You can copy from here when filling out the rest of the page.
Broward County. City of Ft. Lauderdale. Ft. Lauderdale. FL. PROJECT PURPOSE: Basic: The basic project purpose is to improve water access to an existing marina. Overall: The overall project purpose is to improve water access to the existing Las Olas Marina in Ft. Lauderdale, Florida
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT: City of Ft. Lauderdale
Attn: Lee Feldman
100 North Andrews Ave.
Ft. Lauderdale, FL 33316
WATERWAY AND LOCATION: The project would affect waters of the United States associated with an existing marina adjacent to the Intracoastal Waterway (ICW). The project is located at the existing Las Olas marina, adjacent to the ICW at 240 East Las Olas Circle and 300 Las Olas Circle Ft. Lauderdale (Section 12, Township 50 South, Range 42 East), offshore of Broward County Florida.
Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale, take the Broward Blvd, East Exist and continue on Broward Blvd east then turn right onto Andrews Ave. Turn left on to Las Olas Blvd, cross the Intracoastal bridge, then turn left onto S. Birch Road, the marina will be on the left.
APPROXIMATE CENTRAL COORDINATES:
Latitude: 26.1199°
Longitude: -80.1082°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve water access to an existing marina.
Overall: The overall project purpose is to improve water access to the existing Las Olas marina in Ft. Lauderdale, Florida.
EXISTING CONDITIONS: The project area consists of an existing 52 slip marina that contains two floating piers and four fixed piers (14,175 square feet) and a 1,625 linear foot seawall with riprap at the toe. A resource survey was conducted in August 2017. The substrate within the marina consists largely of barren, unconsolidated silty sand. One species of seagrass was observed during the survey, Halophila decipiens (less than 1% coverage) and was a single sprig. No scleractinian corals were observed on the existing bulkhead, pilings, or riprap boulders along the bulkhead.
Project History: The Corps issued a permit dated August 16, 1994, that authorized the City to remove the existing docking structures and construct a 52 slip municipal marina. The permit was modified on March 8, 2002, to expand the submerged land lease westward into the ICW right-of-way to accommodate additional mooring of vessels on the four existing T-shaped piers, allowing the additional mooring of eight vessels.
PROPOSED WORK: The applicant seeks authorization to renovate and expand an existing marina from 52 to 66 slips for vessels up to 150 feet with drafts up to 15 feet, by conducting the following activities:
1. Remove 550 linear feet of existing seawall, 108 mooring piles, and 14,175 square feet of existing fixed/floating docks;
2. Excavate 127,000 square feet (84,000 cy) of upland to create a marina basin with depths ranging from -8 to -14 feet MLLW;
3. Install 1,070 linear feet of new steel sheet pile seawall faced with 1,070 cy of limestone riprap at a 2:1 slope within 10 feet of the new seawall;
4. Dredge 410,800 square feet to depths of -8 to -17 feet MLLW;
5. Install 61,350 square feet of new floating docks;
6. Install 93 steel guide piles, and 55 timber mooring piles
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: No submerged aquatic vegetation will be impacted by the project except for one sprig of seagrass. Best management practices for turbidity and erosion control will be utilized during all demolition and construction activities to prevent turbidity in excess of 29 Nephelometric Turbidity Units (NTUs) above background levels outside of the approved mixing zone. Demolition will be conducted by barge, in stages, with turbidity barriers surrounding areas with active demolition activities. The turbidity barriers will be installed prior to commencement of demolition activities in each demolition zone and will remain in place and be relocated, as necessary, until dock structures and pilings have been removed and turbidity levels have returned to background levels. Erosion control devices will be installed around upland debris staging areas and on the barge. The barge will have a minimum of one foot clearance from the substrate when fully loaded.
COMPENSATORY MITIGATION –The applicant has provided the following explanation why compensatory mitigation should not be required: The applicant has stated that compensatory mitigation is not required because no impacts to submerged aquatic vegetation and/or other aquatic resources (i.e. corals) are proposed or anticipated.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: Since the proposal by the applicant is for in-water construction, potential impacts to the threatened West Indian manatee (Trichechus manatus) were evaluated using The Corps of Engineers, Jacksonville District, and the State of Florida Effect Determination Key for the Manatee in Florida, April 2013 (Key). Use of this Key produced the sequential determination A-B (8)-may affect the West Indian manatee. The project is located within the manatee’s designated critical habitat, but the Corps has determined that the project would not adversely modify its critical habitat. The Corps will request formal consultation with U.S. Fish and Wildlife Service (FWS) pursuant to Section 7 of the Endangered Species Act by separate letter.
The Corps has determined the proposed project may affect, but is not likely to adversely affect the endangered smalltooth sawfish (Pristis pectinata), swimming sea turtles: the endangered green sea turtle (Chelonia mydas), the endangered hawksbill sea turtle (Eretmochelys imbricata), the endangered leatherback sea turtle (Dermochelys coriacea), the endangered Kemp’s ridley sea turtle (Lepidochelys kempii), and the threatened loggerhead sea turtle (Caretta caretta). The Corps will request concurrence with theses determinations from the National Marine Fisheries Service (NMFS), Protected Resources Division pursuant to Section 7 of the Endangered Species Act by separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. Approximately 410,800 square feet of unvegetated mud, sand, shell and rock habitat will be impacted via dredging or the installation of structures. The benthic habitat is utilized by various life stages of penaeid shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and snapper/grouper complex. The project as proposed will not have a substantial adverse impact on EFH or federally managed fisheries based on the applicant’s implemented avoidance and minimization measures. Our final determination relative to project impacts and the need for mitigation measures is subject to review by, and coordination with, the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Ms. Linda C. Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms. Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at Linda.C.Knoeck@usace.army.mil; or by telephone at (561)472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
4400 PGA BOULEVARD, SUITE 500
PALM BEACH GARDENS, FL 33410
December 14, 2017
REPLY TO
ATTENTION OF
Regulatory Division
South Branch
Palm Beach Gardens Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-1992-00459(SP-LCK)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) and Section 10 of the
Rivers and Harbors Act of 1899 (33 U.S.C. §403) as described below:
APPLICANT:
City of Ft. Lauderdale
Attn: Lee Feldman
100 North Andrews Ave.
Ft. Lauderdale, FL 33316
WATERWAY AND LOCATION: The project would affect waters of the United States
associated with an existing marina adjacent to the Intracoastal Waterway (ICW). The
project is located at the existing Las Olas marina, adjacent to the ICW at 240 East Las
Olas Circle and 300 Las Olas Circle Ft. Lauderdale (Section 12, Township 50 South,
Range 42 East), offshore of Broward County Florida.
Directions to the site are as follows: Take I-95 South toward Ft. Lauderdale, take the
Broward Blvd, East Exist and continue on Broward Blvd east then turn right onto
Andrews Ave. Turn left on to Las Olas Blvd, cross the Intracoastal bridge, then turn left
onto S. Birch Road, the marina will be on the left.
APPROXIMATE CENTRAL COORDINATES: Latitude 26.1199°
Longitude -80.1082°
PROJECT PURPOSE:
Basic: The basic project purpose is to improve water access to an existing marina.
Overall: The overall project purpose is to improve water access to the existing Las Olas
marina in Ft. Lauderdale, Florida.
EXISTING CONDITIONS: The project area consists of an existing 52 slip marina that
contains two floating piers and four fixed piers (14,175 square feet) and a 1,625 linear
foot seawall with riprap at the toe. A resource survey was conducted in August 2017. The
substrate within the marina consists largely of barren, unconsolidated silty sand. One
species of seagrass was observed during the survey, Halophila decipiens (less than 1%
coverage) and was a single sprig. No scleractinian corals were observed on the existing
bulkhead, pilings, or riprap boulders along the bulkhead.
Project History: The Corps issued a permit dated August 16, 1994, that authorized the
City to remove the existing docking structures and construct a 52 slip municipal marina.
The permit was modified on March 8, 2002, to expand the submerged land lease
westward into the ICW right-of-way to accommodate additional mooring of vessels on the
four existing T-shaped piers, allowing the additional mooring of eight vessels.
PROPOSED WORK: The applicant seeks authorization to renovate and expand an
existing marina from 52 to 66 slips for vessels up to 150 feet with drafts up to 15 feet, by
conducting the following activities:
1. Remove 550 linear feet of existing seawall, 108 mooring piles, and 14,175
square feet of existing fixed/floating docks;
2. Excavate 127,000 square feet (84,000 cy) of upland to create a marina basin
with depths ranging from -8 to -14 feet MLLW;
3. Install 1,070 linear feet of new steel sheet pile seawall faced with 1,070 cy of
limestone riprap at a 2:1 slope within 10 feet of the new seawall;
4. Dredge 410,800 square feet to depths of -8 to -17 feet MLLW;
5. Install 61,350 square feet of new floating docks;
6. Install 93 steel guide piles, and 55 timber mooring piles
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment: No submerged aquatic vegetation will be impacted by the project
except for one sprig of seagrass. Best management practices for turbidity and erosion
control will be utilized during all demolition and construction activities to prevent turbidity
in excess of 29 Nephelometric Turbidity Units (NTUs) above background levels outside
of the approved mixing zone. Demolition will be conducted by barge, in stages, with
turbidity barriers surrounding areas with active demolition activities. The turbidity
barriers will be installed prior to commencement of demolition activities in each
demolition zone and will remain in place and be relocated, as necessary, until dock
structures and pilings have been removed and turbidity levels have returned to
background levels. Erosion control devices will be installed around upland debris
staging areas and on the barge. The barge will have a minimum of one foot clearance
from the substrate when fully loaded.
COMPENSATORY MITIGATION The applicant has provided the following explanation
why compensatory mitigation should not be required: The applicant has stated that
compensatory mitigation is not required because no impacts to submerged aquatic
vegetation and/or other aquatic resources (i.e. corals) are proposed or anticipated.
2
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: Since the proposal by the applicant is for in-water
construction, potential impacts to the threatened West Indian manatee (Trichechus
manatus) were evaluated using The Corps of Engineers, Jacksonville District, and the
State of Florida Effect Determination Key for the Manatee in Florida, April 2013 (Key).
Use of this Key produced the sequential determination A-B (8)-may affect the West
Indian manatee. The project is located within the manatee's designated critical habitat,
but the Corps has determined that the project would not adversely modify its critical
habitat. The Corps will request formal consultation with U.S. Fish and Wildlife Service
(FWS) pursuant to Section 7 of the Endangered Species Act by separate letter.
The Corps has determined the proposed project may affect, but is not likely to adversely
affect the endangered smalltooth sawfish (Pristis pectinata), swimming sea turtles: the
endangered green sea turtle (Chelonia mydas), the endangered hawksbill sea turtle
(Eretmochelys imbricata), the endangered leatherback sea turtle (Dermochelys
coriacea), the endangered Kemp's ridley sea turtle (Lepidochelys kempii), and the
threatened loggerhead sea turtle (Caretta caretta). The Corps will request concurrence
with theses determinations from the National Marine Fisheries Service (NMFS),
Protected Resources Division pursuant to Section 7 of the Endangered Species Act by
separate letter.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. Approximately 410,800 square feet of
unvegetated mud, sand, shell and rock habitat will be impacted via dredging or the
installation of structures. The benthic habitat is utilized by various life stages of penaeid
shrimp complex, reef fish, stone crab, spiny lobster, migratory/pelagic fish, and
snapper/grouper complex. The project as proposed will not have a substantial adverse
impact on EFH or federally managed fisheries based on the applicant's implemented
avoidance and minimization measures. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by, and coordination
with, the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
3
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Ms. Linda C.
Knoeck Permits Section, 4400 PGA Boulevard, Palm Beach Gardens, FL 33410, within
21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Ms.
Linda C. Knoeck, in writing at the Palm Beach Gardens Permits Section, 4400 PGA
Boulevard, Palm Beach Gardens, FL 33410; by electronic mail at
Linda.C.Knoeck@usace.army.mil; or by telephone at (561)472-3531.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
comments are used to assess impacts to endangered species, historic properties, water
4
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
5
SHEET SET INDEX:
FLORIDA
ATLANTIC
OCEAN
GULF OF MEXICO
FT. LAUDERDALE
* PROJECT
SITE
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
LOCATION MAP
GENERAL NOTES
EXISTING CONDITIONS - NORTH SECTION
EXISTING CONDITIONS - SOUTH SECTION
DEMO PLAN - NORTH SECTION
DEMO PLAN - SOUTH SECTION
MARINA SITE PLAN - NORTH SECTION
MARINA SITE PLAN - SOUTH SECTION
TYPICAL DETAILS
TYPICAL BASIN DETAILS
TYPICAL DOCK DETAILS
DREDGING PLAN - NORTH SECTION
DREDGING PLAN - SOUTH SECTION
DREDGE DISPOSAL PLAN - NORTH SECTION
DREDGE DISPOSAL PLAN - SOUTH SECTION
DISPOSAL POND SECTION/DETAILS
TURBIDITY CONTROL DETAIL
TURBIDITY CURTAIN DETAIL
DREDGING SECTIONS
PROPOSED SUBMERGED LANDS LEASE
LAUDERDALE-BY-THE-SEA
LAS OLAS BLVD
PROJECT SITE
*
*
FORT LA
UDERDA
LE BEAC
H BLVD
FORT LAUDERDALE
LAS O
LAS B
LV
D
DANIA BEACH
LAS OLAS MARINA - LOCATION MAP
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269-932-4502
F: 269-932-3542
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET: 1
OF
20
GENERAL NOTES:
1. HYDROGRAPHIC SURVEY PERFORMED BY EDGEWATER RESOURCES, LLC ON NOVEMBER 17, 2016
2. WATER DEPTHS ARE IN FEET AND REFERENCED TO MEAN LOWER LOW WATER. REFER TO DATUM DIAGRAM BELOW FOR
REFERENCE.
3. ELEVATIONS ARE IN MLLW UNLESS OTHERWISE NOTED.
4.TIDAL DATUM RELATIONSHIPS ARE REFERENCED TO NOAA TIDAL STATION ID:8722939.
5. HORIZONTAL DATUM IS FLORIDA STATE PLANE GRID, EAST ZONE, NAD 83 US FOOT.
6. AERIAL IMAGERY FROM GOOGLE EARTH, DATED 3/17/2017 .
7. RIPARIAN LINES (LIMITS) ARE PROPOSED.
DATUM DIAGRAM
MHHW
MHW
0.16'
2.28'
0.25'
0.11'
NAVD '88
MLW
MLLW
LAS OLAS MARINA - GENERAL NOTES
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET:
2 OF
20
TIMBER
DOCK OWNED
BY OTHERS
BUILDING
WITH GATE
ACCESS
PILE SUPPORTED
CONCRETE PLATFORM
BUILDING
WITH GATE
ACCESS
20
3 OF
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET:
CONCRETE
BULKHEAD
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
LEGEND
SUBMERGED LANDS LEASE
INTRACOASTAL WATERWAY LIMITS
INTRACOSTAL WATERWAY CENTERLINE
RD
LAS OLAS MARINA - EXISTING CONDITIONS - NORTH SECTION
S BIRCH
PORTOFINO CONDOMINIUMS
BUILDING WITH GATE ACCESS
MATCH LINE - SEE SHEET 4
LAS OLAS CIRCLE
PILE SUPPORTED
CONCRETE PROMENADE
FLOATING PLATFORM
WITH ALUMINUM GANGWAY
FIXED CONCRETE DOCKS
SUBMERGED LANDS
LEASE LIMITS
INTRACOASTAL WATERWAY
CHANNEL LIMITS
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
TIMBER SPRING
PILE (TYP)
BOATER SERVICES
BUILDING
FLOATING PLATFORM
WITH ALUMINUM
GANGWAY
ALUMINUM
GANGWAY
E LAS OLAS BLVD (OVERHEAD)
MOONEY POINT
CONDOMINIUMS
20
4 OF
CITY OF FT. LAUDERDALE
INTRACOASTAL
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET:
MATCH LINE - SEE SHEET 3
CLE
AS CIR
LAS OL
S BIRCH RD
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
LAS OLAS BLVD ROW (100')
LAS OLAS MARINA - EXISTING CONDITIONS - SOUTH SIDE
LEGEND
SUBMERGED LANDS LEASE
INTRACOASTAL WATERWAY LIMITS
INTRACOSTAL WATERWAY CENTERLINE
LAS OLAS BLVD. R.O.W
FINGER PIERS
OWNED BY OTHERS
BUILDING
WITH GATE
ACCESS
CONCRETE
BULKHEAD
E. LAS OLAS CIRCLE
ALUMINUM
GANGWAY
PILE SUPPORTED
CONCRETE
PROMENADE
CONCRETE
FLOATING DOCK
TIMBER SPRING PILES
(TYP)
CONCRETE
FLOATING DOCK
INTRACOASTAL
WATERWAY NAVIGATION
CHANNEL LIMITS
FIXED CONCRETE
DOCK
SUBMERGED LANDS
LEASE LIMITS (SLL)
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
PILE SUPPORTED
CONCRETE PLATFORM
I
I~
I g~~
I ~ 3~~
0 ,..
s~I . 0~0
~a: ;;:~~
0
N
~
EXCAVATED AREA TO BE UTILIZED
FOR SPOIL STAGING DURING
DREDGING OPERATIONS
(SEE SHEET 13}
LL
0
~
in
Cl)
z
I
w~
i:..:
~w
:c
WI-:
O~w
w
w
UJ
a.
v
0
:z ~t-"ffi
~
NORTH LIMIT OF
SEAWALL REMOVAL
~
~
SOUTH LIMIT OF
SEAWALL REMOVAL
v
.~~
REMOVE R.OATING
PLATFORM
WITH .ALUMINUM
GANGWAY
'
-- --
REMOVE FIXED
CONCRETE DOCKS,
CONCRETE PILES,
""\:: UTILITY PEDS
.
95,000SF
14,000SF
BOO SF
550 L.F
108EA
52TOT
1Z7,000SF
---"-'~
-~--1
~----1
o·
~o·
100·
I
OVERWATERSTRUCTlJRE REMOVALS
8. CONCRETE FIXED DOCK REMOVAL
7. CONCRETE FLOATING DOCK REMOVAL
8. CONCRETE PLATFORM REMOVAL
9. FLOATING PLATFORM REMOVAL
10,800SF
2,700SF
275SF
400SF
TOTAL 14,175SF
LI.
I ~!!:!li:O~;..i
a~flri~i
~ ~i ~ .
S ::;w .. z~~
a..l-:~i3
~~00~~
777 SOUTH FLAGLER DR,
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET:
6 OF
DEMO PLAN - SOUTH SECTION
LE
S CIRC
E. LAS OLAS BLVD (OVERHEAD)
MATCH LINE - SEE SHEET 5
LA
LAS O
NOTES:
1. SEE TABLE ON SHEET 5 FOR COMPLETE LIST OF REMOVALS
MOONEY POINT
CONDOMINIUMS
REMOVE FIXED
CONCRETE DOCK
REMOVE ALUMINUM
GANGWAY (TYP)
REMOVE MOORING
PILES (TYP)
EXISTING SEAWALL AND
SIDEWALK TO REMAIN
REMOVE FLOATING
DOCK & GUIDE PILES
REMOVE GANGWAY,
FLOATING DOCK
AND GUIDE PILES
20
PROPOSEDSlEELSHEET
PILE SEAWALL (1070 LF)
I
210'
..
·_:.
@
·
-
®
·:.-_·..
@
·
·
·
[
b
~
·
@
·
·
·
'
·
·'
'c;,·
PROPOSED GANGWAY
(4 TOTAL)
LIMITS OF EXISTING SEAWALL
{TOREMAIN)
I~
I
I
(.)
11
I
I
I
,.,. '.··
·
197'
,,
···-
PROPOSED FLOATING
DOCK SYSTEM
(58,700 SF TOTAL)
r
CONTROL POINT
{TYP)
CP#2
Ir '
f
SCALE:
·~
100·
1
·100
---ffi
I
I
1~w
1;.
.·.,
I
PROPOSED SUBMERGED
LANDS LEASE UNE
(SEE SHEET 20 FOR MORE
INFORMATION)
I
-I
0
....
~
.:..;
fi w~
-~
I
II.
I ~ ~~
li1
86SLIPS
185'
·
:i::
55TOT
93TOT
@
0
N
z
Q
~
24,800SF
38,550 SF
61,350 SF
TIMBER SPRING PILES
STEEL GUIDE PILES
SLIPTOTAL
'
llENTIS ITQTALI
PIERS
FINGER DOCKS
TOTAL
PROPOSED GANGWAY
(SEE SHEET 9 FOR
SECTION & PROFIL£)
PROPOSED SEAWALL
CONNECTION
(SEE SHEET 11 FOR
DETAILS)
'
PROPOSED llARINA Ill
w
w
::c
en
~ ::::i
~~ W
rn
~ s~~
t:-~a:we,._
I
1~g~u~
()~
111..-::::!E
~ i:.;~
~~ ..
~ ::iffi .. ~- -~
o.[<~5~~
~~ooc
0
N
I
I
~:c
.-
z
'"
c
J
c
8
EXISTING SEA.WALL
(TO REMAIN)
/
.
.
PROPOSED SUBMERGED LAND LEASE LIMITS
(SEE SHEET 20 FOR MORE INFORMATION)
...
~.
....
····C::::j·
O'
50'
1
100'
SCAL£: 1 -100'
~
EB
NOTES:
1. SEE SHEET 7 FOR MARINA IMPROVEMENT TOTALS
...
+ ··
--- --------- ---
....
. . . . . . . . ..
.
.. .. . .
·
+
·
....... .
' INTRACOASTAL WATEFMAY LIMITS
DOCK CONTRP: 289 932 4502
F: 289 932 3542
777 SOUTH FLAGL.ER Dl~:.1. ~UITE 800-WEST TOWER
WEST PALM BEACH, FL """01
Edge~~~~r
i!
~12
~1~
F
m
'Tl
~
~
I
~
Ci.Ir-
z>
..m n
~~
F
m
m
.,,
6
c:
Ci>
>
z
>
2!!
I::
~~
r-
~~
m
DATIJM:
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
SHEET: 9 OF 20
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/17
MLLW
TYPICAL. DETAILS
11:1 LBIG11I
21J'(VMEllJ
SCALE : NTS
TYPCIAL SHEET PILE WALL CONNECTOR
SCALE : NTS
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
TYPCIAL MARINA BASIN SECTION
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/17
MLLW
SHEET:
TYPICAL BASIN SECTION
10 OF
20
TYPICAL 10' FINGER DOCK
SCALE : NTS
TYPICAL 4' FINGER DOCK
SCALE : NTS
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
SCALE : NTS
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
TYPICAL 12' MAIN PIER
TYPICAL 12' FINGER DOCK
SCALE : NTS
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/17
MLLW
SHEET:
TYPICAL DOCK DETAILS
11 OF
20
DREDGE AREA KEY
"1
--
PROPOSED DREDGING (OlFTSIDE PROP.
l::...:j SUBMERGED LANDS LEASE (SLL))
rrTl
Ll..ll
PROPOSED DREDGING (WrTHIN
PROP. SLL)
[7'\J PROPOSED UPLAND
~ EXr.AVATION
PROPOSED
DREDGE LIMITS
... . .
o·
!50'
100' %
SCALE: 1·-100·
ffi
\:1)
PROPOSED STEEL SHEET
PILE SEAWALL (1,070 LF)
A.._-
0
N
II.
0
....
N
.:..;
w
w
::c
en
B
EXISTING SEAWALL
(TO REMAIN)
20
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET: 13 OF
LIMITS OF EXISTING
SEAWALL
PROPOSED DREDGE
CONTOUR (TYP)
LIMITS OF PROPOSED
SUBMERGED LANDS LEASE (SLL)
INTRACOASTAL WATERWAY LIMITS
B
PROPOSED DREDGING LIMITS
(SEE SHEET 10 FOR TOTALS)
NOTES:
1. SEE SHEET 12 FOR EXCAVATION/DREDGING TOTALS
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
MATCH LINE - SEE SHEET 12
PROPOSED DREDGING (WITHIN PROP.
SLL)
E. LAS OLAS BLVD (OVERHE
AD)
PROPOSED DREDGING (OUTSIDE OF
PROP. SUBMERGED LANDS LEASE (SLL))
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
LAS OLAS MARINA - DREDGING PLAN - SOUTH SECTION
DREDGE AREA KEY
C
PROPOSED MARINA BASIN
EXISTING SEAWALL TO REMAIN
IN PLACE DURING ALL
DREDGING OPERATION
20
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET: 14 OF
C
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
ZONE 2
ZONE 1
TURBIDITY CURTAIN TO BE PLACED
AROUND EACH ZONE AT TIME OF
DREDGING
BARGE WITH DREDGE
EQUIPMENT (TYP.) SEE SECTION
SHEET 17
NOTES:
1. THE DE-WATERING BASIN WILL BE CONSTRUCTED BY EXCAVATING THE UPLAND MATERIAL AND TRUCKING IT OFFSITE.
2. ONCE THE BASIN IS FULLY CONSTRUCTED (SEE SHEET 16 FOR DETAILS), THE DREDGING OPERATION WILL BEGIN
WITHIN EACH ZONE SHOWN HERE. EACH ZONE WILL HAVE A TURBIDITY CURTAIN SURROUNDING IT DURING THE
DREDGING OPERATION.
3. THE MATERIAL WILL BE MECHANICALLY DREDGED INTO THE BARGE AND UNLOADED INTO THE DE-WATERING BASIN,
BEFORE BEING TRUCKED OFFSITE.
4. THE UPLAND/MARINA BASIN EXCAVATION WILL BE THE FINAL STEP IN THE CONSTRUCTION
PROPOSED
DREDGING LIMITS
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
LIMITS OF EXISTING
RETAINING WALL
310'
TEMPORARY H-PILES
TO SECURE
TURBIDITY CURTAIN
(32 TOTAL)
170'
MATCH LINE - SEE SHEET 15
52,700 SF (1.2 AC)
DE-WATERING BASIN SEE
SHEET 16 FOR CROSS
SECTION AND DETAILS
DREDGE DISPOSAL/SEQUENCING PLAN-NORTH SECT
PROPOSED STEEL SHEET
PILE SEAWALL (1,070 LF)
ZONE 3
TEMPORARY H-PILES
TO SECURE TURBIDITY
CURTAIN (18 TOTAL)
INTRACOASTAL WATERWAY LIMITS
TURBIDITY CURTAIN TO BE PLACED
AROUND EACH ZONE AT TIME OF
DREDGING
PROPOSED
DREDGING LIMITS
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
MATCHLINE - SEE SHEET 14
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET: 15 OF
20
DREDGE DISPOSAL/ SEQUENCING PLAN - SOUTH SECT
E. LAS OLAS BLVD (OVERHE
AD)
EXISTING SEAWALL
(TO REMAIN)
LIMITS OF EXISTING
SEAWALL
ZONE 4
4'
EXISTING PARKING LOT
SURFACE = 6.03'
+5.00
+5.00
MHW (2.39')
0.00
0.00
GEOTEXTILE
FILTER CLOTH
-5.00
250'
200'
150'
100'
50'
0'
-5.00
20
16 OF
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/17
MLLW
SHEET:
6'
2'
PROPOSED BASIN
TOP OF WALL = 6.18'
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
HAY BALE
PROPOSED RETENTION BASIN SECTION
2' EARTHEN BERM
DREDGE MATERIAL
TEMPORARILY PLACED TO
DE-WATER
SECTION C-C DE-WATERING BASIN
NOTES:
1.
THE DE-WATERING BASIN WILL BE CONSTRUCTED BY EXCAVATING THE
UPLAND MATERIAL AND TRUCKING IT OFFSITE.
2. ONCE THE DE-WATERING BASIN HAS BEEN CONSTRUCTED IT WILL BE
LINED WITH GEOTEXTILE FILTER FABRIC. MATERIAL DREDGED FROM THE
PROPOSED DREDGE AREA WILL BE PLACED IN THE BASIN TO DE-WATER,
BEFORE BEING TRUCKED OFFSITE.
3. THE DE-WATERING BASIN WILL BE SURROUNDED WITH EARTHEN BERMS.
AS AN ADDITIONAL MEASURE, HAY BALES WILL BE PLACED OUTSIDE OF
THE EARTHEN BERMS.
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
HORZ. SCALE: 1"=50'
VERT. SCALE: 1"=10'
0
·
·
II.
0
....
.,....
\_CONNECT TO SHEET
PILE BULKHEAD
STEEL SHEET PILE
& GEOTEXTILE
FILlER FABRIC ON
BARGE
WORKING BARGE
·
/
TIJRBllJllY CURTAIN
·
TEMPORARY H-PILE TO SECURE
1\JRBIDITY CURTAINS
CONNECT TO SHEET
PILE BULKHEAD
DREDGE PLAN VIEW
NOT TO SCAl.E
~
/
WORKING BARGE
/fY.CAVATED SPOLSAREA
SPOILS MATERIAL
TO BE EXCAVATED
'TEMPORARY H-PILE TO SECURE
1\JRBIDITY CURTAINS
TURBIDITY CURTAIN/ ._____ _
TURBIDITY BARRIER DETAIL
NOTTO SCALE
0
N
5 /16" GALV. CABLE SHEATHED IN PVC
II.
POLYETHYLENE FLOATION
0
cD
.,...
1 SET OF VERTICAL SEAMS BETWEEN EACH
FLOATATION SEGMENT TO ALLOW FOR
STOWAGE AND TO RETAIN FLOAT POISTION
·.....
·.....
BOOM ELEVATION
BOOM SECTION
NOTTO SCALE
NOTTO SCALE
MOUNTING PLATE
(SEE CONNECTION NOTES)
SLIDE STOP BOLTS
(TOP & BOTIOM)
/
c;::::::;;:;;::~:::ri~GUSSET
CONTOURED DELRON WHEELS
.............._ -BEARING BOLT
OOSSET//
~ -........._SLOTIED SS PIPE
_......-'E l~--...._CURTAIN CONNECTER PLATE
~SS BOLTS & NUTS
CURTAIN WALL - - - -
SS BACKUP PLATE
SLOTIED SS PIPE
TOP VIEW
NOTTO SCALE
0
SIDE VIEW
FRONT VIEW
NOTTO SCALE
NOTTO SCALE
CONNECTION NOTES:
1. WELD PLATE TO EXISTING OR NEW SHEET PILING.
2. ATTACH WITH EPOXY ANCHOR BOLTS TO
EXISTING CONCRETE BULKHEAD AS APPLICABLE.
20
19 OF
APPROX EXISTING
WATERWAY BOTTOM
+5.00
+5.00
0.00
0.00
-5.00
-5.00
-10.00
-10.00
-15.00
-15.00
UPLAND EXCAVATION
-20.00
300'
200'
100'
0'
DREDGING
100'
200'
300'
-20.00
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/17
MLLW
SHEET:
TOP OF EXISTING WALL
(TO BE REMOVED AFTER DREDGING
OPERATIONS)
32.5' OFFSET
FROM NBE OF ICW
DREDGE SECTIONS
PROPOSED BASIN WALL
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATUM:
APPROXIMATE LIMITS OF
INTRACOASTAL WATERWAY
PROPOSED LIMITS OF
DREDGING
SECTION A-A
HORZ. SCALE: 1"=100'
VERT. SCALE: 1"=20'
APPROXIMATE LIMITS OF
INTRACOASTAL WATERWAY
32.5' OFFSET
FROM NBE OF ICW
TOP OF EXISTING WALL
APPROX EXISTING
WATERWAY BOTTOM
+5.00
0.00
0.00
-5.00
-5.00
-10.00
-10.00
-15.00
-15.00
-20.00
300'
200'
DREDGING
SECTION B-B
HORZ. SCALE: 1"=100'
VERT. SCALE: 1"=20'
100'
0'
PROPOSED LIMITS OF
DREDGING
-20.00
777 SOUTH FLAGLER DR., SUITE 800-WEST TOWER
WEST PALM BEACH, FL 33401
P: 269 932 4502
F: 269 932 3542
+5.00
.
----__rn
P: 289 932 4502
F: 289 932 3542
7TT SOUTH FLAGLER D~J. ~UITE 800-WEST TOWER
WEST PALM BEACH, FL 4"401
Edge~~~~r
\
\
\ \
- --.
\
-----ll~ll:!!"=~==:::::IL-
\
\
\
\
\
\
____\ \
(
APPLICANT:
WATERWAY:
CITY:
COUNTY:
DATE:
DATIJM:
CITY OF FT. LAUDERDALE
INTRACOASTAL WATERWAY
FT. LAUDERDALE
BROWARD
10/17/2017
MLLW
SHEET: 20 OF 20
LAS Ol.A9 MARINA- PROPOSED SUBMER0ED LANDS LEASE
--~--
------_._,; ,_
a