EXCAVATION AND FILL FOR ACCESS AND FLOWLINES TO SERVE THE PROPOSED BADGER PROSPECT WELL IN LAFOURCHE PARISH

NAME OF APPLICANT: Tellus Operating Group, c/o T. Baker Smith, LLC, Attn: Boyd Boswell,107 Global Circle, Lafayette, Louisiana 70503 LOCATION OF WORK: Near Grand Bayou Canal section 10 and 15, T18S-R20E, approximately 4 miles southwest of the Larose, Louisiana, in Lafourche Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings.

CHARACTER OF WORK: The applicant has requested Department of the Army authorization to excavate and place fill for access to install two (2) 6” flow lines and drill the proposed Badger Prospect Well Location. Approximately 103,000 cubic yards of native water bottoms and marsh will be dredged and excavated. Approximately 7.5 acres of water bottoms will be temporarily impacted by dredging and approximately 9 acres of water bottoms will be permanently filled at an elevation of 6 feet above the normal water elevation to encourage brackish marsh re-establishment. In addition, approximately 4 acres of marsh will be permanently impacted by excavation and approximately 34 acres of marsh will receive 6 inches material by way of spray dredging for brackish marsh nourishment.

A Preliminary analysis has determined that the proposed project would directly impact approximately 16.5 acres of jurisdictional water bottoms. In addition, approximately 4 acres jurisdictional brackish marsh wetlands will be permanently impacted and approximately 34 acres of jurisdictional brackish marsh wetlands will be beneficially impacted in the form of marsh nourishment.

The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.

JOINT PUBLIC NOTICE November 20, 2017 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 701118

State of Louisiana Department of Environmental Quality Office of Environmental Services Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-1301 Project Manager Neil T. Gauthier Neil.T.Gauthier@usace.army.mil MVN 2017-00712-CM

(225) 219-3225 Project Manager Elizabeth Hill WQC Application Number WQC 170925-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act. EXCAVATION AND FILL FOR ACCESS AND FLOWLINES TO SERVE THE PROPOSED BADGER PROSPECT WELL IN LAFOURCHE PARISH NAME OF APPLICANT: Tellus Operating Group, c/o T. Baker Smith, LLC, Attn: Boyd Boswell,107 Global Circle, Lafayette, Louisiana 70503. LOCATION OF WORK: Near Grand Bayou Canal section 10 and 15, T18S-R20E, approximately 4 miles southwest of the Larose, Louisiana, in Lafourche Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings. CHARACTER OF WORK: The applicant has requested Department of the Army authorization to excavate and place fill for access to install two (2) 6" flow lines and drill the proposed Badger Prospect Well Location. Approximately 103,000 cubic yards of native water bottoms and marsh will be dredged and excavated. Approximately 7.5 acres of water bottoms will be temporarily impacted by dredging and approximately 9 acres of water bottoms will be permanently filled at an elevation of 6 feet above the normal water elevation to encourage brackish marsh re-establishment. In addition, approximately 4 acres of marsh will be permanently impacted by excavation and approximately 34 acres of marsh will receive 6 inches material by way of spray dredging for brackish marsh nourishment.

2 A Preliminary analysis has determined that the proposed project would directly impact approximately 16.5 acres of jurisdictional water bottoms. In addition, approximately 4 acres jurisdictional brackish marsh wetlands will be permanently impacted and approximately 34 acres of jurisdictional brackish marsh wetlands will be beneficially impacted in the form of marsh nourishment. The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed. The comment period for the Department of Army will close in 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

3

The US Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being sent to the State Archeologist and State Historic Preservation Officer. Our initial finding is that the proposed work would not affect any species, nor affect any habitat designated as critical to the survival and recovery of such species, listed as endangered by the U.S. Department of Commerce. Our initial finding is that the proposed work would not affect any species, nor affect any habitat designated as critical to the survival and recovery of such species, listed as endangered by the U.S. Department of Interior. The New Orleans District has discovered based on the Standard Local Operating Procedure for Endangered Species of Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers and U.S. Fish and Wildlife Service, Ecological Services Office that the proposed project is located in waters known to be utilized by the West Indian manatee and determined that the proposed activity is not likely to adversely affect the species with the inclusion of the special conditions specific to working in areas that could potentially be preferred habitat for the West Indian Manatee. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of up to 54.5 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate water quality standards will be required from the Department of Environmental Quality, Office of Environmental Services before a permit is issued.

4

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.

For

JOHN M. HERMAN Chief, Central Evaluation Section Regulatory Branch

30 15

M

Texas

is

si

ss

ip

p

i

Arkansas

0

30

60

Scale - Miles

L o u i s i a n a Coastal Zone Boundary

LOCATION

10/17/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_VICINITY_REV8.DWG

Gulf

of

Mexico

LOCATED APPROXIMATELY 4.7 MILES SOUTHWEST OF CUT OFF, LA. NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/4/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

DRAWN BY: DATE:

RRB

APPROVED BY:

01/12/2017

DRAWING NAME:

JOB NO:

2016.0915

20160915_VICINITY_REV8.DWG

1

SHEET NO:

JEF

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

2 MI

0'

PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 4 MILES

4 MI

VICINITY MAP TELLUS OPERATING GROUP, LLC

4 MI

8

REV. DATE: 10/17/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

T18S-R20E P.O.E. PROPOSED 6" FLOWLINE y e Hw @ EXISTING PIPELINE LarosTIE-IN ourg

SEC. 4

Big Bayou Blue Marina SOURCE WATER DISPOSAL

SEC. 2

SEC. 3

B

X = 3,569,836.0' Y = 375,617.9' LAT = 29° 31' 46.972" LONG = 90° 25' 28.488"

State Rte 24

P.O.B. PROPOSED 6" FLOWLINE RISER @ EXISTING PLATFORM

NAD 83 (2011)

X = 3,577,251' Y = 375,773' LAT = 29° 31' 47.917" LONG = 90° 24' 4.544"

NAD 83 (2011)

X = 2,289,034.9' Y = 314,913.4' LAT = 29° 31' 46.208" LONG = 90° 25' 28.195"

NAD 27

NAD 83 (2011) NAD 83 (2011)

X = 2,296,450' Y = 315,068' LAT = 29° 31' 47.152" LONG = 90° 24' 4.253"

NAD 27

001 MRS A S TEMPLET

NAD 27 NAD 27

P.O.B. PROPOSED 6" FLOWLINE @ BADGER PROSPECT WELL LOCATION

X = 3,569,861.4' Y = 374,207.1' LAT = 29° 31' 33.004" LONG = 90° 25' 28.328"

SEC. 11

SEC. 10

NAD 83 (2011)

RICHMOND TREES, L.L.C.

2.5

NAD 83 (2011)

5.5

EXISTING PIPELINE

X = 2,289,060.3' Y = 313,502.6' LAT = 29° 31' 32.239" LONG = 90° 25' 28.035"

PROPOSED 6" FLOWLINE B SEE PLAN VIEW "F"

H

PI

PE LIN

E

PROPOSED 6" FLOWLINE A SEE PLAN VIEW "E"

NAD 27

LF S

OU T

MATCHLINE "D"

20 "

GU

SEE PLAN VIEW "D" SEE PLAN VIEW "C" SEE PLAN VIEW "A"

MATCHLINE "A"

MATCHLINE "B"

MAT

CHL

INE "C

"

SEE PLAN VIEW "B" PROPOSED ACCESS ROUTE (±6,137')

OV . OV .

APACHE LOUISIANA MINERALS, LLC

'C

NAD 27

SEC. 9

'C

P.O.E. PROPOSED 6" FLOWLINE RISER @ EXISTING PLATFORM X = 3,577,643' Y = 375,586' LAT = 29° 31' 46.031" LONG = 90° 24' 0.119"

4.5 'C 3.0 OV . 'C 4.0 OV. ' 6.0 COV 4.5 ' CO . ' C V. OV .

NAD 83 (2011) NAD 83 (2011)

X = 2,296,842' Y = 314,881' LAT = 29° 31' 45.266" LONG = 90° 23' 59.829"

NAD 27 NAD 27

BEGIN ACCESS ROUTE

SEC. 15

X = 3,573,818.0' Y = 371,776.4' LAT = 29° 31' 8.629" LONG = 90° 24' 43.764"

BA YO

UC AN

AL

SEC. 16

DRAWN BY: DATE:

RRB

APPROVED BY:

01/12/2017

DRAWING NAME: SHEET NO:

JOB NO:

JEF

2016.0915

20160915_AREA_REV8.DWG

2

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

2000'

1000'

0'

SEC. 22

SEC. 23

AREA MAP TELLUS OPERATING GROUP, LLC PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 2000'

2000'

NAD 83 (2011)

SEC. 14

GR AN D

10/17/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_AREA_REV8.DWG

NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/4/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

NAD 83 (2011)

8

REV. DATE: 10/17/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

SEC. 15

SEC. 15 EXISTING 20" GULFSOUTH PIPELINE

P.O.B. TO BE LOWERED X = 3,574,014' Y = 371,855' LAT = 29° 31' 9.40" LONG = 90° 24' 41.54"

NAD 83 (2011) NAD 83 (2011)

X = 2,664,794' Y = 411,135'

SEC. 14

T18S-R20E

NAD 27

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT (±11.232 ACRES)

C'

-2.0'

BANKL

B'

INE

-10'

65' WIDE ACCESS

RV SU

-6.0' -5.0' -5.0'

-3.0' -5.0'

PROPOSED EXCAVATION (±0.966 ACRES) (±12,468 CU. YDS)

PROPOSED DREDGING (3.0' CUT) (±0.526 ACRES) (±2,546 CU. YDS)

BEGIN ACCESS ROUTE -3.0'

-8.0'

LEGEND:

RRB

APPROVED BY:

01/12/2017

JOB NO:

JEF

2016.0915

20160915_PLAN_REV8.DWG

3

SHEET NO:

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

100'

NAD 83 (2011)

0'

NE

200'

ED

X = 3,573,963' Y = 371,686' LAT = 29° 31' 7.72" LONG = 90° 24' 42.13"

AN AL

LO

OU

WE R

TH

PIP

ELI

EXISTING 20" GULFSOUTH PIPELINE

NAD 83 (2011) NAD 83 (2011)

NAD 27

GR

AN D

BA

YO

UC

X = 2,664,745' Y = -,411,306'

PLAN VIEW "A" TELLUS OPERATING GROUP, LLC PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 200'

200'

NAD 83 (2011)

P.O.E. TO BE LOWERED

BE

LFS GU NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/4/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

TO

PROPOSED SPOIL PLACEMENT

20"

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

PROPOSED DREDGING

DRAWING NAME:

X = 3,573,818.0' Y = 371,776.4' LAT = 29° 31' 8.629" LONG = 90° 24' 43.764"

-10'

STRUCTURE TO BE REMOVED AND REPLACED UPON ABANDONMENT (P20051486)

PROPOSED EXCAVATION

DATE:

PROPOSED 90' X 90' TURNING WING PROPOSED DREDGING (±5.0' CUT) (±0.344 ACRES) (±2,775 CU. YDS)

-9.0'

A

C

-4.5'

B

MATCHLINE "A"

-8.0'

±390'

±28'

DRAWN BY:

-9.0' -4.0'

A'

EY ED

200'

8

REV. DATE: 10/17/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

SEC. 10

EC. 10

SEC. 15

D'

EC. 15

T18S-R20E PROPOSED SPOIL TO BE PLACED AT A HEIGHT (6.0') CONDUCIVE TO MARSH ESTABLISHMENT (±2.273 ACRES)

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT (±11.234 ACRES)

-5.0'

200'

65' WIDE ACCESS

MATCHLINE "B"

PROPOSED DREDGING (3.0' CUT) (±0.476 ACRES) (±2,304 CU. YDS)

-5.0'

PROPOSED EXCAVATION (±0.594 ACRES) (±7,667 CU. YDS)

PROPOSED DREDGING (3.0' CUT) (±0.367 ACRES) (±1,776 CU. YDS)

-6.0'

PROPOSED DREDGING (2.0' CUT) (±0.326 ACRES) (±1,052 CU. YDS)

LEGEND:

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

PROPOSED EXCAVATION

MATCHLINE "A"

D

-5.0'

PROPOSED DREDGING PROPOSED SPOIL PLACEMENT NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/14/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

DRAWN BY: DATE:

RRB

APPROVED BY:

01/12/2017

DRAWING NAME:

JOB NO:

2016.0915

20160915_PLAN_REV8.DWG

4

SHEET NO:

JEF

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

100'

0'

PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 200'

200'

PLAN VIEW "B" TELLUS OPERATING GROUP, LLC

200'

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

MATCHLINE "C"

T18S-R20E PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT (±5.778 ACRES) PROPOSED SPOIL TO BE PLACED AT A HEIGHT (6.0') CONDUCIVE TO MARSH ESTABLISHMENT (±1.158 ACRES)

SEC. 15

E'

PROPOSED DREDGING (3.5' CUT) (±0.232 ACRES) (±1,310 CU. YDS)

SEC. 10

-5.0' -4.0'

65' WIDE ACCESS

-4.5'

200' -5.0'

65' WIDE ACCESS -5.0'

PROPOSED EXCAVATION (±1.033 ACRES) (±13,333 CU. YDS)

PROPOSED EXCAVATION (±0.753 ACRES) (±9,719 CU. YDS)

LEGEND:

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

PROPOSED EXCAVATION PROPOSED DREDGING PROPOSED SPOIL PLACEMENT

MATCHLINE "B"

PROPOSED DREDGING (4.0 CUT) (±0.306 ACRES) (±1,975 CU. YDS)

E

PROPOSED DREDGING (3.0' CUT) (±0.218 ACRES) (±1,055 CU. YDS)

NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/4/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

DRAWN BY: DATE:

RRB

APPROVED BY:

01/12/2017

DRAWING NAME:

JOB NO:

2016.0915

20160915_PLAN_REV8.DWG

5

SHEET NO:

JEF

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

100'

0'

PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 200'

200'

PLAN VIEW "C" TELLUS OPERATING GROUP, LLC

200'

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

CONDUCIVE NOURISH (±3.426 A

MATCHLINE "D"

H PROPOSED EXCAVATION (±0.029 ACRES) (±374 CU. YDS)

T18S-R20E

SEC. 10

H' PROPOSED EXCAVATION (±0.045 ACRES) (±581 CU. YDS)

-3.0'

SEC. 10 PROPOSED SPOIL TO BE PLACED AT A HEIGHT (6.0') CONDUCIVE TO MARSH ESTABLISHMENT (±2.872 ACRES)

-3.0'

PROPOSED DREDGING (5.0 CUT) (±4.021 ACRES) (±32,436 CU. YDS)

G'

G -3.0'

-3.0'

PROPOSED EXCAVATION (±0.352 ACRES) (±4,543 CU. YDS)

SEC. 15

LEGEND:

-3.0'

PROPOSED EXCAVATION (±0.209 ACRES) (±2,697 CU. YDS)

MATCHLINE "C"

PROPOSED HAY BALES

F'

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT (±0.337 ACRES)

-5.0'

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT (±1.623 ACRES)

PROPOSED DREDGING PROPOSED SPOIL PLACEMENT NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/4/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

DRAWN BY: DATE:

RRB

APPROVED BY:

01/12/2017

DRAWING NAME:

JOB NO:

2016.0915

20160915_PLAN_REV8.DWG

6

SHEET NO:

JEF

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

200'

100'

0'

200'

PROPOSED DREDGING (3.0 CUT) (±0.378 ACRES) (±1,830 CU. YDS)

PLAN VIEW "D" TELLUS OPERATING GROUP, LLC PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 200'

PROPOSED DREDGING (3.0 CUT) (±0.222 ACRES) (±1,074 CU. YDS)

F

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

PROPOSED EXCAVATION

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/4/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

EX

LEGEND: PROPOSED EXCAVATION PROPOSED DREDGING

T18S-R20E

P.O.E. PROPOSED 6" FLOWLINE @ EXISTING FLOWLINE TIE-IN X = 3,569,629.5' Y = 375,614.3' LAT = 29° 31' 46.953" LONG = 90° 25' 30.825"

PROPOSED SPOIL PLACEMENT

SEC. 10

NAD 83 (2011) NAD 83 (2011)

X = 2,288,828.5' Y = 314,909.7' LAT = 29° 31' 46.188" LONG = 90° 25' 30.532"

NAD 27 -3.0'

NAD 27

-3.0'

PROPOSED 6" FLOWLINE A ±1,482' PROPOSED SPOIL TO BE PLACED AT A HEIGHT (6.0') CONDUCIVE TO MARSH ESTABLISHMENT

-3.0'

