You can copy from here when filling out the rest of the page.
PLACEMENT OF FILL FOR THE CONSTRUCTION OF THE BETHANY CHURCH IN LIVINGSTON PARISH
NAME OF APPLICANT: Bethany Church, c/o D & S Environmental Services, Inc., Attn: David Templet, P.O. Box 510, French Settlement, Louisiana 70733.
LOCATION OF WORK: Section 47, T6S-R3E, approximately 0.7 mile north of I-12 on Juban Road, in Denham Springs, Louisiana, in Livingston Parish, within the Lake Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings.
The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and deposit fill to construct and maintain a church facility to include one commercial building with parking, sidewalks, green space, ingress/egress access, and three storm water detention ponds. Approximately 0.68 acre of wetlands onsite have been impacted by clearing activities which included redistribution of native soil. Approximately 5,510 cubic yards of earthen material, lime treated base, concrete, and stone rip-rap would be hauled in and deposited to achieve required grade elevation requirements. The proposed project is situated on an approximate 9.5-acre tract that has been determined to contain approximately 3.9 acres of forested and herbaceous wetlands. All 3.9 acres of wetlands would be used in construction of the proposed church.
A Preliminary analysis has determined that the proposed project would directly impact approximately 3.9 acres of forested and herbaceous wetlands.
The applicant stated that they have designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of the property and, therefore deem the project impracticable. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.
The applicant may be required to fully or partially restore the project site to pre-project conditions, if issuance of a permit is determined to be contrary to the overall public interest.
JOINT PUBLIC NOTICE
December 18, 2017
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1301
Project Manager
Neil T. Gauthier
Neil.T.Gauthier@usace.army.mil
MVN 2016-00855-CM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
171214-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [ ] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section
404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the
Clean Water Act.
PLACEMENT OF FILL FOR THE CONSTRUCTION OF THE BETHANY CHURCH IN
LIVINGSTON PARISH
NAME OF APPLICANT: Bethany Church, c/o D & S Environmental Services, Inc., Attn:
David Templet, P.O. Box 510, French Settlement, Louisiana 70733.
LOCATION OF WORK: Section 47, T6S-R3E, approximately 0.7 mile north of I-12 on
Juban Road, in Denham Springs, Louisiana, in Livingston Parish, within the Lake
Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached
drawings.
The work described below was partially completed prior to obtaining a Department of the
Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues
concerning the unauthorized work have since been deferred.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to clear, grade, excavate, and deposit fill to construct and maintain a church
facility to include one commercial building with parking, sidewalks, green space,
ingress/egress access, and three storm water detention ponds. Approximately 0.68 acre
of wetlands onsite have been impacted by clearing activities which included redistribution
of native soil. Approximately 5,510 cubic yards of earthen material, lime treated base,
concrete, and stone rip-rap would be hauled in and deposited to achieve required grade
2
elevation requirements. The proposed project is situated on an approximate 9.5-acre tract
that has been determined to contain approximately 3.9 acres of forested and herbaceous
wetlands. All 3.9 acres of wetlands would be used in construction of the proposed church.
A Preliminary analysis has determined that the proposed project would directly impact
approximately 3.9 acres of forested and herbaceous wetlands.
The applicant stated that they have designed the project to avoid and minimize direct and
secondary adverse impacts to the maximum extent practicable. Any further reduction
would limit usage of the property and, therefore deem the project impracticable. As
compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind
wetland credits from a Corps approved mitigation bank located in the watershed.
The applicant may be required to fully or partially restore the project site to pre-project
conditions, if issuance of a permit is determined to be contrary to the overall public interest.
The comment period for the Department of Army will close in 20 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and be
mailed to the Louisiana Department of Environmental Quality at the address above.
Individuals or parties may request an extension of time in which to comment on the
proposed work by writing or e-mailing the Corps of Engineers Project Manager listed
above. Any request must be specific and substantively supportive of the requested
extension, and received by this office prior to the end of the initial comment period. The
Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a
total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns, wetlands,
3
historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and State
Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Interior. Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that the proposed
activity would have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
4
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
For
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
(JUBAN ROAD)
LA HWY 1026
U.S. HWY
190
(FLORIDA
BOULEVA
RD)
LA HW
Y 1026
(JUBAN
RO AD)
SITE LOCATION
(PETE'S HWY.)
REALIGNED PORTION
OF JUBAN ROAD
LA HWY 16
(RANGE AVENUE)
LA HWY 3002
TATE ROAD
12
ATE
T
S
ER
INT
TE
LAT
FORREST
.
RD
DE
Bethany Church
2,000'
0
2,000'
Scale: 1'' = 2,000'
Notes
Property is located in Section 47, T-6-S, R-3-E
Bethany Church - Livingston Campus
Vicinity Map
Livingston Parish, Louisiana
Reference
Base map comprised of U.S.G.S. 7.5 minute topographic map "Denham Springs, LA".
29-2017-DOA
07-27-2017
1
C
C'
GRAYS
CREEK
LATERAL
Notes
OTHER WATERS
OF THE U.S. TO
BE IMPACTED BY
CONSTRUCTION
The proposed layout was provided by McLin Taylor, Inc.
2.
Jurisdictional Wetlands and Other Waters Of The U.S.
obtained from U.S. Army CORPS of Engineers
Jurisdictional Determination Account Numbers
MVN-2016-00855-SJ and MVN-2016-00855-1.
3.
According to F.E.M.A. F.I.R.M. Community Panel No.
220113 0210E dated 4-3-2012, this property falls in
Zone X :Areas determined to be outside the 0.2% annual
chance floodplain & Flood Zone AE: Special flood
hazard areas (SFHAs) subject to inundated by the 1%
annual chance flood (Base Flood Elevations
4.
Wetland Impacts by habitat type:
> Bottomland Hardwood = 1.53 Acres
> Herbaceous = 2.33 Acres
INGRESS/EGRESS ACCESS
AND PARKING
(6" CONCRETE)(TYPICAL)
OAD
)
B
910'
0.49
mi. T
U.S
O
(FLO . HWY
1
RID
A BL 90
VD.)
~~~~~ RESIDENCE ~~~~
CHURCH BUILDING
(30,404 SQ FT)
SIDEWALK (CONCRETE)
(TYPICAL)
AN R
STORMWATER
DETENTION POND
(JUB
LA H
WY
JURISDICTIONAL
WETLANDS
TO BE FILLED
1026
327'
741'
12" STORM
DRAIN PIPE
A
A'
OUTFALL
DITCH
210'
8" STORM
DRAIN PIPE
CONCRETE
WEIR
STORMWATER
DETENTION POND
Bethany Church
618'
~~~~~ RESIDENCE ~~~~
B'
Legend
CONCRETE
WEIR
0.7
INTE 3 mi. TO
RST
ATE
12
222'
STORMWATER
DETENTION POND
Total Proposed Fill
INGRESS/EGRESS ACCESS
AND PARKING
(6" CONCRETE)(TYPICAL)
221'
1.
Approximately 1,872.57 Cubic Yards of Earthen Material.
Approximately 1,920.68 Cubic Yards of Compacted Lime Treated Base.
Approximately 1,633.82 Cubic Yards of Concrete.
Approximately 80.67 Cubic Yards of #50 Stone Rip-Rap
25'
Bethany Church - Livingston Campus
12" STORM
DRAIN PIPE
~~~~~ BUSINESS ~~~~
Property Boundary (9.45 Acres)
Total Other Waters Of The U.S. (0.01 Acres)
Non-Wetlands (5.58 Acres)
Other Waters Of The U.S. To Be Impacted
By Construction (0.01 Acres)
Total Jurisdictional Wetlands (3.86 Acres)
Jurisdictional Wetlands To Be Filled (2.92 Acres)
Jurisdictional Wetlands To Be Excavated (0.94 Acres)
125'
0
Horizontal Scale: 1'' = 125'
Proposed Plan View
Livingston Parish, Louisiana
125'
29-2017-DOA
07-27-2017
2
A
45
45
44
44
40
39
43
INGRESS/EGRESS
ACCESS AND
PARKING (6" CONCRETE)
(TYPICAL)
MEDIAN
GREEN SPACE
(TYPICAL)
42
38
37
36
35
34
33
32
31
30
NON-WETLAND
NATURAL GROUND
EARTHEN MATERIAL
JURISDICTIONAL
WETLANDS
TO BE EXCAVATED
PROPOSED
OUTFALL
DITCH
8" COMPACTED LIME TREATED
BASE (TYPICAL)
8" COMPACTED LIME TREATED
BASE (TYPICAL)
39
38
37
36
35
33
32
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
JURISDICTIONAL WETLANDS
TO BE FILLED
40
34
JURISDICTIONAL WETLANDS
TO BE FILLED
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
41
Elevation, N.G.V.D.
