Palm Beach County. Palm Beach County. West Palm Beach. FL. PROJECT PURPOSE: Basic: Fisheries enhancement. Overall: The overall project purpose is to create an artificial reef within Lake Worth Lagoon to enhance local fisheries within Palm Beach County, Florida.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: Palm Beach County
Attention: Robert Robbins
2300 N. Jog Road
West Palm Beach, FL 33411
WATERWAY AND LOCATION: The project would affect waters of the United States associated with the Lake Worth Lagoon adjacent to the Intracoastal Waterway (ICW). The project site is located immediately south of the Southern Boulevard, State Road 80 Bridge where it crosses the ICW, and east of South Flagler Drive, Section 03, Township 44 South, Range 43 East, in West Palm Beach, Palm Beach County, Florida.
Directions to the site are as follows: Take Interstate 95 to Exit 68 for Southern Boulevard/ State Road 80. Travel approximately 1.5 miles east to where Southern Boulevard/State Road 80 crosses the Intracoastal Waterway. Project is located southwest of the bridge, immediately east of Flagler Drive.
APPROXIMATE COORDINATES:
Corner
Latitude
Longitude
NW corner
26.674016
-80.048
NE corner
26.674033
-80.04756
SE Corner
26.672883
-80.047416
SW Corner
26.672883
-80.048
PROJECT PURPOSE:
Basic: Fisheries enhancement
Overall: The overall project purpose is to create an artificial reef within Lake Worth Lagoon to enhance local fisheries within Palm Beach County, Florida.
EXISTING CONDITIONS: The proposed area for placement is approximately 16-30 feet deep. According to the benthic survey conducted on 21 April 2017 there are no benthic resources including seagrasses and corals. The substrate was described as sand and silt. The project is located outside of the 100 foot setback of the federal channel.
PROPOSED WORK: The applicant seeks authorization to create a 1.98 acre artificial reef site within Lake Worth Lagoon, south of the Southern Boulevard Bridge. The Southern Boulevard Bridge is currently being replaced and concrete from the old bridge will be used to create the artificial reef site. The reef structure will be built to maintain a 12-foot clearance from the top of the material relative to mean low water.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
1) An environmental resource survey depicting the exact location of the artificial reef site, locations of observed resources and a stability analysis shall be submitted 30 days prior to the commencement of the artificial reef deployment.
2) All artificial reef material will be placed in barren sandy bottom locations void of all environmental resources.
3) All reef materials shall be clean concrete or rock, other clean heavy gauge steel products with a thickness of ¼ inch or greater, and prefabricated structures that are a mixture of clean concrete and heavy gauge steel.
4) All reef materials shall be cleaned so that they are free of soils, oils and greases, debris, litter, putrescible substances or other pollutants.
5) At no time shall the distance between the top of the reef and the surface of the water be less than 12 feet. Reef construction shall not occur in a shipping lane or navigational channel.
6) The deployment site shall be clearly marked with buoys before and during material placement to insure containment within the permitted site.
7) Placement of reef material shall be accomplished through the use of tugs and/ or barges as the situation requires.
8) Materials used shall be long lasting and of sufficient weight and form to resist migration across the bottom even during severe storm conditions.
9) Material deployment will only be conducted when wave heights are less than 4 ft and short term (day) weather forecasts are favorable.
COMPENSATORY MITIGATION –The applicant has provided the following explanation why compensatory mitigation should not be required:
“Compensatory mitigation should not be required because no benthic resources will be impacted by the placement of an artificial reef in this area. The placement of artificial reef material in this location will create fisheries habitat in an area composed of seawalls along the shoreline and is void of natural fisheries habitat.”
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and, if applicable, those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect, but is not likely to adversely affect the West Indian Manatee (Trichechus manatus) or its designated critical habitat; swimming sea turtles: (green sea turtle (Chelonia mydas), Kemp’s Ridley sea turtle (Lepidochelys kempii), and Loggerhead sea turtle (Caretta caretta)); and smalltooth sawfish (Pristis pectinata).
The Corps has determined that the project is located within waters accessible to manatees and it’s located within its designated critical habitat. Use of The Corps of Engineers, Jacksonville District and the State of Florida Effect Determination Key for the Manatee in Florida (Manatee Key) dated April 2013 results in a path of A-B-C-G-N-O-P (paragraph 5). Provided the applicant adheres to the standard manatee construction conditions during the in-water work, the key results in a may affect, not likely to adversely affect determination.
Work will occur in waters accessible to the swimming sea turtles and smalltooth sawfish. Smalltooth sawfish and swimming sea turtles may be affected by being unable to use an area for forage or refuge habitat due to potential avoidance of construction activities caused by the deployment of artificial reef material. Because these species are motile and likely to leave the area during construction, the risk of injury from this type of construction activity is insignificant. The Corps will request National Marine Fisheries Service concurrence with this determination pursuant to Section 7 of the Endangered Species Act by separate letter.
The Corps has determined the proposal would have no effect on any listed threatened or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 1.53 acres of sand and silt utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic Region. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, suite 500, Palm Beach Gardens, FL 33410 within 30 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Jerilyn Ashworth, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Suite 500, Palm Beach Gardens, FL 33410; by electronic mail at Jerilyn.Ashworth@usace.army.mil; by facsimile transmission at (561)626-6971; or, by telephone at (561)472-3508.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FLORIDA 33410
December 13, 2017
REPLY TO
ATTENTION OF
Regulatory Division
South Permits Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application Number SAJ-2017-03089(SP-JKA)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT:
Palm Beach County
Attention: Robert Robbins
2300 N. Jog Road
West Palm Beach, FL 33411
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with the Lake Worth Lagoon adjacent to the Intracoastal Waterway (ICW).
The project site is located immediately south of the Southern Boulevard, State Road 80
Bridge where it crosses the ICW, and east of South Flagler Drive, Section 03, Township
44 South, Range 43 East, in West Palm Beach, Palm Beach County, Florida.
Directions to the site are as follows: Take Interstate 95 to Exit 68 for Southern
Boulevard/ State Road 80. Travel approximately 1.5 miles east to where Southern
Boulevard/State Road 80 crosses the Intracoastal Waterway. Project is located
southwest of the bridge, immediately east of Flagler Drive.
APPROXIMATE COORDINATES:
Corner
NW corner
NE corner
SE Corner
SW Corner
PROJECT PURPOSE:
Basic: Fisheries enhancement
Latitude
26.674016
26.674033
26.672883
26.672883
Longitude
-80.048
-80.04756
-80.047416
-80.048
Overall: The overall project purpose is to create an artificial reef within Lake Worth
Lagoon to enhance local fisheries within Palm Beach County, Florida.
EXISTING CONDITIONS: The proposed area for placement is approximately 16-30
feet deep. According to the benthic survey conducted on 21 April 2017 there are no
benthic resources including seagrasses and corals. The substrate was described as
sand and silt. The project is located outside of the 100 foot setback of the federal
channel.
PROPOSED WORK: The applicant seeks authorization to create a 1.98 acre artificial
reef site within Lake Worth Lagoon, south of the Southern Boulevard Bridge. The
Southern Boulevard Bridge is currently being replaced and concrete from the old bridge
will be used to create the artificial reef site. The reef structure will be built to maintain a
12-foot clearance from the top of the material relative to mean low water.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
1)
2)
3)
4)
5)
6)
7)
8)
9)
An environmental resource survey depicting the exact location of the artificial reef
site, locations of observed resources and a stability analysis shall be submitted
30 days prior to the commencement of the artificial reef deployment.
All artificial reef material will be placed in barren sandy bottom locations void of
all environmental resources.
All reef materials shall be clean concrete or rock, other clean heavy gauge steel
products with a thickness of ¼ inch or greater, and prefabricated structures that
are a mixture of clean concrete and heavy gauge steel.
All reef materials shall be cleaned so that they are free of soils, oils and greases,
debris, litter, putrescible substances or other pollutants.
At no time shall the distance between the top of the reef and the surface of the
water be less than 12 feet. Reef construction shall not occur in a shipping lane or
navigational channel.
The deployment site shall be clearly marked with buoys before and during
material placement to insure containment within the permitted site.
Placement of reef material shall be accomplished through the use of tugs and/ or
barges as the situation requires.
Materials used shall be long lasting and of sufficient weight and form to resist
migration across the bottom even during severe storm conditions.
Material deployment will only be conducted when wave heights are less than 4 ft
and short term (day) weather forecasts are favorable.
COMPENSATORY MITIGATION The applicant has provided the following explanation
why compensatory mitigation should not be required:
"Compensatory mitigation should not be required because no benthic resources will be
impacted by the placement of an artificial reef in this area. The placement of artificial
2
reef material in this location will create fisheries habitat in an area composed of
seawalls along the shoreline and is void of natural fisheries habitat."
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and, if
applicable, those federally recognized tribes with concerns in Florida and the Permit
Area.
ENDANGERED SPECIES: The Corps has determined the proposed project may affect,
but is not likely to adversely affect the West Indian Manatee (Trichechus manatus) or its
designated critical habitat; swimming sea turtles: (green sea turtle (Chelonia mydas),
Kemp's Ridley sea turtle (Lepidochelys kempii), and Loggerhead sea turtle (Caretta
caretta)); and smalltooth sawfish (Pristis pectinata).
The Corps has determined that the project is located within waters accessible to
manatees and it's located within its designated critical habitat. Use of The Corps of
Engineers, Jacksonville District and the State of Florida Effect Determination Key for the
Manatee in Florida (Manatee Key) dated April 2013 results in a path of A-B-C-G-N-O-P
(paragraph 5). Provided the applicant adheres to the standard manatee construction
conditions during the in-water work, the key results in a may affect, not likely to
adversely affect determination.
Work will occur in waters accessible to the swimming sea turtles and smalltooth
sawfish. Smalltooth sawfish and swimming sea turtles may be affected by being unable
to use an area for forage or refuge habitat due to potential avoidance of construction
activities caused by the deployment of artificial reef material. Because these species are
motile and likely to leave the area during construction, the risk of injury from this type of
construction activity is insignificant. The Corps will request National Marine Fisheries
Service concurrence with this determination pursuant to Section 7 of the Endangered
Species Act by separate letter.
The Corps has determined the proposal would have no effect on any listed threatened
or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
1.53 acres of sand and silt utilized by various life stages of penaeid shrimp complex,
reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper
complex. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or Federally managed fisheries in the South Atlantic
Region. Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the National Marine Fisheries
Service.
3
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Palm Beach
Gardens Permits Section, 4400 PGA Boulevard, suite 500, Palm Beach Gardens, FL
33410 within 30 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Jerilyn Ashworth, in writing at the Palm Beach Gardens Permits Section, 4400 PGA
Boulevard, Suite 500, Palm Beach Gardens, FL 33410; by electronic mail at
Jerilyn.Ashworth@usace.army.mil; by facsimile transmission at (561)626-6971; or, by
telephone at (561)472-3508.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
4
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
Proposed Site-No submerged aquatic
resources found during 4-21-17 benthic
survey.
lntracoastal Waterway Channel
Right of Way
Southern Blvd.
Bridge Site
Attachment 1
0
100
200
I
400 Feet
I
Coordinates for Palm Beach County Permit Request
Site Name: Southern Blvd. Bridge Site
Point
1
2
3
4
Degrees, Minutes, Seconds
26 40' 26.40" -80 02' 52.80"
26 40' 26.40" -80 02' 51.36"
26 40' 22.44" -80 02' 50.64"
26 40' 22.44" -80 02' 52.80"
Degrees Decimal Minutes
26 40.441
-80 02.88
26 40.442
-80 02.854
26 40.373
-80 02.845
26 40.373
-80 02.88
Decimal Degrees
26.674016
-80.048
26.674033
-80.04756
26.672883
-80.047416
26.672883
-80.048
Southern Blvd.
Bridge Site
Bathymetric Data
Attachment 2
0
I
-
-
Proposed Site
Depth Contour Lines
NAVO
37.5
75
I
N
+
150 Feet
I
N
,+
I
Southern Blvd.
Bridge Site
Attachment 3
Proposed Site
Site Dimensions:152ft. x 467ft. x 218ft. x 484ft.
Site Acreage: 1.98 acres
Site Depths= 16-30 feet (MLW)
Site Depths= 19-33 feet (MHW)
O
290
580
1,160 Feet
I
TYPICAL REEF X-SECTION
NOT TO SCALE
16FT
MW
MINIMUM NAVIGAT ONAL CLEARANCE
OF 12FT REQUIRED
30FT
MW
INSHORE ARTIFICIAL REEF
TYPICAL REEF X-SECTION
NTS
9/17