You can copy from here when filling out the rest of the page.
LETTER OF PERMISSION: This project is to repair a broken drain tile line and discharge fill material into a farmed wetland for the purpose of restoring it to historic dimensions and type.
PROJECT DESCRIPTION AND PURPOSE: This project is to repair a broken drain tile line and discharge fill material into a farmed wetland for the purpose of restoring it to historic dimensions and type. The proposed project is to re-attach the broken drain tile west of Wetland 5 and to discharge native soil within the perimeter of the 1.13 acre wetland basin to restore the wetland back to its original size and type.
Information for File # MVP-2016-01300-TJH
Applicant: Susan and Ronald Moore
Corps Contact: Tom Hingsberger
Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678
E-Mail:thomas.j.hingsberger@usace.army.mil
Phone: (651) 290-5376
Primary County: Washington
Section: 20
Township: 32 N
Range: 21 W
Information Complete On: April 10, 2017
Posting Expires On: December 7, 2017
Authorization Type: LOP-05-MN
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 08-02.
AFTER-THE-FACT APPLICATION? Yes
PROJECT INVOLVES:
THREATENED OF ENDANGERED SPECIES? No
TRIBAL TRUST OR OTHER RESOURCES? No
A LISTED STATE-IMPAIRED WATER? No
FEMA 100-YEAR FLOODPLAIN? No
COASTAL RIDGE&SWALE CMPLEX? No
MINK, KAKAGON OR BAD RIVER? No
PLEASANT PRAIRIE ADID? No
PROJECT DESCRIPTION AND PURPOSE: Repair a broken drain tile line and discharge fill
material into a farmed wetland for the purpose of restoring it to historic dimensions and type.
Historic aerial photos have shown that prior to 2008, the delineated Wetland 5 on the project
site was 0.63 acres in size. The wetland basin gradually increased in size since 2008 due to a
broken drain tile underneath Forest Boulevard, from ditch improvements within the Forest
Boulevard right-of way, and from drainage improvements undertaken at the Forest Lake Airport.
The 0.63 acre wet meadow wetland has increased in size to 1.76 acre and has become a
shallow marsh-type wetland due to changed hydrology. The proposed project is to re-attach the
broken drain tile west of Wetland 5 and to discharge native soil within the perimeter of the 1.13
acre wetland basin to restore the wetland back to its original size and type.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS:
Approximately 1.13 acres of an inundated upland area would be drained and filled. There would
be no loss of wetlands associated with the restoration of Wetland 5 to its original size and type.
ALTERNATIVES CONSIDERED: No action.
COMPENSATORY MITIGATION: None was proposed.