41
GREEN SPACE
(TYPICAL)
INGRESS/EGRESS
ACCESS AND
PARKING (6" CONCRETE)
(TYPICAL)
MATCH LINE - SEE FIGURE 4
42
PROPERTY
LINE
Elevation, N.G.V.D.
43
31
Section A-A'
30
Horizontal Scale: 1" = 40'
Vertical Scale: 1" = 4'
40'
Notes
1.
The proposed layout was provided by McLin Taylor, Inc.
2.
Jurisdictional Wetlands and Other Waters Of The U.S. obtained from U.S. Army CORPS of
Engineers Jurisdictional Determination Account Numbers MVN-2016-00855-SJ and
MVN-2016-00855-1.
3.
According to F.E.M.A. F.I.R.M. Community Panel No. 220113 0210E dated 4-3-2012, this
property falls in Zone X :Areas determined to be outside the 0.2% annual chance floodplain &
Flood Zone AE: Special flood hazard areas (SFHAs) subject to inundated by the 1% annual
0
40'
Horizontal Scale: 1'' = 40'
Bethany Church
Legend
Earthen Material
Compacted Lime Treated Base
Bethany Church - Livingston Campus
Section View A-A'
Concrete
4.
Non-wetland natural ground elevations average 51'-6" N.G.V.D. Elevation data was obtained
from topographic data provided by Alvin Fairburn & Associates, LLC Drainage Impact Study.
5.
Natural Ground elevations in existing jurisdictional wetlands are approximately 6" lower than
adjacent non-wetland ground elevations.
Livingston Parish, Louisiana
29-2017-DOA
07-27-2017
3
45
45
44
44
41
40
39
38
37
36
35
CHURCH BUILDING
(12" CONCRETE)
(TYPICAL)
GREEN SPACE
(TYPICAL)
GREEN SPACE
(TYPICAL)
42
GREEN SPACE
(TYPICAL)
NON-WETLAND
NATURAL GROUND
NON-WETLAND
NATURAL GROUND
34
EARTHEN MATERIAL
8" COMPACTED
LIME TREATED
BASE (TYPICAL)
8" COMPACTED LIME TREATED
BASE (TYPICAL)
33
JURISDICTIONAL WETLANDS
TO BE FILLED
32
STORMWATER
DETENTION POND
39
38
37
36
35
33
32
31
Section A-A'
30
40
34
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
31
41
Elevation, N.G.V.D.
42
43
INGRESS/EGRESS
ACCESS AND
PARKING (6" CONCRETE)
(TYPICAL)
MATCH LINE - SEE FIGURE 5
INGRESS/EGRESS
ACCESS AND
PARKING (6" CONCRETE)
(TYPICAL)
MATCH LINE - SEE FIGURE 3
Elevation, N.G.V.D.
43
30
Horizontal Scale: 1" = 40'
Vertical Scale: 1" = 4'
40'
Notes
1.
The proposed layout was provided by McLin Taylor, Inc.
2.
Jurisdictional Wetlands and Other Waters Of The U.S. obtained from U.S. Army CORPS of
Engineers Jurisdictional Determination Account Numbers MVN-2016-00855-SJ and
MVN-2016-00855-1.
3.
According to F.E.M.A. F.I.R.M. Community Panel No. 220113 0210E dated 4-3-2012, this
property falls in Zone X :Areas determined to be outside the 0.2% annual chance floodplain &
Flood Zone AE: Special flood hazard areas (SFHAs) subject to inundated by the 1% annual
0
Horizontal Scale: 1'' = 40'
Bethany Church
Legend
Earthen Material
Compacted Lime Treated Base
Concrete
4.
Non-wetland natural ground elevations average 51'-6" N.G.V.D. Elevation data was obtained
from topographic data provided by Alvin Fairburn & Associates, LLC Drainage Impact Study.
5.
Natural Ground elevations in existing jurisdictional wetlands are approximately 6" lower than
adjacent non-wetland ground elevations.
40'
Bethany Church - Livingston Campus
Section View A-A'
(Continued)
Livingston Parish, Louisiana
29-2017-DOA
07-27-2017
4
44
44
43
43
42
42
40
39
38
37
36
35
34
41
PROPERTY
LINE
41
CONCRETE
WEIR
40
39
38
37
36
Elevation, N.G.V.D.
45
MATCH LINE - SEE FIGURE 4
Elevation, N.G.V.D.
A'
45
35
34
STORMWATER
DETENTION POND
33
32
31
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
JURISDICTIONAL WETLANDS
TO BE EXCAVATED
33
32
JURISDICTIONAL WETLANDS
TO BE FILLED
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
31
Section A-A'
30
30
Horizontal Scale: 1" = 40'
Vertical Scale: 1" = 4'
40'
Notes
1.
The proposed layout was provided by McLin Taylor, Inc.
2.
Jurisdictional Wetlands and Other Waters Of The U.S. obtained from U.S. Army CORPS of
Engineers Jurisdictional Determination Account Numbers MVN-2016-00855-SJ and
MVN-2016-00855-1.
3.
According to F.E.M.A. F.I.R.M. Community Panel No. 220113 0210E dated 4-3-2012, this
property falls in Zone X :Areas determined to be outside the 0.2% annual chance floodplain &
Flood Zone AE: Special flood hazard areas (SFHAs) subject to inundated by the 1% annual
4.
Non-wetland natural ground elevations average 51'-6" N.G.V.D. Elevation data was obtained
from topographic data provided by Alvin Fairburn & Associates, LLC Drainage Impact Study.
5.
Natural Ground elevations in existing jurisdictional wetlands are approximately 6" lower than
adjacent non-wetland ground elevations.
0
40'
Horizontal Scale: 1'' = 40'
Bethany Church
Legend
Concrete
Bethany Church - Livingston Campus
Section View A-A'
(Continued)
Livingston Parish, Louisiana
29-2017-DOA
07-27-2017
5
B
45
45
INGRESS/EGRESS
ACCESS AND
PARKING (6" CONCRETE)
(TYPICAL)
41
40
39
GREEN
SPACE
(TYPICAL)
43
42
SIDEWALK
(6" CONCRETE)
(TYPICAL)
CHURCH BUILDING
(12" CONCRETE)
(TYPICAL)
GREEN
SPACE
(TYPICAL)
38
37
36
EARTHEN MATERIAL
35
34
8" COMPACTED
LIME TREATED
BASE (TYPICAL)
8" COMPACTED
LIME TREATED
BASE (TYPICAL)
NON-WETLAND
NATURAL GROUND
41
40
39
38
37
36
Elevation, N.G.V.D.
42
PROPERTY
LINE
Elevation, N.G.V.D.
43
44
MATCH LINE - SEE FIGURE 7
44
35
34
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
33
32
33
32
JURISDICTIONAL WETLANDS
TO BE FILLED
31
31
Section B-B'
30
30
Horizontal Scale: 1" = 40'
Vertical Scale: 1" = 4'
40'
Notes
1.
The proposed layout was provided by McLin Taylor, Inc.
2.
Jurisdictional Wetlands and Other Waters Of The U.S. obtained from U.S. Army CORPS of
Engineers Jurisdictional Determination Account Numbers MVN-2016-00855-SJ and
MVN-2016-00855-1.
3.
According to F.E.M.A. F.I.R.M. Community Panel No. 220113 0210E dated 4-3-2012, this
property falls in Zone X :Areas determined to be outside the 0.2% annual chance floodplain &
Flood Zone AE: Special flood hazard areas (SFHAs) subject to inundated by the 1% annual
0
40'
Horizontal Scale: 1'' = 40'
Bethany Church
Legend
Earthen Material
Compacted Lime Treated Base
Bethany Church - Livingston Campus
Section View B-B'
Concrete
4.
Non-wetland natural ground elevations average 51'-6" N.G.V.D. Elevation data was obtained
from topographic data provided by Alvin Fairburn & Associates, LLC Drainage Impact Study.
5.
Natural Ground elevations in existing jurisdictional wetlands are approximately 6" lower than
adjacent non-wetland ground elevations.
Livingston Parish, Louisiana
29-2017-DOA
07-27-2017
6
B'
45
45
44
44
CHURCH BUILDING
(12" CONCRETE)
(TYPICAL)
43
40
39
38
37
36
35
GREEN
SPACE
(TYPICAL)
GREEN SPACE
(TYPICAL)
GREEN SPACE
(TYPICAL)
41
PROPERTY
LINE
41
42
INGRESS/EGRESS
ACCESS AND
PARKING (6" CONCRETE)
(TYPICAL)
40
39
38
37
EARTHEN
MATERIAL
34
36
NON-WETLAND
NATURAL GROUND
Elevation, N.G.V.D.
42
MATCH LINE - SEE FIGURE 6
Elevation, N.G.V.D.
43
35
8" COMPACTED
LIME TREATED
BASE (TYPICAL)
STORMWATER
DETENTION POND
34
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
33
33
JURISDICTIONAL WETLANDS
TO BE EXCAVATED
32
32
31
31
Section B-B'
30
30
Horizontal Scale: 1" = 40'
Vertical Scale: 1" = 4'
40'
Notes
1.
The proposed layout was provided by McLin Taylor, Inc.
2.
Jurisdictional Wetlands and Other Waters Of The U.S. obtained from U.S. Army CORPS of
Engineers Jurisdictional Determination Account Numbers MVN-2016-00855-SJ and
MVN-2016-00855-1.
3.
According to F.E.M.A. F.I.R.M. Community Panel No. 220113 0210E dated 4-3-2012, this
property falls in Zone X :Areas determined to be outside the 0.2% annual chance floodplain &
Flood Zone AE: Special flood hazard areas (SFHAs) subject to inundated by the 1% annual
0
Horizontal Scale: 1'' = 40'
Bethany Church
Legend
Earthen Material
Compacted Lime Treated Base
Concrete
4.
Non-wetland natural ground elevations average 51'-6" N.G.V.D. Elevation data was obtained
from topographic data provided by Alvin Fairburn & Associates, LLC Drainage Impact Study.
5.
Natural Ground elevations in existing jurisdictional wetlands are approximately 6" lower than
adjacent non-wetland ground elevations.
40'
Bethany Church - Livingston Campus
Section View B-B'
(Continued)
Livingston Parish, Louisiana
29-2017-DOA
07-27-2017
7
C'
50
45
45
RIP-RAP EROSION CONTROL
(#50 STONE) (TYPICAL)
40
40
OHWM
35
35
2'-6"
OLWM
30
PROPOSED
OUTFALL DITCH
GRAYS CREEK
LATERAL
25
30
Elevation, N.G.V.D.
Elevation, N.G.V.D.
C
50
JURISDICTIONAL WETLANDS
NATURAL GROUND (SEE NOTE 5)
OTHER WATERS
OF THE U.S. TO
BE IMPACTED
BY CONSTRUCTION
25
JURISDICTIONAL WETLANDS
TO BE EXCAVATED
Section C-C'
20
20
Horizontal Scale: 1" = 10'
Vertical Scale: 1" = 10'
10'
Notes
1.
The proposed layout was provided by McLin Taylor, Inc.
2.
Jurisdictional Wetlands and Other Waters Of The U.S. obtained from U.S. Army CORPS of
Engineers Jurisdictional Determination Account Numbers MVN-2016-00855-SJ and
MVN-2016-00855-1.
3.
According to F.E.M.A. F.I.R.M. Community Panel No. 220113 0210E dated 4-3-2012, this
property falls in Zone X :Areas determined to be outside the 0.2% annual chance floodplain &
Flood Zone AE: Special flood hazard areas (SFHAs) subject to inundated by the 1% annual
4.
Non-wetland natural ground elevations average 51'-6" N.G.V.D. Elevation data was obtained
from topographic data provided by Alvin Fairburn & Associates, LLC Drainage Impact Study.
5.
Natural Ground elevations in existing jurisdictional wetlands are approximately 6" lower than
adjacent non-wetland ground elevations.
0
10'
Horizontal Scale: 1'' = 10'
Bethany Church
Legend
#50 Stone Rip-Rap
OHWM
Ordinary High Water Mark
OLWM
Ordinary Low Water Mark
Bethany Church - Livingston Campus
Section View C-C'
Livingston Parish, Louisiana
29-2017-DOA
07-27-2017
8