Home

Omaha District

Run scraper

CITY OF CUSTER

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The City of Custer requests Department of the Army authorization to reconstruct Custer West Dam. The work will include deepening and reshaping the pond to improve recreational access, fish culture and improved wildfire fighting water access. Public access, parking, fishing piers, a playground area and a widened golf course fairway are all recreational improvements in the proposed project. The impacts to waters of the U.S. associated with the proposed project include 1.12 acres for dam reconstruction, 0.29 acres net open water fill area for pond shaping, and the net pond volume increase due to deepening is 37.6 acre-feet. The proposed park recreational improvements result in up to 0.77 acres of wetland fill. The proposed activity is located in Section 23, Township 3 North, Range 5 East, Custer County, South Dakota. The basic purpose of the project is to provide recreational opportunities and water supply for fire protection. The overall purpose of the project is to provide aquatic related recreation and water supply to fight wildfire near the city of Custer.

The City of Custer requests Department of the Army authorization to reconstruct Custer West Dam. The work will include deepening and reshaping the pond to improve recreational access, fish culture and improved wildfire fighting water access. Public access, parking, fishing piers, a playground area and a widened golf course fairway are all recreational improvements in the proposed project. The impacts to waters of the U.S. associated with the proposed project include 1.12 acres for dam reconstruction, 0.29 acres net open water fill area for pond shaping, and the net pond volume increase due to deepening is 37.6 acre-feet. The proposed park recreational improvements result in up to 0.77 acres of wetland fill. The proposed activity is located in Section 23, Township 3 North, Range 5 East, Custer County, South Dakota. The basic purpose of the project is to provide recreational opportunities and water supply for fire protection. The overall purpose of the project is to provide aquatic related recreation and water supply to fight wildfire near the city of Custer.

PUBLIC NOTICE

US ARMY CORPS OF ENGINEERS OMAHA DISTRICT

APPLICANT: CITY OF CUSTER, SOUTH DAKOTA APPLICATION NO: NWO-2013-0579-PIE WATERWAY: CUSTER WEST DAM, FRENCH CREEK ISSUE DATE: NOVEMBER 16, 2017 EXPIRATION DATE: DECEMBER 7, 2017

________________________________________________________________ Regulatory Office, 28563 Powerhouse Rd, Room 118, Pierre, SD 57501 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/SouthDakota.aspx _____________________________________________________________________________

21-DAY NOTICE JOINT NOTICE OF PERMIT PENDING US ARMY CORPS OF ENGINEERS AND SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES The application of the City of Custer, South Dakota (applicant) for approval of plans and issuance of a permit under authority of the Secretary of the Army is being considered by the District Commander, US Army Engineer District, Omaha, Nebraska. The project described herein is not being proposed by the Corps, but by the applicant; the Corps will evaluate the proposed work to determine if it is permittable under current laws and regulations. Description of Proposed Project: The applicant requests Department of the Army authorization to reconstruct Custer West Dam. The work will include deepening and reshaping the pond to improve recreational access, fish culture and improved wildfire fighting water access. Public access, parking, fishing piers, a playground area and a widened golf course fairway are all recreational improvements in the proposed project. The impacts to waters of the U.S. associated with the proposed project include 1.12 acres for dam reconstruction, 0.29 acres net open water fill area for pond shaping, and the net pond volume increase due to deepening is 37.6 acre-feet. The proposed park recreational improvements result in up to 0.77 acres of wetland fill. Location: The proposed activity is located in Section 23, Township 3 North, Range 5 East, Custer County, South Dakota. Purpose: The basic purpose of the project is to provide recreational opportunities and water supply for fire protection. The overall purpose of the project is to provide aquatic related recreation and water supply to fight wildfire near the city of Custer.

Mitigation: The applicant is currently evaluating alternatives to minimize the proposed park recreational improvements which, as currently proposed, may fill up to 0.77 acres of wetlands. Current conceptual options include avoiding the wetlands completely, minimizing wetland fill, and/or providing on-site compensatory mitigation for those wetland impacts that cannot be avoided. The open water impacts associated with the dam reconstruction and pond improvements will be evaluated to determine appropriate compensatory mitigation, if necessary. Existing Conditions: The West Dam & Gates Park area was originally constructed back in the 1940s for the purpose of recreation, fire protection, fish culture, and domestic stockwater. Subsequently, around 2012, the outlet works for the dam became non-functional and the pond was drained. The South Dakota Department of Environment and Natural Resources, Division of Environmental Services, 523 East Capitol Avenue, Pierre, South Dakota, 57501-3181, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The South Dakota Department of Environment and Natural Resources hereby incorporates this public notice as its own public notice and procedures by reference (ARSD 74:51:01). Omaha District will comply with the National Historic Preservation Act of 1966, as amended. We have checked the National Register of Historic Places and "its current supplements," and no property listed in the Register or proposed for listing is located in the permit area. This is the extent of our knowledge about historic properties in the permit area at this time. We will evaluate input by the State Historic Preservation Officer and the public in response to this public notice, and we may conduct or require a reconnaissance survey of the permit area or check for unknown historic properties, if warranted. In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposals must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food production, and, in general the needs and welfare of the people. In addition, the evaluation of the impacts of the project on public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 CFR Part 230). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of

2

this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reason for holding a public hearing. The request must be submitted to the US Army Corps of Engineers, South Dakota Regulatory Office, 28563 Powerhouse Road, Room 118, Pierre, South Dakota 57501. Any interested party (particularly officials of any town, city, county, state, Federal agency, Indian Tribe, or local association whose interests may be affected by the proposed work) is invited to submit to this office, written facts, arguments, or objections on or before December 7, 2017. Any agency or individual having an objection to the proposed work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this permit application. All replies to the public notice should be addressed to the address listed in the previous paragraph. Jeff Breckenridge, telephone number (605) 341-3169, ext. 3621, may be contacted for additional information. Comments received after the close of the business day on the expiration date of this public notice will not be considered. This project, if authorized, will be under the provisions of Section 404 of the Clean Water Act. Drawings showing the location and extent of the work are attached to this notice.

3

4

Figure 1: Location Map

5

Figure 2: Project Area

CHANNEL RESHAPING CUT AREA = 0.02 AC± LAKE AREA VOLUME TABLE

DAM RECONSTRUCTION OVERALL AREA = 1.10 AC± (REFERENCE CONSTRUCTION PLAN SHEETS 2.1 AND 2.4, AND TABLE THIS SHEET)

DAM RECONSTRUCTION TABLE

NORMAL WATER ELEVATION = 5348

CUT (CU YD)

EXISTING POOL

36.9 ACRE/FEET

PROPOSED POOL

74.5 ACRE/FEET

CUT/DREDGE

60,588 CUBIC YARDS

-20478

FILL (CU YD)

NET (CU YD)

+61*

-20417

*VALUE ADJUSTED BY FILL FACTOR OF 1.2

WETLAND BOUNDARY

INV=5336.64

2201 Jackson Blvd., Suite 200 Rapid City, South Dakota 57702 1-855-323-6342 www.bannerassociates.com

CONSULTANTS:

FISHING PIERS FILL AREA = 0.02 AC±

LEGEND FILL LAKE RESHAPING CUT AREA = 0.12 AC±

CUT LAKE RESHAPING CUT AREA = 0.11 AC±

PROJECT TITLE :

CUSTER WEST DAM RECONSTRUCTION

EXISTING STORMWATER RUNOFF CHANNEL FILL AREA = 0.37 AC± LAKE RESHAPING FILL AREA = 0.05 AC±

PROJECT LOCATION :

CUSTER SOUTH DAKTOA REV.

DATE

DESCRIPTION

WETLAND BOUNDARY WETLAND BOUNDARY FAIRWAY WIDENING FILL AREA = 0.50 AC± DRAWN BY:

CKM

DESIGNED BY: KRM CHECKED BY:

LAKE RESHAPING CUT AREA = 0.03 AC±

LAKE BOUNDARY

KRM

JOB NO:

22136.00

DATE:

10/2017

SHEET TITLE :

WETLAND BOUNDARY WITH FUTURE EXPANSION LAYOUT

LAKE INFLOW FILL AREA = 0.39 AC±

SHEET NO. :

1.2

Figure 3: Site Plan

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas