MODIFICATION/TIME EXTENSION TO INCLUDE THE CONSTRUCTION OF ADDITIONAL CAMPS AND CAMPER COVERS, DECK, AND INSTALL ASSOCIATED UTILITIES AND DRAINAGE IN AND ALONG BAYOU RIGAUD IN JEFFERSON PARISH
NAME OF APPLICANT: Paige & Wesley Bland and Thomas & Tina Armstrong, at 344 Highway 3161, Suite B, in Cut Off, Louisiana 70345.
LOCATION OF WORK: Project site is located within Bayou Rigaud and along Tropical Landing Lane, Lots 3 through 11, in Grand Isle, Louisiana, in Jefferson Parish, as shown on the attached drawings.
Latitude: 29.24335/Longitude: -89.98578 Hydrologic Unit Code: 08090301 East Central Louisiana Coastal.
The work described below was partially completed prior to obtaining a Department of Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have been deferred.
CHARACTER OF WORK: Install and maintain a 5’ x 16’ deck and piles, a 50’ x 30’ elevated camp with concrete pad and 42’ x 16’ driveway on Lots 7 and 8 and a 58’ x 30’ elevated camp with concrete pad and 36’ x 16’ driveway on Lot 3, a 42’ x 32’ concrete pad with camper cover and 42’ x 16’ driveway on Lots 4 through 6 and 9 through 11, and 15” culverts, waterline and sewer utilities to service the camps and camper cover areas. Work previously completed include: excavation for a drainage ditch located behind Lots 4 through 6 and excavation of another drainage ditch and culvert fronting Lots 7 through 13. Proposed project will directly impact approximately 0.46 acre of jurisdictional wetlands. The applicant has proposed to contract with an approved mitigation bank in order to offset the adverse impact to jurisdictional wetlands.
The applicant may be required to fully or partially restore the project site to pre-project conditions, if issuance of a permit is determined to be contrary to the overall public interest.
JOINT PUBLIC NOTICE
December 11, 2017
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch, OD-SE
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1564
Stephanie.L.Castaing@usace.army.mil
Project Manager
Stephanie Castaing
Permit Application Number
MVN-2015-0145-EPP
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 150623-02
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
MODIFICATION/TIME EXTENSION TO INCLUDE THE CONSTRUCTION OF ADDITIONAL
CAMPS AND CAMPER COVERS, DECK, AND INSTALL ASSOCIATED UTILITIES AND
DRAINAGE IN AND ALONG BAYOU RIGAUD IN JEFFERSON PARISH
NAME OF APPLICANT: Paige & Wesley Bland and Thomas & Tina Armstrong, at 344 Highway
3161, Suite B, in Cut Off, Louisiana 70345.
LOCATION OF WORK: Project site is located within Bayou Rigaud and along Tropical Landing Lane,
Lots 3 through 11, in Grand Isle, Louisiana, in Jefferson Parish, as shown on the attached drawings.
Latitude: 29.24335/Longitude: -89.98578 Hydrologic Unit Code: 08090301 East Central Louisiana
Coastal.
The work described below was partially completed prior to obtaining a Department of Army permit
and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the
unauthorized work have been deferred.
CHARACTER OF WORK: Install and maintain a 5' x 16' deck and piles, a 50' x 30' elevated camp
with concrete pad and 42' x 16' driveway on Lots 7 and 8 and a 58' x 30' elevated camp with concrete
pad and 36' x 16' driveway on Lot 3, a 42' x 32' concrete pad with camper cover and 42' x 16'
driveway on Lots 4 through 6 and 9 through 11, and 15" culverts, waterline and sewer utilities to
service the camps and camper cover areas. Work previously completed include: excavation for a
drainage ditch located behind Lots 4 through 6 and excavation of another drainage ditch and culvert
fronting Lots 7 through 13. Proposed project will directly impact approximately 0.46 acre of
jurisdictional wetlands. The applicant has proposed to contract with an approved mitigation bank in order
to offset the adverse impact to jurisdictional wetlands.
-2The applicant may be required to fully or partially restore the project site to pre-project conditions, if
issuance of a permit is determined to be contrary to the overall public interest.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating reasons
thereof, are being solicited from anyone having interest in this permit and/or this WQC request and
must be mailed so as to be received before or by the last day of the comment period. Letters
concerning the Corps of Engineers permit application must reference the applicant's name and the
Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must
reference the applicant's name and the WQC Application number and be mailed to the Louisiana
Department of Environmental Quality at the address above. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing or e-mailing the Corps of
Engineers Project Manager listed above. Any request must be specific and substantively supportive of
the requested extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the decision to grant
or deny the request. If granted, the time extension will be continuous to the initial comment period and,
inclusive of the initial comment period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of
this public notice solicits input from the State Archeologist and State Historic Preservation Officer
regarding potential impacts to cultural resources.
-3The New Orleans District has determined that the proposed activity is not likely to adversely affect
the West Indian Manatee (Trichechus manatus) species based on the Standard Local Operating
Procedure for Endangered Species of Louisiana (SLOPES), dated October 22, 2014, between the
U.S. Army Corps of Engineers and U.S. Fish and Wildlife Service, Ecological Services Office.
Our initial finding is that the proposed work would not affect any species, nor affect any habitat
designated as critical to the survival and recovery of such species, listed as endangered by the U.S.
Department of Commerce.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 0.46 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
For
Michael V. Farabee
Chief, Eastern Evaluation Section