DREDGING, CLEANOUT, REDISTRIBUTION OF FILL AND OIL WELL STRUCTURES IN BAYOU BLUE IN LAFOURCHE PARISH
NAME OF APPLICANT: Mack Energy Co. 3861 Ambassador Caffery Pkwy, Suite 500, Lafayette, LA 70503
LOCATION OF WORK: In Bayou Blue, Sections 55, 56, 61, 62, 63 and 64, T18S-R21E and Sections 32, 36 and 53, T19S, R21E approximately 6 miles southeasterly from Larose, Louisiana, in Lafourche Parish, within the Terrebonne Basin in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.498746 N, Longitude -90.366814 W).
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to dredge and redistribute fill material, construct structures and conduct cleanout activities in order to produce the Mardi Gras Prospects A, B, C and D. Approximately 91,401 total cubic yards will be excavated from waterbottoms, of which 74,936 cubic yards will be dredged from approx. from approx. 26.84 acres and redistributed in approx. 23.15 acres as beneficial use. Additionally, approx. 16,465 cubic yards of material will be redistributed via propwash activity in approx. 7.67 acres of open water. A maximum of approx. 0.92 acres of open water would be directly impacted by the placement of structures at the prospect sites.
The applicant proposes to avoid additional direct impacts and minimize secondary impacts to wetlands by remaining within existing open water channels and by utilizing marine equipment for dredging activities.
JOINT PUBLIC NOTICE
December 11, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1545
Project Manager
S. Gail Gainey
Sandra.G.Gainey@usace.army.mil
MVN 2017-01257-CG
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 171204-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
DREDGING, CLEANOUT, REDISTRIBUTION OF FILL AND OIL WELL STRUCTURES
IN BAYOU BLUE IN LAFOURCHE PARISH
NAME OF APPLICANT: Mack Energy Co. 3861 Ambassador Caffery Pkwy, Suite 500,
Lafayette, LA 70503.
LOCATION OF WORK: In Bayou Blue, Sections 55, 56, 61, 62, 63 and 64, T18S-R21E
and Sections 32, 36 and 53, T19S, R21E approximately 6 miles southeasterly from
Larose, Louisiana, in Lafourche Parish, within the Terrebonne Basin in hydrologic unit
(HUC 08090302), as shown on the attached drawings (Latitude 29.498746 N, Longitude
-90.366814 W).
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to dredge and redistribute fill material, construct structures and conduct
cleanout activities in order to produce the Mardi Gras Prospects A, B, C and D.
Approximately 91,401 total cubic yards will be excavated from waterbottoms, of which
74,936 cubic yards will be dredged from approx. from approx. 26.84 acres and
redistributed in approx. 23.15 acres as beneficial use. Additionally, approx. 16,465 cubic
yards of material will be redistributed via propwash activity in approx. 7.67 acres of open
water. A maximum of approx. 0.92 acres of open water would be directly impacted by the
placement of structures at the prospect sites.
2
The applicant proposes to avoid additional direct impacts and minimize secondary
impacts to wetlands by remaining within existing open water channels and by utilizing
marine equipment for dredging activities.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
3
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and the State
Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
The New Orleans District has determined that the proposed project is located in waters
known to be utilized by the West Indian Manatee (Trichechus manatus). Utilizing
Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and
U.S. Fish and Wildlife Service, Ecological Services Office, the Corps has determined that
with the inclusion of the Standard Manatee Conditions for In-Water Activities, proposed
work is not likely to adversely affect the West Indian Manatee.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 50 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
4
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program (Louisiana Coastal Zone Application P20170946). The
Department of the Army permit will not be issued unless the applicant received approval or
a waiver of the Coastal Use Permit by the Department of Natural Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures
Approxmiately 5.4 miles
Southeasterly from
"LAROSE, LOUISIANA"
AREA OF
PROPOSED
WORK
500
PROPOSED CLEANOUT
& STRUCTURES:
Mack Energy Co.Mardi Gras Prospects
A,B,C, & D
VICINITY MAP
NOT TO SCALE
-14.3
-15.9
500
PROPOSED
ACCESS ROUTE
-12.6
-16.3
-17.2
-14.2
-14.2
-18.2
-18.2
20,000'
0
10,000'
20,000'
NAD 27 LA SOUTH ZONE
Scale: 1" = 20,000'
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 1 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
Existing Pipelines
Sec. 55
Sec. 23
Sec. 24
-5.8-6.8
5.5'
AREA OF
PROPOSED WORK
SEE SHEET 4
-7.8 -7.8
Sec.
56
-7.8
-10.8
5.5'
4'
5'
5' 5' 5.5'
-10.8 2.4'COV
4.7'COV
-9.8 2.1'COV
-8.8
-9.8
-9.3
ROUTE 4
Proposed Propwash
70' Wide x ±2554'
Sec. 61
Sec. 62
-8.8
-7.8 7.0'COV.
-7.8
0.8
2.0'COV.
PILING
'CO
V
E
OV
'AB
0.5 H20
V
' CO
1.5
OV
4.0'CCOV
'
8.5
Sec. 26
Sec. 25
-8.8
-8.8
PILING
-7.8
-7.3
-7.8
4'
Pointe Au Chien State
Wildlife Management Area
V
'CO V
5.5 'CO
7.90'COVV
6. 8'CO
6.
-6.8
3B
4'
Sec. 64
ROUTE 3
Proposed Hydraulic
Dredging
70' Wide x ±6674'
4'
Sec. 36
4'
Sec. 63
F
Sec. 35
R 20 E
R 21 E
F'
4'
4'
T 18 S
T 19 S
5.5'
E
Sec. 1
8'
6'1B
Sec. 11
END HYDRAULIC DREDGING 1B
LAT.
29° 27' 14" NAD 83
LONG.
90° 21' 40"
END HYDRAULIC DREDGING 2B
29° 27' 51" NAD 83
LAT.
90° 21' 00"
LONG.
END HYDRAULIC DREDGING 3B
LAT.
29° 28' 42"
LONG.
90° 21' 48"
5'
Sec. 32
E'
5'
6' 2A
21
67
3A
6'
2B
ROUTE 2
Proposed Hydraulic
Dredging
70' Wide x ±4576'
5'
4'
BEGIN HYDRAULIC DREDGING 1A
LAT.
29° 26' 44" NAD 83
LONG.
90° 22' 17"
BEGIN HYDRAULIC DREDGING 2A
29° 27' 28" NAD 83
LAT.
90° 21' 35"
LONG.
BEGIN HYDRAULIC DREDGING 3A
LAT.
29° 27' 57"
LONG.
90° 20' 57"
4'
5'
Sec. 36
Sec. 2
20
4'
Pointe Au Chien State
Wildlife Management Area
NN
Sec. 12
5'
1A 4.5' 5'
4.5'
4'
4'
4'
ROUTE 1
Proposed Hydraulic
Dredging
70' Wide x ±5380'
Sec. 53
Sec. 55
Sec. 54
3000'
0
1500'
3000'
NAD 27 LA SOUTH ZONE
Scale: 1" = 3000'
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 2 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
V
'CO
5.5
V
'CO
7.9 'COV
6.0 OV
'C
6.8
E
OV
'AB
0.5 H20
V
'CO
1.5
OV
4.0'C
V
'CO
8.5
-7.3
-7.8
-6.8
3B
4'
Sec. 64
4'
Pointe Au Chien State
Wildlife Management Area
ROUTE 3
Proposed Hydraulic
Dredging
70' Wide x ±6674'
4'
F'
4'
F
4'
Sec. 63
R 20 E
R 21 E
Sec. 36
20
4'
4'
4'
21
67
3A
6'
T 18 S
T 19 S
2B
5'
5'
E
8'
'
±110
6'
1B
Area of proposed placement of
beneficial use material to be
stacked to the height of the natural
marsh elevation of +1.0' NAVD 88
40
'
±3
5'
Sec. 32
±19,280' of
Hydraulic Pipe
along Access Route
for Hydraulic
Dredging
Pointe Au Chien State
Wildlife Management Area
4'
±100' 4'
4.5'
1A 4.5'
E'
6' 2A
Proposed
Plug
Sec. 1
5'
5'
Sec. 36
ROUTE 2
Proposed Hydraulic
Dredging
70' Wide x ±4576'
5.5'
5'
4'
4'
Proposed
Plugs
ROUTE 1
Proposed Hydraulic
Dredging
70' Wide x ±5380'
Sec. 55
Sec. 54
BEGIN HYDRAULIC DREDGING 1A
LAT.
29° 26' 44" NAD 83
LONG.
90° 22' 17"
BEGIN HYDRAULIC DREDGING 2A
5
29° 27' 28" NAD 83
LAT.
90° 21' 35"
LONG.
BEGIN HYDRAULIC DREDGING 3A
LAT.
29° 27' 57"
LONG.
90° 20' 57"
Sec. 53
Existing Pipelines
2000'
0
1000'
END HYDRAULIC DREDGING 1B
LAT.
29° 27' 14" NAD 83
LONG.
90° 21' 40"
END HYDRAULIC DREDGING 2B
29° 27' 51" NAD 83
LAT.
90° 21' 00"
LONG.
END HYDRAULIC DREDGING 3B
LAT.
29° 28' 42"
LONG.
90° 21' 48"
NN
2000'
NAD 27 LA SOUTH ZONE
Scale: 1" = 2000'
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 3 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
Proposed Plug
±110' x 10'
(NAD 83)
Lat. 29°27'18"
Long.90°22'11"
Sec. 36
Proposed
Borrow Area
±106' x 10'
Area of proposed placement of
beneficial use material to be stacked
to the height of the natural marsh
elevation of +1.0' NAVD 88
INSET A
Scale: 1"=200'
Area of proposed placement of
beneficial use material to be stacked
to the height of the natural marsh
elevation of +1.0' NAVD 88
Sec. 36
Proposed
Borrow Area
±336' x 10'
Proposed Plug
±340' x 10'
(NAD 83)
Lat. 29°26'55"
Long.90°21'48"
Proposed
Borrow Area
±96' x 10'
Proposed Plug
±100' x 10'
(NAD 83)
Lat. 29°26'52"
Long.90°21'54"
INSET B
Scale: 1"=200'
200'
0
100'
200'
NAD 27 LA SOUTH ZONE
Scale: 1" = 200'
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 4 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
R 21 E
PROPOSED PROPWASH
& STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "C"
(NAD 27)
X=2,306,286
Y= 304,217
(NAD 83)
Lat. 29°30'00"
Long.90°22'14"
PROPOSED PROPWASH
& STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "D"
(NAD 27)
X=2,307,480
Y= 304,205
(NAD 83)
Lat. 29°29'59"
Long.90°22'01"
C'
D
PROPOSED
STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "B"
(NAD 27)
X=2,308,408
Y= 304,140
(NAD 83)
Lat. 29°29'59"
Long.90°21'50"
D'
Begin Propwash (4A)
(NAD 83)
Lat. 29°29'58"
Long.90°22'11"
B'
B
C
Pointe Au Chien State
Wildlife Management Area
T
18
S
-5.8
-6.8
-7.8
-7.8
5.5'
Sec. 55
5.5'
Proposed Propwash
±2554'
Approximate 1' Cut
A
5'
4'
Proposed
40' x 40'
Wing
5'
PROPOSED PROPWASH
& STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "A"
(NAD 27)
X=2,307,430
Y= 302,621
(NAD 83)
Lat. 29°29'44"
Long.90°22'01"
A'
5.5'
5'
Sec. 62
Existing Pipelines
500'
0
250'
500'
NAD 27 LA SOUTH ZONE
Scale: 1" = 500'
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 5 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
R 21 E
Sec. 55
86'
5.5'
74'
T
18
S
281'
224'
Proposed
40' x 40'
Wing
A'
100'
4'
A
PROPOSED
CLEANOUT
70' WIDE x 2554'
PROPOSED PROPWASH
& STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "A"
160'
Drilling Barge
5'
NAD 27 LA SOUTH ZONE
5'
PLAN VIEW
200'
0
100'
C/L of Well
200'
Scale: 1" = 200'
NORTHERLY
MHWL +2.53' NAVD 88
MLWL +1.02' NAVD 88
Top of Water
0.0' NAVD 88
5'
1'
-6.0' NAVD 88
86'
74'
160'
Proposed
Propwash
CROSS SECTION A-A'
No Scale
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 6 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
R 21 E
160'
100'
90'
345'
6'
PROPOSED STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "B"
5.0'COV
ge
NAD 27 LA SOUTH ZONE
g Bar
Drillin
Sec. 55
70'
1.5'COV
B
T
18
S
B'
1.5'COV
Existing Pipelines
-7.8
-7.8
PLAN VIEW
200'
0
100'
200'
C/L of Well
NORTHWESTERLY
Scale: 1" = 200'
MHWL +2.53' NAVD 88
MLWL +1.02' NAVD 88
Top of Water
0.0' NAVD 88
6'
-6.0' NAVD 88
90'
70'
160'
CROSS SECTION B-B'
No Scale
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 7 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
Sec. 55
345'
60'
BEGIN
PROPWASH
(NAD 83)
Lat. 29°29'59"
Long.90°22'11"
100'
Drilling Barge
C
100'
4'
5.5'COV
160'
PROPOSED PROPWASH
& STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "C
T
18
S
8.0'COV
C'
R 21 E
6'
4A
NAD 27 LA SOUTH ZONE
-5.8
Proposed Propwash
70' Wide x ±2554'
5.5'
Existing Pipelines
BEGIN
PROPWASH
(NAD 83)
Lat. 29°29'58"
Long.90°22'11"
PLAN VIEW
200'
0
100'
C/L of Well
200'
WESTERLY
Scale: 1" = 200'
MHWL +2.53' NAVD 88
MLWL +1.02' NAVD 88
Top of Water
4'
0.0' NAVD 88
2'
Existing Canal
100'
60'
-6.0' NAVD 88
Proposed
Propwash
160'
CROSS SECTION C-C'
No Scale
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 8 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
R 21 E
PROPOSED PROPWASH
& STRUCTURES:
Mack Energy Co.Mardi Gras Prospect "D"
4.0'COV
5.8'
5.5'COV
Drilling Barge
345'
8.2'COV
9.0'COV
7.0'COV
8.0'COV
5.5'COV
6'
100'
4'
D'
60'
6.5'COV
D
Sec. 55
4.0'COV
T
18
S
100'
160'
6'
NAD 27 LA SOUTH ZONE
6.8'
BEGIN PROPWASH
(NAD 83)
Lat. 29°29'57"
Long.90°22'01"
Existing Pipelines
PLAN VIEW
200'
0
100'
C/L of Well
200'
NORTHERLY
Scale: 1" = 200'
MHWL +2.53' NAVD 88
MLWL +1.02' NAVD 88
0.0' NAVD 88
2'
4'
Top of Water
-6.0' NAVD 88
100'
60'
Proposed
Propwash
160'
CROSS SECTION D-D'
No Scale
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 9 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
MHWL +2.53' NAVD 88
MLWL +1.02' NAVD 88
Top of Water
1'
Top of Water
0.0' NAVD 88
Mudline
Proposed
Cleanout
70'
0.0' NAVD 88
5'
4'
Mudline
2'
-6.0'NAVD 88
-6.0'NAVD 88
Proposed
Cleanout
70'
CROSS SECTION E-E'
CROSS SECTION F-F'
No Scale
No Scale
Navigation
Light
10'
20'
Well
Centerline of Well
PLAN VIEW
Navigation Light if Required
Varies
Centerline of Well
Christmas Tree
±3'
0.0' NAVD 88
6'
0.0' NAVD 88
Mudline
6'
To be constructed upon successful
completion of well.
Proposed
3-Pile Cluster
ELEVATION
ELEVATION OF TYPICAL DRILLING BARGE
TYPICAL 10'x 20' WELL PROTECTOR PLATFORM
No Scale
No Scale
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 10 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
MHWL +2.53' NAVD 88
MLWL +1.02' NAVD 88
Proposed
Discharge
Pipe
Varies
Bankline
The pipe to be set on 3/4" plywood
to prevent discharge pipe from
cutting spoil bank
Bankline
8'
TYPICAL PIPE DISCHARGE
OVER MARSH OR SPOIL BANK
PLAN VIEW OF PROPOSED
3/4" PLYWOOD FOR DISCHARGE PIPE
8' x Varies
No Scale
No Scale
Proposed placement of
beneficial use material to be
stacked to the height of the
natural marsh elevation
Elev. +1.0' NAVD 88
5'
Top of Water
+2.0'
ge
Ed
of
0.0' NAVD 88
.
W
O.
R.
.
W
O.
R.
y&
of
gg
Bu .
ge
rsh .W
Ed
Ma e R.O
at,
bo e Pip
Air
of harg
C/L Disc
1
Bank Line
1
5'
Bank Line
'
30
Varies
PROPOSED AIRBOAT, MARSH BUGGY
& DISCHARGE PIPE R.O.W.
TYPICAL CROSS SECTION OF
BENEFICIAL USE MATERIAL PLACEMENT
No Scale
No Scale
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 11 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg
HYDRAULIC DREDGING REQUIRED FOR ROUTE 1 . . . . . . . . . . . . . . . . . . . . . . . . . 27,896 CU. YDS.
HYDRAULIC DREDGING REQUIRED FOR ROUTE 2 . . . . . . . . . . . . . . . . . . . . . . . . . .11,864 CU. YDS.
HYDRAULIC DREDGING REQUIRED FOR ROUTE 3 . . . . . . . . . . . . . . . . . . . . . . . . . 34,606 CU. YDS.
PROPWASH REQUIRED FOR ROUTE 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,622 CU. YDS.
PROPWASH REQUIRED FOR PROSPECT A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,665 CU. YDS.
PROPWASH REQUIRED FOR PROSPECT C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,089 CU. YDS.
PROPWASH REQUIRED FOR PROSPECT D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,089 CU. YDS.
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90,831 CU. YDS.
MHWL +2.53' NAVD 88
MLWL +1.02' NAVD 88
0.0' NAVD 88
TOTAL EXCAVATION OF WATER BOTTOM MATERIAL FOR EARTHEN PLUGS . . . . . 570 CU. YDS.
TOTAL BENEFICIAL USE MATERIAL DEPOSITED FOR EARTHEN PLUGS . . . . . . . . . 570 CU. YDS.
6'
Mudline
3 PILE CLUSTER
No Scale
Top of Water
Proposed
Plug
Top of Water
-6.0' NAVD 88
Existing
Pipeline
4'
4'
Borrow
Ditch
±4'-5.5'
Mudline
2.5'
4'
10'
0.0' NAVD 88
±7'
Avg. -13.0' NAVD 88
10'
4'
TYPICAL PLUG
TYPICAL CROSS SECTION
@ PIPELINE CROSSING
No Scale
No Scale
NOTES:
1. All structures, facilities, well and pipelines/flowlines occurring in open water areas or in oilfield canals or slips shall be
removed within 120 days of abandonment of the facilities for the herein permitted use unless prior written approval to
leave such structures in place is received from the Coastal Management Division. This condition does not preclude
the necessity for revising the current permit or obtaining a separate Coastal Use Permit, should one be required, for
such removal activities.
2. As-built drawings shall be submitted within 30 days of completion of this project to the Louisiana Department of
Natural Resources, Coastal Management Division, P.O. Box 44487, Baton Rouge, LA 70804-4487.
3. In order to ensure the safety of all parties, the permittee shall contact the Louisiana ONE CALL System
(1-800-272-3020), a minimum of 48 hours prior to the commencement of any excavation (Digging, Dredging, Jetting,
etc.) or demolition activity.
4. Structures will also be marked/lighted in accordance with U.S. Coast Guard regulations.
DISCLAIMER: At this time, C. H. Fenstermaker & Associates, L.L.C. has not performed nor was asked to perform
any type of engineering, hydrological modeling, flood plain, or "No Rise" certification analyses, including but not
limited to determining whether the project will impact flood hazards in connection with federal/FEMA, state, and/or
local laws, ordinances and regulations. Accordingly, Fenstermaker makes no warranty or representation of any
kind as to the foregoing issues, and persons or entities using this information shall do so at their own risk.
Not to be used for construction,
bidding, recordation, conveyance,
sales, or engineering design.
NOTE: THESE PLANS ARE INTENDED
EXCLUSIVELY FOR THE PURPOSE OF
OBTAINING ENVIRONMENTAL
COMPLIANCE PERMITS AND ARE NOT
TO BE USED FOR CONSTRUCTION,
BIDDING, RECORDATION, CONVEYANCE,
SALES OR ENGINEERING DESIGN.
MACK ENERGY CO.
PROPOSED CLEANOUT & STRUCTURES
Mardi Gras Prospects A,B,C & D
Section 55, T18S-R21E
Lafourche Parish, Louisiana
DRAWN BY: KJD
Robert L. Lastrapes
Professional Land Surveyor
Registration No. 4717
C. H. Fenstermaker & Associates, L.L.C.
135 Regency Sq. Lafayette, LA 70508
Ph. 337-237-2200 Fax. 337-232-3299
www.fenstermaker.com
PROJ. MGR.: RLL
REVISED:
DATE: 09/08/2017
SHEET 12 OF 12 SHEETS
FILENAME: T:\2017\2175733\DWG\COE\Mardi Gras Prospects A,B,C & D COE Plans.dwg