Citrus County. H. Robert Eggleston III. Tampa, Florida. PROJECT PURPOSE: Basic: Gasoline Station. Overall: To construct infrastructure and a stormwater management system for the construction of a Gasoline Service Station & Store.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:

APPLICANT: H. Robert Eggleston III

8902 N Dale Mabry Hwy Suite 200

Tampa, FL 33614

WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Hunter Spring Run, Crystal River-Homosassa River Frontal watershed. The WaWa Gas Station is located at US 19 & SR 44, in Section 21, Township 18 South, Range 17 East, Cristal River, Citrus County, Florida.

Directions to the site are as follows: To access the project area take Suncoast parkway north and merge into State Road (SR) 98 West Ponce De Leon Blvd. Turn right onto US 19 (SR 98) North Suncoast Blvd and travel approximately 13 miles north. The project is located at north of the intersection of US 19 & SR 44 Gulf to Lake Highway.

APPROXIMATE CENTRAL COORDINATES:

Latitude: 28.899028°

Longitude: -82.586472°

PROJECT PURPOSE:

Basic: Gasoline Station

Overall: To construct infrastructure and a stormwater management system for the construction of a Gasoline Service Station & Store.

EXISTING CONDITIONS: The project area includes a 1.01-acre restaurant site, a 4.29 acre vacant tract (Jacobs Trust) and a .067 acre vacant portion of the larger Crystal River Middle School property. The 1.01 acre site is completely paved and has no on-site stormwater treatment system. Land use maps show most the Jacobs tract and the school board site as stream and lake swamp, FLUCCS 6150. This land use type is usually found on but not restricted to river, creek and lake floodplain or overflow areas. This category has a wide variety of predominantly hardwood species of which are red maple, river birch, water oak, sweetgum, willows, tupelos, water hickory, bays, and ash and button bush.

The wetland is a mixed hardwood swamp with bay, red maple, sweet gum, black gum, laurel oak and cabbage palm.

On the north side of the Jacobs Trust tract and the school board property is a canal that runs east/west. There is also a ditch/canal that goes into the Jacobs Trust tract perpendicular to the north canal. The habitat on the south side is completely developed and there is a road on the east side.

PROPOSED WORK: The applicant seeks authorization fill ±0.893 acres of waters of the United States in the form of wetlands for the development of a 3.35 acre property for the construction of a Wawa Gas Service Station. The project involves demolishing the restaurant and constructing a WaWa store. The wetland fill will isolate 0.02 acres of the wetland owned by the Suncoast Credit Union which is included in the UMAM calculations for 0.913 acres of impact.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has worked diligently to minimize the impacts to the wetland and setback. The Wawa layout took into consideration the natural site characteristics, projected customer traffic, and the nature of the customers expected for the demographics for this specific location. Wawa is utilizing its standard Florida prototype (f85) which consistent of a convenience store that is 6,119sf. Wawa operationally needs to have 50 parking spaces within a driveways length of the store. The parking count number is imperative given the customer counts they've seen in the over 100 stores they now operate in Florida. Given the narrow site characteristics for the southern portion of this project site where the store is located, Wawa is unable to place a row of parking along the south eastern boundary of the convenience store. This left Wawa with no choice but to add parking to the north side of the store in order to meet the necessary operational parking count. Wawa has created a designated boat/RV parking area as it is projected that there will be a lot of boat trailer traffic for this location given the proximity to the Gulf of Mexico and Crystal River. Moving the furthest north row of parking any further east will= create dangerous traffic conflicts with the boat parking area. The 100-year floodplain compensation has required a larger pond than originally estimated. As shown on the revised construction plans, the flood plain compensation and storm water pond occupies the entire upland habitat on the north side of the driveway to 6th Avenue. The size and location of these ponds are preventing the applicant from moving the parking from the north side of the building to the east and north of the trailer/RV parking spaces.

COMPENSATORY MITIGATION – The applicant has provided the following explanation why compensatory mitigation should not be required: There is not adequate habitat on site to compensate for this wetland impact. The filling into the wetland prevents a 25 feet setback to minimize secondary impacts. The loss of function to the wetland due to secondary impacts is provided on the UMAM analysis. The applicant is proposing to purchase 0.50 credits from the Upper Coastal/Old Florida Mitigation Bank: 0.486 credits for the wetland fill and 0.006 credits for the secondary impact. The applicant has a letter of availability and or reservation letter from the mitigation bank.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the (NLAA) the Eastern indigo snake (Drymarchon corais couperi). Additionally the Corps has determined the proposal would have no effect on the Florida scrub jay (Aphelocoma coerulescens), and the Red-Cockaded Woodpecker (Picoides borealis) or their designated critical habitat.

Eastern indigo snake (Drymarchon corais couperi): By letter dated 25 January 2010 and addendum dated 13 August 2013, the FWS states that projects analyzed with the 25 January 2010 version of the Indigo Snake Key in which the Corps reaches a “may affect, not likely to adversely affect” determination (A>B>C), the FWS hereby concurs with the Corps' determination in accordance with 50 CFR 402.14(b) 1, and no further consultation with the FWS is required.

Florida scrub jay (Aphelocoma coerulescens): The project area is within the consultation area for the Florida scrub jay, however there is no suitable habitat for the species. The Corps has made the preliminary determined the proposal would have “no effect” on the Florida scrub jay or its designated critical habitat. This determination is based on review of the Species Conservation Guideline, consultation maps and information available about the species’ preferred habitat.

Red-Cockaded Woodpecker (Picoides borealis): The Corps has determined that the proposed project “no effect” the RCW. The project occurs within the Consultation area of the endangered RCW, however No suitable habitat types exist on-site for the RCW, there are no open areas preferred by RCW’s for foraging and nest tree development. The nearest documented active RCW colonies 8 miles southeast and 9 miles north of the proposed project. This determination is based on review of the Species Conservation Guideline, consultation maps and information available about the species’ preferred habitat.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries as the project is inland of fisheries resources. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Edgar Garcia, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at edgar.w.garcia@usace.army.mil; by facsimile transmission at (813) 769-7061; or, by telephone at (813) 769-7062.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 10117 PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA 33610 REPLY TO ATTENTION OF

14 November 2017

Regulatory Division West Permits Branch Tampa Permits Section

PUBLIC NOTICE Permit Application Number SAJ-2017-02522(SP-EWG) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below: APPLICANT: H. Robert Eggleston III 8902 N Dale Mabry Hwy Suite 200 Tampa, FL 33614 WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Hunter Spring Run, Crystal River-Homosassa River Frontal watershed. The WaWa Gas Station is located at US 19 & SR 44, in Section 21, Township 18 South, Range 17 East, Cristal River, Citrus County, Florida. Directions to the site are as follows: To access the project area take Suncoast parkway north and merge into State Road (SR) 98 West Ponce De Leon Blvd. Turn right onto US 19 (SR 98) North Suncoast Blvd and travel approximately 13 miles north. The project is located at north of the intersection of US 19 & SR 44 Gulf to Lake Highway. APPROXIMATE CENTRAL COORDINATES: Latitude: 28.899028° Longitude: -82.586472°

PROJECT PURPOSE: Basic: Gasoline Station Overall: To construct infrastructure and a stormwater management system for the construction of a Gasoline Service Station & Store. EXISTING CONDITIONS: The project area includes a 1.01-acre restaurant site, a 4.29 acre vacant tract (Jacobs Trust) and a .067 acre vacant portion of the larger Crystal River Middle School property. The 1.01 acre site is completely paved and has no on-site stormwater treatment system. Land use maps show most the Jacobs tract and the

school board site as stream and lake swamp, FLUCCS 6150. This land use type is usually found on but not restricted to river, creek and lake floodplain or overflow areas. This category has a wide variety of predominantly hardwood species of which are red maple, river birch, water oak, sweetgum, willows, tupelos, water hickory, bays, and ash and button bush. The wetland is a mixed hardwood swamp with bay, red maple, sweet gum, black gum, laurel oak and cabbage palm. On the north side of the Jacobs Trust tract and the school board property is a canal that runs east/west. There is also a ditch/canal that goes into the Jacobs Trust tract perpendicular to the north canal. The habitat on the south side is completely developed and there is a road on the east side. PROPOSED WORK: The applicant seeks authorization fill ±0.893 acres of waters of the United States in the form of wetlands for the development of a 3.35 acre property for the construction of a Wawa Gas Service Station. The project involves demolishing the restaurant and constructing a WaWa store. The wetland fill will isolate 0.02 acres of the wetland owned by the Suncoast Credit Union which is included in the UMAM calculations for 0.913 acres of impact.

AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The applicant has worked diligently to minimize the impacts to the wetland and setback. The Wawa layout took into consideration the natural site characteristics, projected customer traffic, and the nature of the customers expected for the demographics for this specific location. Wawa is utilizing its standard Florida prototype (f85) which consistent of a convenience store that is 6,119sf. Wawa operationally needs to have 50 parking spaces within a driveways length of the store. The parking count number is imperative given the customer counts they've seen in the over 100 stores they now operate in Florida. Given the narrow site characteristics for the southern portion of this project site where the store is located, Wawa is unable to place a row of parking along the south eastern boundary of the convenience store. This left Wawa with no choice but to add parking to the north side of the store in order to meet the necessary operational parking count. Wawa has created a designated boat/RV parking area as it is projected that there will be a lot of boat trailer traffic for this location given the proximity to the Gulf of Mexico and Crystal River. Moving the furthest north row of parking any further east will= create dangerous traffic conflicts with the boat parking area. The 100-year floodplain compensation has required a larger pond than originally estimated. As shown on the revised construction plans, the flood plain compensation and storm water pond occupies the entire upland habitat on the north side of the driveway to 6th Avenue. The size and location of these ponds are preventing the applicant from moving the parking from the north side of the building to the east and north of the trailer/RV parking spaces. 2

COMPENSATORY MITIGATION ­ The applicant has provided the following explanation why compensatory mitigation should not be required: There is not adequate habitat on site to compensate for this wetland impact. The filling into the wetland prevents a 25 feet setback to minimize secondary impacts. The loss of function to the wetland due to secondary impacts is provided on the UMAM analysis. The applicant is proposing to purchase 0.50 credits from the Upper Coastal/Old Florida Mitigation Bank: 0.486 credits for the wetland fill and 0.006 credits for the secondary impact. The applicant has a letter of availability and or reservation letter from the mitigation bank. CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the (NLAA) the Eastern indigo snake (Drymarchon corais couperi). Additionally the Corps has determined the proposal would have no effect on the Florida scrub jay (Aphelocoma coerulescens), and the Red-Cockaded Woodpecker (Picoides borealis) or their designated critical habitat. Eastern indigo snake (Drymarchon corais couperi): By letter dated 25 January 2010 and addendum dated 13 August 2013, the FWS states that projects analyzed with the 25 January 2010 version of the Indigo Snake Key in which the Corps reaches a "may affect, not likely to adversely affect" determination (A>B>C), the FWS hereby concurs with the Corps' determination in accordance with 50 CFR 402.14(b) 1, and no further consultation with the FWS is required. Florida scrub jay (Aphelocoma coerulescens): The project area is within the consultation area for the Florida scrub jay, however there is no suitable habitat for the species. The Corps has made the preliminary determined the proposal would have "no effect" on the Florida scrub jay or its designated critical habitat. This determination is based on review of the Species Conservation Guideline, consultation maps and information available about the species' preferred habitat. Red-Cockaded Woodpecker (Picoides borealis): The Corps has determined that the proposed project "no effect" the RCW. The project occurs within the Consultation area of the endangered RCW, however No suitable habitat types exist on-site for the RCW, there are no open areas preferred by RCW's for foraging and nest tree development. The nearest documented active RCW colonies 8 miles southeast and 9 miles north of the proposed project. This determination is based on review of the Species Conservation Guideline, consultation maps and information available about the species' preferred habitat. 3

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries as the project is inland of fisheries resources. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610 within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Edgar Garcia, in writing at the Tampa Permits Section, 10117 Princess Palm Avenue, Suite 120, Tampa, Florida 33610; by electronic mail at edgar.w.garcia@usace.army.mil; by facsimile transmission at (813) 769-7061; or, by telephone at (813) 769-7062. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All 4

factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

5

WaWa

FIGURE 1 US 19 and SR 44 LOCATION MAP

c::::J

Project Boundary

Clementi Environmental Con1ultin9

610 EG1t Twi991 Street Suite 100 Tampa. fl SS601 www.clementi-ec.com 81 S-117-890 I

WaWa

Wetland Delineation Clementi Envitonmental Con1ultin9

Verified Wetland Boundaries

D

Project Boundary

6t0 EG1t Twi991 Sheet Suite too Tampa . l'l SJ60t

1 inch

100 feet

www.clementi-ec.com 81 S·tt7·890 I

I

I

/

I

II I

'

I

.,' ''I , II

.I

f

7

/

ii

!,,

.

'

I

,-~!~

'

~---- - - -r-, ~--.:.-'

'

~.

I I

I I

= --

/

I

---1

I

,'

I I

LEGEND

\ I

!·

\ -

OH- --

N

--s---- -w- - - E>CllT ~ ~

--r-----c----

s 0

50 1"=100'

Hr\2016\FlT160141\0RAWCNGS\EXHIBITSlCOE\FLT160t41EX6A.,OWGPRINTEDBY: JTAMARGO 9.27.\7 @4:39 PM tAST SAVED BY1JTAMARGO

CRYSTAL RIVER~ WA1NA

PROJECTNAME-

505 US-19 CRYSTAL RIVER, Fl 34429 SHEtTTillE

FIGURE6A DA.TE:

SCALE:

AS NOTED

PROJECT KUMBER:

CAD Ill:

0912612017

EX6A

FLT160141

~ ~N9l}x~a~R 3820 NORTHDALE BLVD., SUITE300B TAMPA. FL33624 PHONE: 813 812-4100 Ff\I.: 813 81&4101

100

DEMOLITION NOTES: 1.

BOHLER ENGINEERING FL, LLC IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. CONTRACTOR IS TO PROCEED WITH THE DEMOLITION IN A SYSTEMATIC AND SAFE MANNER, FOLLOWING ALL OSHA REQU REMENTS, TO ENSURE PUBLIC AND CONTRACTOR SAFETY.

2..

ALL DEMOLITION ACTIVITIES ARE TO BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AS WELL AS ALL FEDERAL, STATE AND LOCAL REGULATIONS. ANY DISCREPANCIES OR DEVIATIONS SHALL BE IDENTIF ED BY THE CONTRACTOR TO BOHLER ENG NEERING FL, LLC IN WRITING FOR RESOLUTION PR]OR TO NITIATION OF SITE ACTIVITY.

3.

PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR/TO: A THE CONTRACTOR SHALL OBTAIN A SUNSHINE STATE ONE CALL LOCATION CERTIFICATION PRIOR TO ANY EXCAVATION OR DEMOLITION. THE NUMBER IS Hl00-432-4nO. B. ENSUR NG COPIES OF ALL PERMrTS AND APPROVALS ARE MA NTAINED ON SITE AND AVAILABLE FOR REVIEW. C. INSTALL NG THE REQU RED SOIL EROSION AND SEO MENT CONTROL MEASURES PRJOR TO SrTE DISTURBANCE. D. LOCATE/CAP ALL UTILITIES AND SERVICES, INCLUD NG BUT NOT L MrTED TO GAS, WATER, ELECTRIC, SANrTARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WlTH N THE L MITS OF DISTURBANCE. E.. PROTECTING AND MAINTAINING N OPERATION, ALL ACTIVE SYSTEMS THAT ARE NOT BEING REMOVED DUR NG ALL DEMOLITION ACTIVITIES. F. FAMILIARIZ NG THEMSELVES WITH THE APPLICABLE UTILITY SERVICE PROV DER AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOUTION REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL PROVIDE THE OWNER WRrTTEN NOTIFICATION THATTHE EXJST NG UTIUT ES AND SERVICES HAVE BEEN TERM NATED AND ABANDONED IN ACCORDANCE WITH JURISDICTION AND UTILITY COMPANY REQUIREMENTS. 13. COORDINATION WITH UTILrTY COMPANIES REGARDING WORK NG "OFF-PEAK" HOURS OR ON WEEKENDS AS MAY BE REQU RED TO M N MIZE THE IMPACT ON THE AFFECTED PART ES. H. A COMPLETE NSPECTION OF CONTAMINANTS BY A LICENSED ENVlRONMENTALTESTING AGENCY, OF ALL BUILD NGS AND/OR STRUCTURES TO BE REMOVED. SAME SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL ENV RONMENTAL REGULATIONS. ANY/ALL CONTAM NANTS SHALL BE REMOVED AND DISPOSED OF BY A FEDERALLY LICENSED CONTRACTOR IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS. ALL ENVIRONMENTAL WORK INCLUDING HAZARDOUS MATERIAL, SOILS, ASBESTOS, OR OTHER REFERENCED OR MPL ED HEREIN ARE THE SOLE RESPONSIBILITY OF THE OWNER'S ENV RONMENTAL CONSULTANT.

4.

THE CONTRACTOR SHALL PROVIDE ALL THE "MEANS AND METHODS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT. OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER MPROVEMENTS THAT ARE REMA N NG ON OR OFF SITE THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS OF DAMAGE TO ALL ITEMS THAT ARE TO REMAIN AS A RESULT OF HIS.ACTIVITIES. ALL REPAIRS SHALL USE NEW MATERIAL. THE REPAIRS SHALL RESTORE THE ITEM TO THE PRE-DEMOLITION COND£TION.

5.

N THE ABSENCE OF SPECIFICATIONS, THE CONTRACTOR SHALL PERFORM EARTH MOVEMENT ACTIVITIES, DEMOLITION AND REMOVAL OF ALL FOUNDATION WALLS. FOOTINGS, AND OTHER MATERIALS WITHIN THE L MrTS OF DISTURBANCE N ,'l.CCOROANCE WITH DIRECTION BY QWNER'S STRUCTURAL OR GEO TECHNICAL ENGINEER.

6.

EXPLOSIVES SHALL NOT BE USED WlTHOUT PRIOR WRffTEN CONSENT OF BOTH THE OWNER AND APPLICABLE GOVERNMENTAL AUTHORIT ES. ALL THE REQUIRED PERMITS AND EXPLOSIVE CONTROL MEASURES THAT ARE REQUIRED B.YTHE FEDERAL, STATE, .AND LOCAL GOVERNMENTS SHALL BE IN PLACE PRIOR TO STARTING AN EXPLOSIVE PROGRAM. THE CONTRACTOR IS ALSO RESPONSIBLE FOR ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQU RED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURES.

7.

CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WlTH:THE ·MANUAL ON UN FORM TRAFAC CONTROL,· AS WELL AS FEDERAL STATE. AND LOCAL REGULATIONS WHEN DEMOLrTION RELATED ACTIVITIES MPACT ROADWAYS OR ROADWAY RIGHTS - OF -WAY.

B.

CONDUCT DEMOLITION ACTIVlTIES N SUCH A MANNER TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, WALKWAYS, AND OTHER FAC LITIES. STREET CLOSURE PERMITS MUST BE RECEIVED FROM THE APPROPRJATE GOVERNMENTAL AUTHORJTY.

9.

DEMOLITION ACTIVITIES AND EQUIPMENT SHALL NOT ENCROACH ON AREAS OUTSIDE THE DEFINED PROPERTY LINE WITHOUT WRITTEN PERMISSION OF THE OWNER, AND/OR APPROPRJATE GOVERNMENT AGENCY.

AD~ACENT

10. USE DUST CONTROL MEASURES TO LIMIT AIRBORNE DUST AND DIRT RISING AND SCATTER NG IN THE AR IN ACCORDANCE WITH FEDERAL STATE, AND/OR LOCAL STANDARDS. AFTER THE DEMOLITION IS COMPLETE, ADJACENT STRUCTURES AND MPROVEMENTS SHALL BE CLEANED OF ALL OUST AND DEBRJS CAUSED BY THE DEMOLITION OPERATIONS. THE CONTRACTOR IS RESPONS BLE FOR RETURNING ALL ADJACENT AREAS TO THEIR ·PRE-DEMOLITION" CONDmON. 11. CONTRACTOR IS RESPONSIBLE TO SAFEGUARD SITE AS NECESS.A.RY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF UNAUTHORIZED PERSONS AT ANY TIME 12. THIS DEMOLITION PLAN IS NTENDED TO IDENTIFY THOSE EXIST NG ITEMS/CONDITIONS WHICH ARE TO BE REMOVED. IT IS NOT INTENDED TO PROV DE D RECTION OTHER THAN THAT ALL METHODS AND MEANS ARE TO BE IN ACCORDANCE WITH STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONS BLE FOR ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE. 13. DEBRIS SHALL NOT BE BUR ED ON THE SUBJECT SITE ALL DEMOLITION WASTES AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL CITY. COUNTY, STATE. AND FEDERAL LAWS AND APPLICABLE CODES. 14. CONTRACTOR IS RESPONSIBLE FOR FIELD VER FYING ALL EXISTING SITE MPROVEMENTS ANO UTILITIES. ALL DISCREPANCIES SHALL BE IDENTIFIED TO THE ENGINEER IN WRIT NG.

15. ALL EXJSTING UT LITIES BE NG REMOVED SHALL BE DONE SO BY THE CONTRACTOR IN ACCORDANCE WITH STAIE AND LOCAL REGULATIONS.

NOTE TO SILT FENCE INST ALLER: TO FACILITATE ·EFFECTIVE' PRESERVATION OF TREES (THOSE WITH DRIP LINES DEPICTED ON PLAN) S l T FENCE SHALL NOT BE TRENCHED N WITH N DRIP LINES OF TREES WHERE AVOIDABLE. IF UNAVOIDABLE THEN EITHER NSTALL SILT FENCE AT GRADE (NO TRENCHING) OR USE HAY BALES N THESE LOCATIONS.

TREE BARBJ:CADE NOTE: TREE BARRICADES FOR TREES TO BE PRESERVED DURING CONSTRUCTION SHALL BE LOCATED AT THE DR PLINE, UNLESS OTHERWISE APPROVED BY THE ENVIRONMENTAL REVIEW STAFF, PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE DR PL NE SHALL BE DEFINED AS THE OUTER BRANCH EDGE OF THE TREE CANOPY. THE AREA WITHIN THE DRIP LINE SHALL REMAIN UNDISTURBED. THE FOLLOWING ACTIV£TIES ARE PROHIBITED WITH N THE DRIP L NE OF PRESERVED TREES: MACH NERY AND VEHICLE TRAVEL OR PARKING; UNDERGROUND UTILITIES; FILL NG, GRADE CHANGES, COMPACTION OF SO l. OR EXCAVATION; STORAGE OR CONSTRUCTION MATERIALS. THE TREE PROTECTION BARRICADES SHALL CONSIST OF CHAIN LINK FENCE (NEW AND USED) WITH A MINIMUM 5' HEIGHT, UNLESS OTHERWISE APPROVED BY THE PLANNING DEPARmENT.

H.'\2016\FLT160141\0RAWlNGSlEXHlBITS\COE\FLT160141EX6B.OWG PRiNTED SY: JTAMARGO 9.26. 17@ 1:52 PM LAST SAVED BY:-JTAMARGO

CRYSTAL RIVER- WA'vVA sos us.19

PROJECT NAME:

CRYSTAL RIVER, FL 34429 SHEET TITLE:

FIGURE6B SCALE:

I DAlE: NIAi

I CADIO: 09126120171

PROJECTNIJMSER:

EX6A

I

FLT160141

m

U.S. ARMY CORPS OF ENGINEERS PERMIT APP NUM: SAJ-2017-02522 DRAWING 4 OF 11 11/2017

WaWa

FIGURE 7 Proposed WaWa Proposed WaWa Clementi EnYi1onmental Con1ultin9

610 Ea/t Twi991 Sheet Suite too Tampa. rl SS60t

Verified Wetland Boundaries

D

Project Boundary

1 inch

100 feet

www.clementi-ec.com 81 S·tt7·8901

(UJ1·,(llTI hMIU)llMOO'~ ((HSUTlll'. UC

·

·0

I

50

-

1"=100~ I

H!\2016\Fl.Ti60141\DRAWfNGS\EXHIBITS\COE\FLT 16014-1EX7A.OWGPRINTEDBY; JTAMARGO 9.21tt7@ 2~01 FM LAST SAVED BY: JTAMARGO

PROJECT NA.VE:

CRYSTAL RIVER- WAWA 505 US-19 CRYSTAL RIVER, FL 34429

SHffillllE:

FIGURE7A SCALE

lll\TE:

AS NOTED

CAD ll:

09/26/'l017

PROJECT NOMBER:

EX6A

FLT160141

~ !3N911}E~1t~R 3820 NORTHDALE BLVD., SUITE300B TAMPA. FL 33624 PHONE: 81~ 812-4100 FAX: 813 812-4101

1 0

I

SITE NOTES: 1

ALL D MENSIONS ARE SHOWN AT FACE OF CURB, UNLESS OTHERWISE NOTED. B/C INDICATES D MENSION IS TO BACK OF CURB.

2-

All RADII DIMENSIONS ARE 3' TO FACE OF CURB UNLESS OTHERWISE NOTED.

3.

FREE STANDING SIGNAGE SHOWN ONLY FOR REPRESENTATIONAL PURPOSES. AND SHALL BE PERMITIED SEPARATELY.

4.

A RJGHT OF WAY PERMIT W LL BE REQUIRED FOR ALL WORK WITHIN THE PUBLIC RIGHT OF WAY. SPECIFIC STIPULATIONS OR CONDITIONS WILL BE MPOSED AT THE TIME OF PERMIT APPLICATION.

5.

CONSTRUCTION PLAN APPROVAL DOES NOT EXEMPT THE CONTRACTOR FROM OBTAIN NG THE REQUIRED BU LDING. ELECTRICAL. PLUMB NG AND MECHANICAL PERMITS. THESE INCLUDE BUT ARE NOT LIMITED TO ANY STRUCTURE, SIGN, WALL. ENCLOSURE OR SCREEN NG, ETC

6.

IN THE EVENT THE PROJECT IS TERM NATED PRIOR TO CONSTRUCTION COMPLETION, THE PROJECT SHALL BE BROUGHT TO GRADE, SEEDED AND ALL DEBRIS AND MATERIALS SHALL BE HAULED OFF-SITE AND DUMPED AT A STATE OF FLORIDA APPROVED FACILITY.

7.

ANY DAMAGED SIDEWALK OR CURB WITH N THE FOOT R.O.W. SHALL BE REMOVED AND REPLACED.

8.

All DISTURBED AREAS WITHIN THE fDOT R.O.W. WILL BE SODDED.

9.

STANDARD INDICES REFER TO THE LATEST VERSION OF FOOT "ROADWAY AND TRAFFlC DESIGN STANDARDS"

10. All WORK REQUIRING LANE CLOSURES SHALL BE PERFORMED SUNDAY THROUGH THURSDAY. 8:00 PM THROUGH 5 00 AM. 11

ALL POTABLE WATER, RECLAIMED WATER AND SANITARY SEWER CONSTRUCTION SHALL BE N ACCORDANCE WITH THE APPROVED CONSTRUCTION PLAN.

12. A FDEP WATER AND WASTEWATER PERMITS MUST BE OBTAINED PRIOR TO BEG NNING CONSTRUCTION. 13_ PROPER DOCUMENTATION FOR ALL PUBLIC UTILITY EASEMENTS SHALL BE PROVIDED TO THE PROPERTY MANAGEMENT DEPARTMENT PRIOR TO CERT FICATE OF COMPLETION. 14. UTILITY RECORD DRAWINGS ARE REQUIRED PRIOR T.O PLAC NG THIS WATER ANO WASTEWATER FAC LITIES NTO SERVICE. PLEASE SEE THE ADDITIONAL INFORMATION SECTION FOR NSTRUCTIONS.

ADA ACCESSIBILITY NOTES: 1.

ALL HANDICAPPED PARKING SPACES AND ACCESS AISLES ADJACENT TO THE HANDICAP PARKING SPACES SHALL HAVE A MAXIMUM OF 2% SLOPE IN ALL D RECTIONS (THIS INCLUDES RUNNING SLOPE AND CROSS SLOPE).

2.

AN ACCESS BLE ROUTE FROM THE PUBLIC STREET OR S DEWAU< TO ALL BUILD NG ENTRANCES MUST BE PROVIDED. THIS ACCESSIBLE ROUTE SHALL BE A MINIMUM OF 60" WIDE THE RUNNING SLOPE OF AN ACCESSIBLE ROUTE SHALL NOT EXCEED 5% AND THE CROSS SLOPE SHALL NOT EXCEED 2%.

3.

SLOPES EXCEEDING 5% BUT LESS THAN 8% WILL REQU RE A RAMP ANl:> MUST CONFORM TO THE REQUIREMENTS FOR RAMP DESIGN (HANDRAJLS, CURBS, LANDINGS). NO RAMP SHALL EXCEED AN 8% RUNN NG SLOPE OR 2% CROSS SLOPE.

4.

IN THE CASE THAT ANEW SIDEWALK WILL BE CONSTRUCTED IN THE RW OF A SITE THE RUNN NG SLOPE OF THE SIDEWALK SHALL NOT EXCEED 5% AND THE CROSS SLOPE SHALL NOT EXCEED 2%. THIS STANDARD APPLIES TO CROSS WALKS N THE DRIVEWAY AS WELL AND WILL REQUIRE SPECIAL ATTENTION DURING STAKING TO MAKE SURE THE 2% CROSS SLOPE IS MET IN THE CROSS WALK.

5.

IT Will BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE THAT THE HANDICAP PARKJNG SPACES, ACCESS BLE ROUTES, AND SIDEWALKS/CROSSWALKS ARE CONSTRUCTED TO MEET ADA REQU REMENTS.

6.

ANY REGUIREMENTS LISTED ABOVE THAT CAN NOT BE MET SHALL BE BROUGHT TO THE ENG NEER'S ATTENTION IMMEDIATELY. ANYTH ING NOT BUILT TO THE ABOVE STANDARDS WILL REQU RE REMOVAL AND REPLACEMENT OF THE NON COMPLIANT AREAS AT THE GENERAL CONTRACTORS COST.

FEM.A. MAP INFORMATION: THE PROPERTY SHOWN HEREON FALLS WITHIN FLOOD ZONE "AE", AS SHOWN ON THE FLOOD INSURANCE RATE MAP, COMMUNITY PANEL NUMBERS 12017C0189D, EFFECTIVE DATE SEPTEMBER 26, 2014. BASE FLOOD ELEVATION 8.0 {NAV.D.'88).

=

H:\2016\FlT16014 1\DRAWINGS\EXHfBITS\COBFLT160141EXJB.OWG PRINTED BY: JTAMARGO 926. \7@ 2:04 PM LAST SAVED BY.t JTAMARGO

CRYSTALRIVER -WAWA

PROJECT NAME;

505 US-19 CRYSTAL RIVER, FL 34429 SHEETTITI.E:

FIGURE7B SCAl.E:

Af3 NOTEDI DA1E:

I CADID: 09126/2Q17I

I PROJECT NUIA!lER: EX6AI

FLT160141

m

u_s_ARMY CORPS OF ENGINEERS PERMIT APP NUM: SAJ-2017-02522 11/2017 DRAWING 7OF11

WaWa

FIGURE 9 Proposed Wetland Impact WaWa and Ponds

25' Wetland Setback

-

Proposed Wetland Impact Clementi Envitonmental Con1ultin9

6t0 Ea/t Twi991 ltteet Suite t06

Verified Wetland Boundaries

CJ

Tampa.

Project Bo undary

1 inch

100 feet

n SS60t

www.clementi-ec.com 81 S·tt7·8901

==n___._. --

....

STORM WATER POND

100YR COMPENSATION POND

WETLAND IMPACT AREAS

ISOLATED WETLAND

~ ?D

~

) / ~

'~

~OEJJlltl/IOI

jioM:alJ,Jl'OIJStlt2XiJ

-"'

1Jp J 2 1·.a 11i~ 1;

i!

~

OMalltla&JflfOf

""""'

Mltl'l~~UllJfi ~

i.

B ~

~,

·I

~

I

I ""l>i

S in$_.,,.,, f#IJO

0 1"=100' Hi\2016'\F.LTit:',Q141\0RAWtNGS\EXHIBITSlCOE\FLT 160141EXQ8.DWG PRINTED BY: JTAMARGO 9.27. 17@ 4:50 PM tAST -SAVED BY: JTAMARGO

CRYSTAL RIVER ~ WAWA

PRo.N:CTNAl/E'.

505 US-19 CRYSTAl RIVER, Fl 34429

FIGURE9B SCALE

OA1E:

AS NOTED

PROJECT NUMBER:

CAil iil:

09/26f2()17

EX9B

FlT160141

~ !JN911}E~R~R 3820 NORTHDALESLVD., SUITE300BTAMPA. FL 33624 PHONE: 813 812-4100 FAX: 813 812-4101

~--(,F~~ Nl!d1.D'1l'E1ISIJUIUJ

-"'

I

I

I

\I I

,.. ....

__ I '

1

I I

l

a:~ I I

I

I

I

, I

,,,.

I

I

I

I

~

I I

I

--------

\

----- I

,'"i:: ,'

I I

,,,,-- \ ---1

I

I

'

I

I

\

I

( ··

'·I

\

I 1,

__ \

I

\ I

I

II -- ___ j

- .... ,~---'--- -_!

___ ' ,--

..,..

__ _

- ----1 0

37,521 SF WEllAND IMPACT ·~ 6,860 Y03 FlLL VOLUME ~-

1"=100'

H...-\2016'\FlT1601"41\DRAWINGS\EXHl8ITS\COE\FLT160141EX9C.OWG PRIITTED BY: JTAMARGO 9.27. 17@4-.:33.Pt.t LAST SAVED BY: JTAMARGO

CRYSTAL RIVER ~ WAWA

PROJECT NAiii?

505 US-19 CRYSTAL RIVER, FL 34429 SHEET llllE:

FIGURE9C SCALE

DATE:

AS NOTED

CAD ID.

09/26/2017

PROJECT NIJMSER:

EX6A

FLT160141

~ !t911}1t~a~R 3820 NORTHDALEBLVD., SUITE3008 TAMPA. FL 33624 PHONE: 813 812..\ 100 FM:. 813 812-4101

44.5' PROP BUILDING

13' PROP SIDEWALK PROP WETLAND UN

0

G 1,19

0

EXIST WETl.ANO LINE

o~o

0+50

1+50

2+00

SECTIONAel SCALE: 1"= 40' HORIZONTAL 1"= 8 'VERTICAL

10

10

4.29 G3,29 0

0

0·50

0+00

SECTION A-2 SCALE: 1'=40 ' HORIZONTAL 1'=8 'VERTICAL

H;\2016\FlT160141\0RAWCNGS'.EXHIBITS\COE\FLT160 141E:XQO.OWG PRINTED BY:JTAMARGO 10. 11.17@: 2.."14 PM LAST SAVED BY: JTA.MARGO

CRYSTAL RIVER~ WAWA

PROJ:CT NAllf:

505 US-19 CRYSTAL RIVER, FL 34429

~ BOHLER

SHEffTll\.E:

FIGURE9D SCALE:

OAIE:

AS NOTED

~ PROJECTNUMBER:

CAO Cl:

09/26/'2017

EX6A

FLT160141

RNGINERR.ING 3820 NORTHDALE BLVD., SUITE 3008 TAMPA, FL 33624 PHONE: 813 812-1100 FAX: 813 812'-4101

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas