The applicant has requested authorization to discharge dredged and/or fill material into waters of the U.S. and work within navigable waters of the U.S. to replace the CR 32 bridge over the Muskingum River on a new alignment immediately east of the existing bridge and to demolish the existing bridge after construction of the new bridge.

TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army Permit under the provisions of Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. This notice serves as the United States Army Corps of Engineers’ (Corps) request to the Ohio Environmental Protection Agency (OEPA) to act on Section 401 Water Quality Certification for the following application.

APPLICANT: Ohio Department of Transportation (ODOT) 1980 West Broad Street, Mail Stop 4170 Columbus, Ohio 43223

LOCATION: The proposed linear project, referred to as MUS-32-0.00, PID 97346, is located along the County Road (CR) 32 bridge over the Muskingum River between the Village of Philo and the Unincorporated Community of Duncan Falls in Muskingum County, Ohio. Logical termini of the linear project are as follows: South Terminus: 39.8673 North, 81.9100 West North Terminus: 39.9085 North, 81.9085 West

Waters of the United States (U.S.) within the proposed project area include approximately 1.347 acres of five (5) wetlands, 557 linear feet of perennial stream, and 260 linear feet of intermittent stream.

DESCRIPTION OF PROPOSED WORK: The applicant has requested authorization to discharge dredged and/or fill material into waters of the U.S. and work within navigable waters of the U.S. to replace the CR 32 bridge over the Muskingum River on a new alignment immediately east of the existing bridge and to demolish the existing bridge after construction of the new bridge.

The applicant has indicated the temporary and permanent discharge of dredged and/or fill material into waters of the U.S. is necessary to construct the applicant’s Preferred Alternative (PA). Implementation of the applicant’s PA would require work within navigable waters of the U.S. and the discharge of permanent fill material into waters of the U.S. for culvert installation, placement of rock channel protection, pier and abutment construction, and grading activities. The applicant also proposes to discharge temporary fill material into waters of the U.S. and work within navigable waters of the U.S. for construction access. Upon completion of construction, all temporary fills would be removed and the aquatic resource would be restored to pre-construction contours to the maximum extent practicable. Proposed permanent and temporary discharges of dredged and/or fill material are described in the attached Table 1. Plans of the proposal are attached to this notice.

ALTERNATIVES ANALYSIS: As a result of the proposal, permanent fill material would be discharged into 135 linear feet (0.49 acre) of the Muskingum River and 0.035 acre of Wetland D. Temporary fill material would be discharged into 250 linear feet (0.358 acre) of the Muskingum River and 0.300 acre of Wetland D. The temporary fill material that would be discharged into Wetland D would be removed, but the wetland would not be restored. Therefore, the temporary discharge of fill material into Wetland D would result in the permanent loss of 0.3 acre of wetland. The project does not require access or proximity to or siting within the wetlands to fulfill its basic purpose and is considered a non-water dependent activity. The Section 404(b)(1) Guidelines state that for non-water dependent activities, practicable alternatives that do not involve wetlands are presumed to be available, unless clearly demonstrated otherwise. The applicant is required to provide an alternatives analysis that must overcome the presumption prior to receiving authorization for the discharge of dredged and/or fill material. No permit would be issued unless the alternatives analysis clearly demonstrates that practicable upland alternatives are not available to achieve the overall project purpose. The applicant has submitted the required alternatives analysis, which is currently under review. By appointment, a complete copy of the alternatives analysis can be reviewed at the address indicated above.

AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the U.S., consideration must be given to avoiding waters of the U.S. If waters of the U.S. cannot be avoided, then the discharge of dredged and/or fill material into waters of the U.S. must be minimized. Approximately 1.347 acres of five (5) wetlands, 557 linear feet of perennial stream, and 260 linear feet of intermittent stream subject to Section 404 Clean Water Act regulation are present within the proposed project area. According to the applicant, on-site alternatives were considered and avoidance and minimization efforts were incorporated into the project design. The applicant completed a Feasibility Study analysis for different roadway alignments and determined other alternatives that would result in avoidance or minimization of waters of the U.S. were not practicable due to cost, property ownership, contaminated materials, and maintenance of traffic constraints.

The project has been designed to completely avoid the discharge of dredged and/or fill material into 1.047 acres of five wetlands, 337 linear feet of the Muskingum River, and complete avoidance (260 linear feet) of one intermittent stream within the project area. The applicant has indicated that the proposed discharge of dredged and/or fill material into waters of the U.S. is unavoidable and that no fill material would be discharged in excess of the minimum needed to complete the project. Minimization of adverse effects to aquatic resources would also be achieved through adherence to the applicant’s Construction and Material Specifications and the implementation of construction Best Management Practices for sediment and erosion control.

Such measures may include the installation of silt barriers, silt fence, and ditch checks appropriately placed prior to construction.

COMPENSATORY MITIGATION PLAN: To compensate for the discharge of dredged and/or fill material into 153 linear feet of the Muskingum River (Hydrologic Unit Code [HUC] 05040004) and 0.3 acre of emergent Category 2 wetlands, the applicant proposes to deduct 918 linear feet of stream mitigation credit and 0.6 acre of wetland mitigation credit from the ODOT’s Dawe’s Arboretum Pooled Mitigation Site (HUC 05040006) in the Licking River watershed (drains to the Muskingum River), in Licking County, Ohio.

The applicant’s proposed compensatory mitigation plan is open to comment and is subject to change based on comments received.

WATER QUALITY CERTIFICATION: A Section 401 Water Quality Certification is required for this project. It is the applicant’s responsibility to obtain certification from the OEPA.

HISTORIC AND CULTURAL RESOURCES: Pursuant to 23 U.S.C. 327(a)(2)(B) and a Memorandum of Understanding executed on December 11, 2015 between the Federal Highway Administration (FHWA) and the ODOT, the FHWA assigned, and the ODOT assumed, the responsibility for compliance with the Section 106 of the National Historic Preservation Act (NHPA). The applicant determined the existing Philo Bridge (SFN 6054129) is eligible for listing on the National Register of Historic Places (NRHP) and would be adversely affected by the proposed undertaking. The Advisory Council of Historic Preservation declined participation in consultation. A Memorandum of Agreement between the applicant and the Ohio State Historic Preservation Office was executed on April 3, 2017 with stipulations the applicant must adhere to for compliance with Section 106 of the NHPA.

In support of our independent permit decision, the Corps intends to rely upon the information collected and consultation performed by the ODOT regarding the effects to historic properties. A copy of this Public Notice will be sent to the Ohio History Connection for review. Comments concerning archaeological sensitivity of the project area should be based upon collected data.

THREATENED AND ENDANGERED SPECIES: The proposed project is located within the known or historic range of the following endangered (E) or threatened (T) species:

Indiana bat (Myotis sodalis) (E)

Northern long-eared bat (Myotis septentrionalis) (T)

Fanshell mussel (Cyprogenia stegaria) (E)

Sheepnose mussel (Plethobasus cyphyus) (E)

Snuffbox mussel (Epioblasma triquetra) (E)

Rabbitsfoot mussel (Quadrula c. cylindrica) (T)

Pursuant to 23 U.S.C. 327(a)(2)(B) and a Memorandum of Understanding executed on December 11, 2015 between the FHWA and the ODOT, the FHWA assigned, and the ODOT assumed, the responsibility for compliance with Section 7 of the Endangered Species Act. The applicant has determined the project would have no effect on any Federally-listed mussel species. The applicant has determined the project may affect, but is not likely to adversely affect either the Indiana bat or the northern long-eared bat. In accordance with the Ohio Programmatic Biological Opinion for the Indiana bat and the northern long-eared bat issued by the United States Fish and Wildlife Service (USFWS) on February 29, 2016, the USFWS concurred with these determinations for the Indiana bat and the northern long-eared bat on October 11, 2016.

In support of our independent permit decision, the Corps intends to rely upon the information collected by the ODOT, and consultation performed by the ODOT, regarding the project’s effects to threatened or endangered species. This Public Notice serves as a request to the USFWS for any additional information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended).

PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow the guidelines published by the U.S. Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR part 230). The decision to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity, on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; among those factors are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. A permit will be granted unless its issuance is found to be contrary to the public interest.

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, Federal, state and local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. The comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. The comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination.

CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to: U.S. Army Corps of Engineers, Huntington District ATTN: CELRH-RD-S-OT Public Notice No. LRH-2016-00803-MUS Building 10 / Section 10 PO Box 3990 Columbus, OH 43218-3990

Please note names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, may be available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation’s water resources. If you have any questions concerning this Public Notice, please contact Tim Long of the South/Transportation Branch, at (614) 692-4654, by mail at the above address, or by email at Timothy.M.Long@usace.army.mil.

Table 1 – Nature of Proposed Discharges of Dredged and/or Fill Material into Waters of the U.S.

Aquatic Resource ID

Type of Fill Activity

Permanent

Temporary

Fill Volume (cy)

Fill Area (ac)

Length (lf)

Fill Volume (cy)

Fill Area (ac)

Length (lf)

Muskingum River

Concrete (Piers and Culvert Installation), Embankment Fill, Rock Channel Protection (RCP), and Temporary Access Fill (TAF)

5,387

0.490

153

27,758

3.580

250

Wetland D

Embankment Fill, RCP, and TAF*

56

0.035

500*

0.300*

Project 1 Totals:

5,443

0.525

153

28,258

3.880

250

*The Temporary Access Fill in Wetland D would be removed but the wetland would not be restored. Therefore, the temporary discharge of fill material into Wetland D would result in the permanent loss of 0.300 acre of wetland.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas