You can copy from here when filling out the rest of the page.
Bay County. Gulf Power Company. Pensacola, Florida.
PROJECT PURPOSE:
Basic: Access road.
Overall: To construct an access road to connect main developed portion at the Lansing Smith Power Plant to the injection well (IW) site in Bay County, Florida.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Gulf Power Company
ATTN: Mr. Richard Markey
One Energy Place
Pensacola, Florida 32520
WATERWAY AND LOCATION: The project would affect waters of the United States associated with North Bay. The project site is located on Highway 2300 in Section 36, Township 2 South, Range 15 West, Southport, Bay County, Florida.
Directions to the site are as follows: From Highway 77, travel west on Highway 2300 to Plant Smith.
APPROXIMATE CENTRAL COORDINATES: Latitude: 30.275378°
Longitude: -85.700168°
PROJECT PURPOSE:
Basic: Access road.
Overall: To construct an access road to connect main developed portion at the Lansing Smith Power Plant to the injection well (IW) site in Bay County, Florida.
EXISTING CONDITIONS: The wetland system consists of a palustrine forested system. The onsite vegetation consists of slash pine, wax myrtle, water oak, and yaupon holly. The existing area surrounding the project area consists of a power plant and pine silviculture. The power plant has an existing perimeter fence and the deep well injection site has an internal IW fence. The site was historically used for silviculture and is fire suppressed.
PROPOSED WORK: The applicant seeks authorization to construct a gravel access road to connect the main developed portion of Lansing Smith Power Plant IW well site with the natural gas fired combined cycle unit. The 12’ wide by 383’ long road would be constructed using 8” stone compacted at a 2% grade with a 12” stabilized subgrade. The direct impacts proposed to jurisdictional wetlands are 0.66 acre and the secondary impacts are 0.48 acre. Stormwater treatment for this site would be provided via wet detention pond. Erosion and sedimentation controls would be used.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
The route design was selected to use existing uplands and avoid wetlands impacts as much as possible.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
The applicant proposes to purchase 0.4 palustrine forested bank credits from Breakfast Point Mitigation Bank.
CULTURAL RESOURCES: The Corps has determined the permit area has been extensively modified by previous work and there is little likelihood a historic property may be affected.
ENDANGERED SPECIES: The Corps has determined, based on the use of the Eastern Indigo Snake Programmatic Effect Determination Key, that the proposed project may affect, but is not likely to adversely affect the Eastern Indigo snake with the inclusion of Standard Protection Measures for the Eastern Indigo Snake (August 2013).
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Panama City Permit Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405 within 15 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Mrs. Lisa S. Lovvorn, in writing at the Panama City Permits Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405; by electronic mail at lisa.s.lovvorn@usace.army.mil; by facsimile transmission at (850)872-0231; or, by telephone at (850)763-0717, extension 27.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The Corps is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
1002 WEST 23RD STREET, SUITE 350
PANAMA CITY, FLORIDA 32405
December 8, 2017
REPLY TO
ATTENTION OF
Regulatory Division
North Permits Branch
Panama City Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2017-02434(SP-LSL)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: Gulf Power Company
ATTN: Mr. Richard Markey
One Energy Place
Pensacola, Florida 32520
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with North Bay. The project site is located on Highway 2300 in Section 36,
Township 2 South, Range 15 West, Southport, Bay County, Florida.
Directions to the site are as follows: From Highway 77, travel west on Highway 2300 to
Plant Smith.
APPROXIMATE CENTRAL COORDINATES: Latitude 30.275378°
Longitude -85.700168°
PROJECT PURPOSE:
Basic: Access road.
Overall: To construct an access road to connect main developed portion at the Lansing
Smith Power Plant to the injection well (IW) site in Bay County, Florida.
EXISTING CONDITIONS: The wetland system consists of a palustrine forested
system. The onsite vegetation consists of slash pine, wax myrtle, water oak, and
yaupon holly. The existing area surrounding the project area consists of a power plant
and pine silviculture. The power plant has an existing perimeter fence and the deep
well injection site has an internal IW fence. The site was historically used for silviculture
and is fire suppressed.
PROPOSED WORK: The applicant seeks authorization to construct a gravel access
road to connect the main developed portion of Lansing Smith Power Plant IW well site
with the natural gas fired combined cycle unit. The 12' wide by 383' long road would be
constructed using 8" stone compacted at a 2% grade with a 12" stabilized subgrade.
The direct impacts proposed to jurisdictional wetlands are 0.66 acre and the secondary
impacts are 0.48 acre. Stormwater treatment for this site would be provided via wet
detention pond. Erosion and sedimentation controls would be used.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
The route design was selected to use existing uplands and avoid wetlands impacts as
much as possible.
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
The applicant proposes to purchase 0.4 palustrine forested bank credits from Breakfast
Point Mitigation Bank.
CULTURAL RESOURCES: The Corps has determined the permit area has been
extensively modified by previous work and there is little likelihood a historic property
may be affected.
ENDANGERED SPECIES: The Corps has determined, based on the use of the
Eastern Indigo Snake Programmatic Effect Determination Key, that the proposed
project may affect, but is not likely to adversely affect the Eastern Indigo snake with the
inclusion of Standard Protection Measures for the Eastern Indigo Snake (August 2013).
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
not been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Panama City
Permit Section, 1002 West 23rd Street, Suite 350, Panama City, Florida 32405 within 15
days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
2
QUESTIONS concerning this application should be directed to the project manager,
Mrs. Lisa S. Lovvorn, in writing at the Panama City Permits Section, 1002 West 23rd
Street, Suite 350, Panama City, Florida 32405; by electronic mail at
lisa.s.lovvorn@usace.army.mil; by facsimile transmission at (850)872-0231; or, by
telephone at (850)763-0717, extension 27.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The Corps is soliciting comments from the public; Federal, State, and local agencies
and officials; Indian Tribes; and other Interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be
considered by the Corps to determine whether to issue, modify, condition, or deny a
permit for this proposal. To make this determination, comments are used to assess
impacts to endangered species, historic properties, water quality, general environmental
effects, and the other public interest factors listed above. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of
the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
3
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4