Proposed expansion of existing industrial facility in Knoxville, Knox County, Tennessee

Public Notice No. 17-23A Nashville District Corps Application No. LRN-2016-00015 Date: November 29, 2017;Expires: December 14, 2017

Please address all comments to:

Nashville District Corps of Engineers, Regulatory Division

East Regulatory Office (Attn: Aric Payne)

3701 Bell Road, Nashville, TN 37214 SUBJECT: Proposed expansion of existing industrial facility in Knoxville, Knox County, Tennessee

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA) (33 U.S.C. 1344). Application (ARAP NRS No. 16.149) has also been made to the State of Tennessee, Department of Environment and

Conservation, Division of Water Resources for a water quality certification pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341).

APPLICANT: Republics Plastics

5428 North National Drive Knoxville, Tennessee 37914

LOCATION: Wetlands adjacent to Sand Branch, Holston River; HUC 060101040304 – Sand Branch Watershed; Latitude N. 35.9582°, Longitude W. -83.8226°; National Drive in Knoxville, Knox County, Tennessee.

DESCRIPTION OF PROPOSED WORK: The applicant proposes expand its existing industrial facility on its own property, which includes the deposition of fill material into 1.4 acres of jurisdictional wetlands.

Plans and location maps of the proposed project are provided in this notice. If you wish to view additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx

PURPOSE AND NEED: In order to meet expanded business demands, Republic Plastics has a need to increase production at their facility at Forks of the River Industrial Park in Knox County, Tennessee. The facility is poised to double its production and increase workforce from 125 to 225 employees once the expansion project moves forward.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: Based on information provided in the project application, efforts were made during the planning and design phases of this project to avoid impacts to waters of the U.S. to the extent practicable, and to minimize impacts that were not avoidable. The Corps has not completed an evaluation of the applicant’s avoidance and minimization measures.

COMPENSATORY MITIGATION: The applicant has proposed to offset unavoidable impacts by purchasing credits from Shady Valley Wetland Mitigation Bank at a 2:1 ratio.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a DA permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of

important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable

detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

As the proposed activity involves the discharge of fill material into the waters of the U.S., the evaluation of the probable impacts on the public interest will include application of the guidelines promulgated by the Administrator of the U.S. Environmental Protection Agency at 40 CFR 230.

SOLICITATION OF COMMENTS: The U.S. Army Corps of Engineers, Nashville District (Corps) is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. In accordance with the Council on Environmental Quality (40 CFR 1500- 1508) and Corps (Engineer Regulation (ER) 200-2-2, dated 1988) regulations for implementing National Environmental Policy Act (NEPA), this document serves as a scoping letter to notify the public of the proposed action and affording the public the opportunity to participate. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to NEPA. Comments are used to assess impacts on fish, wildlife, endangered species, water quality, historic properties, water supply, conservation, economics,

aesthetics, wetlands, flood hazards, floodplain values, land use, navigation, shore erosion, sedimentation, recreation, energy needs, safety, climate change, considerations of property ownership, general environmental effects, cumulative effects, and in general, the needs and welfare of the people. Any comments received will be considered by the Corps prior to a final decision concerning the authorization of the project, i.e. the issuance, modification, or

denial of the requested DA permit.

HISTORIC AND CULTURAL RESOURCES: A review of the National Register website (http://nrhp.focus.nps.gov/natreghome.do?searchtype=natreghome) indicates there are three federally listed historic properties within one-mile of the National Historic Preservation Act (NHPA) Section 106 Permit Area. This public notice serves to initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. The Corps invites responses to this public notice from Native American Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area. Copies of this public notice are being provided to the State Historic Preservation Office (SHPO) and Native American Tribes. The Corps will consult with the SHPO, Native American Tribes, and other consulting parties in accordance with Section 106 of the National Historic Preservation Act.

ENDANGERED/THREATENED SPECIES REVIEW: The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or

endangered or any designated critical habitat. Initial coordination with the USFWS indicates the presence of several federally listed endangered or threatened species in the vicinity of the action area, which are described below. A request will be made to the applicant to evaluate the project in light of potential impacts to threatened and endangered species including potential impacts to the Indiana bat (Myotis sodalis), Northern Long-eared bat (Myotis septentrionalis) and Gray bat (Myotis grisescens). A copy of this notice is being furnished to the USFWS for their review. We are requesting comments from the USFWS concerning potential impacts to threatened and/or endangered species pursuant to Section 7(a)(2) of the Endangered Species Act (ESA) of 1973, as amended. If required, the Corps will initiate ESA consultation with the USFWS by separate letter.

OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work, including:

1. Before a permit can be issued, water quality certification must be provided by the State of Tennessee, pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated.

2. Other federal, state, and/or local approvals that may be required for the proposed work.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.

COMMENT PERIOD: Written statements received by December 14, 2017, will become a part of the record and considered in the determination. A 30 day public notice was issued from September 15 to October 14, 2017, Public Notice No. 17-23. This notice serves as an update to modified project plans,

after the closing of the initial public notice. Any response to this notice N-2016-00015, and be directed to the Regulatory Division, Attention: Aric Payne, at the above address or at aric.j.payne@usace.army.mil.

Casey Ehorn Chief, East Branch Regulatory Division U.S. Army Corps of Engineers

File No. LRN-2016-00015 PN 17-23A Exhibit 1 of 3

File No. LRN-2016-00015 PN 17-23A Exhibit 2 of 3

LRN-2016-00015; Proposed Republic Plastics Expansion Area of Impact

File No. LRN-2016-00015 PN 17-23A Exhibit 3 of 3

-3/1SPQPTFE3FQVCMJD1MBTUJDT&YQBOTJPO"SFBPG*NQBDU

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas