City of Lincoln - Grade, pave, and widen Rokeby Road between South 70th Street and South 84th Street to urban standards, including curb and gutters with enclosed storm sewers; Improve the South 70th Street and South 84th Street intersections with Rokeby Road; Construct new intersections at Rokeby Road and South 73rd Street, South 77th Street, and South 80th Street; and Install storm water management facilities, sanitary sewer, water lines, and a trail crossing within the right-of-way of the road.

City of Lincoln - Grade, pave, and widen Rokeby Road between South 70th Street and South 84th Street to urban standards, including curb and gutters with enclosed storm sewers; Improve the South 70th Street and South 84th Street intersections with Rokeby Road; Construct new intersections at Rokeby Road and South 73rd Street, South 77th Street, and South 80th Street; and Install storm water management facilities, sanitary sewer, water lines, and a trail crossing within the right-of-way of the road.

PUBLIC NOTICE Application No: NWO-2015-01247-WEH Applicant: Craig Aldridge, City of Lincoln, Nebraska, Public Works and Utilities Department Waterway: Tributaries to Salt Creek, Beal Slough, Wagon Train Creek, and Adjacent/Abutting Wetlands Issue Date: November 15, 2017 Expiration Date: December 6, 2017 21 DAY NOTICE Reply To: NEBRASKA REGULATORY OFFICE 8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635

JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of Engineers, Omaha District, and the Nebraska Department of Environmental Quality (NDEQ), P.O. Box 98922, State House Station, Lincoln, Nebraska 68509. NDEQ will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. NDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. For the purposes of NDEQ, this public notice will expire 30 days from the issue date shown above. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). APPLICANT: Craig Aldridge, City of Lincoln Public Works and Utilities Department, 901 West Bond, Lincoln, Nebraska 68521 PROJECT LOCATION: Sections 27, 28, 33 and 34 , Township 9 North, Range 7 East, City of Lincoln, Lancaster County, Nebraska; 40.712017° North, -96.617626° West. PROJECT DESCRIPTION: The City of Lincoln is proposing the following: x x x

Grade, pave, and widen Rokeby Road between South 70th Street and South 84th Street to urban standards, including curb and gutters with enclosed storm sewers; Improve the South 70th Street and South 84th Street intersections with Rokeby Road; Construct new intersections at Rokeby Road and South 73rd Street, South 77th Street, and South 80th Street; and

1

x

Install storm water management facilities, sanitary sewer, water lines, and a trail crossing within the right-of-way of the road.

Basic Project Purpose: The basic project purpose, as defined by the Corps, is road construction. Applicant's Project Purpose: The project purpose, as stated by the applicant, is as follows: "The purpose of the proposed improvements is to: x x x x

Safely and effectively accommodate increased traffic volumes; Provide a planned rural to urban transition of paving and upgrading roads in urbanizing areas as the City annexes parts of the County; Concurrently construct other urban utilities and infrastructure at the same time as the road improvements to minimize expense, disruption, and impacts; these will include storm water management, sanitary sewer and water lines; and Provide for pedestrian and bicycle trail connectivity as shown in the City-County Comprehensive Plan (2017) and Lincoln MPO 2040 Long Range Transportation Plan (2017)."

Overall Project Purpose: The overall project purpose, as defined by the Corps, is to upgrade an existing segment of Rokeby Road between South 70th Street and South 84th Street from rural gravel road to urban roadway design and safety standards and to accommodate city-provided infrastructure. SPECIAL AQUATIC SITES: The proposed project would result in the discharge of fill material into Waters of the U.S., thus impacting 0.94 acre of PEMA/C floodplain depressional wetlands, 0.33 acre PFOA floodplain depressional wetlands, and 0.24 acre of PSSA floodplain depressional wetland. Proposed impacts to three, R4SB un-named tributaries total 255 linear feet. AVOIDANCE, MINIMIZATION, AND MITIGATION: Avoidance and Minimization: The applicant has considered alternatives to avoid, minimize, and mitigate impacts to waters of the U.S. Project impacts on wetlands and waters of the United States are unavoidable. Minimization measures included the use of roundabout intersections, use of vertical headwalls, modification of trail clearance standards, and minimization of the trail embankment. Mitigation: Permittee-required mitigation is being proposed at the City of Lincoln Wetland Mitigation Bank. Mitigation credits have not yet been determined. CULTURAL RESOURCES: The Corps of Engineers, Omaha District, will comply with the National Historic Preservation Act of 1966 and amendments, and the procedures set forth in 33 CFR 325, Appendix C. We have checked the National Register of Historic Places, and any 2

available site database information, and there are no known National Register sites in the vicinity. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. ENDANGERED SPECIES: Pursuant to the Endangered Species Act, a preliminary determination has been made that the described work may affect but is not likely to adversely affect species designated as threatened or endangered or adversely affect critical habitat. May affect, not likely to adversely affect: Northern Long-Eared Bat; No effect: Least Tern; Piping Plover, Whooping Crane, Pallid Sturgeon, Western Prairie Fringed Orchid, Salt Creek Tiger Beetle. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. This public notice serves as an application to the state in which the discharge site is located for certification of the discharge. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the state's opinion that the discharge will not violate applicable water quality standards. PUBLIC INTEREST REVIEW: The decision whether to issue the Corps' permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed / completed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against their reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 CFR Part 230).

3

COMMENTS: The Corps of Engineers is soliciting comments from the public, Federal, State, and Local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. Anyone whose interests may be affected by the proposed / completed work is invited to submit favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic system's functional values, cumulative and secondary effects, and endangered species. All comments received will be considered public information; copies of all comments, including names and addresses of commenters, may be provided to the applicant unless confidentiality is requested. Comments must be submitted on or before the expiration date (located at the top of the first page) of this notice to be considered in the subsequent actions on this application. PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the reason(s) for holding a public hearing. If the District Engineer determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. ADDITIONAL INFORMATION: Additional information about this application may be obtained by writing to Ms. Laura Banker at the address shown on page one, or by calling (402) 896-0896. You can also e-mail Ms. Banker at Laura.Banker@usace.army.mil. REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until the expiration date specified at the top of page one. NOTICE TO EDITORS: This notice purpose is provided as background information for your use in formatting news stories. This notice is not a contract for classified display advertising.

4

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas