The applicant proposes to construct and operate the proposed Public Oil Docks 20, 21 and 22.

Full Public Notice Project Plans Proposed Mitigation Plan PROJECT DESCRIPTION: The applicant proposes to construct and operate the proposed Public Oil Docks 20, 21, and 22 Project. The project consists of construction of a 40-foot by 40-foot barge dock, three new barge breasting dolphins, approximately 4,155 feet of steel sheet pile bulkhead, approximately 2,924 feet of elevated concrete wharf platform consisting of mooring bollards and dock fenders, and related infrastructure. The project would result in the removal and relocation of approximately 2.9 million cubic yards of material.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas