Home

Nashville District

Run scraper

Swannanoa River Watershed

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers Nashville District seeks public comment on its Swannanoa River Watershed, Section 205 Flood Risk Management, Detailed Project Report and Environmental Assessment and Unsigned Finding of No Significant Impact Statement, Asheville, Buncombe County, North Carolina.

The U.S. Army Corps of Engineers, Nashville District (Corps) has prepared a Detailed Project Report and Environmental Assessment to evaluate measures and alternatives for a flood risk management study for the Swannanoa River Watershed in Buncombe County, North Carolina, near Asheville. A wide variety of forty eight FRM measures were developed that would address one or more planning objectives. These measures were then screened for efficiency and acceptability. Seven structural measures were evaluated in further detail along with non-structural measures. The final array of four measures were combined into alternatives. The recommended plan, Biltmore 700 foot cut, includes a bank modification upstream and downstream of Biltmore Avenue Bridge for approximately 700 feet.

DEPARTMENT OF THE ARMY NASHVILLE DISTRICT, CORPS OF ENGINEERS . 110 9TH AVENUE SOUTH, ROOM A-405 NASHVILl,.E, TENNESSEE 37203 IN REPLY REFER TO

DEC OJ 2017

Project Planning Branch

TO ALL INTERESTED PARTIES: The U. S. Army Corps of Engineers, Nashville District (Corps) has prepared a Integrated Detailed Project Report and Environmental Assessment (DPR/EA), dated August 2017 for the Swannanoa Watershed Flood Risk Management Study to analyze potential solutions for flooding problems within the Swannanoa Watershed in Buncombe County, North Carolina, near the city of Asheville. Figure 1 shows the study area for the project. In addition to the "no action" alternative, the DPR/EA evaluated a wide variety of flood risk management measures that were developed to address one or more of the planning objectives. The DPR/EA revealed, based on existing conditions, that the recommended plan, Biltmore 700 Foot Bank Cut, was the National Economic Development (NED) Plan. The NED plan provides the greatest net annual benefits of any of the considered alternatives. The recommended plan includes a bank modification upstream and downstream of Biltmore Avenue Bridge. North Carolina Department of Transportation (NCDOT) has already widened the bridge span so the structure would not be modified during this project. This letter serves as a Notice of Availability for reviewing the EA and unsigned FONSI. This EA is prepared pursuant to the National Environmental Policy Act (NEPA), Council on Environmental Quality Regulations (40 CFR 1500-1508), and the USAGE implementing regulation, ER 200-2-2, 1988, Policies and Procedures for Implementing NEPA. Electronic copies of the documents can be found at: http://www.lrn.usace.army.mil/Media/PublicNotices/Category/10561/project-planning-branch/. Please submit any written comments no later than thirty days from the date of this letter to ensure consideration in the EA. Send your written comments to the address listed on the letterhead, ATTN: CELRN-PMP (Chip Hall), or email your comments to CorpsLRNPlanningPublicCom@usace.army.mil. Your participation is greatly appreciated. Sincerely,

· ·~~ ~Angela E. Dunn Chief, Project Planning Branch

Figure 1. Swannanoa Section 205 Study Area

Figure 2. Swannanoa Section 205 Study Area

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas