Walton County. CR 83 Business Storage, LLC, Mr. Blair Schmidt-Fellner. Atlanta, Georgia. PROJECT PURPOSE: Basic: Commercial Development Overall: Construct a business storage facility in south Walton County.

TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below:

APPLICANT: CR 83 Business Storage, LLC.

c/o: Blair Schmidt-Fellner

275 King Road

Atlanta, Georgia 30342

WATERWAY AND LOCATION: The project site is located on the west side of County Road 83, approximately 0.28 mile south of U.S. Highway 98, within Section 36, Township 2 South, Range 20 West, Walton County Florida.

Directions to the site are as follows: From Pensacola, travel east on U.S. Highway 98 approximately 64 miles to County Road 83. Turn south on County Road 83 and travel for approximately 0.28 mile and the site is on the west side of the road.

APPROXIMATE CENTRAL COORDINATES: Latitude: 30.365058°

Longitude: -86.198016°

PROJECT PURPOSE:

Basic: Commercial Development

Overall: Construct a business storage facility in south Walton County.

EXISTING CONDITIONS: The wetland system consists of a freshwater palustrine system. The site has historically been used for silviculture with the current pines being planted on elevated bed rows. The onsite vegetation consists of slash pine (Pinus elliottii), bitter gallberry (Ilex glabra), sweet gallberry (Ilex coriacea) and pepperbush (Clethra alnifolia). The existing area surrounding the project area consists of large undeveloped parcels and the Point Washington State Forest. Additionally, the site contains one 0.043-acre isolated wetland.

PROPOSED WORK: The applicant seeks authorization to fill 2.84 acres of wetlands for the construction of a business storage facility and associated infrastructure.

AVOIDANCE AND MINIMIZATION INFORMATION – The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment:

The proposed impacts have been limited to 2.84 acres of direct wetland impacts, of the 4.36 acres of wetlands onsite. The remaining 1.48 acres of wetlands would remain in their natural state. Additionally, the applicant will implement best management practices to avoid sedimentation and water quality degradation.

COMPENSATORY MITIGATION – The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment:

To offset direct and secondary impacts, the applicant proposes purchase 1.54 palustrine credits from Devil’s Swamp Mitigation Bank.

CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area.

ENDANGERED SPECIES: The Corps has determined the proposal would have no effect on any listed threatened or endangered species or designated critical habitat.

ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 2.84 acres of palustrine wetlands adjacent to and contiguous with tidal waters utilized by various life stages of black grouper, gray snapper, red drum, and penaid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service.

NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel.

AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Pensacola Permits Section, 41 North Jefferson Street, Suite 301, Pensacola, Florida 32502 within 21 days from the date of this notice.

The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed.

QUESTIONS concerning this application should be directed to the project manager, Steve Andrews Jr., in writing at the Pensacola Permits Section, 41 North Jefferson Street, Suite 301, Pensacola, Florida 32502, by electronic mail at stephen.w.andrews@usace.army.mil, by fax at (850) 433-8160, or by telephone at (850) 439-0707.

IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest.

The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PENSACOLA REGULATORY OFFICE 41 NORTH JEFFERSON STREET, SUIT 301 PENSACOLA, FLORIDA 32502 REPLY TO ATTENTION OF

December 18, 2017

Regulatory Division North Branch Pensacola Permits Section

PUBLIC NOTICE Permit Application No. SAJ-2016-01924 (SP-SWA) TO WHOM IT MAY CONCERN: The Jacksonville District of the U.S. Army Corps of Engineers (Corps) has received an application for a Department of the Army permit pursuant to Section 404 of the Clean Water Act (33 U.S.C. §1344) as described below: APPLICANT:

CR 83 Business Storage, LLC. c/o: Blair Schmidt-Fellner 275 King Road Atlanta, Georgia 30342

WATERWAY AND LOCATION: The project site is located on the west side of County Road 83, approximately 0.28 mile south of U.S. Highway 98, within Section 36, Township 2 South, Range 20 West, Walton County Florida. Directions to the site are as follows: From Pensacola, travel east on U.S. Highway 98 approximately 64 miles to County Road 83. Turn south on County Road 83 and travel for approximately 0.28 mile and the site is on the west side of the road. APPROXIMATE CENTRAL COORDINATES: Latitude: 30.365058° Longitude: -86.198016° PROJECT PURPOSE: Basic: Commercial Development Overall: Construct a business storage facility in south Walton County. EXISTING CONDITIONS: The wetland system consists of a freshwater palustrine system. The site has historically been used for silviculture with the current pines being planted on elevated bed rows. The onsite vegetation consists of slash pine (Pinus elliottii), bitter gallberry (Ilex glabra), sweet gallberry (Ilex coriacea) and pepperbush (Clethra alnifolia). The existing area surrounding the project area consists of large undeveloped parcels and the Point Washington State Forest. Additionally, the site contains one 0.043-acre isolated wetland. PROPOSED WORK: The applicant seeks authorization to fill 2.84 acres of wetlands for the construction of a business storage facility and associated infrastructure.

AVOIDANCE AND MINIMIZATION INFORMATION ­ The applicant has provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment: The proposed impacts have been limited to 2.84 acres of direct wetland impacts, of the 4.36 acres of wetlands onsite. The remaining 1.48 acres of wetlands would remain in their natural state. Additionally, the applicant will implement best management practices to avoid sedimentation and water quality degradation. COMPENSATORY MITIGATION ­ The applicant has offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: To offset direct and secondary impacts, the applicant proposes purchase 1.54 palustrine credits from Devil's Swamp Mitigation Bank. CULTURAL RESOURCES: The Corps is not aware of any known historic properties within the permit area. By copy of this public notice, the Corps is providing information for review. Our final determination relative to historic resource impacts is subject to review by and coordination with the State Historic Preservation Officer and those federally recognized tribes with concerns in Florida and the Permit Area. ENDANGERED SPECIES: The Corps has determined the proposal would have no effect on any listed threatened or endangered species or designated critical habitat. ESSENTIAL FISH HABITAT (EFH): This notice initiates consultation with the National Marine Fisheries Service on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act 1996. The proposal would impact approximately 2.84 acres of palustrine wetlands adjacent to and contiguous with tidal waters utilized by various life stages of black grouper, gray snapper, red drum, and penaid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or Federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. NOTE: This public notice is being issued based on information furnished by the applicant. This information has not been verified or evaluated to ensure compliance with laws and regulation governing the regulatory program. The jurisdictional line has been verified by Corps personnel. AUTHORIZATION FROM OTHER AGENCIES: Water Quality Certification may be required from the Florida Department of Environmental Protection and/or one of the state Water Management Districts.

2

COMMENTS regarding the potential authorization of the work proposed should be submitted in writing to the attention of the District Engineer through the Pensacola Permits Section, 41 North Jefferson Street, Suite 301, Pensacola, Florida 32502 within 21 days from the date of this notice. The decision whether to issue or deny this permit application will be based on the information received from this public notice and the evaluation of the probable impact to the associated wetlands. This is based on an analysis of the applicant's avoidance and minimization efforts for the project, as well as the compensatory mitigation proposed. QUESTIONS concerning this application should be directed to the project manager, Steve Andrews Jr., in writing at the Pensacola Permits Section, 41 North Jefferson Street, Suite 301, Pensacola, Florida 32502, by electronic mail at stephen.w.andrews@usace.army.mil, by fax at (850) 433-8160, or by telephone at (850) 439-0707. IMPACT ON NATURAL RESOURCES: Coordination with U.S. Fish and Wildlife Service, Environmental Protection Agency (EPA), the National Marine Fisheries Services, and other Federal, State, and local agencies, environmental groups, and concerned citizens generally yields pertinent environmental information that is instrumental in determining the impact the proposed action will have on the natural resources of the area. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, esthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food, and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people. Evaluation of the impact of the activity on the public interest will also include application of the guidelines promulgated by the Administrator, EPA, under authority of Section 404(b) of the Clean Water Act or the criteria established under authority of Section 102(a) of the Marine Protection Research and Sanctuaries Act of 1972. A permit will be granted unless its issuance is found to be contrary to the public interest. The US Army Corps of Engineers (Corps) is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other Interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this determination, 3

comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COASTAL ZONE MANAGEMENT CONSISTENCY: In Florida, the State approval constitutes compliance with the approved Coastal Zone Management Plan. In Puerto Rico, a Coastal Zone Management Consistency Concurrence is required from the Puerto Rico Planning Board. In the Virgin Islands, the Department of Planning and Natural Resources permit constitutes compliance with the Coastal Zone Management Plan. REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

4

"C

a:

Santa Rosa Beach

ccg E

...

Cl

0

~

~

Qi 2

t:

cg

!ii .E

:c Cb ;;:;

< ~ ::D

11.

Chat Holley Rd

z ("")

0

I

~

'<

w

,.........

'°w M

c:n CW')

--

OJ

ID

"<

...0

(ill

E Point Washington

~

:r 0

c:

u

·~

CJ)

+-

c

::i

0

~ QI

.2

al "O

0

W County\°'~

Point Washington

'!,~

State Forest

Cl

Grayton Beach State Park Outstanding Fforida Water

ic-i

j Q.

'O

la

~ 1---~~~~~~~~~~~~~~~~~~~~~~~~~~~___::::=----___:~~~~~~::...._~~~~~~~~--.:.'.~~---l

~

-.;

g>

! _J

~

Ci5

ill ~

'ill

dl l6

a:

(.)

~

LE GAL DESCRIPTION LOT 10, SECTION 36, TOWNSHIP 2 SOUTH, RANGE 20 WEST, SANTA ROSA PLANTATION, ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 2, PAGE 4, OF THE PUBLIC RECORDS OF WALTON COUNTY, FLORIDA.

i6

I ·o

~ c

i})

!!

SHEET INDEX DRAWING SHEET TITLE 1 C01 LOCATION MAP WETLANDS SURVEY 2 C02 WETLAND IMPACTS 3 C03 4 C04 CROSS SECTION

CLIENT INFORMATION CR 83 BUSINESS STORAGE, LLC 275 KING ROAD ATLANTA, GA 30342 PHONE: (404) 841-6501 EMAIL: BLAJRSF@MINDSPRING.COM

~ t--~~~~~~~~~~~~~~~~~~~--.~~~~~~~~~~~~~~~~~~~~~~~~~~~~----l

I ;< "-'

~ ~~~~~~4~~1~INE~~~~~~~~: /..)

~

PHONESS0.837.2448

FAX 850.837.2450

PHONE SS0.678.51 41

FAX 850.729.2460

C.R.

83 LIGHT INDUSTRIAL D~:.B~;~s;;~RA;E, LLC

D~:W\Ng~~:B:~

7

SHEET NUMBER

~l'--~~~~~c_.o_._A_N_o_.~ ~21~-~L_ .s_.N_o_._ Bo_a1~~'--LO~C_A_T_l_O_N~M_A~P~~~~~~~~~~~__J'--~C_0_1~___,

I I I

i

I

I

I I

, I I

, I I

. ..·,,.-i"... ~ ·

\

I

I

i i

::;: Q.

.i

~

.;;

/

,._

-~

/

/

.i

~I

a;

0

0

.,

a: ~

.£ Q)

x

'·'·

::!:

~

\

i \

\

'· \

\ \

Cl

\. \

\

\

ic-i

'· ·' I

j Q.

i

..

u c

I

~

3::

~

I

/; {/

-.;

g>

/

/

/

·~

g0 _J

~

h Ci5

ill ~

.ill

dl l6

a: u

~

i6

LEGEND

~ ~

I·.:.·.... -I PHASE2 EXISTING WETLANDS: 190,075.3 SQ FT. OR 4.36AC.

Ig

~---'I

PHASE 1 DEVELOPMENT: 49,119.0 SQ FT. OR 1.13 AC.

,..

TOTAL SITE AREA: 422,313.6 SQ.FT. OR 9.70 AC.

!!

PHASE 2 SITE AREA: 373, 194.6 SQ.FT. OR 8.57 AC.

CJ)

CD

IL Q. ::;:

-.;

$

3

(j

~I

g~

0

C .OA NO. 9927

121 HART STREET NICEVtlLE. FLORIDA 32578 PHONE SS0.678.5141 FAX 850.729.2460

LB. NO. 8081

200'

400'

600'

....-.-----SCALE: 1" = 200' CR 83 BUSINESS STORAGE, LLC

JENKINS ENGINEERING, INC. 1234 AIRPORT ROAD, SUITE 126 DESTIN. Ft.OAIOA 32541 PHONE 850.837..2448 FAX 850.837.2450

100'

C.R. 83 LIGHT INDUSTRIAL DEV. - PHASE 2

DATE:

MAY 2017

DRAWING NUMBER 2 OF 4 SHEET NUMBER

WETLANDS SURVEY

C02

I I I I

I I I

, , I

·-·· .

I I

· ..·=a.."!: ·· ~

........ .

.

I

'·'· '·

I

I I

:::;:

i

0..

@

i

I

...c-i

/

~

i

-

/

i

II Qi

~u..

..

.:.:

'·'

~

i

\

'· \ \

\

\ \

\ \

~

' ·....

":!

'\

·,.

"'~

I

&

i

i

·'

~

~ ~

~ c

i

i

.j

e

g .. -'

~

a "'~

~

13 a: 0

~

LEGEND

:;::. I/)

I ..... 1PHASE 2 WETlAND IMPACTS: 125,460 9 SQ.FT. OR 2 88 AC.

~ ~

·~

%-

~ x

~

ser 0..

:;;. ~

"' :;:!.

0

$1 u::

I·.......... J PHASE 2 WETlANDS TO REMAIN : 64,614.4 SQ FT. OR 1.48 .___ __,I PHASE 1DEVELOPMENT: 49,119.0SQ FT. OR 1.13AC. TOTAL SITE AREA: 422,313.6 SQ.FT. OR 9.70 AC.

0

jf~

PHONE 850.837.2448 FAX 850.837.2450

C.OA NO . 9927

NICEvtlLE. FLORIDA 32578 PHONE 850.678.5141 FAX 850.7292460

L .B . NO. 8 081

600'

400'

SCALE: 1" = 200' C R 83 BUSIN ESS STORAGE, LLC

JENKINS ENGINEERING, INC. 121 HART STREET

200'

iwr~------

PHASE2 SITE AREA: 373,194.6SQ FT. OR 8.57 AC.

1234 AIRPORT ROAD. SUITE 126 DESTIN. FLORIOA32541

100'

C.R. 83 LIGHT INDUSTRIAL DEV. - PHASE 2

DATE:

MAY 2017

DRAWING NUMBER

3 OF 4 SHEET NUMBER

WETLAND IMPACTS

C03

40 35 30 25

=· =

= =

:::.

I

..J:

·-

'

T -~

20

- -~

15 ·1

-·

:·

lfl_Q%-

j

::- ----

f--

_I

-

-'-- ~-

0

C')

...-

~

...-

~ 0

C\I

C\I

"-: C\I

0

co

~

...- iri

tO

C\I

12+00

0

~ 0

-

C\I

C\I

0 0 C\I

c

~1----

:::

:::

'- ·

I-

:::.

:::

0

tO

C\i iri C\I

13+00

~

0 0

...-

C\I

":

C\I

'

...-

14+00

C\I

t--

...-

~ '

...-

C\I

I

jf~

NICEvtlLE. FLORIDA 32578 PHONE 850.678.5141

FAX 850.837.2450

C.OA NO. 9927

FAX 850.729.2460

-

L.B. NO. 8D81

20

0 0

0 0

C\i

C\I

...0

...-

0 t--

C')

C\i iri C\I C\I

C\I

16+00

50'

~

C\i iri C\I

0 0

ct) C\I

())

C\I

C\I

17+00

100'

200'

300'

iwr~------

I

SCALE: 1" = 100' CR 83 BUSINESS STORAGE, LLC

JENKINS ENGINEERING, INC. PHONE 850.837.2448

25 - ~

IHI-

10

15+00

IPHASE 2 WETlAND IMPACTS: 125,4358SQ.FT. OR 288AC. 121 HART STREET

--

:0.89%

15

0

1234 AIRPORT ROAD. SUITE 126 DESTIN. FLORIOA32541

30

·- .

:::

LEGEND

I

35

: --_o_.a§ Y0-

~

:::

10

40

-

-·

C.R. 83 LIGHT INDUSTRIAL DEV. - PHASE 2

DATE:

MAY 2017

DRAWING NUMBER 4 OF 4 SHEET NUMBER

CROSS SECTION

C04

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas