The applicant proposes to decommission in place an approximate 4.8-mile-long, 6.625-inch-diameter, gas pipeline.

Full Public Notice Project Plans PROJECT DESCRIPTION: The applicant proposes to decommission in place an approximate 4.8-mile-long, 6.625-inch-diameter, gas pipeline (Pipeline segment 11438), the Gulf of Mexico in the OCS that traverses from Platform A Galveston Area Block 151 to Platform A High Island Area Block 179 and is buried to a depth of 16.5 feet below the natural bottom. There will be no dredged or fill materials involved in these operations. No structures will be installed.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas