Proposed Marina Expansion, Dredging, Sheet Pile, Rubble Breakwall, Boardwalk and Floating Dock System in Lake Michigan (West Grand Traverse Bay) at Traverse City, Leelanau County, Michigan

Please open the attachment to view the full Public Notice.

US Army Corps of Engineers

Public Notice

Detroit District Applicant:

West Shore Partners, LLC

In Reply Refer To:

Corps File No. LRE-2007-00769-56-S17

October 23, 2017 November 12, 2017

Date: Expires:

Proposed Marina Expansion, Dredging, Sheet Pile, Rubble Breakwall, Boardwalk and Floating Dock System in Lake Michigan (West Grand Traverse Bay) at Traverse City, Leelanau County, Michigan

Applicant: West Shore Partners, LLC c/o Ronald Walters 13380 South West Bay Shore Drive Traverse City, Michigan 49684 Project Location: In Lake Michigan (West Grand Traverse Bay) offshore property located at 13380 South West Bay Shore Drive (M-22), Elmwood Township, Section 33, Township 28 N, Range 11 W, Leelanau County, Michigan 49684. Federal Authority: The applicant has applied for a Department of the Army permit under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. State Authority: Section 401 of the Clean Water Act requires that all discharges of dredged or fill material must be certified by the State as complying with applicable effluent limitations and water quality standards. Coastal Zone Management Certification (or waiver thereof) is required from the State of Michigan if this proposed activity would occur within the designated coastal zone. Project Description: As shown on the attached plans, the applicant proposes to conduct the following work below the Ordinary High Water Mark of 581.5 feet (IGLD 85) for Lake Michigan: · Initially dredge by hydraulic means, a total of 25,280 cubic yards from a 450 foot long by 350 foot wide area to a project depth of 568.0 feet (9.5 feet below Low Water Datum (LWD) elevation of 577.5 feet (IGLD 85) (Sheets 6 and 7). The material would be directly pumped into a contained upland area consisting of a dewatering basin with an overflow to a settling basin, per the attached plans (Sheets 10 -11). Return water from the contained settling basin would be discharged into the waterway via an existing outlet pipe. Upon completion of the dewatering process, the dredged material would be

File No. LRE-2007-00769-56-S17

October 23, 2017

permanently disposed of and/or used for construction on the permittee's upland property located directly to the west of M-22. · Remove three (3) existing culverts and a total of 1,243 cubic yards of existing riprap from a 316 foot long by 20 foot wide by 10.5 ft. deep area along the north side of the southern breakwall (Sheets 4 and 7). Removed riprap would be used in construction of the north breakwall and shoreline improvements. · Install 143 linear feet of steel sheet pile wall along the shoreline and discharge 49 cubic yards of riprap placed on filter fabric in a 143 foot long by 4 foot wide by 2.3 foot deep area along the toe of the newly constructed seawall (Sheets 4 and 9). · Discharge 41 cubic yards of riprap placed on filter fabric in a 91 foot long by 6 foot wide by 2 foot deep area waterward of the proposed concrete sidewalk along the shoreline (Sheets 4 and 8). North Dock and Breakwall Components · Construct a 71 foot long by 8 foot wide wooden open-pile boardwalk crossing an approximately 568 square foot area of existing wetlands along the north end of the property. The boardwalk would be connected to a gangway (Sheets 4 and 5). · Construct a 245 foot long by 8 foot wide floating dock with a 30 foot and 33 foot long gangway attached at the landward and waterward ends (respectively) for access (Sheet 5). · Discharge 231 cubic yards of riprap and rubble stone to construct a 117 foot by 123 foot L-shaped rubble mound breakwall, as measured from the outside of the structure (Sheet 4). The breakwall would be constructed to a crest elevation of 585.0 feet (7.5 feet above LWD) with an average base width of 26 feet extending, waterward from the seawall (Sheet 9). · Install 217 linear feet of steel sheet pile wall and construct a 92 foot by 85 foot L-shaped 8 foot wide concrete walkway with a 15 foot by 16 foot platform and a 16 foot by 16 foot viewing/fishing platform along the inner face and atop of the newly constructed breakwall (Sheet 5). · Install five (5) 60 foot long by 4 foot wide floating finger piers (slips #1-11), two (2) 70 foot long by 6 foot wide floating finger piers (slips #12-13) and seven (7) wood spring piles along the interior of the north docking system (Sheet 5). South Dock and Breakwall Components · Discharge 665 cubic yards of riprap and rubble stone in a 69 foot long by 26 foot wide by 10 foot deep area to extend the existing southern breakwall to a total length of 376 feet (Sheets 4 and 9). 2

File No. LRE-2007-00769-56-S17

October 23, 2017

· Install 365 linear feet of steel sheet pile wall along the inner face of the existing/extended southern breakwall (Sheet 5). · Install eight (8) 15 foot long by 4 foot wide floating finger piers (slips #14-28) and eight (8) wood spring piles along the interior of the south docking system (Sheet 5). Combined with the existing slips along the exterior of the south dock (slips #29-40), there would be a total of 40 boat slips in the proposed marina. · Upon completion of the work, the northern dock/breakwall structure would have a total length of 450 feet extending waterward from the landward end of the boardwalk. The southern dock/breakwall structure would have a total length of 376 feet extending waterward from the seawall (Sheet 4). · Thereafter, on an annual basis as needed, remove by mechanical means up to 2,000 cubic yards of accumulated sediment from the authorized dredge area to maintain project depths. The dredged material would be disposed of in an upland area off site or a commercial landfill. The purpose of the proposed work is to expand an existing marina facility with the related breakwall and revetment structures, and 28 additional boat slips to bring the total number of slips to 40. Avoidance & Minimization: The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: "The project utilizes an existing dock for one border of the facility. Floating docks will be used for finger piers and main piers to minimize the impact on the lake bottom...The settling basin will be constructed to assure that no dredged water or material will flow out of the basin to the site. The dredged material will have to be removed [periodically] from the settling basin throughout the process to allow for the dredging to continue... Water flowing back to the bay [during the return water process] will be monitored to insure excess sediment is not pumped back into the bay...We do not anticipate an excess amount of turbidity created because of the dredging process [hydraulic method]. If excess turbidity is encountered, turbidity curtains will be installed around the dredge area...Double rows of silt fence will be installed around the settling basins to prevent any erosion from occurring." The Corps has not verified the adequacy of the applicant's avoidance and minimization statement at this time. Compensatory Mitigation: The applicant has not offered compensatory mitigation for unavoidable impacts to Waters of the United States associated with the proposed marina expansion project. The Corps has not verified whether a mitigation proposal will/will not be required at this time. 3

File No. LRE-2007-00769-56-S17

October 23, 2017

Other Authorizations: A permit is required from the Michigan Department of Environmental Quality under applicable provisions of the Natural Resources and Environmental Protection Act (NREPA), 1994 PA 451, Part 325 Submerged Lands and Part 303 Wetlands Protection. The State file number is HN6-G77F-9VR1E. Comments: We are publishing this notice in compliance with Title 33 Code of Federal Regulations Parts 320-332. Comments on the project should be submitted in writing and postmarked or delivered by the expiration date of this public notice. Comments of a positive or negative nature may be submitted. All responses must refer to file number LRE-2007-00769-56-S17. We will interpret a lack of response as meaning that there is no objection to the permit application. Comments should be filed with: Kerrie E. Kuhne Permit Evaluation Western Branch Regulatory Office Detroit District, Corps of Engineers 477 Michigan Avenue Detroit, Michigan 48226-2550 Comments may be e-mailed to: Kristi.M.DeFoe@usace.army.mil , but must include a name and mailing address. Public Hearing: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Evaluation: The decision whether to issue the Department of the Army permit will be based on evaluation of the probable impacts of the proposed activity on the public interest. That decision will reflect the national concerns for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition 4

File No. LRE-2007-00769-56-S17

October 23, 2017

or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. This activity involves the discharge of dredged or fill material into waters of the United States. Therefore, the U.S. Army Corps of Engineers' evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator of the Federal Environmental Protection Agency, under the authority of Section 404(b)(1) of the Clean Water Act. Endangered Species: We will review this application for the potential impact on threatened or endangered species pursuant to Section 7 of the Endangered Species Act as amended. We are not aware of the presence of any listed species or critical habitat at or in the vicinity of the proposed worksite. We invite information and/or comments regarding the potential presence of, or impacts to, any listed species or critical habitat. Cultural Resources: The District Staff has reviewed existing information on historic properties potentially affected by the proposed project, including the National Register of Historic Places. There are no recorded historic properties within the permit area. The permit area has been so extensively modified by modern development that little likelihood exists for the proposed project to impinge upon an undisturbed historic property. The District Engineer invites responses to this public notice from federal, state and local agencies, historical and archaeological societies, Indian tribes, and other parties likely to have knowledge of or concerns with historic properties in the area. Additional Information: This public notice and drawings are also available for viewing/printing at: http://www.lre.usace.army.mil/Missions/RegulatoryProgramandPermits/PublicNotices.as px. Questions concerning this application may be directed to Kristi DeFoe at the Corps of Engineers address listed above, or telephone number (313) 226-7718. FOR THE DISTRICT ENGINEER:

Kerrie E. Kuhne Chief, Permit Evaluation Western Branch Regulatory Office 5

File No. LRE-2007-00769-56-S17

October 23, 2017

NOTICE TO POSTMASTERS: We request that the above notice be conspicuously and continuously posted for the time period of this notice.

6

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas