SHIPPING DOCKS AND BULK MATERIALS FACILITY IN CAMERON PARISH, LOUISIANA
Name of Applicant: Bell Tech Group, INC, 3309 Kaliste Saloom Rd., Lafayette, LA 70508, ATTN: Michael Bellard
Location of Work: The project is located at the mouth of the Calcasieu River Shipping Channel and the Gulf of Mexico, within Cameron Parish, Louisiana, as shown on the attached drawings. (Lat 29.7576, Long -93.3454) within the Calcasieu Watershed.
Character of Work: Excavate 505,908 cubic yards of waterbottoms, and place spoil to create land, build the Bell Tech A,B,C & D Docks with bulkheads and a 13,329 linear foot access road, all to construct a loading and off-loading facility for bulk materials, aggregate, etc., to supply for other local ventures and facilities. In addition, 404,118 cubic yards of aggregate material and 5,700 cubic yards of asphalt will be placed on site to construct the proposed project.
A Corps of Engineers jurisdictional determination (JD) is presently pending; and a preliminary wetland delineation by the applicant indicates that the project will impact approximately 47.5 acres of vegetated wetlands and approximately 90 acres of non-vegetated waterbottoms. Following a final JD by the USACE, should variations and additional wetlands and/or waterbottoms show to exist and/or be impacted, a secondary Public Notice and/or resource agency notification will be issued, subject the extent of differences in jurisdiction and impacts.
JOINT PUBLIC NOTICE
November 13, 2017
U.S. Army Corps of Engineers
New Orleans District
Attn: Regulatory Branch
7400 Leake Avenue
New Orleans, LA 70118
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, LA 70821-4313
Project Manager:
Michael H. Herrmann
(504) 862-1954/ (504) 862-2574 fax
michael.h.herrmann@usace.army.mil
Application # MVN-2016-00584-WLL
Project Manager:
Elizabeth Hill
(225) 219-3225
WQC Application Number:
WQC 171106-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers
and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 U.S.C. 403); and/or [X] Section 404 of the
Clean Water Act (86 Stat. 816; 33 U.S.C. 1344).
Application has also been made to the Louisiana Department of Environmental Quality for a
Water Quality Certification (WQC) in accordance with statutory authority contained in La. R.S.
30:2074(A)(3) and provisions of Section 401 of the Clean Water Act (P.L. 95-217; 33 U.S.C.
1341).
SHIPPING DOCKS AND BULK MATERIALS FACILITY IN CAMERON PARISH,
LOUISIANA
Name of Applicant: Bell Tech Group, INC, 3309 Kaliste Saloom Rd., Lafayette, LA 70508,
ATTN: Michael Bellard
Location of Work: The project is located at the mouth of the Calcasieu River Shipping
Channel and the Gulf of Mexico, within Cameron Parish, Louisiana, as shown on the attached
drawings. (Lat 29.7576, Long -93.3454) within the Calcasieu Watershed.
Character of Work: Excavate 505,908 cubic yards of waterbottoms, and place spoil to create
land, build the Bell Tech A,B,C & D Docks with bulkheads and a 13,329 linear foot access road,
all to construct a loading and off-loading facility for bulk materials, aggregate, etc., to supply for
other local ventures and facilities. In addition, 404,118 cubic yards of aggregate material and
5,700 cubic yards of asphalt will be placed on site to construct the proposed project.
A Corps of Engineers jurisdictional determination (JD) is presently pending; and a preliminary
wetland delineation by the applicant indicates that the project will impact approximately 47.5
acres of vegetated wetlands and approximately 90 acres of non-vegetated waterbottoms.
Following a final JD by the USACE, should variations and additional wetlands and/or
waterbottoms show to exist and/or be impacted, a secondary Public Notice and/or resource
agency notification will be issued, subject the extent of differences in jurisdiction and impacts.
The comment period for the Department of the Army (DA) permit application and the
Louisiana Department of Environmental Quality WQC will close 20 days from the date of this
joint public notice. Written comments, including suggestions for modifications or objections to
the proposed work, stating reasons thereof, are being solicited from anyone having interest in
this DA permit and WQC request and must be mailed, so as to be received before or by the
last day of the comment period. Letters concerning the DA permit application must reference
the applicant's name and the DA Permit Number, and be mailed to the U.S. Army Corps of
Engineers at the address above. Similar letters concerning the WQC must reference the
applicant's name and the WQC Number and be mailed to the Louisiana Department of
Environmental Quality at the address above. Individuals or parties may request an extension of
time in which to comment on the proposed work by writing or e-mailing the Project Manager
listed above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the decision
to grant or deny the request. If granted, the time extension will be continuous to the initial
comment period and, inclusive of the initial comment period, will not exceed a total of 30
calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must
be balanced against its reasonably foreseeable detriments. All factors which may be relevant
to the proposal will be considered, including the cumulative effects thereof; among these
being: conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and
other public interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data.
Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work may effect species listed as endangered, and
may effect habitat designated as critical to the survival and recovery of endangered species
listed by the U.S. Department of Commerce. Based on the South Louisiana Standard Local
Operating Procedure for Endangered Species (SLOPES), as signed on October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, it
has been determined that the proposed activity may affect the Piping Plover (Charadrius
melodius) and the Red Knot (Calidris canutus rufa) and their Critical Habitat due to project
construction. It has been determined that the 90 acre dredge footprint is located in waters
known to be utilized by the West Indian Manatee (Trichecus manatus) and determined that the
activity is not likely to adversely affect this species. If the subject permit is issued, the permittee
will be required to the follow the SLOPES Manatee Conditions for In-Water Use.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of approximately 137 acres of possible EFH utilized
by various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally managed
fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need
for mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the U.S. Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Louisiana Department of Environmental Quality before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that
a public hearing be held to consider this application. Requests for public hearings shall state,
with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are invited to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure
"
"
'
"