Broward County. Town of Hillsboro Beach. Hillsboro Beach. FL. PROJECT PURPOSE: Basic: The basic project purpose is shoreline stabilization. Overall: The overall project purpose is stabilization of the shoreline on Hillsboro and Deerfield Beach.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: TOWN OF HILLSBORO BEACH
Attn: Mayor Deborah Tarrant
1210 Hillsboro Mile
Hillsboro Beach, Florida 33062
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the discharge of fill material within the Atlantic Ocean in Palm Beach County. The project is located along approximately 2,200 linear feet of shoreline FDEP monuments R-6 + 750 feet to R-9 (Section 5, 8, and 17, Township 48 South, Range 43 East) Broward County, Florida.
Directions to the site are as follows: From Interstate 95 exit at Hillsboro Beach and head east to A1A. Turn south on A1A Drive to Southeast 7th St. Turn east on SE 7th St. to SE 21st Ave. Head south, the project site lies on the east side of SE 21st Ave.
APPROXIMATE COORDINATES:
Northern Limit: Latitude 26.30535°; Longitude -80.07638°
Southern Limit: Latitude 26.29893°; Longitude -80.07719°
PROJECT PURPOSE:
Basic: The basic project purpose is shoreline stabilization.
Overall: The overall project purpose is stabilization of the shoreline on Hillsboro and Deerfield Beach.
EXISTING CONDITIONS: The project area is located between the Atlantic Ocean and single family residential developments and condominiums to the west. There are existing groins along this stretch of beach. Substantial erosion has occurred along the beach in this area. There are natural nearshore reefs offshore of the proposed fill placement area approximately 509 feet from the construction toe of fill. Sub-tidal areas where the fill material will be placed consist of sand. Boca Raton Inlet is located approximately 2.1 miles to the north of the project area.
PROPOSED WORK: The applicant proposes to perform a onetime truck haul that will place approximately 37,285 cubic yards of compatible beach quality sand along 2,200 linear feet of shoreline, from FDEP monuments R-6 +750 to R-9. A berm elevation of +7.5 feet (NAVD) will be established. All design sections will incorporate a 1V:10H foreshore/nearshore slope. Beach compatible sand will be transported to the project area from one of three upland mines - Immokalee (Steward Mining Inc.), Witherspoon (Vulcan Minerals) and/or Ortona (E.R. Jahna) - by dump truck. Access to the beach would be provided via the oceanfront property located at 1185 Hillsboro Mile. Sand will be offloaded directly onto the beach’s berm, above the mean high water line, within the construction zone. Final grading of material to the lines and grades of the template will be completed utilizing standard mechanized equipment. All sand placements will be completed using upland equipment and no water dependent equipment (barges, etc.) will be utilized. All work will be conducted during daylight hours and no project lighting will be required.
PROJECT HISTORY: This region has received several shoreline restoration projects. The first recorded beach nourishment was conducted in 1957 when dredge material from Boca Raton Inlet was placed directly on the beach south of the Inlet. In 1958, the City of Deerfield Beach constructed a rock groin field in an attempt to stabilize the eroding shoreline. The Town of Hillsboro Beach conducted a large beach renourishment project in 1970, placing 360,000 cubic yards of material between R-7 and R-12. In 1972, the City of Boca Raton established regular bypass dredging at the Boca Raton Inlet. In 1972, under Corps permit SAJ-1972-0474, the Town of Hillsboro placed approximately 1,550,000 cubic yards of material onto Hillsboro Beach between R-7 through R-12. The proposed project area was renourished again in 1998 under Corps permit #SAJ-1997-2355(IP-KE) which resulted in the placement of 550,000 cubic yards of material between DEP Monuments R-6 and R-12 (see project description in Figure 1). In February 2008, the Town of Hillsboro placed pressure equalizing modules (PEMs) from 330 feet north of DEP Monument R-7 to DEP Monument R-12 under Corps Permit #SAJ-2006-7167(IP-KLV). The Town of Hillsboro placed 9,000 cubic yards of fill at DEP Monument R-7 in June 2008 by truck haul under Corps permit #SAJ-1997-2355(IP-KLV). The truck haul project was meant to temporarily provide shoreline stabilization at a small erosion “hot spot”. The Corps issued a permit on January 10, 2011, authorizing the placement of 375,000 cubic yards of material from DEP Monuments R-6.5 to R-12 + 400 feet via pipeline from an offshore borrow area. The Corps issued modification number 1 on May 2, 2011, to extend the construction window and to amend the U.S. Fish and Wildlife Biological Opinion. The Corps issued a second modification on January 27, 2012, that made changes to the special condition regarding monitoring. The Corps issued modification number 3 on February 12, 2015 for the one time placement of 50,000 cy of material from an upland mine along 1,942 linear feet of shoreline. The permit expired in January 2016.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant stated the project was minimized to the maximum extent possible that would achieve their project purpose, and all practical efforts were made to minimize and avoid aquatic resource impacts. The project lies within the design template of a previously authorized nourishment project and no impacts to submerged aquatic resources are proposed or anticipated. Turbidity impacts would be temporary and monitoring will be required. Fill template densities have been calculated to avoid direct and secondary impacts to nearshore hardbottom that is approximately 509 linear feet from the toe-of-fill.
COMPENSATORY MITIGATION: The applicant has provided the following explanation as to why compensatory mitigation should not be required: The one-time truck haul sand placement is within a previously authorized fill template and the construction toe of fill is substantially landward (approximately 509 linear feet) of the nearshore hardbottom. The applicant stated the project will not result in any impacts to aquatic resource and did not propose any compensatory mitigation.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposal may affect the threatened West Indian manatee (Trichechus manatus), endangered and threatened nesting seaturtles (Chelonia mydas, Eretmochelys imbricate, Lepidochelys kempii, Dermochelys coriacea, Caretta caretta, Lepidochelys olivacea), the threatened piping plover (Charadrius melodus), and the loggerhead designated terrestrial critical habitat Unit LOGG-T-FL-09. The Corps will request initiation of formal consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact a total of 4.32 acres of unconsolidated sand below the mean high water line utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. The Corps initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the South Atlantic Region. The Corps final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Regulatory Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated aquatic resources. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Regulatory Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, by electronic mail at Linda.C.Knoeck@usace.army.mil, by fax at (561)626-6971, or by telephone at (561)472-3531.
IMPACT ON NATURAL RESOURCES: Preliminary review of this application indicates that an Environmental Impact Statement will not be required. Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Service, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. By means of this notice, we are soliciting comments on the potential effects of the project on threatened or endangered species or their habitat.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act and the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FL 33410
REPLY TO
ATTENTION OF
October 18, 2017
Regulatory Division
South Permits Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application Number SAJ-1997-02355(SP-LCK)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT:
TOWN OF HILLSBORO BEACH
Attn: Mayor Deborah Tarrant
1210 Hillsboro Mile
Hillsboro Beach, Florida 33062
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with the discharge of fill material within the Atlantic Ocean in Palm Beach
County. The project is located along approximately 2,200 linear feet of shoreline FDEP
monuments R-6 + 750 feet to R-9 (Section 5, 8, and 17, Township 48 South, Range 43
East) Broward County, Florida.
Directions to the site are as follows: From Interstate 95 exit at Hillsboro Beach and head
east to A1A. Turn south on A1A Drive to Southeast 7th St. Turn east on SE 7th St. to SE
21st Ave. Head south, the project site lies on the east side of SE 21st Ave.
APPROXIMATE COORDINATES:
Northern Limit: Latitude 26.30535°; Longitude -80.07638°
Southern Limit: Latitude 26.29893°; Longitude -80.07719°
PROJECT PURPOSE:
Basic: The basic project purpose is shoreline stabilization.
Overall: The overall project purpose is stabilization of the shoreline on Hillsboro and
Deerfield Beach.
EXISTING CONDITIONS: The project area is located between the Atlantic Ocean and
single family residential developments and condominiums to the west. There are
existing groins along this stretch of beach. Substantial erosion has occurred along the
beach in this area. There are natural nearshore reefs offshore of the proposed fill
placement area approximately 509 feet from the construction toe of fill. Sub-tidal areas
where the fill material will be placed consist of sand. Boca Raton Inlet is located
approximately 2.1 miles to the north of the project area.
PROPOSED WORK: The applicant proposes to perform a onetime truck haul that will
place approximately 37,285 cubic yards of compatible beach quality sand along 2,200
linear feet of shoreline, from FDEP monuments R-6 +750 to R-9. A berm elevation of
+7.5 feet (NAVD) will be established. All design sections will incorporate a 1V:10H
foreshore/nearshore slope. Beach compatible sand will be transported to the project
area from one of three upland mines - Immokalee (Steward Mining Inc.), Witherspoon
(Vulcan Minerals) and/or Ortona (E.R. Jahna) - by dump truck. Access to the beach
would be provided via the oceanfront property located at 1185 Hillsboro Mile. Sand will
be offloaded directly onto the beach's berm, above the mean high water line, within the
construction zone. Final grading of material to the lines and grades of the template will
be completed utilizing standard mechanized equipment. All sand placements will be
completed using upland equipment and no water dependent equipment (barges, etc.)
will be utilized. All work will be conducted during daylight hours and no project lighting
will be required.
PROJECT HISTORY: This region has received several shoreline restoration projects.
The first recorded beach nourishment was conducted in 1957 when dredge material
from Boca Raton Inlet was placed directly on the beach south of the Inlet. In 1958, the
City of Deerfield Beach constructed a rock groin field in an attempt to stabilize the
eroding shoreline. The Town of Hillsboro Beach conducted a large beach renourishment
project in 1970, placing 360,000 cubic yards of material between R-7 and R-12. In 1972,
the City of Boca Raton established regular bypass dredging at the Boca Raton Inlet. In
1972, under Corps permit SAJ-1972-0474, the Town of Hillsboro placed approximately
1,550,000 cubic yards of material onto Hillsboro Beach between R-7 through R-12. The
proposed project area was renourished again in 1998 under Corps permit #SAJ-19972355(IP-KE) which resulted in the placement of 550,000 cubic yards of material
between DEP Monuments R-6 and R-12 (see project description in Figure 1). In
February 2008, the Town of Hillsboro placed pressure equalizing modules (PEMs) from
330 feet north of DEP Monument R-7 to DEP Monument R-12 under Corps Permit
#SAJ-2006-7167(IP-KLV). The Town of Hillsboro placed 9,000 cubic yards of fill at DEP
Monument R-7 in June 2008 by truck haul under Corps permit #SAJ-1997-2355(IPKLV). The truck haul project was meant to temporarily provide shoreline stabilization at
a small erosion "hot spot". The Corps issued a permit on January 10, 2011, authorizing
the placement of 375,000 cubic yards of material from DEP Monuments R-6.5 to R-12 +
400 feet via pipeline from an offshore borrow area. The Corps issued modification
number 1 on May 2, 2011, to extend the construction window and to amend the U.S.
Fish and Wildlife Biological Opinion. The Corps issued a second modification on
January 27, 2012, that made changes to the special condition regarding monitoring. The
Corps issued modification number 3 on February 12, 2015 for the one time placement
2
of 50,000 cy of material from an upland mine along 1,942 linear feet of shoreline. The
permit expired in January 2016.
AVOIDANCE AND MINIMIZATION INFORMATION: The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: The applicant stated the project was minimized to the maximum
extent possible that would achieve their project purpose, and all practical efforts were
made to minimize and avoid aquatic resource impacts. The project lies within the design
template of a previously authorized nourishment project and no impacts to submerged
aquatic resources are proposed or anticipated. Turbidity impacts would be temporary
and monitoring will be required. Fill template densities have been calculated to avoid
direct and secondary impacts to nearshore hardbottom that is approximately 509 linear
feet from the toe-of-fill.
COMPENSATORY MITIGATION: The applicant has provided the following explanation
as to why compensatory mitigation should not be required: The one-time truck haul
sand placement is within a previously authorized fill template and the construction toe of
fill is substantially landward (approximately 509 linear feet) of the nearshore
hardbottom. The applicant stated the project will not result in any impacts to aquatic
resource and did not propose any compensatory mitigation.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposal may affect the
threatened West Indian manatee (Trichechus manatus), endangered and threatened
nesting seaturtles (Chelonia mydas, Eretmochelys imbricate, Lepidochelys kempii,
Dermochelys coriacea, Caretta caretta, Lepidochelys olivacea), the threatened piping
plover (Charadrius melodus), and the loggerhead designated terrestrial critical habitat
Unit LOGG-T-FL-09. The Corps will request initiation of formal consultation with the
Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by
separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact a total of 4.32
acres of unconsolidated sand below the mean high water line utilized by various life
stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic
fish, and snapper/grouper complex. The Corps initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed
fisheries in the South Atlantic Region. The Corps final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
3
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Palm Beach
Gardens Regulatory Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach
Gardens, FL 33410, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated aquatic resources. This is based on an analysis of the applicant's
avoidance and minimization efforts for the project, as well as the compensatory
mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms.
Linda C. Knoeck, in writing at the Palm Beach Gardens Regulatory Permits Section,
4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410, by electronic mail at
Linda.C.Knoeck@usace.army.mil, by fax at (561)626-6971, or by telephone at
(561)472-3531.
IMPACT ON NATURAL RESOURCES: Preliminary review of this application indicates
that an Environmental Impact Statement will not be required. Coordination with U.S.
Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine
Fisheries Service, and other Federal, State, and local agencies, environmental groups,
and concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area. By means of this notice, we are soliciting comments on the
potential effects of the project on threatened or endangered species or their habitat.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
4
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act and the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this decision, comments
are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and the other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act
comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
TOWN OF HILLSBORO BEACH, FLORIDA
BEACH RENOURISHMENT PROJECT
APPLICATION
N
TALLAHASSEE
JACKSONVILLE
VICINITY MAP
NTS
TAMPA
WEST PALM BEACH
Project
Location
FT LAUDERDALE
N
DEERFIELD BEACH
HILLSBORO BEACH
N
R-7
R-7+500
R-8
LOCATION PLAN
R-9
SITE PLAN
B L A NK E N
SH
K
T I F I CA
R
PRO
FE
STATE OF
F
S
S
A
LO
R I D
IO
NA L
EN
IN
EER
T
E
No. 0055910
E
C
T
IP
.
.
G
N
N
R-6 +750
ATLANTIC OCE
AN
R-7
R-7+500
R-8
E
No. 0055910
PRO
FE
STATE OF
F
S
S
MATCH LINE - SEE SHEET 3
A
LO
R I D
IO
NA L
EN
IN
EER
E
T
T
C
B L A NK E N
SH
T I F I CA
R
.
IP
.
K
G
MATCH LINE - SEE SHEET 2
N
ATLANTIC O
CEAN
R-8 +500
R-9
E
No. 0055910
PRO
FE
STATE OF
F
S
S
A
LO
R I D
IO
NA L
EN
IN
EER
E
T
T
C
B L A NK E N
SH
T I F I CA
R
.
IP
.
K
G
E
No. 0055910
PRO
FE
STATE OF
F
S
S
A
LO
R I D
IO
NA L
EN
IN
EER
E
T
T
C
B L A NK E N
SH
T I F I CA
R
.
IP
.
K
G
B L A NK E N
SH
T I F I CA
R
.
IP
T
No. 0055910
PRO
FE
STATE OF
F
S
S
A
LO
R I D
IO
NA L
EN
IN
EER
E
T
.
CE
K
G
B L A NK E N
SH
T I F I CA
R
.
IP
T
No. 0055910
PRO
FE
STATE OF
F
S
S
A
LO
R I D
IO
NA L
EN
IN
EER
E
T
.
CE
K
G