You can copy from here when filling out the rest of the page.
INSTALLATION OF WATER CONTROL STRUCTURES IN ST. MARY PARISH
NAME OF APPLICANT: Central Boat Rentals, c/o: Reid A. Miller, P.O. Box 223, Franklin, Louisiana 70538
LOCATION OF WORK: Located on Shell Island on two unnamed channels near Big Hog Bayou south of Morgan City, Louisiana, in St. Mary Parish (29.515833, -91.338611), as shown within the attached drawings. (HUC: 08080101, Atchafalaya River Watershed)
CHARACTER OF WORK: Installation of treated timber water control structures (30’ and 20’ in length) across two existing unnamed channels at Shell Island. No wetlands are proposed to be impacted; therefore, the applicant has not proposed a compensatory mitigation plan.
JOINT PUBLIC NOTICE
November 13, 2017
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
7400 Leake Ave.
New Orleans, Louisiana 70118-3651
Project Manager:
Bobby Quebedeaux
(504) 862-2224
bobby.d.quebedeaux@usace.army.mil
Application #: MVN-2017-1258-WJJ
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ ] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
INSTALLATION OF WATER CONTROL STRUCTURES IN ST. MARY PARISH
NAME OF APPLICANT: Central Boat Rentals, c/o: Reid A. Miller, P.O. Box 223, Franklin,
Louisiana 70538
LOCATION OF WORK: Located on Shell Island on two unnamed channels near Big Hog
Bayou south of Morgan City, Louisiana, in St. Mary Parish (29.515833, -91.338611), as shown
within the attached drawings. (HUC: 08080101, Atchafalaya River Watershed)
CHARACTER OF WORK: Installation of treated timber water control structures (30' and 20' in
length) across two existing unnamed channels at Shell Island. No wetlands are proposed to be
impacted; therefore, the applicant has not proposed a compensatory mitigation plan.
The comment period for the Department of the Army Permit will close 15 days from the
date of this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit must be submitted so as to be received before or by the last day of
the comment period. Letters concerning the Corps of Engineers permit application must
reference the applicant's name and the Permit Application Number, and be forwarded to the
Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals
or parties may request an extension of time in which to comment on the proposed work by
writing, faxing, or e-mailing the Corps of Engineers Project Manager listed above. Any request
must be specific and substantively supportive of the requested extension, and received by this
office prior to the end of the initial comment period. The Section Chief will review the request
and the requestor will be promptly notified of the decision to grant or deny the request. If
granted, the time extension will be continuous to the initial comment period and, inclusive of the
initial comment period, will not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Copies of this public notice are being sent to the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species. Based on the
South Louisiana Standard Local Operating Procedure for Endangered Species (SLOPES), as
signed on October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and the
U.S. Fish and Wildlife Service, it has been determined that the project is located in waters
known to be utilized by the Western Manatee and determined that the activity is not likely to
adversely affect this species. If this permit is issued, the permittee will be required to the follow
the SLOPES condition: "Standard Manatee Conditions for In-Water Activities".
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may
result in the destruction or alteration of unknown acres of EFH utilized by various life stages of
red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
You are invited to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure
PRELIMINARY
ME A
&
Miller Engineers & Associates, Inc.
FOR PERMITITTING ONLY
THIS DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION, BIDDING, RECORDATION,
CONVEYANCE OR SALES
REID A. MILLER
LA. LICENSE NO. 28559
PRELIMINARY
ME A
&
Miller Engineers & Associates, Inc.
FOR PERMITITTING ONLY
THIS DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION, BIDDING, RECORDATION,
CONVEYANCE OR SALES
REID A. MILLER
LA. LICENSE NO. 28559
PRELIMINARY
ME A
&
Miller Engineers & Associates, Inc.
FOR PERMITITTING ONLY
THIS DOCUMENT IS NOT TO BE USED
FOR CONSTRUCTION, BIDDING, RECORDATION,
CONVEYANCE OR SALES
REID A. MILLER
LA. LICENSE NO. 28559