You can copy from here when filling out the rest of the page.
Walton County. CR 83 Business Storage, LLC, Mr. Blair Schmidt-Fellner. Atlanta, Georgia.
PROJECT PURPOSE:
Basic: Commercial Development
Overall: Construct a business storage facility in south Walton County.
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT: CR 83 Business Storage, LLC.
c/o: Blair Schmidt-Fellner
275 King Road
Atlanta, Georgia 30342
WATERWAY AND LOCATION: The project site is located on the west side of County Road 83, approximately 0.28 mile south of U.S. Highway 98, within Section 36, Township 2 South, Range 20 West, Walton County Florida.
Directions to the site are as follows: From Pensacola, travel east on U.S. Highway 98 approximately 64 miles to County Road 83. Turn south on County Road 83 and travel for approximately 0.28 mile and the site is on the west side of the road.
APPROXIMATE CENTRAL COORDINATES: Latitude: 30.365058°
Longitude: -86.198016°
PROJECT PURPOSE:
Basic: Commercial Development
Overall: Construct a business storage facility in south Walton County.
EXISTING CONDITIONS: The wetland system consists of a freshwater palustrine system. The site has historically been used for silviculture with the current pines being planted on elevated bed rows. The onsite vegetation consists of slash pine (Pinus elliottii), bitter gallberry (Ilex glabra), sweet gallberry (Ilex coriacea) and pepperbush (Clethra alnifolia). The existing area surrounding the project area consists of large undeveloped parcels and the Point Washington State Forest. Additionally, the site contains one 0.043-acre isolated wetland.
PROPOSED WORK: The applicant seeks authorization to fill 2.84 acres of wetlands for the construction of a business storage facility and associated infrastructure.
AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:
The proposed impacts have been limited to 2.84 acres of direct wetland impacts, of the 4.36 acres of wetlands onsite. The remaining 1.48 acres of wetlands would remain in their natural state. Additionally, the applicant will implement best management practices to avoid sedimentation and water quality degradation.
COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:
To offset direct and secondary impacts, the applicant proposes purchase 1.54 palustrine credits from Devil’s Swamp Mitigation Bank.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposal would have no effect on any listed threatened or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 2.84 acres of palustrine wetlands adjacent to and contiguous with tidal waters utilized by various life stages of black grouper, gray snapper, red drum, and penaid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.
COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Pensacola Permits Section, 41 North Jefferson Street, Suite 301, Pensacola, Florida 32502 within 21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager, Steve Andrews Jr., in writing at the Pensacola Permits Section, 41 North Jefferson Street, Suite 301, Pensacola, Florida 32502, by electronic mail at stephen.w.andrews@usace.army.mil, by fax at (850) 433-8160, or by telephone at (850) 439-0707.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
PENSACOLA REGULATORY OFFICE
41 NORTH JEFFERSON STREET, SUIT 301
PENSACOLA, FLORIDA 32502
REPLY TO
ATTENTION OF
December 18, 2017
Regulatory Division
North Branch
Pensacola Permits Section
PUBLIC NOTICE
Permit Application No. SAJ-2016-01924 (SP-SWA)
TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of
Engineers (Corps) has received an application for a Department of the Army permit
pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:
APPLICANT:
CR 83 Business Storage, LLC.
c/o: Blair Schmidt-Fellner
275 King Road
Atlanta, Georgia 30342
WATERWAY AND LOCATION: The project site is located on the west side of County
Road 83, approximately 0.28 mile south of U.S. Highway 98, within Section 36,
Township 2 South, Range 20 West, Walton County Florida.
Directions to the site are as follows: From Pensacola, travel east on U.S. Highway 98
approximately 64 miles to County Road 83. Turn south on County Road 83 and travel
for approximately 0.28 mile and the site is on the west side of the road.
APPROXIMATE CENTRAL COORDINATES: Latitude:
30.365058°
Longitude: -86.198016°
PROJECT PURPOSE:
Basic: Commercial Development
Overall: Construct a business storage facility in south Walton County.
EXISTING CONDITIONS: The wetland system consists of a freshwater palustrine
system. The site has historically been used for silviculture with the current pines being
planted on elevated bed rows. The onsite vegetation consists of slash pine (Pinus
elliottii), bitter gallberry (Ilex glabra), sweet gallberry (Ilex coriacea) and pepperbush
(Clethra alnifolia). The existing area surrounding the project area consists of large
undeveloped parcels and the Point Washington State Forest. Additionally, the site
contains one 0.043-acre isolated wetland.
PROPOSED WORK: The applicant seeks authorization to fill 2.84 acres of wetlands for
the construction of a business storage facility and associated infrastructure.
AVOIDANCE AND MINIMIZATION INFORMATION The applicant has provided the
following information in support of efforts to avoid and/or minimize impacts to the
aquatic environment:
The proposed impacts have been limited to 2.84 acres of direct wetland impacts, of the
4.36 acres of wetlands onsite. The remaining 1.48 acres of wetlands would remain in
their natural state. Additionally, the applicant will implement best management
practices to avoid sedimentation and water quality degradation.
COMPENSATORY MITIGATION The applicant has offered the following
compensatory mitigation plan to offset unavoidable functional loss to the aquatic
environment:
To offset direct and secondary impacts, the applicant proposes purchase 1.54
palustrine credits from Devil's Swamp Mitigation Bank.
CULTURAL RESOURCES: The Corps is not aware of any known historic properties
within the permit area. By copy of this public notice, the Corps is providing information
for review. Our final determination relative to historic resource impacts is subject to
review by and coordination with the State Historic Preservation Officer and those
federally recognized tribes with concerns in Florida and the Permit Area.
ENDANGERED SPECIES: The Corps has determined the proposal would have no
effect on any listed threatened or endangered species or designated critical habitat.
ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National
Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery
Conservation and Management Act 1996. The proposal would impact approximately
2.84 acres of palustrine wetlands adjacent to and contiguous with tidal waters utilized by
various life stages of black grouper, gray snapper, red drum, and penaid shrimp. Our
initial determination is that the proposed action would not have a substantial adverse
impact on EFH or Federally managed fisheries in the Gulf of Mexico. Our final
determination relative to project impacts and the need for mitigation measures is subject
to review by and coordination with the National Marine Fisheries Service.
NOTE: This public notice is being issued based on information furnished by the
applicant. This information has not been verified or evaluated to ensure compliance
with laws and regulation governing the regulatory program. The jurisdictional line has
been verified by Corps personnel.
AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be
required from the Florida Department of Environmental Protection and/or one of the
state Water Management Districts.
2
COMMENTS regarding the potential authorization of the work proposed should be
submitted in writing to the attention of the District Engineer through the Pensacola
Permits Section, 41 North Jefferson Street, Suite 301, Pensacola, Florida 32502 within
21 days from the date of this notice.
The decision whether to issue or deny this permit application will be based on the
information received from this public notice and the evaluation of the probable impact to
the associated wetlands. This is based on an analysis of the applicant's avoidance and
minimization efforts for the project, as well as the compensatory mitigation proposed.
QUESTIONS concerning this application should be directed to the project manager,
Steve Andrews Jr., in writing at the Pensacola Permits Section, 41 North Jefferson
Street, Suite 301, Pensacola, Florida 32502, by electronic mail at
stephen.w.andrews@usace.army.mil, by fax at (850) 433-8160, or by telephone at (850)
439-0707.
IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife
Service, Environmental Protection Agency (EPA), the National Marine Fisheries
Services, and other Federal, State, and local agencies, environmental groups, and
concerned citizens generally yields pertinent environmental information that is
instrumental in determining the impact the proposed action will have on the natural
resources of the area.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of
the probable impact including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefits, which reasonably may be expected to accrue from
the proposal, must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including cumulative
impacts thereof; among these are conservation, economics, esthetics, general
environmental concerns, wetlands, historical properties, fish and wildlife values, flood
hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food,
and fiber production, mineral needs, considerations of property ownership, and in
general, the needs and welfare of the people. Evaluation of the impact of the activity on
the public interest will also include application of the guidelines promulgated by the
Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the
criteria established under authority of Section 102(a) of the Marine Protection Research
and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be
contrary to the public interest.
The US Army Corps of Engineers (Corps) is soliciting comments from the public;
Federal, State, and local agencies and officials; Indian Tribes; and other Interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the Corps to determine whether to issue,
modify, condition, or deny a permit for this proposal. To make this determination,
3
comments are used to assess impacts to endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval
constitutes compliance with the approved Coastal Zone Management Plan. In Puerto
Rico, a Coastal Zone Management Consistency Concurrence is required from the
Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and
Natural Resources permit constitutes compliance with the Coastal Zone Management
Plan.
REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The
request must be submitted in writing to the District Engineer within the designated
comment period of the notice and must state the specific reasons for requesting the
public hearing.
4
"C
a:
Santa Rosa
Beach
ccg
E
...
Cl
0
~
~
Qi
2
t:
cg
!ii
.E
:c
Cb
;;:;
<
~
::D
11.
Chat Holley Rd
z
("")
0
I
~
'<
w
,.........
'°w
M
c:n
CW')
--
OJ
ID
"<
...0
(ill
E Point Washington
~
:r
0
c:
u
·~
CJ)
+-
c
::i
0
~
QI
.2
al
"O
0
W County\°'~
Point
Washington
'!,~
State Forest
Cl
Grayton Beach
State Park
Outstanding
Fforida Water
ic-i
j
Q.
'O
la
~ 1---~~~~~~~~~~~~~~~~~~~~~~~~~~~___::::=----___:~~~~~~::...._~~~~~~~~--.:.'.~~---l
~
-.;
g>
!
_J
~
Ci5
ill
~
'ill
dl
l6
a:
(.)
~
LE GAL DESCRIPTION
LOT 10, SECTION 36, TOWNSHIP 2 SOUTH, RANGE 20 WEST, SANTA ROSA PLANTATION,
ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 2, PAGE 4, OF THE
PUBLIC RECORDS OF WALTON COUNTY, FLORIDA.
i6
I
·o
~
c
i})
!!
SHEET INDEX
DRAWING SHEET TITLE
1
C01
LOCATION MAP
WETLANDS SURVEY
2
C02
WETLAND IMPACTS
3
C03
4
C04
CROSS SECTION
CLIENT INFORMATION
CR 83 BUSINESS STORAGE, LLC
275 KING ROAD
ATLANTA, GA 30342
PHONE: (404) 841-6501
EMAIL: BLAJRSF@MINDSPRING.COM
~ t--~~~~~~~~~~~~~~~~~~~--.~~~~~~~~~~~~~~~~~~~~~~~~~~~~----l
I
;<
"-'
~ ~~~~~~4~~1~INE~~~~~~~~:
/..)
~
PHONESS0.837.2448
FAX 850.837.2450
PHONE SS0.678.51 41
FAX 850.729.2460
C.R.
83 LIGHT INDUSTRIAL D~:.B~;~s;;~RA;E, LLC
D~:W\Ng~~:B:~
7
SHEET NUMBER
~l'--~~~~~c_.o_._A_N_o_.~
~21~-~L_
.s_.N_o_._
Bo_a1~~'--LO~C_A_T_l_O_N~M_A~P~~~~~~~~~~~__J'--~C_0_1~___,
I
I
I
i
I
I
I
I
,
I
I
,
I
I
. ..·,,.-i"... ~ ·
\
I
I
i
i
::;:
Q.
.i
~
.;;
/
,._
-~
/
/
.i
~I
a;
0
0
.,
a:
~
.£
Q)
x
'·'·
::!:
~
\
i
\
\
'·
\
\
\
Cl
\.
\
\
\
ic-i
'·
·'
I
j
Q.
i
..
u
c
I
~
3::
~
I
/;
{/
-.;
g>
/
/
/
·~
g0
_J
~
h
Ci5
ill
~
.ill
dl
l6
a:
u
~
i6
LEGEND
~
~
I·.:.·.... -I PHASE2 EXISTING WETLANDS: 190,075.3 SQ FT. OR 4.36AC.
Ig
~---'I
PHASE 1 DEVELOPMENT: 49,119.0 SQ FT. OR 1.13 AC.
,..
TOTAL SITE AREA: 422,313.6 SQ.FT. OR 9.70 AC.
!!
PHASE 2 SITE AREA: 373, 194.6 SQ.FT. OR 8.57 AC.
CJ)
CD
IL
Q.
::;:
-.;
$
3
(j
~I
g~
0
C .OA NO. 9927
121 HART STREET
NICEVtlLE. FLORIDA 32578
PHONE SS0.678.5141
FAX 850.729.2460
LB. NO. 8081
200'
400'
600'
....-.-----SCALE: 1" = 200'
CR 83 BUSINESS STORAGE, LLC
JENKINS ENGINEERING, INC.
1234 AIRPORT ROAD, SUITE 126
DESTIN. Ft.OAIOA 32541
PHONE 850.837..2448
FAX 850.837.2450
100'
C.R. 83 LIGHT INDUSTRIAL DEV. - PHASE 2
DATE:
MAY 2017
DRAWING NUMBER
2 OF 4
SHEET NUMBER
WETLANDS SURVEY
C02
I
I
I
I
I
I
I
,
,
I
·-·· .
I
I
· ..·=a.."!: ·· ~
........ .
.
I
'·'·
'·
I
I
I
:::;:
i
0..
@
i
I
...c-i
/
~
i
-
/
i
II
Qi
~u..
..
.:.:
'·'
~
i
\
'· \
\
\
\
\
\
\
~
' ·....
":!
'\
·,.
"'~
I
&
i
i
·'
~
~
~
~
c
i
i
.j
e
g
..
-'
~
a
"'~
~
13
a:
0
~
LEGEND
:;::.
I/)
I ..... 1PHASE 2 WETlAND IMPACTS: 125,460 9 SQ.FT. OR 2 88 AC.
~
~
·~
%-
~
x
~
ser
0..
:;;.
~
"'
:;:!.
0
$1
u::
I·.......... J PHASE 2 WETlANDS TO REMAIN : 64,614.4 SQ FT. OR 1.48
.___ __,I PHASE 1DEVELOPMENT: 49,119.0SQ FT. OR 1.13AC.
TOTAL SITE AREA: 422,313.6 SQ.FT. OR 9.70 AC.
0
jf~
PHONE 850.837.2448
FAX 850.837.2450
C.OA NO . 9927
NICEvtlLE. FLORIDA 32578
PHONE 850.678.5141
FAX 850.7292460
L .B . NO. 8 081
600'
400'
SCALE: 1" = 200'
C R 83 BUSIN ESS STORAGE, LLC
JENKINS ENGINEERING, INC.
121 HART STREET
200'
iwr~------
PHASE2 SITE AREA: 373,194.6SQ FT. OR 8.57 AC.
1234 AIRPORT ROAD. SUITE 126
DESTIN. FLORIOA32541
100'
C.R. 83 LIGHT INDUSTRIAL DEV. - PHASE 2
DATE:
MAY 2017
DRAWING NUMBER
3 OF 4
SHEET NUMBER
WETLAND IMPACTS
C03
40
35
30
25
=·
=
=
=
:::.
I
..J:
·-
'
T
-~
20
- -~
15
·1
-·
:·
lfl_Q%-
j
::- ----
f--
_I
-
-'-- ~-
0
C')
...-
~
...-
~ 0
C\I
C\I
"-:
C\I
0
co
~
...- iri
tO
C\I
12+00
0
~ 0
-
C\I
C\I
0
0
C\I
c
~1----
:::
:::
'- ·
I-
:::.
:::
0
tO
C\i iri
C\I
13+00
~
0
0
...- C\I
":
C\I
'...- 14+00
C\I
t--
...-
~ '...- C\I
I
jf~
NICEvtlLE. FLORIDA 32578
PHONE 850.678.5141
FAX 850.837.2450
C.OA NO. 9927
FAX 850.729.2460
-
L.B. NO. 8D81
20
0
0
0
0
C\i C\I
...0
...-
0
t--
C')
C\i iri
C\I
C\I
C\I
16+00
50'
~
C\i iri
C\I
0
0
ct)
C\I
())
C\I
C\I
17+00
100'
200'
300'
iwr~------
I
SCALE: 1" = 100'
CR 83 BUSINESS STORAGE, LLC
JENKINS ENGINEERING, INC.
PHONE 850.837.2448
25
- ~
IHI-
10
15+00
IPHASE 2 WETlAND IMPACTS: 125,4358SQ.FT. OR 288AC.
121 HART STREET
--
:0.89%
15
0
1234 AIRPORT ROAD. SUITE 126
DESTIN. FLORIOA32541
30
·- .
:::
LEGEND
I
35
: --_o_.a§ Y0-
~
:::
10
40
-
-·
C.R. 83 LIGHT INDUSTRIAL DEV. - PHASE 2
DATE:
MAY 2017
DRAWING NUMBER
4 OF 4
SHEET NUMBER
CROSS SECTION
C04