The U.S. Army Corps of Engineers announces the completion and adoption of the Sepulveda Dam Basin
33re
Sepulveda Dam Basin Vegetation Management and
Access Maintenance Plan
Final Environmental Assessment
November 2017
U.S. Army Corps of Engineers
Los Angeles District
Finding of No Significant Impact
Sepulveda Dam Basin Vegetation Management Plan
The U.S. Army Corps of Engineers (Corps) proposes adopt an updated vegetation management
plan for the triangular-shaped, 48-acre parcel in the southeastern corner of the Sepulveda Dam
Basin, south of Burbank Boulevard, and upstream of Sepulveda Dam. The adopted plan would
supersede the previous vegetation management plan from 2012. The adopted plan also includes
an access maintenance plan for existing access roads and the dam operation area within the 48acre parcel.
Six alternatives, including the No Action Alternative, were evaluated. All action alternatives
were developed in coordination and with input from interested stakeholders. Alternative 1 would
entail annual vegetation mowing and brush cutting, herbicide application, native tree
maintenance, and non-native/dead tree removal. Furthermore, existing access roads and the dam
operations area would be maintained.
Alternatives 2 and 3 are variations of Alternative 1 with respect to mowing and brush cutting
operations. Both Alternatives 2 and 3 would incrementally decrease mowing to varying degrees.
Other vegetation management and access maintenance activities remain unchanged from
Alternative 1. Furthermore, both alternatives would adopt a one year pilot program to hand
remove invasive and non-native plants. Implementation of the pilot program would require
additional coordination with interested stakeholders prior to approval. Continuation of the
program beyond the pilot phase would be subject to additional review and authorization by the
Corps as appropriate.
Alternatives 4 and 5 are identical to Alternative 3 with respect to vegetation management, access
maintenance, and the one year pilot program to hand remove invasive and non-native plants. In
addition, Alternative 4 contemplates construction of a marsh; Alternative 5 contemplates
construction of a sinuous channel and adjacent marsh.
Alternative 6 is the No Federal Action Alternative. Under the No Federal Action Alternative, the
Corps would not conduct any vegetation or access maintenance activities.
Alternatives 1 through 3 are within the scope of existing operations and maintenance authority
and funding capabilities. Alternatives 4 and 5 are conceptual and are not within the scope of
existing operations and maintenance authority and funding capabilities. Alternatives 4 and 5
could be further evaluated under a separate authorization. The Corps could be a cost-share
partner for a study of this nature, but would require a non-federal partner and a study agreement.
Under the existing operations and maintenance authority, Alternative 3 is the preferred
alternative since it best balances the Corps' maintenance objectives with minimizing impacts to
vegetation.
Some access maintenance measures evaluated as part of all action alternatives, including
Alternative 3, such as road grading would require consultation with the State Historic
Preservation Officer to ensure compliance with section 106 of the National Historic Preservation
Act prior to undertaking any ground disturbing activities.
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Table of Contents
1.0 Introduction
1
1.1 Location
1
1.2 Background
1
1.3 Purpose and Need
3
1.4 Scoping
3
1.5 Proposed Action
5
2.0 Alternatives
7
2.1 Alternative 1 Active Management Alternative
7
2.2 Alternative 2 Passive Management Alternative
11
2.3 Alternative 3 Phased Mowing Alternative
15
2.4 Alternative 4 South Marsh Alternative
19
2.5 Alternative 5 Sinuous Channel Alternative
26
2.6 Alternative 6 No Action Alternative
33
3.0 Affected Environment and Environmental Consequences
33
3.1 Land Use
33
3.2 Soils
35
3.3 Surface Water Quality
37
3.4 Air Quality and Greenhouse Gases
41
3.5 Noise
47
3.6 Biological Resources
50
3.7 Cultural Resources
58
3.8 Hazardous Waste and Materials
61
3.9 Aesthetic Quality
62
3.10 Recreation Resources
64
3.11 Public Health and Safety
66
3.12 Socioeconomics and Environmental Justice
69
3.13 Traffic and Transportation
71
3.14 Utilities
74
4.0 Cumulative Impacts
76
4.1 Past Impacts
76
4.2 Present Impacts
77
i
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
4.3 Future Impacts
78
6.0 Environmental Compliance
80
7.0 List of Preparers
81
8.0
82
References Cited
Appendix A: Response to Comments
ii
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
1.0 Introduction
The United States (U.S.) Army Corps of Engineers (Corps) has prepared this Environmental
Assessment (EA) to evaluate the potential environmental consequences of managing vegetation
and maintaining access within a 48acre area located within the Sepulveda Dam Basin (Basin).
The EA characterizes the existing environmental conditions within the Proposed Action Area and
evaluates potential environmental effects of the five action alternatives and the No Action
Alternative.
This EA will be used to determine whether a "Finding of No Significant Impact (FONSI)" to the
environment would result from undertaking the action or whether an Environmental Impact
Statement (EIS) must be prepared.
This document complies with the National Environmental Policy Act (NEPA) of 1969, as
amended (42 USC 43214347); the Council on Environmental Quality (CEQ) regulations for
implementing NEPA (40 CFR 15001508); and the Corps' NEPA Regulations (33 CFR Part 230).
1.1 Location
The Proposed Action would occur in the Basin, which is on the upper Los Angeles River in the
San Fernando Valley, approximately 17 miles northwest of downtown Los Angeles, Los Angeles
County, California. The Proposed Action Area is a roughly triangularshaped, 48acre parcel in
the southeastern corner of the Basin, south of Burbank Boulevard, and upstream of Sepulveda
Dam (Figure 11; Proposed Action Area). Access to the Los Angeles River is located at the
confluence of Haskell Creek and the Los Angeles River.
1.2 Background
Prior to 2011, the Proposed Action Area under the Sepulveda Basin Master Plan was designated
as "Multiple Resource ManagementVegetation Management" for the protection and
development of forest and vegetative cover. The Proposed Action Area was heavily vegetated
with a mixture of native and nonnative species. In addition, the vegetation provided dense
cover for a variety of unauthorized activities including encampments. The range of unauthorized
activities include lewd activities and drug dealing. Walkers and joggers who use the
maintenance roads through the area reported mugging incidents. Corps personnel have also
been threatened. The presence of unauthorized encampments has resulted in accidental fires.
The density and robust growth of vegetation resulted in at least one death because emergency
responses to the area were impeded.
In 2011, the Corps issued an updated Sepulveda Basin Master Plan. In the updated master plan,
the Proposed Action Area was redesignated as a "vegetation maintenance area." Consistent
with the 2011 master plan, in 2012, the Corps developed a vegetation management plan for the
1
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Proposed Action Area to address flood risk management and public safety concerns (Corps
2012).
The 2012 vegetation management plan also incorporated requirements of Engineering Technical
Letter (ETL) 11102571 which mandated a vegetation free zone surrounding all levees,
floodwalls, embankment dams, and critical appurtenant structures in all Corps maintained flood
risk management systems. In particular, the ETL, requires a dam operations zone extending 50
feet outwards from the toe of dam to be kept clear of vegetation.
The selected plan from the 2012 vegetation management plan and associated EA consisted of
eradication of nonnative vegetation and vegetative debris within the area of the Proposed
Action followed by a two year period of herbicide application to control reemergence of non
native invasive vegetation and restoration of the area to oak woodland grassland, coastal sage
scrub, and riverine marsh.
In December 2012, the Corps began implementing the approved plan in the area south of
Haskell Creek, initially trampling vegetation and removing trees. While this work was occurring,
local stakeholders who frequented the area for nature walks and wildlife viewing voiced their
concerns about the impacts of the activity on native and nonnative vegetation. Concerns were
also raised about the 2012 EA. In response, the Corps temporarily suspended vegetation
management activities in the area and agreed to reevaluate vegetation management and
access maintenance activities within the Proposed Action Area to address stakeholder concerns.
While the reevaluation was underway, in January 2014, the Corps, in coordination with local
stakeholders, applied herbicides to manage invasive vegetation and removed nonnative trees
from the Proposed Action Area.
From early 2013 through 2015, the Corps held a number of scoping meetings with local
stakeholders as well as representatives from the City of Los Angeles and field representatives of
various elected officials to gather their input on the issues, potential impacts and alternatives. In
reevaluating potential action alternatives, the Corps' ability to implement an alternative
requires an independent evaluation of the Corps' existing authority as well as resource
constraints and flood risk management project priorities. The Corps receives annual
appropriations for operation, maintenance and related activities at water resources
development projects for which the Corps retains responsibility. Operation and maintenance
funds are allocated for the purpose of maintenance, repair, replacement, rehabilitation, and
operations of structures and other facilities. A subset of operations and maintenance dollars are
provided specifically for environmental and natural resources stewardship (ENS). The types of
activities that may be undertaken with ENS funds include nonnative/invasive species removal,
species surveys, pest control, and landscaping of native plants in a manner that is compatible
with the flood risk management purpose. Only limited amounts of funding are available for ENS
work. Activities beyond the scope of the operations and maintenance appropriation may not be
compliant with Corps fiscal policy and will not receive funding through the operations and
maintenance funds.
Where an alternative contemplates planting, mowing, removal or similar activities that do not
significantly change the onsite conditions, operations and maintenance funds as well as ENS
2
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
funds may be used at the discretion of the Corps. Significant changes that alter the land or
structures located on a water resources and development project may not be implemented
without further study and may require separate authorization. The Corps could be a costshare
partner for a study of this nature, but would require a nonfederal partner and a study
agreement. If a third party wishes to independently implement an alteration or modification on
federal land, that party must apply for a permit pursuant to 33 U.S.C. Section 408 and/or a lease
or easement from the U.S. if the U.S. is the fee owner such as the case at the Basin.
1.3 Purpose and Need
As discussed above, the Proposed Action Area is designated as a "vegetation management area"
pursuant to the 2011 Sepulveda Basin Master Plan. Growth of native and nonnative invasive
plants in the interior of the Proposed Action Area provide dense cover for a variety of
unauthorized activities including encampments. The density and robust growth of vegetation
also impede emergency responses to the area and dam operations, as vegetation growth
impacts basin capacity. A need exists to manage vegetation to maintain dam operations and
improve public safety.
The growth of native and nonnative vegetation within the area over time has contributed to
use of the area for recreation such as nature walks and bird watching. Managing vegetation in
support of maintaining dam operations and improving public safety affects the existing
vegetation in the area, a valued resource for recreational users of the area. The purpose of the
Proposed Action is to manage vegetation to maintain dam operations and improve public safety
while supporting compatible biological resources.
1.4 Scoping
The Corps held number of scoping meetings in the development of the vegetation management
and access maintenance alternatives as shown in Table 11.
TABLE 11
SCOPING AND ALTERNATIVES DEVELOPMENT MEETINGS
Meeting Date
Location
Stakeholder(s)
January 8, 2013
Sepulveda Dam
Representative Brad Sherman and staff
January 9, 2013
Los Angeles
Los Angeles City Councilmember Ed Reyes,
District 1; Los Angeles City Councilmember Tom
LaBonge, District 4
January 9, 2013
Los Angeles
San Fernando Valley Audubon Society
January 11, 2013
Encino
San Fernando Valley Audubon Society
January 11, 2013
Los Angeles
California State Senator Kevin de León
January 11, 2013
Los Angeles
Sierra Club Angeles Chapter
January 16, 2013
Los Angeles
Los Angeles City Councilmember Jan Perry,
District 9
3
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Meeting Date
Location
Stakeholder(s)
January 17, 2013
Conference call
California State Senator Fran Pavley staff
January 22, 2013
Los Angeles
Sepulveda Wildlife Steering Committee,
Audubon Society; Neighborhood Councils; Los
Angeles City Councilmember Paul Koretz,
District 5; City of Los Angeles
January 28, 2013
Los Angeles
Ad Hoc Los Angeles River Committee
February 6, 2013
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
February 7, 2013
Sepulveda Basin
City of Los Angeles Bureau of Sanitation
February 12, 2013
Sepulveda Basin
Colonel Mark Toy, Corps; District Leadership;
Sepulveda Wildlife Steering Committee,
Audubon Society
February 21, 2013
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
February 25, 2013
Los Angeles
Los Angeles City Councilmembers, Los Angeles
River Ad Hoc Committee
February 26, 2013
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
February 27, 2013
Los Angeles
City of Los Angeles Bureau of Sanitation
March 19, 2013
Los Angeles
Los Angeles City Councilmembers, Los Angeles
River Ad Hoc Committee
March 20, 2013
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
April 23, 2013
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
May 28, 2013
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
March 25, 2014
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
May 13, 2014
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
August 1, 2014
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
October 30, 2014
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
December 15, 2014
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
August 25, 2015
Encino
Sepulveda Wildlife Steering Committee,
Audubon Society
4
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
All comments received by the Corps have been considered in the scoping stage of the planning
process and have been used to inform the development of alternatives.
1.5 Proposed Action
Depending on the selected alternative, vegetation management would include a combination of
tree removal and maintenance, mowing and brush cutting, herbicide application, revegetation,
and regular maintenance of the vegetated areas, vehicular access roads, and the 2.3acre dam
operation zone. In addition, emergency access for police and fire personnel would be improved
and pedestrian access formalized. The specific vegetation management and access maintenance
activities proposed in the alternatives are described in Chapter 2.
5
Image Source: Copyright 2014, Google, (flown 2014)
City of LA
Sepulveda Basin
Wildlife Reserve
d le y
Wo o
Bu rbank Blv d
H
ke
as
ll
C
ek
re
USACE Vegetation
Management Area
¨
§
¦
405
sA
Lo
Sepulveda
Dam
s
ele
ng
Ri
ve
r
Wedding ton
101
£
¤
Magnolia
Magnolia
0
Feet
450
[
Project Boundary - USACE Sepulveda Dam Basin
FIGURE 1-1
Proposed Action Area
M:\JOBS4\7260\common_gis\fig1-1.mxd 3/2/2015 sab
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
2.0 Alternatives
2.1 Alternative 1 Active Management Alternative
Alternative 1 is within the scope of existing operations and maintenance authority and funding
capabilities. The Active Management Alternative is depicted in Figure 21.
Vegetation Management Activities
Herbicide Application:
Herbicide would be applied as needed to all nonnative vegetation
in the Proposed Action Area with either backpack sprayers or with a truckmounted herbicide
sprayer under the direction of a qualified biologist and a qualified herbicide applicator. All
herbicide spraying would occur outside the bird nesting and breeding season. Herbicide
application would occur for Zone B, Zone Q, Zone L, and Zone SG.
Mowing and Brush Cutting:
All shrubs in Zone B and Zone Q would be annually mowed
and brush cut, respectively, to a height of approximately 3 feet, outside of the bird nesting and
breeding season. Cut vegetation would be mulched and left onsite.
Tree Maintenance (Native Trees): Branches of large (greater than 18 inches diameter
breast height) native trees below 8 feet in Zones B, Q, L, and SG would be pruned to open the
canopy, add light, and improve public safety in the Proposed Action Area. Large branches that
cannot be mulched would be disposed offsite. Mulched vegetation would be left onsite.
Native trees would be monitored annually and treated as needed between the months of
September and March.
Tree Removal (Nonnative and Dead Trees): Nonnative and dead trees would be
periodically removed and/or mulched in Zones B, Q, L, and SG between the months of
September and March as needed and as resources permit. Trees would be cut at the base of
the trunk. The root mass would be left intact in the ground. Large trunks and branches that
cannot be mulched would be disposed offsite. Mulched vegetation would be left onsite.
Native trees would be monitored annually and treated as needed.
Access Maintenance Activities
Maintenance of Vehicular Access Roads: Existing vehicular access roads would be
kept clear of vegetation annually between the months of September and March. The vehicular
access roads in the Proposed Action Area would be graded and leveled with decomposed
granite as needed to facilitate access by maintenance vehicles as well as police patrol and
emergency vehicles.
7
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
A 3foot by 3foot buffer along the vehicular access roads would be maintained. Trees within 3
feet of access roads would be pruned up to 12 feet. Likewise, shrubs within 3 feet of access
roads would be trimmed to a height of 3 feet. Branches overhanging the roads would be cut.
Large branches that cannot be mulched would be disposed offsite. Mulched vegetation would
be left onsite. Vegetation maintenance may include the use of hand tools or line trimmers. All
maintenance would occur annually between the months of September and March.
Maintenance of Dam Operations Zone:
Pursuant to ETL 11102571, a dam
operations zone extending 50 feet outwards from the toe of dam would be kept clear of
vegetation with the exception of large native trees on the upstream side of the dam operations
zone which would remain in place and be pruned up to 12 feet to facilitate access. This work
would occur annually between the months of September and March. The access road located
within the area would be subject to the same road maintenance regimen described above.
Large branches that cannot be mulched would be disposed offsite. Mulched vegetation would
be left onsite. Vegetation removal may include the use of hand tools, line trimmers, and/or
herbicide application with either backpack sprayers or with a truckmounted herbicide sprayer.
Table 21 shows the schedule for activities under the Active Management Alternative.
8
TABLE 21
SCHEDULE
ALTERNATIVE 1, ACTIVE MANAGEMENT ALTERNATIVE
Management Activity
Schedule
Acreage*
31.5 acres
15.1 acres
3.3 acres
5.8 acres
31.5 acres
15.1 acres
3.3 acres
5.8 acres
31.5 acres
15.1 acres
3.3 acres
5.8 acres
31.5 acres
15.1 acres
Tree removal
(Nonnative and Dead
Trees)
Periodically between the months of September and March
as needed and as resources permit. Trees would be cut at
base of trunk.
Herbicide application
As needed between the months of September and March.
Timing would be dependent on current weather conditions
and type of plant being controlled.
Tree maintenance
(Native Trees)
Annually between the months of September and March as
needed.
Mowing and Brush Cutting
Annually between the months of September and March.
Maintenance of vehicular
access roads
Annually between the months of September and March.
Throughout the Proposed
Action Area
(see Figure 21)
8,778 linear feet, 14foot width
Maintenance of dam
operations zone
Annually between the months of September and March.
Dam operations zone
2.3 acres
See
*
Management Zone
Zone B
Zone Q
Zone L
Zone SG
Zone B
Zone Q
Zone L
Zone SG
Zone B
Zone Q
Zone L
Zone SG
Zone B
Zone Q
Figure 12.
Acreages may not total equal to the Proposed Action Area due to rounding.
9
Image Source: Copyright 2014, Google, (flown 2014)
Burba nk Blvd
Woo
dley
"
)
L
"
)
Q
"
)
Q
"
)
SG
"
)
"
)
B
Ha
sk
el
lC
re
ek
B
sA
Lo
s
ele
ng
Ri
r
ve
"
)
B
Project Boundary - USACE Sepulveda Dam Basin Vegetation Management Zones
Un-named Drain
Salix goodingii Woodland Alliance (SG)
Dam Operation Zone (Width: 50ft)
Quercus spp. Woodland Alliance (Q)
ed
ul v
p
Se
¨
§
¦
405
am
aD
Vehicular Access
0
Pedestrian Access
Feet
200
[
Bacharis pilularis Shrubland Alliance (B)
FIGURE 2-1
Seasonal Pond
Native Plant Landscape Buffer (L)
M:\JOBS4\7260\common_gis\fig2-1.mxd 8/21/2015 sab
Active Management Alternative
No-action Alternative
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
2.2 Alternative 2 Passive Management Alternative
Alternative 2 is within the scope of existing operations and maintenance authority and funding
capabilities. The Passive Management Alternative is depicted in Figure 22.
Vegetation Management Activities
Herbicide Application: Herbicide would be similar to that described under Alternative 1
Active Management Alternative.
Mowing: Shrubs in Zone B would be mowed to a height of approximately 3 feet, outside of
the bird nesting and breeding season once every three years. Mowed vegetation would be
mulched and left onsite.
Brush Cutting: Native monotypic vegetation (i.e., Baccharis pilularis) within Zone Q would
be delineated from other vegetation and cut with handheld brush cutters to a height of 3 feet.
Brush cutting would occur in conjunction (i.e., at the same time) with the mowing of Zone B. Cut
vegetation would be mulched and left onsite.
One Year Pilot Program to Hand Remove Invasive and Nonnative Plants:
In order to reduce the use of herbicides within the Los Angeles River watershed, local
stakeholders would organize and implement a one year pilot program that would utilize
volunteers to remove invasive and nonnative plants. Volunteers would use hand tools to
remove invasive and nonnative plants. Once removed, the plants would be placed within
appropriate containers such as trash bags and disposed offsite.
Implementation of the program would require and be dependent upon successful completion of
additional coordination with the stakeholders on a number of matters encompassing technical
(e.g., development of success criteria for invasive plant coverage); logistical (e.g., schedules, site
access, etc.); and legal (e.g., memoranda of agreement, volunteer program, etc.). Continuation
of the program beyond the pilot phase would be subject to additional review and authorization
by the Corps as appropriate. The Corps would proceed with use of herbicides in areas not
designated for the pilot program. If the pilot program is not renewed, herbicides would be
applied to the vacated area. The Corps would also proceed with use of herbicides in the
Proposed Action Area during the period in which the coordination for the oneyear pilot
program is ongoing or in the event the pilot program does not go forward.
Tree Maintenance (Native Trees):
Maintenance of native trees would be similar to
that described under Alternative 1 Active Management Alternative.
Tree Removal (Nonnative and Dead Trees):
Removal of nonnative and dead trees
would be similar to that described under Alternative 1 Active Management Alternative.
11
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Access Maintenance Activities
Maintenance of Vehicular Access Roads:
Maintenance of vehicular access roads
would be similar to that described under Alternative 1 Active Management Alternative.
Maintenance of Dam Operations Zone:
Maintenance of the Dam Operation Zone
would be similar to that described under Alternative 1 Active Management Alternative.
Schedule
Table 22 shows the schedule for proposed activities under Alternative 2.
12
Sepulveda Dam Basin Vegetation Management Plan
Final Supplemental Environmental Assessment
TABLE 22
SCHEDULE
ALTERNATIVE 2, PASSIVE MANAGEMENT
Management Activity
*
Schedule
Acreage*
Management Zone
Zone B
Zone Q
Zone SG
Zone L
Zone B
Zone Q
Zone SG
Zone L
Zone B
Zone Q
Zone L
Zone SG
31.5 acres
15.1 acres
5.8 acres
3.3 acres
31.5 acres
15.1 acres
5.8 acres
3.3 acres
31.5 acres
15.1 acres
3.3 acres
5.8 acres
Tree removal
(Nonnative and Dead
Trees)
Periodically between the months of September and March
as needed and as resources permit. Trees would be cut at
base of trunk.
Herbicide application
As needed between the months of September and March.
Timing would be dependent on current weather conditions
and type of plant being controlled.
Tree maintenance
(Native Trees)
Annually between the months of September and March as
needed.
Mowing
Once every three years between the months of September
and March.
Zone B
31.5 acres
Brush cutting
Once every three years between the months of September
and March in conjunction with Zone B mowing (i.e., at the
same time).
Zone Q
15.1 acres
Maintenance of vehicular
access roads
Annual maintenance between the months of September
and March.
Throughout the Proposed
Action Area
(see Figure 21)
8,778 linear feet, 14foot width
Maintenance of dam
operations zone
One Year Pilot Program to
Hand Remove Invasive and
Nonnative Plants
Annual maintenance between the months of September
and March.
Dam operations zone
2.3 acres
To be determined.
To be determined.
To be determined.
Acreages may not total equal to the Proposed Action Area due to rounding.
13
Image Source: Copyright 2014, Google, (flown 2014)
Burba nk Blvd
Wo
y
od le
"
)
L
"
)
Q
"
)
Q
"
)
SG
"
)
"
)
B
Ha
sk
el
lC
re
ek
B
sA
Lo
s
ele
ng
Ri
r
ve
"
)
B
Project Boundary - USACE Sepulveda Dam Basin Vegetation Management Zones
Un-named Drain
Salix goodingii Woodland Alliance (SG)
Dam Operation Zone (Width: 50ft)
Quercus spp. Woodland Alliance (Q)
ed
ul v
p
Se
¨
§
¦
405
am
aD
Vehicular Access
Pedestrian Access
0
Feet
200
[
Bacharis pilularis Shrubland Alliance (B)
Seasonal Pond
Native Plant Landscape Buffer (L)
FIGURE 2-2
Passive Management Alternative
M:\JOBS4\7260\common_gis\fig2-2.mxd 2/24/2015 sab
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
2.3 Alternative 3 Phased Mowing Alternative
Alternative 3 is within the scope of existing operations and maintenance authority and funding
capabilities.
Vegetation Management Activities
Herbicide Application: Herbicide would be similar to that described under Alternative 1
Active Management Alternative.
Mowing:
A five year mowing and brush cutting cycle would be implemented. Shrubs in Zone
B would be mowed to a height of approximately 3 feet, outside of the bird nesting season. Zone
B would be subdivided into Zone B1 (9.3 acres), Zone B2 (13.1 acres), and Zone B3 (10.1 acres;
see Figure 22). Mowing would occur once every five years in each sub zone and would be
rotated across Zones B1, B2, and B3, with brush cutting (see below) occurring the fourth year.
There would be no mowing in the fifth year. Mowed vegetation would be left onsite.
Brush Cutting:
Native monotypic vegetation (i.e., Baccharis pilularis) within Zone Q would
be delineated from other vegetation and cut with handheld brush cutters to a height of 3 feet.
Brush cutting would occur in Zone Q once every five years, as part of the mowing cycle for Zones
B1, B2, and B3. Brush cutting in Zone Q would not occur during a Zone B mowing year. Native
vegetation occurring in low densities (less than 5 percent cover), such as currant (Ribes sp.) and
gooseberry (Ribes sp.), would be avoided. Cut vegetation would be mulched and left onsite.
One Year Pilot Program to Hand Remove Invasive and Nonnative Plants:
The pilot program would be similar to that described under Alternative 2 Passive Management
Alternative.
Tree Maintenance (Native Trees):
Maintenance of native trees would be similar to
that described under Alternative 1 Active Management Alternative.
Tree Removal (Nonnative and Dead Trees):
Removal of nonnative and dead trees
would be similar to that described under Alternative 1 Active Management Alternative.
Access Maintenance Activities
Maintenance of Vehicular Access Roads:
Maintenance of vehicular access roads
would be similar to that described under Alternative 1 Active Management Alternative.
Maintenance of Dam Operations Zone:
Maintenance of the Dam Operation Zone
would be similar to that described under Alternative 1 Active Management Alternative.
Schedule
Table 23 shows the schedule for proposed activities under Alternative 3.
15
Sepulveda Dam Basin Vegetation Management Plan
Draft Supplemental Environmental Assessment
TABLE 23
SCHEDULE
ALTERNATIVE 3, PHASED MOWING
Management Activity
Schedule
Tree removal
(Nonnative and Dead
Trees)
Periodically, between the months of September and March
as needed and as resources permit. Trees would be cut at
base of trunk.
Herbicide application
As needed between the months of September and March.
Timing would be dependent on current weather conditions
and type of plant being controlled.
Tree maintenance
(Native Trees)
Annually between the months of September and March as
needed.
Mowing
Brush cutting
Maintenance of vehicular
access roads
Zone B would be subdivided into three Zones: Zone B1 (9.3
acres), Zone B2 (13.1 acres; including the seasonal pond),
and Zone B3 (10.1 acres). Each Zone would be mowed
once every five years between the months of September
and March. Mowing would be rotated across Zones B1, B2,
and B3, with brush cutting in Zone Q occurring the fourth
year. No mowing would occur in the fifth year.
Once every five years between the months of September
and March, in the rotation cycle associated with the Zone B
mowing schedule. However, brush cutting in Zone Q would
not occur during a Zone B mowing year. Native vegetation
occurring in low densities (less than 5 percent cover), such
as currant (Ribes sp.) and gooseberry (Ribes sp.), would be
avoided.
Annual maintenance between the months of September
and March.
16
Acreage*
Management Zone
Zone B
Zone Q
Zone SG
Zone L
Zone B
Zone Q
Zone SG
Zone L
Zone B
Zone Q
Zone L
Zone SG
31.5 acres
15.1 acres
5.8 acres
3.3 acres
31.5 acres
15.1 acres
5.8 acres
3.3 acres
31.5 acres
15.1 acres
3.3 acres
5.8 acres
Zone B1
Zone B2
Zone B3
9.3 acres
13.1 acres
10.1 acres
Zone Q
15.1 acres
Throughout the Proposed
Action Area (see Figure 2
2)
8,778 linear feet, 14foot width
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Maintenance of dam
operations zone
One Year Pilot Program to
Hand Remove Invasive and
Nonnative Plants
*
Annual maintenance between the months of September
and March.
Dam operations zone
2.3 acres
To be determined.
To be determined.
To be determined.
Acreages may not total equal to the Proposed Action Area due to rounding.
17
Image Source: Copyright 2014, Google, (flown 2014)
Burba nk Blvd
Wo
y
od le
"
)
L
"
)
Q
"
)
Q
"
)
SG
"
)
"
)
B2
Ha
sk
el
lC
re
ek
B3
sA
Lo
s
ele
ng
Ri
r
ve
"
)
B1
Project Boundary - USACE Sepulveda Basin Vegetation Management Zones
Un-named Drain
Salix goodingii Woodland Alliance (SG)
Dam Operation Zone (Width: 50ft)
Quercus spp. Woodland Alliance (Q)
ed
ul v
p
Se
¨
§
¦
405
am
aD
Vehicular Access
Pedestrian Access
0
Feet
200
[
Bacharis pilularis Shrubland Alliance (B1, B2, B3)
Seasonal Pond
Native Plant Landscape Buffer (L)
FIGURE 2-3
Phased Mowing Alternative
M:\JOBS4\7260\common_gis\fig2-3.mxd 2/24/2015 sab
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
2.4 Alternative 4 South Marsh Alternative
Alternative 4 is outside the scope of existing operations and maintenance authority and funding
capabilities. A separate authority and appropriation would be required to implement
Alternative 4. The Corps could partner with a nonFederal governmental entity or a nonprofit
organization to conduct a study to evaluate alternatives of this nature under the Continuing
Authorities Program, but would require an interested nonfederal partner to share the costs of
under the terms of a study agreement, and if an alternative is selected, a nonFederal entity
would have to share the implementation costs under a design and implementation agreement.
Alternatively, if a third party wishes to implement Alternative 4 on its own, that party would
need to seek a lease or easement from the United States, which would also require a review
pursuant to 33 U.S.C. Section 408.
Under Alternative 4, the South Marsh Alternative (Figure 23), vegetation Zone B and Zone Q
would be managed in the same phased approach described under Alternative 3. In addition, the
Corps would create an approximate 4.6acre marsh habitat (Juncus acutus; Zone J) in the
Proposed Action Area. An area within Zone J, which is a subarea of Zone B1, would be
excavated to create a marsh to support a Juncus acutus vegetation type (i.e., marsh habitat)
adjacent to Haskell Creek.
In the spiny rush (Juncus acutus) vegetation type, (Juncus acutus) is dominant or codominant in
the herbaceous layer with yarrow (Achillea millefolium), sedge (Carex spp.), saltgrass (Distichlis
spicata), and bulrush (Schoenoplectus spp). Emergent trees or shrubs may be present at a low
cover. Zone J would be revegetated by installing container plants, installing cuttings, seeding,
and allowing native volunteer recruitment to create the basic structure of the Juncus acutus
vegetation type. Excavated soil resulting from marsh creation would be removed from the site.
In addition, culverts would be installed to allow water to flow from Haskell Creek to Zone J.
Vegetation Management Activities
Herbicide Application: Herbicide would be similar to that described under Alternative 1
Active Management Alternative for areas not subject to active revegetation due to marsh
construction. Areas within the construction footprint where active revegetation would occur
would be subject to more frequent herbicide application until sufficient establishment of the
vegetation. Upon sufficient establishment of the vegetation, herbicide application regime
would revert back to that described under Alternative 1 Active Management Alternative.
Mowing:
Mowing would be similar to that described under Alternative 3. Phased Mowing
Alternative for areas not subject to active revegetation due to marsh construction. Areas within
the construction footprint where active revegetation would occur would be excluded from
mowing footprint.
Brush Cutting:
Brush cutting would be similar to that described under Alternative 3.
19
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
One Year Pilot Program to Hand Remove Invasive and Nonnative Plants:
The pilot program would be similar to that described under Alternative 2 Passive Management
Alternative.
Tree Maintenance (Native Trees):
Maintenance of native trees would be similar to
that described under Alternative 1 Active Management Alternative.
Tree Removal (Nonnative and Dead Trees):
Removal of nonnative and dead trees
would be similar to that described under Alternative 1 Active Management Alternative.
Access Maintenance Activities
Maintenance of Vehicular Access Roads:
Maintenance of vehicular access roads
would be similar to that described under Alternative 1 Active Management Alternative.
Maintenance of Dam Operations Zone:
Maintenance of the Dam Operation Zone
would be similar to that described under Alternative 1 Active Management Alternative.
Marsh
Grading: An area within Zone J would be excavated over a 2month period, preferably before
the onset of the rainy season or as determined by a qualified biologist, to create a marsh to
support a Juncus acutus vegetation type (i.e., marsh habitat) adjacent to Haskell Creek. The
target hydrologic regime would be supported by diverting water from Haskell Creek via culverts
and maintaining a constant water level via installed watercontrol structures. Installation of the
culverts and watercontrol structures is discussed below. Excavated soil associated with grading
would be removed from the site. An estimated 22,264 cubic yards of soil would be removed.
The final amount would be determined upon approval of project design.
Installation of Infrastructure:
Culverts would be installed in Zone J to allow the flow of
water from Haskell Creek to the newly created marsh Zone. Water control structures would be
installed to return flows back into the creek. The number, size, and location of culverts and
watercontrol structures would be determined upon approval of project design.
Revegetation: Revegetation activities in Zone J would include installing native container
plants and/or cuttings, hand seeding with native seed, and allowing native volunteer
recruitment to create the basic structure of the desired habitat (plants typically occurring within
these vegetation types). Plants would be installed between the months of October and March
and/or when soil moisture is optimal and as determined by a qualified biologist, and at a density
of approximately 1,800 plants per acre. Native cover should equate to approximately 85 percent
by Year 5 of plan implementation. In Zone J, seed to be used for handseeding and/or for the
propagation of container stock would be collected locally in the amount of 40 pounds of seed
per acre. If the preferred seed is not available, commercial sources may be used.
Monitoring: Qualitative and quantitative monitoring of revegetated areas in Zone J would be
conducted to assess native and nonnative vegetative cover, species diversity, and density.
20
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Remedial Planting/Seeding: Should performance standards (i.e., native percent cover
described under Revegetation section, above) not be achieved for Zone J, remedial planting
and/or seeding would occur between the months of October and March and/or when soil
moisture is optimal and as determined by a qualified biologist.
Schedule
Table 24 shows the schedule for proposed activities under Alternative 4.
21
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Supplemental Environmental Assessment
TABLE 24
SCHEDULE
ALTERNATIVE 4, SOUTH MARSH
Management Activity
Tree removal
(Nonnative and Dead
Trees)
Herbicide application
Tree maintenance
Schedule
Acreage*
Management Zone
Zone B
Zone Q
Zone SG
Zone L
31.5 acres
15.1 acres
5.8 acres
3.3 acres
For areas outside the construction zone, herbicides would
be applied as needed between the months of September
and March. Timing would be dependent on current
weather conditions and type of plant being controlled.
Zone B
Zone Q
Zone L
Zone SG
31.5 acres
15.1 acres
3.3 acres
5.8 acres
For areas inside the construction zone where active
planting would occur, herbicides would be applied four
times per year (between the months of September and
March) for the first two years following revegetation, then
twice per year (between the months of September and
March) until sufficient establishment of planted
vegetation. Upon sufficient establishment, Zone J would
be treated on an as needed basis between the months of
September and March.
Zone J
4.6 acres
Zone B
Zone L
Zone Q
Zone SG
26.9 acres
3.3 acres
15.1 acres
5.8 acres
Periodically, between the months of September and March
as needed and as resources permit.
Annually between the months of September and March as
needed.
22
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Mowing
Brush cutting
Revegetation
Zone B would be subdivided into three Zones: Zone B1 (9.3
acres), Zone B2 (13.1 acres; including the seasonal pond),
and Zone B3 (10.1 acres). Each Zone would be mowed
once every five years between the months of September
and March. Mowing would be rotated across Zones B1, B2,
and B3, with brush cutting in Zone Q occurring the fourth
year. No mowing would occur in the fifth year.
Once every five years between the months of September
and March, in the rotation cycle associated with the Zone B
mowing schedule. However, brush cutting in Zone Q would
not occur during a Zone B mowing year. Native vegetation
occurring in low densities (less than 5 percent cover), such
as currant (Ribes sp.) and gooseberry (Ribes sp.), would be
avoided.
Between the months of October and March and/or when
soil moisture is optimal and as determined by a qualified
biologist. Zone J, the marsh area within Zone B1, would be
excluded from the mowing footprint.
Zone B1
Zone B2
Zone B3
9.3 acres
13.1 acres
10.1 acres
Zone Q
15.1 acres
Zone J
4.6 acres
Grading
Over a 2month period, preferably before the onset of the
rainy season, or as determined by a qualified biologist.
Zone J
Installation of infrastructure
Water control structures would be set to a predetermined
height as determined by Corps project management
personnel.
Zone J
Remedial planting/seeding
Monitoring
Maintenance of Vehicular
access roads
Between the months of October and March and/or when
soil moisture is optimal and as determined by a qualified
biologist.
Qualitative to occur quarterly; quantitative to occur
annually in the spring.
Annual maintenance between the months of September
and March.
23
An estimated 22,264 cubic
yards of soil would be removed.
The final amount would be
determined upon approval of
project design.
The number and size of culverts
and water control structure
would be determined upon
approved project design.
Zone J
4.6 acres
Zone J
4.6 acres
Throughout the Proposed
Action Area
(see Figure 23)
8,429 linear feet, 14foot width
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Maintenance of dam
operations zone
One Year Pilot Program to
Hand Remove Invasive and
Nonnative Plants
*
Annual maintenance between the months of September
and March.
Dam operations zone
To be determined.
To be determined.
Acreages may not total equal to the Proposed Action Area due to rounding.
24
2.3 acres
To be determined.
Image Source: Copyright 2014, Google, (flown 2014)
Burba nk Blvd
Wo
y
od le
"
)
L
"
)
Q
"
)
Q
"
)
B3
"
)
SG
"
)
B2
1
$
e
sk
Ha
ll
k
ee
Cr
#
0
sA
Lo
s
ele
ng
Ri
r
ve
#
0
1
$
"
)
J
ed
ul v
p
Se
¨
§
¦
405
am
aD
"
)
B1
Project Boundary - USACE Sepulveda Dam Basin
Un-named Drain
#
0
1
$
Dam Operation Zone (Width: 50ft)
Vegetation Management Zones
Quercus spp. Woodland Alliance (Q)
Vehicular Access
Bacharis pilularis Shrubland Alliance (B1, B2, B3)
Pedestrian Access
Engineered Culvert (Depth: TBD)
Juncus acutus Herbaceous Alliance (J)
Seasonal Pond
Culvert (Inlet / Outlet)
Salix goodingii Woodland Alliance (SG)
Native Plant Landscape Buffer (L)
Water Control Structure
Grade Control Devices
M:\JOBS4\7260\common_gis\fig2-4.mxd 2/24/2015 sab
0
Feet
200
[
FIGURE 2-4
South Marsh Alternative
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
2.5 Alternative 5 Sinuous Channel Alternative
Alternative 5 is outside the scope of existing operations and maintenance authority and funding
capabilities. A separate authority and appropriation would be required to implement
Alternative 5. The Corps could partner with a nonFederal governmental entity or a nonprofit
organization to conduct a study to evaluate alternatives of this nature under the Continuing
Authorities Program, but would require an interested nonfederal partner to share the costs of
under the terms of a study agreement, and if an alternative is selected, a nonFederal entity
would have to share the implementation costs under a design and implementation agreement.
Alternatively, if a third party wishes to implement Alternative 5 on its own, that party would
need to seek a lease or easement from the United States, which would also require a review
pursuant to 33 U.S.C. Section 408.
Under Alternative 5, the Sinuous Channel Alternative (Figure 24), the Corps would conduct
mowing and other vegetation management activities within the Proposed Action Area to
enhance the existing vegetation Zones. Using a phased approach, the Corps would mow Zone B
and Zone Q once every five years, allowing native species to regenerate. In addition, Haskell
Creek would be graded to create a channel consisting of gentle bends (Zone OW), thereby
decreasing the flow velocities through Haskell Creek. Schoenoplectus californicus (Zone SC, 2.6
acres) and Juncus acutus (Zone J, 2.8 acres) vegetation Zones would be created within the
graded portions on each side of Haskell Creek. Creation of these Zones would include
revegetation through a combination of container plants, cuttings, seed, and native volunteer
recruitment. Materials generated from grading activities would be used to create access Zones
along the perimeter of the channel and placed in a fill site.
In the Schoenoplectus californicus vegetation type, California bulrush (Schoenoplectus
californicus) is dominant or codominant in the herbaceous layer with sea clubrush
(Bolboschoenus maritimus), western goldenrod (Euthamia occidentalis), common tule (S.
acutus), southern cattail (Typha domingensis), and broadleaf cattail (Typha latifolia) Emergent
California rose (Rosa californica) or willow (Salix spp.) shrubs may be present at low cover.
Vegetation Management Activities
Herbicide Application: Herbicide application would be similar to that described under
Alternative 1 Active Management Alternative for areas not subject to active revegetation due
to sinuous channel construction. Areas within the construction footprint where active
revegetation would occur would be subject to more frequent herbicide application until
sufficient establishment of the vegetation. Upon sufficient establishment of the vegetation,
herbicide application regime would revert back to that described under Alternative 1 Active
Management Alternative.
Mowing:
Mowing would be similar to that described under Alternative 3.
Brush Cutting:
Brush cutting would be similar to that described under Alternative 3.
26
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
One Year Pilot Program to Hand Remove Invasive and Nonnative Plants:
The pilot program would be similar to that described under Alternative 2 Passive Management
Alternative.
Tree Maintenance (Native Trees):
Maintenance of native trees would be similar to
that described under Alternative 1 Active Management Alternative but would be limited to
Zones B, L, and Q.
Tree Removal (Nonnative and Dead Trees):
Removal of nonnative and dead trees
would be similar to that described under Alternative 1 Active Management Alternative.
Access Maintenance Activities
Maintenance of Vehicular Access Roads:
Maintenance of vehicular access roads
would be similar to that described under Alternative 1 Active Management Alternative.
Maintenance of Dam Operations Zone:
Maintenance of the Dam Operation Zone
would be similar to that described under Alternative 1 Active Management Alternative.
Sinuous Channel
Grading:
Grading under Alternative 5 would occur after Zone SC has been cleared of all
vegetation. Trees within the construction footprint would be cut. Root wads would be removed
via excavators. Segmented tree trunks and root wads would be disposed offsite. Large
branches that cannot be mulched would be disposed offsite. Mulched vegetation would be left
onsite in other zones outside the construction area.
Heavy machinery would be used to achieve the proper hydrology to support wetland vegetation
for Zone SC by lowering the existing elevation to create a gradient toward Haskell Creek. The
target hydrologic regime would be supported by the reconfiguration of the existing creek by
grading activities.
Grading activities for Zone J would be similar to those described above for Zone SC. Heavy
machinery would be used to grade the area in order to achieve the proper hydrology to support
wetland vegetation, such as spiny rush.
Portions of the cut soil from grading activities in Zones SC and J would be used to create earthen
Zones, which would run parallel to the creek on both sides. These Zones would also protect the
site during flood events and aid the Corps in protecting public safety. An estimated 12,584 cubic
yards of soil would be removed in Zone SC and 13,552 cubic yard would be removed from Zone
J. The final amount would be determined upon approval of project design.
Grading in both Zones would occur over a 2 month period, preferably before the onset of the
rainy season, or as determined by a qualified biologist.
Installation of Infrastructure: Logs would be installed along Haskell Creek (Zone OW)
over a 2month period, preferably before the onset of the rainy season or as determined by a
qualified biologist, to serve as natural check dams. Depending on the final design of the check
27
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
dams, between 5 and 10 may be required; the size of the dams would be determined based on
the channel width. Since the Tillman Water Treatment Plant discharges treated water into
Haskell Creek, modifications to the creek would need to be coordinated with the City of Los
Angeles' Bureau of Sanitation.
The logs would be obtained from trees removed during grading activities. Installation of the
check dams would occur over a twomonth period before the onset of the rainy season or as
directed by a qualified biologist. The check dams would be maintained and replaced over time.
Revegetation: The same as described under Alternative 4, revegetation would occur in
Zones SC and J. Revegetation would include installing native container plants and/or cuttings,
hand seeding with native seed, and allowing native volunteer recruitment to create the basic
structure of the desired habitat (plants typically occurring within the vegetation type), the same
as under Alternative 4. Revegetation would occur between the months of October and March
and/or when soil moisture is optimal and as determined by a qualified biologist.
Monitoring: Qualitative and quantitative monitoring of revegetated Zones in Zones SC and J
would be conducted to assess native and nonnative vegetative cover, species diversity, and
density.
Remedial Planting/Seeding:
Should performance standards (i.e., native percent cover
described under Revegetation section, above) not be achieved for Zones SC and J, remedial
planting and/or seeding would occur between the months of October and March and/or when
soil moisture is optimal and as determined by a qualified biologist.
Schedule
Table 25 shows the schedule for proposed activities under Alternative 5.
28
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
TABLE 25
SCHEDULE
ALTERNATIVE 5, SINUOUS CHANNEL
Management Activity
Tree removal
(Nonnative and Dead
Trees)
Herbicide application
Tree maintenance
Schedule
Periodically, between the months of September and March
as needed and as resources permit.
For areas outside the construction zone, herbicides would
be applied as needed between the months of September
and March. Timing would be dependent on current
weather conditions and type of plant being controlled.
For areas inside the construction zone where active
planting would occur, herbicides would be applied four
times per year (between the months of September and
March) for the first two years following revegetation, then
twice per year (between the months of September and
March) until sufficient establishment of planted
vegetation. Upon sufficient establishment of vegetation,
Zones J and SC would be treated on an as needed basis
between the months of September and March.
Annually between the months of September and March as
needed.
29
Acreage*
Management Zone
Zone B
Zone Q
Zone SG
Zone L
Zone B
Zone Q
Zone L
31.5 acres
15.1 acres
5.8 acres
3.3 acres
32.5 acres
10.9 acres
3.3 acres
Zone SC
Zone J
2.6 acres
2.8 acres
Zone B
Zone Q
Zone L
32.5 acres
10.9 acres
3.3 acres
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Mowing
Brush cutting
Revegetation
Once every five years between the months of September
and March, in the rotation cycle associated with the Zone B
mowing schedule. However, brush cutting in Zone Q would
not occur during a Zone B mowing year. Native vegetation
occurring in low densities (less than 5 percent cover), such
as currant (Ribes sp.) and gooseberry (Ribes sp.), would be
avoided.
Once every five years between the months of September
and March, in the rotation cycle associated with the Zone B
mowing schedule. However, brush cutting in Zone Q would
not occur during a Zone B mowing year. Native vegetation
occurring in low densities (less than 5 percent cover), such
as currant (Ribes sp.) and gooseberry (Ribes sp.), would be
avoided.
Between the months of October and March and/or when
soil moisture is optimal and as determined by a qualified
biologist.
Zone B1
Zone B2
Zone B3
9.3 acres
13.1 acres
10.1 acres
Zone Q
10.9 acres
Zone SC
Zone J
2.6 acres
2.8 acres
Zone SC
Grading
Over a 2month period, preferably before the onset of the
rainy season, or as determined by a qualified biologist.
Zone J
Installation of infrastructure
Over a 2month period, preferably before the onset of the
rainy season, or as determined by a qualified biologist.
30
Zone OW
An estimated 12,584 cubic
yards of soil would be removed.
The final amount would be
determined upon approval of
project design.
An estimated 13,552 cubic
yards of soil would be removed.
The final amount would be
determined upon approval of
project design.
Depending on the final design of
the check dams, between 5 and
10 may be required; the size of
the dams would be determined
based on the width of the
channel.
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Remedial planting/seeding
Monitoring
Maintenance of Vehicular
access roads
Maintenance of dam
operations zone
One Year Pilot Program to
Hand Remove Invasive and
Nonnative Plants
*
Between the months of October and March and/or when
soil moisture is optimal and as determined by a qualified
biologist.
Qualitative to occur quarterly; quantitative to occur
annually in the spring.
Annual maintenance between the months of September
and March.
Annual maintenance between the months of September
and March.
To be determined.
Acreages may not total equal to the Proposed Action Area due to rounding.
31
Zone SC
Zone J
2.6 acres
2.8 acres
Zone SC
Zone J
Throughout the Proposed
Action Area(see Figure 24)
2.6 acres
2.8 acres
Dam operations zone
2.3 acres
To be determined.
To be determined.
7,467 linear feet, 14foot width
Image Source: Copyright 2014, Google, (flown 2014)
lvd
Burb ank B
Wo
y
od le
"
)
L
"
)
Q
"
)
OW
"
)
Q
"
)
SC
"
)
J
"
)
B3
"
)
J
"
)
B2
"
)
SC
sA
Lo
sR
e le
ng
r
iv e
B1
lv
pu
Se
Project Boundary - USACE Sepulveda Dam Basin Vegetation Management Zones
Vehicular Access
Pedestrian Access
Un-named Drain
Schenoplectus californicus Herbaceous Alliance (SC)
Grade Control Devices
Juncus acutus Harbaceous Alliance (J)
Open Water (OW)
Quercus spp. Woodland Alliance (Q)
Seasonal Pond
Rip-rap Bridge Footing
am
aD
ed
Native Plant Landscape Buffer (L)
Vegetation-Free Berm
Dam Operation Zone (Width: 50ft)
¨
§
¦
405
"
)
0
Feet
200
[
Bacharis pilularis Shrubland Alliance (B1, B2, B3)
FIGURE 2-5
Sinuous Channel Alternative
M:\JOBS4\7260\common_gis\fig2-5.mxd 2/24/2015 sab
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
2.6 Alternative 6 No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
3.0 Affected Environment and Environmental
Consequences
3.1 Land Use
Affected Environment
The Proposed Action Area is within the Basin, which supports multiple uses, including
recreation, water reclamation, wildlife preserves, and military facilities.
Land uses in the immediate vicinity of the Proposed Action Area include the Sepulveda Basin
Wildlife Preserve north of Burbank Boulevard; an agricultural field to the west, across from the
Los Angeles River; a municipal golf course to the northwest; commercial and residential Zones,
across Interstate 405; and a spillway and Corps operations and maintenance Zone to the south,
immediately downstream of Sepulveda Dam.
The Proposed Action Area and its vicinity were historically used for agriculture subsequent to
the completion of the dam in 1941. Agricultural uses ceased circa 1980. Currently, the Proposed
Action Area is classified in the 2011 Sepulveda Basin Master Plan as a "vegetation maintenance
area." South of Haskell Creek, the land contains native and nonnative trees, nonnative shrubs,
weeds, and grasses. Similar vegetation is found north of Haskell Creek. Haskell Creek banks are
covered with a dense canopy of native and nonnative trees with little understory. The area is
not outgranted for other uses. There are no recreation amenities on site. However, passive
recreational uses such as nature walks and bird watching do occur onsite.
Significance Threshold
Impacts would be considered significant if the alternative:
Permanently conflicts with existing land uses or with adjacent, offsite land uses.
Changes the existing land use.
Does not comply with the land use classification identified in the 2011 Sepulveda Basin
Master Plan.
Environmental Consequences
Alternative 1: Active Management Alternative
All activities would be located within the Proposed Action Area. There would be no change to
the existing land use or landuse patterns. Neither would there be changes to the adjacent land
uses. There would be no change in the designated land use classification of Sepulveda Dam
33
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Basin Vegetation Maintenance Area per the 2011 Sepulveda Basin Master Plan. As a result,
there would be no significant impact on land use under the Active Management Alternative.
Alternative 2: Passive Management Alternative
Impacts under Alternative 3 would be the same as those characterized under Alternative 1. As a
result, there would be no significant impact on land use.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be the same as those characterized under Alternative 1. As a
result, there would be no significant impact on land use.
Alternative 4: South Marsh Alternative
Impacts under Alternative 4 would be similar to those characterized under Alternative 1.
Construction of the marsh may result in additional passive recreational use of the area.
However, passive recreation is an existing use of the land. Thus, the existing use would remain
and would be further enhanced. As a result, there would be no significant adverse impact on
land use.
Alternative 5: Sinuous Channel Alternative
Impacts under Alternative 5 would be similar to those characterized under Alternative 1.
Construction of the sinuous channel and adjoining marsh may result in additional passive
recreational use of the area. However, passive recreation is an existing use of the land. Thus,
the existing use would remain and would be further enhanced. As a result, there would be no
significant adverse impact on land use.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
There would be no change to the existing land use or landuse patterns. Neither would there be
changes to the adjacent land uses. There would be no change in the designated land use
classification of Sepulveda Dam Basin Vegetation Maintenance Area per the 2011 Sepulveda
Basin Master Plan. As a result, there would be no significant impact on land use.
34
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
3.2 Soils
Affected Environment
The greater part of the San Fernando Valley is overlain by recent alluvium, consisting of
unconsolidated and unweathered, poorly graded clay, silt, gravel, and boulders. The Basin is
entirely covered by recent alluvium composed of relatively fine material (Corps 2012a).
The Natural Resources Conservation Service (NRCS) reported four different soil groups within
the Proposed Action Area--Capistrano, Conejo, Cropley, and Mocho. The Capistrano soil group
covers approximately 5.5 percent of the Proposed Action Area. A fine, sandy loam comprising
mixed alluvium derived from granite, Capistrano is commonly found along river valleys. The
Conejo soil group is found along river valleys, and makes up approximately 47.3 percent of the
Proposed Action Area. Conejo is a welldrained clay loam derived from young, mixed alluvium.
The Cropley soil group covers approximately 29.4 percent of the Proposed Action Area. It is a
welldrained, clay alluvium derived from calcareous shale. Lastly, the Mocho soil group makes
up approximately 17.9 percent of the Proposed Action Area. It is a welldrained loam comprising
young alluvium. The Capistrano, Conejo, and Cropley soil groups are all within 0 to 2 percent
slope topography with fastdraining, nonsaline soils. The Mocho soil group has 2 to 9 percent
slope topography (NRCS 2015).
Significance Threshold
Impacts would be considered significant if the alternative:
Substantially increases wind or water erosion of soils or loss of topsoil.
Substantially alters the physical or chemical quality of sediments or soils.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing and
brush cutting of all shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large
native trees in Zones B, Q, L, and SG; periodic removal of nonnative and dead trees as needed
and as resources permit; and maintenance of access roads and the dam operations zone. The
vegetation management activities would not substantially increase wind or water erosion. The
area would remain vegetated. Vegetation would provide a continuous vegetative cover with a
fibrous root system that would reduce wind erosion of top soil and minimize inundation erosion
by flood waters. Furthermore, cut vegetation would be chipped and spread onsite as
practicable. Thus, ground cover would be increased, preventing wind or water erosion. The
potential for soil erosion would also be reduced by the compaction of soil and use of
decomposed granite when improving and maintaining the vehicular access roads and dam
operations zone.
Herbicides deemed suitable for use in or near the aquatic environment would be applied as
needed between the months of September and March. The Basin receives storm runoff and
35
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
nuisance flows from fully developed urban areas. Storm runoff and nuisance flows typically
convey pollutants associated with urban development such as organic solvents, metals,
surfactants, fecal matter, organic waste, pesticides, herbicides, and fertilizers. As the Proposed
Action Area lies in the lowest part of the Basin, it is often inundated by overflow from the Los
Angeles River and Haskell Creek. With frequent inundation and absorption, presence of
chemical listed above or their breakdown products in the soil is certain. Thus, periodic use of
herbicides would not substantially alter the chemical quality of sediments or soils.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1.
However, mowing in Zone B and brush cutting in Zone Q would occur once every three years
allowing for additional growth of shrubs when compared to the Active Management Alternative.
Thus, the frequency of disturbance to soils associated with mowing and brush clearing activities
would be reduced to once every three years. Use of hand tools by volunteers associated with
the pilot oneyear program to remove nonnative and invasive plants would result in de minimis
soil disturbance. Impacts would be less than significant.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 2.
However, the frequency of disturbance to soils associated with mowing and brush clearing
activities would be reduced to once every five years and would be rotated across Zones B1, B2,
B3 and Q. Impacts would be less than significant.
Alternative 4: South Marsh Alternative
Impacts associated with maintenance activities would be similar to those characterized under
Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 24). Construction would include earthmoving activities such as excavating and
grading. Earth moving activities may have the potential to increase runoff and erosion in the
short term due to mechanical disruption of the soil resulting in loose and unconsolidated
topsoil. The area would be revegetated, which would have a beneficial impact on the soil
stability. Revegetation activities in the Proposed Action Area would include broadcast seeding in
fill areas and remedial planting in the marsh habitat. Soil would be stabilized upon revegetation.
Impacts would be less than significant.
Alternative 5: Sinuous Channel Alternative
Impacts associated with maintenance activities would be similar to those characterized under
Alternative 3.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
Construction would include earthmoving activities such as excavating and grading. As under
Alternative 4, mechanical disruption of the soil due to the grading required for these activities
would result in unconsolidated topsoil which could increase shortterm runoff and erosion
36
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
potential. Also, the same as under Alternative 4, these areas would be revegetated, and upon
revegetation the soils would be stabilized. Impacts would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. Vegetation
would provide a continuous vegetative cover with a fibrous root system that would reduce wind
erosion of top soil and minimize inundation erosion by flood waters. Impacts would be less than
significant.
3.3 Surface Water Quality
Affected Environment
The major sources of water for the Los Angeles River in the project vicinity are storm flows and
nuisance flows from upstream tributaries and storm drain outfalls, and tertiarytreated effluent
from the Tillman Water Reclamation Plant (WRP). The active channel of Haskell Creek is
perennial due to discharge of reclaimed water from the Tillman WRP. The Tillman WRP treats
about 40 million gallons per day and discharges approximately 17 million gallons per day of
reclaimed water to 3 lakes: the Wildlife Lake, the Japanese Garden Lake, and Lake Balboa. The
Wildlife Lake discharges water into Haskell Creek. All three lakes eventually discharge water
into the Los Angeles River.
The Proposed Action Area is adjacent to the Los Angeles River and encompasses a portion of
Haskell Creek. Both waterways are considered to be waters of the United States. The Los
Angeles Regional Water Quality Control Board has designated beneficial uses of the Los Angeles
River in the Basin (Los Angeles River Reach 5), which include: Municipal and Domestic Supply,
Industrial Service Supply, Ground Water Recharge, Warm Freshwater Habitat, Wildlife Habitat,
Wetland Habitat, Water Contact Recreation, and Noncontact Water Recreation (Corps 2013a).
The Los Angeles River routine base flow (usually less than 10 cubic feet per second) is typically
high in salinity, whereas storm runoff is generally low in salinity. As the Proposed Action Area
lies in the lowest part of the Basin, it is often inundated by overflow from the Los Angeles River
and Haskell Creek which can deposit sediment and trash from upstream. The urban storm runoff
entering the Basin is generally of poor quality. Storm runoff and nuisance flows typically convey
pollutants associated with urban development such as organic solvents, metals, surfactants,
fecal matter, organic waste, pesticides, and fertilizers.
Significance Threshold
Impacts would be considered significant if the alternative:
Causes a permanent violation of water quality standards or otherwise substantially
degrades water quality.
37
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Substantially alters the existing drainage pattern of the site or area, including the
alteration of the course of a stream or river, in a manner that would result in substantial
increase in erosion or siltation on or off site.
Substantially alters the existing drainage pattern of the site or area, including the
alteration of the course of a stream or river, in a manner that would result in a
substantial reduction in the quantity of surface water.
Substantially alters the existing drainage pattern of the site or area, including the
alteration of the course of a stream or river, or substantially increases the rate or
amount of surface runoff in a manner that would result in flooding on or off site or
provide substantial additional sources of polluted runoff.
Increases substantial erosion or sedimentation in relation to existing conditions.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing and
brush cutting of all shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large
native trees in Zones B, Q, L, and SG; periodic removal of nonnative and dead trees as needed
and as resources permit; and maintenance of access roads and the dam operations zone. The
use of herbicides would be limited to those deemed suitable for use in or near the aquatic
environment.
The work would not violate water quality standards or otherwise substantially degrade water
quality. All work would be located outside of waters of the United States. There would be no
presence of earthmoving machinery within active flows. With the exception of regrading the
existing access road, there would be no activities which would result in the movement of
earthen material. The regrading would occur on access roads constructed from compacted
decomposed granite which is resistant to erosion relative to compacted earth. Furthermore, the
regrading activity would be located approximately 40 to 50 feet from the banks of Haskell Creek.
There would be no alterations to the landscape or drainage patterns that would result in
substantial increase in erosion or siltation or reduce the quantity of surface water. Mowing and
brush cutting of vegetation would not change the drainage pattern of the site. Maintenance
grading of existing access road would retain the existing grades and alignments. Therefore,
impacts would be less than significant.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized for Alternative 1. However,
mowing in Zone B and brush cutting in Zone Q would occur once every three years allowing for
additional growth of shrubs when compared to Alternative 1.
Use of hand tools by volunteers associated with the pilot oneyear program to remove non
native and invasive plants would not result in impacts to water quality or alter drainage patterns
that would affect erosion and sedimentation process or reduce the amount of surface water.
38
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
For the duration of a pilot oneyear program to hand remove invasive and nonnative plants, no
herbicides would be used. Any herbicides used before or after the pilot program would be
limited to those deemed suitable for use in or near the aquatic environment. Impacts would be
less than significant.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 2..
However, the frequency of mowing and brush clearing activities would be reduced to once every
five years and would be rotated across Zones B1, B2, B3 and Q, allowing further additional
growth of shrubs when compared to Alternative 2 . Impacts would be less than significant.
Alternative 4: South Marsh Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 24). Though most construction activities would occur outside of waters of the
United States, construction would require installation of grade control structures as well as
water intake and outlet structures within Haskell Creek. Earthwork within Haskell Creek would
result in turbidity increases during construction. Excavators, bulldozers, and other earthmoving
equipment may be used in or near Haskell Creek. As such, waters may come into contact with
petroleumbased products such as lubricants, fuel, and hydraulic fluids. Construction areas
would be isolated from flows to minimize water quality impacts. Structures within waters of the
United States would be chemically inert, and would consist of materials such as concrete or
stone which would not leach contaminants into the water column. Backfill would consist of on
site substrate.
Establishment of marsh habitat would require excavation of a depressed area within the
Proposed Action Area. Because sedimentation within the Proposed Action Area is dictated by
flooding frequency from the larger drainage area and the Los Angeles River and Haskell Creek
are lower in elevation relative to the Proposed Action Area, presence of a depression would not
change the larger drainage patterns that would result in substantial change in erosion or
siltation. All water routed to the marsh habitat would be redischarged back into Haskell Creek.
Thus, there would be no reduction in the quantity of surface water.
Installation of grade control structures and water intake and outlet structures would discharge
dredge or fill material into Haskell Creek, a waters of the United States. Thus, compliance with
Section 401 and Section 404 of the Clean Water Act would be required. With implementation of
best management practices (e.g., such as diverting surface flows around the construction site or
refueling in the uplands) and the terms and conditions of Section 401 Water Quality
Certification, impacts to water quality would be avoided or minimized. Impacts would be less
than significant.
39
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 5: Sinuous Channel Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
Construction would include earthmoving activities such as excavating and grading. The majority
of construction would occur in waters of the United States. Construction would require
installation of grade control structures throughout Haskell Creek. Excavators, bulldozers, and
other earthmoving equipment may be used in or near Haskell Creek. As such, waters may come
into contact with petroleumbased products such as lubricants, fuel, and hydraulic fluids.
Construction areas would be isolated from flows to minimize water quality impacts. Structures
within waters of the United States would be chemically inert, and would consist of materials
such as concrete or stone which would not leach contaminants into the water column. Backfill
would consist of onsite substrate.
Establishment of a sinuous channel may change erosion and sedimentation processes within
Haskell Creek relative to the linear alignment. Any proposed design would be further subject to
detailed engineering review and modification to ensure that the change in alignment does not
result in further changes to erosion and sedimentation processes throughout the larger
Proposed Action Area. The sinuous channel would not reduce the amount of surface water
through the Proposed Action Area.
Installation of structures within waters of the United States would result in discharges of
dredged or fill material under Section 404 of the Clean Water Act. Thus, compliance with
Section 401 and Section 404 of the Clean Water Act would be required. With implementation of
best management practices similar to those described for Alternative 4, as well as terms and
conditions of Section 401 Water Quality Certification, impacts to water quality would be avoided
or minimized. Impacts would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. Vegetation
would provide a continuous vegetative cover with a fibrous root system that minimize
inundation erosion by flood waters. There would be no maintenance activities which could alter
the landscape or drainage patterns that would result in substantial increase in erosion or
siltation or reduce the quantity of surface water. Impacts would be less than significant.
40
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
3.4 Air Quality and Greenhouse Gases
Affected Environment
National Ambient Air Quality Standards
To protect the public health and welfare, the Federal government identified a number of criteria
air pollutants and established ambient air quality standards through the Federal Clean Air Act
for each. The air pollutants for which Federal standards have been promulgated via the
National Ambient Air Quality Standards (NAAQS) include ozone (O3), carbon monoxide (CO),
suspended particulate matter (PM), sulfur dioxide (SO2), nitrogen dioxide (NO2), and lead (Pb).
PM emissions are regulated in two size classes: Particulates up to 10 microns in diameter (PM10
and particulates up to 2.5 microns in diameter (PM2.5).
A region is given the status of "attainment" or "unclassified" if the NAAQS have not been
exceeded. A status of "nonattainment" for particular criteria pollutants is assigned if the NAAQS
have been exceeded. Once designated as nonattainment, attainment status may be achieved
after three years of data showing nonexceedance of the standard. When an area is reclassified
from nonattainment to attainment, it is designated as a "maintenance area," indicating the
requirement to establish and enforce a plan to maintain attainment of the standard. Federal
attainment status designations for the South Coast Air Basin (SCAB) are summarized in Table 3
1.
General Conformity Rule
Section 176(c) of the federal Clean Air Act states that a federal agency cannot issue a permit for,
or support an activity within, a nonattainment or maintenance area unless the agency
determines it will conform to the most recent U.S. Environmental Protection Agencyapproved
State Implementation Plan (SIP). Thus, a federal action must not:
Cause or contribute to any new violation of a NAAQS.
Increase the frequency or severity of any existing violation.
Delay the timely attainment of any standard, interim emission reduction, or other
milestone.
A conformity determination is required for each criteria pollutant or precursor where the total
of direct and indirect emissions of the criteria pollutant or precursor in a nonattainment or
maintenance area caused by the federal action would equal or exceed rates specified in 40
C.F.R. 93.153.
41
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
TABLE 31
NAAQS ATTAINMENT DESIGNATIONS FOR THE SCAB AND APPLICABLE GENERAL CONFORMITY
APPLICABILITY RATES
Attainment Status
General Conformity
Applicability Rates
Nonattainment
Attainment/Maintenance
Nonattainment
Attainment/Maintenance
Attainment/Maintenance
Attainment
Nonattainment
(tons/year)
10
100
100
100
100
100
25
Pollutant
Ozone
Inhalable particulate matter (PM10)
Fine particulate matter (PM2.5)
Carbon monoxide
Nitrogen oxide
Sulfur dioxide
Lead
Source: US EPA Green Book
The SCAB is currently in extreme nonattainment for ozone (precursors: VOC or NOx);
nonattainment for PM2.5; attainment/maintenance for PM10; attainment/maintenance for
NO2; and attainment/maintenance for CO; and nonattainment for lead. Based on the present
attainment designation for the SCAB, a Federal action would conform to the SIP if annual
emissions are below 100 tons of CO, PM2.5, PM10, or N02, 10 tons of VOC, or 25 tons of lead.
Regional Significance Thresholds
The South Coast Air Quality Management District (SCAQMD) has developed Regional
Significance Thresholds (RSTs) for mass daily emission rates of criteria pollutants for both
construction and operational sources. RSTs represent the maximum emissions from a project
that are not expected to cause or contribute to an exceedance of the most stringent applicable
Federal or state ambient air quality standard in the SCAB.
TABLE 32
SCAQMD REGIONAL AIR QUALITY SIGNIFICANCE THRESHOLDS1
Construction Emission
Thresholds
Pollutant
Reactive Organic Gas (ROG or VOC2)
Inhalable particulate matter (PM10)
Fine particulate matter (PM2.5)
Carbon monoxide
Nitrogen oxide
Sulfur dioxide
Lead
(lbs/day)
75
150
55
550
100
150
3
1. Source: http://www.aqmd.gov/docs/defaultsource/ceqa/handbook/scaqmdairquality
significancethresholds.pdf?sfvrsn=2; 2., ROG and VOC are used interchangeably for the purpose of
comparing to significance thresholds.
42
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Emission Estimates Methodology
Emissions were estimated using onroad and offroad emission factors published by the
SCAQMD.
Each of the action alternatives as well as the Active Management Alternative would require the
same suite of onroad and offroad vehicles for vegetation management activities: two loaders,
two dump trucks; two chippers; one water truck, and five pickup trucks. Most vegetation
activities would be completed within a four week period. Five pickup trucks would make 60 mile
round trips each work day. Vegetation not mulched on site would be transported over the dam
and placed within a sediment storage site downstream of the dam.
Construction of the marsh and sinuous channel in Alternatives 4 and 5 would require the same
suite of onroad and offroad vehicles: two excavators, two loaders, two dump trucks; two
chippers; one water truck, and five pickup trucks. Excavated earth would be transported over
the dam and placed within a sediment storage site downstream of the dam. Period of
construction would be six months.
Estimates of lead emissions were not calculated. Lead emissions from mobile sources in
California have significantly decreased due to the near elimination of lead in fuels. Thus,
emission factors for lead are not available. Little to no quantifiable and foreseeable lead
emissions would be generated by any of the alternatives.
Ozone (O3) formation is driven by two major classes of directly emitted precursors: nitrogen
oxides (NOx) and volatile organic compounds (VOC). The relation between O3, NOx and VOC is
driven by complex nonlinear photochemistry. Due to the variability in rates of ozone formation,
there are no emission factors for ozone. Instead, the emissions associated with ozone
precursors (i.e., ROG) are calculated and used as a surrogate for reporting ozone emissions.
Greenhouse Gas Emissions
Gases that trap heat in the atmosphere are often called greenhouse gases (GHG). GHGs are
emitted by natural processes and human activities. Examples of GHGs that are produced both
by natural processes and industry include carbon dioxide (CO2), methane (CH4), and nitrous
oxide (N2O). Currently, there are no Federal standards for GHG emissions and no Federal
regulations have been set at this time, though the CEQ has issued final guidance on the
consideration of GHG emissions, entitled Final Guidance on the Consideration of Greenhouse
Gas Emissions and the Effects of Climate Change in NEPA Reviews, dated August 1, 2016. The
annual GHG emissions under each alternative disclosed in Table 36.
43
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Significance Threshold
Impacts would be considered significant if the alternative:
Exceeds any General Conformity Rule applicability rate
Exceeds any SCAQMD daily RSTs
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing of all
shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large native trees in Zones
B, Q, L, and SG; periodic removal of nonnative and dead trees as needed and as resources
permit; and maintenance of access roads and the dam operations zone. Offroad emissions
would include those from loaders and chippers operating 8 hours per day over a 25day period.
Onroad emissions would include daily commutes for 5 pickup trucks and dump trucks operating
within the Proposed Action Area.
As shown in Table 35 estimated annual emissions would not exceed the Clean Air Act General
Conformity applicability rates. As a result, a General Conformity Analysis would not be required.
As shown in Table 33 estimated emissions would not exceed daily SCAQMD emissions
thresholds. Therefore, Alternative 1 would entail less than significant impacts to air quality.
Fugitive emissions of PM2.5 and PM10 associated with the use of unpaved roads and material
handling would be minimized through implementation best management practices such as
watering unpaved roads within the Proposed Action Area.
TABLE 33
COMPARISON OF ESTIMATED DAILY EMISSIONS TO SCAQMD THRESHOLDS
ALTERNATIVES 1, 2 AND 3
Pollutant
Reactive Organic Gas (ROG or VOC)
Inhalable particulate matter (PM10)
Fine particulate matter (PM2.5)
Carbon monoxide
Nitrogen oxide
Sulfur dioxide
Construction Emission
Thresholds (lbs/day)
75
150
55
550
100
150
Estimated Emissions
(lbs/day)
1.59
0.36
0.32
13.21
8.78
0.03
Alternative 2: Passive Management Alternative
Activities under Alternative 2 are similar to Alternative, except mowing in Zone B and brush
cutting in Zone Q would occur once every three years allowing for additional growth of shrubs
when compared to Alternative 1.
Due to the decrease in mowing frequency, impacts associated with maintenance activities
would be less than those characterized under Alternative 1. Commutes by volunteers
associated with the pilot oneyear program to remove nonnative and invasive plants would
44
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
likely result in use of lightduty passenger vehicles. Contribution from the use of passenger
vehicles to the emissions shown in Table 33 would be de minimis. As shown in Table 35
estimated annual emissions would not exceed the Clean Air Act General Conformity applicability
rates. As a result, a General Conformity Analysis would not be required. Fugitive emissions of
PM2.5 and PM10 associated with the use of unpaved roads and material handling would be
minimized through implementation best management practices such as watering unpaved roads
within the Proposed Action Area. Impacts would be less than significant.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 2, except
that mowing and brush cutting would occur once every five years and would be rotated across
Zones B1, B2, B3 and Q.
Due to the decrease in mowing frequency, impacts associated with maintenance activities
would be less than those characterized under Alternatives 1 and 2. Commutes by volunteers
associated with the pilot oneyear program to remove nonnative and invasive plants would
likely result in use of lightduty passenger vehicles. Contribution from the use of passenger
vehicles to the emissions shown in Table 34 would be de minimis. As shown in Table 35
estimated annual emissions would not exceed the Clean Air Act General Conformity applicability
rates. As a result, a General Conformity Analysis would not be required. Fugitive emissions of
PM2.5 and PM10 associated with the use of unpaved roads and material handling would be
minimized through implementation best management practices such as watering unpaved roads
within the Proposed Action Area. Impacts would be less than significant.
Alternative 4: South Marsh Alternative
Impacts associated with maintenance activities under Alternative 4 would be similar to those
characterized under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 24). Construction would include earthmoving activities such as excavating and
grading. Offroad emissions would include those from excavators and loaders operating 8 hours
per day over a 6 month period. Onroad emissions would include daily commutes for 5 pickup
trucks and dump trucks operating within the Proposed Action Area.
Commutes by volunteers associated with the pilot oneyear program to remove nonnative and
invasive plants would likely result in use of lightduty passenger vehicles. Contribution from the
use of passenger vehicles to the emissions shown in Table 34 would be de minimis.
As shown in Table 35 estimated annual emissions would not exceed the Clean Air Act General
Conformity applicability rates. As a result, a General Conformity Analysis would not be required.
As shown in Table 34 estimated emissions would not exceed daily SCAQMD emissions
thresholds. Therefore, Alternative 4 would entail less than significant impacts to air quality.
Fugitive emissions of PM2.5 and PM10 associated with the use of unpaved roads and material
handling would be minimized through implementation best management practices such as
watering unpaved roads within the Proposed Action Area.
45
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
TABLE 34
COMPARISON OF ESTIMATED DAILY EMISSIONS TO SCAQMD THRESHOLDS
ALTERNATIVES 4 AND 5
Pollutant
Reactive Organic Gas (ROG or VOC2)
Inhalable particulate matter (PM10)
Fine particulate matter (PM2.5)
Carbon monoxide
Nitrogen oxide
Sulfur dioxide
Construction Emission
Thresholds (lbs/day)
75
150
55
550
100
150
Estimated Emissions
(lbs/day)
3.62
0.74
0.64
30.30
17.46
0.03
Alternative 5: Sinuous Channel Alternative
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
Impacts under Alternative 5 would be similar to and potentially slightly greater than those under
Alternative 4. Implementing Alternative 5 would not be expected to result in any violations of
federal or state air quality standards or result in any significant adverse impacts on air quality.
TABLE 35
COMPARISON OF ESTIMATED ANNUAL EMISSIONS TO GENERAL CONFORMITY APPLICABILITY
RATES
General
Conformity
Applicability Rates
Pollutant
Ozone (ROG,VOC)
Inhalable particulate matter (PM10)
Fine particulate matter (PM2.5)
Carbon monoxide
Nitrogen oxide
Lead
(tons/year)
10
100
100
100
100
25
Alternatives
1, 2 and 3
(tons/year)
Alternatives 4 and 5
(tons/year)
0.018
0.004
0.003
0.15
0.10
0.25
0.051
0.044
2.09
1.2
TABLE 36
ESTIMATED GHG EMISSIONS
Pollutant
CO2e
Alternatives 1, 2 and 3
(metric tons/year)
Alternatives 4 and 5
(metric tons/year)
757
9,177
46
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. There would
be no use of mechanized equipment that would result in emissions of criteria pollutants.
Impacts would be less than significant.
3.5 Noise
Noise can be defined as unwanted sound or combination of sounds that may interfere with
conversation, work, rest, recreation, and sleep, or in the extreme may produce physiological or
psychological damage. Sound travels from a source in the form of wave, which exerts a pressure
on a receptor such as a human ear. The amount of pressure a sound wave exerts is referred to
as sound level, commonly measured in decibels (dB). As a reference, a sound level of zero dB
corresponds roughly to the threshold of human hearing, and a sound level in the range of 120 to
140 dB can produce human pain.
Sound has two main components to a human ear: pitch and loudness. While the pitch of a sound is
generally associated with an annoyance, sound loudness can interfere with activities such as
conversation, sleep, and learning, and can even have lasting physiological effects, such as hearing
loss. Those who are more sensitive to noise such as children and the elderly are at higher risk of
being adversely affected by excessive noise levels. Table 37 lists some sources and effects
associated with a typical range of noise levels.
TABLE 37
SOURCE AND EFFECTS OF COMMON NOISE LEVELS
Noise
Level (dB)
130
120
110
100
90
85
80
75
70
65
60
55
50
45
40
35
30
Effects
Evidence
Pain Threshold
Deafening
Hearing Loss
Source
Hard Rock Band
Thunder
Jet Takeoff
Loud Auto Horn at 10 feet
Noisy City Street
Very Loud
School Cafeteria
Physiological Effects
Interference with
Conversation
Vacuum Cleaner at 10 feet
Loud
Normal Speech at 3 feet
Sleep Interruption
Moderately Loud
Sleep Disturbance
Faint
47
Average Office
Dishwasher in Next Room
Soft Radio Music
Quiet Residential Zone
Interior of Average Residence
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
TABLE 37
SOURCE AND EFFECTS OF COMMON NOISE LEVELS
20
10
5
0
Average Whisper at 6 feet
Rustle of Leaves in Wind
Very Faint
Hearing Threshold
Human Breathing
Noise can be one of the most widespread environmental pollutants affecting communities.
Community noise, or environmental noise, varies continuously in any given Zone over a period
of time depending on the contributing sound sources within and surrounding the area. Such
community noise typically includes a combination of relatively stable background noise--where
individual contributors are not identifiable--and the periodic addition of short duration noise
sources such as aircraft flyovers, motor vehicles, or sirens. Some land uses can be considered
more sensitive to community noise levels than others and are often referred to as sensitive
receptors. These include residences, schools, hotels, hospitals, nursing homes, churches,
libraries, and cemeteries. Shopping centers, commercial parks, strip malls, industrial Zones, and
active recreation Zones can be considered less noisesensitive receptors.
In addition, wildlife may be sensitive receptors to noise and vibrations. Wildlife rely on
meaningful sounds for communication, navigation, avoiding danger and finding food. Noise may
be defined for wildlife as any human or other exterior sound that alters the behavior of animals
or interferes with their functioning. The level of disturbance may be qualified as damage, which
may harm health, reproduction, survivorship, habitat use, distribution, abundance or genetic
distribution, or disturbance which causes a detectable change in behavior. Behavioral and
physiological responses of wildlife to noise have the potential to cause injury, energy loss,
decrease in food intake, habitat avoidance and abandonment, and reproductive losses.
Affected Environment
The Basin is in the Encino Zone of San Fernando Valley, and is surrounded by an urban
environment. Traffic is the primary source of noise in and near the Proposed Action Area.
Interstate 405 borders the Proposed Action Area to the east and Burbank Boulevard borders it
to the south. Noise from Burbank Boulevard varies throughout the day, being typically greater
during early morning rush hour and late afternoon/early evening rush hour periods. Noise from
Interstate 405 is limited to a very low background hum, if at all, depending on wind direction.
Operation of the Van Nuys Airport, approximately 2.6 miles north of the Basin, periodically
contributes to the existing noise levels in the area. Sound measurements conducted in the area
range from 50 Aweighted decibels (dB(A)) to 65 dB(A). Nesting birds may be present on site
and in adjacent vegetation during bird nesting season. There are no human sensitive receptors
such as schools, hospitals, or houses of worship near the Proposed Action Area.
Significance Threshold
Impacts would be considered significant if the alternative results in:
A long term increase in noise levels above ambient noise levels by 5 dB(A).
48
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
An increase in noise levels that may interfere with breeding behavior of migratory birds.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing and
brush cutting of all shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large
native trees in Zones B, Q, L, and SG; periodic removal of nonnative and dead trees as needed
and as resources permit; and maintenance of access roads and the dam operations zone. The
work would require limited use of construction equipment. Equipment may include haul trucks,
loaders, and tractors with articulated mowing attachments. Typical construction equipment
generates noise levels ranging from approximately 76 to 88 dB(A) at a distance of 50 feet from
the source.
Atmospheric attenuation of sound level is approximately 6 dB(A) for every doubling of distance
from a noise source. Table 38 shows estimated sound levels at each doubling of distance from
the center of the noise source based solely on atmospheric attenuation.
TABLE 38
ESTIMATED RANGES OF SOUND LEVELS AT VARIOUS DISTANCES
Distance from noise source
(feet)
Estimated sound levels (dBA)
50
76 88
100
70 82
200
64 76
400
58 70
800
52 64
The geographic center of the Proposed Action Area is approximately 600 to 1,200 feet from the
boundary. At a distance of 800 feet, the sound levels would range from approximately 52 dB(A)
to 64 dB(A) and would not be distinguishable from ambient noise levels. Recreational users in
the area at distances closer than 800 feet would be temporarily exposed to elevated noise
levels. Noise levels would return to ambient levels upon completion of work. As such, there
would be no long term increase in noise levels above ambient noise levels by 5 dB(A).
The noise created during the implementation period would have no significant impact on
migratory birds, as all work would be performed after 15 September and prior to 15 March (i.e.,
outside the migratory bird breeding season). No significant adverse impacts on noise conditions
would occur under Alternative 1.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be slightly less relative to those characterized under
Alternative 1 due to the reduced mowing and brush cutting frequency. Use of hand tools by
volunteers associated with the pilot oneyear program to remove nonnative and invasive plants
would result in de minimis noise disturbance. Therefore, impacts from noise would be less than
significant.
49
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be slightly less relative to those characterized under
Alternative 1 due to the reduced mowing and brush cutting area per year. Use of hand tools by
volunteers associated with the pilot oneyear program to remove nonnative and invasive plants
would result in de minimis noise disturbance. Therefore, impacts from noise would be less than
significant.
Alternative 4: South Marsh Alternative
Impacts under Alternative 4 would be similar to those characterized under Alternative 3;
however, there would be a temporary increase in noise levels during construction of the marsh
from the use of excavators, loaders, and bulldozers. Use of hand tools by volunteers associated
with the pilot oneyear program to remove nonnative and invasive plants would result in de
minimis noise disturbance. Therefore, impacts from noise would be less than significant.
Alternative 5: Sinuous Channel Alternative
Impacts under Alternative 5 would be similar to those characterized under Alternative 4;
however, there would be a temporary increase in noise levels during construction of the sinuous
channel and adjoining marsh from the use of excavators, loaders, and bulldozers. Use of hand
tools by volunteers associated with the pilot oneyear program to remove nonnative and
invasive plants would result in de minimis noise disturbance. Therefore, impacts from noise
would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. There would
be no use of mechanized equipment that would result in temporary noise disturbances. Impacts
would be less than significant.
3.6 Biological Resources
Affected Environment
Vegetation
Vegetation in the Basin has been altered from its natural state by agriculture, urbanization, the
construction of the dam and associated works, several periods of cyclic droughts, natural and
humancaused erosion, establishment of invasive (nonnative) plant species, and ongoing
planting and maintenance of ornamental landscaping. In late 2012, the Corps removed native
and nonnative invasive species in the area between Haskell Creek and the dam to enhance
public safety. In 2014, the Corps applied herbicides to manage invasive vegetation and removed
a number of nonnative trees throughout the Proposed Action Area. Furthermore, the Corps
annually removes emergent vegetation growing on top of grouted stone section of the Los
50
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Angeles River between Burbank Boulevard and the dam; the mouth of Haskell Creek; and the
mouth of Encino Creek. The naturally recruited vegetation located on inchannel sediment bars
includes cattails (Typha spp.), willow tree saplings (Salix spp.), mulefat (Baccharis salicifolia), and
California fan palms (Washingtonia filifera).
Prior to the 2012 vegetation management project, the Proposed Action Area supported,
Baccharis pilularis vegetation type was dominant to codominant in the shrub canopy with
California sagebrush (Artemisia californica), lilacs (Ceanothus spp.), beaked hazel (Corylus
cornuta), California buckwheat (Eriogonum fasciculatum), seaside woolly sunflower (Eriophyllum
staechadifoliu), silk tassel (Garrya elliptica), deer weed (Lotus scoparius), yellow bush lupine
(Lupinus arboreus), California blackberry (Rubus ursinus), white sage (Salvia apiana), and pitcher
plant (S. leucophylla). Shrubs are less than 3 meters in height, and the canopy is variable. The
herbaceous layer is also variable. Due to vegetation management and human use of the area,
the vegetation community currently consists of a mix of these native plants and nonnative
plants.
The Quercus spp. vegetation type is a combination of the coast live oak (Quercus agrifolia)
vegetation type and the valley oak vegetation type. Within the Q. agrifolia vegetation type,
coast live oak is dominant or codominant in the tree canopy with maple (Acer spp.), California
sycamore (Platanus racemosa), Fremont's cottonwood (Populus fremontii), valley oak, and
arroyo willow (Salix lasiolepis). Trees are over 30 meters in height, and the canopy is open to
continuous. The shrub layer is sparse to intermittent and the herbaceous layer is sparse or
grassy. Within the Q. lobata vegetation type, the Q. lobata is dominant or codominant in the
tree canopy with box elder (Acer negundo), Oregon ash (Fraxinus latifolia), California sycamore,
Fremont's cottonwood, coast live oak, Gooding's willow (Salix gooddingii), and arroyo willow (S.
lasiolepis). Trees are under 30 meters in height and the canopy is open to continuous. Shrubs
are common to occasional and the herbaceous layer may be grassy.
The Salix gooddingii vegetation type is dominant or codominant in the tree canopy with
Fremont's cottonwood, red willow (Salix laevigata), arroyo willow, and black elderberry
(Sambucus nigra). The shrub layer is intermittent to open and the herbaceous layer is variable.
The Proposed Action Area also includes ruderal lands and riverine habitat. Ruderal lands are
Zones that have been substantially altered by maintenance or construction, causing them to be
devoid of vegetation. Ruderal land is found near the dam as well as various access roads and
trails throughout the Proposed Action Area.
Nonnative, invasive species such as black mustard (Brassica nigra), wild fennel (Foeniculum
vulgare), and poison hemlock (Conium maculatum), a variety of nonnative grasses, and several
species of nonnative trees (e.g., tree of heaven/Chinese sumac [Ailanthus altissima] and
eucalyptus [Eucalyptus spp.]) are found in the Proposed Action Area. The Corps typically treats
these invasive plants as well as any others that may be found in the Basin (Corps 2014a).
Wildlife
Common wildlife near the project site include western fence and sideblotched lizards, squirrels,
opossums, raccoons, and coyotes. Common birds include western scrub jay, Anna's
51
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
hummingbird, black phoebe, and California towhee. In addition, over 200 species of migratory
and resident birds have been observed in the Sepulveda Basin Wildlife Reserve and using other
patches of habitat such as riparian corridors supported by the Los Angeles River and Haskell
Creek.
Previous agricultural use in the Basin has historically limited its ability to support a diverse
population of nonavian wildlife. Over time, however, mammals, reptiles, amphibians, and fish
have been found within the Sepulveda Basin Wildlife Reserve. Small mammals, mostly rodents
such as squirrels, field mice, and rabbits, roam the area. Raccoons, coyotes, and feral cats and
dogs also frequent the area.
Several species of frogs and a variety of fish are found along the Los Angeles River and
surrounding creeks and ponds. Altered seasonal flows and existing barriers to fish passage
severely limit fish presence in the Sepulveda Dam Basin. Common nonnative species that may
inhabit the Basin include largemouth bass (Micropterus salmoides), bluegill (Lepomis
macrochirus), western mosquito fish (Gambusia affinis), channel catfish (Ictalurus punctatus),
fathead minnow (Pimephales promelas), common carp (Cyprinus carpio), and goldfish (Carassius
auratus auratus; Corps 2012b).
Several species of bats have been observed near the Basin. The silverhaired bat (Lasionycteris
noctivagans) is among the most common bat in forested Zones of the United States. They are a
solitary, treeroosting species, which feeds on insects. Hoary bats (Lasiurus cinereus) are the
most widespread North American bat. They have been observed northeast of the Basin. They
are a solitary species, which consumes mainly moths and other insects. The pallid bat (Antrozous
pallidus) has been observed southwest of the Proposed Action Area. These bats are found in
regions with rocky outcroppings or open, sparsely vegetated grasslands. Water must be
available close by, and they can be found in different roosts for day, night, and hibernation.
Endangered Species
The Least Bell's vireo (Vireo bellii pusillus), a Federallyendangered bird is present within riparian
vegetation in areas primarily north of Burbank Boulevard. Per past surveys, the vireo has been
sighted in the Proposed Project Area in areas immediately south of Burbank Boulevard.
Presence of the vireo within the interior of the Proposed Project Area is less likely since the area
is composed of primarily upland vegetation. Furthermore, the reach of Haskell Creek that
traverses through the Proposed Project Area is populated with mature nonnative ash trees and
lacks riparian shrubs. Surveys since 2011 have not indicated presence of the vireo within the
vast majority of the interior of the Proposed Project Area. The Proposed Project Area is not
within designated critical habitats for any Federally listed taxa.
Significance Threshold
Impacts would be considered significant if the alternative:
Creates substantial loss of species diversity in natural vegetation and wildlife habitat.
Result in the extirpation of a regional or local species.
52
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Jeopardizes the continued existence of species protected under the Endangered Species
Act.
Alternative 1: Active Management Alternative
Vegetation
Activities under Alternative 1 would result in herbicide treatment of nonnative shrubs and herbs
in Zone B, Zone Q, Zone L, and Zone SG. Native and nonnative shrubs in Zone B and Zone Q
would be annually mowed and brush cut to a height of approximately 3 feet. Branches below 8
feet from large native trees in Zones B, Q, L, and SG would be pruned. Nonnative and dead
trees would be removed. Access roads and dam operation zone would be maintained. There
would be no permanent loss of native species from the Proposed Action Area. Mowed native
shrubs are expected to resume growth. The loss of nonnative species would allow for growth of
native species. With the exception of the understory of trees that would be pruned to a height
of 8 feet, the existing habitat structure would be maintained. Thus, the diversity of native
species and wildlife habitat would be maintained. Impacts would be less than significant.
Wildlife
Annual mowing, brush cutting, and mulching of invasive and other nonnative plant species in
the Proposed Action Area would cause wildlife to temporarily abandon the immediate
maintenance zone due to noise and vibration as well as the presence of humans and machinery.
Wildlife in the Proposed Action Area are expected to temporarily occupy vegetated areas nearby
such as the Sepulveda Basin Wildlife Preserve or the vegetated reach of the Los Angeles River
both of which are north of Burbank Boulevard. Furthermore, wildlife may also use other
developed parts of the Basin such as golf courses and parks. Since wildlife in the Proposed
Action Area are habituated to the urban environment, use of developed areas would minimally
impact wildlife. Furthermore, the Proposed Action Area would be reoccupied upon completion
of work. The remaining vegetative cover in the Proposed Action Area would provide cover and
foraging for small mammals, and foraging for birds. In order to minimize impacts to birds during
the nesting season, mowing, mulching, and nonnative/dead tree removal operations would be
undertaken outside of the bird nesting and breeding season. Due to the availability of habitat
nearby and the habituation of wildlife to the urban environment, the maintenance activities
would not result in extirpation of a regional or local species. Impacts would be less than
significant.
Endangered Species
Annual mowing, brush cutting, and mulching of invasive and other nonnative plant species
would be conducted outside of the vireo nesting and breeding season. All work would be done
in conjunction with a biological monitor. In the event that work is scheduled to occur before or
soon after the vireo nesting season, it would be preceded by preconstruction vireo surveys
conducted by a qualified biologist. If vireos are present, a 500 foot buffer area would be
avoided. Based on the above, there would be no effect to the vireo. Therefore, impacts would
be less than significant.
53
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 2: Passive Management Alternative
Vegetation
Branches below 8 feet from large native trees in Zones B, Q, L, and SG would be pruned. Non
native and dead trees would be removed. However, mowing in Zone B and brush cutting in
Zone Q would occur once every three years allowing for additional growth of shrubs when
compared to the Alternative 1. There would be no permanent loss of native species from the
Proposed Action Area. Mowed native shrubs are expected to resume growth. The loss of
nonnative species would allow for growth of native species. With the exception of the
understory of trees that would be pruned to a height of 8 feet, the existing habitat structure
would be maintained. Thus, the diversity of native species and wildlife habitat would be
maintained. Impacts would be less than significant.
A pilot oneyear program to remove nonnative and invasive plants would further benefit native
species. The Corps would proceed with use of herbicides in areas not designated for the pilot
program. If the pilot program is not renewed, herbicides would be applied to the vacated area.
The Corps would also proceed with use of herbicides in the Proposed Action Area in the short
term while the coordination for the oneyear pilot program is ongoing. The suite of herbicides
would be limited to those deemed suitable for use in or near the aquatic environment.
Wildlife
Impacts to wildlife during vegetation management activities would result in an impact similar to
those characterized under Alternative 1. However, with brush cutting limited to once every
three years, disturbances from noise and vibration as well as the presence of humans and
machinery would be limited. Furthermore, functions and services provided by the brush to
wildlife such as cover would be would be maintained for a longer period of time. Impacts would
be less than significant.
Endangered Species
Annual mowing and mulching of invasive and other nonnative plant species would be conducted
outside of the vireo nesting and breeding season. All work would be done in conjunction with a
biological monitor. In the event that work is scheduled to occur before or soon after the vireo
nesting season, it would be preceded by preconstruction vireo surveys conducted by a qualified
biologist. If vireos are present, a 500 foot buffer area would be avoided. Based on the above,
there would be no effect to the vireo. Therefore, impact would be less than significant.
Alternative 3: Phased Mowing Alternative
Vegetation
Impacts under Alternative 3, the Phased Mowing Alternative, would be similar to those under
Alternative 2. Vegetation management activities would be similar, but mowing and brush
cutting would occur once every five years and would be rotated across Zones B1, B2, B3 and Q.
Thus, there would be shrubs at 1, 2, 3, and 4year growth levels at any point in time. Shrubs at a
54
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
4year growth level would be continuously present across Zones B1, B2, B3 and Q. There would
be no permanent loss of native species from the Proposed Action Area. Mowed native shrubs
are expected to resume growth. The loss of nonnative species would allow for growth of native
species. With the exception of the understory of trees that would be pruned to a height of 8
feet, the existing habitat structure would be maintained. Thus, the diversity of native species
and wildlife habitat would be maintained. Impacts would be less than significant.
Wildlife
Impacts to wildlife during vegetation management activities would result in an impact similar to
those characterized under the Alternative 1. However, with brush cutting limited to once every
five years, disturbances from noise and vibration as well as the presence of humans and
machinery would be limited. Furthermore, functions and services provided by the brush to
wildlife such as cover would be would be maintained for a longer period of time. Impacts would
be less than significant.
Endangered Species
Annual mowing and mulching of invasive and other nonnative plant species would be conducted
outside of the vireo nesting and breeding season. All work would be done in conjunction with a
biological monitor. In the event that work is scheduled to occur before or soon after the vireo
nesting season, it would be preceded by preconstruction vireo surveys conducted by a qualified
biologist. If vireos are present, a 500 foot buffer area would be avoided. Based on the above,
there would be no effect to the vireo. Therefore, impacts would be less than significant.
Alternative 4: South Marsh Alternative
Vegetation
Zone B2, B3 and Q would be managed in the same phased approach manner described under
Alternative 3 as would areas of Zone B1 outside of the marsh. Impacts to vegetation associated
with maintenance activities would also be the same as those characterized under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 23). The Bacharis pilularis vegetation and nonnative vegetation would be removed
from Zone J. Elevation of the area would be lowered and Juncus acutus vegetation would be
planted to create a marsh habitat. Thus, Bacharis pilularis vegetation within Zone J would be
replaced by Juncus acutus. Bacharis pilularis vegetation would continue to be maintained within
Zones B2, B3, and the outer perimeter of Zone B1. However, Alternative 4 would increase
diversity of native vegetation. Impacts would be less than significant.
Wildlife
Maintenance and marsh construction activities in the Proposed Action Area would cause wildlife
to temporarily abandon the immediate maintenance Zone due to noise and vibration as well as
the presence of humans and machinery. Wildlife in the Proposed Action Area are expected to
temporarily occupy vegetated areas nearby such as the Sepulveda Basin Wildlife Preserve or the
vegetated reach of the Los Angeles River both of which are north of Burbank Boulevard.
55
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Furthermore, wildlife may also use other developed parts of the Basin such as golf courses and
parks. Since wildlife in the Proposed Action Area are habituated to the urban environment, use
of developed areas would minimally impact wildlife. Furthermore, the Proposed Action Area
would be reoccupied upon completion of work. The remaining vegetative cover in the Proposed
Action Area would provide cover and foraging for small mammals, and foraging for birds. In
order to minimize impacts to birds during the nesting season, mowing, mulching, and nonnative
tree removal operations would be undertaken outside of the bird nesting and breeding season.
Due to the availability of habitat nearby and the habituation of wildlife to the urban
environment, the maintenance activities would not result in extirpation of a regional or local
species. Impacts would be less than significant.
Endangered Species
Annual mowing and mulching of invasive and other nonnative plant species would be conducted
outside of the vireo nesting and breeding season. All work would be done in conjunction with a
biological monitor. In the event that work is scheduled to occur before or soon after the vireo
nesting season, it would be preceded by preconstruction vireo surveys conducted by a qualified
biologist. If vireos are present, a 500 foot buffer area would be avoided.
Construction of the marsh would be located in the portion of the Proposed Action Area south of
Haskell Creek. Per past surveys, the vireo has been sighted in the Proposed Project Area in
areas immediately south of Burbank Boulevard. Presence of the vireo within the interior of the
Proposed Project Area, including areas south of Haskell Creek, is less likely since the area is
composed of primarily upland vegetation. Surveys since 2011 have not indicated presence of
the vireo within this area. Based on the above, there would be no effect to the vireo. Therefore,
impacts would be less than significant.
Alternative 5: Sinuous Channel Alternative
Vegetation
Zone B1, B2, B3 and Q would be managed in the same phased approach manner described
under Alternative 3. Impacts to vegetation associated with maintenance activities would also be
the same as those characterized under Alternative 3.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
The existing, broad archlike alignment of Haskell Creek would be modified to a sinuous channel
with terraces constructed to support Schenoplectus californicus and Juncus acutus. Thus, mixed
riparian forest which line the Haskell Creek corridor would be replaced with wetland and marsh
vegetation. A mixture of native (Goodding's black willow and Fremont cottonwood) and non
native (tropical ash) would be removed. However, approximately 60% of the trees within the
corridor are nonnative tropical ash trees. Furthermore, native black willow and cottonwood
trees are present throughout riparian corridors within the Basin. Thus, Alternative 5 would
increase diversity of native species within the Proposed Action Area. Impacts would be less than
significant.
56
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Wildlife
Impacts to wildlife associated with maintenance activities would be similar to those
characterized for Alternative 4. Construction of the sinuous channel would result in removal of
the mixed riparian forest within the Haskell Creek corridor. A mixture of native (Goodding's
black willow and Fremont cottonwood) and nonnative (tropical ash) would be removed. Shade
and perches associated with trees would no longer be available. However, mature trees are
present throughout the Basin for wildlife use.
During construction, wildlife in the Proposed Action Area are expected to temporarily occupy
vegetated areas nearby such as the Sepulveda Basin Wildlife Preserve or the vegetated reach of
the Los Angeles River both of which are north of Burbank Boulevard. Furthermore, wildlife may
also use other developed parts of the basin such as golf courses and parks. Since wildlife in the
Proposed Action Area are habituated to the urban environment, use of developed areas would
minimally impact wildlife. Furthermore, the Proposed Action Area would be reoccupied upon
completion of work. The remaining vegetative cover in the Proposed Action Area would provide
cover and foraging for small mammals, and foraging for birds. Upon completion of construction,
the marsh and wetland habitats would continue to provide foraging habitat within the aquatic
habitat. The change in habitat would afford additional benefits for all wildlife in the area.
In order to minimize impacts to birds during the nesting season, mowing, mulching, and non
native tree removal operations would be undertaken outside of the bird nesting and breeding
season. Due to the availability of habitat nearby and the habituation of wildlife to the urban
environment, the maintenance activities would not result in extirpation of a regional or local
species. Impacts would be less than significant.
Endangered Species
Annual mowing and mulching of invasive and other nonnative plant species would be conducted
outside of the vireo nesting and breeding season. All work would be done in conjunction with a
biological monitor. In the event that work is scheduled to occur before or soon after the vireo
nesting season, it would be preceded by preconstruction vireo surveys conducted by a qualified
biologist. If vireos are present, a 500 foot buffer area would be avoided.
Construction of the sinuous channel and marsh would be located in the interior of the Proposed
Project Area where the vireo has been absent since the area is composed of primarily upland
vegetation. Surveys since 2011 have not indicated presence of the vireo within this area. Based
on the above, there would be no effect to the vireo. Therefore, impacts would be less than
significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. Additional
vegetation growth may foster increased wildlife use of the area. There would be no impacts to
endangered species. Impacts would be less than significant.
57
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
3.7 Cultural Resources
Affected Environment
The area of potential effects (APE) for the Proposed Action is land directly or indirectly impacted
and includes the 48acre Proposed Action Area shown in Figure 11. The Proposed Action Area
was disturbed during construction of Sepulveda Dam. Subsequent to completion of the dam, the
area was used for agriculture. Furthermore, with repeated impoundment of water behind the
dam, sediment from the upper reaches of the drainage area is deposited within the area. Haskell
Creek was excavated from the uplands to convey storm flows into the Los Angeles River. Thus,
the Proposed Action Area has a history of high disturbance to such degree that no surficial
cultural resources could remain. No historic resources listed on or eligible for the National
Register of Historic Places are known to be present within the APE. The entire Basin, including
the Proposed Action Area was surveyed by Pat Martz (1977), who surveyed all undeveloped
areas. She noted at the time that the cultivated fields were difficult to examine thoroughly
because of the vegetation but that they were situated in low floodplain areas and that the areas
have a low potential for cultural resources based on prior studies and field data.
Significance Threshold
Impacts would be considered significant if the alternative results in:
The removal or destruction cultural resources.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing and
brush cutting of all shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large
native trees in Zones B, Q, L, and SG; periodic removal of nonnative and dead trees as needed
and as resources permit; and maintenance of access roads and the dam operations zone.
Vegetation management activities would use rubbertired tractors and mowers resulting in
minimal surficial ground disturbance. This activity would have no potential to affect cultural
resources National Historic Preservation Act Section 106 consultation with the State Historic
Preservation Officer would not be required for this element of Alternative 1.
Maintenance of access roads would require surficial ground disturbing activities such as
resurfacing with decomposed granite or regrading roads. However, those impacts would be
limited to established roads. Furthermore, the Proposed Action Area has a history of high
disturbance to such degree that no surficial cultural resources could remain. Thus, there would
be no effects to cultural resources. The Corps will undergo National Historic Preservation Act
Section 106 consultation with the State Historic Preservation Officer for maintenance of access
roads. Upon completion of the Section 106 consultation process, Alternative 1 would be in
compliance with the National Historic Preservation Act. Impacts would be less than significant.
58
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1.
Branches below 8 feet from large native trees in Zones B, Q, L, and SG would be pruned. Non
native and dead trees would be removed. However, mowing in Zone B and brush cutting in
Zone Q would occur once every three years allowing for additional growth of shrubs when
compared to Alternative 1. Thus, the frequency of surficial surface disturbance associated with
mowing and brush clearing activities would be reduced to once every three years. In addition,
use of hand tools by volunteers associated with the pilot oneyear program to remove non
native and invasive plants would result in de minimis surficial soil disturbance. This activity
would have no potential to affect cultural resources National Historic Preservation Act Section
106 consultation with the State Historic Preservation Officer would not be required for this
element of Alternative 2.
Maintenance of access roads would require surficial ground disturbing activities such as
resurfacing with decomposed granite or regrading roads. However, those impacts would be
limited to established roads. Furthermore, the Proposed Action Area has a history of high
disturbance to such degree that no surficial cultural resources could remain. Thus, there would
be no effect on historic properties. The Corps will undergo National Historic Preservation Act
Section 106 consultation with the State Historic Preservation Officer for maintenance of access
roads. Upon completion of the Section 106 consultation process, Alternative 2 would be in
compliance with the National Historic Preservation Act. Impacts would be less than significant.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 1.
Branches below 8 feet from large native trees in Zones B, Q, L, and SG would be pruned. Non
native and dead trees would be removed. Bowing and brush cutting would occur once every five
years and would be rotated across Zones B1, B2, B3 and Q. Thus, the frequency of potential
surface disturbance associated with mowing and brush clearing activities would be reduced to
once every five years and potential disturbances would be rotated across Zones B1, B2, B3 and
Q. In addition, use of hand tools by volunteers associated with the pilot oneyear program to
remove nonnative and invasive plants would result in de minimis surficial soil disturbance. This
activity would have no potential to affect cultural resources National Historic Preservation Act
Section 106 consultation with the State Historic Preservation Officer would not be required for
this element of Alternative 2.
Maintenance of access roads would require surficial ground disturbing activities such as
resurfacing with decomposed granite or regrading roads. However, those impacts would be
limited to established roads. Furthermore, the Proposed Action Area has a history of high
disturbance to such degree that no surficial cultural resources could remain. Thus, there would
be no effect on historic properties. The Corps will undergo National Historic Preservation Act
Section 106 consultation with the State Historic Preservation Officer for maintenance of access
roads. Upon completion of the Section 106 consultation process, Alternative 3 would be in
compliance with the National Historic Preservation Act. Impacts would be less than significant.
59
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 4: South Marsh Alternative
Zone B1, B2, B3 and Q would be managed in the same phased approach manner described
under Alternative 3. Impacts associated with vegetation maintenance activities and access roads
maintenance activities would also be the same as those characterized under Alternative 3.
Vegetation maintenance would not require National Historic Preservation Act Section 106
consultation with the State Historic Preservation Officer. Maintenance of access roads would
require National Historic Preservation Act Section 106 consultation with the State Historic
Preservation Officer.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 23). The Proposed Action Area has a history of high disturbance to such degree that
no surficial cultural resources could remain. However, construction would include earthmoving
activities such as excavating and grading. These activities could potentially unearth buried
cultural resources. In the event that cultural resources are unearthed during grounddisturbing
activities, CUL1 would be implemented. With implementation of CUL1, there would be no
significant impacts to cultural resources.
Earth moving activities under Alternative 4 would have no effect on historic properties. The
Corps will undergo Section 106 consultation with the State Historic Preservation Officer
regarding this determination. Upon completion of the Section 106 consultation process,
Alternative 4 would be in compliance with the National Historic Preservation Act.
Alternative 5: Sinuous Channel Alternative
Zone B1, B2, B3 and Q would be managed in the same phased approach manner described
under Alternative 3. Impacts associated with vegetation maintenance activities and access roads
maintenance activities would also be the same as those characterized under Alternative 3.
Vegetation maintenance would not require National Historic Preservation Act Section 106
consultation with the State Historic Preservation Officer. Maintenance of access roads would
require National Historic Preservation Act Section 106 consultation with the State Historic
Preservation Officer.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
The existing, broad archlike alignment of Haskell Creek would be modified to a sinuous channel
with terraces constructed to support Schenoplectus californicus and Juncus acutus. The Proposed
Action Area has a history of high disturbance to such degree that no surficial cultural resources
could remain. However, construction would include earthmoving activities such as excavating
and grading. These activities could potentially unearth buried cultural resources. In the event
that cultural resources are unearthed during grounddisturbing activities, CUL1 would be
implemented. With implementation of CUL1, there would be no significant impacts to cultural
resources.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
60
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
The area would remain vegetated and additional vegetation growth would occur. There would
be no maintenance activities which could result in ground disturbance. Impacts would be less
than significant.
Environmental Commitments
CUL1: Pursuant to 36 C.F.R. section 800.13, in the event of any discoveries during
construction of human remains, archeological deposits, or any other type of cultural
resource, all ground disturbing activities shall immediately be suspended in any area(s)
where potential cultural resources are discovered. Ground disturbing activities shall not
resume in the area surrounding the potential cultural resources until documentation of
compliance with 36 C.F.R. section 800.13(b).
3.8 Hazardous Waste and Materials
Affected Environment
According to the California Department of Toxic Substances Control's EnviroStor database, there
are no hazardous, toxic, or radioactive material sites within the Proposed Action Area.
Significance Threshold
A significant impact would occur if the alternative results in:
Longterm exposure of humans, wildlife, wildlife habitat, and the general environment
to hazardous materials through the transport, use, storage, or disposal of hazardous
materials.
Substantial release of hazardous materials into the environment.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing and
brush cutting of all shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large
native trees in Zones B, Q, L, and SG; periodic removal of nonnative and dead trees as needed
and as resources permit; and maintenance of access roads and the dam operations zone.
Vegetation management activities would require use of diesel and gasoline powered
equipment. As standard best management practice, vehicles are refueled at a designated
refueling area protected by earthen berms and lining. Thus, any leaks and spills during refueling
operations would be contained within the refueling area. Onsite spill kits would be deployed to
remove spilled fuel. The suite of herbicides would be limited to those deemed suitable for use
in or near the aquatic environment. There would be no use or storage of materials classified as
hazardous, toxic, or radioactive material sites under Comprehensive Environmental Response,
Compensation, and Liability Act or the Resource Conservation and Recovery Act within the
Proposed Action Area. Based on the above, there would be no longterm exposure of humans
61
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
or wildlife to hazardous waste and materials. The potential for release of petroleum products
into the environment would be minimal. Impacts would be less than significant.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 1.
Alternative 4: South Marsh Alternative
Impacts under Alternative 4 would be similar to those characterized under Alternative 1.
Alternative 5: Sinuous Channel Alternative
Impacts under Alternative 5 would be similar to those characterized under Alternative 1.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
There would be no use of mechanized equipment on site which could result in leaks and spills of
fuels, oils, and hydraulic fluid. Impacts would be less than significant.
3.9 Aesthetic Quality
Affected Environment
Primary visual elements in the vista within the Proposed Action Area include:
An open and expansive landscape with beige, brown, green, and olive hues as well as
heterogeneous textures associated with a vegetated landscape.
Linear lines, sharp angles and other geometric forms as well as industrial colors and
textures associated with the Sepulveda Dam, Burbank Blvd., Interstate 405 Freeway,
and the concretelined embankments of the Los Angeles River.
Significance Threshold
Impacts would be considered significant if the alternative:
Substantially alters the existing vista.
Impairs or obstructs views of major visual elements
62
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing and
brush cutting of all shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large
native trees in Zones B, Q, L, and SG; periodic removal of nonnative and dead trees as needed
and as resources permit; and maintenance of access roads and the dam operations zone. Annual
mowing and brush cutting in Zones B and Q would produce a uniform 3foot high shrub layer.
However, impacts would be temporary since regrowth would restore visual heterogeneity
associated with shrub vegetation. Primary visual elements in the vista within the Proposed
Action Area would remain unchanged. Large structures that could obstruct views of the major
visual elements would not be constructed. Impacts would be less than significant.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1.
Branches below 8 feet from large native trees in Zones B, Q, L, and SG would be pruned. Non
native and dead trees would be removed. However, mowing in Zone B and brush cutting in
Zone Q would occur once every three years allowing for additional growth of shrubs when
compared to Alternative 1. Thus, the frequency of disturbance to the vista associated with
mowing and brush clearing activities would be reduced to once every three years. Use of hand
tools by volunteers associated with the pilot oneyear program to remove nonnative and
invasive plants would not result in noticeable impacts to the vista. Large structures that could
obstruct views of the major visual elements would not be constructed. Impacts would be less
than significant.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 2.
Branches below 8 feet from large native trees in Zones B, Q, L, and SG would be pruned. Non
native and dead trees would be removed. However, mowing and brush cutting would occur
once in each subzone or Zone Q every five years and would be rotated across Zones B1, B2, B3
and Q. Thus, the frequency of disturbance to the vista associated with mowing and brush
clearing activities would be reduced compared to Alternative 2. Use of hand tools by
volunteers associated with the pilot oneyear program to remove nonnative and invasive plants
would not result in noticeable impacts to the vista. Large structures that could obstruct views of
the major visual elements would not be constructed. Impacts would be less than significant.
Alternative 4: South Marsh Alternative
Zones B1, B2, B3 and Q would be managed in the same phased approach manner described
under Alternative 3. Impacts associated with maintenance activities would also be the same as
those characterized under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 23). A limited number of earthmoving equipment with highly visible paint schemes
63
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
and colors would be temporarily present in the in the construction footprint for the duration of
construction. Furthermore, vegetation would temporarily be removed from the footprint of the
marsh during construction. Upon completion of work, the area would be subsequently
vegetated with Juncus acutus. Upon establishment and growth, the overlapping circular outlines
associated with Bacharis pilularis would be replaced by radiating striations associated with
Juncus acutus. The plant palate, would add diversity to the hues and textures within the existing
vista. Large structures that could obstruct views of the major visual elements would not be
constructed. Impacts would be less than significant.
Alternative 5: Sinuous Channel Alternative
Zone B1, B2, B3 and Q would be managed in the same phased approach manner described
under Alternative 3. Impacts associated with maintenance activities would also be the same as
those characterized under Alternative 3.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively. A
limited number of earthmoving equipment with highly visible paint schemes and colors would
be temporarily present in the in the construction footprint for the duration of construction.
Furthermore, vegetation would temporarily be removed from the footprint of the marsh during
construction. The mixed riparian forest along the Haskell Creek corridor would be replaced with
Schenoplectus californicus and Juncus acutus. Construction would include earthmoving activities
such as excavating and grading. Presence of earthmoving equipment within an open, disturbed
area would result in temporary impacts during construction. The existing line of nonnative
trees which forms a visual boundary between the Proposed Action Area and the vegetated area
to the north of Haskell Creek would be replaced by low growing marsh and wetland plants. The
vista would merge with the vegetated area north of Haskell Creek. The removal of the tree line
would be a notable change. However, the diversity of hues and textures associated with a
vegetated environment would be retained. Large structures that could obstruct views of the
major visual elements would not be constructed. Impacts would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. Primary visual
elements in the vista within the Proposed Action Area would remain unchanged. Impacts would
be less than significant.
3.10 Recreation Resources
Affected Environment
The approximately 48acre area between Burbank Boulevard and Sepulveda Dam is designated
as a Vegetation Maintenance Area pursuant to the 2011 master plan. Furthermore, this area is
not outgranted for other uses including recreation use. However, the presence of native and
nonnative vegetation within the area over time has resulted in use of the area for recreation
64
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
such as nature walks and bird watching. An existing tunnel beneath Burbank Blvd. as well as
vehicle entrances facilitate access to the Proposed Action Area.
Significance Threshold
Impacts would be considered significant if the alternative:
Permanently disrupts or limits access or use of existing recreational uses.
Results in construction or operational activities that substantially conflict with
recreational uses.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing of all
shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large native trees in Zones
B, Q, L, and SG; periodic removal of nonnative and dead trees as needed and as resources
permit; and maintenance of access roads and the dam operations zone. Sections of the
maintenance road and/or portions of various zones may be temporarily closed for a few days
during annual maintenance activities. Areas outside of the immediate work zone would remain
accessible during maintenance activities. Upon completion of work, the entire Proposed Action
Area would be accessible for recreational users. The vegetated character of the land that
attracts recreational users would be retained. Impacts would be less than significant.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1.
However, mowing in Zone B and brush cutting in Zone Q would occur once every three years
allowing for additional growth of shrubs when compared to Alternative 1. Thus, the frequency
of disturbance to recreation associated with mowing and brush clearing activities would be
reduced to once every three years. Implementation of the pilot oneyear program to remove
nonnative and invasive plants would result not result in impacts to recreation. The vegetated
character of the land that attracts recreational users would be retained. Impacts would be less
than significant.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 1.
Branches below 8 feet from large native trees in Zones B, Q, L, and SG would be pruned. Non
native and dead trees would be removed. Mowing in each sub zone of Zone B and brush cutting
in Zone Q would be rotated across Zones B1, B2, B3 and Q each year over a four year period
such that each subzone is subject to mowing once every five years. Thus, the frequency of
disturbance to recreation associated with mowing and brush clearing activities would be
reduced compared to Alternative 1. Implementation of the pilot oneyear program to remove
nonnative and invasive plants would result not result in impacts to recreation. The vegetated
65
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
character of the land that attracts recreational users would be retained. Impacts would be less
than significant.
Alternative 4: South Marsh Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 23). Construction would include earthmoving activities such as excavating and
grading. Public access in the vicinity of Zone B1 would be limited for the duration of
construction. Public access would be restored upon completion of construction. Though there
would be a change in the vegetation palette within Zone J, the vegetated character of the land
that attracts recreational users would be retained. Impacts would be less than significant.
Alternative 5: Sinuous Channel Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
Construction would include earthmoving activities such as excavating and grading. Public access
in the vicinity of Zone SC would be limited for the duration of construction. Public access would
be restored upon completion of construction. Though there would be a change in the
vegetation palette within Zone SC, the vegetated character of the land that attracts recreational
users would be retained. Impacts would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. The presence
of vegetation would foster continued use of the area for recreation such as nature walks and
bird watching. Impacts would be less than significant.
3.11 Public Health and Safety
Affected Environment
As the Proposed Action Area lies in the lowest part of the Basin, it is often inundated by
overflow from the Los Angeles River and Haskell Creek. Sections of Balboa Boulevard, Burbank
Boulevard, and Woodley Avenue adjacent to the Proposed Action Area are often closed to
vehicles during storms when there is a danger of flooding. On occasion vehicles have been
stranded due to flooding before roads have been closed.
There is no formal evacuation plan for the Basin because flood inflows can be forecast with
sufficient leadtime to clear the Basin of recreation users. To that end, the Corps issues
notifications to the City of Los Angeles which curtails use of the Basin by erecting roadway
66
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
barriers, posting signage, and redirecting traffic. People occupying unauthorized encampments
within the Proposed Project Area typically relocate to higher ground or other areas within and
outside of the Basin.
Prior to December 2012, the Proposed Action Area had been generally heavily vegetated.
Unchecked growth of nonnative invasive plants in the interior of the Proposed Action Area
provided dense cover for a variety of unauthorized activities including encampments. The range
of unauthorized activities include lewd activities and drug dealing. Walkers and joggers who use
the maintenance roads through the area reported mugging incidents. Corps personnel have
also been threatened. In addition, the presence of unauthorized encampments has resulted in
accidental fires. The density and robust growth of vegetation resulted in at least one death
because emergency responses to the area were impeded.
In December 2012, to address flood risk management and public safety concerns, the Corps
began implementing the approved plan in the area south of Haskell Creek, initially trampling
vegetation and removing trees. However, the Corps ended up temporarily suspending
vegetation management activities in the area due to stakeholder concerns and agreed to re
evaluate vegetation management and access maintenance activities within the Proposed Action
Area. While this reevaluation was underway, in January 2014, the Corps, in coordination with
local stakeholders, applied herbicides to manage invasive vegetation and removed nonnative
and dead trees from the Proposed Action Area as an interim means of addressing flood risk
management and public safety.
Significance Threshold
Impacts would be considered significant if the alternative:
Substantially increases safety risks for the general public.
Increases exposure of people or structures to flooding hazards.
Environmental Consequences
Alternative 1: Active Management Alternative
Annual mowing and brush cutting of all shrubs in Zone B and Zone Q to a height of 3 feet;
trimming of branches below 8 feet from large native trees in Zones B, Q, L, and SG; periodic
removal of nonnative and dead trees as needed and as resources permit would discourage
unauthorized encampments and establish a line of sight across the Proposed Action Area. With
reduction in unauthorized encampments, there would be a decrease in people exposed to
flooding hazards. The potential for humancaused fires would be reduced. Maintenance of
access roads and the dam operations zone would improve safety vehicles and pedestrians who
use the roads. Safety risks would be reduced. Impacts would be beneficial and less than
significant.
67
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1. The
pilot oneyear program to remove nonnative and invasive plants would not increase safety risks
for the general public or increase exposure of people or structures to flooding hazards
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 2.
Alternative 4: South Marsh Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 23). Construction would include earthmoving activities such as excavating and
grading. Hazards would be present within the vicinity of the work area during construction.
However, public access in the vicinity of Zone B1 would be limited for the duration of
construction through signage, barriers, and fencing. Thus, any temporary increases in safety
risks would be attenuated. The design of the marsh would be subject to engineering review and
approval to ensure that the creation of the marsh would not affect the structural integrity of the
dam or hamper its flood risk management functions. Impacts would be less than significant.
Alternative 5: Sinuous Channel Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 4.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
Construction would include earthmoving activities such as excavating and grading. Hazards
would be present within the vicinity of the work area during construction. However, public
access in the vicinity of Zone B1 would be limited for the duration of construction through
signage, barriers, and fencing. Thus, any temporary increases in safety risks would be
attenuated. The design of the sinuous channel would be subject to engineering review and
approval to ensure that the creation of the channel would not affect the structural integrity of
the dam or hamper its flood risk management functions. Impacts would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
The area would remain vegetated and additional vegetation growth would occur. The presence
of vegetation would foster unauthorized encampments within the Proposed Action Area.
Furthermore, views across the Proposed Action Area would become increasingly obstructed
with additional vegetation growth. With limited access for law enforcement, safety of the
general public and inhabitants of the unauthorized encampments could be compromised.
68
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Furthermore, accumulated trash and waste associated with such encampments could lead to
potentially unsanitary conditions that would affect public health.
With no maintenance activities, access to the dam would be impeded. Roots from vegetation
within the dam operation zone could loosen the compacted soil of the earthen dam,
compromising the integrity of the structure. Continued growth of vegetation overtime could
hamper proper dam operations or lead to structural failure of the structure.
3.12 Socioeconomics and Environmental Justice
Each federal agency is required, by Executive Order 12898, Federal Actions to Address
Environmental Justice in Minority Populations and LowIncome Populations, to "make achieving
environmental justice part of its mission by identifying and addressing, as appropriate,
disproportionately high and adverse human health or environmental effects of its programs,
policies, and activities on minority populations and lowincome populations . . ."
The Council on Environmental Quality (CEQ) defines a minority population as any group of
minorities that exceeds 50 percent of the existing population within the market Zone or where a
minority group comprises a meaningfully greater percentage of the local population than in the
general population. Additionally, the CEQ identifies low income using 2000 census data for
"individuals living below the poverty level."
Ensuring environmental justice means protecting existing local and minority and lowincome
populations from disproportionate adverse human health or environmental effects related to
federal government action.
Affected Environment
The communities surrounding the Basin are largely white (including Sherman Oaks and Encino)
with the communities of Van Nuys and Lake Balboa having a large Hispanic population.
Household income suggests more affluent communities south of the Los Angeles River
compared to Van Nuys and Lake Balboa, north of the Basin (Corps 2012a). Table 35 displays the
demographics of the county and city of Los Angeles.
69
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
TABLE 35
DEMOGRAPHICS OF THE AREA
County of Los
Angeles
City of Los Angeles
Race (2013 ACS 5year population estimate)
African American
833,477
357,932
51,849
20,424
Asian
1,372,726
434,946
Hispanic or Latino
4,741,492
3,827,261
368,478
129,081
26,132
6,924
American Indian/Alaska Native
Mixed Race
Native Hawaiian/Other Pacific Islander
White
5,277,461
3,698,180
Household Income (past 12 months)
Less than $10,000
$10,000 $14,999
$15,000 $24,999
$25,000 $34,999
209,050
190,300
341,120
310,181
106,678
94,255
155,302
136,813
$35,000 $49,000
$50,000 $74,999
$75,000 $99,000
$100,000 $149,999
$150,000 $199,999
$200,000 or more
410,856
545,369
384,881
437,818
189,195
211,613
172,578
212,788
139,576
153,261
64,932
84,777
22.1%
Poverty
Source: U.S Census Bureau 2013
Demographics for the City of Los Angeles are used as the reference demographics under
environmental justice. The demographics of visitors to the Sepulveda Dam Basin are assumed to
reflect the demographics of communities adjacent to the Basin (Corps 2011a).
Significance Threshold
Impacts would be considered significant if the alternative results in:
Disproportionately high and adverse impacts on minorities, lowincome residents, or
children
A substantial shift in population, housing, and employment.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing of all
shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large native trees in Zones
B, Q, L, and SG; periodic removal of nonnative and dead trees as needed and as resources
70
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
permit; and maintenance of access roads and the dam operations zone. The Corps' operations
and maintenance staff would do the majority of work. While some vegetation management
activities such as mowing would likely be contracted to an outside source by the Corps, the
economic effects would be negligible. The maintenance work would not result in direct or
indirect adverse environmental impacts. The work would not require additional housing for
laborers since the project is readily within commuting distance from most parts of Los Angeles
County. Furthermore, the work would not entail the construction of infrastructure or utilities
that would result in growth of the surrounding area, nor would the work increase capacity of
existing infrastructure that would induce growth. The work would not lead to a substantial shift
in population, housing, and employment. Impacts would be less than significant.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1.
Implementation of the pilot oneyear program to remove nonnative and invasive plants would
result not result in impacts to socioeconomics and environmental justice.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 2.
Alternative 4: South Marsh Alternative
Impacts under Alternative 4 would be similar to those characterized under Alternative 2.
Alternative 5: Sinuous Channel Alternative
Impacts under Alternative 5 would be similar to those characterized under Alternative 2.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
There would be no substantial shifts in population, housing, and employment. Impacts would be
less than significant.
3.13 Traffic and Transportation
Affected Environment
The Basin is in the northwest quadrant of the intersection of Interstate 405 and U.S. Highway
101. Access into the Basin can be attained via main entrances along Woodley Avenue from the
north, Burbank Boulevard (which runs along the southern portion of the Basin) from the east or
west, Balboa Boulevard from the west, or from Victory Boulevard from the north. Average daily
traffic volumes of these roadways are shown in Table 36.
71
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
TABLE 36
ROADWAYS AND TRAFFIC VOLUMES
Average Daily Twoway
Traffic (in thousands of
cars)
Roadway Designation
Interstate 405
264,000
Freeway
U.S. Route 101
211,000
Freeway
Victory Boulevard
171,000
Arterial
Balboa Boulevard
300,000
Arterial
Burbank Boulevard
187,500
Arterial
Roadway Name
Source: Caltrans 2013
A maintenance road is at the toe of the dam on the upstream side. The road turns west and runs
parallel to Burbank Boulevard toward Haskell Creek, turning southwest and parallel to the creek
toward the Los Angeles River, and circles back toward the dam. The road is often used by
walkers and joggers coming from the sidewalk along Burbank Boulevard or through the tunnel
under Burbank Boulevard from the Sepulveda Basin Wildlife Reserve on the north side of
Burbank Boulevard. There is no through traffic in the Proposed Action Area.
Significance Threshold
Impacts would be considered significant if the alternative:
Substantially increases traffic levels in the long term.
Caused closure of a major roadway to through traffic with no suitable route available for
traffic.
Decreased safety for vehicular traffic or transit operations in the long term.
Environmental Consequences
Alternative 1: Active Management Alternative
Activities would entail application of herbicides to nonnative vegetation; annual mowing of all
shrubs in Zone B and Zone Q; trimming of branches below 8 feet from large native trees in Zones
B, Q, L, and SG; periodic removal of nonnative and dead trees as needed and as resources
permit; and maintenance of access roads and the dam operations zone. The Corps' operations
and maintenance staff would do the majority of work. During the mobilization phase, crews
would transport approximately three to four earthmoving equipment such as backhoes, loaders,
dozers, or excavators to the Proposed Action Area from the base yard in El Monte, California. In
addition, approximately two to three onroad dump trucks would be driven from the base yard.
Dump trucks and earthmoving equipment would remain on site until completion of work. A five
to ten member crew would commute daily from the base yard to the worksite in pickup trucks.
For the most part, vegetation would not be hauled offsite. Instead, vegetation would be
chipped and spread on site. All earthmoving equipment and dump trucks would be returned to
72
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
base yard during the demobilization phase. During mobilization and demobilization periods
when the number of work vehicles are expected to peak, approximately fifteen additional
vehicles would be on regional and local roadways. The addition of fifteen vehicles for a
temporary duration to roadways would not substantially increase traffic levels nor would it
require closure of major roadways. There would be no changes to road alignment, elevation,
lane striping, or signal operations that would decrease safety for vehicular traffic or transit
operations. Impacts would be less than significant.
Alternative 2: Passive Management Alternative
Impacts under Alternative 2 would be similar to those characterized under Alternative 1.
However, mowing in Zone B and brush cutting in Zone Q would occur once every three years
allowing for additional growth of shrubs when compared to Alternative 1. Thus, the frequency
traffic impacts associated with mowing and brush clearing activities would be reduced to once
every three years.
Commutes by volunteers associated with the pilot oneyear program to remove nonnative and
invasive plants would likely occur on weekends or holidays. It's likely that in most cases, the
number of passenger vehicles that volunteers use would be less than 25. The periodic commute
associated with this program would not substantially increases traffic levels. Impacts would be
less than significant.
Alternative 3: Phased Mowing Alternative
Impacts under Alternative 3 would be similar to those characterized under Alternative 2..
However, mowing in each subzone of Zone B and brush cutting in Zone Q would occur once
every five years and would be rotated across Zones B1, B2, B3 and Q. Impacts would be less
than significant.
Alternative 4: South Marsh Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 23). Construction would include earthmoving activities such as excavating and
grading. Construction would require the same suite of equipment required for ongoing
maintenance activities under the Active Management Alternative. The duration of onsite use
would be approximately six months. Excavated material from Zone J would not be hauled off
site. Instead, excavated earth would be transported over the dam and placed within a sediment
storage site downstream of the dam. During mobilization and demobilization periods when the
number of work vehicles are expected to peak, approximately fifteen additional vehicles would
be on regional and local roadways. The addition of fifteen vehicles for a temporary duration to
roadways would not substantially increase traffic levels. Impacts would be less than significant.
73
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 5: Sinuous Channel Alternative
Impacts associated with maintenance activities would be the same as those characterized under
Alternative 3.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
Construction would include earthmoving activities such as excavating and grading. Construction
would require the same suite of equipment required for ongoing maintenance activities under
Alternative 1. The duration of onsite use would be approximately six months. Excavated
material from Zone SC would not be hauled offsite. Instead, excavated earth would be
transported over the dam and placed within a sediment storage site downstream of the dam.
During mobilization and demobilization periods when the number of work vehicles are expected
to peak, approximately fifteen additional vehicles would be on regional and local roadways. The
addition of fifteen vehicles for a temporary duration to roadways would not substantially
increase traffic levels. Impacts would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
There would be no use of vehicles or use of local roads and freeways.
3.14 Utilities
Affected Environment
A sewer line crosses under the Proposed Action Area from the northwestern corner between
the Los Angeles River and Woodley Avenue, continuing southeastward under Haskell Creek and
under the dam. Haskell Creek, which provides drainage for surface flows as well as drainage for
discharges from the Tillman Water Reclamation Plant also traverses the Proposed Action Area.
Significance Threshold
Impacts would be considered significant if the alternative:
Causes substantial modification or relocation of utilities resulting in longterm or
widespread disruption of service.
Environmental Consequences
Alternative 1: Active Management Alternative
There would be no impacts on the existing sewer line in the Proposed Action Area since
maintenance activities would not involve excavation or other earthmoving activities.
74
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Alternative 2: Passive Management Alternative
There would be no impacts on the existing sewer line in the Proposed Action Area since
maintenance activities as well as the pilot oneyear program to remove nonnative and invasive
plants would not involve excavation or other earthmoving activities.
Alternative 3: Phased Mowing Alternative
There would be no impacts on the existing sewer line in the Proposed Action Area since
maintenance activities as well as the pilot oneyear program to remove nonnative and invasive
plants would not involve excavation or other earthmoving activities.
Alternative 4: South Marsh Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
An approximately 4.6acre marsh habitat would be established in Zone J, a subarea of Zone B1
(see Figure 24). Construction would include earthmoving activities such as excavating and
grading. Standard procedures for locating and avoiding utilities would be implemented during
the design and construction phases to avoid potential impacts to the sewer line. Small water
intake and outflow structures would need to be constructed within Haskell Creek in order to
bring water in and out of the marsh, respectively. Flows within the creek would need to be
diverted around the structures during construction. Water diversion structures would be
removed upon completion of construction. Drainage through Haskell Creek would not be
disrupted during or after construction. Based on the above, there would be no need to relocate
or modify existing utilities. Furthermore, longterm or widespread disruption of services are not
expected. Impacts would be less than significant.
Alternative 5: Sinuous Channel Alternative
Impacts associated with maintenance activities would also be the same as those characterized
under Alternative 3.
A sinuous channel and adjoining marsh would be created within Zones SC and J, respectively.
Construction would include earthmoving activities such as excavating and grading. Standard
procedures for locating and avoiding utilities would be implemented during the design and
construction phases to avoid potential impacts to the sewer line.
The design of the sinuous channel would be subject to engineering review and approval to
ensure that the sinuous channel would continue to adequately convey the volume of discharged
treated water from the Tillman Plant. Flows within the creek would need to be diverted around
the structures during construction of the sinuous channel and placement of grade control
structures. Water diversion structures would be removed upon completion of construction.
Drainage through Haskell Creek would not be disrupted during or after construction. Based on
the above, there would be no need to relocate existing utilities. Conversion of Haskell Creek
from a linear to sinuous channel would result in modification to a drainage utility. However, the
75
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
sinuous channel would remain in the same location and follow the same alignment as the linear
channel. Furthermore, with a design that would not change the conveyance capacity of the
channel, the modification would not be substantial. Furthermore, longterm or widespread
disruption of services are not expected. Impacts would be less than significant.
Alternative 6: No Action Alternative
Under Alternative 6 the Corps would not conduct mowing and other vegetation management
activities, maintain access roads or the dam operation zone within the Proposed Action Area.
There would be no activities that could potentially affect utilities.
4.0 Cumulative Impacts
Pursuant to 40 CFR Parts 15001508, cumulative impacts of a proposed action must be assessed.
A cumulative impact is an "impact on the environment which results from the incremental
impact of the action when added to other past, present, and reasonably foreseeable future
actions." The geographic scope of analysis encompasses the Basin.
4.1 Past Impacts
Historically the Basin, including the site that the Tillman plant occupies, was primarily used for
agricultural purposes. Within the San Fernando Valley, the Los Angeles River made possible the
early development of agricultural and ranching area operations. Mission San Fernando, founded
in 1797, was located in the valley due to the need to access water. The early agricultural base
was developed within the vicinity of the mission. Until the housing boom following World War II,
land uses in the San Fernando Valley consisted primarily of agricultural and ranches.
Accordingly, substantial portions of natural areas within San Fernando Valley were modified to
accommodate ranching and agriculture operations prior to the construction of Sepulveda Dam
in 1941. Construction of Sepulveda Dam itself required grading and clearing of land within the
Basin and substantial modifications to the river.
The acceleration of urbanization within the San Fernando Valley after World War II created a
need for outdoor recreational areas. In 1951, the Corps and the City entered into a 50year
recreational lease where a large portion of the Basin was leased for recreational purposes to the
City. Recreational facilities were first constructed in the Basin in 1959. Multiple supplements to
the original 50year lease with the City for recreational purposes have been extended; thus
recreational use of the Basin will continue at least until 2042. The construction of the
recreational facilities would not have resulted in additional impacts on natural habitat, since
lands within the Basin had been used for agriculture.
Increasing urbanization also created a need for a WRP to service the San Fernando Valley. In
1970, the City entered into a lease agreement for the approximately 90 acres where the Tillman
WRP is located. Phase 1 was completed in 1984 and Phase II in 1991.
In 1979 and 1988 the City established the two wildlife areas south (48acre riparian habitat) and
north (60acre upland habitat) of Burbank Boulevard, respectively, thereby converting open and
76
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
agricultural land into wildlife habitat for birds and small mammals. In 1998, the Corps also added
an additional 60 acres of open lands west of Haskell Creek as part of the wildlife reserve. The
Corps and the City restored approximately 28 acres of native riparian and upland habitat along
Bull Creek starting in 2008.
In addition to issuances of leases, the Corps has also issued to lessees permits under Section 404
of the Clean Water Act. A review of available records in the Corps' database indicates issuance
of the following Section 404 permits:
Agency
Year
Project
LA City Dept. of Public
Works (LACDPW)
2007
Replace open concrete-lined storm drain channel with a closed box
culvert to accommodate widening of Victory Boulevard
LACDPW
2007
Vegetation removal.
LACDPW
2006
Well decommissioning.
Caltrans
2006
Wetland creation as mitigation for the widening of the West Sylmar
Overhead Structure for a High Occupancy Vehicle Connector.
Metropolitan
Transportation Authority
2002
No file in admin record.
Unavailable
2002
LACDPW
LACDPW
1998
1998
Unavailable
1996
No project proponent identified, no file in admin record. NWP-33
verified.
No project description. NWP-31 verified
No project description. NWP-31 verified
No project proponent identified, no file in admin record. Standard
individual permit authorized.
4.2 Present Impacts
The Basin continues to function as a flood risk management facility. In addition, the Basin
supports a variety of recreational uses including three golf courses, parkland, a sports center,
baseball and soccer fields, the garden center, model airplane field, cricket fields, tennis courts,
hiking/jogging/bicycle trails, and a lake for fishing and boating. Recreational facilities occupy
approximately 1,542 acres of land. The Corps also authorized implementation of a recreational,
nonmotorized boating program in select reaches of the Los Angele River traversing Sepulveda
Dam Bain in 2011.
77
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Several leases have also been granted for nonrecreational purposes including a fire station, a
National Guard Armory, maintenance shops, and a Naval Reserve Training Center. In addition,
several parcels in the Basin are leased for agricultural purposes. Easements have also been
granted for water lines, power lines, sewer lines, storm drains, gas lines, and traffic arteries,
such as freeways and city streets.
The City continues to operate the Tillman Water Treatment Plant in the upper Basin. As a part of
ongoing operations and maintenance activities, the City has modified or augmented various
elements of the water treatment plant. The most recent major improvement was the
construction of two 7.6 million gallons storage ponds within the 90 acre footprint of the water
treatment plant in 2011.
In the waterways adjacent to the Proposed Action Area, the Corps annually removes
approximately 5,000 cubic yards of sediment and emergent vegetation from grouted stone
portions of 1) the Los Angeles River from just below Burbank Boulevard to the outlet works and
2) Haskell and Encino Creeks. These activities are typically completed within a fourweek
duration. Furthermore, the Corps has authorized operation of a seasonal nonmotor boating
program within the reach of the Los Angeles River traversing the Basin.
As described under the Active Management Alternative, the Corps manages vegetation within
the Proposed Action Area annually. Activities would entail application of herbicides to non
native vegetation; annual mowing of all shrubs in Zone B and Zone Q; trimming of branches
below 8 feet from large native trees in Zones B, Q, L, and SG ; periodic removal of nonnative
and dead trees as needed and as resources permit; and maintenance of access roads and the
dam operations zone.
The continued use and maintenance of existing recreational facilities would entail ongoing
impacts on air quality, noise, and traffic especially during periods of peak usage.
4.3 Future Impacts
The Basin functions primarily as a flood risk management facility, and will continue to do so for
the foreseeable future. Proper maintenance and function of the facility would require at a
minimum ongoing routine maintenance activities in the Proposed Action Area as described
above in addition to other maintenance activities in areas outside of the Proposed Action Area.
Surrounded by a built out urban environment, the open space within the Basin will continue to
be regional resource for recreation and wildlife enthusiasts in the foreseeable future. As a
result, multiple supplements to the original 50year lease with the City has extended
recreational uses in the Basin to 2042. Likewise, the city of Los Angeles would likely seek a lease
renewal for the Tillman Water Treatment Plant. Activities within leased areas may require
periodic issuance of Section 404 and Section 408 permits to city and county agencies as well as
nongovernmental applicants. Last, the Corps has initiated two limited ecosystem restoration
projects under the Continuing Authorities Program at Encino Creek and Woodley Creek. Both
creeks are tributaries to the Los Angeles River. If implemented the two restoration projects
would further enhance and contribute to the extent of native habitat within the Basin.
78
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
The Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan under all
alternatives would further increase impacts to environmental resources as described above.
However, these impacts would be minor relative to existing impacts associated with ongoing
uses of the Basin for recreational and nonrecreational purposes. Though the Proposed Action
could result in additional diversity or additional growth of native vegetation within the lower
basin under all action alternatives, the native vegetation within the lower basin would continue
to be maintained at a minimum under the Active Management Alternative. Overall, the
Proposed Action would not result in significant environmental consequences and would not
result in incremental cumulative adverse impacts on the human environment.
79
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
6.0 Environmental Compliance
Clean Air Act
The Proposed Action would not violate any Federal air quality standards, exceed the U.S. EPA's
general conformity applicability rates, or hinder the attainment of air quality objectives in the
local air basin.
Clean Water Act
The Proposed Action, under Alternatives 4 and 5, would involve discharges of dredged or fill
material into waters of the United States. Verification of compliance with Section 404 of the
Clean Water Act will be completed upon identification of a preferred alternative, as applicable.
A Section 401 Water Quality Certification would be secured for construction of Alternatives 4 or
5.
Endangered Species Act
With incorporation of avoidance measures, the Proposed Action would not affect Federally
endangered species and would be in compliance with the Endangered Species Act.
National Environmental Policy Act
This EA has evaluated a reasonable range of alternatives within the context of the purpose and
need. Furthermore, this EA has evaluated and disclosed anticipated environmental impacts.
National Historic Preservation Act
Vegetation management activities under all alternatives would have no potential to affect
historic properties. Access road management under all action alternatives as well as
earthmoving activities under Alternative 4 and Alternative 5 would have no effect on historic
properties. The Corps will initiate National Historic Preservation Act Section 106 consultation
with the State Historic Preservation Officer for elements that would have no effect on historic
properties.
Executive Order 12898, Federal Actions to Address Environmental Justice
in Minority Populations and LowIncome Populations.
The Proposed Action would not result in longterm environmental impacts that would result in
disproportionately high and adverse impacts to minority and low income communities.
80
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
7.0 List of Preparers
U.S. Army Corps of Engineers, Los Angeles District
Kenneth Wong, Environmental Planner, Environmental Policy Section
RECON Environmental, Inc.
Adrienne Beeson, Restoration Ecologist
Sean Bohac, GIS Analyst
Kate Connor, Restoration Ecologist
Helen Cordier, Environmental Coordinator
Robert Hobbs, Senior Restoration Biologist
Susy Morales, Senior Environmental Planner/Wildlife Biologist
Sharon Wright, NEPA/Environmental Planner
81
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
8.0
References Cited
Bay Zone Air Quality Management District
n.d.
Air Quality Standards and Attainment Status. Accessed on February 20, 2015 at
http://hank.baaqmd.gov/pln/air_quality/ambient_air_quality.htm.
California Air Resources Board (CARB)
2007 California 1990 Greenhouse Gas Emissions Level and 2020 Emissions Limit. November
16.
2010 Ambient Air Quality Standards Chart. September 8. Accessed on July 16, 2011 at
http://www.arb.ca.gov/research/aaqs/aaqs2.pdf.
2011 iADAM Air Quality Data Statistics Homepage. Accessed on July 18, 2011 at
http://www.arb.ca.gov/adam/.
2013 California Greenhouse Gas Inventory for 20002011 by Category as Defined in the
2008 Scoping Plan. Last updated August, 1 2013. Accessed on April 2014.
California Department of Fish and Wildlife
n.d.
Swainson's Hawks in California. Accessed on May 21, 2014 at
https://www.dfg.ca.gov/wildlife/nongame/raptors/swha/.
California Department of Transportation
2013 Traffic Counts. Accessed on February 20, 2015 at
http://www.dot.ca.gov/hq/traffops/saferesr/trafdata/index.htm.
California Energy Commission (CEC)
2014 Integrated Energy Policy Report 2013 (IEPR). February.
California Natural Diversity Database
2011 Wildlife and Habitat Data. Analysis Branch, California Department of Fish and Game,
Sacramento, CA. Accessed on July 14, 2011 at http://bios.dfg.ca.gov/.
Hays, D. W., K. R. McAllister, S. A. Richardson, and D. W. Stinson
1999 Washington state recovery plan for the western pond turtle. Wash. Dept. Fish and
Wild., Olympia. 66 pp.
Natural Resources Conservation Service (NRCS)
2015 Custom Soil Resource Report for Los Angeles County, California, West San Fernando
Valley Zone. Sepulveda Basin. United States Department of Agriculture.
82
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Final Environmental Assessment
Patten, Michael A.
n.d.
Least Bell's Vireo. Vireo bellii pusillus.
U.S. Army Corps of Engineers (Corps)
2011a Sepulveda Dam Basin Master Plan and Draft Environmental Assessment. August.
2011b Los Angeles River (Sepulveda Dam Basin) Nonmotorized Boating Pilot program.
Environmental Assessment. July.
2011c Donald C. Tillman Water Reclamation Plan InPlan Storage Project. Environmental
Assessment. September.
2012a Sepulveda Dam Basin Vegetation Management Finding of No Significant Impact &
Environmental Assessment. September.
2012b Sepulveda Dam and Basin ONEgeneration Child Care Expansion Environmental
Assessment. November.
2013a Technical Report R420130039. April.
2013b Ordinary High Water Mark report.
2014a Sepulveda Dam Basin Vegetation Management Area--NonNative and Invasive Plant
Species Management through selectively targeted herbicide treatments. Categorical
Exclusion
2014b Sepulveda Basin Trash and Debris Removal Project Categorical Exclusion.
2014c Sepulveda Basin--Los Angeles River Sediment Removal Project. Categorical
Exclusion--Final.
U.S. Census Bureau
2013 American Fact Finder. Website accessed June 12, 2015 at
http://factfinder.census.gov/faces/nav/jsf/pages/index.xhtml.
U.S. Environmental Protection Agency (EPA)
2010 Inventory of U.S. Greenhouse Gas Emissions and Sinks: 19902008. U.S. Greenhouse
Gas Inventory Program, Office of Atmospheric Programs. 430R10006. April 15.
2011 AirData: Access to Air Pollution Data Homepage. Accessed on July 18, 2011 at
http://www.epa.gov/air/data/index.html.
83
Appendix A
Sepulveda Dam Basin Vegetation Management and Access Maintenance Plan
Response to Comments
Mr. Joe Phillips (Chair, Sepulveda Basin Wildlife Steering Areas Committee)
By email received on June 14, 2016, the Sepulveda Basin Wildlife Steering Areas Committee
1. expressed support for Alternative 4; and
2. expressed concern about the use of herbicides and recommended implementation of a oneyear
pilot program to manually remove invasive plants with participation from members of the Sierra
Club and Friends of the Los Angeles River.
Response:
1. The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
2. The Corps is amenable to a oneyear pilot program to manually remove invasive plants from the
Proposed Action Area with participation from members of the Sierra Club and Friends of the Los
Angeles River and have added such pilot program as part of Alternatives 2 through 5. As noted
in the EA, implementation of the program would require and be dependent upon successful
completion of additional coordination with the stakeholders on a number of matters
encompassing technical (e.g., development of success criteria for invasive plant coverage);
logistical (e.g., schedules, site access, etc.); and legal (e.g., memoranda of agreement, volunteer
program, etc.). Continuation of the program beyond the pilot phase would be subject to
additional review and authorization by the Corps as appropriate. The Corps would proceed with
use of herbicides in areas not designated for the pilot program. If the pilot program is not
renewed, herbicides would be applied to the vacated area. The Corps would also proceed with
use of herbicides in the Proposed Action Area during the period in which the coordination for
the oneyear pilot program is ongoing or in the event the pilot program does not go forward.
Mr. Barry Katzen (Chair, San Fernando Valley Group, Sierra Club/Los Angeles Chapter)
By letter dated June 14, 2016, the San Fernando Valley Group of the Sierra Club/Los Angeles Chapter:
1. expressed support for Alternative 4 and recommended addition of a fifth year in the mowing
cycle for Alternative 4 in which no mowing would occur;
2. expressed concern about the use of herbicides and recommended implementation of a oneyear
pilot program to manually remove invasive plants with participation from members of the Sierra
Club and Friends of the Los Angeles River; and
3. objected to the Corps' characterization in Section 1.2 of the EA regarding the December 2012
vegetation management activities citing impacts to native plants.
Response:
1. The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
The recommendation to add a fifth year to the vegetation management cycle in which no
mowing would occur has been incorporated as part of Alternatives 3 through 5.
2. The Corps is amenable to a oneyear pilot program to manually remove invasive plants from the
Proposed Action Area with participation from members of the Sierra Club and Friends of the Los
Angeles River and have added such pilot program as part of Alternatives 2 through 5. As noted
in the EA, implementation of the program would require and be dependent upon successful
completion of additional coordination with the stakeholders on a number of matters
encompassing technical (e.g., development of success criteria for invasive plant coverage);
logistical (e.g., schedules, site access, etc.); and legal (e.g., memoranda of agreement, volunteer
program, etc.). Continuation of the program beyond the pilot phase would be subject to
additional review and authorization by the Corps as appropriate. The Corps would proceed with
use of herbicides in areas not designated for the pilot program. If the pilot program is not
renewed, herbicides would be applied to the vacated area. The Corps would also proceed with
use of herbicides in the Proposed Action Area during the period in which the coordination for
the oneyear pilot program is ongoing or in the event the pilot program does not go forward.
3.
The text in Section 1.2 of the EA has been revised.
Mr. Lewis MacAdams (President, Friends of the Los Angeles River)
By letter dated June 15, 2016, Friends of the Los Angeles River (FoLAR):
1. expressed support for Alternative 4; and
2. expressed concern about the use of herbicides and recommended implementation of a oneyear
pilot program to manually remove invasive plants with participation from members of the Sierra
Club and Friends of the Los Angeles River.
Response:
1. The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
2. The Corps is amenable to a oneyear pilot program to manually remove invasive plants from the
Proposed Action Area with participation from members of the Sierra Club and Friends of the Los
Angeles River and have added such pilot program as part of Alternatives 2 through 5. As noted
in the EA, implementation of the program would require and be dependent upon successful
completion of additional coordination with the stakeholders on a number of matters
encompassing technical (e.g., development of success criteria for invasive plant coverage);
logistical (e.g., schedules, site access, etc.); and legal (e.g., memoranda of agreement, volunteer
program, etc.). Continuation of the program beyond the pilot phase would be subject to
additional review and authorization by the Corps as appropriate. The Corps would proceed with
use of herbicides in areas not designated for the pilot program. If the pilot program is not
renewed, herbicides would be applied to the vacated area. The Corps would also proceed with
use of herbicides in the Proposed Action Area during the period in which the coordination for
the oneyear pilot program is ongoing or in the event the pilot program does not go forward.
Mr. Kris Ohlenkamp (San Fernando Valley Audubon Society)
By letter dated June 13, 2016, Friends of the San Fernando Valley Audubon Society:
1. expressed support for Alternative 4 with supporting rationale and recommended the 4year
mowing cycle include a 5th year in which no mowing would take place; and
2. noted that Alternative 1 (No Action) is not a true no action alternative.
Response:
1. The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
The recommendation to add a fifth year to the vegetation management cycle in which no
mowing would occur have been incorporated as part of Alternatives 3 through 5.
2. Alternative 6 under which no activities would be undertaken has been incorporated into the EA.
Alternative 1 has been revised to provide an active vegetation and access management
alternative.
Ms. Muriel Kotin
By letter dated June 13, 2016, Ms. Kotin expressed support for Alternative 4 and concurred with the
Audubon Society's recommendation to add a 5th year to the 4year mowing cycle in Alternative 4 in
which no mowing would take place.
Response:
The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
The recommendation to add a fifth year to the vegetation management cycle in which no
mowing would occur have been incorporated as part of Alternatives 3 through 5.
Encino Neighborhood Council Parks Committee
By motion passed on May 9, 2016, the fivemember Encino Neighborhood Council Parks Committee:
1. unanimously supported in concept Alternative 4; and
2. recommended reestablishment of reclaimed water to Pothole Pond.
Response:
1. The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
2. Restoration of Pot Hole Pond is outside the scope of existing operations and maintenance
operations. The proposal would require additional coordination with the stakeholders, the
Corps, and appropriate agencies from the City of Los Angeles.
Mr. Steve Hartman (President, Board of Directors, California Native Plant Society)
By letter dated May 25, 2016, the California Native Plant Society (CNPS):
1. recommended Alternative 4 and is against Alternative 1 and Alternative 5; also preferred
Alternative 3 to Alternatives 2;
2. offered a number of revisions to Section 1.2 and Section 3.6 of the EA with respect to the
presence of native trees in the project area in 2012 and cautioned against establishing a direct
relationship between vegetation and unauthorized/illegal activities; and recommended
changing the phrase "Large ... native trees ... would be pruned to a height of 8 feet ..." to "...
branches below eight feet should be trimmed in order to ... " since the former could potentially
suggest that trees should be limited to a height of 8 feet;
3. recommended incorporation of biological monitoring and implementation of adaptive
management measures to mowing operations per potential impacts to coyote bush;
4. noted differing prescriptions for herbicide application in the EA and suggested application of
herbicides on an as needed basis since nonnative infestation is multivariate; and
5. recommended removal of evergreen ashes along the Haskell Creek corridor.
Response:
1.
The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
2. CNPSrecommended revisions to Section 1.2 and 3.6 have been incorporated as appropriate.
The sentence, "Native vegetation Zones within the Basin are fragmented, degraded, and small in
size (Corps 2012b)," has been deleted. The reference to madrone (Arbutus menzeisii) and
poison oak (Toxicodendron diversilobum) have been removed. With regards to public outreach
for the 2012 EA, the Corps made available the EA for public review as required by the National
Environmental Policy Act. With regards to the relationship between vegetation growth and
unauthorized activities, the Corps notes a decrease in unauthorized encampments in the
Proposed Action Area since initiation of vegetation management activities. Text concerning
pruning trees to a height of 8 feet has been changed per the CNPS recommendation throughout
the EA.
3. Mowing operations would be conducted in concert with a biological monitor. All shrubs within
Zone B would be subject to mowing. In Zone Q, native monotypic vegetation (i.e., Baccharis
pilularis) within Zone Q would be delineated from other vegetation and cut with handheld
brush cutters to a height of 3 feet.
4. Herbicides for Alternatives 1 through 3, all of which do not involve construction, would be
implemented on an asneeded basis. Herbicides application schedules for Alternatives 4 and 5
were prescribed for the purpose of ensuring successful establishment of vegetation in areas
where vegetation would be actively planted. Upon sufficient establishment of the vegetation,
herbicide application regime would revert back to that described under Alternative 1 Active
Management Alternative. The EA has been updated with this clarification.
5. As noted in all action alternatives and as was done in January 2014, the Corps would periodically
remove nonnative trees and dead trees including those in the Haskell Creek corridor between
the months of September and March as needed and as resources permit. Trees would be cut at
the base of the trunk.
Mr. Mark Osokow
By letter dated May 25, 2016, Mr. Osokow:
1. expressed support for Alternative 4;
2. requested additional information on use of the articulated arm mower due to concerns about
the mower driving over vegetation;
3. recommended removal of nonnative plants outside the bird breeding season;
4. requested additional details on the use of truckmounted herbicide spraying due to concerns
about impacts to nontarget plants and animal species;
5. recommended soil and water sampling for herbicide breakdown products and minimization of
herbicide application;
6. requested clarification of what determines "need" with respect to tree maintenance and brush
cutting;
7. noted that the saltgrass in Section 2.5 is not native to the area and has minimal wildlife value in
fresh water situations and that Achillea millefolium is not suitable for the marsh vegetation in
the Southern California area;
8. requested additional certification on regulation of flows into and out of Haskell Creek for
Alternative 4;
9. recommended additional measures to further minimize noise impact to birds; and
10. noted that the description of existing vegetation in Section 3.6 of the EA is textbook the
stretches of natural vegetation types and should be further refined to reflect actual vegetation
that are more likely to be in the Sepulveda Basin.
Response:
1. The Corps notes support for Alternative 4. As noted in the EA, Alternative 4 is outside the scope
of existing operations and maintenance authority and funding capabilities. A separate authority
and appropriation would be required to implement Alternative 4. The Corps could partner with
a nonFederal governmental entity or a nonprofit organization to conduct a study to evaluate
alternatives of this nature under the Continuing Authorities Program, but would require an
interested nonfederal partner to share the costs of under the terms of a study agreement, and
if an alternative is selected, a nonFederal entity would have to share the implementation costs
under a design and implementation agreement. Alternatively, if a third party wishes to
implement Alternative 4 on its own, that party would need to seek a lease or easement from the
United States, which would also require a review pursuant to 33 U.S.C. Section 408.
2. The mowing operation would require a rubbertired tractor to drive across the vegetation
towing a rubbertired, heightadjustable mowing deck. The mowing deck would be raised to
approximately 3 feet. The tractor would make parallel passes through the mowing area.
3. As shown in the summary tables for each alternative, nonnative trees and dead trees would be
removed between the months of September and March (i.e., outside the bird nesting season).
4. In recognition of the potential for herbicides to affect nontargeted species, herbicide
application would be undertaken in conjunction with a biological monitor and a qualified
herbicide applicator.
5. Given the use of herbicides in the past and the planned use of herbicides as part of the
vegetation management plan, the presence of herbicides or breakdown products in the soil is
certain. Likewise, given the urban watershed that drains into the basin, presence of herbicides
and pesticides or their associated breakdown products in the water is certain. Thus, sampling
would not be undertaken.
The Corps is amenable to a oneyear pilot program to manually remove invasive plants from the
Proposed Action Area with participation from members of the Sierra Club and Friends of the Los
Angeles River and have added such pilot program as part of Alternatives 2 through 5. As noted
in the EA, implementation of the program would require and be dependent upon successful
completion of additional coordination with the stakeholders on a number of matters
encompassing technical (e.g., development of success criteria for invasive plant coverage);
logistical (e.g., schedules, site access, etc.); and legal (e.g., memoranda of agreement, volunteer
program, etc.). Continuation of the program beyond the pilot phase would be subject to
additional review and authorization by the Corps as appropriate. The Corps would proceed with
use of herbicides in areas not designated for the pilot program. If the pilot program is not
renewed, herbicides would be applied to the vacated area. The Corps would also proceed with
use of herbicides in the Proposed Action Area during the period in which the coordination for
the oneyear pilot program is ongoing or in the event the pilot program does not go forward.
6. Section 1.3 of the EA discusses the general purpose and need for the vegetation management
plan. Pruning trees to a height of 8 feet is required to discourage unauthorized encampments.
Brush cutting is required to establish a line of sight across the Proposed Action Area.
7. Consistent with the conceptual nature of Alternatives 4 and 5, vegetation characterization in the
EA is primarily a description of habitat type and commonly found species within the habitat
type. As noted above, Alternative 4 would require further study and require separate authority
and appropriation. Specific plant pallets would be developed at such time.
8. The use of water control structures in Alternative 4 would be for the sole purpose of diverting
and returning flows into Haskell Creek. Due to the conceptual nature of Alternative 4, no further
information on regulation of flows are available. As noted above, Alternative 4 would require
further study and require separate authority and appropriation. Specific inflow and outflow
rates would be developed at such time.
9. Vegetation management activities would be conducted from September to March, outside of
the bird nesting season. Furthermore, vegetation management activities would be undertaken
in conjunction with a biological monitor.
10. Description of vegetation communities has been revised per suggestions from the CNPS. The
descriptions better reflect the existing vegetation communities in the Proposed Action area.