P.O.B. PROPOSED 6" FLOWLINE @ BADGER PROSPECT WELL LOCATION

X = 3,569,861.4' Y = 374,207.1' LAT = 29° 31' 33.004" LONG = 90° 25' 28.328"

NAD 83 (2011) NAD 83 (2011)

X = 2,289,060.3' Y = 313,502.6' LAT = 29° 31' 32.239" LONG = 90° 25' 28.035"

NAD 27 NAD 27

-3.0' -3.0'

90'

PROPOSED EXCAVATION

90'

-3.0'

90'

-3.0'

70'

-3.0'

90'

160'

I

PROPOSED HAY BALES TO BE PLACED

100'

345'

I'

PROPOSED (2) 90' X 90' WINGS

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT

MATCHLINE "D"

T18S-R20E

-3.0'

SEC. 10RRB

DRAWN BY: DATE:

APPROVED BY:

01/12/2017

DRAWING NAME:

JOB NO:

2016.0915

20160915_PLAN_REV8.DWG

7

SHEET NO:

JEF

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

150'

0'

PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 300'

300'

PLAN VIEW "E" TELLUS OPERATING GROUP, LLC

300'

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

T18S-R20E SEC. 11

P.O.B. PROPOSED 6" FLOWLINE RISER @ EXISTING PLATFORM X = 3,577,251' Y = 375,773' LAT = 29° 31' 47.917" LONG = 90° 24' 4.544"

-9.0'

NAD 83 (2011) NAD 83 (2011)

X = 2,296,450' Y = 315,068' LAT = 29° 31' 47.152" LONG = 90° 24' 4.253"

-8.0'

NAD 27 NAD 27

-5.0'

PIPE

LINE

PROPOSED 6" FLOWLINE B ±435'

-8.0'

PROPOSED 6" FLOWLINE (±435')

GR

BO

INSET NOT TO SCALE

X = 3,577,643' Y = 375,586' LAT = 29° 31' 46.031" LONG = 90° 24' 0.119"

NAD 83 (2011) NAD 83 (2011) NAD 27

ESS

CC

NAD 27

15'

SS

CE

C P. A EM

X = 2,296,842' Y = 314,881' LAT = 29° 31' 45.266" LONG = 90° 23' 59.829"

P. A

T AT

EM

BO

T AT

AIR

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

P.O.E. PROPOSED 6" FLOWLINE RISER @ EXISTING PLATFORM

AIR

AN D

BA YO

20 "

U

GU

LF

CA N

AL

SO U

TH

PI PE

LIN

E

TING EXIS

NOTES: 1) THIS PLAT IS BASED UPON FIELD SURVEYS CONDUCTED ON 12/07/2016-12/08/2016. 2) TOP OF WATER WAS 0.47' ON 12/08/2016. 3) THIS DRAWING MAY NOT REPRESENT ALL HAZARDS IN PROJECT AREA. 4) THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. 5) FIELD VISIT WITH OCM ON 5/4/17. 6) GR CONDUCTED AND APPROVED ON 5/11/17.

DRAWN BY: DATE:

RRB

APPROVED BY:

01/12/2017

DRAWING NAME:

JOB NO:

2016.0915

20160915_PLAN_REV8.DWG

8

SHEET NO:

JEF

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

100'

0'

PROPOSED (2)6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

SCALE: 1" = 200'

200'

PLAN VIEW "F" TELLUS OPERATING GROUP, LLC

200'

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

MHW +2.4' NAVD MLW +1.1' NAVD PER P20051484

155'

TOP OF WATER +0.35' ON 12/08/2016

0.00' NGVD ±4.5 ±3.5' PROPOSED DREDGING

CROSS-SECTION A-A'

EXISTING STRUCTURE TO BE REMOVED AND REPLACED UPON ABANDONMENT (P20051486)

NOT TO SCALE 65' WIDE ACCESS 17'

±200'

5'

10" 6'

6'

±0.5'

MUDLINE 7.5'

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT

±8.0'

PROPOSED EXCAVATION

CROSS-SECTION B-B' NOT TO SCALE PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT

65' WIDE ACCESS ±31'

±34'

±200'

5'

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

TOP OF WATER +0.35' ON 12/08/2016

±0.5'

0.00' NGVD

MUDLINE ±5.0

±8.0' ±3.0' PROPOSED DREDGING

PROPOSED EXCAVATION

CROSS-SECTION C-C' NOT TO SCALE

DRAWN BY: DATE:

RRB 01/12/2017

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

JEF

2016.0915

20160915_PLAN_REV8.DWG

9

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS.

CROSS-SECTIONS TELLUS OPERATING GROUP, LLC PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

NOT TO SCALE

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

MHW +2.4' NAVD MLW +1.1' NAVD PER P20051484 65' WIDE ACCESS ±200' ±31'

±160'

±11'

±23'

±0.5'

TOP OF WATER +0.35' ON 12/08/2016

±6' ±2'

0.00' NGVD

MUDLINE

±5.0' PROPOSED EXCAVATION

±8.0' ±3.0' PROPOSED EXCAVATION

CROSS-SECTION D-D'

PROPOSED SPOIL TO BE PLACED PROPOSED AT A HEIGHT (0.5') CONDUCIVE DREDGING TO MARSH ESTABLISHMENT

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (4.5') CONDUCIVE TO MARSH ESTABLISHMENT

NOT TO SCALE

65' WIDE ACCESS ±234' ±23'

±42'

±6'

TOP OF WATER +0.35' ON 12/08/2016

TOP OF WATER

±2'

MUDLINE

0.00' NGVD

MUDLINE

±4.5' ±8.0'

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (4.5') CONDUCIVE TO MARSH ESTABLISHMENT

±3.5' PROPOSED DREDGING

PROPOSED EXCAVATION

CROSS-SECTION E-E' NOT TO SCALE PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT

65' WIDE ACCESS ±35'

±30'

5'

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

±200'

±0.5'

+0.35' ON 12/08/2016 TOP OF WATER MUDLINE

±5.0'

0.00' NGVD

MUDLINE

±8.0'

PROPOSED EXCAVATION

±3.0' PROPOSED DREDGING

CROSS-SECTION F-F' NOT TO SCALE DRAWN BY: DATE:

RRB 01/12/2017

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

JEF

2016.0915

20160915_PLAN_REV8.DWG

10

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

CROSS-SECTIONS TELLUS OPERATING GROUP, LLC PROPOSED (2)6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

NOT TO SCALE

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

MHW +2.4' NAVD MLW +1.1' NAVD PER P20051484

5'

65' WIDE ACCESS

TOP OF WATER ±0.5'

±300'

±6'

+0.35' ON 12/08/2016

0.00' NGVD

±3.0'

±2'

±5.0'

PROPOSED SPOIL TO BE PLACED AT A HEIGHT (4.5') CONDUCIVE TO MARSH ESTABLISHMENT

PROPOSED DREDGING

CROSS-SECTION G-G' NOT TO SCALE

65' WIDE ACCESS 35'

6'

0.00' NGVD PROPOSED SPOIL TO BE PLACED AT A HEIGHT (0.5') CONDUCIVE TO MARSH NOURISHMENT PROPOSED EXCAVATION

±5.0' PROPOSED EXCAVATION

±200'

±0.5'

TOP OF WATER +0.35' ON 12/08/2016 ±3.0'

5'

24'

PROPOSED DREDGING

CROSS-SECTION H-H' NOT TO SCALE

160' SLIP

TOP OF WATER +0.35' ON 12/08/2016 ±0.5'

0.00' NGVD

±3.0'

±5.0'

PROPOSED DREDGING

CROSS-SECTION I-I' NOT TO SCALE TOP OF WATER

THESE PLATS ARE TO BE USED EXCLUSIVELY FOR THE ACQUISITION OF REGULATORY PERMITS. DRAWN BY: DATE:

RRB 01/12/2017

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

JEF

2016.0915

20160915_PLAN_REV8.DWG

11

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

PROFILE & TYPICALS TELLUS OPERATING GROUP, LLC PROPOSED (2) 6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

NOT TO SCALE

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

MHW +2.4' NAVD MLW +1.1' NAVD PER P20051484

TOP OF WATER +0.35' ON 12/08/16 0.00' NGVD

4.5'

GRAND BAYOU CANAL

EXISTING MUDLINE

3.5'

3'

PROPOSED MUDLINE PROPOSED DREDGING

1'

EXISTING 20" GULFSOUTH P/L TO BE LOWERED

8' MIN.

GULFSOUTH P/L LOWERING CROSS-SECTION P.O.B PROPOSED 6" PIPELINE @ BADGER PROSPECT WELL LOCATION

NOT TO SCALE ±1,482

P.O.E PROPOSED 6" PIPELINE @ EXISTING PIPELINE TOP OF WATER 0.35' on 12/8/16 0.00' NGVD

PROPOSED 6" FLOWLINE A

±3'

MUDLINE 3' MIN P.O.B PROPOSED 6" PIPELINE RISER @ EXISTING PLATFORM

TYPICAL PIPELINE PROFILE

PROPOSED WORKSPACE 5' X 5' X 5'

NOT TO SCALE TOP OF WATER

P.O.E PROPOSED 6" PIPELINE RISER @ EXISTING PLATFORM

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

±435'

PROPOSED 6" FLOWLINE B TO BE PLACED ON MARSH

MUDLINE

MUDLINE

TYPICAL PIPELINE PROFILE NOT TO SCALE DRAWN BY: DATE:

RRB 01/12/2017

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

JEF

2016.0915

20160915_PLAN_REV8.DWG

12

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

TYPICALS, NOTES, & CALCS TELLUS OPERATING GROUP, LLC PROPOSED (2)6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

NOT TO SCALE

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

MHW +2.4' NAVD MLW +1.1' NAVD PER P20051484 NOTE: 8 TEMPORARY 3 PILE CLUSTERS TO BE DRIVEN TO ASSIST IN MAINTAINING DRILL BARGE LOC,N. TEMPORARY CLUSTERS TO BE PULLED WHEN PERMANENT WELL GAURD IS INSTALLED. PROPOSED KEYWAY 6 PILES 7.5' OR LESS

54'

TYPICAL DRILL BARGE WELL LOCATION

TOP OF WATER 0.00' NGVD

210'

MUD LINE

PLAN VIEW

PROFILE VIEW

NOT TO SCALE

NOT TO SCALE

TYPICAL DIESEL POWER DRILL BARGE

TOP OF WATER 0.35' ON 12/08/2016 4' MUDLINE 3' MIN

15'

PROPOSED 6" PIPELINE TO BE JETTED

4'

±0.5'

TYPICAL PIPELINE JETTING

AIRBOAT ACCESS IMPACT TYPICAL NOT TO SCALE

NOT TO SCALE

10/30/2017 - P:\Y-2016\2016.0915\DWG\COE PLAT\REV 8\20160915_PLAN_REV8.DWG

STAKES

PROPOSED HAY BALE

HAY BALE TYPICAL NOT TO SCALE

DRAWN BY: DATE:

RRB 01/12/2017

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

JEF

2016.0915

20160915_PLAN_REV8.DWG

13

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

TYPICALS, NOTES, & CALCS TELLUS OPERATING GROUP, LLC PROPOSED (2)6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

NOT TO SCALE

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

MHW +2.4' NAVD MLW +1.1' NAVD PER P20051484

COASTAL NOTES:

ALL STRUCTURES, FACILITIES, WELLS AND PIPELINES/FLOWLINES OCCURRING IN OPEN WATER AREAS, OR IN OILFIELD CANALS, OR SLIPS SHALL BE REMOVED WITHIN 120 DAYS OF ABANDONMENT OF THE FACILITIES FOR THE HEREIN PERMITTED USE, UNLESS PRIOR WRITTEN APPROVAL TO LEAVE SUCH STRUCTURES IN PLACE IS RECEIVED FROM THE COASTAL MANAGEMENT DIVISION. THIS CONDITION DOES NOT PRECLUDE THE NECESSITY FOR REVISING THE CURRENT PERMIT OR OBTAINING A SEPARATE COASTAL USE PERMIT, SHOULD ONE BE REQUIRED FOR SUCH ACTIVITIES. AS-BUILT DRAWINGS SHALL BE SUBMITTED WITHIN 30 DAYS OF COMPLETION OF THIS PROJECT TO THE LOUISIANA DEPARTMENT OF NATURAL RESOURCES, COASTAL MANAGEMENT DIVISION AND OFFICE OF CONSERVATION, PIPELINE SAFETY DIVISION, POST OFFICE BOX 44487, BATON ROUGE, LA 70804-4487. IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES, THE PERMITEE SHALL CONTACT THE LOUISIANA ONE CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION (DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION ACTIVITY. THE PERMITEE SHALL ALSO CONTACT OTHER GOVERNMENTAL ENTITIES THAT MAY HAVE OPTED OUT OF THE ONE CALL PROGRAM . THESE GOVERNMENTAL ENTITIES MAY HAVE OPERATIONS LOCATED IN THE AREA OF THIS PROJECT. ALL STRUCTURES WILL BE MARKED AND LIGHTED IN ACCORDANCE WITH U.S. COAST GUARD REGULATIONS.

CALCULATIONS: APPROXIMATELY 50,133 CU YDS OF MATERIAL TO BE DISPLACED DUE TO DREDGING OF WATER BOTTOMS.. APPROXIMATELY 7.416 ACRES OF WATER BOTTOM TO BE IMPACTED BY DREDGING OF WATER BOTTOMS. APPROXIMATELY 51,860 CU YDS OF MATERIAL TO BE DISPLACED DUE TO EXCAVATION OF MARSH. APPROXIMATELY 4.018 ACRES OF MARSH TO BE IMPACTED BY EXCAVATION OF MARSH . APPROXIMATELY 33.63 ACRES OF MATERIAL TO BE IMPACTED DUE TO SPOIL PLACEMENT AT A HEIGHT (0.5') CONDUCTIVE TO MARSH NOURISHMENT. APPROXIMATELY 8.847 ACRES OF MATERIAL TO BE IMPACTED DUE TO SPOIL PLACEMENT AT A HEIGHT (6.0') CONDUCTIVE TO MARSH ESTABLISHMENT. APPROXIMATELY 0.004 ACRES OF MATERIAL TO BE IMPACTED DUE TO LOWERING OF PIPELINE. APPROXIMATELY 20 CU YDS OF MATERIAL TO BE DISPLACED DUE TO LOWERING OF PIPELINE. APPROXIMATELY 102,786 CU YDS OF SPOIL MATERIAL TO BE DEPOSITED FROM DREDGING, EXCAVATION, AND PIPELINE INSTALLATION ACTIVITIES. THIS SPOIL WILL BE PLACED IN A MANNER CONDUCIVE TO MARSH ESTABLISHMENT. APPROXIMATELY 768.4 CU YDS OF MATERIAL TO BE DISPLACED FOR PIPELINE INSTALLATION. APPROXIMATELY 0.136 ACRES OF WATER BOTTOM TO BE TEMPORARILY IMPACTED BY PIPELINE INSTALLATION. APPROXIMATELY 4.63 CU YDS OF MATERIAL TO BE DISPLACED FOR WORKSPACE (0.0006 ACRES TO BE IMPACTED).

NOTES: PROPOSED PIPELINE TO BE INSTALLED 3' BELOW EXISTING MUDLINE. DRAFT OF VESSELS UTILIZED FOR THIS PROJECT WILL BE LESS THAN 7.5' SELF PROPELLED PIPE LAYING BARGE WILL HAVE A MAX VESSEL DRAFT OF 2.5'. SURROUNDING MARSH AROUND PROJECT SITE HAS ELEVATION OF APPROX. 1.0' ABOVE 0.00' NGVD. SPOIL PLACEMENT IN OPEN WATER WILL BE PLACED AT 6.0' TO ALLOW FOR A SETTLEMENT HEIGHT OF 2.0'.

DRAWN BY: DATE:

RRB 01/12/2017

DRAWING NAME: SHEET NO:

APPROVED BY: JOB NO:

JEF

2016.0915

20160915_PLAN_REV8.DWG

14

OF

14

PROJECTION: LOUISIANA SOUTH GEO. DATUM: NAD83 | VERT. DATUM: NAVD88 GRID UNITS: US SURVEY FEET

NOTES & CALCULATIONS TELLUS OPERATING GROUP, LLC PROPOSED (2)6" FLOWLINES & CLEANOUT SERVING THE BADGER PROSPECT WELL LOCATION LOCATED IN SECTIONS 10 & 15 T18S-R20E LAFOURCHE PARISH, LOUISIANA REV. NO:

NOT TO SCALE

8

REV. DATE: 10/18/2017

REVISION DESCRIPTION: REVISED PLAT PER OCM REQUEST

REV. BY:

RLV

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas