You can copy from here when filling out the rest of the page.
Miami-Dade County. AMB Codina Beacon Lakes LLC. Doral, Florida.
PROJECT PURPOSE:
Basic: The basic project purpose is to construct an access roadway roadway to a permitted development.
Overall: The overall project purpose is to construct an access roadway associated Houndstooth, a permitted development in western Miami-Dade County.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: AMB Codina Beacon Lakes LLC
c/o Travis Harvey
8355 Northwest 12th Street
Doral, FL 33126
WATERWAY AND LOCATION: The project would affect surface waters of the United States. The Beacon Lakes Entrance to Houndstooth roadway project is located west of the Homestead Extension to Florida’s Turnpike (HEFT), north of Northwest 12th Street and State Road 836/Dolphin Expressway, within Section 36, Township 53 South, Range 39 East, in unincorporated Miami-Dade County, Florida (portion of Folio No. 30-3936-000-0105).
Directions to the site are as follows: From Take I-95 to Exit 3A and exit onto FL-836 W. Continue on FL-836 W for approximately 7.5 miles and take the FL-985 S / NW 107th Avenue / Homestead Extension of Florida’s Turnpike exit. Continue toward NW 12th Street and follow signs for Florida Turnpike N / Ft. Lauderdale / Orlando. Take Exit 27, following signs for NW 12th Street. Turn right (west) onto NW 12th street and continue for approximately ½ mile. The destination will be on the right.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 25.785211°
Longitude: -80.390719°
PROJECT PURPOSE:
Basic: The basic project purpose is to construct an access roadway roadway to a permitted development.
Overall: The overall project purpose is to construct an access roadway associated Houndstooth, a permitted development in western Miami-Dade County.
EXISTING CONDITIONS: The approximate 5.86-acre project site consists of approximately 3.32 acres of disturbed upland (herbaceous dry prairie and upland shrub and brush) and approximately 2.54 acres of surface waters. The surface waters are part of a Florida Department of Transportation (FDOT) retention lake bordered by limestone outcropping and opportunistic vegetation. The upland area surrounding the lake embankment is generally flat with elevations five to eight feet above the National Geodetic Vertical Datum (NGVD) of 1929. The project site surface water depths are variable, ranging from seven to 22 feet below land surface. The retention lake lacks a palustrine fringe, and the sharp relief prohibits a littoral shelf. No wetlands jurisdictional to the Corps are located on-site.
The USDA NRCS soil survey completed in 2012 for Miami-Dade County indicates the majority of the project site historically contained Biscayne marl-rock outcrop complex. However, historical analysis indicated the presence of former structures, roadways, and agricultural land in the late 1970s through the 1990s, as well as the creation and alteration of the retention lake between 2004 and 2007. These disturbances have completely altered the native soils and hydrology throughout the project site. The current soils are friable and predominantly consist of topsoil above limerock in the area around the retention lake.
PROPOSED WORK: The applicant seeks authorization to install 84,235 cubic yards of fill over approximately 2.54 acres of surface waters for construction of the proposed roadway.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
The entrance road project proposes the construction of a roadway to connect the permitted Houndstooth development located to the northeast and the MDX planned connector road (NW 122nd Avenue) to NW 12th Street. As required by Miami-Dade County, the alignment of the proposed roadway must match the planned MDX connector road. If the roadway were adjusted to the east or west it would not allow for proper alignment with the planned MDX connector road. The use of box culverts was reviewed to reduce the amount of fill within the retention lake; however, this added over $1,000,000 to the project fees making this cost prohibitive. It was determined that design modifications to eliminate and/or reduce impacts were not practicable as the project needs to align with the proposed MDX connector roadway.
This project will include the placement of approximately 84,235cubic yards of fill to accommodate the construction of the roadway and associated runout slopes.
The potential for habitat corridors does not exist, and no wetland areas will be impacted by the project.
COMPENSATORY MITIGATION: The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
No wetlands will be lost due to this project. Standard erosion control measures will be installed as applicable.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project will have “no affect” on the Florida Bonneted Bat (Eumops floridanus), American crocodile (Crocodylus acutus), Everglade snail kite (Rostrahmus sociabilis plumbeus), wood stork (Mycteria Americana), and eastern indigo snake (Rostrahmus sociabilis plumbeus) because the project area provides no suitable habitat for these species. .
The Corps has determined the proposal would have no effect on any other listed threatened or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service (NMFS) on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The project is located in an isolated freshwater retention lake and would have no impacts on tidally influenced waters. Therefore, the proposed action would have no impact on EFH or Federally-managed fisheries within Biscayne Bay. The final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with NMFS.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Miami Permits Section, 9900 S.W. 107th Avenue, Suite 203, Miami, Florida 33176 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated surface waters. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Patrick Gaughran, in writing at the Miami Permits Section, 9900 S.W. 107th Avenue, Suite 203, Miami, Florida 33176; by electronic mail at Patrick.M.Gaughran@usace.army.mil or, by telephone at (305) 779-6058.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board, in the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
9900 SW 107TH AVE., SUITE 203
MIAMI, FLORIDA 33176
REPLY TO
ATTENTION OF
October 18, 2017
Regulatory Division
South Permits Branch
Miami Permits Section
PUBLIC NOTICE
Permit Application Number SAJ-2015-03471 (SP-AG)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: AMB Codina Beacon Lakes LLC
c/o Travis Harvey
8355 Northwest 12th Street
Doral, FL 33126
WATERWAY AND LOCATION: The project would affect surface waters of the United
States. The Beacon Lakes Entrance to Houndstooth roadway project is located west of
the Homestead Extension to Florida's Turnpike (HEFT), north of Northwest 12th Street
and State Road 836/Dolphin Expressway, within Section 36, Township 53 South, Range
39 East, in unincorporated Miami-Dade County, Florida (portion of Folio No. 30-3936000-0105).
Directions to the site are as follows: From Take I-95 to Exit 3A and exit onto FL-836 W.
Continue on FL-836 W for approximately 7.5 miles and take the FL-985 S / NW 107th
Avenue / Homestead Extension of Florida's Turnpike exit. Continue toward NW 12th
Street and follow signs for Florida Turnpike N / Ft. Lauderdale / Orlando. Take Exit 27,
following signs for NW 12th Street. Turn right (west) onto NW 12th street and continue
for approximately ½ mile. The destination will be on the right.
APPROXIMATE CENTRAL COORDINATES:
Latitude:
Longitude:
25.785211°
-80.390719°
PROJECT PURPOSE:
Basic: The basic project purpose is to construct an access roadway roadway to a
permitted development.
Overall: The overall project purpose is to construct an access roadway associated
Houndstooth, a permitted development in western Miami-Dade County.
EXISTING CONDITIONS: The approximate 5.86-acre project site consists of
approximately 3.32 acres of disturbed upland (herbaceous dry prairie and upland shrub
and brush) and approximately 2.54 acres of surface waters. The surface waters are
part of a Florida Department of Transportation (FDOT) retention lake bordered by
limestone outcropping and opportunistic vegetation. The upland area surrounding the
lake embankment is generally flat with elevations five to eight feet above the National
Geodetic Vertical Datum (NGVD) of 1929. The project site surface water depths are
variable, ranging from seven to 22 feet below land surface. The retention lake lacks a
palustrine fringe, and the sharp relief prohibits a littoral shelf. No wetlands jurisdictional
to the Corps are located on-site.
The USDA NRCS soil survey completed in 2012 for Miami-Dade County indicates the
majority of the project site historically contained Biscayne marl-rock outcrop complex.
However, historical analysis indicated the presence of former structures, roadways, and
agricultural land in the late 1970s through the 1990s, as well as the creation and
alteration of the retention lake between 2004 and 2007. These disturbances have
completely altered the native soils and hydrology throughout the project site. The
current soils are friable and predominantly consist of topsoil above limerock in the area
around the retention lake.
PROPOSED WORK: The applicant seeks authorization to install 84,235 cubic yards of
fill over approximately 2.54 acres of surface waters for construction of the proposed
roadway.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
The entrance road project proposes the construction of a roadway to connect the
permitted Houndstooth development located to the northeast and the MDX planned
connector road (NW 122nd Avenue) to NW 12th Street. As required by Miami-Dade
County, the alignment of the proposed roadway must match the planned MDX
connector road. If the roadway were adjusted to the east or west it would not allow for
proper alignment with the planned MDX connector road. The use of box culverts was
reviewed to reduce the amount of fill within the retention lake; however, this added over
$1,000,000 to the project fees making this cost prohibitive. It was determined that
design modifications to eliminate and/or reduce impacts were not practicable as the
project needs to align with the proposed MDX connector roadway.
This project will include the placement of approximately 84,235cubic yards of fill to
accommodate the construction of the roadway and associated runout slopes.
The potential for habitat corridors does not exist, and no wetland areas will be impacted
by the project.
2
COMPENSATORY MITIGATION: The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
No wetlands will be lost due to this project. Standard erosion control measures will be
installed as applicable.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project will have
"no affect" on the Florida Bonneted Bat (Eumops floridanus), American crocodile
(Crocodylus acutus), Everglade snail kite (Rostrahmus sociabilis plumbeus), wood stork
(Mycteria Americana), and eastern indigo snake (Rostrahmus sociabilis plumbeus)
because the project area provides no suitable habitat for these species. .
The Corps has determined the proposal would have no effect on any other listed
threatened or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service (NMFS) on EFH as required by the Magnuson-Stevens
Fishery Conservation and Management Act 1996. The project is located in an isolated
freshwater retention lake and would have no impacts on tidally influenced waters.
Therefore, the proposed action would have no impact on EFH or Federally-managed
fisheries within Biscayne Bay. The final determination relative to project impacts and the
need for mitigation measures is subject to review by and coordination with NMFS.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Miami Permits
Section, 9900 S.W. 107th Avenue, Suite 203, Miami, Florida 33176 within 21 days from
the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
3
the associated surface waters. This is based on an analysis of the applicant's
avoidance and minimization efforts for the project, as well as the compensatory
mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Patrick Gaughran, in writing at the Miami Permits Section, 9900 S.W. 107th Avenue,
Suite 203, Miami, Florida 33176; by electronic mail at
Patrick.M.Gaughran@usace.army.mil or, by telephone at (305) 779-6058.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this decision, comments
are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act
comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
4
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board, in the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
M:\Projects\2015 Projects\2015-0044-001 Prologis Beacon Lakes 45 Acres\4_figures and drawings\GIS\EntranceRoadtoHoundstooth\SiteLocation.mxd
Site Location
Approximate Site Boundary (±5.86 acres)
Permitted Site (Houndstooth)
MDX Planned Connector Road
²
0
500
1,000
2,000
Feet
330 SW 27th Avenue, Suite 504, Miami, FL 33135
P: 786.313.3977 F: 305.356.4333
www.smart-sciences.com
CHECKED BY: GC
3,000
DRAWN BY: VJM
PROJECT NUMBER
2015-0044-001
Service Layer Credits: Sources: Esri, HERE, DeLorme, USGS,
Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China
(Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia, NGCC, ©
OpenStreetMap contributors, and the GIS User Community
Entrance Road to Houndstooth
West of the Homestead Extention to Florida Turnpike
and North of NW 12th Street
Western Miami, Miami-Dade County, Florida
Site Location
SCALE: As Shown DATE: 7/25/2017
1
FIGURE
M:\Projects\2015 Projects\2015-0044-001 Prologis Beacon Lakes 45 Acres\4_figures and drawings\GIS\EntranceRoadtoHoundstooth\Topo.mxd
Approximate Site Boundary (±5.86 acres)
Permitted Site (Houndstooth)
MDX Planned Connector Road
²
0
500
1,000
2,000
Feet
330 SW 27th Avenue, Suite 504, Miami, FL 33135
P: 786.313.3977 F: 305.356.4333
www.smart-sciences.com
CHECKED BY: GC
3,000
DRAWN BY: VJM
PROJECT NUMBER
2015-0044-001
Service Layer Credits: Copyright:© 2013 National Geographic
Society, i-cubed
Entrance Road to Houndstooth
West of the Homestead Extention to Florida Turnpike
and North of NW 12th Street
Western Miami, Miami-Dade County, Florida
USGS Topographic Map
SCALE: As Shown DATE: 7/25/2017
2
FIGURE
M:\Projects\2015 Projects\2015-0044-001 Prologis Beacon Lakes 45 Acres\4_figures and drawings\GIS\EntranceRoadtoHoundstooth\AerialMap.mxd
Approximate Site Boundary (±5.86 acres)
Permitted Site (Houndstooth)
MDX Planned Connector Road
²
0
200
400
800
Feet
330 SW 27th Avenue, Suite 504, Miami, FL 33135
P: 786.313.3977 F: 305.356.4333
www.smart-sciences.com
CHECKED BY: GC
1,200
DRAWN BY: VJM
PROJECT NUMBER
2015-0044-001
Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors
Entrance Road to Houndstooth
West of the Homestead Extention to Florida Turnpike
and North of NW 12th Street
Western Miami, Miami-Dade County, Florida
2016 Aerial Imagery
SCALE: As Shown DATE: 7/25/2017
3
FIGURE
Drawing"""''" Z:'ENGINEERING\PROJECTS\Zl15\2015 15 BEACON LAKES\201615 e.con ~ E>q>enslon 1ond 11~ IV Plnnit SubmlllMCOE FUN.dwg
>"'
,.,.
15' TEMPORARY CONSTRUCTION EASEMENT
8
DEPT.
F TRANS ORTATION J
/
~
LEGEND
1~
LAKE FILL AREA
ROW AREA
ROW TO TCE AREA
I
~
I
I
0
I
'
I
I
I
~
I
I
'
I
~
0
-llESIGHED:
LAS
-
SB
LAS
CllEaEO:
8CillE:
DATE:
1"=1 00'
07/1lll2017
PROJ. NO. 2015-15
-- -
m
LUDOVI C I
&
ORANG
CONSUL TING
ENGIN EERS.
BEACON LAKES
NW 122nd AVE &
NW 14th ST
IN ~--------r---------i-l--1------l
329 PALERMO AVENUE, CORAL Gl\BLES, FLORIDA 33184 · 306/446-1800 · LB 1012
AMBCODINA
B E ACON LAKES LLC
ACOE
Drawing name: Z:'ENGINEERING\PROJECTS'l2015\201515 BEACON LAKEB'QD1515 ee.:on LakBI Expan1ion I and 11\Cllm IV Pwmit Submllal\ACOE PLAN.dwg
STATE OF
FLORIDA DOT
FOLIO No.:
30-3096-000-0105
15' TEMPORARY CONSTRUCTION EASEMENT
PROJECT AREA
ROW NW 122nd AVE & NW 14th ST
LAKE FILL AREA OUTSIDE OF ROW
TCE INCLUDING SLOPE RUNOUT
.....
3.44AC
1.44 AC
0.98AC
,.'f>
5.86AC
TOTAL AREA
LAKE FILL AREA WITHIN ROW
TOTAL LAKE FILL AREA
SLOPE RUNOUT AREA
1.10 AC
2.54AC
0.53AC
I
I
I
..I
I
I
I
I
LEGEND
LAKE FILL AREA
ROW AREA
ROW TO TCE AREA
....
~
......
,,....
~-'"
L.,
"''''
..."'
..
...,.,
...
~
20' TEMPORARY CONSTRUCTION EASEMENT
TOE OF SLOPE
~·"
I
,.,.
I ....,
I ,.,.
I
I .....
I
I
~.,.
....r
--1
~'~
,,...
.....
,,...
~
'
.
...,
......
I
,....
I
I
I
ID
...
DESIGNED:
LAB
ORA~:
SB
CHECKED:
SClt.E:
DATE:
LAS
1"=1 DD'
07/19/2017
PllOJ. NO. 2D1l>-15
m
LUDOVICI
&
ORANG
CONSUL Tl NG
ENGINEERS.
BEACON LAKES
NW 122nd AVE &
NW 14th ST
IN , . . . . . . . . - - - - - - - - r - - - - - - - - - - - i - + - - + - - - - - - - 1
AMB co DI NA
ACOE
BEACON LAKES LLC
329 PALERMO AVENUE, CORAL GABI.ES, FLORIDA 33134. 306/443-1800. LB 1012
R/W LINE
R/W LINE
112'
BASELINE AND
CENTERLINE OF CONSTRUCTION
11'
2'
11'
(-)0.32
MIN. ELEV. = +7.5
(-)0.23
(-)0.70
2.64 %
P.G.L. REFERS
TO THIS POINT
0.00
2.08 %
2'
20'
SOD
56'
0.04':1'
11'
11'
2'
7'
6'
BIKE LANE
P.G.L. REFERS
TO THIS POINT
(-)0.23
0.00 2.08
%
2.64 %
0.04':1'
3'
MIN.
ELEV. 8.5
CURB & GUTTER TYPE "F"
CURB & GUTTER TYPE "F"
4" CONC. SIDEWALK
MISC ASPHALT PAVEMENT
MIN. ELEV. =
+7.5
(-)0.70
WHERE EXIST. LAKE
IS ADJACENT, SLOPE
AS SHOWN ON EAST
SIDE OF RIGHT OF
WAY.
CURB & GUTTER TYPE "F"
3'
MDX PROPERTY
VARIES
EXIST LAKE
1'
.5'
(-)0.32
(-)0.14
0.02':1'
4" CONC. SIDEWALK
MISC ASPHALT PAVEMENT
8'
BENCH
40'
MIN.
ELEV. 8.5
PROP
GUARDRAIL
4:1 M
AX
LOW WATER EL. 3.5
EL. 0.5
ANGLE OF REPOSE
ANGLE OF REPOSE
EL. (-) 19.5
EL. (-) 19.5
R/W LINE
10'
SLOPE RUNOUT
(-)0.13
AX
MATCH EXIST. EL. VARIES 7.0 TO 7.7±
4:1 M
2'
6'
SIDEWALK
(-)0.25
0.02':1'
2'
4'
BIKE
LANE
EOW
11'
MIN. ELEV. = +7.5
2.64 % (-)0.23
(-)0.63
43'
1'
BASELINE
OF CONSTRUCTION
L
42'
17.6' TO 31.2'±
VARIES
R/W LINE
CENTERLINE
OF ROW
L
VARIES 93.1±' TO 107.9±
LUDOVICI & ORANGEBEACON LAKES
SECTION A-A
112' R/W
TYPICAL SECTION
N.W. 122ND AVENUE
SCALE: 1" = 20'
LOOKING NORTH
44'
EXIST LAKE
2'
2'
8'
SOD
P.G.L.
REFERS TO
THIS POINT
0.00
0.04':1' 0.04':1'
2.08 %
11'
11'
P.G.L.
REFERS TO
THIS POINT
0.00 2.08
%
11'
(-)0.23
4'
BIKE
LANE
MIN. ELEV. = +7.5
2.64 %
(-)0.63
CURB & GUTTER TYPE "F"
CURB & GUTTER TYPE "F"
2'
6'
3' 1'
SIDEWALK
.5'
PROP
GUARDRAIL
(-)0.07
(-)0.25
MIN.ELEV.
0.02':1'
8.5
4:1 M
AX
4" CONC. SIDEWALK
MISC ASPHALT PAVEMENT
4" CONC. SIDEWALK
SECTION B - B
86' R/W
TYPICAL SECTION
N.W. 122ND AVENUE
SCALE: 1" = 20'
LOOKING NORTH
MDX PROPERTY
VARIES
EXIST LAKE
8'
BENCH
40'
LOW WATER EL. 3.5
EL. 0.5
ANGLE OF REPOSE
EL. (-) 19.5
ACOE SECTIONS
7'
BIKE LANE
AX
LOW WATER EL. 3.5
EL. 0.5
2'
AMB CODINA
BEACON LAKES LLC
4:1 M
6'
.5'
PROP
GUARDRAIL
0.02':1'
ENGINEERS, INC.
12'
1' 3'
3'
MAX. SLOPE RUNOUT
WHERE THERE IS NO
EXIST LAKE
(-)0.14
329 PALERMO AVENUE, CORAL GABLES, FLORIDA 33134 · 305/448-1600 · LB 1012
VARIES
EXIST LAKE
CONSULTING
8'
BENCH
NW 122nd AVE &
NW 14th ST
56'
MDX PROPERTY
40'
I
~
FOOT
PROPERTY
l\BH
20'
TEMPORARY CONSTRUCTION EASEMENT
,.
VARIES
~
25'ROW
,.
15'0NEWAY
SOD
ACCESS DmVEWAY
2' 11'
SOD
oil
FRENCH DRAIN
VG
wI-
P.G.L. REFERS TO THIS POINT
~ (/)
EXIST.
c: v
~
N~
WATER~ SEWER~
GRADE
5.5±
w
0
:5
'C
2%
~ATCH
::
:: z
~
z
MIN. EL. +8.3±
(100-YR BERM ELEV.)
SECTION D- D
WEST PROPERTY LINE
(/)
~
~
<( ...J
w
NW 1181H PLACE
SCALE: 1""' 10'
LOOKING NORTH
z (/)
c II:
8~
-W
z
0
R/WUNE
....
SOD
MDX PROPERTY
15.B' TO 28.2':t
VARIES
f
ENTERLINE OF ROW
..aoo
16'L.M.E.
ECYW
RIWUNE
86.00
43.00'
25'
....
l(ASELINE OF CONSTRUCTION
'"
lJTILnY EASEMENT
15'
4.00
11.00'
SOD
~
~Tif4H1Wt61~
·M·
EXIST. EL. VARIES 7.4 TO B.4:1:
'·""
11.00
2.118%
2.00
11.00'
11.00'
~
OJM,~1'
0.00
000
(-)IJ.93
~
CURB & OOTTER lYPE 'F'
Cl.RB & GUTTIR 1YPE 'F"
Cl.RB & GUTTER TYPE 'F"
SECTIONC-C
MATCH ElCIST. EL
VARIES 6.7 TO 6.2'>
(!'.
·~
~
I
I
c
!
ffi i
w~
0 z.
-R
86'R/W
TYPICAL SECTION
N.W. 14th STREET
SCALE: 1""' 10'
LOOKING WEST
(!) ~
_<.,/
U\)
zg
wit
i~
u
-z8
(!)
FUTURE
RIW LINE
·
FOOT PROPERTY
FUTURE 35' ROW
6' MAX{VARIES:
BASELINE OF CONSTRUCTION
CENTERLINE OF PAVEMENT
3'
,.
I~
~
J
10'
'!_~E.!~·~4.:.~~~
D.02':1'
_ _ 2 2 2 h 2 2r;;p,
W222h2
Y
MATCH EXIST GRADE
___________________
_:g,ONI ' I
TO GRADE
P.G.L REFERS TO
S POINT
2'
2' I
SODI
A
I II I
r;zcrc;zrcrcr'tZ)
I
6'
,.
DRAINAGE EASEMENT
002'1'
Is
~
_Ju~
I
MIN EL +6.3
OR 0.12' ABOVE TOP OF CURB
SECTION E- E
35'-112 R1W
SCALE: 1""' 10'
:::J
0 zw
VJ~
::J 0 ~
WHICHEVER IS GREATER
TYPICAL SECTION
N.W. 17th Straet
_J z
0
SIDEWALK
T
CURB 6 GUTTER TYPE "F"
>F ~
PROPOSED
R/WLINE
PROPOSED 35' ROW
1H TEMPORARY CONSTRUCTION EASEMEI
.j
I
~
z<(VJ.-~
MIN. ELEV. - +7.0
6" BELOW FLOOD
CRITERI.'<---...
·M·
-"!l!...
(j
12.00
4.00'
BIKE LANE
P.G.L.REFER&
ro~·
·
~
CD
TEMPORARY CONSTRUCTION
!
!.
<(~
III
>
I
::;O
EASEMENT
12.00'
IJ
I~
CD Z
~
FOOT PROPERTY
i
~
LOOKING WEST
~lml~I~ ~ ~
~I
·1- ~
-
-
N
!i
llH ~ ~ ~
-
-