PUBLIC NOTICE: The sponsor is proposing to develop the Cliffside Park Wetland ILF (Cliffside Park) site within the boundaries of Cliffside Park.
PROJECT DESCRIPTION AND PURPOSE: The sponsor is proposing to develop the Cliffside Park Wetland ILF (Cliffside Park) site within the boundaries of Cliffside Park. This project is proposed to generate enough wetland mitigation credits to offset 12 advanced mitigation credits sold in the Southwestern Lake Michigan service area by the WWCT ILF program. In addition, the project is needed to restore historically lost wetland types in the service area, to reduce urban and agricultural runoff into Lake Michigan, and to enhance wildlife habitat.
SPONSOR:
Wisconsin Department of
Natural Resources
(WDNR): Wisconsin
Wetland Conservation
Trust In-Lieu Fee (ILF)
program
REFER TO: MVP-2013-00984-RMG
Public Notice
ISSUED: 13 November, 2017
EXPIRES: 12 December, 2017
SECTION:404 - Clean Water Act
1. WETLAND COMPENSATORY MITIGATION: ILF SITE PROPOSAL
2. SPECIFIC INFORMATION
SPONSOR'S ADDRESS:
Wisconsin Department of Natural Resources (WDNR)
Wisconsin Wetland Conservation Trust (WWCT) ILF program
101 S. Webster Street
P.O. Box 7921
Madison, Wisconsin 53707
PROJECT LOCATION: The project site is located in the NE quarter of Section 7 of Township 4 North,
Range 23 East, Racine County, Wisconsin. The approximate coordinates are 42.8243390 degrees
North, -87.8185940 degrees East.
SERVICE AREA: The proposed ILF service area is the Southwestern Lake Michigan service area.
DESCRIPTION OF PROJECT: The sponsor is proposing to develop the Cliffside Park Wetland ILF
(Cliffside Park) site within the boundaries of Cliffside Park. Forty-six acres of drained wetlands are
atop of the bluff overlooking Lake Michigan, and have mapped hydric soils (Ashkum silty clay loam AtA). Approximately 37 acres are proposed for the project site.
Pre-settlement maps (1837) designate this area as Southern mesic and dry-mesic forest. Southern
mesic forest was dominated by maple, basswood and beech; dry-mesic forest was dominated by a
variety of oak (red, white and black oak) and hickory species. These areas were historically protected
from fire. The site was cleared of trees and farmed in a 1937 aerial photo that is the earliest photo
available. The Bordner Economic Survey that was researching land cover in Racine County in 1934
shows cropland and pasture in Cliffside Park.
An estimated 9 acres of wetlands were observed on-site and were further indicated by Wisconsin
Wetland Inventory mapping. These wetlands would be eligible for enhancement credit through
increased functionality of at last two wetland values. Other areas mapped as Potentially Restorable
Wetlands (approx. 24 acres) make up a majority of the site and contain drain tile. Restoration via reestablishment credits would be achievable in these areas. Lastly, about four acres of the site is
mapped as containing non-hydric soils which (some) may be eligible for buffer.
The proposed wetland restoration project would focus on removal or disabling of drainage features to
restore natural hydrology and the enhancement of native wetland vegetation. While some of the site
may be existing wetland, it still has active drainage features that the sponsor proposes to disable or
remove. By disabling these drainage features, the sponsor expects to restore the historic hydrology to
the wetland, thereby slowing down and retaining flood waters from further eroding the bluffs along
Lake Michigan.
Regulatory Branch (2013-00984-RMG, Southwest Lake Michigan Service Area: Cliffside Park site)
NEED AND OBJECTIVE OF PROJECT: This project is proposed to generate enough wetland
mitigation credits to offset 12 advanced mitigation credits sold in the Southwestern Lake Michigan
service area by the WWCT ILF program. In addition, the project is needed to restore historically lost
wetland types in the service area, to reduce urban and agricultural runoff into Lake Michigan, and to
enhance wildlife habitat.
The objective of this project is generally to restore high-quality wetland community types for critical
and endangered species, slow soil erosion, and improve water quality to Lake Michigan. Specifically,
the project will re-establish, re-habilitate, and enhance approximately 37 acres of wet-mesic prairie,
shrub-carr, and Southern mesic forest. We estimate that the site can generate about 20 credits. At
this time, a wetland delineation or soil survey has not been completed so it will be hard to determine
what portion of the site will qualify as upland and wetland and which area is ideal for each community
type restoration. The types and acreages described in this notice are estimates and will be adjusted
after initial surveys are completed in spring of 2018.
This project would fulfill several of the tenants of the HUC-8 Watershed Goals and Objectives outlined
in the WWCT Instrument. First, the project site is located within a high opportunity watershed where
significant wetland loss has occurred - over 70% of sedge meadow/wet mesic has been lost to
agriculture and development. The 37-acre site includes approximately 24 acres of mapped Potentially
Restorable Wetlands, and approximately 9 acres of mapped wetland (Wisconsin Wetland Inventory).
Second, the project site is located within a Conservation Opportunity Area along Lake Michigan and
functions as a migratory and wintering bird location. Restoration of this wetland site would create a
larger stopover site for migrating birds. Third, the project site will provide functional buffers which will
protect it from adjacent adverse impacts including home development expansion. Buffers will be
placed along the western boundary of the bank site, adjacent to landowners and development which
have increased drainage to the project site. Fourth, the project site will preserve critical habitat
Wisconsin species of special concern including the Cream Gentian. Results of the Natural Heritage
Inventory indicate state endangered resources are present within the proposed bank site. These
species will benefit greatly from enhanced habitat at this project site. Lastly, Cliffside Park is a
designated special coastal area per the Southeast Wisconsin Regional Planning Commission
(SEWRPC) and the Wisconsin Coastal Management Program (WCMP). This project listed as "Highly
Critical" in the completed Nine Element Wind Point Watershed Restoration Plan. The Plan lists this
area as "potentially restorable" and the recommendation as "Investigate possibility to restore
hydrology and native vegetation as part of a potential wetland mitigation bank".
ESTABLISHMENT, OPERATION AND MANAGEMENT: In order to produce detailed construction
plans, a solid understanding of the system is needed. Future field assessment will include a
topographic survey, vegetation evaluation, and a geomorphic assessment to determine important
design parameters and possibilities. These field activities will be supplemented with spatial analysis in
GIS. Hydrology and hydraulic analyses will build on these data by identifying an appropriate
hydrologic regime and how the energy associated with these regime flows are distributed within the
existing and proposed channel. One option is to conduct very shallow scrapes to generate enough
soil to create small berms (no more than 1 foot in height) in the far northeast of the site to slow water
right before it gets to the bluffs and to fill drainage ditches.
The above proposed alterations shall be guided by the presence of any endangered resources
identified on the site. An Endangered Species Preliminary Assessment indicates that state
endangered resources may be present within the project area, so further ER review is recommended.
Soil disturbance to create scrapes may be determined impossible depending on ER identified.
Page 2 of 7
Regulatory Branch (2013-00984-RMG, Southwest Lake Michigan Service Area: Cliffside Park site)
Field work conduced in the summer of 2017 found evidence of drainage and tiles. As indicated in
aerial photos, drain tiles appear to run north/south within the southern portion of the site, and
east/west within the northern portion of the site. Two shallow tree lined ditch runs east west directing
surface flow toward the bluff. Along the western parcel boundary, adjacent to the residential homes,
were puddles (approximately every 25 feet) where possibly drain tiles are functional but inundated by
adjacent land use. An exposed PVC drain tile was also observed along one of the recreational paths
on the eastern border of the proposed ILF site. Most of the site interior was dry, however some
patches of reed canary grass coupled with 2017 aerial photos indicate some tile failure within the
southwestern portion of the site. A few additional areas appear to show narrow, linear sunken areas
where it would appear that some older clay drain tiles have collapsed, creating shallow ditches where
excess water is being directed off the site.
The site is connected by a series of shallow drainage ditches and drain tiles. The sponsor proposes
disabling these drainage features to the greatest extend possible as they are accelerating water
leaving the site and moving water towards the eroding bluffs. While some of the site may be
delineated in the future as wetland, the sponsor believes that re-establishing a historic hydrologic
condition will allow for a more complete wetland restoration. A wetland delineation of the entire site is
needed to determine the extent of disturbed wetlands currently found in the fields and drainage ways.
Pre-construction hydrology monitoring wells will be installed in spring 2018 to understand hydrologic
conditions before and after restoration efforts.
A vegetation inventory shall be done in early summer 2018 including a rare plant inventory so that any
restoration work avoids rare plants. Invasive and non-native species will be inventoried and mapped
as well. There is a small pocket of cut-leaved teasel on site that the sponsor will control before it
spreads. There are also stands of reed canary grass in wet areas, and buckthorn and box elder found
throughout the site.
Based on the field work including hydrology, topography, vegetation and soils the sponsor will design
a concept plan for restoration that shall seek to remedy surface water erosional forces, expand
wetland habitat and native plant species that will provide high quality habitat. Grading plans and
construction ready documents shall be generated after concept plans are finalized. The final products
shall include construction ready grading plans, erosion control plans, native vegetation planting plans
and management plans. The final implementation shall include construction, maintenance, adaptive
management, long-term management, and monitoring plans.
Maintenance of the site will require periodic prescribed fire and possible invasive, non-native species
control using techniques such as mowing and herbicide application. The site will be managed for five
to eight years to meet interim and final performance standards. The vegetation plan shall prioritize
planting with native species to provide native food and habitat for migratory birds. Management plans
for the 37 acres shall focus on managing the restored wetlands for migratory bird species. Buffer
along the western project site boundary at 100' wide will add up to approximately 3.85 acres of buffer.
All buffers will have performance standards and all wetland buffers will be managed consistent with
the adjacent wetland community type. In addition, some trails may be maintained through or around
the restoration area; trails will also incorporate a narrow buffer zone.
This project site will result in a sustainable net of wetland area and gain in wetland function through
the removal of drain tile, increased soil saturation, and maintenance and amendment of the existing
native seed bank through the removal of invasive, non-native species and encouragement of native,
non-invasive species growth. The project will remedy surface water erosion and improve water
quality to Lake Michigan. Critical species and endangered resource are known to the site and
surrounding area and will benefit from the improved habitat provided by this project.
Page 3 of 7
Regulatory Branch (2013-00984-RMG, Southwest Lake Michigan Service Area: Cliffside Park site)
The restoration site will be actively monitored and managed for at least five, but up to ten years;
monitoring reports will be submitted annually or every-other year as appropriate to assess how the
site's vegetation and hydrology are being enhanced. The sponsor proposes to limit public access
during construction and early in the restoration period to allow for the site to establish.
OWNERSHIP AND LONG-TERM MANAGEMENT: The Sponsor of the mitigation site is the
Wisconsin Wetland Conservation Trust. The projects primary consultant is Tallgrass Land
Conservation LLC working with Racine County and others for the restoration planning, construction,
and monitoring and maintenance of the Cliffside Park site. Racine County Public Works, as the
landowner, and the Root-Pike Watershed Initiative Network will participate as partners in planning and
operation of the mitigation site.
An easement will be placed on the property by the WDNR to further protect this site for wetland
mitigation purposes. A draft of this easement will be included in the draft compensation site plan.
Long-term, Racine County will continue to retain ownership of the site. A long-term endowment will be
used to fund management activities such as burning and invasive species control. The sponsor does
not propose any structures that will need to be kept in working order for this project.
TECHNICAL FEASIBILITY AND QUALIFICATIONS: The site is bordered to the south by more of the
County Park with a large ravine separating the two areas, to the west by multiple residential
properties, which are situated uphill from the restoration site, to the north by Wisconsin Electric Power
Company, and to the east by Lake Michigan. The geomorphic position of the site and its neighboring
landowners allow this site to be able to restore hydrology completely and effectively without negatively
impacting neighboring properties. The site is accessible with equipment so as to facilitate ease of
restoration mobilization, and the size of the site is reasonable at about 37 acres. Feasibility of the
project will be dependent upon striking a balance whereby surface water is retained through
hydrologic restoration without further destabilizing the bluff.
The site does not contain extensive non-native invasive species but does include some stands of
aggressive native dogwoods in addition to some reed canary grass and a handful of other less
established invasive species. Neighboring parcels do not appear to include many invasive species
either, so there is not much seed source of invasive species in the immediate area. There are some
small areas of reed canary grass that will targeted for treatment and monitoring moving forward. We
propose to manage the site for invasive native species to increase species richness and habitat
quality.
The project will be beneficial in that it will not only restore drained wetlands but will expand wetland
habitat in a site that currently harbors uncommon bird species due to a large block of wooded and
open habitat along the shoreline. The project site shall continue to provide human use value through
recreational opportunities to the public such as cross-country skiing and hiking. Due to proximity to
residential land use, however, hunting and trapping would not be allowed on the site.
Tallgrass Land Conservation, LLC sponsored, designed and built the Bass Creek Wetland Mitigation
Bank in Afton, Wisconsin, a 102 flood-plain forested wetland complex at the confluence of the Rock
River and Bass Creek. Since 1997, Tallgrass Restoration, LLC has had continued success with
restoring and maintaining native ecosystems throughout Wisconsin, Illinois, Indiana, Ohio, Michigan,
Iowa, and North Dakota.
Thompson & Associates Wetland Services has provided environmental assistance on wetland issues
and projects throughout Wisconsin since 1998. Thompson & Associates staff includes certified
Professional Wetland Scientists with the Society of Wetland Scientists, staff certified by the WDNR as
Endangered Resource Reviewers since 2011, and WDNR "assured" wetland delineators.
Page 4 of 7
Regulatory Branch (2013-00984-RMG, Southwest Lake Michigan Service Area: Cliffside Park site)
RA Smith National staff working on this project have more than 40 years of water resources
engineering and project management experience focused on water resources projects, primarily in the
areas of storm water management and flood control to solve surface water problems in the Midwest.
Staff have successfully managed feasibility studies, preliminary engineering designs, and preparation
of construction plans and specifications for surface water management projects including: sewers,
stormwater detention facilities, streambanks, channel modifications, and levees. They have managed
projects for a variety of clients including large and small municipalities, county agencies, consulting
firms, and private businesses.
ECOLOGICAL SUITABILITY: The project expands wetland habitat in a site that currently harbors
uncommon bird species due to a large block of wooded and open habitat along the shoreline. Current
research on migratory birds and stop over habitat highlight the need for high quality stop over sites
along migratory routes for birds to rest, and refuel. Migration is a time of high mortality. Cliffside Park
provides a diversity of habitats on the Lake Michigan flyway and wetland restoration with native
species within this complex can significantly improve habitat by providing shallow water and a food
base. Early reconnaissance has documented old field vegetation with a number of native species
already colonizing the site, including prairie grasses, such as big bluestem, and wetland grasses,
such Muhly grass. This high degree of native species is a good indicator of restoration success.
The site is not currently inundated with invasive, non-native species and contains several acres of
Wisconsin Wetland Inventory wetlands, which were evidenced upon identification of several wetland
plant species during a recent site visit. Additionally, many more acres of Potentially Restorable
Wetlands are mapped for the site. These acres appear to have been drained decades ago for
farming and since left fallow. The existing drainage network that can be disabled makes this site a
good candidate for wetland restoration. In addition, the long history of agricultural uses and urban
landscape have negatively impacted the existing wetland quality. By removing drain tiles, filling
ditches, and enhancing the existing community with additional trees, shrubs, and/or herbaceous
seeds, the sponsor expects to greatly improve the quality of the wetland and habitat for both
permanent and migratory wildlife.
HYDROLOGY: Pre-settlement forest would have had a variety of highs and lows or micro-topography
formed by woody debris and tree tips that would pool and slow surface water. This microtopography
was destroyed by farming practices including removal of trees and woody debris, tilling, and
sedimentation and grading to flatten the landscape. The sponsor proposes to partially fill the two
existing drainage ditches, and construct small berms at the eastern end of each ditch, to release
water flow slowly toward the bluff. Some fill will be obtained onsite, supplemented with material
sourced locally.
A sub-foot topographic survey and County GIS topographic mapping will be used to understand and
modify surface water. The offsite drainage area shall be calculated as well. The sponsor will explore
the modifications to hydrology including the surface drains and the presence of sub-surface drain tile
using tile probes, or possibly a mini back hoe to trench potential drain tile areas. The team will
investigate soils within the areas that lend themselves to wetland restoration. All artificial drainage,
both ditches and tiles, will be disabled/removed to the greatest extent practicable to restore the
wetland's hydrology to historic conditions.
It will be necessary with this project to balance retaining surface water for wetland restoration without
further destabilizing the eroding bluff. Thoughtful engineering will be required to develop a restoration
plan that will un-focus surface runoff, which is currently focused to discharge points and cutting the
ravines, which are contributing to erosion of the cliff. Care shall be taken to ensure scrapes and berms
do not trap water too close to the cliff that will further the loss of the slope.
Page 5 of 7
Regulatory Branch (2013-00984-RMG, Southwest Lake Michigan Service Area: Cliffside Park site)
CURRENT LAND USES: Currently, there are shallow surface drainage-ways draining towards the
bluff and concentrating flow, contributing to ravine and bluff erosion. There is likely sub-surface drain
tiles that are typical of hydric soils in this region. The drainage-ways are focusing water on the
currently eroding Lake Michigan "Clay Seepage Bluff' - listed as "unique" by the Wisconsin
Department of Natural Resources. Aerial photo from 2005 shows drainage features, the likely location
of drain tiles. Invasive herbaceous species identified onsite and aerial photos from 2017 indicate
some drain tile failure. Also seen in the 2017 aerial are two ditches directing flow toward the bluff via
winding ravines located outside of the proposed project site.
The drained wetland area has been released from farming for decades. There is a diversity of habitats
reclaiming the agricultural land including open prairie species with milkweed, asters, goldenrods, wild
bergamot, sneezeweed, and Indian grass, a shrub thicket with gray and red osier dogwoods,
cockspur hawthorn, high bush cranberry, blackcap and nannyberry, and some tree species including
ash, apple, prairie crabapple and black walnut. Surrounding the site is an early successional forest
dominated by cottonwood, ash, buckthorn, aspen and box elder. Unfortunately, many of the green ash
on the site are dead or dying of Emerald Ash borer infestation and much of the site is dominated by
only 2-3 species of shrub. The site cover is estimated at about 60% native, non-invasive species and
40% invasive, non-native species.
The site is drained by narrow ditches that are approximately three to five feet wide and one foot deep
as well as a network of aging drain tiles. The ditches are seasonally active with standing water flowing
towards the Lake Michigan bluff face, contributing to bluff erosion. During the mild winter of 20162017, ice was found congregating in these areas and clearly draining into the eroded ravines and
bluffs.
COORDINATION WITH RESOURCE AGENCIES: This project has been coordinated with the United
States Environmental Protection Agency.
3. FEDERALLY-LISTED THREATENED OR ENDANGERED WILDLIFE OR PLANTS OR THEIR
CRITICAL HABITAT
None were identified by the bank sponsor or are known to exist in the action area. However, Racine
County is within the known historic range for the following Federally-listed species:
Northern Long-Eared Bat
Hibernates in caves and mines swarming in surrounding
wooded areas in autumn. Roosts and forages in upland forests
during spring and summer.
Rufa Red Knot
Along Lake Michigan.
Rusty Patch Bumblebee
Grasslands with flowering plants from April through October,
underground and abandoned rodent cavities or clumps of
grasses above ground as nesting sites, and undisturbed soil for
hibernating queens to overwinter.
This notice is being coordinated with the U.S. Fish and Wildlife Service. Any comments it may have
concerning Federally-listed threatened or endangered wildlife or plants or their critical habitat will be
considered in our final assessment of the described work.
Page 6 of 7
Regulatory Branch (2013-00984-RMG, Southwest Lake Michigan Service Area: Cliffside Park site)
4. JURISDICTION
This proposal is being reviewed in accordance with the practices for documenting Corps jurisdiction
under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act
identified in Regulatory Guidance Letter 16-01.
5. HISTORICAL/ARCHAEOLOGICAL
The Corps will review information on known cultural resources and/or historic properties within and
adjacent to the project area. The Corps will also consider the potential effects of the project on any
properties that have yet to be identified. The results of this review and the Corps' determination of
effect will be coordinated with the State Historic Preservation Officer independent of this public notice.
Any adverse effects on historic properties will be resolved prior to the Corps authorization of the work
in connection with this project.
6.
PUBLIC HEARING REQUESTS
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, in detail, the
reasons for holding a public hearing. A request may be denied if substantive reasons for holding a
hearing are not provided or if there is otherwise no valid interest to be served.
7.
REPLIES/COMMENTS
Interested parties are invited to submit to this office written facts, arguments, or objections within 30
days of the date of this notice. These statements should bear upon the suitability of the location and
the adequacy of the project and should, if appropriate, suggest any changes believed to be desirable.
Comments received may be forwarded to the applicant. A copy of the full prospectus submitted by
the Sponsor is available to the public for review upon request.
Replies may be addressed to:
Rebecca Graser, Wisconsin Program Manager
Regulatory Branch
St. Paul District Corps of Engineers
250 N. Sunnyslope Road, Suite 296
Brookfield, WI 53005
Or, IF YOU HAVE QUESTIONS ABOUT THE PROJECT, call Rebecca Graser at the Brookfield,
Wisconsin office of the Corps, telephone number (651) 290-5728.
To receive Public Notices by e-mail, go to: http://mvp-extstp/list_server/ and add your information in
the New Registration Box.
Chad Konickson,
Chief, Regulatory Branch
Enclosure(s)
Page 7 of 7
2013-00984-RMG, Page 1 of 5
2013-00984-RMG, Page 2 of 5
2013-00984-RMG, Page 3 of 5
2013-00984-RMG, Page 4 of 5
2013-00984-RMG, Page 5 of 5