or are under contract to commence construction, to remain authorized provided the activity is completed within 12 months of the date of the RGP-003-WI expiration, suspension, or revocation; whichever is sooner. This modification is similar to the Corps Nationwide Permit program's grandfather provision, and has been proposed to reduce the number of projects which will require reauthorization after the current RGP expires. In addition, the Corps proposes to extend the expiration date of RGP-003-WI from December 31, 2017 to January 8, 2017. By regulation, Corps RGP's may not be valid for more than 5 years without a re-evaluation and reissuance. The proposed extension would optimize this five year window in lieu of re-issuance of RGP-003-WI. No other portions of the current RGP-003-WI are proposed to be modified. 2. PURPOSE OF THE PROPOSED ACTION: Separate from this proposed action, the Corps issued a public notice on July 11, 2017, announcing its intent to develop several new regional general permits, which would replace the current suite of general permits, including GP-003-WI. This initiative remains the overarching goal of the Corps. Information regarding the new proposed regional general permits has been made available under separate notices. The Corps has proposed to modify GP-003-WI to minimize any potential gap in general permit coverage during development of the new regional general permits. In the event that the proposed modification described herein is not adequate to provide seamless RGP coverage, the Corps has solicited comments (public notice dated August 31, 2017) on the proposed re-issuance of RGP-003-WI which would allow RGP coverage after January 8, 2018. 3. REPLIES AND COMMENTS: The current version of RGP-003-WI is available for review from the Corps website at: http://www.mvp.usace.army.mil/Missions/Regulatory/Permitting-Process-Procedures/. Interested parties are invited to submit to this office written facts, arguments, or objections concerning the proposal within 30 days of the date of this notice. These statements should bear upon the suitability and adequacy of the proposal and should, if appropriate, suggest any changes deemed desirable. Questions regarding the proposed modification of RGP-003-WI may be addressed to Rebecca Graser in our Brookfield office at (651) 290-5728, comments should be submitted to Ms. Graser via email at Rebecca.m.graser@usace.army.mil. FOR THE DISTRICT COMMANDER: Chad Konickson Chief, Regulatory Branch

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas