Highlands County Board of County Commissioners. Sebring, Florida. PROJECT PURPOSE: Basic: Water Quality Improvements. Overall: Construct a stormwater treatment and reuse impoundment in the Istokpoga Marsh Watershed Improvement District.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: Highlands County Board of County Commissioners

c/o Clell Ford

4344 George Boulevard

Sebring, FL 33875

WATERWAY AND LOCATION: The project would affect waters of the United States associated with ditches that discharge to Canal C-41A. The project site is located off of Driggers Road, in Section 4, Township 37 South, Range 31 East, Lake Placid, Highlands County, Florida.

Directions to the site are as follows: From Sebring, Florida proceed south on US 27 to SR 98. Turn east on SR 98 toward the town of Lorida and proceed approximately 14 miles until reaching the intersection of CR 621. Turn south on 621 and follow it 10 miles until reaching Driggers Road (a dirt road) which extends east from 621. Turn on Driggers road and follow it 2 miles to the end where you must turn south along the east side of the canal and carefully follow the access road an additional 0.7 miles to reach the NW corner of the 400 acre project site.

APPROXIMATE CENTRAL COORDINATES: Latitude 27.284047°

Latitude 27.284047°

Longitude -81.227069°

PROJECT PURPOSE:

Basic: Water Quality Improvements

Overall: Construct a stormwater treatment and reuse impoundment in the Istokpoga Marsh Watershed Improvement District.

EXISTING CONDITIONS: The 400 acre site is an existing pasture/agricultural field bisected by ditches and adjacent to Canal C-41A. Adjacent properties consist of similar pasture/agricultural fields.

PROPOSED WORK: The applicant seeks authorization to construct a 326-acre stormwater impoundment to reduce phosphorus loading into downstream waters. Work will include the construction of an earthen berm that will require the placement of fill in 3.96 acres of ditches.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The proposed activities will have no effect on wetlands and have been minimized to the maximum extent practicable.

COMPENSATORY MITIGATION – The applicant has provided the following explanation why compensatory mitigation should not be required: No mitigation is being proposed as there are no impacts to wetlands.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES: The Corps has preliminarily determined the proposed project may affect, but is not likely to adversely affect the Audubon’s Crested Caracara and the Everglades Snail Kite. The Corps will request U.S. Fish and Wildlife concurrence with this determination pursuant to Section 7 of the Endangered Species Act.

The Corps has preliminarily determined the proposal may affect the Eastern Indigo Snake. The Corps will request initiation of formal consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter.

The Corps has preliminarily determined the proposal would have no effect on the Florida Bonneted Bat, Florida Scrub-jay, Florida Grasshopper Sparrow, or Wood Stork as there is no suitable habitat for these species on site.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Gulf of Mexico or Atlantic Ocean. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7064.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610

November 09, 2017

REPLY TO ATTENTION OF

Regulatory Division West Branch Tampa Permits Section

PUBLIC NOTICE Permit Application No. SAJ-2017-02172(SP-CMW) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT: Highlands County Board of County Commissioners c/o Clell Ford 4344 George Boulevard Sebring, FL 33875 WATERWAY AND LOCATION: The project would affect waters of the United States associated with ditches that discharge to Canal C-41A. The project site is located off of Driggers Road, in Section 4, Township 37 South, Range 31 East, Lake Placid, Highlands County, Florida. Directions to the site are as follows: From Sebring, Florida proceed south on US 27 to SR 98. Turn east on SR 98 toward the town of Lorida and proceed approximately 14 miles until reaching the intersection of CR 621. Turn south on 621 and follow it 10 miles until reaching Driggers Road (a dirt road) which extends east from 621. Turn on Driggers road and follow it 2 miles to the end where you must turn south along the east side of the canal and carefully follow the access road an additional 0.7 miles to reach the NW corner of the 400 acre project site. APPROXIMATE CENTRAL COORDINATES: Latitude 27.284047° Longitude -81.227069° PROJECT PURPOSE: Basic: Water Quality Improvements Overall: Construct a stormwater treatment and reuse impoundment in the Istokpoga Marsh Watershed Improvement District. EXISTING CONDITIONS: The 400 acre site is an existing pasture/agricultural field bisected by ditches and adjacent to Canal C-41A. Adjacent properties consist of similar pasture/agricultural fields.

PROPOSED WORK: The applicant seeks authorization to construct a 326-acre stormwater impoundment to reduce phosphorus loading into downstream waters. Work will include the construction of an earthen berm that will require the placement of fill in 3.96 acres of ditches. AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The proposed activities will have no effect on wetlands and have been minimized to the maximum extent practicable. COMPENSATORY MITIGATION ­ The applicant has provided the following explanation why compensatory mitigation should not be required: No mitigation is being proposed as there are no impacts to wetlands. CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has preliminarily determined the proposed project may affect, but is not likely to adversely affect the Audubon's Crested Caracara and the Everglades Snail Kite. The Corps will request U.S. Fish and Wildlife concurrence with this determination pursuant to Section 7 of the Endangered Species Act. The Corps has preliminarily determined the proposal may affect the Eastern Indigo Snake. The Corps will request initiation of formal consultation with the Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act by separate letter. The Corps has preliminarily determined the proposal would have no effect on the Florida Bonneted Bat, Florida Scrub-jay, Florida Grasshopper Sparrow, or Wood Stork as there is no suitable habitat for these species on site. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Gulf of Mexico or Atlantic Ocean. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

2

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Candice Wheelahan, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at Candice.M.Wheelahan@usace.army.mil; by facsimile transmission at (813)769-7061; or, by telephone at (813)769-7064. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the 3

criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

4

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS ISTOKPOGA MARSH WATER IMPOUNDMENT DISTRICT IMPOUNDMENT PHASE II

6 1

GULF OF MEXICO

ATLANTIC OCEAN

"' "'u

"'

'1>

PROJECT

~

PROJECT SITE ( HI GHLANDS COUNTY)

SITE

SR 70

FLORIDA VICINITY MAP NTS

MAY 2017

LOCATI ON MAP NTS

PREPARED BY:

ROYAL CONSULTING SERVICES, INC. RCS PROJECT NO.

0202- 02- E~

Royal Consulting Services, Inc.

U

21 1 West Warren Avenue Longwood, FL 32750 ( 407) 831 - 3095 phone (407) 831 - 5095 fax www. royal consult ing. com FL COA No. 7290

PROFESSIONAL ENGINEER STATE OF FLORIDA NOT FOR CONSTRUCTION GENERAL CIVI L - - - - - - - - - - - Richard A. Jones FL P.E. No. 31118

FOR REVIEW PURPOSES ONLY

Job: 0202- 02-ES

G-4

Seale:

As Shown

Date:

5- 31- 2017

D..1gn:

R.A.J.

Drawn:

J.J.D.

Checked: Approved:

r-------4-------1

I I

I I

1

I

I

1 ,

--r------------------------~ -------------------------

I I L~

_J

iT-====='=======--========-~t=============c:======-=== L ________

\

' ' '' 1

'\

\

' ' ------------------------------~--~ \

250

0

!

NOT FOR CONSTRUCTION FOR REVIEW PURPOSES ONLY

SHEET

500

Richard A. Jones, P.E. FL P.E. No. 31118

G-2

Job: 0202- 02-ES Scale:

J.J.O.

Appro...ed:

" ' '' \

'

UI ! 0) I I I

'

\ \

\

' \

PROPOSED (f\ ACCESS ROAD~

I

\, \

\ \

!1 I

lI , I

R. A.J.

Drawn:

'

I

I

Oeslgo: Che

n

uI

As Shown

5- 31- 2017

Date'

C-1

I

C-2a

C-2b

C-3a

C-6b

C-6a

\

'

C-3b

~---

- - - - -

-,-~ 1

C-7b

C-7a

e

150

0

.300

NOT FOR CONSTRUCTION FOR REVIEW PURPOSES ONLY

SHEET Richard A. Jones, P. E. FL P.E. No. 31118

G-4

Job: 0202- 02-ES Sedle:

Oat·:

PROPERTY BOUNDARY

A& Shown

5- 31- 20 17

o..19n'

R.A.J.

Ora"":

J.J.O.

Ch·cke

Approved:

i / '/

;i

_ ..L_ 37

PROPOSED BERM ACCESS RAMP@

I

I

36

I I

I

I

I

I

1 I I

I

~

-- -

30 29

,,.. ,p~]

/

26

I

I I

I I

I

r

11111

L

-

-

. t.11~

P-dsiht-~ >i Pi.G

_j_~

I I

I C1

2s.6'

11

1· 00

I I

I

r,:r,. --:I

.

'

'

' @Pfi' t I I

I

I

I

I

I

I I I I I I I I I 111 I I I

I I

I

I /;

-

- !' ''

.;JtrJi~,~ ' '

T1

EL :

I

-

' : :

--- '1'-: '

'

I

I 1<.U>J I ATU ,.~

AA-

=.h~~ ' '

I

I

't 32· :f-=l F= =-=A=Si· ' J·o· I

' ' '

I ~9! 28· I

r

I

: 6 · 00

33· I

l0.5'

!

oJ?:

1 13,r> I 315-

noo

C-1

1· 27

2&·

, 2S·

BASELINE" PROfiL£ SCALE - 10; 1 (H:V)

.

J I

~

I I I

I

I I

I

I I

I

I I I I

I I I I I I I I

I

I

I I 1 I I I I

I I I I I I X" I - - - _l LERo.E!!.S.E.l :t BERMi.= ".J _ ___ _ l_I 34 _ .b3i--1-+-1--1-1-1-!-+-1--i-+-i-+--1--1H--+1""t...11 ""' ir, 1"''1-'+vl ~_Tfff?' I I r I _L....., - -1...J I T-1 I I _J I 2 '-l--1- ,_.i- T 11 - 'i - I

~~~

--H---

I

I

I I

I

I I I I

I I

I

I

IT -i-__ _ I L---+--_J_[_ ::-:; I 1 A E1x1, , N ; I

I

- -

I

I

:i::.--

u

A

I

I

I

I I

37

~:

I_ ,. 1 33

i L GIRO J 0 1

32

I '- -

3~ 9 -l -_,_~_+=-+~ --~~~==~-:=.~-=.~;_-:;_~~.~~~~~~~~-l-· ~l-+-l-l--J.-l-'--+ _ l -l-+.-;-l--1-l-l--l-l-4--l-~+-+ l -1--1-1-+-1-1-+-1-+-+~~-:-i-;~ t,-_+t_1_~~32l9~

""'REMOVE ""'- EXISTING FENCE

I I I I I I I I I I I I L GIRO ' "D

I I I

I

I

:

3 · 00

2 · 00

J

I

I

I

!- - :

I

0 · 00

REMOVE EXISTING FENCE

I

I

I

2S

/

I

I

I -~~9'~E9Ji,~ ,.,.

/ m TEJ·,IV -

28

27

BERM

-

I I I I I I I I I I I '

~- - --f-- --

- -r

31

I

I I I I

I

32

I

I

I I

I

33

I I I

PROPOSED

~1 1-!POUNOMENT

EXISTING SWALE

I

l!

EXISTING DITCH

~

CONNECT PROPOSED BORROW DITCH TO EXIS TING SWALE

REMOVE EXISTING FENCE

t

~oo

- - - -- - - - --

1

,

" t7Q.l.00

I

I , I

I 171 ~00

t72..f.OO

t73+00

z 50

_,_,_,_.,_,_.,_, ,_,,_,_~

:,

I I

25

!

:

1 1

I I

1 1 I

j

A.

w t:

~~

!:

ti)

...

174+66

~ u

BASELINE" PROFILE SCALE - 10: I (H: V)

PROPOSED (C'\ BORROW DITCH ~

ffi

PROPER TY BOUNDARY

PROPOSED IMPOUNOMENT BERM~

NOT FOR CONSTRUCTION FOR REVIEW PURPOSES ONLY

SHEET Richard A. Jones. P. E. FL P. E. No. 31 118

C-1

Job: 0202- 02-ES

As

Seal e~

Shown

5- 31- 20 17

Date: Oesl9n:

R.A.J.,

Drawn:

J.J.O.

Ch.eck~d :

Approved:

22.5__.,..40 I-

_ ...d.P.RJ 20SE!L -.,,. "--tf'EI E

:

35

30

--

I-

25

1-

1 -

II-

"°' :

GR<*JNH-

,.--

A

20-J::==F===J=====~,==:;:::=J::==F=~l===!=::::J:==*'==l= · ·,·u=='F===!=::::J:==:J::::::::!:::==f:=:::;::::::j:==:;==J::==F=~ 0

20

10

30

so

40

Sl:Al.E

60

8

CROSS SECTION

EASEMENENT"

'

;:."'

~

= 2:1 (H: \/)

70

80

100

90

2:-L

I

20

120

110

I

0

I

10

'-~ ,.:-.:.

'

2.

20-J::==F===!=::::J:==:J::::=l===F==!=::::J:==:;:::=l===F= 1=!= 1:0====:J::::=l===F==!==l===i==l===F===l=====I I I I 40 so 60 70 80 90 100 110 0 10 20 30 120 P(

,, - .

EXIS.TI. -G~OO I -

25

~

I

;

-

I

'

I

I

I

30

20

so

40

C

CROSS SECTION Sl:Al.E 2:1 (H; V)

=

.,,.._

J

35

- 1 -r -

~

FE

I

30

'

''

-

25

___!rt

N

-

__

-

10

0

'

-22:

I

-

I L EI

20

40

.lO

50

60

D

70

----

PR\lt'0 E

-~

90

80

-' ,

I

100

110

-

l

20

30

40

35

I-

--

- _::reai ,e.osffi::: ..,,.... F_. '

-...-,..__ 1- -

25

--- ,J,

'

'

30

-

~~SI, NG V-

-

.....::-

--

,_

0

' 10 '

I

~

I

=

F=

---4-'Y-

-

G

H:O- ...(.

I

~

-----"T"-

I-

I

I

80

70

I 110

I

i

I 110

100

120

CROSS SECTION Sl:Al.E = 2:1 (H; V)

:/4~

e- -

I-

25

I

I

I 80

70

35 30

QI'

90

I

100

I

I

120

-

I

-r-:::= i -r- =b J-/' I l= fcXI ~NGR · N I _,_ _, _ -

.L

_/l'

"

'

-+-'

~ -22;

.

10

20

.lO

40

50

~

CllOSS SECTION 2'1 (H:\/)

I-

I

I

,,

-

I

__L_ -

-

II-

,.

I

I

0

IENI E- :::;;:

I /

'

-l-

" X sn~c. ~

.,..

/

- .!=-;:

20

I

110

I ROSE

I

11:0

60

70

-iI 80

90

I

I

100

110

120

CROSS SECTION

en

SCALE - 2: 1 (H: V)

tzw

. - - - - - - - - - - - - - - - 110.0 - - - - - - - - - - - - - - - .

-.-

70

60

I

'

80

90

-

I-

25

'

1- -

-Efi;~ ~~·-¥--f-+--+--l-" -"1 --1--1--lf--V-,-+-+-ll-·I" ~ ~~EN-T- - 1 -

I

I

35 30

- ·l'li( ~EiL " FEN -1~ I

- -} - - 1-

-

-

- '

'

,

EXISTIN~ -

·GR~MI

, "

1qio

!

I

0

200

10

k

-

100

110

en .J w

120

0 H

= 2:1 (H: V)

10

110

CllOSS SECTION

120

CROSS SECTION

SCALE= 2'1 (H; V)

2

Sl:Al.E

= 2: 1 (H; \/)

- - - - - - - - - - - - - - - 110.0 - - - - - - - - - - - - - - - <

I

--

"

~. ' -- ....~·z_ ,...._

20

I

_,

-

,,

-

I

40-i===i:::::;====::;::::::::;::::::;:::::::;==;::=::;:::::::;::::==::::;:==;::=:;::::::==::::;:::::::;:::::;==;::::::;::::::::::;=:=i::==i:~ ...,i eruieosbH--f--11---i--1---1--1---1-i-~-1--r-1--1··EX s.TI11c;.,, ---17GE I fENl· E-

sj-

H -

"

- +~=t=::

z z c :c u

_c

--+rn 35-1--f--l--'::+::!::t::~:~::~::+::t::~·_,r-f-~-t"~~t:°~ji=-~_j"~~_:f~=~-f--l--I 1

-- ~=~=±===--= -

--1-

I

......

.'>

~+

22:5 -

-~

I

I

40

-

~

--1- h

-J,L

' L:l= -

I

30

,_ -

I

-l

25

20

-

a:

t- CD

;

110.0 40

t-

-

1

I I I I I I I

w

w A. Q ::E w-

l-_-1-_-1-::.-::.t==~'°' ....o..;._ - -~ --1- - - ·- - -hi;ili·:--~·~'~i::3E~l~3E;.1::=1: 1 :::t:::i :-- - j _ _... _ _;;Y-+~~r- --·- - = ! 71 P, OP SEC ~ _ , _

""'~ '"

IM2"jfO

.J

-> co

l=~=:t:~::::;F-*==T!~=l=:t:;;.,,4+ ' -- _ _..,,,_ ==l-= -i=-;7i=__i_ :::.~-::: .,. -1::::::i=:.t:::t=1

F=

CllOSS SECTION Sl:Al.E

-

::E

-R

-,-

I

llEM N'.I:

30 -l--lf-+-~~f---i--lf--+"'<'+_,,_+--+-l-+--i-+--~f-,l<.,--f--;--+-i--1--1-1

I ~

so

40

30

-

I

60

--t..7" --!FE~ i::~ -

'

I

:0

Sl;Al.E -

'

l--l--l--'>---~-+--+--"·-·l--¥-~+--+-- 1 --1--+-~ l-4"--l-+--~-+--l--l-I

-'-

I

-

·-

I

60

PROP ~s"'

~

35 -1--+--l--l-+--+-+-~-l--l--+-+--l-->-+----l--+~-l-+--l---+-l--I

.L..~..

'

20

=

-, ~

~~~

50

11.v11H

I

..:::-.. -

I

~

I

' - N$E-

=-----~

~- '

-nr-

20

e;xs:n.

'

~

I

-

.s±

~eR<

- - - - - - - - - - - - - - -110.0 - - - - - - - - - - - - - - - t

110.0

40

-

~

QlOSS SECTION

*I

J DITCH TQB l

~

I - I-' -

·-

40

/

- -l-r ,,,.,

I

SCM..E - ?;:1 ( H:'I/)

EXISTING

L\..-

-

'

I I

10

0

120

~

.2:

..<: .

;

__L_ -

I

- 1-

20

I

- '

-

_,_

I

=

GR

I-

-.r.--

!

25

' ;l>IN

iMRRQ5 ~'i.t

--

'.:....-! FB I::~

1

I

I I I

-

110.0

EX~~~~

I ~ea

. -bl=::

I-

30

"=-

I I

I

'

i - r-

I

1

~ ·-.:;.. =±=; ' -.:

' I

L~/-

'

'

, 20

-

;....

-

_t=.i.

JJN" -

G~

'I'

10

I

I

R »

r

1!:0

'

11 0.0

40

>l<

-

v.,...

-

..:r-

I

50

@

'E :G

-

--1

,.

CROSS SECTION Sl;Al.E

IMPROl/1 MEI

;

I

70

= 2:1 (H'\/)

J"R( PO : n.C~ANN

I I

60

'

b ' 80

i

I

90

-

,_ -

100

NOT FOR CONSTRUCTION

I-

I

110

120

0

10

20

30

40

50

@

60

70

CROSS SECTION Sl;Al.E

= 2'1 (M·\/)

80

90

100

110

120

0

10

20

30

40

50

@

60

70

CROSS SECTION

90

FOR REVIEW PURPOSES O NLY

SCALE= 2:1 (H:V)

SHEET Richard A. Jones, P.E. FL P.E. No· .311 18

SD-2

SHELL ROCK 'RO@ ELEV = 32.S'

~CCESS

,__

O

0

---------

-1

---------

------

Job' 0202- 02-ES Seale:

Oote1

BO~ROW

BORROW DITCH TOB

-- -- -- --·-

DITCH TOE

As Sh.own

5- 31- ·2011

Oesl9n:

R.A.·.i-

Ordwn:

J.J.O.

Cheeked: Approved:

2' OEEP RIP- RAP PLACED ON SIDE SLOPE AND BOHOM OF POND, UNDERLAY 'MlH GEOTEXTILE FABRIC PROFILE VIEW :(

~ 3:1

PRQVIDE CONDUIT SUPPOR T

SHELt ROCK ACCESS ROAD. EL.EV = 32.5'

0

Pf(OFILE VI EW 1

0 -

3: 1

3: 1 -

PROPOSED UGPL FROM PO~ POLE 40 LF OF 24" DISCHARGE PIPE

2 1 LF OF 24" DISCHARGE PIPE W/FLAP GATE

SHELL ROCK ACCESS ROAD ELEV = 32.5'

34.2'

- 27.4'l.fAo ~~ ~~~~~-

PUMP ON

26.4'- PUMPS OFF'

30.5' AVG. rnSTING GROUND ELEV AT PUMP

o· - - -

6" COMPACTED SHELL ROCK ON ACCESS ROAD

2' DE.EP RIP- RAP PLACED ON SIDE SLOPE ANO BOTTOM OF SUMP, UNDERLAY l'llTH GEOTEXTILE FABRIC

19.0' SUMP BOTTOM

NAVO

88

PEAK EOF STAGE

-==========================~~~§~~iD~~J>I~~~~~~~-=

L[:::\CONCRETE PUMP S!JMP PIT, ~ TOP OF SLAB ELEV = 31, 2'

CONCRETE RIP- RAP BAGS

2' DEEP RIP- RAP PLACED ON SIDE SLOPE /\NO BOTTOM OF PONO, UNDERLAY WITH GEOTEXTILE FABRIC

PROFILE VIEW 1

1 - - - - - -25" MIN. SEPARATI ON FROM _ _ _ _-1 BERM TO BORROW SITE

6'x6'x10.5'

ffi

PRECAST SLUICE GATE SUMP

- - - - - 1 5'

IMPQUNDMENT BERM cl TOB ELEV = 36.2' ~

BORROW CONCRETE PUMP SUMP, ~ SEE PROFILE l/IEW 1

---------------------------- ~~~~~-

J 4 7' TOP OF SUMP WALL

30.5' AVG. __________ f_:;::_:;::_:;::_:;::_:;::4_T EXIS TING GROUNO I I I I 1

27.9' LAG---~---------- -!~ ----!- 1 PUMP ON 27.4 LEAD - - ----;--1-1 - - - - ->- ,_._\ PUMP ON 26.4 - - L l- - - - - - .LI ":-' PUMPS OFF I I I I

26.0'

INV. ELEV

I I

!!

1\,..-- & "'.._ _ __.._ _

19.0' SUMP I I ~ '- 24 2' SUMP BOTTOM ,;. _ ,.. / : :--------WALL BOITOM _ _ _ _ _ _...J.:...._-----~~ I. f ~/ I I 2' DEEP RIP- RAP PLACED ON ~ ~=-====~~ SIDE SLOPE AND BOITOM OF - -- - - - - - - " " - - - - - -"' - - ' ~~~fi:x~~~E~~~ICl\ll TH

' ,

._

6" COMPACTED SHELL ROCK ON ACCESS ROAD

42" x 100' HOPE DOUBLE WALL CULVERT

PROFILE VIEW 2

,______ 25'

MIN. SEPARATI ON FROM _ _ _ __.

BERM TO BORROW SITE

NOT FOR CONSTRUCTION FOR REVIEW PURPOSES ONLY

SHEET

®PUMP STA TION DETAIL

Richard A. Jones, P. E.

FL P.E, No. 31118

CD-1

---23

24

25 28

3 22

11

IMP L OMENT AREA

19

18

17

16

15

'14

12

13

---LEGEND

~

PROPOSED DITCH

~ Q

Ditch

Dlteh Fiii

Dltd>Flll

Ditch

Ditch Fiii

Ditch Fill

Fill

Area

Volume

Area

Volume

ID

(so fH

Isa ftl

k v yol

1.

1517 1486 2418 2113 1683 1901 2375 2392 2075 15873

lcv ydl 6t

Fill ID

1S

2325

16 17 18 19 20 21 22

1639

6l 61 61 61 61 61 195 2611 100 1 101 1697 1679

2

3 4

5 6 7

8 9 10 II

l2 13 14

61

1839

61 61 61 61 61 80 61 678 61 61

3'53

&l

1926

1175

61 Total Fill Area a3.96acres

i

23 24 25 26 27

1867 2639 2883 2673 2844

29742 1326 "13773 35183 23387 7459

1062

·-

EXISTING DITCH

"[;j

SCALE:

35 -

_,,,_

~:5"-mv. 30 " ----"-'·

:

:-P

25

- - -'iE-EpAGE 01.t.c·

20

0

'

'

'

-

50

M

1·- 40'

~

BERM

PROPOSED ROAD

0

jllj

PROPOSED DITCH FILL

300

TYPICAL IMPOUNDMENT BERM CROSS SECTION 40

0 0

-:al ~p6u Nsg~ENT

0

600

TYPICAL CHAN NEL B DIVERSION CROSS SECTI ON

2'1 (H:I/)

SCALE:

1"- 4-0'

1:1 (H: I/)

' 35

IMl'O 110 1.16111-T- ARI A - W517M ·~ WY· f -

-

30 25

W.!it >

' 100

'

20~ 150

0

50

100

28 2615 120 Total Fill Volume = 10428.26tubicyards

nsulting Services, Inc.

Figure 1 Highlands County BCC IMWID · Phase II Proposed Ditch Fill Details

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas