Broward County. Hillsboro Inlet District. Hillsboro Beach. FL. PROJECT PURPOSE: Basic: The basic project purpose is to repair and replace an existing jetty to prevent the return of sand into an existing inlet. Overall: The overall project purpose is to repair and replace an existing jetty located in Hillsboro Inlet in order to continue to prevent the return of sand into the inlet from the south beach.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Hillsboro Inlet District
C/o Jack Holland
907 Hillsboro Mile
Hillsboro Beach, FL 33062
WATERWAY AND LOCATION: The project would affect waters of the United States associated with Hillsboro Inlet between the waters of the Intracoastal Waterway and the Atlantic Ocean. The project site is located at the jetty located along the south side of the Hillsboro Inlet, Pompano Beach ( Section 29, Township 48 South, Range 43 East), offshore of Broward County Florida.
Directions to the site are as follows: Take I-95 to E Copans Road in Pompano Beach (Exit 38a), Continue on Copans Road East until you reach Federal Highway then take a right on Federal Highway, Left on NE 14th Street, Left after the Causeway onto A1A, Right onto NE 16th Street and park at North Ocean Park (3424 NE 16th Street, Pompano Beach, FL 33062). Walk onto beach through access way, turn left and walk until you reach the Hillsboro Inlet South Jetty.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 26.2578°
Longitude: –80.0817°
PROJECT PURPOSE:
Basic: The basic project purpose is to repair and replace an existing jetty to prevent the return of sand into an existing inlet.
Overall: The overall project purpose is to repair and replace an existing jetty located in Hillsboro Inlet in order to continue to prevent the return of sand into the inlet from the south beach.
EXISTING CONDITIONS: There is an existing 420 linear foot jetty that is 17-feet wide and 3-feet tall (elevation +4 NGVD), composed of two parallel rows of 12-inch square concrete piles (122 in each row) tied together with 12-inch timber beams. The southern face of the jetty includes 118 concrete panels (3.4-feet by 4-inches) between the piles which act as a sediment barrier. The interior of the crib is filled with limestone boulders and the outside of the jetty is protected by 2,850 cy of limestone boulders, 2 to 4 tons in size. The total acreage of the jetty is 0.36 acre.
A resource survey was conducted in August 2017. The onsite vegetation consists of turf algae. The existing area surrounding the project area consists of large limestone boulders, intermixed with some smaller limestone rocks, which transitioned to beach quality sand, with several limestone rocks that have spread out away from the jetty. Seagrass was not observed growing in the substrate adjacent to the jetty. The limestone boulders surrounding the jetty are populated by hydroids, white encrusting zoanthids (Palythoa caribaeorum), red boring sponges (Cliona delitrix), turf algae and three species of scleractinian corals (Siderastrea siderea, Siderastrea radians and Phyllangia americana americana). A total of 138 corals, mostly lesser starlet corals (S. radians) and massive starlet corals (S. siderea) ranging in diameter from 1 to 19 cm, as well as two colonies of hidden cup corals (P. americana americana) with diameters of 2 and 6 cm., were observed along the jetty. The majority of the corals were observed along the southern side of the jetty (93 corals) with only 42 corals on the northern side. Only 2 corals were observed along the east end and 1 coral on the west end of the Jetty. More than half the corals observed (71 corals) were smaller than 5 cm and 66 corals were greater than or equal to 5 cm in diameter (Coral #4 was dead at time of survey and not counted).
Project History: The Corps issued a permit dated May 7, 1964, that authorized the construction of a jetty in Hillsboro Inlet, southwesterly side.
PROPOSED WORK: The applicant seeks authorization to repair and replace a 420 linear foot jetty located along the south side of the Hillsboro Inlet by performing the following activities: Reuse the inner row of concrete piles of the existing jetty structure as a foundation for the restored Jetty. The outer row of 121 concrete piles of the existing jetty will be cut off to 6 inches below mean low water level elevation and abandoned. The existing inner row of 121 concrete pilings will be saw-cut approximately 2 feet below grade, to expose the sound portion of the piles, and rebar will be doweled into the remaining concrete pile. A 32-inch wide by 5.6-foot tall concrete cap will be cast-in-place along the length of the 420-foot jetty, with the concrete piles embedded 9 inches minimum into the cap. The existing concrete panels and king piles will remain in place. The existing 2,850 c.y of armor stone will be re-configured and 950 c.y. (0.14 acres) of new limestone boulders will be sized and placed on both sides of the cap (in a 3:1 slope), and extend approximately for optimum stability and protection 2-10 feet from the existing footprint. The total area of the proposed jetty and limestone is approximately 0.50 acres.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: Construction will occur from an in-water barge, maintaining a minimum of one-foot draft clearance between the bottom of the fully loaded barge and the substrate. The equipment on the barge will most likely include an excavator, crane and concrete truck/pump. Approximately 2-3 barges will be used and rotated during the concrete pour. All construction debris will be placed on the barge and transported by barge to the upland staging area and disposed of in an approved upland disposal site.
Turbidity curtains will be in place around active construction areas which will serve as a physical barrier to manatees, smalltooth sawfish and sea turtles as well as to prevent turbid waters from exiting the turbidity structure. Temporary 8-inch wood piles will be installed to support the turbidity curtains around the existing jetty. The 8-inch piles will be installed with a drop punch that is gravity-dropped from a barge mounted crane to create a hole to install the wood pile. The marine resource survey of the jetty did not indicate the presence of listed species of corals or Johnsons seagrass. Turbidity curtains around the jetty should minimize the potential for sedimentation or turbidity impacts to any sensitive benthic resources in the surrounding area. Additionally, the contractor will comply with all applicable boating zones and follow the protocols set forth in the FWC’s 2011 Standard Manatee Conditions for In-Water Work and the NMFS Sea Turtle and Smalltooth Sawfish Construction Conditions dated March 23, 2006.
COMPENSATORY MITIGATION –The applicant has provided the following explanation why compensatory mitigation should not be required:
The restoration of the south jetty involves the repositioning of existing limestone boulders surrounding the jetty and the addition of approximately 950 cy of new boulders. As a result, the Project may result in direct (burial, crushing) or indirect (sedimentation) impacts to the 137 stony corals observed growing on the limestone boulders. In light of the 3-year long disease event that has reduced the number of corals by approximately 50%, the decision was made to relocate corals > 5cm rather than limiting the relocation to only the more common standard of corals equal to or greater than 10 cm. Only 16 corals are equal to or greater than 10 cm. Sixty six corals > 5cm will be transplanted to the existing Hillsboro Inlet artificial reef located approximately 157 feet (48 meters) south of the south jetty, prior to construction activities at the jetty. Monitoring of the corals will be conducted immediately following transplantation, at 1-month and at 1-year to ensure that at least 75% of the transplanted corals survive. If, at the end of the 1-Year Post-Transplantation monitoring survey, 75% of the transplanted corals have not survived, the Hillsboro Inlet District will discuss the need for further monitoring or mitigation with the regulatory agencies.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES:
The Corps has determined the proposal may affect but is not likely to adversely affect the West Indian Manatee or its designated critical habitat. The Corps evaluated potential project related effects to the manatee by using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, (Key) dated April 2013. Using the Key, A>B>C>G> N>O>P couplet 4, resulted in a “May Affect Not Likely to Adversely Affect” determination. The U.S. Fish and Wildlife has given programmatic concurrence with this determination and no further coordination is required.
The Corps has determined the proposed project may affect, but is not likely to adversely affect the threatened and endangered swimming sea turtles; loggerhead (Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea), hawksbill (Eretmochelys imbricata), Kemp's Ridley (Lepidochelys kempii), and the threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify any of their designated critical habitat. The Corps will request National Marine Fisheries Service concurrence with these determinations pursuant to Section 7 of the Endangered Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 0.50 acres of unvegetated habitat that is utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Ms. Linda C. Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; or by telephone at (561) 472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FL 33410
December 13, 2017
REPLY TO
ATTENTION OF
Regulatory Division
South Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-1964-00151(SP-LCK)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Hillsboro Inlet District
C/o Jack Holland
907 Hillsboro Mile
Hillsboro Beach, FL 33062
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with Hillsboro Inlet between the waters of the Intracoastal Waterway and the
Atlantic Ocean. The project site is located at the jetty located along the south side of
the Hillsboro Inlet, Pompano Beach ( Section 29, Township 48 South, Range 43 East),
offshore of Broward County Florida.
Directions to the site are as follows: Take I-95 to E Copans Road in Pompano Beach
(Exit 38a), Continue on Copans Road East until you reach Federal Highway then take a
right on Federal Highway, Left on NE 14th Street, Left after the Causeway onto A1A,
Right onto NE 16th Street and park at North Ocean Park (3424 NE 16th Street, Pompano
Beach, FL 33062). Walk onto beach through access way, turn left and walk until you
reach the Hillsboro Inlet South Jetty.
APPROXIMATE CENTRAL COORDINATES: Latitude
26.2578°
Longitude 80.0817°
PROJECT PURPOSE:
Basic: The basic project purpose is to repair and replace an existing jetty to prevent the
return of sand into an existing inlet.
Overall: The overall project purpose is to repair and replace an existing jetty located in
Hillsboro Inlet in order to continue to prevent the return of sand into the inlet from the
south beach.
EXISTING CONDITIONS: There is an existing 420 linear foot jetty that is 17-feet wide
and 3-feet tall (elevation +4 NGVD), composed of two parallel rows of 12-inch square
concrete piles (122 in each row) tied together with 12-inch timber beams. The southern
face of the jetty includes 118 concrete panels (3.4-feet by 4-inches) between the piles
which act as a sediment barrier. The interior of the crib is filled with limestone boulders
and the outside of the jetty is protected by 2,850 cy of limestone boulders, 2 to 4 tons in
size. The total acreage of the jetty is 0.36 acre.
A resource survey was conducted in August 2017. The onsite vegetation consists of
turf algae. The existing area surrounding the project area consists of large limestone
boulders, intermixed with some smaller limestone rocks, which transitioned to beach
quality sand, with several limestone rocks that have spread out away from the jetty.
Seagrass was not observed growing in the substrate adjacent to the jetty. The limestone
boulders surrounding the jetty are populated by hydroids, white encrusting zoanthids
(Palythoa caribaeorum), red boring sponges (Cliona delitrix), turf algae and three species
of scleractinian corals (Siderastrea siderea, Siderastrea radians and Phyllangia
americana americana). A total of 138 corals, mostly lesser starlet corals (S. radians) and
massive starlet corals (S. siderea) ranging in diameter from 1 to 19 cm, as well as two
colonies of hidden cup corals (P. americana americana) with diameters of 2 and 6 cm.,
were observed along the jetty. The majority of the corals were observed along the
southern side of the jetty (93 corals) with only 42 corals on the northern side. Only 2 corals
were observed along the east end and 1 coral on the west end of the Jetty. More than
half the corals observed (71 corals) were smaller than 5 cm and 66 corals were greater
than or equal to 5 cm in diameter (Coral #4 was dead at time of survey and not counted).
Project History: The Corps issued a permit dated May 7, 1964, that authorized the
construction of a jetty in Hillsboro Inlet, southwesterly side.
PROPOSED WORK: The applicant seeks authorization to repair and replace a 420
linear foot jetty located along the south side of the Hillsboro Inlet by performing the
following activities: Reuse the inner row of concrete piles of the existing jetty structure
as a foundation for the restored Jetty. The outer row of 121 concrete piles of the existing
jetty will be cut off to 6 inches below mean low water level elevation and abandoned.
The existing inner row of 121 concrete pilings will be saw-cut approximately 2 feet
below grade, to expose the sound portion of the piles, and rebar will be doweled into the
remaining concrete pile. A 32-inch wide by 5.6-foot tall concrete cap will be cast-inplace along the length of the 420-foot jetty, with the concrete piles embedded 9 inches
minimum into the cap. The existing concrete panels and king piles will remain in place.
The existing 2,850 c.y of armor stone will be re-configured and 950 c.y. (0.14 acres) of
new limestone boulders will be sized and placed on both sides of the cap (in a 3:1
slope), and extend approximately for optimum stability and protection 2-10 feet from the
existing footprint. The total area of the proposed jetty and limestone is approximately
0.50 acres.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
2
aquatic environment: Construction will occur from an in-water barge, maintaining a
minimum of one-foot draft clearance between the bottom of the fully loaded barge and
the substrate. The equipment on the barge will most likely include an excavator, crane
and concrete truck/pump. Approximately 2-3 barges will be used and rotated during the
concrete pour. All construction debris will be placed on the barge and transported by
barge to the upland staging area and disposed of in an approved upland disposal site.
Turbidity curtains will be in place around active construction areas which will serve
as a physical barrier to manatees, smalltooth sawfish and sea turtles as well as to
prevent turbid waters from exiting the turbidity structure. Temporary 8-inch wood piles
will be installed to support the turbidity curtains around the existing jetty. The 8-inch
piles will be installed with a drop punch that is gravity-dropped from a barge mounted
crane to create a hole to install the wood pile. The marine resource survey of the jetty
did not indicate the presence of listed species of corals or Johnsons seagrass. Turbidity
curtains around the jetty should minimize the potential for sedimentation or turbidity
impacts to any sensitive benthic resources in the surrounding area. Additionally, the
contractor will comply with all applicable boating zones and follow the protocols set forth
in the FWC's 2011 Standard Manatee Conditions for In-Water Work and the NMFS Sea
Turtle and Smalltooth Sawfish Construction Conditions dated March 23, 2006.
COMPENSATORY MITIGATION The applicant has provided the following explanation
why compensatory mitigation should not be required:
The restoration of the south jetty involves the repositioning of existing limestone boulders
surrounding the jetty and the addition of approximately 950 cy of new boulders. As a
result, the Project may result in direct (burial, crushing) or indirect (sedimentation) impacts
to the 137 stony corals observed growing on the limestone boulders. In light of the 3-year
long disease event that has reduced the number of corals by approximately 50%, the
decision was made to relocate corals > 5cm rather than limiting the relocation to only the
more common standard of corals equal to or greater than 10 cm. Only 16 corals are
equal to or greater than 10 cm. Sixty six corals > 5cm will be transplanted to the existing
Hillsboro Inlet artificial reef located approximately 157 feet (48 meters) south of the south
jetty, prior to construction activities at the jetty. Monitoring of the corals will be conducted
immediately following transplantation, at 1-month and at 1-year to ensure that at least
75% of the transplanted corals survive. If, at the end of the 1-Year Post-Transplantation
monitoring survey, 75% of the transplanted corals have not survived, the Hillsboro Inlet
District will discuss the need for further monitoring or mitigation with the regulatory
agencies.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES:
3
The Corps has determined the proposal may affect but is not likely to adversely affect
the West Indian Manatee or its designated critical habitat. The Corps evaluated
potential project related effects to the manatee by using The Corps of Engineers,
Jacksonville District, and the State of Florida Effect Determination Key for the Manatee
in Florida, (Key) dated April 2013. Using the Key, A>B>C>G> N>O>P couplet 4,
resulted in a "May Affect Not Likely to Adversely Affect" determination. The U.S. Fish
and Wildlife has given programmatic concurrence with this determination and no further
coordination is required.
The Corps has determined the proposed project may affect, but is not likely to
adversely affect the threatened and endangered swimming sea turtles; loggerhead
(Caretta caretta), green (Chelonia mydas), leatherback (Dermochelys coriacea),
hawksbill (Eretmochelys imbricata), Kemp's Ridley (Lepidochelys kempii), and the
threatened smalltooth sawfish (Pristis pectinata) and would not adversely modify any of
their designated critical habitat. The Corps will request National Marine Fisheries
Service concurrence with these determinations pursuant to Section 7 of the Endangered
Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
0.50 acres of unvegetated habitat that is utilized by various life stages of penaeid
shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and
snapper/grouper complex. Our initial determination is that the proposed action would
not have a substantial adverse impact on EFH or Federally managed fisheries in the
South Atlantic Region. Our final determination relative to project impacts and the need
for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Ms. Linda C.
Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within
21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
4
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms.
Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA
Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at
Linda.C.Knoeck@usace.army.mil; or by telephone at (561) 472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
5
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
6
SHEET UST TABLE
Sheet Number
Sheet Title
1
LOCATION MAP
GULF OF
2
EXISTING SITE - 1
MEXICO
3
EXISTING SITE - 2
4
EXISTING SITE - 3
5
EXlSTINIG PARTlAL PLAN
6
EXISTING lYPICAL SECTION
7
PROPOSED SITE PLAN - 1
8
PROPOSED SITE PLAN - 2
9
PROPOSED SITE PLAN - 3
10
PROPOSED PARTIAL PLAN
11
PROPOSED lYPICAL SECTION
..."I:
12
TURBIDnY CURTAIN
0
13
GENERAL NOTES
14
MARINE RESOURCES SUIMY
I
/
:lo..
I
I
tlWIOlO
IMCH
:t
~
I
~
....
...
:t
......
~
w
~
PllO.ICI' SITE
''
PCM.ANO'
lfMJI
' \
''
''
AJWmC aw
' ' ,~.ftri!f!ld:d&:~
VIONITY MAP
~
NTS
APP. NO:
»--==---'---+'----------i· PROJECT NO:
32204.01
!41-~--'-----lf.!--------~cDA=TU~M~:--------:-;N~(}J-;;:-11D
.: Cl::'. .:~~---...P=ER=M=rr~s=KET=cH=ES~.
.....·DRAWN
ATE OF
· /:'L OR\DI>- ····:t:.,~~""""D:.;.;A""'TE:;...:__.__
·
8 -?A# ,
~S~'P·~· ~\¥ ,,,'
1,
0 NA l
111 1 I I I I I I 11 I\\\
,'''
tr_~D~fg ~~~~~
.co.uu.L
.. .
.
SYS · BMB
"
BY:
JD
R1;,.;PT.;.;;10.;.;;N:'="",........,,.~c_HE_c_KE_D_B_Y_:_ _ _ _M'~1
___,;;;,o....
Es_,c....
SUBMITIED B :
COASTAL SYSTEMS INilRNAT10NA4 INC.
- Sc1u111 Diode HP-Y.
c-.bleo, llmldo lJM6
Toi: J05-e61-J655
°""
Ni~ :!05-661-1914
www.co..to1Syotemonlccm
=:e:::.:.'::7~1ftd,,..,...._
liUSBORO INlfT MAINTENANCE DISTRICT
812 NW 6th AVENUE
FORT LAUDERDAl..E, Fl 33311
SOUTH JEflY RESTORATION
LOCATION MAP
SHEET
1
OF
14
\
EXISTING OUANTJT!ES:
LENGTH: ± 420 FEET
WIDTH: 17 FE£T
HEIGHT: 3 FEET
(ELEV.= H' NGVD)
PILES (12"X12"): 244 EA
PANELS (3.4'X4j: 118 EA
TIMBER BEAMS ( 12"X18"): 1,680 LF
TIMBER CROSS BEAMS (12"X12"): 1,020 LF
LIMESTONE ROCK: 2,850 Cf
-17
0.62'
"' -0.62'-__._- MLW
""'
vi
a...
J REF: STATION ID: 8722861
~ EPOCH: 1983 - 2001
N
'"3N.T.S.
G
......__~~~~~~~~____,
:z
::;;::
Ct'.'.
0
~
Q)
.<::
0
4l
..:.:
V>
I
I
I
I
\
\
\
\
0
-q:
0
N
N
,.,..,
/
1:)
·Q)
:2
a...
0
1-1...J
10
20
I
SCALE IN FEET
t"
= 20'
.
.
\
,
-----------------------------;
APP. NO:
32204.01
NGVD
-,
JD
CHECKED BY:
COASTAL
·
tmSIOlO NIT MAM9IANCE DISlllCT
812 NW 6th
A.~NUE
FORT LAUDERDALE, Fl 33311
SOUTH JETlY RESTORATION
COASTAL SYSTfMS INTERNATIONAi.. iNC
"'*
464 5aulli
~ c-1 ~ ....... U146
lei: ~t-J~ Fax: JOS- 881-t9t4 ....eoa.tais,Nmolnt.com
SfAlE OF Fl.ORI~ EB f 7087
ClllOlllll.~CM~lllll----
EXISTING Slit · 1
SHEET 2 OF 14
---
MATCHUNE A·A, SHEET 2
. -- - -
------""t::~~~
r-------
REFER TO PARTIAL -----..... I
PLAN SHEET-5
"'
0
10
1-1..J
20
I
SCALE IN FEET
1" = 20'
EXISTING QUANTITIES:
LENGTH: ± 420 FEET
WIDTH: 17 FEET
HEIGHT: 3 FEET
{ELEV.· +4' NGVD)
PILES (12"X12"): 244 £A
PANELS (3.4'X4·): 118 EA
TIMBER BEAMS (12"X18j: 1,680 LF
TIMBER CROSS BEAMS (12"X12"): 1,020 LF
LIMESTONE ROCK: 2,850 CT
DARJM DIAGRAM
1.87'---.-- MHW
0.30'
1.57'
NAVO
1.57'
- - - 0.0' NGVD
0.62'
-0.62'
MLW
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
u
"'e
a..
/
~
APPROX. EXIST.
SHORELINE
----------
MATOIUNE >rA, SHEET 4
APP. NO:
32204.01
DATUM:
PERMIT SKE'f'()I
DRAWN BY:
DESCRIPTION:
CHECKED BY:
SUBMITIED BY:
NGVD
JD
M'
..i.sBORO INl£T MAIN1DW«l DIS1RICT
812 NW 6th AVENUE
FORT LAUDERDALE, Fl 33311
SOUTH JETlY RESTORATION
EXISTING Sfll · 2
SHEET
3
OF
14
MATOfUNE A·A, SHEET 3
----7--- -----'t
/'
21 '
~~
l'
(
21'
I
I
..,.,__.___.__._~..__-'---'--"-___..,I
DATUM DIAGRAM
1.87'
0.30'
C>
"'
C>
N
N
1.57'
?- 0
1l
·e
o_
~
MHW
1-1-J
10
20
I
SCALE IN F££T
!" = 20'
J
NAVO
1.57'
---- o.o·
NGVD
0.62'
-0.62'
MLW
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
EXISTINC Silt · 3
SHEET 4 OF 14
~Ll5BORO
EXISTING TIMBER
BEAMS, lYP.
-
1
!>C
-t
'--
I
O"
3'
-0
vi
a..
I
'
I
I
s
0
N
IXI
IX
EXISTING LIMEROCK
RIP RAP
r
-,
I]
~I I ~
IXI
7
INLIT CHANNEL
IXI
--1
rx
D{j
I")
~
z
:;;::
IXI
,-.--rrs
I
I
N
t---
,_
er:
0
;;.
·-I-
Cll
.s::::
u
-~
-1-
~
~
IXI
!XI
IXI
(/)
'- ·-I
-I
--1
IXI
IXI
T>
·-i
I-
fX1
IXl
q;
-"'
VJ
~
,___
..__
-l
· -i
..__
..__
Cl)
a..
I-
-1-
IXI
# IX\
I
I
.__
/
0
""""'-l
2.5'
5'
I
I
EXISTING CONCRETE
PANELS BETWEEN PILES
(INNER ROW ONLY)
EXISTING 12· SQ.
CONCRETE PILING, lYP.
SCALE IN F££T
'" 1=54
,,,,,,,,,.~.).'' ,,,,,,
,,,''°
.~~.'f!..J.~;y ~I
=~ :.~;;;
*:
0
=
*
~
J)'::
~
' ·.
I
i
\._./
~NG PARTIAL Pl.AN
f~:--"---t-------~A~PP~.~N~O:
:J----:--::-----:-:--:--:-:-~r1~1~~'~IT=::::-:-:-:-:-=:-=-::==~-----i
_ _ _ __
......_~=----+'----------IPROJECT NO:
32204.01
! .a.:-r.._. .-__,
-:r--_-_------_--~--_-_-_,t-:i..=D"2:AT~UM=-:=-=-=-=-=-=-=-~=N~GVO~
!-'--- _
ATE OF
·.
@
1,
/
Q: PERMIT SKETCHES
DRAWN BY:
JD
4-; ...---=
DA"""JE.._
: _...__..,:D:.::,ES:::.,::C;:.::Rl:.,,,:PT~IO""'N:_~c;.;.;H=
EC.;..;;
KE=D_;;B"Y:_ _ _ _--tf.P
I
n \>-- ··
. . OR\v .· ~,~<;;, ,....._....,,..,,~..,....._---..::
S"""UB...,M'"""
lm
...,o.........,
BY""-:- - - - - - - - - 1
.....
..
,~: .i;o~~~~~",,,'
Sttt'i b~: A,tU.11
:t'oREg. ~~~~~
.
HUSBOIO INllT MAINTENANCE DISlllCT
812 NW 6th AVENUE
FORT LAUDERDAI.£, Fl 33311
SOUTH JETTY RESTORATION
.COASTAL ~~!.~ca!.~~~ INC.
-· ..-
.~:~~MS
Tel:
~661-3651>
Fa.: J05-<61-1914 -.CcaotalSyatemolnl.oom
~~'=~llMIMnpmom
EXISTINIG PAR.11AL PIAN
SHEET
5 OF 14
EXISTING TIMBER
BfAMS
17'
EXISTING CONCRETE
PANELS BETWEEN PILES
{INNER ROW ONLY)
\_EXISTING UPlAN
BEACH AREA
-w~~,q:---
~
\_HIUSBORO
INLET CHANNEL
__±J.87'
--
MHVL__ _
EXISTING 12" SQ.
CONCRETE PILING lYPICAL.
0
~~~~G TYPICAL SECTION
DATUM DIAGRAM
1.87'
MHW
0.30'
1.57'--+-- NAVO
1.57'
0
H-J
2
- - - - 0.0' NGVO
0.62'
-0.62'
MLW
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
I
SCALE IN FEET
1" = 2 '
APP. NO:
32204.01
NGVD
JD
CHECKED BY:
HUSBORO INLET MAINTENANCE DISTRICT
812 NW 6th AVENUE
FORT LAUDERDALE, FL 33311
SOUTH JETIY RESTORATION
COASTAL SYSTfMS INTERNATIONAL, INC.
<464 Soulll DNI ~ Onl ~ Aallda JIM6
Tet l05~61-3451l Fa.: 306-661-1914 nw.Cooota~emmt.com
STAT£ Of' ~ EB f7087
Coolllll, MCNllW.... EXISTING TYPICAL SECTION
SHEET
6
OF
14
DATUM DIAGRAM
1.87'----.-- MHW
0.30'
1.57'--+--- NAVO
1.57'
--+--
o.o·
NGVO
0.62'
-0.62'
MLW
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
4'
APPROX. EXIST.
SHORELINE
-16
NEW LIMESTONE
ROCK
EXISTING DUNE
@X. EDGE
-a
~
-
32'
m
w
z
-z
0
10
-.a
0 ......
~
Q(
~
~
~
~
3::
d '= s
~ 3::
20
::c:
SCALE IN FEET
7" = 20'
:t:
PROPOSED QUANTITIES:
NEW LENGTH: ± 400 FEET
NEW WIDE: 2'8"
NEW HEIGHT: 5·5·
EXIST. PILES CUT AND EXTENDED (12~12"): 121 EA
EXIST. PILES CUT AND ABANDONED (12'X12"): 121 EA
EXIST. PANELS REMAINI
(J.4'X4"): 118 EA
NEW LI
ONE ROCK: 950 CT
MATCHUNE A-A, SHEET 8
APP. NO:
DATUM:
32204.01
NGVD
lillSBORO 1Nl£T MAINTENANCE DISlRICT
812 NW 6th AVENUE
FORT LAUDERDAI..£, Fl 33311
SOUTH JETIY RESTORATION
PROPOSB> SITE PlAN · 1
SHEET
7
OF
14
MATO-IUNE A-A, SHEET 7
·---- - -- ---.....,...,--r-..------- - - ~~~
NEW EXTENDED CAP---..
0
20
10
SCALE IN FEET
= 20'
EXISTING DUNE
APPROX. EDGE
r
,----
NEW LIMESTONE
ROCK
- -· - - --·
-- - -- --,
1
I
I
I
r
REFER TO PARTIAL
PLAN SHEET 10
0
QC
DAlUM DIAGRAM
1.87'
1.57'
~
ui
~
I
~
NAVO
~
~
~ :::c:
b
~
~
0.30'
°'
::;z
0 ::;z
MHW
~
-a
LA.a
u
0I")
('I
+t
..........
1.57'
a..
~
0.0' NGVD
N
~
0.62'
~ -0.62'
MLW
~ REF: STATION ID: 8722861
gi EPOCH: 1983 - 2001
<.:>
CY
m
..c
2w
I
~~~~~~--~~~~
-""
(/)
PROPOSED QUANTITIES:
NEW LENGTH: ± 400 FEET
NEW WIDE: 2'8·
NEW HEIGHT: 5'5"
EXIST. PILES CUT AND EXTENDED {12-X12·): 121 EA
EXIST. PILES CUT AND ABANDONED {12'X12j: 121 EA
EXIST. PANELS REMAINING (3.4'X4j: 118 EA
NEW LIMESTONE ROCK: 950 CY
32204.01
NGVD
JD
DESCRIPTION:
CHECKED BY:
SUBMITTED BY:
~
~
Hill.SBORO IND MAINllNANCE DIS1RICT
812 NW 6th AVENUE
FORT LAUDERDALE, FL 33311
SOUTH JETTY RESTORATION
COASTAL SYSTFMS INnRNATIONAL. INC.
5aah llNI lfll-1, Clllll ~ Flmldl JJM6
Tel: JOS-~1-:3655 flD! JOS-6111-1914 rn.CoastalSystemont.e«n
STATE OF flORllA EB f7087
-
Oiubl.~CM~-~
PROPOSED Sl1E PlAN · 2
SHEET
8 OF
14
·---------MATOWNE A·A, SHEET 8
PROPOSED OUANI!DES:
NEW LENGTH: ± 400 FEET
NEW WIDE: 2'8~
NEW HEIGHT: 5·5·
EXIST. PILES CUT AND EXTENDED {12"X12"}: 121 EA
EXIST. PILES CUT AND ABANDONED {12'X12"): 121 EA
EXIST. PANELS REMAINING {3.4'X4} : 118 EA
NEW LIMESTONE ROCK: 950 Cf
......
-
:;z
APPROX. EXIST.
SHORELINE
0
~
I'
l
MHW
0.30'
3:
-0
vi
I
!
~
0...
I
,.,.,
0.0' NGVD
/
(..!)
z:
S2
0:
0
;f;
"'co
..r::::
<.>
Q)
en
""
11I.!
1.57'
v
I
NAVO
1.57'
Cl
N
N
(
I~
0.62'
-0.62'
MLW
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
I
I
I.
11l
41'
38'
4
§
I
@
/
0
~
0
N
N
,.,.,
<:>
Q)
~
0...
/
G..:
0
10
20
--
I
ti-L-1
~
SCALE IN FEET
1 = 20 '
11
APP. NO:
32204.01
NGVD
JD
812 NW 6th AVEHUE
FORT LAUDERDALE, FL 33311
SOUTH JETIY RESTORATION
SUBMITIED BY:
COASTAL SYSTEMS INTElNATIONAL, INC
~ HiilfiMli, Ccnl c.i-. ....... ll146
J05-5&1-J655 r..: JOS-661-1914 - .CoostaSplmllnt.com
STATE OF FLORIDA EB f7087
... 5aulh
To~
cauta1.-i.
~
/
.....
/
~
0...
~~3:
II
DAlUM DIAGRAM
1.87'
""" ;i
-
I. ;s,"
'O
~
a:::
w
...,,
:;z ~~
-H
38'
NEW EXTENDED CAP
s:-
PROPOSB> SITE PL4N · 3
SHEET
9
OF
14
NEW AND
RE-WORKED
LIMESTONE ROCK
0
2.5'
5'
SCALE IN FEET
!" =5'
PROPOSED PARllAL PLAN
SCALE: 1: - 5'
AP P. NO:
32204.01
NGVD
JD
SUBMITTED BY:
COASTAL
·
tlUSBORO HUT MMNIENANCE DISIRICT
812 NW 6th AVENUE
FORT LAUDERDALE, A. 33311
SOUTH JETTY RESTORATION
COASTAL SYSTEMS INTERNATIONAi.. iNC.
.... South Dlldl 1111-y. Onl ...._ llarlda lJ146
Toi: JM-661-3655 Fax: JOS-861-1914 - .Coostals,.tem.hl.com
STATE OF FlORID.I. Ell #7087
Qmtal,.-........ a.ti~ llld ,,..,..._
PROPOSED PAlllAL Pl.AN
SHEET
10 OF
14
EL. +4 NGVD
EL. +5.6 NAVO
NEW EXTENDED CAfl
NEW LIMESTONE
ROCK
~EXISTING
NEW AND
RE-WORKED
LIMESTONE ROCK \ _
UPLAND
BEACH AREA 2
HILLSBORO
INLET CHANNEC
1 +1.87' MHW
+1 .57' NAVO
3
1r=
--i
EXIST. CONC. PILE
g· EMBED MIN. INTO
EXTENDED C>P.
CUT-OFF AT MLW
ELEVATION
REMOVE 2' BELOW
GRADE TO EXPOSE
SOUND PORTION OF
PILE
\
I
I
1 I1
I
I
11
1 11
I
11 I /
1
I I
[
DOWEL REBAR INTO
CONC. PILE
EXIST. CONC. PANEL &
KING PILE TO REMAIN
f--__ EXIST.
L/Ll-1-
0
I
EXIST. CONC. PILE
CUT-OFF 6n BELOW
MLW ELEVATION AND
ABANDON
~~·P..SED TYPICAL SECTION
DAl\JM DIAGRAM
MHW
0.30'
1.57'---i--- NAVO
1.87'
1.57'
--+--
0.0' NGVD
0.62'
-0.62'
MLW
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
LI N :
APP. NO:
---~-+'-------- PROJECT
NO:
32204.01
DATUM:
NGVD
JD
SUBMITTED B :
HIUSBOIO ltlff MAINlfNANCI DISlllCT
812 NW 6th AVENlE
FORT LAUDERDALE, Fl 33311
SOUTH JETIY RESTORATION
COASTAL SYSTEMS INTERNATIONAL. INC
4'4 Soudi DWI Hmlonr. c-1 C-.W.. lblda 1J146
Tel: J05-661-J65:1 FOi: 30S-Ul- 1914 Wft.C.OltdS)'otomllolcom
STATE OF Fl0Rlll4 EB f7087
Clllllll. .............. CM.,,.._.. llld ,,..,,..._
PROPOSED 1YPICAl. SECTION
SHEET
11 OF
14
:rEMPORARY a· fl TIMBER PILES
APPROX. 90 PILES INSTAU.ED
WITH DROP HAMMER
10'
lYP. (OR AS
TURBIDITY CURTAIN
BOOM
REQUIRED)
TURBIDITY
CURTAIN
SCREEN
:Z
s
"N
~
~
EL. VARIES
ADDmONAL ANCHORS IF
REQUIRED, lYP.
1 SET OF VERTICAL SEAMS
BETWEEN EACH FLOTATION
SEGMENT TO ALLOW FOR
STOWAGE AND TO RETAIN
FLOAT POsmoN.
·
5/16 GALV.
CHAIN BALLAST
BOOM B.EVATION
BOOM SECTION
TURBIDITY CURTAIN DETAILS
NTS
APP. NO:
32204.01
NGVD
JD
HIUSBOlO HUT MAINIENANCE DIS1RICT
812 NW 6th AVENUE
FORT LAUDERDALE, FL 33311
SOUTH JETTY RESTORATION
COASTAL SYSTIMS INTERNATIONAL. INC.
464 s...di DNo ttat-y, Canl Cow., llollda D146
Ta: 305-U1-3855 Fa~ 305~&1-1914 wn.Coostolsy,11n'1911Uom
STATE Of Fl.ORlw. EB #70&7
Coucll. ~a.I~ 11111 Mompr...i
TURBIDITY OJRT.AIN
SHEET 12 OF 14
GENERAL NOTES:
1.
HYDROGRAPHIC DATA COLLECTED BY COASTAL SYSTEMS INTERNATIONAL INC. ON APRIL 24, 2017.
2.
ELEVATIONS ARE IN FEET REFERENCED TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD
29).
3.
CONTRACTOR TO INSTALL AND MAINTAIN FLOATING TURBIDITY BARRIERS DURING ALL PHASES OF MARINE
CONSTRUCTION.
4.
CONSTRUCTION MAY BE COMPLETED WITH BARGE-BASED EQUIPMENT WHILE MAINTAINING A MINIMUM OF
ONE FOOT DRAFT CLEARANCE BETWEEN BOTTOM OF FULLY LOADED BARGE AND SUBSTRATE.
5.
CONSTRUCTION SHALL BE CONDUCTED DURING DAYLIGHT HOURS.
6.
THESE DRAWINGS ARE "PERMIT SKETCHES" INTENDED TO PROVIDE SUFFICIENT DATA FOR REVIEW AND
EVALUATIONS BY REGULATORY AGENCIES. THESE DRAWINGS ARE NOT INTENDED FOR CONSTRUCTION.
7.
CONSTRUCTION WILL BE FROM A BARGE. THERE WILL BE AN UPLAND STAGING AREA THAT IS TO BE
DETERMINED WHERE THE DEBRIS FROM THE DEMO WILL BE OFFLOADED AND DISPOSED OF AT AN
APPROVED LOCATION (LANDFILL). THE EQUIPMENT ON THE BARGE WILL BE AN EXCAVATOR, CRANE AND
CONCRETE TRUCK/PUMP. THERE MAY BE 2-3 BARGES ROTATING DURING THE CONCRETE POUR.
~
...:
QJ
-0
>
0
0
j
0
N
N
t')
/
G
~
::.:
0:::
0
:s:
/
"'..c
2
"'
.Y
(/J
""E
'QJ
0...
/
0
-.t=
0
N
N
t')
/-+-'
0
QJ
·0
n:
/
L.L
', , ti''.~7' j',,
,,-.'' -~?.
.....
~~
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
N.T.S.
.;
v
.
,
p
,
:
r\
-* 'VJ
::~,~~NO
; f N·.l
:.1
f
~~·
:
JI
'£-. " n
8·
,,
~
I I
\.
. ~.
'
~
·-"
...._,.
11
.
\\ \
,,,,
·
DATE:
·
PERMIT SKETCHES
DRAWN BY:
DESCRIPTION:
CHECKED BY:
SUBMITTED BY:
COAST AL
11 I I I 11 I I I I\
ANDRES PEREZ
FL. REG. 66507
361600
DATUM:
-
ST E OF / Q:- ,,:~ ~ "·..
0~\Q'r~·0 '"'"
f 'l
~
NGVD
JD
M'
I~ ~I:
tOUSBORO INLET MAINHNANCE DIS1RICT
812 NW 6th AVENUE
FORT LAUDERDALE, FL 33311
SOUTH JETTY RESTORATION
COASTAL SYSTEMS INTERNATIO~ INC.
4M 5outh Dim tflll-y. ca.I o.bllr, lbldo Ul46
lei: JC5-661-J655 Fax: ~661-1914 www.coastalSysttmslnlcam
STAIE OF FLORIDA EB f70ff7
Cautal,-1111·- CM~ ..i ,..,...._
CB8AI. NOTES
SHEET
13 OF
14
SURVEY NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
HYDROGRAPHIC DATA COLLECTED BY COASTAL
SYSTEMS INTERNATIONAL INC. ON APRIL 24, 2017.
MARINE RESOURCE SURVEY WAS CONDUCTED BY
COASTAL SYSTEMS INTERNATIONAL INC. ON AUGUST
15, 2017.
HORIZONTAL POSITIONING FOR HYDROGRAPHIC DATA
OBTAINED WITH A TRIMBLE DGPS RECEIVER TUNED
TO FREQUENCY 322 Khz (MIAMI).
WATER DEPTHS OBTAINED WITH AN ODOM ECHOTRAC
CV-100 SURVEY GRADE ECHOSOUNDER OPERATING
AT 200 Khz.
TIDE DATA COLLECTED WITH A HOBO LEVELOGGER
ELECTRONIC TIDE GAUGE.
ELEVATION OF TIDE GAUGE ESTABLISHED USING RTK
GPS LOCALLY CALIBRATED TO PROJECT SITE.
HORIZONTAL COORDINATES ARE IN FEET REFERENCED
TO NORTH AMERICAN DATUM OF 1983 (NAD 83),
FLORIDA EAST ZONE.
ELEVATIONS ARE IN FEET AND REFERENCED TO
NATIONAL GEODETIC VERTICAL DATUM OF 1929
(NGVD 29).
THE INFORMATION DEPICTED ON THIS MAP
REPRESENTS THE RESULTS OF THE SURVEY ON THE
DATES INDICATED AND CAN ONLY BE CONSIDERED
AS AN INDICATION OF THE GENERAL CONDITIONS
EXISTING AT THAT TIME.
DATUM DIAatAM
1.87'
MHW
.§
~
0.30'
Q)
o_
NAVO
1.57'
,/
0
.q:
1.57'
0
N
N
t')
-:::u
---+--
"'
0
$
~
0.62'
-0.62'-__.__ MLW
"----~~-.....,c.;:;__.......1..._:.__~~"'==~~~
o
40'
LEGEND
80'
~LE
~N FEET ~
C~6 CORAL LOCATION
1" = 80'
\j I/
1
0.0' NGVD
REF: STATION ID: 8722861
EPOCH: 1983 - 2001
N.T.S.
........
....
APP. NO:
NO:
32204.01
NGVD
DRAWN BY:
DESCRIPTION:
CHECKED BY:
SUBMITIED BY:
JD
f.P
.---~---t~------tr PROJECT
DATUM:
PERMIT SKETCHES
COASTALSYSTEMSINTERNATIO~INC
464 Saudi Dim Hahnr. Call ~ llodda l1M6
Toi: J00.-661-3655 fmc: 305-llll-1914 www.Coosto~com
STATE OF Ft.OfllCl'I EB #7087
a.mi,-......, CM
..i ,...,......_
rr-.-.
tfWBORO HUT MAINTENANCE DISTRICT
812 NW 6th AVENUE
FORT LAUDERDALE, FL 33311
SOUTH JETTY RESTORATION
MARIN: RESOUR.as SURVEY
SHEET
14 OF
14