You can copy from here when filling out the rest of the page.
LETTER OF PERMISSION: Enbridge Energy Limited Partnership (Enbridge) is proposing to perform pipeline maintenance within the exterior boundaries of the Fond du Lac Band of Lake Superior Chippewa Reservation located on Line 1 at Mileposts 1063.3477 and 1063.4911.
PROJECT DESCRIPTION AND PURPOSE: Enbridge Energy Limited Partnership (Enbridge) is proposing to perform pipeline maintenance within the exterior boundaries of the Fond du Lac Band of Lake Superior Chippewa Reservation located on Line 1 at Mileposts 1063.3477 and 1063.4911. This work is needed to inspect an anomaly in the pipeline and, if necessary, perform maintenance repairs for the safe operation of Line 1.
Information for File # 2017-03476-ARC
Applicant
Enbridge Energy, Limited Partnership
Corps Contact
Andrew R Chambers
Address
600 South Lake Avenue, Suite 211, Duluth, MN 55802
E-Mail
Andrew.R.Chambers@usace.army.mil
Phone
218-720-5291
Primary County
Carlton County
Section
7
Township
49N
Range
18W
Information Complete On
October 16, 2017
Posting Expires On
November 18, 2017
Authorization Type
LOP-10-FDL
This application is being reviewed in accordance with current practices for documenting Corps
jurisdiction under Section 404 of the Clean Water Act.
We have made a preliminary determination that the aquatic resources that would be impacted
by the proposed project are subject to Corps of Engineers jurisdiction under Section 404 of the
Clean Water Act. If an approved jurisdictional determination is completed as part of the review
process for this application, a copy will be posted on the St. Paul District web page at the
following link: http://www.mvp.usace.army.mil/Missions/Regulatory.aspx.
Project:
Enbridge Energy Limited Partnership (Enbridge) is proposing to perform pipeline maintenance
within the exterior boundaries of the Fond du Lac Band of Lake Superior Chippewa Reservation
located on Line 1 at Mileposts 1063.3477 and 1063.4911. This work is needed to inspect an
anomaly in the pipeline and, if necessary, perform maintenance repairs for the safe operation of
Line 1. The project would result in the temporary discharge of dredged and fill materials into
2.95 acres of sedge meadow and shrub-carr wetlands adjacent to Stoney Brook.
PROJECT DESCRIPTION AND PURPOSE:
Access to the repair locations would be from Ditchbank Road traveling east along an unnamed
road to the Enbridge right-of-way (ROW) and then traveling northwest to the project locations.
Enbridge plans on creating frost roads to facilitate access through wetlands and timber mats
would be used as necessary to prevent rutting, compaction and mixing of soil layers. Nonessential equipment, vehicle parking, and material storage would be located in adjacent upland
areas.
1
The areas around the pipeline would be excavated, visually and physically inspected and
repaired as needed. The areas excavated will be approximately 30 40 feet wide, 60 80 feet
long and 10 feet deep. Use of a back hoe or similar excavator and trucks for transportation
would be required. Temporary rock fill may be placed in the bottom of the excavation site to
create a safe and dry work surface. A physical barrier, geotextile fabric, would be placed below
the rock to separate the rock and native soils. This temporary fill would be removed prior to site
restoration which will commence immediately after completion of the repair work. The trench
would be backfilled using excavated native soils.
Dewatering activities using pumps may be necessary. Discharges will be directed through a
filtration sediment bag placed inside a double geotextile lined straw bale structure and located in
a well-vegetated upland, if possible.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS:
The project would result in temporary disturbance of 2.95 acres of sedge meadow and shrubcarr wetlands adjacent to Stoney Brook. The work for this project would include the construction
of a 16-foot-wide by 3,900-foot-long timber mat access route through sedge meadow and shrubcarr wetlands, accounting for 1.43 acres of temporary wetland impact. The work for this project
would also include excavation and temporary stockpiling of excavated material from two 30 - 40foot wide by 60 80-foot long by 10 foot deep inspection and maintenance areas, accounting
for 6,400 square feet (0.14-acre) of wetland impacts. The project would also involve a temporary
workspace at each inspection and maintenance area. Each workspace would be 300 feet long
by 100 feet wide, accounting for 1.38 acres of wetland impact. Temporary timber mats would be
used where necessary to ensure rutting or mixing of wetland soils does not occur.
ALTERNATIVES CONSIDERED:
The no inspection/maintenance alternative was abandoned due to the need to promote safe
operations and reliable delivery of energy to customers. The maintenance project would be
conducted on an existing pipeline structure, no off-site alternatives exist.
COMPENSATORY MITIGATION:
As no permanent wetland impacts would result from the project, the applicant has proposed that
no required compensatory mitigation be required. All affected areas, including the approach to
the work site, will be restored, seeded, and mulched as necessary to restore the site to preconstruction conditions.
Drawings
See attached.
2
Legend
Enbridge Energy
Black Bear Casino Resort
Carlton County Courthouse
University of Minnesota Extension Cloquet Regional Office
Line 1 Mileposts 1063.3477 & 1063.4911
Project Location
© 2017 Google
2017-03476-ARC
Drawing 1 of 7
N
4 mi
ND
Lake Superior
MN
MI
T49N, R19W
S1
T49N, R18W
S5
T49N, R18W
S6
WI
SD
IA
Carlton County
!
Perch Lake
Township
North Carlton
Unorganized Territory
1063.3477
T49N, R19W
S12
Maintenance Location
Line 1
!
1063.4911
!
T49N, R18W
S7
T49N, R18W
S8
;
!
N
0
2,000
4,000
Feet
T49N, R19W
S13
T49N, R18W
S18
T49N, R18W
S17
1 Inch = 2,000 Feet
EXCAVATION SITE
LOCATION
Line 1
Milepost 1063.3477 and 1063.4911
2017-03476-ARC
Drawing 2 of 7
Barr Footer: ArcGIS 10.4.1, 2017-06-14 10:01 File: I:\Client\Enbridge_Energy\Work_Orders\Digs\49160146\Maps\Line_1\061217\L1_1063_3477_and_1063_4911_Topo.mxd User: jwk
Hardwood Lake Rd
ND
Lake Superior
MN
MI
!
Temporary Workspace
WI
1063.3477
1063.4911
!
SD
IA
Perch Lake
Township
!
Maintenance Location
Line 1
Tw
p
Access Route
T49N, R18W
S8
T49N, R18W
S7
Staging Area
Temporary Workspace
(100'x300')
53
5
Field Delineated Wetland (2014)
Twp 535
Carlton County
;
!
N
Staging Area
0
Access Route
800
1,600
Feet
1 Inch = 800 Feet
Statewide FSA Imagery Circa 2015 Via MnGEO
Twp 421
Twp 536
T49N, R18W
S18
T49N, R18W
S17
Confidential and Critical
Energy Infrastructure Information
2017-03476-ARC
Drawing 3 of 7
Barr Footer: ArcGIS 10.4, 2017-09-25 11:30 File: I:\Client\Enbridge_Energy\Work_Orders\Digs\49160146\Maps\Line_1\061217\L1_1093_3477_and_1093_4911_Special\L1_1063_3477_and_1063_4911_Access.mxd User: mak3
ACCESS ROUTE
Line 1
Milepost 1063.3477 and 1063.4911
ND
Lake Superior
MN
MI
WI
Excavation Extent
SD
IA
Soil Stockpile
!
1063.3477
!
Carlton County
Erosion Control Barrier
T49N, R18W
S7
Maintenance Location
Line 1
Erosion Control Barrier
Dewatering Area - Location TBD
depending on site conditions
Access Route
Staging Area
Temporary Workspace
(100'x300')
Perch Lake
Township
Temporary Workspace
Excavation Extent
Soil Stockpile
Soil Stockpile
Dewatering Area
Excavation Extent
Field Delineated Wetland (2014)
!
1063.4911
Erosion Control Barrier
;
!
N
0
200
400
Feet
1 Inch = 200 Feet
Statewide FSA Imagery Circa 2015 Via MnGEO
Access Route
SITE PLAN
Line 1
Milepost 1063.3477 and 1063.4911
Confidential and Critical
Energy Infrastructure Information
2017-03476-ARC
Drawing 4 of 7
Barr Footer: ArcGIS 10.4, 2017-09-26 15:21 File: I:\Client\Enbridge_Energy\Work_Orders\Digs\49160146\Maps\Line_1\061217\L1_1093_3477_and_1093_4911_Special\L1_1063_3477_and_1063_4911_SitePlan.mxd User: mak3
Dewatering
Area
(If Necessary)
PLACE EROSION CONTROL
DEVICES, AS NECESSARY
EROSION CONTROL
Pipeline
DEVICES WILL BE
PLACED AROUND THE
DISTURBED WORK
AREA, AS NECESSARY
EROSION CONTROL DEVICES
WILL BE PLACED ACROSS
OPENING AT END OF THE DAY
30' - 40'
EXCAVATED
AREA
60' - 80'
EXCAVATED SUBSOIL WILL
BE STOCKPILED NEAR THE
EXCAVATION WITHIN ECD'S,
AS NECESSARY
Subsoil
Topsoil
MINIMUM ONE FOOT
SEPARATION MUST BE
MAINTAINED BETWEEN
TOPSOIL AND SUBSOIL OR A
PHYSICAL BARRIER SHOULD
BE USED.
STOCKPILE TOPSOIL
SEPARATELY FROM
SUBSOIL
WORKSPACE
Pipeline
For environmental review purposes only.
Figure 1
Environmental Mitigation Plan
Typical Maintenance Excavation
Plan View
2017-03476-ARC
Drawing 5 of 7
DATE: 3/23/2015
REVISED: 4/8/2015
SCALE: NTS
an ERM Group company
DRAWN BY: JEBAKKEN
K:\_CLIENT_PROJECTS\D-F\EEL\BARR\
2015\04\REVISED_TYPICALS\
FIG_01_MAINT_EXCAVATION.VSD
NOTE: TRENCH BOXES CONSIST OF TWO STEEL PLATES
THAT HOLD UP THE SIDES OF AN EXCAVATION.
THE PLATES ARE HELD IN PLACE BY STEEL BRACES.
PIPELINE
TRENCH
BOX
TRENCHBOX
Excavation
Apprx. 10'
EXCAVATION
PIPELINE
PLAN: TRENCH BOX
PROFILE: TRENCH BOX
SUBSOIL
EXISTING PIPELINE
TO BE REPAIRED
TOPSOIL
CONSTRUCTION MATS
(AS REQUIRED)
TRENCH BOX
Topsoil
Subsoil
PROFILE: TRENCH BOX
For environmental review purposes only.
DATE: 3/23/2015
Figure 2
Environmental Mitigation Plan
Typical Trench Box
2017-03476-ARC
Drawing 6 of 7
REVISED: 4/8/2015
SCALE: NTS
an ERM Group company
DRAWN BY: JEBAKKEN
K:\_CLIENT_PROJECTS\D-F\EEL\BARR\
2015\04\REVISED_TYPICALS\
FIG_02_TRENCH_BOX.VSD
FASTENER-MIN. NO. 10
GAGE WIRE 4 PER POST
REQUIRED. (TYP.)
FASTENER-MIN. NO. 10
GAGE WIRE 4 PER POST
REQUIRED. (TYP.)
6' MAX (TYP.)
8' MAX (TYP.)
2'
Min
MESH SUPPORT
6" SQUARE (MAX)
2'
Min
FILTER
FABRIC
18" MIN.
TYP
18" MIN.
TYP
ELEVATION
ELEVATION
FILTER
FABRIC
DIRECTION OF FLOW
UNDISTURBED
GROUND LINE
3" MIN WIRE
MESH IN TRENCH
6" MIN.
6" MIN.
STEEL OR
WOOD POST
FILTER
FABRIC
3" MIN WIRE
MESH IN TRENCH
6" MIN.
COMPACTED BACKFILL
6" MIN.
FABRIC ANCHOR DETAIL
DIRECTION OF FLOW
UNDISTURBED
GROUND LINE
COMPACTED BACKFILL
FABRIC ANCHOR DETAIL
SILT FENCE WITH WIRE SUPPORT PLAN
SILT FENCE PLAN
NTS
NOTES:
1. WIRES OF MESH SUPPORT SHALL BE MIN. GAGE NO. 12.
2. FILTER FABRIC SHALL MEET THE REQUIREMENTS OF THE SPECIFICATION WITH EQUIVALENT OPENING SIZE OF AT LEAST
30 FOR NONWOVEN AND 50 FOR WOVEN. (SIEVE NO.)
3. THE POSTS USED TO SUPPORT THE SILT FENCE SHOULD BE HARDWOOD MATERIAL WITH A MINIMUM CROSS SECTIONAL
AREA OF 4 INCHES SQUARE AND 4 FEET LONG. METAL POSTS SHOULD BE USED IN AREAS THAT POND WATER.
FILTER
FABRIC
STEP 1
FILTER
FABRIC
POSTS
STEP 2
STEP 3
ATTACHING TWO SILT FENCES
NOTES:
1. PLACE THE END POST OF THE SECOND FENCE INSIDE THE END POST OF THE FIRST FENCE.
2. ROTATE BOTH POSTS AT LEAST 180 DEGREES IN A CLOCKWISE DIRECTION TO CREATE
A TIGHT SEAL WITH THE FABRIC MATERIAL.
3. DRIVE BOTH POSTS A MINIMUM OF 18 INCHES IN THE GROUND AND BURY THE FLAP.
For environmental review purposes only.
DATE: 5/25/2001
Figure 8
Environmental Mitigation Plan
Typical Silt Fence Installation
2017-03476-ARC
Drawing 7 of 7
REVISED: 4/10/2015
SCALE: NTS
an ERM Group company
DRAWN BY: KMKENDALL
K:\_CLIENT_PROJECTS\D-F\EEL\BARR\
2015\04\REVISED_TYPICALS\
FIG_08_SILT_FENCE_INSTALL.VSD