You can copy from here when filling out the rest of the page.
The application is to construct a stormwater detention facility, which includes an earthen berm along the south and west side of the facility with a concrete discharge structure at the southwest corner to control water discharges.
Location: The proposed project is located in the Southwest 1/4 of Section 7, Township 21 North, Range 14 East, in Owasso, Tulsa County, Oklahoma. The project site can be found on the Collinsville, Oklahoma 7.5 Minute USGS Quadrangle map at Latitude 36.307585 North and Longitude 95.85943 West.
Purpose: The basic purpose of this work is to reduce flooding on-site and downstream as part of the 2005 Owasso Master Drainage Plan. The project is not a water dependent activity. The overall purpose of this work is to construct a stormwater detention facility within this specific drainage area that would reduce flooding in the unnamed tributary of Ranch Creek.
Description of Work: The applicant proposes to place soil excavated from on-site within the above listed aquatic resources for the construction and grading of a stormwater detention facility on City of Owasso property. The total earthen fill would equate to 8,210 cys within the above identified aquatic resources below their associated OHWM.
The proposed detention facility would be excavated, include construction of a perimeter berm, and incorporate both wet and dry area detention. Normal and high flows from the unnamed tributary (FS-3) that currently transition along the southern property boundary would be redirected into the detention facility near the southeast basin corner. The lower portion of the basin is designed as wet detention and the unnamed tributary would be allowed to enter and exit the basin unrestricted. The lower portion of the basin would be excavated to retain approximately 2 feet of standing water. Six reinforced concrete boxes would be constructed in the southwest corner of the basin and serve as the controlled outlet structure. Flows from the basin would reenter the undisturbed downstream section of the rerouted unnamed tributary. The upper portion of the proposed basin would be graded to drain and be used as dry detention to temporarily retain stormwater. Recreational facilities such as soccer fields and day use areas are planned for development in the dry detention area of the basin. Earth disturbance anticipated with basin construction would include excavation, berm construction, clearing, and shaping of the basin.
Table of Impacts:
Original Proposal
Number or Location
Impact Activity
Type of Water
Type of Fill Material
Qty of Material cys below OHWM
Footprint
(ac and/or lf)
FS-1
Construction grading
Pond
Earthen clay
2,132 cys
1.32 ac
FS-2
Construction grading
Emergent wetland
Earthen clay
32 cys
0.02 ac
FS-3
Construction grading
Intermittent stream
Earthen clay
521 cys
476 lf
FS-4
Construction grading
Pond
Earthen clay
1,489 cys
0.92 ac
FS-5
Construction grading
Emergent wetland
Earthen clay
1,303 cys
0.81 ac
FS-6
Construction grading
Mixed wetland
Earthen clay
1,663 cys
1.03 ac
FS-7
Construction grading
Ephemeral stream
Earthen clay
1,070 cys
578 lf
cubic yards (cys), ordinary high water mark (OHWM), acre (ac), linear feet (lf)