2017-03476-ARC (Carlton County

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

LETTER OF PERMISSION: Enbridge Energy Limited Partnership (Enbridge) is proposing to perform pipeline maintenance within the exterior boundaries of the Fond du Lac Band of Lake Superior Chippewa Reservation located on Line 1 at Mileposts 1063.3477 and 1063.4911.

PROJECT DESCRIPTION AND PURPOSE: Enbridge Energy Limited Partnership (Enbridge) is proposing to perform pipeline maintenance within the exterior boundaries of the Fond du Lac Band of Lake Superior Chippewa Reservation located on Line 1 at Mileposts 1063.3477 and 1063.4911. This work is needed to inspect an anomaly in the pipeline and, if necessary, perform maintenance repairs for the safe operation of Line 1.

Information for File # 2017-03476-ARC Applicant

Enbridge Energy, Limited Partnership

Corps Contact

Andrew R Chambers

Address

600 South Lake Avenue, Suite 211, Duluth, MN 55802

E-Mail

Andrew.R.Chambers@usace.army.mil

Phone

218-720-5291

Primary County

Carlton County

Section

7

Township

49N

Range

18W

Information Complete On

October 16, 2017

Posting Expires On

November 18, 2017

Authorization Type

LOP-10-FDL

This application is being reviewed in accordance with current practices for documenting Corps jurisdiction under Section 404 of the Clean Water Act. We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are subject to Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. If an approved jurisdictional determination is completed as part of the review process for this application, a copy will be posted on the St. Paul District web page at the following link: http://www.mvp.usace.army.mil/Missions/Regulatory.aspx.

Project: Enbridge Energy Limited Partnership (Enbridge) is proposing to perform pipeline maintenance within the exterior boundaries of the Fond du Lac Band of Lake Superior Chippewa Reservation located on Line 1 at Mileposts 1063.3477 and 1063.4911. This work is needed to inspect an anomaly in the pipeline and, if necessary, perform maintenance repairs for the safe operation of Line 1. The project would result in the temporary discharge of dredged and fill materials into 2.95 acres of sedge meadow and shrub-carr wetlands adjacent to Stoney Brook. PROJECT DESCRIPTION AND PURPOSE: Access to the repair locations would be from Ditchbank Road traveling east along an unnamed road to the Enbridge right-of-way (ROW) and then traveling northwest to the project locations. Enbridge plans on creating frost roads to facilitate access through wetlands and timber mats would be used as necessary to prevent rutting, compaction and mixing of soil layers. Nonessential equipment, vehicle parking, and material storage would be located in adjacent upland areas.

1

The areas around the pipeline would be excavated, visually and physically inspected and repaired as needed. The areas excavated will be approximately 30 ­ 40 feet wide, 60 ­ 80 feet long and 10 feet deep. Use of a back hoe or similar excavator and trucks for transportation would be required. Temporary rock fill may be placed in the bottom of the excavation site to create a safe and dry work surface. A physical barrier, geotextile fabric, would be placed below the rock to separate the rock and native soils. This temporary fill would be removed prior to site restoration which will commence immediately after completion of the repair work. The trench would be backfilled using excavated native soils. Dewatering activities using pumps may be necessary. Discharges will be directed through a filtration sediment bag placed inside a double geotextile lined straw bale structure and located in a well-vegetated upland, if possible. NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The project would result in temporary disturbance of 2.95 acres of sedge meadow and shrubcarr wetlands adjacent to Stoney Brook. The work for this project would include the construction of a 16-foot-wide by 3,900-foot-long timber mat access route through sedge meadow and shrubcarr wetlands, accounting for 1.43 acres of temporary wetland impact. The work for this project would also include excavation and temporary stockpiling of excavated material from two 30 - 40foot wide by 60 ­ 80-foot long by 10 foot deep inspection and maintenance areas, accounting for 6,400 square feet (0.14-acre) of wetland impacts. The project would also involve a temporary workspace at each inspection and maintenance area. Each workspace would be 300 feet long by 100 feet wide, accounting for 1.38 acres of wetland impact. Temporary timber mats would be used where necessary to ensure rutting or mixing of wetland soils does not occur. ALTERNATIVES CONSIDERED: The no inspection/maintenance alternative was abandoned due to the need to promote safe operations and reliable delivery of energy to customers. The maintenance project would be conducted on an existing pipeline structure, no off-site alternatives exist. COMPENSATORY MITIGATION: As no permanent wetland impacts would result from the project, the applicant has proposed that no required compensatory mitigation be required. All affected areas, including the approach to the work site, will be restored, seeded, and mulched as necessary to restore the site to preconstruction conditions. Drawings

See attached.

2

Legend

Enbridge Energy

Black Bear Casino Resort Carlton County Courthouse University of Minnesota Extension Cloquet Regional Office

Line 1 Mileposts 1063.3477 & 1063.4911

Project Location

© 2017 Google

2017-03476-ARC Drawing 1 of 7

N 4 mi

ND

Lake Superior

MN MI T49N, R19W S1

T49N, R18W S5

T49N, R18W S6

WI SD IA

Carlton County

!

Perch Lake Township

North Carlton Unorganized Territory

1063.3477

T49N, R19W S12

Maintenance Location Line 1

! 1063.4911 !

T49N, R18W S7

T49N, R18W S8

; ! N

0

2,000

4,000

Feet T49N, R19W S13

T49N, R18W S18

T49N, R18W S17

1 Inch = 2,000 Feet EXCAVATION SITE LOCATION Line 1 Milepost 1063.3477 and 1063.4911

2017-03476-ARC Drawing 2 of 7

Barr Footer: ArcGIS 10.4.1, 2017-06-14 10:01 File: I:\Client\Enbridge_Energy\Work_Orders\Digs\49160146\Maps\Line_1\061217\L1_1063_3477_and_1063_4911_Topo.mxd User: jwk

Hardwood Lake Rd

ND

Lake Superior

MN MI

!

Temporary Workspace

WI

1063.3477

1063.4911 !

SD IA

Perch Lake Township

!

Maintenance Location Line 1

Tw p

Access Route

T49N, R18W S8

T49N, R18W S7

Staging Area Temporary Workspace (100'x300')

53 5

Field Delineated Wetland (2014)

Twp 535

Carlton County

; ! N

Staging Area

0 Access Route

800

1,600

Feet 1 Inch = 800 Feet Statewide FSA Imagery Circa 2015 Via MnGEO

Twp 421

Twp 536

T49N, R18W S18

T49N, R18W S17

Confidential and Critical Energy Infrastructure Information

2017-03476-ARC Drawing 3 of 7

Barr Footer: ArcGIS 10.4, 2017-09-25 11:30 File: I:\Client\Enbridge_Energy\Work_Orders\Digs\49160146\Maps\Line_1\061217\L1_1093_3477_and_1093_4911_Special\L1_1063_3477_and_1063_4911_Access.mxd User: mak3

ACCESS ROUTE Line 1 Milepost 1063.3477 and 1063.4911

ND

Lake Superior

MN MI

WI Excavation Extent

SD IA

Soil Stockpile

!

1063.3477

!

Carlton County Erosion Control Barrier

T49N, R18W S7

Maintenance Location Line 1 Erosion Control Barrier

Dewatering Area - Location TBD depending on site conditions

Access Route Staging Area Temporary Workspace (100'x300')

Perch Lake Township

Temporary Workspace

Excavation Extent

Soil Stockpile

Soil Stockpile Dewatering Area

Excavation Extent

Field Delineated Wetland (2014)

!

1063.4911

Erosion Control Barrier

; ! N

0

200

400

Feet 1 Inch = 200 Feet Statewide FSA Imagery Circa 2015 Via MnGEO

Access Route

SITE PLAN Line 1 Milepost 1063.3477 and 1063.4911

Confidential and Critical Energy Infrastructure Information

2017-03476-ARC Drawing 4 of 7

Barr Footer: ArcGIS 10.4, 2017-09-26 15:21 File: I:\Client\Enbridge_Energy\Work_Orders\Digs\49160146\Maps\Line_1\061217\L1_1093_3477_and_1093_4911_Special\L1_1063_3477_and_1063_4911_SitePlan.mxd User: mak3

Dewatering Area (If Necessary)

PLACE EROSION CONTROL DEVICES, AS NECESSARY

EROSION CONTROL

Pipeline

DEVICES WILL BE PLACED AROUND THE DISTURBED WORK AREA, AS NECESSARY

EROSION CONTROL DEVICES

WILL BE PLACED ACROSS OPENING AT END OF THE DAY

30' - 40'

EXCAVATED AREA 60' - 80'

EXCAVATED SUBSOIL WILL BE STOCKPILED NEAR THE EXCAVATION WITHIN ECD'S, AS NECESSARY

Subsoil

Topsoil

MINIMUM ONE FOOT

SEPARATION MUST BE MAINTAINED BETWEEN TOPSOIL AND SUBSOIL OR A PHYSICAL BARRIER SHOULD BE USED.

STOCKPILE TOPSOIL SEPARATELY FROM SUBSOIL

WORKSPACE

Pipeline

For environmental review purposes only.

Figure 1 Environmental Mitigation Plan Typical Maintenance Excavation Plan View 2017-03476-ARC Drawing 5 of 7

DATE: 3/23/2015 REVISED: 4/8/2015 SCALE: NTS

an ERM Group company

DRAWN BY: JEBAKKEN K:\_CLIENT_PROJECTS\D-F\EEL\BARR\ 2015\04\REVISED_TYPICALS\ FIG_01_MAINT_EXCAVATION.VSD

NOTE: TRENCH BOXES CONSIST OF TWO STEEL PLATES THAT HOLD UP THE SIDES OF AN EXCAVATION. THE PLATES ARE HELD IN PLACE BY STEEL BRACES.

PIPELINE TRENCH BOX TRENCHBOX

Excavation Apprx. 10'

EXCAVATION

PIPELINE

PLAN: TRENCH BOX

PROFILE: TRENCH BOX SUBSOIL

EXISTING PIPELINE TO BE REPAIRED

TOPSOIL

CONSTRUCTION MATS (AS REQUIRED) TRENCH BOX Topsoil

Subsoil

PROFILE: TRENCH BOX For environmental review purposes only.

DATE: 3/23/2015

Figure 2 Environmental Mitigation Plan Typical Trench Box

2017-03476-ARC Drawing 6 of 7

REVISED: 4/8/2015 SCALE: NTS

an ERM Group company

DRAWN BY: JEBAKKEN K:\_CLIENT_PROJECTS\D-F\EEL\BARR\ 2015\04\REVISED_TYPICALS\ FIG_02_TRENCH_BOX.VSD

FASTENER-MIN. NO. 10 GAGE WIRE 4 PER POST REQUIRED. (TYP.)

FASTENER-MIN. NO. 10 GAGE WIRE 4 PER POST REQUIRED. (TYP.) 6' MAX (TYP.)

8' MAX (TYP.)

2' Min

MESH SUPPORT 6" SQUARE (MAX)

2' Min

FILTER FABRIC

18" MIN. TYP

18" MIN. TYP

ELEVATION

ELEVATION FILTER FABRIC

DIRECTION OF FLOW UNDISTURBED GROUND LINE

3" MIN WIRE MESH IN TRENCH

6" MIN.

6" MIN.

STEEL OR WOOD POST

FILTER FABRIC

3" MIN WIRE MESH IN TRENCH

6" MIN.

COMPACTED BACKFILL 6" MIN.

FABRIC ANCHOR DETAIL

DIRECTION OF FLOW UNDISTURBED GROUND LINE

COMPACTED BACKFILL

FABRIC ANCHOR DETAIL

SILT FENCE WITH WIRE SUPPORT PLAN SILT FENCE PLAN NTS NOTES: 1. WIRES OF MESH SUPPORT SHALL BE MIN. GAGE NO. 12. 2. FILTER FABRIC SHALL MEET THE REQUIREMENTS OF THE SPECIFICATION WITH EQUIVALENT OPENING SIZE OF AT LEAST 30 FOR NONWOVEN AND 50 FOR WOVEN. (SIEVE NO.) 3. THE POSTS USED TO SUPPORT THE SILT FENCE SHOULD BE HARDWOOD MATERIAL WITH A MINIMUM CROSS SECTIONAL AREA OF 4 INCHES SQUARE AND 4 FEET LONG. METAL POSTS SHOULD BE USED IN AREAS THAT POND WATER. FILTER FABRIC STEP 1 FILTER FABRIC

POSTS STEP 2

STEP 3

ATTACHING TWO SILT FENCES NOTES: 1. PLACE THE END POST OF THE SECOND FENCE INSIDE THE END POST OF THE FIRST FENCE. 2. ROTATE BOTH POSTS AT LEAST 180 DEGREES IN A CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL WITH THE FABRIC MATERIAL. 3. DRIVE BOTH POSTS A MINIMUM OF 18 INCHES IN THE GROUND AND BURY THE FLAP. For environmental review purposes only.

DATE: 5/25/2001

Figure 8 Environmental Mitigation Plan Typical Silt Fence Installation

2017-03476-ARC Drawing 7 of 7

REVISED: 4/10/2015 SCALE: NTS

an ERM Group company

DRAWN BY: KMKENDALL K:\_CLIENT_PROJECTS\D-F\EEL\BARR\ 2015\04\REVISED_TYPICALS\ FIG_08_SILT_FENCE_INSTALL.VSD

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas