APPLICANT: Tavistock East Services, LLC. Orlando, Florida. PROJECT PURPOSE: Basic: Infrastructure. Overall: The overall project purpose is the development of an access road and utilities site within north-central Osceola County, Florida.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: Tavistock East Services, LLC

9801 Lake Nona Road

Orlando, Florida 32827

WATERWAY AND LOCATION: The 88± acre Sunbridge Utility Site and Access Road project would affect waters of the United States associated with the Kissimmee River Hydrologic Unit (Hydrologic Unit Code 03090101); project is located southeast of Lake Mary Jane. The project site is located south of the Orange-Osceola County Line and east of Narcoosee Road, within Sections 2, 10 & 11, Township 25 South, Range 31 East, in Osceola County, Florida.

Directions to the site are as follows: The project is not accessible by public road but is located east of the intersection of Cyrils Drive and Absher Road.

APPROXIMATE CENTRAL COORDINATES: Latitude 28.3377º

Longitude -81.1873º

PROJECT PURPOSE:

Basic: Infrastructure.

Overall: The overall project purpose is the development of an access road and utilities site within north-central Osceola County, Florida.

EXISTING CONDITIONS: The Sunbridge Utility Site and Access Road project area currently supports five land use types/vegetative communities. These land use types/vegetative communities were identified utilizing the Florida Land Use, Cover and Forms Classification System, Level III (FLUCCS, FDOT, January 1999). The on-site upland land use types/vegetative communities are classified as Woodland Pasture (213), Shrub and Brushland (320), and Pine Flatwoods (411). Approximately 2.84 acres of aquatic resources are found in the project area, including land use types/vegetative communities classified as Reservoirs (530) and Wetland Forested Mixed (630).

Woodland pastures (213) and Shrub and Brushland (320) total approximately 83.47 acres and are described as historically grazed rangeland with scattered or limited canopy. The subcanopy includes wax myrtle, sapling-size red maple, pine and oak species. The understory is dominated by saw palmetto with occasional areas of open grasslands.

A majority of the on-site wetlands would be most consistent with the Wetland Forested Mixed (630) FLUCCS classification. Vegetation observed within this community type includes swamp tupelo, sweetbay, dahoon, loblolly bay, slash pine, swamp bay, highbush blueberry, gallberry, saw palmetto, cinnamon fern, swamp fern, Virginia chain fern, netted chain fern, sugarcane plumegrass, yelloweyed grass, blue waterhyssop, blackberry, grape vine, greenbrier, and climbing fern.

PROPOSED WORK: The applicant seeks authorization to fill 2.84 acres of waters of the United States for construction of the access road to the proposed utility site.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:

“In order to provide an economically feasible project that satisfies the stated purpose, impacts to 2.21 acres of CORPS jurisdictional wetlands and 0.63 acre of non-jurisdictional surface water are unavoidable. The project limits have been reduced to only include those areas proposed for construction and will require full use of the area to support the proposed access road, utility site, and associated surface water management system. Construction of the proposed Sunbridge Utility Site and Access Road project is not expected to result in significant adverse impacts to natural communities. Impacts are limited to those necessary to gain access to the utility site via the access road improvements. The access road has been located along an existing field road and will cross wetlands at existing wetland crossings, thereby minimizing impacts.”

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:

“Mitigation to offset the functional loss incurred via the project’s direct and secondary wetland impacts consist of the purchase of credits from a mitigation bank. The project proposes to purchase 1.81 Wetland Rapid Assessment Procedure (WRAP) credits from the TM Econ Mitigation Bank.”

CULTURAL RESOURCES:

The Corps is not aware of any known historic properties within the permit area, which is defined by the project boundaries. A Cultural Resources Assessment Survey report was finalized August 2017 and submitted to the State Historic Preservation Officer for review. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES:

The action area includes the entire 88± acre project site. The Corps has determined the proposed project “may affect, but is not likely to adversely affect” (NLAA) wood stork (Mycteria americana). The proposed activity is within the Core Foraging Area (CFA) of one rookery; the project supports marginally Suitable Foraging Habitat (SFH) for wood stork. Based on the Effect Determination Key for the Wood Stork in South Peninsular Florida (dated May 2010), the Corps determination sequence is as follows: A (Project impacts SFH at a location greater than 0.47 miles from a colony site) > B (Project impact to SFH is greater in scope than 0.5 acres) > C (Project impacts to SFH within the CFA of a colony site > E (Project provides SFH compensation) = NLAA. The project provides SFH compensation within the CFA consisting of enhancement, restoration or creation (and federal mitigation bank credits) that provides an amount of habitat and foraging function equivalent to that of the impacted SFH; in accordance with the Clean Water Act section 404(b)(1) guidelines, and is not contrary to the habitat management guidelines. The Corps has U.S. Fish and Wildlife Service (USFWS) concurrence for the proposed activities through use of the aforementioned determination key.

The Corps has determined the proposed project “may affect” the Eastern Indigo Snake (Drymarchon couperi). Based on the Eastern Indigo Snake Programmatic Effect Determination Key (dated August 1, 2017), the Corps determination sequence is as follows: A (The project is not located in open water or salt marsh.) > B (The permit will be conditioned for use of the Service’s Standard Protection Measures for the Eastern Indigo Snake during site preparation and construction.) > C (The project will impact more than 25 acres of eastern indigo snake habitat.) = NLAA. The Corps will initiate formal consultation with USFWS pursuant to the aforementioned determination key.

Based on existing habitat types and/or provided survey information, the Corps preliminarily determined the project will have no effect on bluetail mole skink (Eumeces egregious lividus) and sand skink (Neoseps reynoldsi), red-cockaded woodpecker (Leuconotopicus borealis), Everglades Snail Kite (Rostrhamus sociabilis plumbeus), Audubon’s crested caracara (Polyborus plancus audubonii), and Florida scrub-jay (Aphelocoma coerulescens).

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 2.84 acres of wetland forested mixed community located in the headwaters of the Kissimme River. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Kissimmee River. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Jeffrey Collins, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida, 32926; by electronic mail at Jeffrey.S.Collins@usace.army.mil; by fax at (321) 504-3803, or by telephone at (321) 504-3771 extension 13.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS COCOA PERMIT SECTION 400 HIGH POINT DRIVE COCOA, FLORIDA 32926 REPLY TO ATTENTION OF

Regulatory Division North Permits Branch Cocoa Permits Section

November 9, 2017

PUBLIC NOTICE Permit Application Number SAJ-2017-01897 (SP-JSC) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: Tavistock East Services, LLC c/o Mr. James Zboril 9801 Lake Nona Road Orlando, Florida 32827 WATERWAY AND LOCATION: The 88± acre Sunbridge Utility Site and Access Road project would affect waters of the United States associated with the Kissimmee River Hydrologic Unit (Hydrologic Unit Code 03090101); project is located southeast of Lake Mary Jane. The project site is located south of the Orange-Osceola County Line and east of Narcoosee Road, within Sections 2, 10 & 11, Township 25 South, Range 31 East, in Osceola County, Florida. Directions to the site are as follows: The project is not accessible by public road but is located east of the intersection of Cyrils Drive and Absher Road. APPROXIMATE CENTRAL COORDINATES: Latitude 28.3377º Longitude -81.1873º PROJECT PURPOSE: Basic: Infrastructure. Overall: The overall project purpose is the development of an access road and utilities site within north-central Osceola County, Florida. EXISTING CONDITIONS: The Sunbridge Utility Site and Access Road project area currently supports five land use types/vegetative communities. These land use types/vegetative communities were identified utilizing the Florida Land Use, Cover and Forms Classification System, Level III (FLUCCS, FDOT, January 1999). The on-site upland land use types/vegetative communities are classified as Woodland Pasture (213), Shrub and Brushland (320), and Pine Flatwoods (411). Approximately 2.84 acres

of aquatic resources are found in the project area, including land use types/vegetative communities classified as Reservoirs (530) and Wetland Forested Mixed (630). Woodland pastures (213) and Shrub and Brushland (320) total approximately 83.47 acres and are described as historically grazed rangeland with scattered or limited canopy. The subcanopy includes wax myrtle, sapling-size red maple, pine and oak species. The understory is dominated by saw palmetto with occasional areas of open grasslands. A majority of the on-site wetlands would be most consistent with the Wetland Forested Mixed (630) FLUCCS classification. Vegetation observed within this community type includes swamp tupelo, sweetbay, dahoon, loblolly bay, slash pine, swamp bay, highbush blueberry, gallberry, saw palmetto, cinnamon fern, swamp fern, Virginia chain fern, netted chain fern, sugarcane plumegrass, yelloweyed grass, blue waterhyssop, blackberry, grape vine, greenbrier, and climbing fern. PROPOSED WORK: The applicant seeks authorization to fill 2.84 acres of waters of the United States for construction of the access road to the proposed utility site. AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: "In order to provide an economically feasible project that satisfies the stated purpose, impacts to 2.21 acres of CORPS jurisdictional wetlands and 0.63 acre of nonjurisdictional surface water are unavoidable. The project limits have been reduced to only include those areas proposed for construction and will require full use of the area to support the proposed access road, utility site, and associated surface water management system. Construction of the proposed Sunbridge Utility Site and Access Road project is not expected to result in significant adverse impacts to natural communities. Impacts are limited to those necessary to gain access to the utility site via the access road improvements. The access road has been located along an existing field road and will cross wetlands at existing wetland crossings, thereby minimizing impacts." COMPENSATORY MITIGATION ­ The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: "Mitigation to offset the functional loss incurred via the project's direct and secondary wetland impacts consist of the purchase of credits from a mitigation bank. The project proposes to purchase 1.81 Wetland Rapid Assessment Procedure (WRAP) credits from the TM Econ Mitigation Bank."

2

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area, which is defined by the project boundaries. A Cultural Resources Assessment Survey report was finalized August 2017 and submitted to the State Historic Preservation Officer for review. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The action area includes the entire 88± acre project site. The Corps has determined the proposed project "may affect, but is not likely to adversely affect" (NLAA) wood stork (Mycteria americana). The proposed activity is within the Core Foraging Area (CFA) of one rookery; the project supports marginally Suitable Foraging Habitat (SFH) for wood stork. Based on the Effect Determination Key for the Wood Stork in South Peninsular Florida (dated May 2010), the Corps determination sequence is as follows: A (Project impacts SFH at a location greater than 0.47 miles from a colony site) > B (Project impact to SFH is greater in scope than 0.5 acres) > C (Project impacts to SFH within the CFA of a colony site > E (Project provides SFH compensation) = NLAA. The project provides SFH compensation within the CFA consisting of enhancement, restoration or creation (and federal mitigation bank credits) that provides an amount of habitat and foraging function equivalent to that of the impacted SFH; in accordance with the Clean Water Act section 404(b)(1) guidelines, and is not contrary to the habitat management guidelines. The Corps has U.S. Fish and Wildlife Service (USFWS) concurrence for the proposed activities through use of the aforementioned determination key. The Corps has determined the proposed project "may affect" the Eastern Indigo Snake (Drymarchon couperi). Based on the Eastern Indigo Snake Programmatic Effect Determination Key (dated August 1, 2017), the Corps determination sequence is as follows: A (The project is not located in open water or salt marsh.) > B (The permit will be conditioned for use of the Service's Standard Protection Measures for the Eastern Indigo Snake during site preparation and construction.) > C (The project will impact more than 25 acres of eastern indigo snake habitat.) = NLAA. The Corps will initiate formal consultation with USFWS pursuant to the aforementioned determination key. Based on existing habitat types and/or provided survey information, the Corps preliminarily determined the project will have no effect on bluetail mole skink (Eumeces egregious lividus) and sand skink (Neoseps reynoldsi), red-cockaded woodpecker (Leuconotopicus borealis), Everglades Snail Kite (Rostrhamus sociabilis plumbeus), Audubon's crested caracara (Polyborus plancus audubonii), and Florida scrub-jay (Aphelocoma coerulescens). ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery 3

Conservation and Management Act 1996. The proposal would impact approximately 2.84 acres of wetland forested mixed community located in the headwaters of the Kissimme River. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Kissimmee River. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida 32926 within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Jeffrey Collins, in writing at the Cocoa Permits Section, 400 High Point Drive, Suite 600, Cocoa, Florida, 32926; by electronic mail at Jeffrey.S.Collins@usace.army.mil; by fax at (321) 504-3803, or by telephone at (321) 504-3771 extension 13. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general 4

environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

5

Copy rig h t: ©2013Na tiona lGe og ra ph icSoc ie ty ,ic ubed La ke

Proje ct Bou nda ry

27

Su nb ridg e Bou nda ry

Se ctions 2,10,a nd1 1,T ow nsh ip 25S. ,R a ng e 31E.

USGSNa rcoose e ,Fla .Qu a dra ng le ( 7½ Minu te T opog ra ph icMa p) Sou rce :Proje ct b ou nda ryprovide db y:Pou los a ndBe nne tt;20170719.

Polk

4

27

4

92

Ora ng e

a rd Bre v

Legend

Se minole Volu sia

441

192 95

1

Osce ola 1 92

441 0

1, 000

2, 000

1inc h =2, 000fe e t

LOCATI ONOFTHESUNBRI DGEUTI LI TYSI TEANDACCESSROAD, OSCEOLACOUNTY,FLORI DA.

BDA

Fe e t

BREEDLOVE, DENNIS & ASSOCIATES, INC. Environmental Consultants

330W .Cant onAv e. ,W i nt erPar k,FL32789· 4076771882

CBT·8/ 17/ 2017·P: \ ATG\ 2015077\ Pe rmit_Use \ Wa te rTre a tme ntSite \ ACOEPN_201708\ AR CGI S\ Loca tion. mxd

Legend

27

Pr ojectBoundar y

Sunbr idgeBoundar y

Polk

Sour ce:Pr ojectboundar y pr ovidedby :Poulos andBennet t ;20170719.

Sem inole V olusia

441

4

27

4

92

Or ange

d evar Br

Lak e

Sour c e:Esr i,Digit alGlobe,GeoEy e,Ear t hst arGeogr aphic s, CNES/ Air bus DS,USDA,USGS, Aer oGRI D,I GN,andt heGI SUser Com m unit y

Osceola1 92

192 95

1

441 0

500

1, 000

Feet

1inc h=1, 000f eet

AERI ALOFTHESUNBRI DGEUTI LI TYSI TEANDACCESSROAD, OSCEOLACOUNTY,FLORI DA.

BDA

BREEDLOVE, DENNIS & ASSOCIATES, INC. Environmental Consultants

330W .Cant onAv e. ,W i nt erPar k,FL32789· 4076771882

CBT· 8/ 17/ 2017· P: \ ATG\ 2015077\ Per m it _Use\ Wat er Tr eat m ent Sit e\ ACOEPN_201708\ ARCGI S\ Aer ial. m xd

213 320

630 320

213 41 1

320

41 1 41 1

213

630

213 530

630

Proje ct Bou ndary

Su nbridg e Bou ndary

FLU CFCS

213-WoodlandPastu re s

27

320-Sh ru bandBru sh land 41 1-Pine Flatw oods 530-R e se rvoirs

630-We tlandFore ste dMixe d

Polk

Se m inole Volu sia

441

4

27

4

92

Orang e

ard Bre v

Legend

Sou rce :Proje ct bou ndaryprovide dby:Pou los andBe nne tt;20170719.

Lake

Sou rc e :Esri,Dig italGlobe ,Ge oEy e ,Earth star Ge og raph ic s, CNES/ Airbu s DS,USDA,USGS, Ae roGR I D,I GN,andth e GI SUse r Com m u nity 192 95

1

Osce ola1 92

441 0

450

900

1inc h =900fe e t

FLORI DALANDU SE,COVER,ANDFORMSCLASSI FI CATI ONSYSTEM MAPOFTHE SU NBRI DGEU TI LI TYSI TEANDACCESSROAD,OSCEOLACOU NTY,FLORI DA.

BDA

Fe e t

BREEDLOVE, DENNIS & ASSOCIATES, INC. Environmental Consultants

330W.CantonAv e. ,Wi nter Park,FL32789·4076771882

CBT·8/ 17/ 2017·P: \ ATG\ 2015077\ Pe rm it_Use \ Wate rTre atm e ntSite \ ACOEPN_201708\ AR CGI S\ FLUCFCS. m xd

40 32 16 42

40

5 22

22

5 16 22 5

6

22

P roje c tBound a ry

34

Source :U. S.De pa rt m e ntof Ag ricult ure ,Na t ura lRe s ource s Cons e rva t ion Se rvice , SoilSurve yGe og ra phic( SSURGO)d a t a ba s e .

Sunbrid g e Bound a ry NRCSSo i l s

5-Ba s ing e r fine s a nd ,0t o 2pe rce nt s lope s

6-Ba s ing e r fine s a nd ,d e pre s s iona l,0t o 1pe rc e nts lope s 16-I m m oka le e fine s a nd

16 34

22-My a kka fine s a nd ,0t o 2pe rc e nt s lope s

27

32-P la cid fine s a nd ,d e pre s s iona l

34-P om e llo fine s a nd ,0t o 5pe rc e nt s lope s 40-Sa m s ula m uc k

42-Sm y rna fine s a nd ,0t o 2pe rc e nt s lope s

NAT URALRESOURCESCONSERVAT I ONSERVI CESOI LSMAPOFT HESUNBRI DGE UT I LI T YSI T EANDACCESSROADPROJECT SI T E,OSCEOLACOUNT Y,FLORI DA.

P olk

Se m inole Volus ia

441

4

27

4

92

Ora ng e

a rd Bre v

Legen d

40

5

La ke

34

16

192 95

1

Os ce ola 1 92

441 0

450

900

1inc h =900fe e t

BDA

Fe e t

BREEDLOVE, DENNIS & ASSOCIATES, INC. Environmental Consultants

330W.Can to n Ave. ,Wi n ter Park,FL32789· 4076771882

CBT·8/ 17/ 2017·P : \ ATG\ 2015077\ P e rm it _ Us e \ Wa t e rTre a t m e nt Sit e\ ACOEP N_ 201708\ ARCGI S\ Soils . mx d

OR081

OR038

OR011 OR070 La k eMa ry Ja ne612037

OR049 OR029

OS157

OS103 OS155

OS209 612135

OS106 OS132 OS115 OS122

Projec tBou nda ry

Cont entma y notreflec tNa t iona lGeog ra ph ic ' s c u rrentma ppolic y. S ou rc es:Na t iona lGeog ra ph ic ,Esri,DeLorme,HERE,UNEPWCMC, US GS ,NAS A,ES A,METI ,NRCAN,GEBCO,NOAA,inc rementPCorp.

Wa d ingBird Rook eries ( 1999)

S u nb ridg eBou nda ry

Ea g le' s Nest s( 2015)

WoodS t ork Colonies ( 2015)

Ac t ive

I na c t iv e

Notc h ec ked

S ou rc e:Florida Fish a ndWildlifeConserva t ionCommission( FFWC) .

27 Polk

S eminole Volu sia

441

4

27

4

92

Ora ng e

a rd Brev

Legend

612042

La k eConlin

La ke

OS200

192 95

Osc eola 1 92

441 0

1 1inc h =2miles

WADI NG BI RDROOKERI ESANDBALDEAGLENESTLOCATI ONSI NTHEVI CI NI TYOFTHE SUNBRI DGEUTI LI TYSI TEANDACCESSROADP ROJECTSI TE,OSCEOLACOUNTY,FLORI DA.

1

BDA

2

Mi.

BREEDLOVE, DENNIS & ASSOCIATES, INC. Environmental Consultants

330W.Ca ntonAve. ,Winter P a rk ,FL32789· 4076771882

CBT·8/ 17/ 2017·P: \ ATG\ 2015077\ Permit _Use\ Wa t erTrea t ment S it e\ ACOEPN_201708\ ARCGI S\ Birds. mxd

S erv ic eLayer Credits:S ou rc e:Esri,Dig italGlob e,GeoEye, Earth star Geog raph ic s,CNES / Airb u s DS ,US DA,US GS , AeroGRI D,I GN,andth eGI S User Commu nity

630 ( 0. 24ac)

W1

630 ( 0. 58ac)

630 ( 0. 53ac)

W24

W26 630 ( 0. 23ac)

W27 D5 W28 630 ( 1. 26ac)

W1

W22

W28A

630 ( 0. 39ac)

W25

D6

630 ( 0. 02ac)

SW3

W21 NJD

NJD

641 ( 0. 58ac)

W1 630 ( 1. 58ac)

W1

630 ( 1. 00ac)

Projec tBou ndary

S u nb ridg eBou ndary

Primary WetlandI mpac ts ( 2. 21ac )

27

Wetlands

S u rfac eWaters

S ec ondary WetlandI mpac ts ( 4. 20ac )

Polk

S eminole Volu sia

441

4

27

4

92

Orang e

ard Brev

Le ge n d

S ou rc e:Projec tb ou ndary prov idedb y:Pou los andBennett;20170719.

Lake

W1 192 95

1

Osc eola1 92

441 0

450

900

1inc h =900feet PROPOS EDDEVELOPMENTPLANANDDEPARTMENTOFTHEARMY,CORPS OFENGI NEERS WETLANDI MPACTS FORTHES UNBRI DGEUTI LI TYS I TEANDACCES S ROAD,OS CEOLACO. ,FL.

BDA

Feet

BREEDLOVE, DENNIS & ASSOCIATES, INC. Environmental Consultants

330W.Can to n Ave . ,Wi n te rPar k ,FL32789· 4076771882

CBT·8/ 17/ 2017·P: \ ATG\ 2015077\ Permit_Use\ WaterTreatmentS ite\ ACOEPN_201708\ ARCGI S\ I mpac ts. mxd

A

TYPICAL SECTION - 123' R/W FOUR LANE AVENUE/BOULEVARD WITH MEDIAN, 12' TRAIL AND ON-STREET PARKING ON ONE SIDE.

N.T.S.

TYPICAL SECTION - 42' R/W

B TWO-WAY LOCAL STREET NO PARKING AND NO SIDEWALK

N.T.S.

ACOE Phase 1 Cyrils & Utility Access Road Site Plan and Impact Sections N

Sunbridge July 31, 2017 P & B Job No.: 17-042

2602 E. Livingston St. Orlando, Florida 32803- 407.487.2594

www.poulosandbennett.com Certificate of Authorization No. 28567

Exhibit 1

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas