The applicant proposes decommissioning in place approximately 521 feet of a pipeline bundle.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to cut, flush, cap and decommission-in-place approximately 521 feet of a horizontal directional drilled (HDD) pipeline bundle that crosses the Gulf Intracoastal Waterway (GIWW), and approximately 2,410 feet of a HDD pipeline bundle starting in State Tract 463 off the west coast of Mustang Island and terminating at an upland location on Mustang Island. The pipeline bundles that cross the GIWW are buried at a depth of -27 feet NGVW, with an overburden between 10 feet and 15 feet thick. The pipelines off Mustang Island are buried at a minimum depth of 5 feet below the mudline.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas