Home

Jacksonville District

Run scraper

City of Ft. Lauderdale

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Broward County. City of Ft. Lauderdale. Ft. Lauderdale. FL. PROJECT PURPOSE: Basic: The basic project purpose is to improve water access to an existing marina. Overall: The overall project purpose is to improve water access to the existing Las Olas Marina in Ft. Lauderdale, Florida

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:

APPLICANT: City of Ft. Lauderdale

Attn: Lee Feldman

100 North Andrews Ave.

Ft. Lauderdale, FL 33316

WATERWAY AND LOCATION: The project would affect waters of the United States associated with an existing marina adjacent to the Intracoastal Waterway (ICW). The project is located at the existing Las Olas marina, adjacent to the ICW at 240 East Las Olas Circle and 300 Las Olas Circle Ft. Lauderdale (Section 12, Township 50 South, Range 42 East), offshore of Broward County Florida.

Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale, take the Broward Blvd, East Exist and continue on Broward Blvd east then turn right onto Andrews Ave. Turn left on to Las Olas Blvd, cross the Intracoastal bridge, then turn left onto S. Birch Road, the marina will be on the left.

APPROXIMATE CENTRAL COORDINATES: Latitude: 26.1199°

Longitude: -80.1082°

PROJECT PURPOSE:

Basic: The basic project purpose is to improve water access to an existing marina.

Overall: The overall project purpose is to improve water access to the existing Las Olas marina in Ft. Lauderdale, Florida.

EXISTING CONDITIONS: The project area consists of an existing 52 slip marina that contains two floating piers and four fixed piers (14,175 square feet) and a 1,625 linear foot seawall with riprap at the toe. A resource survey was conducted in August 2017. The substrate within the marina consists largely of barren, unconsolidated silty sand. One species of seagrass was observed during the survey, Halophila decipiens (less than 1% coverage) and was a single sprig. No scleractinian corals were observed on the existing bulkhead, pilings, or riprap boulders along the bulkhead.

Project History: The Corps issued a permit dated August 16, 1994, that authorized the City to remove the existing docking structures and construct a 52 slip municipal marina. The permit was modified on March 8, 2002, to expand the submerged land lease westward into the ICW right-of-way to accommodate additional mooring of vessels on the four existing T-shaped piers, allowing the additional mooring of eight vessels.

PROPOSED WORK: The applicant seeks authorization to renovate and expand an existing marina from 52 to 66 slips for vessels up to 150 feet with drafts up to 15 feet, by conducting the following activities:

1. Remove 550 linear feet of existing seawall, 108 mooring piles, and 14,175 square feet of existing fixed/floating docks;

2. Excavate 127,000 square feet (84,000 cy) of upland to create a marina basin with depths ranging from -8 to -14 feet MLLW;

3. Install 1,070 linear feet of new steel sheet pile seawall faced with 1,070 cy of limestone riprap at a 2:1 slope within 10 feet of the new seawall;

4. Dredge 410,800 square feet to depths of -8 to -17 feet MLLW;

5. Install 61,350 square feet of new floating docks;

6. Install 93 steel guide piles, and 55 timber mooring piles

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: No submerged aquatic vegetation will be impacted by the project except for one sprig of seagrass. Best management practices for turbidity and erosion control will be utilized during all demolition and construction activities to prevent turbidity in excess of 29 Nephelometric Turbidity Units (NTUs) above background levels outside of the approved mixing zone. Demolition will be conducted by barge, in stages, with turbidity barriers surrounding areas with active demolition activities. The turbidity barriers will be installed prior to commencement of demolition activities in each demolition zone and will remain in place and be relocated, as necessary, until dock structures and pilings have been removed and turbidity levels have returned to background levels. Erosion control devices will be installed around upland debris staging areas and on the barge. The barge will have a minimum of one foot clearance from the substrate when fully loaded.

COMPENSATORY MITIGATION –The applicant has provided the following explanation why compensatory mitigation should not be required: The applicant has stated that compensatory mitigation is not required because no impacts to submerged aquatic vegetation and/or other aquatic resources (i.e. corals) are proposed or anticipated.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES: Since the proposal by the applicant is for in-water construction, potential impacts to the threatened West Indian manatee (Trichechus manatus) were evaluated using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013 (Key). Use of this Key produced the sequential determination A-B (8)-may affect the West Indian manatee. The project is located within the manatee’s designated critical habitat, but the Corps has determined that the project would not adversely modify its critical habitat. The Corps will request formal consultation with U.S. Fish and Wildlife Service (FWS) pursuant to Section 7 of the Endangered Species Act by separate letter.

The Corps has determined the proposed project may affect, but is not likely to adversely affect the endangered smalltooth sawfish (Pristis pectinata), swimming sea turtles: the endangered green sea turtle (Chelonia mydas), the endangered hawksbill sea turtle (Eretmochelys imbricata), the endangered leatherback sea turtle (Dermochelys coriacea), the endangered Kemp’s ridley sea turtle (Lepidochelys kempii), and the threatened loggerhead sea turtle (Caretta caretta). The Corps will request concurrence with theses determinations from the National Marine Fisheries Service (NMFS), Protected Resources Division pursuant to Section 7 of the Endangered Species Act by separate letter.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Approximately 410,800 square feet of unvegetated mud, sand, shell and rock habitat will be impacted via dredging or the installation of structures. The benthic habitat is utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. The project as proposed will not have a substantial adverse impact on EFH or federally managed fisheries based on the applicant’s implemented avoidance and minimization measures. Our final determination relative to project impacts and the need for mitigation measures is subject to review by, and coordination with, the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Ms. Linda C. Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; or by telephone at (561)472-3531.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 4400 PGA BOULEVARD, SUITE 500 PALM BEACH GARDENS, FL 33410

December 14, 2017

REPLY TO ATTENTION OF

Regulatory Division South Branch Palm Beach Gardens Permits Section

PUBLIC NOTICE Permit Application No. SAJ-1992-00459(SP-LCK) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below: APPLICANT: City of Ft. Lauderdale Attn: Lee Feldman 100 North Andrews Ave. Ft. Lauderdale, FL 33316 WATERWAY AND LOCATION: The project would affect waters of the United States associated with an existing marina adjacent to the Intracoastal Waterway (ICW). The project is located at the existing Las Olas marina, adjacent to the ICW at 240 East Las Olas Circle and 300 Las Olas Circle Ft. Lauderdale (Section 12, Township 50 South, Range 42 East), offshore of Broward County Florida. Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale, take the Broward Blvd, East Exist and continue on Broward Blvd east then turn right onto Andrews Ave. Turn left on to Las Olas Blvd, cross the Intracoastal bridge, then turn left onto S. Birch Road, the marina will be on the left. APPROXIMATE CENTRAL COORDINATES: Latitude 26.1199° Longitude -80.1082° PROJECT PURPOSE: Basic: The basic project purpose is to improve water access to an existing marina. Overall: The overall project purpose is to improve water access to the existing Las Olas marina in Ft. Lauderdale, Florida. EXISTING CONDITIONS: The project area consists of an existing 52 slip marina that contains two floating piers and four fixed piers (14,175 square feet) and a 1,625 linear foot seawall with riprap at the toe. A resource survey was conducted in August 2017. The

substrate within the marina consists largely of barren, unconsolidated silty sand. One species of seagrass was observed during the survey, Halophila decipiens (less than 1% coverage) and was a single sprig. No scleractinian corals were observed on the existing bulkhead, pilings, or riprap boulders along the bulkhead. Project History: The Corps issued a permit dated August 16, 1994, that authorized the City to remove the existing docking structures and construct a 52 slip municipal marina. The permit was modified on March 8, 2002, to expand the submerged land lease westward into the ICW right-of-way to accommodate additional mooring of vessels on the four existing T-shaped piers, allowing the additional mooring of eight vessels. PROPOSED WORK: The applicant seeks authorization to renovate and expand an existing marina from 52 to 66 slips for vessels up to 150 feet with drafts up to 15 feet, by conducting the following activities: 1. Remove 550 linear feet of existing seawall, 108 mooring piles, and 14,175 square feet of existing fixed/floating docks; 2. Excavate 127,000 square feet (84,000 cy) of upland to create a marina basin with depths ranging from -8 to -14 feet MLLW; 3. Install 1,070 linear feet of new steel sheet pile seawall faced with 1,070 cy of limestone riprap at a 2:1 slope within 10 feet of the new seawall; 4. Dredge 410,800 square feet to depths of -8 to -17 feet MLLW; 5. Install 61,350 square feet of new floating docks; 6. Install 93 steel guide piles, and 55 timber mooring piles AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: No submerged aquatic vegetation will be impacted by the project except for one sprig of seagrass. Best management practices for turbidity and erosion control will be utilized during all demolition and construction activities to prevent turbidity in excess of 29 Nephelometric Turbidity Units (NTUs) above background levels outside of the approved mixing zone. Demolition will be conducted by barge, in stages, with turbidity barriers surrounding areas with active demolition activities. The turbidity barriers will be installed prior to commencement of demolition activities in each demolition zone and will remain in place and be relocated, as necessary, until dock structures and pilings have been removed and turbidity levels have returned to background levels. Erosion control devices will be installed around upland debris staging areas and on the barge. The barge will have a minimum of one foot clearance from the substrate when fully loaded. COMPENSATORY MITIGATION ­The applicant has provided the following explanation why compensatory mitigation should not be required: The applicant has stated that compensatory mitigation is not required because no impacts to submerged aquatic vegetation and/or other aquatic resources (i.e. corals) are proposed or anticipated.

2

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: Since the proposal by the applicant is for in-water construction, potential impacts to the threatened West Indian manatee (Trichechus manatus) were evaluated using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013 (Key). Use of this Key produced the sequential determination A-B (8)-may affect the West Indian manatee. The project is located within the manatee's designated critical habitat, but the Corps has determined that the project would not adversely modify its critical habitat. The Corps will request formal consultation with U.S. Fish and Wildlife Service (FWS) pursuant to Section 7 of the Endangered Species Act by separate letter. The Corps has determined the proposed project may affect, but is not likely to adversely affect the endangered smalltooth sawfish (Pristis pectinata), swimming sea turtles: the endangered green sea turtle (Chelonia mydas), the endangered hawksbill sea turtle (Eretmochelys imbricata), the endangered leatherback sea turtle (Dermochelys coriacea), the endangered Kemp's ridley sea turtle (Lepidochelys kempii), and the threatened loggerhead sea turtle (Caretta caretta). The Corps will request concurrence with theses determinations from the National Marine Fisheries Service (NMFS), Protected Resources Division pursuant to Section 7 of the Endangered Species Act by separate letter. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Approximately 410,800 square feet of unvegetated mud, sand, shell and rock habitat will be impacted via dredging or the installation of structures. The benthic habitat is utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. The project as proposed will not have a substantial adverse impact on EFH or federally managed fisheries based on the applicant's implemented avoidance and minimization measures. Our final determination relative to project impacts and the need for mitigation measures is subject to review by, and coordination with, the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts. 3

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Ms. Linda C. Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; or by telephone at (561)472-3531. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water 4

quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

5

SHEET SET INDEX:

FLORIDA ATLANTIC OCEAN

GULF OF MEXICO

FT. LAUDERDALE * PROJECT SITE

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

LOCATION MAP GENERAL NOTES EXISTING CONDITIONS - NORTH SECTION EXISTING CONDITIONS - SOUTH SECTION DEMO PLAN - NORTH SECTION DEMO PLAN - SOUTH SECTION MARINA SITE PLAN - NORTH SECTION MARINA SITE PLAN - SOUTH SECTION TYPICAL DETAILS TYPICAL BASIN DETAILS TYPICAL DOCK DETAILS DREDGING PLAN - NORTH SECTION DREDGING PLAN - SOUTH SECTION DREDGE DISPOSAL PLAN - NORTH SECTION DREDGE DISPOSAL PLAN - SOUTH SECTION DISPOSAL POND SECTION/DETAILS TURBIDITY CONTROL DETAIL TURBIDITY CURTAIN DETAIL DREDGING SECTIONS PROPOSED SUBMERGED LANDS LEASE

LAUDERDALE-BY-THE-SEA

LAS OLAS BLVD

PROJECT SITE

* *

FORT LA UDERDA LE BEAC

H BLVD

FORT LAUDERDALE

LAS O LAS B LV

D

DANIA BEACH

LAS OLAS MARINA - LOCATION MAP

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269-932-4502 F: 269-932-3542

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET: 1

OF

20

GENERAL NOTES: 1. HYDROGRAPHIC SURVEY PERFORMED BY EDGEWATER RESOURCES, LLC ON NOVEMBER 17, 2016 2. WATER DEPTHS ARE IN FEET AND REFERENCED TO MEAN LOWER LOW WATER. REFER TO DATUM DIAGRAM BELOW FOR REFERENCE. 3. ELEVATIONS ARE IN MLLW UNLESS OTHERWISE NOTED. 4.TIDAL DATUM RELATIONSHIPS ARE REFERENCED TO NOAA TIDAL STATION ID:8722939. 5. HORIZONTAL DATUM IS FLORIDA STATE PLANE GRID, EAST ZONE, NAD 83 US FOOT. 6. AERIAL IMAGERY FROM GOOGLE EARTH, DATED 3/17/2017 . 7. RIPARIAN LINES (LIMITS) ARE PROPOSED.

DATUM DIAGRAM MHHW MHW

0.16'

2.28'

0.25'

0.11'

NAVD '88

MLW MLLW

LAS OLAS MARINA - GENERAL NOTES

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET:

2 OF

20

TIMBER DOCK OWNED BY OTHERS BUILDING WITH GATE ACCESS

PILE SUPPORTED CONCRETE PLATFORM

BUILDING WITH GATE ACCESS

20 3 OF CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET:

CONCRETE BULKHEAD

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

LEGEND SUBMERGED LANDS LEASE INTRACOASTAL WATERWAY LIMITS INTRACOSTAL WATERWAY CENTERLINE

RD

LAS OLAS MARINA - EXISTING CONDITIONS - NORTH SECTION

S BIRCH

PORTOFINO CONDOMINIUMS

BUILDING WITH GATE ACCESS

MATCH LINE - SEE SHEET 4

LAS OLAS CIRCLE

PILE SUPPORTED CONCRETE PROMENADE

FLOATING PLATFORM WITH ALUMINUM GANGWAY

FIXED CONCRETE DOCKS SUBMERGED LANDS LEASE LIMITS

INTRACOASTAL WATERWAY CHANNEL LIMITS

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

TIMBER SPRING PILE (TYP)

BOATER SERVICES BUILDING FLOATING PLATFORM WITH ALUMINUM GANGWAY

ALUMINUM GANGWAY

E LAS OLAS BLVD (OVERHEAD)

MOONEY POINT CONDOMINIUMS

20 4 OF CITY OF FT. LAUDERDALE INTRACOASTAL FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET:

MATCH LINE - SEE SHEET 3

CLE AS CIR LAS OL

S BIRCH RD

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

LAS OLAS BLVD ROW (100')

LAS OLAS MARINA - EXISTING CONDITIONS - SOUTH SIDE

LEGEND SUBMERGED LANDS LEASE INTRACOASTAL WATERWAY LIMITS INTRACOSTAL WATERWAY CENTERLINE LAS OLAS BLVD. R.O.W

FINGER PIERS OWNED BY OTHERS

BUILDING WITH GATE ACCESS

CONCRETE BULKHEAD

E. LAS OLAS CIRCLE

ALUMINUM GANGWAY PILE SUPPORTED CONCRETE PROMENADE

CONCRETE FLOATING DOCK TIMBER SPRING PILES (TYP) CONCRETE FLOATING DOCK

INTRACOASTAL WATERWAY NAVIGATION CHANNEL LIMITS

FIXED CONCRETE DOCK SUBMERGED LANDS LEASE LIMITS (SLL)

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

PILE SUPPORTED CONCRETE PLATFORM

I I~ I g~~ I ~ 3~~ 0 ,.. s~I . 0~0 ~a: ;;:~~

0 N

~

EXCAVATED AREA TO BE UTILIZED FOR SPOIL STAGING DURING DREDGING OPERATIONS (SEE SHEET 13}

LL

0

~

in

Cl)

z I

w~

i:..:

~w

:c

WI-:

O~w

w w

UJ

a.

v

0 :z ~t-"ffi

~

NORTH LIMIT OF SEAWALL REMOVAL

~

~ SOUTH LIMIT OF SEAWALL REMOVAL

v

.~~ REMOVE R.OATING PLATFORM WITH .ALUMINUM GANGWAY

'

-- --

REMOVE FIXED CONCRETE DOCKS, CONCRETE PILES, ""\:: UTILITY PEDS

.

95,000SF 14,000SF BOO SF 550 L.F 108EA 52TOT 1Z7,000SF

---"-'~ -~--1

~----1

o·

~o·

100·

I

OVERWATERSTRUCTlJRE REMOVALS 8. CONCRETE FIXED DOCK REMOVAL 7. CONCRETE FLOATING DOCK REMOVAL 8. CONCRETE PLATFORM REMOVAL 9. FLOATING PLATFORM REMOVAL

10,800SF 2,700SF 275SF 400SF TOTAL 14,175SF

LI.

I ~!!:!li:O~;..i a~flri~i ~ ~i ~ . S ::;w .. z~~ a..l-:~i3

~~00~~

777 SOUTH FLAGLER DR, WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET:

6 OF

DEMO PLAN - SOUTH SECTION

LE S CIRC

E. LAS OLAS BLVD (OVERHEAD)

MATCH LINE - SEE SHEET 5

LA LAS O

NOTES: 1. SEE TABLE ON SHEET 5 FOR COMPLETE LIST OF REMOVALS

MOONEY POINT CONDOMINIUMS

REMOVE FIXED CONCRETE DOCK

REMOVE ALUMINUM GANGWAY (TYP) REMOVE MOORING PILES (TYP)

EXISTING SEAWALL AND SIDEWALK TO REMAIN

REMOVE FLOATING DOCK & GUIDE PILES

REMOVE GANGWAY, FLOATING DOCK AND GUIDE PILES 20

PROPOSEDSlEELSHEET PILE SEAWALL (1070 LF)

I

210' ..

·_:.

@

· -

® ·:.-_·.. @

·

· ·

[ b

~ ·

@

· · ·

'

·

·'

'c;,·

PROPOSED GANGWAY (4 TOTAL) LIMITS OF EXISTING SEAWALL {TOREMAIN)

I~

I

I

(.)

11

I I

I ,.,. '.··

·

197'

,,

···-

PROPOSED FLOATING DOCK SYSTEM (58,700 SF TOTAL)

r

CONTROL POINT {TYP)

CP#2

Ir ' f SCALE:

·~

100· 1

·100

---ffi

I I

1~w

1;.

.·.,

I PROPOSED SUBMERGED LANDS LEASE UNE (SEE SHEET 20 FOR MORE INFORMATION)

I

-I

0

....

~

.:..;

fi w~

-~

I

II.

I ~ ~~ li1

86SLIPS

185'

·

:i::

55TOT 93TOT

@

0 N

z

Q

~

24,800SF 38,550 SF 61,350 SF

TIMBER SPRING PILES STEEL GUIDE PILES SLIPTOTAL

'

llENTIS ITQTALI

PIERS FINGER DOCKS TOTAL

PROPOSED GANGWAY (SEE SHEET 9 FOR SECTION & PROFIL£)

PROPOSED SEAWALL CONNECTION (SEE SHEET 11 FOR DETAILS)

'

PROPOSED llARINA Ill

w

w ::c en

~ ::::i ~~ W

rn

~ s~~ t:-~a:we,._

I

1~g~u~ ()~

111..-::::!E

~ i:.;~ ~~ .. ~ ::iffi .. ~- -~ o.[<~5~~ ~~ooc

0 N

I I

~:c

.-

z

'"

c

J

c

8 EXISTING SEA.WALL (TO REMAIN)

/

.

.

PROPOSED SUBMERGED LAND LEASE LIMITS (SEE SHEET 20 FOR MORE INFORMATION)

...

~.

....

····C::::j·

O'

50' 1

100'

SCAL£: 1 -100'

~

EB

NOTES: 1. SEE SHEET 7 FOR MARINA IMPROVEMENT TOTALS

... + ··

--- --------- ---

.... . . . . . . . . ..

.

.. .. . .

·

+

·

....... .

' INTRACOASTAL WATEFMAY LIMITS

DOCK CONTR

P: 289 932 4502 F: 289 932 3542

777 SOUTH FLAGL.ER Dl~:.1. ~UITE 800-WEST TOWER WEST PALM BEACH, FL """01

Edge~~~~r

i!

~12

~1~

F m

'Tl

~

~

I

~

Ci.Ir-

z>

..m n

~~

F m

m .,,

6

c:

Ci>

>

z

> 2!!

I::

~~ r-

~~

m

DATIJM:

APPLICANT: WATERWAY: CITY: COUNTY: DATE:

SHEET: 9 OF 20

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/17 MLLW

TYPICAL. DETAILS

11:1 LBIG11I

21J'(VMEllJ

SCALE : NTS

TYPCIAL SHEET PILE WALL CONNECTOR SCALE : NTS

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

TYPCIAL MARINA BASIN SECTION APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/17 MLLW SHEET:

TYPICAL BASIN SECTION

10 OF

20

TYPICAL 10' FINGER DOCK

SCALE : NTS

TYPICAL 4' FINGER DOCK SCALE : NTS

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

SCALE : NTS

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

TYPICAL 12' MAIN PIER

TYPICAL 12' FINGER DOCK

SCALE : NTS

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/17 MLLW SHEET:

TYPICAL DOCK DETAILS

11 OF

20

DREDGE AREA KEY

"1

--

PROPOSED DREDGING (OlFTSIDE PROP. l::...:j SUBMERGED LANDS LEASE (SLL))

rrTl Ll..ll

PROPOSED DREDGING (WrTHIN PROP. SLL)

[7'\J PROPOSED UPLAND ~ EXr.AVATION

PROPOSED DREDGE LIMITS

... . . o·

!50'

100' %

SCALE: 1·-100·

ffi \:1)

PROPOSED STEEL SHEET PILE SEAWALL (1,070 LF)

A.._-

0 N

II.

0

.... N

.:..; w

w ::c en

B

EXISTING SEAWALL (TO REMAIN)

20 CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET: 13 OF

LIMITS OF EXISTING SEAWALL

PROPOSED DREDGE CONTOUR (TYP) LIMITS OF PROPOSED SUBMERGED LANDS LEASE (SLL) INTRACOASTAL WATERWAY LIMITS

B

PROPOSED DREDGING LIMITS (SEE SHEET 10 FOR TOTALS)

NOTES: 1. SEE SHEET 12 FOR EXCAVATION/DREDGING TOTALS

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

MATCH LINE - SEE SHEET 12

PROPOSED DREDGING (WITHIN PROP. SLL)

E. LAS OLAS BLVD (OVERHE AD)

PROPOSED DREDGING (OUTSIDE OF PROP. SUBMERGED LANDS LEASE (SLL))

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

LAS OLAS MARINA - DREDGING PLAN - SOUTH SECTION

DREDGE AREA KEY

C

PROPOSED MARINA BASIN EXISTING SEAWALL TO REMAIN IN PLACE DURING ALL DREDGING OPERATION

20 CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET: 14 OF

C

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

ZONE 2

ZONE 1 TURBIDITY CURTAIN TO BE PLACED AROUND EACH ZONE AT TIME OF DREDGING

BARGE WITH DREDGE EQUIPMENT (TYP.) SEE SECTION SHEET 17

NOTES: 1. THE DE-WATERING BASIN WILL BE CONSTRUCTED BY EXCAVATING THE UPLAND MATERIAL AND TRUCKING IT OFFSITE. 2. ONCE THE BASIN IS FULLY CONSTRUCTED (SEE SHEET 16 FOR DETAILS), THE DREDGING OPERATION WILL BEGIN WITHIN EACH ZONE SHOWN HERE. EACH ZONE WILL HAVE A TURBIDITY CURTAIN SURROUNDING IT DURING THE DREDGING OPERATION. 3. THE MATERIAL WILL BE MECHANICALLY DREDGED INTO THE BARGE AND UNLOADED INTO THE DE-WATERING BASIN, BEFORE BEING TRUCKED OFFSITE. 4. THE UPLAND/MARINA BASIN EXCAVATION WILL BE THE FINAL STEP IN THE CONSTRUCTION

PROPOSED DREDGING LIMITS

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

LIMITS OF EXISTING RETAINING WALL

310'

TEMPORARY H-PILES TO SECURE TURBIDITY CURTAIN (32 TOTAL)

170'

MATCH LINE - SEE SHEET 15

52,700 SF (1.2 AC) DE-WATERING BASIN SEE SHEET 16 FOR CROSS SECTION AND DETAILS

DREDGE DISPOSAL/SEQUENCING PLAN-NORTH SECT

PROPOSED STEEL SHEET PILE SEAWALL (1,070 LF)

ZONE 3 TEMPORARY H-PILES TO SECURE TURBIDITY CURTAIN (18 TOTAL)

INTRACOASTAL WATERWAY LIMITS

TURBIDITY CURTAIN TO BE PLACED AROUND EACH ZONE AT TIME OF DREDGING PROPOSED DREDGING LIMITS 777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

MATCHLINE - SEE SHEET 14

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET: 15 OF

20

DREDGE DISPOSAL/ SEQUENCING PLAN - SOUTH SECT

E. LAS OLAS BLVD (OVERHE AD) EXISTING SEAWALL (TO REMAIN)

LIMITS OF EXISTING SEAWALL

ZONE 4

4'

EXISTING PARKING LOT SURFACE = 6.03'

+5.00

+5.00 MHW (2.39')

0.00

0.00 GEOTEXTILE FILTER CLOTH

-5.00

250'

200'

150'

100'

50'

0'

-5.00

20 16 OF CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/17 MLLW SHEET:

6'

2'

PROPOSED BASIN TOP OF WALL = 6.18'

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

HAY BALE

PROPOSED RETENTION BASIN SECTION

2' EARTHEN BERM DREDGE MATERIAL TEMPORARILY PLACED TO DE-WATER

SECTION C-C DE-WATERING BASIN

NOTES: 1. THE DE-WATERING BASIN WILL BE CONSTRUCTED BY EXCAVATING THE UPLAND MATERIAL AND TRUCKING IT OFFSITE. 2. ONCE THE DE-WATERING BASIN HAS BEEN CONSTRUCTED IT WILL BE LINED WITH GEOTEXTILE FILTER FABRIC. MATERIAL DREDGED FROM THE PROPOSED DREDGE AREA WILL BE PLACED IN THE BASIN TO DE-WATER, BEFORE BEING TRUCKED OFFSITE. 3. THE DE-WATERING BASIN WILL BE SURROUNDED WITH EARTHEN BERMS. AS AN ADDITIONAL MEASURE, HAY BALES WILL BE PLACED OUTSIDE OF THE EARTHEN BERMS.

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

HORZ. SCALE: 1"=50' VERT. SCALE: 1"=10'

0

·

·

II.

0

.... .,.... \_CONNECT TO SHEET PILE BULKHEAD STEEL SHEET PILE & GEOTEXTILE FILlER FABRIC ON BARGE

WORKING BARGE

· /

TIJRBllJllY CURTAIN

·

TEMPORARY H-PILE TO SECURE 1\JRBIDITY CURTAINS CONNECT TO SHEET PILE BULKHEAD

DREDGE PLAN VIEW NOT TO SCAl.E

~ /

WORKING BARGE

/fY.CAVATED SPOLSAREA SPOILS MATERIAL TO BE EXCAVATED

'TEMPORARY H-PILE TO SECURE 1\JRBIDITY CURTAINS

TURBIDITY CURTAIN/ ._____ _

TURBIDITY BARRIER DETAIL NOTTO SCALE

0 N

5 /16" GALV. CABLE SHEATHED IN PVC

II.

POLYETHYLENE FLOATION

0

cD .,...

1 SET OF VERTICAL SEAMS BETWEEN EACH FLOATATION SEGMENT TO ALLOW FOR STOWAGE AND TO RETAIN FLOAT POISTION

·..... ·.....

BOOM ELEVATION

BOOM SECTION

NOTTO SCALE

NOTTO SCALE

MOUNTING PLATE (SEE CONNECTION NOTES)

SLIDE STOP BOLTS (TOP & BOTIOM)

/

c;::::::;;:;;::~:::ri~GUSSET

CONTOURED DELRON WHEELS .............._ -BEARING BOLT

OOSSET//

~ -........._SLOTIED SS PIPE

_......-'E l~--...._CURTAIN CONNECTER PLATE ~SS BOLTS & NUTS CURTAIN WALL - - - -

SS BACKUP PLATE

SLOTIED SS PIPE

TOP VIEW NOTTO SCALE

0

SIDE VIEW

FRONT VIEW

NOTTO SCALE

NOTTO SCALE CONNECTION NOTES: 1. WELD PLATE TO EXISTING OR NEW SHEET PILING. 2. ATTACH WITH EPOXY ANCHOR BOLTS TO EXISTING CONCRETE BULKHEAD AS APPLICABLE.

20 19 OF

APPROX EXISTING WATERWAY BOTTOM

+5.00

+5.00

0.00

0.00

-5.00

-5.00

-10.00

-10.00

-15.00

-15.00 UPLAND EXCAVATION

-20.00

300'

200'

100'

0'

DREDGING

100'

200'

300'

-20.00

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/17 MLLW SHEET:

TOP OF EXISTING WALL (TO BE REMOVED AFTER DREDGING OPERATIONS)

32.5' OFFSET FROM NBE OF ICW

DREDGE SECTIONS

PROPOSED BASIN WALL

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATUM:

APPROXIMATE LIMITS OF INTRACOASTAL WATERWAY

PROPOSED LIMITS OF DREDGING

SECTION A-A HORZ. SCALE: 1"=100' VERT. SCALE: 1"=20' APPROXIMATE LIMITS OF INTRACOASTAL WATERWAY 32.5' OFFSET FROM NBE OF ICW

TOP OF EXISTING WALL

APPROX EXISTING WATERWAY BOTTOM

+5.00

0.00

0.00

-5.00

-5.00

-10.00

-10.00

-15.00

-15.00

-20.00

300'

200' DREDGING

SECTION B-B HORZ. SCALE: 1"=100' VERT. SCALE: 1"=20'

100'

0' PROPOSED LIMITS OF DREDGING

-20.00

777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER WEST PALM BEACH, FL 33401 P: 269 932 4502 F: 269 932 3542

+5.00

.

----__rn

P: 289 932 4502 F: 289 932 3542

7TT SOUTH FLAGLER D~J. ~UITE 800-WEST TOWER WEST PALM BEACH, FL 4"401

Edge~~~~r

\ \

\ \

- --.

\

-----ll~ll:!!"=~==:::::IL-

\ \ \ \ \ \ ____\ \

(

APPLICANT: WATERWAY: CITY: COUNTY: DATE: DATIJM:

CITY OF FT. LAUDERDALE INTRACOASTAL WATERWAY FT. LAUDERDALE BROWARD 10/17/2017 MLLW SHEET: 20 OF 20

LAS Ol.A9 MARINA- PROPOSED SUBMER0ED LANDS LEASE

--~--

------_._,; ,_

a

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas