Home

Kansas City District

Run scraper

IMPLEMENTATION OF THE MISSOURI WETLAND MITIGATION METHOD (MWMM) . This notice is an informational notice only

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

IMPLEMENTATION OF THE MISSOURI WETLAND MITIGATION METHOD (MWMM) . This notice is an informational notice only, no comments are requested. The U.S. Army Corps of Engineers Districts within the State of Missouri (Kansas City, Little Rock, Memphis, Rock Island, St. Louis) (Corps) have adopted the MWMM on November 17, 2017. The MWMM is the primary tool the Corps will use for the evaluation of wetland impacts and mitigation proposals for Department of the Army permit actions within the State of Missouri. This MWMM will enhance the Corps ability to protect the Nation’s aquatic resources, while allowing reasonable development through fair, flexible and balanced permit decisions. PURPOSE: For projects approved pursuant to the Corps Regulatory Program with jurisdiction under Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and Section 404 of the Clean Water Act (33 USC 1344), the Corps of Engineers must require compensatory mitigation to offset losses of aquatic functions and services. The MWMM creates a tool to identify impacts to aquatic ecosystems (debits) and effects of mitigation actions (credits) so that debit and credits can be compared in like terms. Use of a standard assessment tool improves efficiency, communication and consistency and provides increased predictability in the mitigation design and evaluation process.

IMPLEMENTATION OF THE MISSOURI WETLAND MITIGATION METHOD (MWMM) . This notice is an informational notice only, no comments are requested. The U.S. Army Corps of Engineers Districts within the State of Missouri (Kansas City, Little Rock, Memphis, Rock Island, St. Louis) (Corps) have adopted the MWMM on November 17, 2017. The MWMM is the primary tool the Corps will use for the evaluation of wetland impacts and mitigation proposals for Department of the Army permit actions within the State of Missouri. This MWMM will enhance the Corps ability to protect the Nation’s aquatic resources, while allowing reasonable development through fair, flexible and balanced permit decisions. PURPOSE: For projects approved pursuant to the Corps Regulatory Program with jurisdiction under Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and Section 404 of the Clean Water Act (33 USC 1344), the Corps of Engineers must require compensatory mitigation to offset losses of aquatic functions and services. The MWMM creates a tool to identify impacts to aquatic ecosystems (debits) and effects of mitigation actions (credits) so that debit and credits can be compared in like terms. Use of a standard assessment tool improves efficiency, communication and consistency and provides increased predictability in the mitigation design and evaluation process.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas