The applicant proposes to perform maintenance to two, natural gas pipelines.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to perform maintenance to two, natural gas pipelines. Proposed activities include cutting and capping of existing 4-inch-diameter and 2-inch-diameter natural gas pipelines at three locations on Market Street. In addition, approximately 1,000 feet of existing 4-inch-diameter steel pipeline will be abandoned and replaced, and approximately 565 feet of existing 4-inch-diameter steel pipeline will be abandoned in place. Cut and cap activities will take place within temporary workspaces measuring approximately 5-foot-wide by 5-foot-long by 5-foot-deep. Installation activities will be completed using the horizontal bore method. Approximately, 9.26 cubic yards of native soil will be excavated and returned upon project completion. All project activities will be temporary in nature, and the project workspaces will be backfilled and returned to pre-construction conditions upon project completion.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas